Flood protection for Hamburg s Niederhafen port. Construction of the new Niederhafen flood protection barrier in Hamburg city centre

Size: px
Start display at page:

Download "Flood protection for Hamburg s Niederhafen port. Construction of the new Niederhafen flood protection barrier in Hamburg city centre"

Transcription

1 Flood protection for Hamburg s Niederhafen port Construction of the new Niederhafen flood protection barrier in Hamburg city centre

2 Construction of the new Niederhafen fl ood protection barrier Plans have been drawn up for the construction of the new flood protection barrier over a length of 625 m at the Niederhafen port between St. Pauli Landungsbrücken and Baumwall. Reason for action Flood protection requires foresighted action. Today s meas urement and calculation methods, computer simulations and scientific findings enable us to analyse storm surges with greater precision and make better forecasts of future flood characteristics. As part of an extensive construction programme, Hamburg is modernising and reinforcing its flood protection barriers in order to increase safety for people, goods and property. Location The Niederhafen flood protection section is an exposed location in Hamburg which includes the city s best-known promenade, a major attraction for tourists from all over Germany and even further afield. The promenade links St. Pauli Landungsbrücken with the historic Speicherstadt warehouse area. As the HafenCity area is developed further, this harbourside promenade will become even more significant. Existing structure The current construction came into being between 1964 and 1968 as part of the modernization of Hamburg s flood protection system in the aftermath of the storm surge in Taking account of traffic planning for the harbourside road and an intended partial shifting of the elevated railway s viaduct, the shoreline was shifted out into the Elbe by up to 20 metres during this period. The barrier structure gives protection up to a height of 7.20 m above sea level (a.s.l.). Both the shoreline and the viaduct follow the historical structural line of the commercial and residential buildings along the streets Vorsetzen and Johannisbollwerk. This results in the distinctive sharp bend in the shoreline at the Niederhafen port about halfway along this stretch, a spot which is emphasised to this day by the fortification from the Second World War. The promenade on top of the flood protection barrier provides an undisturbed view of the Elbe and the port. Below the promenade, parking spaces are provided within the structure itself. A preliminary inspection revealed that significant supporting elements of the present structure are overburdened and that the foundations, in particular, are in need of reinforcement. Increasing the existing barrier s height would be structurally very complex and elaborate, as well as unsatisfactory from a technical point of view. Planning In the Hamburg Architectural Olympics competition in 2006, urban planning requirements for a redevelopment of the installation were formulated as follows: In the last analysis, the intention is that in addition to the flood protection barrier, an attractive promenade should be devel oped in an exposed position in Hamburg. The promenade should be suitable for a variety of uses, function as a high- calibre connecting path, and generate numerous pathway intersections while simultaneously helping to define the cityscape. Picture 1: Plans, aerial photo montage from the west For you. For Hamburg.

3 E l b e N i e d e r h a f e n Site plan: Plans with connecting pathways to the urban residential area Picture 2: Plans, view of Baumwall The plans for the redevelopment work are in conformity with the award-winning design draft prepared by the architecture firm Zaha Hadid, whose central approach is to open up the promenade to the urban surroundings and the water. To achieve this, the linear structure which lies high above street level because of the flood protection system will be hollowed out at the points where streets from the adjacent urban district meet the barrier structure. The solution comprises cone-like insections for stairs whose shapes resemble that of small amphitheatres. In this way, passers-by at street level will have an undisturbed view of the people strolling along the promenade and the masts and superstructures of the ships in the Niederhafen port. Similar stairs will be constructed on the Elbe side in alternation with the access paths from the city centre. For the promenade, this alternation will bring about an oscillating sequence which repeatedly narrows and expands. On the shore side, a number of buildings whose ground floors are to be made accessible from street level will be integrated into the overall structure. The existing structure will be demolished for the redevelopment work. The new structure has been planned as a massive construction with deep foundations. As the new flood barrier will be higher and wider in overall terms, a cantilever structure into the Elbe will also have to be included. A minimum width of 10 metres has been stipulated for the promenade. There will again be car parking facilities within the structure, and on the street side it will be possible to accommodate shops and other utilisations. Picture 3: Existing structure, view of Baumwall

4 C i t y S p o r t h a f e n Picture 4: Existing structure, flood protection with promenade Planned cross-section with waterside stairs Protected height Elevated railway Notional max. water level Parking level Shop Footpath Cycle lane Road Median strip Service road Average high water level Retaining wall Main sewer Average low water level Retaining wall The shore-side stairs will be oriented towards the streets Stubbenhuk, Neustädter Neuer Weg, Rambachstraße, Reimarusstraße and Ditmar-Koel-Straße. New pedestrian crossings are going to be built to connect these with the promenade. The stair units facing the water side will also provide seating facilities, thereby making it possible to enjoy the undisturbed view of the port, the harbour ferries, and the Cap San Diego and Rickmer Rickmers ships away from the flow of pedestrians on the promenade. The platforms of these stairs on the water side are planned to be 5.40 m a.s.l., which means that they will be submerged by the Elbe only during very severe storm surges in the autumn and winter months. Thanks to the shore-side utilisations within the structure itself, the access paths to the parking facilities and the special shape of the stairs, the new facade facing the city side will be more appealing than the present construction. On the street side, a pavement will be laid along the entire length of the construction. Here, for the first time, there will also be a separate cycle lane for cyclists heading towards the city centre. Ramps located at Baumwall and Landungs brücken will connect the facility with street level in a manner that provides full accessibility for the physically handicapped. And a third ramp, located centrally between the two, will ensure continued access also for motor vehicles to the Überseebrücke. Extension heights When a new flood protection barrier is being built or an existing one significantly reinforced as part of the construction programme, allowance must be made for a possible further increase of 0.80 m (extension capacity) in the future. In the Niederhafen flood protection programme, this extension capacity is already being added (single-stage extension). This provides both the best, from a design point of view, and the most economical solution under the specific conditions imposed by the location and the plans. The extension heights are 8.60 m a.s.l. in the eastern section of the new structure and 8.90 m a.s.l. in the western section. Construction schedule The construction schedule provides for two construction stages over the length of the construction site which are to be completed consecutively, beginning with construction stage 1. The stage is structured in such a way that the access restrictions will be kept within specified areas. When the work is being performed in construction stage 1, the promenade to the west of the Überseebrücke will remain unaffected. During construction, restrictions will also be necessary in the areas adjacent to the construction site. The street sequence Johannisbollwerk, Vorsetzen, Baumwall will, depending on the progress of construction, be used partly for construction site purposes and therefore be restricted to one lane for

5 Construction stage 2 Construction stage 1 Construction schedule construction stages drivers. The water side will also be affected, however. There, ground areas will be closed section by section for work and material pontoons and/or jack-up platforms, and pontoons will be moved temporarily. Not only protection from storm surges in the winter months, but also the protection of low-lying areas of the city from summer high tides, must be guaranteed at all times. In addition to this essential basic condition, access paths must be maintained as far as possible and must continue to be The history of the Niederhafen port The Niederhafen was a significant commercial port in Hamburg from the 17th to the 20th century. When the Binnenhafen port at the mouth of the Alster was no longer able to absorb the briskly expanding volume of overseas trade, further berths were set up downstream. The name Niederhafen ( low harbour ) arose from the position of this port area beneath the timber raft barrier ( Niederbaum or low raft) between Baumwall and Kehrwiederspitze, which served to safeguard the entrance to the port. The expansion of the ramparts, the city s fortifications during the Thirty Years War, also shaped this area of the harbour front with the Johannis bastion, a reminder of which is still provided today by the street name Johannisbollwerk. Up until the start of the 18th century, the berths were extended several times using rows of pile moorings. Here, the cargo from the large ships arriving from overseas was transshipped on to smaller barges and lighters. The Johannis bastion, which stood until 1838, was demolished to make way for a massive bank wall. In 1873, the built-up street Vorsetzen was broadened with a bank wall measuring some 16 m. As early as 1889, this wall was so dilapidated that it had to be closed and operations using manual swivel cranes had to be abandoned. In 1893 a new quay wall was constructed with a massive superstructure and a foundation of wooden stakes. The shoreline was again pushed out into the Niederhafen, this time by 20 m. A temporarily erected English church situated level with the site of the former bastion had to make way for the development of the port. Quay sheds for domestic German maritime traffic on the Hamburg-Rhine line were erected for port transhipment purposes and the quay wall was equipped For you. For Hamburg. made attractive for visitors and tourists as well. The hub of the construction stages will therefore be the Überseebrücke bridge. The Überseebrücke s bridgehead will have to be expanded. Here, a temporary bridge will continue to ensure access to the Überseebrücke s pontoon facilities, the Cap San Diego, and the Vorsetzen pontoon including the launches and the City Sporthafen recreational harbour. Passability for pedestrians and cyclists in the construction site area will be guaranteed by signposted alternative routes. with gantry cranes. After the Second World War, quayside cargo handling was discontinued here, and in the 1950s all the sheds were demolished, with the areas being levelled and some of them used as car parking facilities. After the flood in 1962, the present-day flood protection barrier was erected along with the promenade. This was followed in the 1980s by the construction of the road along the harbour front. Picture 5: Vorsetzen ca Picture 6: Johannisbollwerk ca. 1930

6 Hamburg s public flood protection line Length 103 km of which dykes 78 km of which flood protection walls 25 km Constructions 82 of which storm surge barriers 6 of which locks 6 of which tidal gates 20 of which pumping stations 10 of which gates and other closing devices 40 Niederhafen flood protection data Length of the enhanced section 625 m New, increased height 8.60 to 8.90 m a.s.l. Planning approval procedure Application Dec. 2009, approval March 2011 Scheduled construction period Publisher, contacts Project management Landesbetrieb Straßen, Brücken und Gewässer Divison of Surface Waters and Flood Protection Phone (040) Architecture ZAHA HADID LTD ARCHITECTURE Project and support structure planning INGENIEURBÜRO GRASSL GMBH Road and traffic planning SCHMECK-JUNKER INGENIEURGESELLSCHAFT MBH Technical building services RMN INGENIEURE Geotechnical consulting GRUNDBAUINGENIEURE STEINFELD UND PARTNER GBR Environmental impact assessment LANDSCHAFT & PLAN Design, picture credits Design Hamburg Agency of Geoinformation and Surveying Picture credits Cover picture Picture 1, 2 and 3, montage Picture 4 Picture 5 Picture 6 ON3 Studio ON3 Studio LSBG Photography by Otto Reich, Museum for Hamburg History Photography by Strumper & Co., Museum for Hamburg History updated January 2013

MOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT

MOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT AIPCN-France Third Mediterranean Days of Coastal and Harbour Engineering Troisièmes journées méditerranéennes de génie côtier et portuaire 23/05/2013 Marseille MOSE PROJECT: STATE-OF-THE-ART AND FUTURE

More information

Chapter 26 Route Window SE6A Manor Wharf. Transport for London

Chapter 26 Route Window SE6A Manor Wharf. Transport for London Chapter 26 Route Window SE6A Manor Wharf Transport MANOR WHARF 26 Route Window SE6A Manor Wharf Transport Introduction 26.1 The route window lies within the London Borough of Bexley. The works in the

More information

places Mooloolaba s heart five

places Mooloolaba s heart five five places the mooloolaba heart 1 Flexible community event use of school oval 2 Enhanced streetscape District cycle route Future cross-block pedestrian link 5 Existing school buildings New signalised

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date:

Schedule of Planning Applications Committee Date: 23 May Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: Schedule of Planning Applications Committee Date: 23 May 2018 Reference: 06/18/0064/F Great Yarmouth Officer: Mr J Beck Expiry Date: 24-04-2018 Applicant: Proposal: Site: Mr Mavroudis Clear weather hoardings

More information

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme.

Kirkcaldy Sea Wall Improvements. Non-technical Summary. For illustration purposes only to give an indicative representation of the scheme. ENVIRONMENTAL STATEMENT Non-technical Summary For illustration purposes only to give an indicative representation of the scheme. Kirkcaldy Sea Wall Improvements Introduction A concrete sea wall fronts

More information

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre

HARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre 78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that

More information

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/

Ms P Goldfinger Date: 18 September 2017 Head of Programme The Architecture Centre Our Ref: M15/ Unit 2 Eclipse Office Park High Street Staple Hill Bristol BS16 5EL T: 0117 956 1916 E: all@tetlow-king.co.uk F: 0117 970 1293 W: www.tetlow-king.co.uk Ms P Goldfinger Date: 18 September 2017 Head of Programme

More information

CITY OF HELSINKI. Introducing Major Urban Development Projects CITY OF HELSINKI - Introducing Major Urban Development Projects 1

CITY OF HELSINKI. Introducing Major Urban Development Projects CITY OF HELSINKI - Introducing Major Urban Development Projects 1 CITY OF HELSINKI Introducing Major Urban Development Projects CITY OF HELSINKI - Introducing Major Urban Development Projects 1 City of Helsinki Urban Development Areas One of the fastest growing metropolitan

More information

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study

Island Eastern Corridor Boardwalk-Cycleway Feasibility Study For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront

More information

PRIMARY EDUCATION PACK CLOZE PROCEDURE

PRIMARY EDUCATION PACK CLOZE PROCEDURE PRIMARY EDUCATION PACK www.titanclydebank.com Cloze Procedure Passage 1 Use the words at the bottom of the sheet to complete this passage. The Titan Clydebank Crane was designed and built by (1) whose

More information

NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME ATLAS OF BERTH

NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME ATLAS OF BERTH NETWORK OF DANUBE WATERWAY ADMINISTRATIONS data & user orientation SOUTH EAST EUROPE TRANSNATIONAL COOPERATION PROGRAMME ATLAS OF BERTH Republic of Croatia Document ID O 4.2.6 Activity Act. 4.2 Author/organisation

More information

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation WAIMAKARIRI DISTRICT COUNCIL REPORT FILE NO: GOV-26-01-07, CPR-04-04-01 / 150609090834 REPORT TO: Kaiapoi Community Board DATE OF MEETING: 15 June 2015 FROM: SUBJECT: Craig Sargison, Manager Community

More information

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY PURPOSE The purpose of this Working Draft Spatial Framework summary is to facilitate additional public and stakeholder feedback following the public meetings and reference group workshops held in November

More information

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview

chapter - Hex Highway Touring Route Hamburg to Strausstown Overview chapter - 2 Hex Highway Touring Route Hamburg to Strausstown Overview The on-road Hex Highway automobile and bicycle touring route begins on State Street in downtown Hamburg. The route continues west on

More information

Phoenix Sky Harbor transit guideway bridge

Phoenix Sky Harbor transit guideway bridge Phoenix Sky Harbor transit guideway bridge by David A. Burrows, Gannett Fleming The evolution of the PHX Sky Train s crossing of Taxiway Romeo At one of the 10 busiest airports in the United States, cast-in-place,

More information

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London

Chapter 8 Route Window NE7 Chadwell Heath station. Transport for London Chapter 8 Route Window NE7 Chadwell Heath station Transport CHADWELL HEATH STATION 8 Route Window NE7 Chadwell Heath station Baseline conditions 8.6 This route window lies within the London Boroughs of

More information

Consultation on Town Quay Mooring Redevelopment Proposals

Consultation on Town Quay Mooring Redevelopment Proposals Consultation on Town Quay Mooring Redevelopment Proposals Lymington Harbour Commissioners (LHC) would like your views on its proposals to redevelop the Town Quay area to meet the changing market requirements

More information

Landscapes of Gallipoli

Landscapes of Gallipoli Landscapes of Gallipoli The Roman architecture office COdESIGN is since 14 years working on several projects in the south-eastern city Gallipoli in Salento, in order to revive the city and realize a more

More information

APPLICANT NAME PROJECT DESCRIPTION AWARD

APPLICANT NAME PROJECT DESCRIPTION AWARD Scotland - Round 1 Awards APPLICANT NAME PROJECT DESCRIPTION AWARD Highlands & Islands Bute Forest Ltd The project will launch a community timber products business, attract tourists to the Island and create

More information

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS INTRODUCTION The Municipal docks in both Newboro and Portland were transferred to the Township of Rideau Lakes by Parks Canada in 2002. Little has been done to improve the docks physical condition or role

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

The Galveston Seawall

The Galveston Seawall Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada. March, 2013 The Galveston Seawall Mark Harvey

More information

Ship Launching in Small Shipyards

Ship Launching in Small Shipyards Edwin Salas 6 th EMship cycle: October 2015 February 2017 Master Thesis Ship Launching in Small Shipyards Supervisor: Prof. Tadeusz Graczyk, West Pomeranian University of Technology, Szczecin, Poland Reviewers:

More information

EVIDENCE OF GORDON DESMOND MOLLER ONZM ON BEHALF OF PANUKU DEVELOPMENT AUCKLAND (ARCHITECT) 7 AUGUST 2018

EVIDENCE OF GORDON DESMOND MOLLER ONZM ON BEHALF OF PANUKU DEVELOPMENT AUCKLAND (ARCHITECT) 7 AUGUST 2018 0117 BEFORE THE ENVIRONMENT COURT I MUA I TE KOOTI TAIAO O AOTEAROA ENV-2018-AKL-000078 IN THE MATTER of the Resource Management Act 1991 (RMA) AND IN THE MATTER BETWEEN of the direct referral of applications

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

MESSE BASEL NEW EXIBITION BUILDING

MESSE BASEL NEW EXIBITION BUILDING 12013E MESSE BASEL NEW EXIBITION BUILDING Basel - BS Owner MCH Messe Schweiz (Basel) AG Messeplatz 1 4058 Basel General contractor HRS Real Estate AG Hochbergerstrasse 60c 4057 Basel Architect/General

More information

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships: Monitoring and assessing risk from operation of watertight doors E MARITIME SAFETY COMMITTEE 93rd session Agenda item 6 MSC 93/6/9 11 March 2014 Original: ENGLISH PASSENGER SHIP SAFETY Damage stability of cruise passenger ships: Monitoring and assessing risk from operation

More information

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe

Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe Unlocking our Coastal Heritage Strand 2 - Watermouth Bay, nr Ilfracombe In order to provide a safe route for users of the South West Coast Path this project realigned 265m of the A399 coast road to incorporate

More information

8-10 September 2017 The Hamburg Cruise Days. Highlights, Results, Visitor Survey

8-10 September 2017 The Hamburg Cruise Days. Highlights, Results, Visitor Survey 8-10 September 2017 The Hamburg Cruise Days Highlights, Results, Visitor Survey EDITORIAL Dear Readers, It is hard to imagine Hamburg without its port. And it is equally impossible to imagine the port

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN

EDEN PARK REDEVELOPMENT COMPLETED STADIUM DESIGN 1 INTRODUCTION New Zealand was awarded the Rugby World Cup 2011 hosting rights in November 2005. A condition of the winning bid was the provision of a 60,000 seat stadium for the finals. New Zealand s

More information

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes

STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH

More information

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010 CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF

More information

Draft Length 10 Thorness Bay to Cowes Chain Ferry

Draft Length 10 Thorness Bay to Cowes Chain Ferry Draft Length 10 Thorness Bay to Cowes Chain Ferry Introduction The southern section of this length of coast is largely (mud and sand) beach edged with landslip. Landward of this is agricultural land with

More information

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE

how it started where we are now what is coming up NEW WESTMINSTER WATERFRONT PARK THE RIVER THE PAST THE PEOPLE how it started Downtown Waterfront Park How It Started March 2009 City of New Westminster Purchases 3.2 Hectare Westminster Pier Site March 2009 City of New Westminster and Design Team develop plan for

More information

Port construction in Bremerhaven Construction of the new Kaiserschleuse sea lock

Port construction in Bremerhaven Construction of the new Kaiserschleuse sea lock Port construction in Bremerhaven Construction of the new Kaiserschleuse sea lock Requirement: permanent demand for engineering skills History repeats itself On 23 August 1897, the new double-propeller

More information

Centurion Way Chichester

Centurion Way Chichester Centurion Way Chichester Work book of plans to show details of the Centurion Way, its links, and potential developments and enhancements from linking to the South Downs National Park all the way to the

More information

Alexandria Port, Egypt

Alexandria Port, Egypt Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material

More information

Its climate is very mild, with almond trees in full bloom in December. Its temperature very seldom drops below 12 degrees centigrade.

Its climate is very mild, with almond trees in full bloom in December. Its temperature very seldom drops below 12 degrees centigrade. Preliminary design of a new marina and artificial beach related to an urban development M. Poole Perez-Pardo Nautilus Servicios Tecnicos, S.L. Consulting Engineers, Camino Alto, 26 La Morale]a, 28109 Alcobendas,

More information

LAKE KAWANA BIRTINYA LAKE MANAGEMENT PLAN

LAKE KAWANA BIRTINYA LAKE MANAGEMENT PLAN LAKE KAWANA BIRTINYA LAKE MANAGEMENT PLAN 2 October 2008 (Volume 1 of 2) Amended on 2 July 2013 (Platform and Ladder) Amended on 9 March 2015 (Pontoon Design Principles) TABLE OF CONTENTS VOLUME 1 1.0

More information

TERMINAL TARIFF Extracts

TERMINAL TARIFF Extracts GRAND PORT MARITIME DE LA MARTINIQUE PORT AUTHORITY OF MARTINIQUE TERMINAL TARIFF Extracts TARIFF N 004 Année 2017 GRAND PORT MARITIME DE LA MARTINIQUE PORT AUTHORITY OF MARTINIQUE HARBOUR DUES Extracts

More information

Road Signs, Markings and Their Meaning

Road Signs, Markings and Their Meaning Road Signs, Markings and Their Meaning FUNCTIONS OF ROAD SIGNS AND MARKINGS 1. Guides 2. Directs 3. Warns 4. Informs 5. Prohibits 6. Regulates CLASSIFICATION OF ROAD SIGNS 1. Warning 2. Regulatory 3. Informatory

More information

20mph Speed Limit Zones

20mph Speed Limit Zones Traffic Advisory Leaflet 7/91 May 1991 20mph Speed Limit Zones Summary This leaflet illustrates the main steps in the procedures for the implementation of 20mph zones. It provides brief details on: the

More information

Llandudno Junction. Regeneration Proposals for the Future. December 2009

Llandudno Junction. Regeneration Proposals for the Future. December 2009 Llandudno Junction Regeneration Proposals for the Future December 2009 Llandudno Junction - Vision Statement 1 Purpose 1.1 The purpose of this document is to describe key priorities to support the regeneration

More information

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B

Energy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED

GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED GREATER SYDNEY COMMISSION DRAFT SOUTH DISTRICT PLAN SUBMISSION PREPARED BY KOGARAH CENTRE DEVELOPMENT INCORPORATED 1601214 Table of Contents 1. Introduction... 1 2. Observation 1: How has the GSC Draft

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

F6. Coastal Ferry Terminal Zone

F6. Coastal Ferry Terminal Zone F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.

More information

City of College Park s Update to the Zoning Ordinance

City of College Park s Update to the Zoning Ordinance Comparison table for the City s Zoning Ordinance Residential s R-1 Single Family R-2 Single Family Single family uses 24,000 sq ft lot size 90 ft lot width Front 60 ft Side 15 ft Rear 40 ft Minimum floor

More information

Re-integrate the River Torrens

Re-integrate the River Torrens 1 Re-integrate the River Torrens The river is a landmark of Adelaide and is fortunate to have a wide selection of public spaces on its banks. The River Torrens is a special part of Adelaide, which needs

More information

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Hamburg s city centre retail space productivity is only surpassed by Munich

Hamburg s city centre retail space productivity is only surpassed by Munich 29. June 2018 News release COMFORT city report Hamburg 2018 Hamburg the star of the north for shopping Current market analysis of prime shopping locations Hamburg takes second place in the COMFORT City

More information

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles

October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles October 7, 2016 Hurricane Matthew Rakes the East Coast of Flagler County for 18.1 Miles Hammock Dunes Suffers Penetration of the Ocean into the Community; has a 15-30 ft. Wide Triangular Section of the

More information

INFRASTRUCTURE ENGINEERING

INFRASTRUCTURE ENGINEERING INFRASTRUCTURE ENGINEERING SIPAL INFRASTRUCTURES CONCEPTUAL DESIGN > FINAL DESIGN > DETAILED DESIGN STRUCTURAL ANALYSIS Pre-project/preliminary studies on Highway and Railway infrastructures PSC Bridges

More information

Welcome to our exhibition

Welcome to our exhibition Welcome to our exhibition We are bringing forward a new, employment-led scheme for the Vauxhall Cross Island site in the heart of Vauxhall. We are keen to hear local views on our proposals ahead of submitting

More information

AIR NAVIGATION ORDER

AIR NAVIGATION ORDER CLEARANCE AREAS AND OBSTACLE LIMITATION SURFACES AT AIR NAVIGATION ORDER VERSION : 2.0 DATE OF IMPLEMENTATION : 15-02-2013 OFFICE OF PRIME INTEREST : AERODROME STANDARDS BRANCH. (Directorate of Airspace

More information

Provincial Railway Technical Standards

Provincial Railway Technical Standards GENERAL: INDEX: The standards and requirements listed in this document are intended for use on provincially regulated railway public grade crossings. These standards are considered the minimum requirements

More information

Planning Committee. Thursday, 26 May 2016

Planning Committee. Thursday, 26 May 2016 Planning Committee Thursday, 26 May 2016 Attendees: Substitutes: Councillor Lyn Barton (Member), Councillor Helen Chuah (Member), Councillor Theresa Higgins (Chairman), Councillor Brian Jarvis (Member),

More information

Hamburg Lindy Exchange

Hamburg Lindy Exchange Hamburg Lindy Exchange 01.09.2017 03.09.2017 HHLX2017_Info_v1-3.docx Page 1 of 12 Dear Lindy Hopper, Only a few days are left till the Hamburg Lindy Exchange 2017 takes place. High time to send you some

More information

Bye-Laws for the Port of of Gothenburg

Bye-Laws for the Port of of Gothenburg 1 (7) Bye-Laws for the Port of of Gothenburg Göteborg THE MUNICIPALITY OF GÖTEBORG THE MUNICIPALITY OF GOTHENBURG THE COUNTY ADMINI- STRATIVE BOARD OF VÄSTRA GÖTALAND THE COUNTY ADMINISTRATIVE BOARD OF

More information

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES

FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES FLINDERS STREET STATION DESIGN COMPETITION STATEMENT OF KEY OBJECTIVES Page 2 of 28 Flinders Street Station and environs (looking west) INTRODUCTION Page 3 of 28 First built in 1854, Flinders Street Station

More information

General Summer and Winter Views

General Summer and Winter Views ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX 11. 2 General Summer and Winter Views Table of Contents Section APPENDIX 11.2 Page 1 General Views... 1-1 Tansy Lane, Portishead... 1-2 Galingale Way,

More information

ELECTION SIGN GUIDELINES

ELECTION SIGN GUIDELINES ELECTION SIGN GUIDELINES GUIDELINES FOR THE PLACEMENT OF FREE STANDING ELECTION SIGNS ON CITY OF LETHBRIDGE ROAD RIGHT OF WAY Definition An election sign is a temporary sign announcing or supporting political

More information

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982

ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 ROAD TRAFFIC (PEDESTRIAN CROSSINGS) (JERSEY) ORDER 1982 Revised Edition Showing the law as at 1 January 2016 This is a revised edition of the law Road Traffic (Pedestrian Crossings) (Jersey) Order 1982

More information

ISOM & ISSOM forbidden symbol comparison

ISOM & ISSOM forbidden symbol comparison & forbidden symbol comparison Forbidden symbols and their relatives Symbol 2000 (Long, Middle) 2007 (Sprint) 201 Impassable cliff An impassable cliff, quarry or earth bank (see 106) is shown with a 0.35

More information

HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL.

HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL. HAMBURG. APPLICATION FOR THE TITLE AS EUROPEAN GREEN CAPITAL. Christian Maaß State Secretary for Urban Development and the Environment Free and Hanseatic City of Hamburg THE WORLD IS AT RISK. Europe s

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

PERFORMANCE MEASURE INFORMATION SHEET #16

PERFORMANCE MEASURE INFORMATION SHEET #16 PERFORMANCE MEASURE INFORMATION SHEET #16 ARROW LAKES RESERVOIR: RECREATION Objective / Location Recreation/Arrow Lakes Reservoir Performance Measure Access Days Units Description MSIC 1) # Access Days

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/TRANS/SC.3/2017/16 Distr.: General 24 July 2017 English Original: Russian Economic Commission for Europe Inland Transport Committee Working Party on Inland

More information

Downtown Ferry Basin Redevelopment - Stage 1. Integrated Transport Assessment

Downtown Ferry Basin Redevelopment - Stage 1. Integrated Transport Assessment Downtown Ferry Basin Redevelopment - Stage 1 Integrated Transport Assessment 12/11/2018 Project: Downtown Ferry Basin Redevelopment - Stage 1 Title: Integrated Transport Assessment Document Reference:

More information

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport Warehouse case study Cargo Facility, Stansted 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport This new facility shows how BAA Lynton can deliver large complex

More information

MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017

MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017 MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017 The Head of the Maritime Compartment and Harbour Master of the Port of Ravenna: the Regulation for the towing

More information

03 Opportunities and Strategies Union Canal Study 17

03 Opportunities and Strategies Union Canal Study 17 03 Opportunities and Strategies 17015 Union Canal Study 17 Introduction This chapter summarises the issues, opportunities for improvement and proposed strategy outcomes of the study of the towpath. The

More information

Guidance for operators of recreation craft

Guidance for operators of recreation craft Wir machen Schifffahrt möglich. Guidance for operators of recreation craft Kiel Canal Guidance for operators of recreation craft 3 Dear recreation craft operators, You want to navigate the Kiel Canal with

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES

WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES WARRENPOINT HARBOUR AUTHORITY PORT OF WARRENPOINT SCHEDULE OF CHARGES OPERATIVE FROM 1 JANUARY 2019 SCHEDULE OF CHARGES INDEX 1. PORT CHARGES ON SHIPS 2. PORT CHARGES ON GOODS 3. QUAY RENTS 4. WEIGHBRIDGE

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

New ADA Accessibility Standards for the Attractions Industry

New ADA Accessibility Standards for the Attractions Industry New ADA Accessibility Standards for the Attractions Industry 1 New ADA Accessibility Standards for the Attractions Industry 2 INTERNATIONAL ASSOCIATION OF AMUSEMENT PARKS AND ATTRACTIONS WEBINAR DISCLAIMER

More information

D1 January 8, 2014 Public Hearing APPLICANT: HUNT CLUB FARM

D1 January 8, 2014 Public Hearing APPLICANT: HUNT CLUB FARM D1 January 8, 2014 Public Hearing APPLICANT: HUNT CLUB FARM PROPERTY OWNER: HUNT CLUB A-1- A, LLC. STAFF PLANNER: Kevin Kemp REQUEST: Modification of a Conditional Use Permit approved by the City Council

More information

East Melbourne Precinct HO2. March 2015

East Melbourne Precinct HO2. March 2015 East Melbourne Precinct HO2 March 2015 Local Heritage Planning Policy Review Statements of Significance Melbourne s Local Heritage Planning Policy Review project includes the preparation of statements

More information

Iberville International Maritime Terminal and Alexandra Pier

Iberville International Maritime Terminal and Alexandra Pier PLANNING & COMPETITION Location: Montreal, Canada Iberville International Maritime Terminal and Alexandra Pier Design Date: 2013 Master Planning: Provencher_Roy Last April 25, the Montreal Port Authority

More information

Beaver Creek Provincial Park. Management Plan

Beaver Creek Provincial Park. Management Plan Beaver Creek Provincial Park Management Plan 2 Beaver Creek Provincial Park Table of Contents 1. Introduction... 3 2. Park History... 3 3. Park Attributes... 4 3.1 Natural... 4 3.2 Recreational... 4 4.

More information

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health

More information

LLANBEDR ACCESS IMPROVEMENTS

LLANBEDR ACCESS IMPROVEMENTS LLANBEDR ACCESS IMPROVEMENTS NON-MOTORISED USER SUPPLEMENTARY REPORT CPF: 5111 Client: Gwynedd Council Document Control Sheet Document Title: Document Author: Project Manager: Project Title: A496 Llanbedr

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Alexandra pier: New terminal in an old port

Alexandra pier: New terminal in an old port TOPOS Alexandra pier: New terminal in an old port 30.08.201630.08.2016 < GO TO BLOG OVERVIEW Last April the Montreal Port Authority (MPA) officially unveiled its plans for the restoration of Alexandra

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced

More information

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board Port of San Francisco Waterfront Design Advisory Committee Agenda Item No. 1 Meeting Date: Staff Report To: From: Waterfront Design Advisory Committee: Laura Crescimano Jeff Joslin Marsha Maytum Kathrin

More information

DARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:

DARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes: OUR VISION Our shared vision We are creating an iconic tropical hotel. A hotel that is uniquely Darwin. A hotel that embodies the rich natural and cultural heritage of the Top End. A gateway to the natural

More information

Railfuture East Anglia Whittlesford Parkway station audit

Railfuture East Anglia Whittlesford Parkway station audit Railfuture East Anglia Whittlesford Parkway station audit Introduction and summary of findings This report details the findings of a station audit carried out by members of Railfuture East Anglia Branch

More information

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL L 85/40 DIRECTIVE 2002/30/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 March 2002 on the establishment of rules and procedures with regard to the introduction of noise-related operating restrictions

More information

DOCKING AND ROUTING PLAN

DOCKING AND ROUTING PLAN DOCKING AND ROUTING PLAN TABLE OF CONTENT Contents Table of content... 2 1 Introduction... 3 1.1 Background... 3 1.2 Document Scope... 3 1.3 Harbour dues... 3 2 ROUTING TO SHIPYARD... 4 2.1 General...

More information

A SPECTACULAR GESAMTKUNSTWERK THE ELBPHILHARMONIE. MORE THAN JUST A CONCERT HALL

A SPECTACULAR GESAMTKUNSTWERK THE ELBPHILHARMONIE. MORE THAN JUST A CONCERT HALL ENGLISH ARCHITECTURE A SPECTACULAR GESAMTKUNSTWERK THE ELBPHILHARMONIE. MORE THAN JUST A CONCERT HALL In the five months since the grand opening on 11 and 12 January 2017, some 300 high-class concerts

More information

replacement SONNE status report

replacement SONNE status report replacement SONNE status report preliminary remark Preliminary remark: Tendering procedure started in 2009. For the first time the tender was for the construction as well as for the operation of the ship

More information