1 Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High /2/6 Wednesday Daily Precipitation. Weather Conditions: Clear 2 Progress Report Copyright 25, Sevenson Environmental Services, Inc. All Rights Reserved. Pushing the dredge into position to remove material Removing material from the South Basin Removing material within the silt curtain moon pool Loading a scow with dredge material Adding portland cement to solidify dredge material Loading out dredge material blended with portland cement to the material staging bins of 5

2 Weekly Summary Date Dredge QTY Disposal QTY (Tns) - Continued communication with residents regarding residential slip //6 Mon 6 -- dredging - Continued survey of resident boat slips //6 Tue Continued dredging the south basin /2/6 Wed Continued blending dredge material with Portland Cement /3/6 Thu Continued staging blended dredge material in anticipation of /4/6 Fri disposal - Continued checking dredge depth using a lead line /5/6 Sat Continued 43 #### noise level monitoring activities /6/6 Sun #### Weekly Totals,975 CY Tns Work Performed by Sevenson Safety Remarks - No accidents or incidents observed or reported. - Conducted daily safety meeting: Equipment inspections. Work Performed by Subcontractors Remarks/Verbal Directives Equipment/Materials Delivered to Site - FOR A LIST OF EQUIPMENT RECEIVED TODAY PLEASE SEE PAGE 3 Planned Activities - Continue survey of residential slips for residential slip dredging - Perform a self check bathymetric survey of the dredge area in the South Basin - Sevenson has scheduled Hydrographic Surveysto perform a contractor check bathymetric survey in the South Basin on Friday, /4/6 Other Information Production Tables Disposal Today Previous Total Kinsley Cape Mining Beach.. Other Other Total... Unit Dredging South Basin Snug Harbor Shelter Haven Entrance Stone Harbor Pleasure Bay Carnival Bay Sanctuary Bay Paradise Bay Access Channel Stone Harbor Hole Available Pay Quantity Data Source Dredged Today 3, BD Survey 494 8, BD Survey,6 26 BD Survey 4,65 26 BD Survey, Contract Bid Sheet 2, Contract Bid Sheet 3, Contract Bid Sheet 9, Contract Bid Sheet 7, Contract Bid Sheet 4, Contract Bid Sheet Dredged To Date 2986 % Complete 75% % % % % % % % % % TOTALS 82, ,986 * Volumes include Required and Allowable Pay Overdepth **% Complete when approved by Owner 4% 2 of 5

3 Sevenson Equipment List SES Equipment # Make/Model Description Date Onsite Hrs Qty 526-E JCB Lodall Telescoping Forklift 9/2/26 84-E JCB Lodall Telescoping Forklift 9/3/26 BB2442 Seabox Seabox 9/3/ E Sennebogen 86 Material Handler 9/3/ B Anvil 4Cy Clamshell Clamshell Bucket 9/3/26 57-E Cat 95 Loader Loader 9/4/26 PF7-27RCT Poseidon Barge 4' 4'x'x7' Barge 9/4/26 PF7-79QCT Poseidon Barge 4' 4'x'x7' Barge 9/4/26 247B8 Poseidon Barge 4' 4'x'x7' Barge 9/4/26 PF7-28RCT Poseidon Barge 4' 4'x'x7' Barge 9/4/26 99EC Shakerton Barge 4' 4'x'x5' Barge 9/4/ Shakerton Barge 4' 4'x'x5' Barge 9/4/26 J--E Shakerton Barge 4' 4'x'x5' Barge 9/4/26 99EJ Shakerton Barge 4' 4'x'x5' Barge 9/4/ Shakerton Barge 4' 4'x'x5' Barge 9/4/26 99ER Shakerton Barge 4' 4'x'x5' Barge 9/4/ E Bumblebee Boat Push Boat 9/4/26 PF273QC Poseidon Barge 2' 2'x'x5' Barge 9/5/26 PF2732QCT Poseidon Barge 2' 2'x'x5' Barge 9/5/26 227B6 Poseidon Barge 2' 2'x'x5' Barge 9/5/26 227B33 Poseidon Barge 2' 2'x'x5' Barge 9/5/26 247B34 Poseidon Barge 4' 4'x'x7' Barge 9/5/26 247C34 Poseidon Barge 4' 4'x'x7' Barge 9/5/26 P4Q Poseidon Barge 4' 4'x'x5' Barge 9/5/26 99Ea Shakerton Barge 4' 4'x'x5' Barge 9/5/ Shakerton Barge 4' 4'x'x5' Barge 9/5/26 996EB Shakerton Barge 4' 4'x'x5' Barge 9/5/26 996EG Shakerton Barge 4' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Shakerton Barge 2' 4'x'x5' Barge 9/5/ Seabox Seabox 9/5/26 76-E Tugboat Shirley Tugboat 9/5/26 5-E JCB 9 Skid Steer Rubber Tire Skid Steer 9/5/ E IR 85 Compressor Air Compressor 85 9/5/26 45-E XQ6 Generator Generator XQ6 9/5/ Sennebogen 86 Material Handler 9/6/ E 9/2/26 76-E 9/2/ E 9/2/26 78-E 674-E 9/2/26 9/2/ E 9/2/26 38-E Triumph 2' Boat Boat 9/2/26 67-E Terex RL 4 Light Light Plant 9/2/ E Komatsu PC 35 Ex PC 35 Excavator 9/2/26 26-E 999-E Genie Light Tower Terex RL 4 Light Genie Light Tower / Generator Light Plant 9/2/26 9/2/26 85-E Cat 966 Loader Cat 966 Front End Loader 9/2/26 RAKE ENDS BARGE RAKE ENDS BARGE RAKE ENDS 9/23/ E Dredge Tender DSC Dredge Tender 9/23/ Bells Tug 7 Bells Tugboat /6/26 3 of 5

4 Rental Equipment List Rental Equipment Make/Model Description Date Onsite Hrs Qty Frac Tank Adler Adler Open Top Weir Tank 9/6/26 2 Frac Tank Adler 2K Gal Frac Tank 9/6/26 Roll Off Adler Adler Roll Off Geotube Box 9/2/ gal fuel tank Taylor Oil Gas Tank 9/2/26 5 gal fuel tank Taylor OIl Off Road Diesel Tank 9/2/26 Roll Off Container H4 Roll Off Container 9/2/26 Roll Off Container H4 Roll Off Container 9/2/26 Office Trailer Modspace Office Trailer 9/23/26 Break Trailer Modspace Break Trailer 9/2/26 Noise Meter Pine Environmental Pine Environmental Noise Meter 9/26/26 4 of 5

5 Labor SES Personnel SES Subcontractor Personnel Shift: Day Hrs Shift: Day Hrs Day Shift General Superintendant 2. Hydrographic Surveys Employees 2 Project Manager 2. 2 Project Superintendent 24. Night Shift Timekeeper. Employees QA/QC Manager. Surveyor 2. Daily Total Mechanic 2. Employees 2 Health and Safety. Labor Foreman 72/ Laborer 72/ Operator Licensed Boat Op Day Shift Hours Mate Deckhand Night Shift Dredge Op Hours. Today's Man Hours Totals Totals. Total Man Hours to Date. 2,62.5 SES Personnel SES Subcontractor Personnel Shift: Night Hrs Shift: Day Hrs Total Man Hours Since Lost Time Incident 2,62.5 Lost Time Incidents To-Date - Last Lost Time Incident - N/a Totals. Totals. 5 of 5

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 42 33 63 45 2/8/6 Thursday Daily Precipitation. Weather Conditions: Overcast 2 Progress

More information

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 55 45 99 45 2/7/7 Tuesday Daily Precipitation. Weather Conditions: Clear Progress Report

More information

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved.

Progress Report Copyright 2005, Sevenson Environmental Services, Inc. All Rights Reserved. Stone Harbor Maintenance Dredging Stone Harbor, NJ Weather Low Reports No. Project No. Report Date: Day of Week: High 4 33 83 45 /7/7 Tuesday Daily Precipitation.25" Weather Conditions: Rain Progress Report

More information

U.S. Coast Guard - American Waterways Operators Annual Safety Report

U.S. Coast Guard - American Waterways Operators Annual Safety Report American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting December 12, 2017 Established Safety Metrics For 17 years,

More information

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015 CORPS OF ENGINEERS ALASKA DISTRICT 2016 Dredging Projects Michael Tencza, PE Operations Project Manager November 4, 2015 US Army Corps of Engineers Building and Preserving Alaska s Future AWARDED CONTRACTS

More information

TENTATIVE SCHEDULE

TENTATIVE SCHEDULE TENTATIVE SCHEDULE 20-2015 Facility Dredge Depth (- ft MLLW) 20 Spring Early Summer 20/2012 2012/2013 HWRP/ HWRP/ HWRP/ SFDODS SF- MWP Upland SFDODS SF- MWP upland SFDODS SF- MWP upland SFDODS SF- 2013/2014

More information

Kissimmee DAYS February 6th- 9am 80% ABSOULTE

Kissimmee DAYS February 6th- 9am 80% ABSOULTE 80% ABSOULTE Sale Site: 651 West Southport Road Kissimmee, Florida, USA, 34746 T: +1 407.396.6060 F: +1 407.396.8181 6 DAYS February 6th- 11th @ 9am Kissimmee 2017 Unused Caterpillar 320FL - choice of

More information

Port of Kalama, New Approach to Maintenance Dredging

Port of Kalama, New Approach to Maintenance Dredging Port of Kalama, New Approach to Maintenance Dredging Vladimir Shepsis, Coast @ Harbor Engineering, Inc. John Dawson, Coast @ Harbor Engineering, Inc. Mark Wilson, Port of Kalama Tabitha Reeder, Port of

More information

The Whitefish Trail

The Whitefish Trail The Trail - 2017 Trail Construction Specifications & Scope of Services The Lower Haskill section of Trail construction will take place on two different land ownerships: City of and Iron Horse. This section

More information

SFO Construction and Maintenance Schedule 2013

SFO Construction and Maintenance Schedule 2013 Mon SUN MONDAY 01/06/2014 Ops. Construction (650)821-3341 2 2 1 1 1 1 SFO P&G - Power Wash 0130-0430 PM Crew will power wash various areas around Boarding Area C. 12 Woolpert/SFO Surveyors - AGIS Survey

More information

BRIDGE SPAN 'X28'X6', 35 OF 108 DROPS SINGLE CONCRETE BRIDGE SPAN, 5 SINGLE CONCRETE BRIDGE SPAN, 6

BRIDGE SPAN 'X28'X6', 35 OF 108 DROPS SINGLE CONCRETE BRIDGE SPAN, 5 SINGLE CONCRETE BRIDGE SPAN, 6 A B C D E F G H I 1 2 3 4 REEFNAME MATERIAL1 MATERIAL2 TONS LORAN1 LORAN2 LATITUDE LONGITUDE DESCRIPTION ST GEORGE ISLAND BRIDGE PILINGS 40 BRIDGE PILINGS, BRIDGE REEF-WEST END (40) 80.00 2930.052 8449.937

More information

U.S. Army Corps of Engineers Wilmington District

U.S. Army Corps of Engineers Wilmington District U.S. Army Corps of Engineers Wilmington District 2012 East Coast - WEDA October 9-11, 2012 Ongoing & Upcoming Contracts US Army Corps of Engineers Wilmington District Ongoing Contracts Project Quantity

More information

U.S. Coast Guard - American Waterways Operators Annual Safety Report

U.S. Coast Guard - American Waterways Operators Annual Safety Report American Waterways Operators U.S. Coast Guard - American Waterways Operators Annual Safety Report National Quality Steering Committee Meeting August 3, 216 Established Safety Metrics For 16 years, the

More information

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions

January 25, House Select Committee on Strategic Transportation Planning and Long Term Funding Solutions House Select Committee on Strategic Planning and Long Term Funding Solutions January 25, 2016 Sterling Baker, P.E. Multimodal Special Projects Engineer Key Items Ferry System Overview System wide Summary

More information

SYSTEM BRIEF DAILY SUMMARY

SYSTEM BRIEF DAILY SUMMARY SYSTEM BRIEF SUMMARY * ANNUAL (PEAK HOURS 7:00 AM TO 10:00 PM MON-SAT) MaxTemp NEL (MWH) Hr Ending Hr Ending LOAD ENERGY (MWH) INCREMENTAL COST DAY DATE Civic TOTAL MAXIMUM @Max MINIMUM @Min FACTOR ON

More information

Presented to: City of Petaluma City Council

Presented to: City of Petaluma City Council Agenda Item #1.A REVISED Presented to: City of Petaluma City Council Presented By: Dan St. John, F.ASCE, Director Jason Beatty, P.E., Senior Engineer James 'Jody' Boyette, USACE Project Manager November

More information

PARK PERMIT APPLICATION

PARK PERMIT APPLICATION Park Requested: Byrd Park Dean Park Museum Lawn Nelson Park Stonewall Park Please call or check the online calendar for availability. CITY OF MANASSAS Please send completed registration form with payment

More information

MONTHLY OPERATIONS REPORT SEPTEMBER 2015

MONTHLY OPERATIONS REPORT SEPTEMBER 2015 MONTHLY OPERATIONS REPORT SEPTEMBER 215 Table of Contents SEPTEMBER 215 Section Page September Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis Sterling Baker, P.E. NCDOT James

More information

SFO Construction and Maintenance Schedule 2013

SFO Construction and Maintenance Schedule 2013 Mon SUN MONDAY 08/05/2013 Ops. Construction (650)821-3341 Item # Activity/Contractor Time 1 SFO P&G - Crack Seal RWY 10R/28L 0000-0600 4 6 Clean Harbors/Superior Drilling/SFIA Water Treatment - Excavation/Cleaning

More information

PORT OF FLÅM PORT INFORMATION SHEET Prepared November Harbour Master: Mr. John Erik Johnsen, (until May 2018) Aurland Port Authority

PORT OF FLÅM PORT INFORMATION SHEET Prepared November Harbour Master: Mr. John Erik Johnsen, (until May 2018) Aurland Port Authority PORT OF FLÅM PORT INFORMATION SHEET 2018 Prepared vember 2017 NAME AND CONTACTS Name of Port: Position: Distance from Bergen: Distance from Skjolden: Distance from Geiranger: Pilot Station: Flåm Hamn Port

More information

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018 NC Dredge Studies Study of the Use and Efficiency of the Dredge Manteo Study of Acquisition of Dedicated Dredging Capacity Study of Dredging Services Cost-Benefit Analysis 2018 NCBIWA Spring Conference

More information

U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee

U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee Am erican Waterways Operators August 05, 2015 Established Safety Metrics U.S. Coast Guard - American Waterways Operators Safety Report National Quality Steering Committee Towing Industry Safety Statistics

More information

OUTDOOR RECREATION RENTAL GUIDE

OUTDOOR RECREATION RENTAL GUIDE OUTDOOR RECREATION RENTAL GUIDE Hours Of Operation Monday, Tuesday, Thursday, and Friday: 8:30 a.m. to 5 p.m. Wednesday, Saturday, Sunday, and Holidays: CLOSED Prices current as of October 2017. All prices

More information

2013 IQA Young Members Network Study Tour Hong Kong / China

2013 IQA Young Members Network Study Tour Hong Kong / China 2013 IQA Young Members Network Study Tour Hong Kong / China Introduction IQA Young Members Network (YMN) Alliance Construction Materials Hong Kong Sponsor 5 Quarries 1. Anderson Road Quarry 2. Lam Tei

More information

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form

[Owner s or Custodian s Company Name] VGP Annual Towing Vessel Inspection Report Form Form Vessel General Permit Compliance Instructions: (1) This form must be completed at least once every 12 months. Visually inspect all areas of the vessel affected by the requirements in the VGP that

More information

Madagascar. Ports description

Madagascar. Ports description Madagascar Ports description Toamasina (Tamatave) Access Specification Map reference number and Description 1 Mole A - General cargo Length (m) Draught (m) East 110 6.50 Head 59 7.5 West 192 5 Remarks

More information

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83

More information

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China

HERMAN EIJKELENBOOM. Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, P.R. China Marine Engineer Office Location Brookes Bell LLP Brookes Bell Shanghai Suite K 5 th Floor East Hope Plaza 1777 Century Avenue Pudong Shanghai, 200122 P.R. China Telephone +86 21 5860 2868 E-mail he@brookesbell.com

More information

Proposal from Crowne Plaza Memphis Downtown 300 North Second Street, Memphis, Tennessee, 38105, USA

Proposal from Crowne Plaza Memphis Downtown 300 North Second Street, Memphis, Tennessee, 38105, USA PROPOSAL DETAILS RFP Name RFP Code Event Name Sept 2017-ALRP FZNKPLGJF69 Sept 2017-ALRP Response Date Mon, 13-Mar-2017 2:19 PM Proposal Status Cancelled Supplier Name Crowne Plaza Memphis Downtown Supplier

More information

MIDAMERICA ST. LOUIS AIRPORT Invitation for Bid: HVAC Service & Maintenance Solicitation No

MIDAMERICA ST. LOUIS AIRPORT Invitation for Bid: HVAC Service & Maintenance Solicitation No MIDAMERICA ST. LOUIS AIRPORT Solicitation No. 2016-05 TO: ISSUED BY: All Plan Holders and Meeting Attendees (Meeting Roster Attached) MidAmerica St. Louis Airport Dept. of Engineering & Planning DATE:

More information

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018 SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY September 25, 2018 The members of the Woods Hole, Martha s Vineyard and Nantucket Steamship Authority ( SSA

More information

Agency on Bay Management Gulfstream Phase IV Expansion

Agency on Bay Management Gulfstream Phase IV Expansion Agency on Bay Management Gulfstream Phase IV Expansion July 13, 2006 Al Taylor Vice President, Operations 1 Company Overview - Introduction Placed into service in May 2002, Gulfstream is a stateof-the-art

More information

Register free at Hillhead.com. Come and visit our team on stand RB14 registration area June Hillhead Quarry Buxton Derbyshire UK

Register free at Hillhead.com. Come and visit our team on stand RB14 registration area June Hillhead Quarry Buxton Derbyshire UK 26 28 June Hillhead Quarry Buxton Derbyshire UK Register free at Hillhead.com #Hillhead18 Three days of live demonstrations, 500 exhibitors and thousands of products for the quarrying, construction and

More information

YMA TRAINING CATALOG 2017

YMA TRAINING CATALOG 2017 E Learning Solutions Centum VP Virtual Operator Trainer Process, Safety and basic Engineering courses Safe System of Work Range Safety Awareness range Environmental Range Process Operation and technology

More information

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where

More information

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD

2012 WATER & SEWER ALLEY CONSTRUCTION CONTRACT, PACKAGE II SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B DD BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Welcome to the City of Ketchikan Port & Harbors

Welcome to the City of Ketchikan Port & Harbors Effective Sept 1, 2017 Welcome to the City of Ketchikan Port & Harbors The City of Ketchikan operates five public boat harbors in the Ketchikan area. Harbor regulations and user fees are established by

More information

KISSIMMEE. Wednesday, Oct 25 th 08:30am. Florida - USA CALL NOW TO CONSIGN QUALITY EQUIPMENT

KISSIMMEE. Wednesday, Oct 25 th 08:30am.   Florida - USA CALL NOW TO CONSIGN QUALITY EQUIPMENT License Number: AU-C003078 KISSIMMEE Florida - USA Wednesday, Oct 25 th 2017 @ 08:30am 2006 John Deere 670D 13-14 Caterpillar 320EL - choice CALL NOW TO CONSIGN QUALITY EQUIPMENT +1 419-865-3990 www.yoderandfrey.com

More information

Investigation Report Worker Fatality March 31, 2014

Investigation Report Worker Fatality March 31, 2014 Investigation Report Worker Fatality March 31, 2014 Report No- F-OHS-062228-389D3 March 2015 Page 1 of 6 The contents of this report This document reports s (OHS ) investigation of a worker fatality in

More information

PA CI All-Hands Meeting

PA CI All-Hands Meeting PROPOSAL DETAILS RFP Name RFP Code Event Name 20404 - PA CI All-Hands Meeting KLNZJLRX6ZH 20404 - PA CI All-Hands Meeting Response Date Mon, 13-Mar-2017 6:03 PM Proposal Status Withdrawn Supplier Name

More information

Panama Canal Stakeholder Working Group Meeting

Panama Canal Stakeholder Working Group Meeting Panama Canal Stakeholder Working Group Meeting POHA, Bayport Container Terminal, Houston, Texas August 27, 2012 TOTAL ECONOMIC IMPACT 9,749 Texas jobs are in some way related to the Port Of the 9,749

More information

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone Steve Hubbard: Lane Construction Safety Training Manager Michael Grey: Rea Contracting Project Superintendent Access and Egress Into the Work Zone THE TYPICAL INTERSTATE

More information

Airport Passenger Conveyance Benchmarking Discussion

Airport Passenger Conveyance Benchmarking Discussion Airport Passenger Conveyance Benchmarking Discussion Presented by: Los Angeles World Airports Greater Toronto Airport Authority Salt Lake City International Airport Seattle-Tacoma International Airport

More information

MONTHLY OPERATIONS REPORT DECEMBER 2015

MONTHLY OPERATIONS REPORT DECEMBER 2015 MONTHLY OPERATIONS REPORT DECEMBER 215 Table of Contents DECEMBER 215 Section Page December Highlights... 3 Strategic Goals Progress Update... 4 Ridership... 6 Revenue... 9 Expenses... 1 System Summary...

More information

Stone Harbor Municipal Public Access Plan. in accordance with N.J.A.C. 7:7E

Stone Harbor Municipal Public Access Plan. in accordance with N.J.A.C. 7:7E Stone Harbor Municipal Public Access Plan in accordance with N.J.A.C. 7:7E December 2011 Stone Harbor Municipal Public Access Plan EXECUTIVE SUMMARY In the spring of 2011, the New Jersey Department of

More information

2.1 General Characteristics. 2.2 General Dimensions. 2.3 Ground Clearances. 2.4 Interior Arrangements. 2.5 Cabin Cross Sections

2.1 General Characteristics. 2.2 General Dimensions. 2.3 Ground Clearances. 2.4 Interior Arrangements. 2.5 Cabin Cross Sections 2.0 AIRPLANE DESCRIPTION 2.1 General Characteristics 2.2 General Dimensions 2.3 Ground Clearances 2.4 Interior Arrangements 2.5 Cabin Cross Sections 2.6 Lower Cargo Compartments 2.7 Door Clearances JUNE

More information

ACCEPTING CONSIGNMENTS, CONTACT US NOW

ACCEPTING CONSIGNMENTS, CONTACT US NOW Las Vegas, NV April 20, 2018 (Friday) Unreserved public auction 2014 Komatsu D375A-6 2015 Komatsu WA380-7 7 of 8 2012 Volvo A40F 6x6 2016 Komatsu PC390LC-11 2010 Peterbilt 389 Heavy Haul ACCEPTING CONSIGNMENTS,

More information

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH Harbor Location: Cleveland Harbor is located at the mouth of the Cuyahoga River on the southern shore of Lake Erie in the city of Cleveland, OH. Authority:

More information

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM

SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM SAN FRANCISCO DISTRICT FY 2018 NAVIGATION PROGRAM 1 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 WEDA PACIFIC CHAPTER 2017 ANNUAL MEETING 131 132 122 PORTLAND, OREGON 239 65 53 80

More information

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA Harbor Location: Erie Harbor is located on the southern shore of Lake Erie in the City of Erie, PA about 98 Miles southwest of Buffalo. Authority: River

More information

Baltimore Harbor & Channels, Maryland and Virginia

Baltimore Harbor & Channels, Maryland and Virginia FACT SHEET January 2006 Type of Project: Navigation Project Phase: Operation & Maintenance Authorization: Section 101 of the River and Harbor Act of 1958 (42-Foot Project), Section 101 of the River and

More information

22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland

22 Days Escorted Tour Fly & Cruise Scandinavia Celebrity Host Ian Healy Denmark, Sweden, Russia Finland Dream Maker Travel (Australia) Pty Ltd METROPOL SHOPPING CENTRE 742 Creek Road (Cnr Creek Rd & Pine Mountain Rd) MOUNT GRAVATT EAST QLD 4122 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au

More information

Report for Jan-Nov-2006 pdf. General Statistics

Report for Jan-Nov-2006 pdf. General Statistics Report for Jan-Nov-006 pdf Time range: /8/006 07:3:37 - /3/006 3:50:6 Generated on Mon Jan 0, 007-9:3:5 General Statistics Summary Summary Hits Total Hits 97,06 Average Hits per Day 89 Average Hits per

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of GAC & SAC = $2.06 / 1,000 lbs) $3.32 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.91 / sq. ft. $0.41

More information

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017

CAAC China. CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision Oct-2017 CAAC China CCAR 121 Subpart P Crew members Flight and Duty time Limits, and Rest Requirements Revision 5 10-Oct-2017 Contents Contents... 2 CCAR 121.481 General... 3 CCAR 121.483 Flight crew flight time

More information

Disaster Preparedness 7/18/17

Disaster Preparedness 7/18/17 Disaster Preparedness 7/18/17 The Hurricane team is: Ryan Pritchford: Tel: 941-705-5156 Hilary Tosch: Tel: 941-779-6171 Susan Zelt: Tel: 1-580-458-9180 **Should a hurricane be imminent, I will receive

More information

The Corps of Engineers Dredges on the West Coast

The Corps of Engineers Dredges on the West Coast The Corps of Engineers Dredges on the West Coast Presented To California Marine Affairs and Navigation Conference Sheryl Carrubba Operations Manager, Channels & Harbors Portland District November 8, 2011

More information

Special Specification 6113 Movable Barrier Transfer Operations and Maintenance for High Occupancy Vehicle Lanes

Special Specification 6113 Movable Barrier Transfer Operations and Maintenance for High Occupancy Vehicle Lanes D M 6113 Special Specification 6113 Movable Barrier Transfer Operations and Maintenance for High Occupancy Vehicle Lanes 1. DESCRIPTION Provide movable barrier transfer operations and maintenance for high

More information

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT

JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT JOHN GLENN COLUMBUS INTERNATIONAL AIRPORT Signatory Airlines Landing Fee: (Net of General Airline Credit = $1.91 / 1,000 lbs) $3.17 / 1,000 lbs. Apron Fees: Square Foot Rate Landed Weight Rate $1.78 /

More information

THE PRECAST SHOW 2021 REQUEST FOR PROPOSAL

THE PRECAST SHOW 2021 REQUEST FOR PROPOSAL THE PRECAST SHOW 2021 REQUEST FOR PROPOSAL GENERAL INFORMATION Official Event Name: The Precast Show 2021 ABOUT NPCA & THE PRECAST SHOW Founded in 1965, the National Precast Concrete Association (NPCA)

More information

LEADERS 3DS 2018 Proposal from Corinthia Hotel St. George s Bay St. George's Bay, St. Julian's, STJ 3301, Malta

LEADERS 3DS 2018 Proposal from Corinthia Hotel St. George s Bay St. George's Bay, St. Julian's, STJ 3301, Malta Proposal Details RFP Name LEADERS 3DS 2018 RFP Code NWNH8P4CS9K Event Name LEADERS 3DS 2018 Response Date Thu, 06-Oct-2016 6:01 AM Proposal Status Withdrawn Supplier Name Corinthia Hotel St. George s Bay

More information

Network Revenue Management

Network Revenue Management Network Revenue Management Page 1 Outline Network Management Problem Greedy Heuristic LP Approach Virtual Nesting Bid Prices Based on Phillips (2005) Chapter 8 Demand for Hotel Rooms Vary over a Week Page

More information

Carnival Elation (EL)

Carnival Elation (EL) Carnival Elation (EL) Itineraries listed by Embarkation Home Port, in order of duration. Embarkation Home Port: Charleston, South Carolina Carnival Elation 4 Day Bahamas from Jacksonville, FL Freeport,

More information

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013

FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO AUTHORITY MEETING #5/13 To Be Held June 21, 2013 FURTHER TO: Pages AUTH7. SECTION I - ITEMS FOR AUTHORITY ACTION AUTH7.4 AUTH7.5 AUTH7.6 COATSWORTH CUT PROJECT Contract RSD13-080 - Channel Dredging

More information

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety Vancouver Airport Authority Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety - 2017 CSMP Contractor Expectations - 2017 i Contents Contents Contents Introduction ii

More information

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018

March 2, The Honorable Mayor Williams D. Sessoms, Jr. Members of City Council. Subject: Coastal CIP Presentation to City Council - March 6, 2018 OFFICE OF THE CITY MANAGER (757) 385-4242 (757) 427-5626 FAX MUNICIPAL CENTER BUILDING 1, ROOM 234 2401 COURTHOUSE DRIVE VIRGINIA BEACH, VA 23456-9001 March 2, 2018 The Honorable Mayor Williams D. Sessoms,

More information

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort

Amended Maintenance Dredge Spoil Management Plan. Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Shute Harbour Marina Resort Amended Maintenance Dredge Spoil Management Plan Quality Information Document Ref Amended Maintenance Dredge and Spoil Maintenance

More information

GENERAL TARIFF PROVISIONS :

GENERAL TARIFF PROVISIONS : GENERAL TARIFF PROVISIONS : a) Overtime working hours are considered from 22.00 hrs to 06.00 hrs of the next day, and from 22.00 hrs on Friday to 06.00 on Monday as well as during holidays. b) Service

More information

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT

CLIPPER COVE PROMENADE & MARINA DEVELOPMENT CLIPPER COVE PROMENADE & MARINA DEVELOPMENT Treasure Island / Yerba Buena Island Citizen Advisory Board Review May 05 2015 CLIPPER COVE PROMENADE & MARINA DEVELOPMENT TREASURE ISLAND TI YBI CAB Review

More information

Plan to Provide for the Deplanement of Passengers Following Excessive Tarmac Delays

Plan to Provide for the Deplanement of Passengers Following Excessive Tarmac Delays BURLINGTON INTERNATIONAL AIRPORT EMERGENCY CONTINGENCY PLAN Burlington International Airport has prepared this pursuant to 42301 of the FAA Modernization and Reform Act of 2012. Questions regarding this

More information

Aid to Local Ports FY19 Requests

Aid to Local Ports FY19 Requests City Accomack- Greenbackville Harbor Phase III Accomack-Quinby Harbor Bulkhead Cape Charles- Installation of 4 th breakwater Total Project Cost Amount Requested Proposed Allocation Carryover Request $260,000.00

More information

Genting Dream Ex Singapore

Genting Dream Ex Singapore Genting Dream Ex Singapore 5N CRUISE (SUN SAILING) Singapore-High Seas-Surabaya-North Bali DAY PORT ETA ETD Jan: 13 Mar: 17 Mon High Seas -- -- Tue Surabaya 0800 (0700) 1700 (1600) Wed North Bali (Celukan

More information

SFO Construction and Maintenance Schedule 2013

SFO Construction and Maintenance Schedule 2013 Mon SUN MONDAY 05/20/2013 Ops. Construction (650)821-3341 1 1A 3 SFO Pavings & Grounds - Crack Seal RWY 10R/28L SFO Pavings & Grounds - Repair Catch Basin SFO Engineering/Ennis-Flint - Re-install Thermoplastics

More information

State of the Waterway 2017

State of the Waterway 2017 State of the Waterway 2017 Steven W. Nerheim Director VTS Houston/Galveston Lone Star Harbor Safety Committee 2 FEBRUARY 2018 U.S. Port Rankings 2015 1 South Louisiana, LA, Port of 259.1-3.07% 15 Texas

More information

BID SCHEDULE LOT 1 Two Four-place Piston Helicopter (3 Passengers & Pilot) Bidder (Company ) Company Address Bidder Contact Name Contact E-Mail Contact Phone # Web site Bidder s Authorized Signature Name

More information

Port Columbus International Airport

Port Columbus International Airport Port Columbus International Airport Signatory Airlines Landing Fee: (Net of General Airline Credit = $2.77 / 1,000 lbs) $4.13 / 1,000 lbs Apron Fees: Square Foot Rate Landed Weight Rate $2.28 / sq. ft

More information

Senator Bert Stedman Sitka Chamber of Commerce June 24, 2015

Senator Bert Stedman Sitka Chamber of Commerce June 24, 2015 Senator Bert Stedman Sitka Chamber of Commerce June 24, 2015 District R Ketchikan Sitka Petersburg Wrangell Metlakatla Craig Hoonah Klawock Kake Thorne Bay Angoon Saxman Hydaburg Coffman Cove Tenakee Springs

More information

January 2009 City of Long Branch

January 2009 City of Long Branch January 2009 City of Long Branch Garbage Pickup North of Broadway Garbage Pickup South of Broadway January 2009 City of Long Branch All Dog Dog Licenses Licenses must must be renewed be renewed by January

More information

Cleveland Harbor Dredged Material Management

Cleveland Harbor Dredged Material Management Cleveland Harbor Dredged Material Management Requirements, Capacity Issues, and Placement Alternatives Brent R. Leslie, CPA Chief Financial Officer Cleveland-Cuyahoga County Port Authority Brent.Leslie@portofcleveland.com

More information

ABERYSTWYTH MARINA, ABERYSTWYTH, SY23 1AS N W FOR SALE

ABERYSTWYTH MARINA, ABERYSTWYTH, SY23 1AS N W FOR SALE ABERYSTWYTH MARINA, ABERYSTWYTH, SY23 1AS 52 24.42N 04 5.47W FOR SALE SUMMARY One of the finest and best developed coastal marinas in Wales 150 berths, all on Walcon pontoons with connections to mains

More information

Vermont State Fair PO Box 10 Rutland, Vermont fax VENDOR APPLICATION

Vermont State Fair PO Box 10 Rutland, Vermont fax  VENDOR APPLICATION PO Box 10 Rutland, Vermont 05702 802-775-5200 802-775-9560 fax email VermontStateFair@outlook.com VENDOR APPLICATION This application does not guarantee you a space. A picture of your concession MUST accompany

More information

Genting Dream Ex Singapore

Genting Dream Ex Singapore Genting Dream Ex Singapore Duration: 02 NIGHTS CRUISE (FRIDAY SAILING) 2 Nts. Singapore High Seas Cruise (Friday Dep.) Fri Singapore - 2100 Dec: 1, 8, 15, 22, 29, 2017 Jan: 5, 12, 19, 26, 2018 Sat High

More information

2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION

2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION 2010 CHICAGO YACHT CLUB RACE TO MACKINAC LAKE MICHIGAN HARBOR CONTACT INFORMATION On your return trip from Mackinac Island, you will likely want to go at a more leisurely pace, stopping in different harbors

More information

Appendix 15.2: Pasha Dere Beach Usage Survey

Appendix 15.2: Pasha Dere Beach Usage Survey Appendix 15.2: Pasha Dere Beach Usage Survey URS-EIA-REP-22375 Table of Contents 15.2 Pasha Dere Beach Usage Survey... 1 15.2.1 Introduction... 1 15.2.2 Beach Surveys... 1 15.2.2.1 Survey Dates, Times

More information

Chris LeClair Pine Glen Rd., Riverview, NB E1B 4J ; Fax

Chris LeClair Pine Glen Rd., Riverview, NB E1B 4J ; Fax Chris LeClair 2-387 Pine Glen Rd., Riverview, NB E1B 4J8 506 852-1049; 1-800-591-6034 chris.leclair@rogers.com Fax 830-1835 www.ccbustour.com Saint-Pierre et Miquelon & Newfoundland July 14-26, 2019 13

More information

Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014

Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Arctic Canada 1 Public Works and Government Services Canada (PWGSC) Real Property Institute of Canada: Marine Infrastructure National Workshop January 28, 2014 Jerome MacGillivray, P. Eng John Davidson,

More information

THE PRECAST SHOW 2021 REQUEST FOR PROPOSAL

THE PRECAST SHOW 2021 REQUEST FOR PROPOSAL THE PRECAST SHOW 2021 REQUEST FOR PROPOSAL GENERAL INFORMATION Official Event Name: The Precast Show 2021 ABOUT NPCA & THE PRECAST SHOW Founded in 1965, the National Precast Concrete Association represents

More information

Jadrolinija international ferries Timetable and pricelist 2017

Jadrolinija international ferries Timetable and pricelist 2017 Jadrolinija international ferries Timetable and pricelist 2017 ANCONA - SPLIT - STARI GRAD (Hvar island) 01.01-31.03 and 29.10-29.12 Wed.20:00 Sun.20:00 SPLIT Wed.07:00 Sat.07:00 Thu.07:00 Mon.07:00 ANCONA

More information

Lincoln, NE November 9, 2018 (Friday)

Lincoln, NE November 9, 2018 (Friday) Lincoln, NE November 9, 2018 (Friday) Unreserved public auction Caterpillar D6N XL 1 of 2 John Deere 770D Caterpillar 627F 2011 Case 550 QuadTrac Caterpillar 963D 2016 Smithco SX3-46-36 46 Ft ACCEPTING

More information

Investigation Report. Bundesstelle für Flugunfalluntersuchung. Identification. Factual information

Investigation Report. Bundesstelle für Flugunfalluntersuchung. Identification. Factual information Bundesstelle für Flugunfalluntersuchung German Federal Bureau of Aircraft Accidents Investigation Investigation Report EX007-0/02 April 2004 Identification Kind of occurrence: Serious incident Date: 29

More information

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017 Commonwealth Avenue Bridge Deck Replacement Project Legislative and Stakeholder Briefing April 13, 2017 1 Project Team Contractor Walsh Construction Company Design Team HDR Lead City Point Partners, LLC

More information

Prices are Starting From MARINER OF THE SEAS VOYAGER CLASS TONNAGE :

Prices are Starting From MARINER OF THE SEAS VOYAGER CLASS TONNAGE : MARINER OF THE SEAS SAILING ON MARCH 2018 1-Mar-18 5-Mar-18 9-Mar-18 12-Mar-18 16-Mar-18 19-Mar-18 29-Mar-18 2-Apr-18 6-Apr-18 4 NIGHTS 4 NIGHTS 3 NIGHTS 4 NIGHTS 3 NIGHTS 3 NIGHTS 4 NIGHTS 4 NIGHTS 3

More information

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012

SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 CENAN-PP-H 9 Oct 12 MEMORANDUM FOR RECORD SUBJECT: Newark Bay Study Area Coordination Team Meeting, 9 October 2012 1. The regularly scheduled monthly interagency coordination meeting was held on 9 Oct

More information

Job Demands Analysis NEEDLE RECOVERY (PARK BOARD)

Job Demands Analysis NEEDLE RECOVERY (PARK BOARD) Purpose Job Demands Analysis NEEDLE RECOVERY (PARK BOARD) The purpose of the job of a Needle Recovery Employee working for the City of Vancouver s Parks & Recreation Department is to pick up needles in

More information

The Risk Management of Vessel Traffic

The Risk Management of Vessel Traffic Western Washington University Western CEDAR Salish Sea Ecosystem Conference 2014 Salish Sea Ecosystem Conference (Seattle, Wash.) May 1st, 3:30 PM - 5:00 PM The Risk Management of Vessel Traffic Follow

More information

European aviation sector reactions on the Ebola threat

European aviation sector reactions on the Ebola threat Cairo, 17 - November 2014 European aviation sector reactions on the Ebola threat Perspective of the European Aviation Crisis Coordination Cell (EACCC) Marc van Oudheusden Sr. Political Advisor Crisis Management

More information

SOLICITATION ADDENDUM NO. 1 RFP MOBILE ONSITE AND CARD OR KEY-LOCK FUEL AND LUBRICANT PRODUCTS

SOLICITATION ADDENDUM NO. 1 RFP MOBILE ONSITE AND CARD OR KEY-LOCK FUEL AND LUBRICANT PRODUCTS Purchasing Department 16550 SW Merlo Road Beaverton, OR 97003-5152 P: (503) 356-4461 F: (503) 591-4139 SOLICITATION ADDENDUM NO. 1 RFP 15-0034 MOBILE ONSITE AND CARD OR KEY-LOCK FUEL AND LUBRICANT PRODUCTS

More information

I.R IRAN - NORWAY TECHNOLOGY PARTNERSHIP WORKSHOP

I.R IRAN - NORWAY TECHNOLOGY PARTNERSHIP WORKSHOP I.R IRAN - NORWAY TECHNOLOGY PARTNERSHIP WORKSHOP Teheran 1 March 2017 www.dlapiper.com Teheran 1 March 2017 0 Previous buy back contract The buy back contract A risk service contract, repayment of petroleum

More information

18 Sep 07 Oct 2018 $ 5998

18 Sep 07 Oct 2018 $ 5998 Dream Maker Travel (Australia) Pty Ltd Metropol Shopping Centre, 742 Creek Road, Carindale QLD 4152 Tel: 07 3343 5422 Fax: 07 3849 5770 Email: info@dreammakertravel.com.au Web Site: www.dreammakertravel.com.au

More information