1 Port construction in Bremerhaven Construction of the new Kaiserschleuse sea lock
2 Requirement: permanent demand for engineering skills History repeats itself On 23 August 1897, the new double-propeller steamer Bremen owned by Norddeutsche Lloyd (NDL) was the first trans-atlantic ship to pass through the chamber of the recently completed Kaiserschleuse in Bremerhaven. A very special event in the history of Bremerhaven, as the Nordwestdeutsche Zeitung reported the next day. In fact, this steamer, which was state of the art in its day, embodied exactly the type of ship for which the new Kaiserschleuse had been built the large passenger liners operated by Norddeutsche Lloyd. The brand-new lock construction was huge By the standards of those days and was a monument to supreme engineering skills. The outer head was equipped with two pairs of mitre gates. For the first time in lock construction, a sliding gate was fitted for the inner head. The construction of the lock had been an urgent matter. NDL had already installed all the equipment needed for servicing and equipping its increasingly large ships at the Kaiserhafen. But these huge vessels could only reach the port during high spring tides. For five years, the engineers had worked under great pressure to create this access, at a cost of 18.5 million marks. The need for the sea lock was so great that it was not officially inaugurated until one month after the Bremen had used it to reach the port. To this day, Bremerhaven is still dependent on troublefree access to its facilities. The large car carriers are ro-ro vessels and need non-tidal port areas that can only be reached through the Nordschleuse and Kaiserschleuse locks. However, the latter can only take ships with a maximum length of 185 metres. As today's carriers have lengths far in excess of 200 metres, they can only use Nordschleuse for port access. To ensure that Bremerhaven can defend its position as Europe's leading automotive hub in future, the Kaiserschleuse is being extended so that Panamax ships can reach the quays simultaneously through two large locks. After 110 years in service... growing to a length of 305 metres and a width of 55 metres The construction of a large sea lock is one of the most demanding tasks in port construction and also one of the most expensive metres History is repeating itself. Just like the initial project more than 100 years ago, the new construction project again uses the very latest technological developments: innovative lifting sliding gates that combine the advantages of a sliding gate with those of a lifting gate. The new, more efficient lock chamber will be 305 metres long, 55 metres wide and 13 metres deep. This is currently the largest lock construction project in Europe, with an investment volume of around million. The project is scheduled for completion in 2010 and will have overall economic and fiscal effects extending way beyond the borders of the Federal Land of Bremen.
3 Prospects: highly efficient infrastructure Overseas car transports in Bremen/Bremerhaven in millions of vehicles Car transhipment calls for better infrastructure Cars have already been transhipped in Bremerhaven for a good 100 years, but it was not until the mid-1970s that the seaport began to develop into one of the world's leading car hubs. Since then, vehicle transhipment alongside container transport has evolved into a cornerstone of the economy with one of the highest value added factors and is also a mainstay of the local labour market. 2,0 1,5 1,0 In 2007, around 2 million vehicles rolled over the quays at the Kaiserhafen, Osthafen and Nordhafen. Every day, more than 5,500 vehicles reach or leave the seaport, and an averrage four to five large car carriers and feeder ships are moored here at any given time. With an export share of well over 60%, Bremerhaven is already the largest intercontinental vehicle transhipment port and is still steadily growing. 0, Transhipment volumes increase thanks to ro-ro ships The constant increases in transhipment volumes have also had an impact on the size of the vessels used for automobile transport. In the early days of international vehicle trading, conventional freighters carried cars over the seas with loading procedures that seem almost incredible today. The first roll-on/roll-off (ro-ro) ships did not emerge until the mid-1950s. These special ships could carry around 2,000 cars at a time. Today up to 8,000 cars fit into modern carriers, which currently have a maximum length of 240 metres. As an automotive hub (volume of 2 million vehicles in 2007), Bremerhaven does not only need sufficient operating area for export, import and transhipment: it is just as important for the port to be constantly accessible to the large car carriers Kaiserschleuse But the competition is wide awake. Zeebrugge, for example, has distinctly enhanced its position since the 1990s by making substantial investments in operating areas and modern infrastructure. Bremerhaven has taken up the challenge. But a successful market position can only be achieved by adapting the infra- and suprastructure of the port facilities to changes in general conditions and in customer requirements. Future prospects for the automobile logistics centre Bremerhaven automobile terminal is used not only by cars but by all rolling goods. This includes trucks, large construction and harvesting machinery as well as rolling trailers. This so-called high and heavy sector considerably enhances the economic value added by the terminal. Osthafen Back in 2002, the port management company bremenports was already commissioned by the Senator for Economic Affairs and Ports to draw up a master plan to optimise Bremerhaven's automobile logistics centre. That master plan recommends three measures: to improve seaward access, to create additional berths and operating areas, and to reorganise road and railway facilities. The third point was initially postponed in view of the excessive costs and considerable restrictions it would impose on day-to-day port operating procedures. The Osthafen restructuring project was completed in April Improving seaward access is currently being achieved by modernising the Kaiserschleuse sea lock. This gives the automotive industry, transhipment companies and ship owners planning certainty, while providing Bremerhaven with reliable future prospects.
4 New lock: state-of-the-art technology The Kaiserschleuse, which in those days was the largest lock in the world, has been in service for 110 years. It now has to be expanded to take account of the increasing size of ships Innovative technology for construction of the new lock Construction gets off to a stormy start Not even the low-pressure weather system Thilo with its storm and high winds could delay the official start of construction work on the Kaiserschleuse on 9 November Without further ado, bremenports relocated the official first-pile ceremony for the new lock from the marquee to the neighbouring old power station. Around 200 guests were present when Ralf Nagel, Bremen s Senator for Economic Affairs and Ports, pressed the red button to drive in the first of the steel piles. Senator Nagel and Jürgen Holtermann, head of bremenports, were agreed that with the initiation of this construction project, Bremerhaven was preparing to cope with the automotive logistics business of the future. The great significance of the Kaiserschleuse for the development of Bremen's ports in general made this a historic moment. Senator Nagel also saw it as a signal to the customers using Bremen's ports: We offer excellent transhipment options, no matter how large the ships. Ralf Nagel, Senator for Economic Affairs and Ports (centre), Jürgen Holtermann, head of bremenports (left), and Henner Mahlstedt, Chairman of the Board of Management of Hochtief, set the pile driver in motion In July 2005, the Senate of the Free and Hanseatic City of Bremen took the decision to build a new Kaiserschleuse. Since then, planning, approval and tender activities have been proceeding full steam ahead. Construction work has been in progress since autumn In its capacity as port management company, bremenports was responsible for the preparatory work. First of all, the dimensions of the new lock structure had to be defined, based on two rating ships: 1. Future deep sea carriers (DSC) with a length/width/draught ratio of 270 m/40 m/10 m 2.Future study (E/S Orcelle) with a length/width/draught ratio of 250 m /50 m / 10 m The lock is being built in the same place as the existing structure. In nautical terms, it is vital to expand the outer harbour and to create a tug port which is protected by the extended eastern mole. A two-lane road which is capable of taking heavy traffic runs over both lock heads to improve the accessibility of the cruise centre and fruit terminal on Columbusinsel. The companies that now make up the Kaiserschleuse consortium emerged from the planning approval, tendering and contract award procedures. They are responsible for building a lock consisting of the outer and inner head with sill, gate fittings and gate chamber, lock chamber, steel structures, drive and control systems, outer harbour with the necessary flood protection structures, and tug port together with the traffic facilities and buildings. Construction phase 1: April 07 to September 07 Lock operations through the old Kaiserschleuse Setting up the building site Protecting and rerouting the supply lines Construction phase 2: October 07 to February 08 Dismantling the culvert at the existing inner head Decommissioning the old Kaiserschleuse (December 2007) Decommissioning the supply lines Demolishing the existing operating building Closing the road to all car traffic Construction phase 3: March 08 to June 08 Completion of the tug port Construction phase 4: July 08 to October 08 Dismantling the culvert at the old outer head and lock chamber Routing provisional supply lines across the lock Starting work to produce the outer facilities Construction phase 1 Construction phase 2 Construction phase 3 Construction phase 4 Demolition work by principal Demolition work by contractor Sections under construction Completed concrete work Completed sheet piling Flood protection line Public traffic Dyke opening
5 New lock: Lifting sliding gate - lowered - Road crossing Flow cross-section (closed) Lifting sliding gate - raised - Road crossing Flow cross-section state-of-the-art technology The highlight of the new sea lock is the innovative lifting sliding gate. It combines the advantages of a lifting gate, where the gate structure forms the closure for both filling and emptying the lock chamber, with those of a sliding gate. The sliding gate is divided into an upper and lower part. A hydraulic structure can raise the upper part by 0.6 metres to equalise the water level in the lock chamber. During this procedure, almost the entire gate width between the two gate parts can be used for the water to flow in or out. Once the water level has been evened out, the upper part is lowered again and the gate slides sideways into the gate chamber. The eastern outer harbour ensures that the ships can move into and out of the lock safely. The outer harbour walls are produced as simply anchored, combined sheet piling walls connected by steel structures. A new tug port is being produced under the protection of the extended eastern mole of the outer harbour, with a total of 10 berths (including 2 reserve berths). Road traffic will move from the road onto the lifting sliding gate across lifting slabs which are raised and lowered by electric lifting cylinders. The upper part of the outer gate is raised. Water flows between the two gate sections from the outer harbour into the lock chamber. The water in the lock chamber rises. Once the water in the outer harbour and the lock chamber is on the same level, the upper part of the outer gate is lowered again. The outer gate is moved into the gate chamber. The ship enters the lock chamber. Construction phase 6: March 09 to June 09 Continued production of the outer facilities Time slot begins for the customs post and building work by the principal Construction phase 7: July 09 to September 09 Continued production of the outer facilities New culvert completed A total of approx. 455,000 m3 of soil will be excavated, 6,800 m3 underwater concrete and 45,000 m3 concrete used; 4,300 tonnes of reinforcing steel will be required, together with 39,500 tonnes of sheet piling steel and steel piles, as well as 6,300 tonnes of structural steel. The consortium made up of Hochtief Construction, August Prien Bauunternehmung, Strabag and Gustav W. Rogge is expected to work on the lock for 28 months. The new lock is to be completed and handed over in mid The outer gate is closed. The upper part of the inner gate is raised. Water flows from the lock chamber into the harbour basin. The water level in the lock chamber falls. Once the water in the lock chamber and the harbour basin is on the same level, the upper part of the inner gate is lowered again. The inner gate is moved into the gate chamber. The ship moves into the harbour basin. Construction phase 5 Start of concrete work on the inner main gate chamber Production of the western flood protection wall in the outer harbour Completion of the work to dismantle the old eastern lock chamber wall The control building will be erected on the outer head at the end of the gate chamber. It will have a total volume of approx. 4,000 m3 and contain machine and electrical control rooms, as well as operating rooms and social amenities for the lock staff. The building on the inner head is also positioned at the end of the gate chamber, has a volume of approx. 2,700 m3 and will accommodate the machinery and control systems. The water in the outer harbour and lock chamber is not on the same level. Both lock gates are closed. Construction phase 5: November 08 to February 09 Construction phase 6 Construction phase 8: October 09 to December 09 Construction phase 9: January 2010 to May 2010 Lock operations through the new Kaiserschleuse (from month 37) Handover of the Kaiserschleuse after 38.5 months (final state) Construction phase 7 Routing the supply lines Continued production of the outer facilities Road construction Remaining work Completion of the outer facilities Overall commissioning Trial operation of the lock facilities Remaining work Construction phase 8 Construction phase 9
6 History: largest lock structure The Kaiserschleuse: a structure for the new century 110 years ago, on 20 September 1897, the Kaiserschleuse was officially handed over for its intended purpose. The sea lock, which was built with 25 million bricks and 20,000 driven piles, had already been completed one month before. But given the delays in its completion caused by the heavy winter and storm tides, right up to the end it was not possible to predict with any certainty the day on which the opening would take place, according to Carl Barkhausen, Senator for Ports. And so the only option was to start operation of the lock one month in advance. Shipping interests and the financial situation of the state, said Barkhausen, demanded that the huge structure should start operating as soon as possible, without taking account of official ceremonies. Photo: Bremerhaven Museum of History Shipping interests in those days referred to the interests of Norddeutsche Lloyd (NDL). The shipowners needed sufficient port capacities for their expanding regular services. NDL found such capacities in the Kaiserhafen ports I to III, built between 1872 and The first Kaiserhafen was opened in 1875, and one year later was provided with a seaward lock with a passage width of 17 metres and an outer harbour. But soon this was no longer sufficient to cope with NDL's needs, so that from 1890 to 1897 the company s high-speed steamers were handled in Nordenham on the other side of the river. Back in those days, the construction of a large sea lock was one of the most demanding engineering tasks and not much has changed in that respect right up to the present day. Adapting the port infrastructure to developments in shipbuilding and other means of transport is a permanent challenge. Photo: Bremerhaven Museum of History Bremen s answer was to expand the Kaiserhafen. In 1892, work began on the new Kaiserschleuse under the supervision of Bremerhaven s port construction director Rudolf Rudloff. It was large enough to accommodate NDL s largest Atlantic steamship, Kaiser Wilhelm der Grosse, which was metres long and metres wide. In its early years, the new Kaiserschleuse was said to be the largest lock structure in the world. The hydraulic system for operating the lock gates, which originally ran on steam, was replaced by an electric system in the 1950s. The current construction project is again one of the largest anywhere in Europe. When it is completed, the new Kaiserschleuse will be able to take the largest car carriers in the world, thus safeguarding Bremerhaven's longterm future as the leading international automobile hub.
7 All clear ahead for car carriers Imprint Published by: bremenports GmbH & Co. KG Am Strom Bremerhaven Telefon +49 (0) Text and Layout: GuS Kommunikation Photos: bremenports GmbH & Co. KG German Maritime Museum GuS Kommunikation Bremerhaven Museum of History Design: GuS Kommunikation 1 st edition (2007) Photo: Bremerhaven Museum of History
FACTS & FIGURES THE PORTS OF BREMEN AND BREMERHAVEN. The Senator for Economic Affairs, Labour and Ports. Free Hanseatic City of Bremen
FACTS & FIGURES THE PORTS OF BREMEN AND BREMERHAVEN The Senator for Economic Affairs, Labour and Ports Free Hanseatic City of Bremen 1 xxx FACTS & FIGURES 2017 INQUIRIES AND SUGGESTIONS ABOUT THE LATEST
More informationPRIMARY EDUCATION PACK CLOZE PROCEDURE
PRIMARY EDUCATION PACK www.titanclydebank.com Cloze Procedure Passage 1 Use the words at the bottom of the sheet to complete this passage. The Titan Clydebank Crane was designed and built by (1) whose
More informationSite Formation Works of the Kai Tak Cruise Terminal Project
Site Formation Works of the Kai Tak Cruise Terminal Project Presented by Ian Muir MIEAust, CPEng Maritime Business Unit Head Asia Pacific and Deputy Project Director for the Kai Tak Cruise Terminal Site
More informationAPPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY
APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY Effects of Lyttelton Port Recovery Plan on Navigational Safety November 2014 INTRODUCTION Lyttelton Port of Christchurch (LPC) utilises an integrated health
More informationHUTCHISON PORTS STOCKHOLM
HUTCHISON PORTS STOCKHOLM A NEW CONTAINER TERMINAL OPENING 2020 2 THE ONLY DEEP-WATER FACILITY ON THE EAST COAST OF SWEDEN 3 SCHEDULED PHASE 1 TO OPEN THE FIRST PHASE IN MAY 2020. 4 ON PHASE 1 COMPLETION:
More informationOnline unter
Online unter www.bremenports.de/statistiken 1 FACTS & FIGURES THE PORTS OF BREMEN The Senator for Economic Affairs, Labour and Ports Free Hanseatic City of Bremen Bremen/Bremerhaven 2012 Design and layout:
More informationMIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT
MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT Economic Impact One of Miami-Dade County s Principal Economic Engines 207,000 jobs $27 Billion annually 2 Cruise Capital
More informationBREMEN PROPERTY LOCATION
BREMEN PROPERTY LOCATION Stand B2.240 4 to 6 October 2017 1 CONTENTS 4 13 Title topic city centre 14 15 Our partners 16 19 Our services Bremeninvest the international brand of WFB Wirtschaftsförderung
More informationP R E S S R E L E A S E
Strategy successfully confirmed: operating profit up by 10.2% Bremen, 14 April 2015 +++ The EUROGATE Group can look back on a successful business performance in 2014. The Company increased operating profit
More informationNSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS
2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.
More informationForth Ports Limited. Ruling Depths & Under Keel Clearances
Forth Ports Limited - Forth Vessels are scheduled into / out of ports on the Forth & Tay in accordance with the under keel clearance criteria specified in this section of the Marine Guidelines & Port Information.
More informationWalvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development
Walvis Bay and its role as a logistics hub for the SADC region Christian Faure Executive: Marketing and Strategic Business Development CONTENTS 1. Namport and market environment 2. Walvis Bay town dynamics
More informationDOCKING AND ROUTING PLAN
DOCKING AND ROUTING PLAN TABLE OF CONTENT Contents Table of content... 2 1 Introduction... 3 1.1 Background... 3 1.2 Document Scope... 3 1.3 Harbour dues... 3 2 ROUTING TO SHIPYARD... 4 2.1 General...
More informationHalf-yearly Report 2013
Half-yearly Report 2013 Financial result unchanged PORT OF ROTTERDAM THROUGHPUT DECREASED SLIGHTLY Throughput in the port of Rotterdam in the first half of the year decreased by 0.9% compared to the first
More informationINDEX NAVIGATION SUPPORT RATE (T0) 3 VESSEL RATE (T1) 4 1. ZONE I: SHORT STAY BERTHING 4 2. ZONE I: PROLONGED STAY BERTHING 5
Port s & fees 2016 Summary of s applicable by the Port of Algeciras Bay Authority at facilities for purposes, for maritime signalling and fees for electricity and water supply, occupation of surface area,
More informationMesse Essen s new East Fair Building inaugurated at North Rhine- Westphalia
Messe Essen s new East Fair Building inaugurated at North Rhine- Westphalia Published on 14 Dec 2017 A festive ceremony with around 500 invited guests from the political, economic, media and fair sectors
More information9 th EURO-MED CONVENTION FROM LAND TO SEA THE ECONOMIC INTEGRATION OF EUROPE: THE ROLE OF THE MOTORWAYS OF THE SEA MALTA - 21 st OCTOBER 2005
trasporti - diritto, economia, politica volume 2006 - n. 98 Dr. MARCO BONELLO* Chairman Malta Maritime Authority 9 th EURO-MED CONVENTION FROM LAND TO SEA THE ECONOMIC INTEGRATION OF EUROPE: THE ROLE OF
More informationSAMOA PORTS AUTHORITY
SAMOA PORTS AUTHORITY SAMOA PORTS AUTHORITY PRESENTATION OUTLINE: About SPA Port Facilities Port Statistics Challenges Developments SAMOA PORTS AUTHORITY ABOUT SPA: Established under the Ports Authority
More informationProject Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825
Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182 Port Carpentaria community consultation commenced
More informationONLINE UNTER W W W.BREMENPORTS.DE/STATISTIKEN FACTS & FIGURES THE PORTS OF BREMEN BREMEN/BREMERHAVEN 2016
ONLINE UNTER W W W.BREMENPORTS.DE/STATISTIKEN 1 FACTS & FIGURES THE PORTS OF BREMEN BREMEN/BREMERHAVEN 216 FACTS & FIGURES 216 3 13 18 2 22 25 29 FACTS & FIGURES ABOUT THE PORTS OF BREMEN/BREMERHAVEN 216
More informationTerminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava
Terminal Reconstruction and Addition at the M.R. Štefánik Airport in Bratislava Preparation of Terminal Reconstruction and Addition Preparation started in 2003 2004 and was motivated by the following:
More information2017 STAKEHOLDER REPORT
2017 STAKEHOLDER REPORT MESSAGE FROM THE CHAIR On behalf of the Halifax Port Authority (HPA) and its Board of Directors, we want to applaud the entire port community on making 2017 a record-breaking year
More information2. Project Need and Alternatives
2. Project Need and Alternatives 2.1 This chapter discusses and assesses the need for the proposed Marchwood Widening and identifies the alternatives to the works that have been considered by ABP as part
More informationBremerhaven. Offshore Wind Energy Competence Center More than just a port. presented by the BIS Bremerhaven Economic Development Company Ltd.
Bremerhaven Offshore Wind Energy Competence Center More than just a port. presented by the BIS Bremerhaven Economic Development Company Ltd. September 2018 Maritime City Bremerhaven Bremerhaven is the
More informationSummary Report. Contact with Wharf General Villa. 5 March 2006
Summary Report Contact with Wharf 5 March 2006 NARRATIVE arrived at Napier pilot station at 0442 hours on 5 March 2006, having sailed from Bluff two days earlier The Pilot boarded at 0457 hours The Master
More informationUK Port Infrastructure Project Pipeline Analysis Report
UK Port Infrastructure Project Pipeline Analysis Report Prepared by Moffatt & Nichol, for the British Ports Association, March 2018 Following release of the Analysis of the National Infrastructure and
More informationMoorMaster, automated mooring for ports automation
Click Cavotec to edit MoorMaster Master title style MoorMaster, automated mooring for ports automation AAPA Facilities Engineering Seminar and Expo 2015 Presented by: Mike Howie Group Product Manager,
More informationValencia, 17 th December 2015
Valencia, 17 th December 2015 SUBJECT CHARGES FOR THE SPECIAL USE OF PORT FACILITIES AND FOR NAVIGATIONAL AIDS THE PORT AUTHORITY OF VALENCIA, VALID FROM 1 ST JANUARY 2016. The following memorandum sets
More information3 Pilbara ports provide gateways
COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial
More informationVERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE
DRAMMENREGIONENS VIRKESTERMINALER DEVELOPMENT OF NEW TIMBER TERMINAL NAVIGATION AND BERTH LOCATION STUDY ADDRESS COWI A/S Parallelvej 2 2800 Kongens Lyngby Denmark TEL +45 56 40 00 00 FAX +45 56 40 99
More informationMaster Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica
Master Plan of Costa Rica 2009-2030 Atlantic Coast Limon - Moin November, 2008 Costa Rica America Main Maritimes routes Costa Rica is located in a strategic position next to Panama Canal and its future
More informationBeyond Gateway Ports Navigating New Destinations
Beyond Gateway Ports Navigating New Destinations Steven Young Director Port Services & Government Affairs Carnival UK Cruise Down Under Conference 4 th 5 th September 2014 The Nautical Challenges for Regional
More informationTECHNICAL DATA SHEET EZE Hub Shoring System
EZE Hub Shoring System WWW.EZE-SHORING.CO.UK / INFO@EZE-SHORING.CO.UK / 01422 203222 1 EZE Shoring Composite Trench Lining System The EZE Shoring composite trench lining system is the world s first non-metallic
More informationPress Release Mérignac, Tuesday June 28 th 2016
Press Release Mérignac, Tuesday June 28 th 2016 Bordeaux Airport: An ambitious modernisation plan for Halls A & B and new access points planned for 2019/2020 Bordeaux Airport Monitoring Committee adopted
More information1. Tanjung Priok; Batavia-Jakarta 1895 Postcard collection Dirk Teeuwen. 2. Tanjung Priok Estate; Batavia-Jakarta Author Dirk Teeuwen, Holland
Jakarta heritage, Tanjung Priok Harbours Batavia s Tandjong Priok drs Dirk Teeuwen MSc, Holland The aim of this article is to summarize the story of the origin as well as the getting off the ground of
More informationATR Freighter Information Pack
ATR42-300 Freighter Information Pack September 2014 Our History Air Contractors has grown considerably since its inception in 1972 as Air Bridge Carriers. It was formed with four Argosy freighters to fly
More informationTARIFF OF HARBOUR DUES
PORT OF GDYNIA AUTHORITY S.A. JOINT-STOCK COMPANY TARIFF OF HARBOUR DUES Valid from 1 July 2007 The Tariff established by the Port of Gdynia Authority, S.A. under Resolution no. 168/II/2004 of 18 August
More informationThe History of the tug Polmear
The History of the tug Polmear Previous names:- Polmear Built:- Toms Yard, Polruan Scrapped:- In service Jenkins in Poole Period in Fowey:- 1960-1968 Name of Vessel in Fowey Polmear In 2003 with the coming
More informationLessons to be learned by the 5 countries of the River Plate Basin (R.P.B.), from River Management and Collaboration of the River Rhine
SMART RIVERS 2015 Lessons to be learned by the 5 countries of the River Plate Basin (R.P.B.), from River Management and Collaboration of the River Rhine Zuidwijk, A. Ocampo, J. ; Savarese, A. Buenos Aires,
More informationEMERGENCY TOWING CAPABILITIES IN LITHUANIA. Igor Kuzmenko Lietuvos maritime academy
EMERGENCY TOWING CAPABILITIES IN LITHUANIA Igor Kuzmenko Lietuvos maritime academy Introductory words It is axiomatic that lifesaving takes precedence over salvage but saving the ship may also be the best
More informationAlexandria Port, Egypt
Alexandria Port, Egypt Source: This information has been extracted from the WFP Logistics Capacity Assessment for Egypt. This LCA is a work in progress and not all sections are complete. This material
More informationBUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE
www.channelcapacityupgrade.com.au 2 $10 BILLION in trade value Introduction The Port of Townsville is the largest container and automotive port in Northern Australia and last financial year handled around
More informationAuckland Port and the Unitary Plan Dr Douglas Fairgray
Auckland Port and the Unitary Plan Dr Douglas Fairgray Source: Auckland 1886 - Sir George Grey Special Collections, Auckland Libraries, NZ Map 374 Scope The interface between the Unitary Plan and the Port
More informationInnovation based development of Klaipeda Port technologies
Discover a proven way! Innovation based development of Klaipeda Port technologies Mr. Artūras Drungilas Marketing and Corporate Affairs Director Klaipeda State Seaport Authority PortofKlaipeda.lt 1 Management
More informationPlugging the greater Midlands region into global wealth
Plugging the greater Midlands region into global wealth A great airport for a great city Birmingham Airport will be at the centre of a network of great airports delivering aviation capacity and connectivity
More informationThe challenges of the Mediterranean: economic scenario and forecasts. Alessandro PANARO Head of Mediterranean & Maritime Dept. SRM
The challenges of the Mediterranean: economic scenario and forecasts Alessandro PANARO Head of Mediterranean & Maritime Dept. SRM The International Propeller Clubs meeting Barcelona, April 25 th, 2016
More informationPORT OF HELSINKI ALL OF FINLAND WITHIN YOUR REACH
PORT OF HELSINKI ALL OF FINLAND WITHIN YOUR REACH PORT OF THE ENTIRE FINLAND One of the strengths of the Port of Helsinki is its excellent location at the heart of Finnish production, population and consumption.
More informationTerms, conditions and prices
Terms, conditions and prices 2017 PORT OF ALTA valid from January 1th - Expires Des 31th 2017 page 1 CRUISE QUAYS IN ALTA QUAY LENGTH DRAFT BEAM HEIGHT Terminalquay 169 m 8,4 m Unlimited Marinequay 63
More informationCPP failure caused heavy contact with lock
December 2016 CPP failure caused heavy contact with lock The vessel was berthed alongside a quay, waiting to proceed through a lock to another berth. The pilot called on the radio and informed the master
More informationAPPLICATION OF THE NO-SPECIAL-FEE SYSTEM IN THE BALTIC SEA AREA
CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE BALTIC SEA AREA HELSINKI COMMISSION - Baltic Marine HELCOM 19/98 Environment Protection Commission 15/1 Annex 19 19th Meeting Helsinki, 23-27
More informationTURKISH SHIPBUILDING/ RECYCLING INDUSTRIES AND NATIONAL POLICIES SUPPORTING GREENER SHIPPING
MINISTRY OF TRANSPORT MARITIME AFFAIRS AND COMMUNICATIONS TURKISH SHIPBUILDING/ RECYCLING INDUSTRIES AND NATIONAL POLICIES SUPPORTING GREENER SHIPPING OECD WP6 WORKSHOP ON GREEN GROWTH OF MARITIME INDUSTRIES
More informationFor Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard
For Immediate Release 14-033 September 3, 2014 CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard VICTORIA BC Ferries and Seaspan s Vancouver Shipyards announced that
More informationMINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017
MINISTRY OF INFRASTRUCTURES AND TRANSPORT HARBOUR MASTER S OFFICE OF RAVENNA ORDER NO. 97/2017 The Head of the Maritime Compartment and Harbour Master of the Port of Ravenna: the Regulation for the towing
More informationCURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO
Ministry of Public Works and Transport STATE-OWNED PORTS PORT AUTHORITY OF CARTAGENA CURRENT PORT CHARGES AND TARIFFS FROM 01/01/2016 TO This is an unofficial document. Official port charges and tariffs
More informationPort of Tallinn Estonia s Biggest Maritime Gateway
Port of Tallinn Estonia s Biggest Maritime Gateway Margus Vihman Chief Commercial Officer/ Member of the Management Board Organization The company in a nutshell State-owned limited liability company Port
More informationNEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May
Organization Of American States Second Hemispheric Conference On Inland Ports, Waterways & Dredging NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA Christopher Hamilton May 18 2017 2.83
More informationMOSE PROJECT: STATE-OF-THE-ART AND FUTURE DEVELOPMENT
AIPCN-France Third Mediterranean Days of Coastal and Harbour Engineering Troisièmes journées méditerranéennes de génie côtier et portuaire 23/05/2013 Marseille MOSE PROJECT: STATE-OF-THE-ART AND FUTURE
More informationTECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB
TECHPORT AUSTRALIA TECHPORT AUSTRALIA Techport Australia - Australia s premier naval industry hub is located at Osborne in South Australia. The South Australian Government has invested over $300 million
More informationWHARFAGE, HARBOUR DUES AND PORT CHARGES REGULATIONS
WHARFAGE, HARBOUR DUES AND PORT CHARGES REGULATIONS 06 February, 2015 Wharfage, Harbour Dues and Port Charges Regulations CAP.48.08 Arrangement of Sections WHARFAGE, HARBOUR DUES AND PORT CHARGES REGULATIONS
More informationPhoto list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in
Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in 2000 2016 Construction as of March 31, 2016 2016 General Designer 2015 General Designer 2015 General Designer
More informationFREEING UP MELBOURNE'S BIGGEST BOTTLENECK
FREEING UP MELBOURNE'S BIGGEST BOTTLENECK PRESENTATION TO THE TOURISM INDUSTRY 29 AUGUST 2017 Evan Tattersall, CEO, Melbourne Metro Rail Authority MELBOURNE S CHALLENGES POPULATION GROWTH NORTHERN +450,000
More informationFinancing of Small/Mid Cap Container Terminal. Case study of Le Verdon sur Mer
Financing of Small/Mid Cap Container Terminal Case study of Le Verdon sur Mer Summary Bordeaux Port Overview SMPA : an innovative project Verdon Container Terminal Development Plan Conclusion 2 Bordeaux
More informationProject Data Sheet BASIC PROJECT DATA
BASIC PROJECT DATA Full project title: Short project title: (acronym) Improvement of navigation in the joint Bulgarian-Romanian section of the Danube river from km 530 to km 520 Batin and from km 576 and
More informationOil and Gas Capabilities
ENERGY www.hie.co.uk Oil and Gas Capabilities Outer Hebrides BiFab, Arnish Outer Hebrides Oil and Gas Capabilities Introduction The Outer Hebrides area has an established record of engineering and fabrication
More informationASL Marine Holdings Ltd.
ASL Marine Holdings Ltd. SHIPBUILDING SHIPREPAIR SHIPCHARTERING Pulse of Asia 2008 - Presentation 8 th July 2008 1 Presentation Outline Company Profile 9M FY2008 Financial Review Business Review - Shipbuilding
More informationNew generation mobdock used for fast underwater stern tube seal replacement in Port Everglades.. 3
NEWS Number 187 LETTER 198 New generation mobdock used for fast underwater stern tube seal replacement in Port Everglades.. 3 Rapid underwater bow thruster removal avoids drydocking... 6 Underwater propeller
More informationEnergy from Waste and Recycling Facility Trident Park, Cardiff. Planning History. January 2010 SLR Ref: B
Energy from Waste and Recycling Facility Trident Park, Cardiff Planning History January 2010 Ref: 402-0036-0306B Viridor Ltd. i 402/0036/00306B CONTENTS 1.0 INTRODUCTION... 1 2.0 GENERAL HISTORY... 3
More informationFemern Belt Fixed Link
Femern Belt Fixed Link Impact on Baltic turntable function of Lübeck 5th BeltLogistics Workshop Felix Klingbiel, Vice Head of Marketing & Sales Lübecker Hafen-Gesellschaft mbh Femern Belt, 29 January 2015
More informationOil and Gas Capabilities
ENERGY www.hie.co.uk Oil and Gas Capabilities Orkney Kirkwall, Orkney Orkney Oil and Gas Capabilities Orkney has strong links to the energy industry and has utilised its geographical positioning to build
More informationDFDS A/S H Analyst meeting 30 August 2006
DFDS A/S H1 2006 Analyst meeting 30 August 2006 DFDS A/S Contents The half-year in brief Strategy on track DFDS Seaways DFDS Tor Line Half-year accounts & profit forecast 2006 DFDS A/S H1 2006 in brief
More informationDOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER. The single biggest investment ever undertaken in Dover
DOVER WESTERN DOCKS REVIVAL (DWDR) NEWSLETTER The single biggest investment ever undertaken in Dover Spring 2017 WELCOME The Port handles 12 million passengers, 2.6 million freight vehicles, 2.3m tourist
More informationTERMINAL TARIFF Extracts
GRAND PORT MARITIME DE LA MARTINIQUE PORT AUTHORITY OF MARTINIQUE TERMINAL TARIFF Extracts TARIFF N 004 Année 2017 GRAND PORT MARITIME DE LA MARTINIQUE PORT AUTHORITY OF MARTINIQUE HARBOUR DUES Extracts
More informationPort of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management
Port of Long Beach 2012 Capital Program Update G.J. Cardamone, PE, FCMAA Director of Construction Management Who We Are 3,500 acres of land 4,600 acres of water 6 container terminals 66 Ship-to-Shore cranes
More informationMessage from the CEO. Message from the Chair. 2 portofhalifax.ca
1 Message from the CEO This was a transformative year for the Port of Halifax - the next generation of big ships started calling, and containerized cargo volume grew year-over-year. Cruise saw a record
More informationOil and Gas Capabilities
ENERGY www.hie.co.uk Oil and Gas Capabilities Shetland Oil and gas fabrication, Lerwick Shetland Oil and Gas Capabilities Introduction Shetland is one of the most remote and beautiful places in the British
More informationCaacupe-mí Port / Asunción. 1er. Puerto Privado desde 1980
Caacupe-mí Port / Asunción Caacupe-mí Port / Pilar Caacupe-mí Logistic Park Division / Asunción Who we are Caacupe-mí is the first private port in Paraguay, founded in 1980, with 36 years of experience
More informationSHIP RECYCLING. Your guide to compliance. Move Forward with Confidence
SHIP RECYCLING Your guide to compliance. Move Forward with Confidence WHY DID THE EU INTRODUCE THE REGULATION? The majority of ships today are demolished in South East Asia, mainly by grounding ships on
More informationPaper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA
Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA CIORTAN R.; DUMITRU M.; SUCIU I.; KRKLJUS D. Ph.D, Corresponding Member of the Romanian Academy of Technical Sciences,
More informationTradition and innovation
Wärtsilä Auxpac Tradition and innovation The Wärtsilä Auxpac generating sets are the most compact and lightweight generating sets available on the market. The compact design of the generating set simplifies
More informationDevelopments in berth layout
Developments in berth layout Recent examples in the Port of Rotterdam Willem Hoebée 9th International Harbour Masters Congress Bruges - Ghent, Belgium 26th - 30th May 2014 1 Agenda Introduction Components
More informationI. The Danube Area: an important potential for a strong Europe
Final Declaration of the Danube Conference 2008 The Danube River of the European Future On 6 th and 7 th October in the Representation of the State of Baden-Württemberg to the European Union I. The Danube
More informationCorporate Presentation 5 March 2003
Corporate Presentation 5 March 2003 Agenda Investment Highlights Business Overview Financial Highlights Competitive Strengths Business Strategies & Future Plans Growth Prospects Corporate Presentation
More informationPERTH-ADELAIDE CORRIDOR STRATEGY
INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South
More informationEX USS SHADWELL Disposal Wreck in Place
20 February 2018 EX USS SHADWELL Disposal Wreck in Place EX USS SHADWELL, a decommissioned CASA GRANDE Class Dock Landing Ship has had a long history supporting the US Navy. She was built by Newport News
More informationGrowth and Renewal. Port Saint John
Port Saint John Growth and Renewal From his harbourfront office, Jim Quinn looks at the ships, heavy machinery at work, and hundreds of stacked shipping containers at the west side Rodney Container Terminal.
More informationPRESS RELEASE. Address: Hungary, H-1068 Budapest, Benczúr utca 25.
PRESS RELEASE Participation of the Permanent Representative of Hungary in Danube Commission, Dr. Ivan Gyurcsík at the 7th ASEM Sustainable Development Dialogue, (11-12 September 2018, Budapest, Hungary)
More informationGeneral Announcement::Media Release - Marina Bay Cruise Centre Singapore Celebrates...
General Announcement::Media Release - Marina Bay Cruise Centre Singapore Celebrates... http://infopub.sgx.com/apps?a=cow_corpannouncement_content&b=announcementt... Page 1 of 1 5/26/2017 General Announcement::Media
More informationDARWIN LUXURY HOTEL CONNECTIVITY AND PUBLIC REALM Our concept includes:
OUR VISION Our shared vision We are creating an iconic tropical hotel. A hotel that is uniquely Darwin. A hotel that embodies the rich natural and cultural heritage of the Top End. A gateway to the natural
More informationAmerican Institute of Marine Underwriters
American Institute of Marine Underwriters Mr. Scott Bergeron Chief Executive Officer, Liberian Registry Commissioner, Virginia Port Authority May 8, 2013 1 Existing Lock Dimensions vs. Expanded Lock Dimensions
More informationPort Everglades Overview
Port Everglades Overview Broward County Charter Review Infrastructure Subcommittee June 7, 2017 Steven M. Cernak, P.E., PPM Chief Executive & Port Director Jurisdictional Area Located in the cities of:
More informationNetwork Safeworking Rules and Procedures
Network Safeworking Rules and Procedures Train Order Working Rule Number: 5017 Version 1.0, 31 March 2016 Train Order Working Rule Number: 5017 Document Control Identification Document title Number Version
More informationThe Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway
1 Our Plan Real Solutions for all Australians The direction, values and policy priorities of the next Coalition Government. The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway August
More informationJhan Schmitz. Executive Sponsor Panama Canal Expansion Program
Jhan Schmitz Executive Sponsor Panama Canal Expansion Program Capacity constraints need to double the capacity of the existing canal Accommodate post-panamax vessels Enhance Panama s strategic position
More informationRamirentClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED
ClimateSolve TM WE RENT OUT TENTS SO YOU ARE COVERED Side height Length: Ridge height Width: Measurement in meters: Width: All widths between 10 and 24 m Side height: As desired, in 5 m sections Ridge
More informationSCHEDULE OF PORT CHARGES
SCHEDULE OF PORT CHARGES for the Ports of the Federal Land of Bremen in Bremen and Bremerhaven from 01.04.2006 valid from 01.03.2017 Contents Section 1 General Provisions 1 Scope of Application 2 Definition
More informationSchiphol Group. Annual Report
Schiphol Group Annual Report 2013 Business model Business model Schiphol Group distinguishes four core activities: Aviation, Consumer Products and Services, Real Estate, and Alliances and Participations.
More informationGreat Barrier Reef Ports Strategy Have your say
Great Barrier Reef Ports Strategy Have your say Written submission form The Great Barrier Reef Ports Strategy presents the vision and principles guiding the Queensland Government s approach to future port
More informationLIFTIng HEAVY CARgO FOR WORLDWIDE TRAnSPORT
LIFTIng HEAVY CARgO FOR WORLDWIDE TRAnSPORT 01 INTRODUCTION 02 happy star 03 happy sky InTRODUCTIOn BigLift Shipping is one of the world s leading heavy lift shipping companies, specialized in worldwide
More informationThe Panama Canal: A Challenge to Efficiency in the 21st Century
The Panama Canal: A Challenge to Efficiency in the 21st Century Intertanko Chemical Conference April 8, 2008 Silvia de Marucci Leader, Liquid Bulk Segment smarucci@pancanal.com Physical Profile of the
More informationUNLOCKING THE BRIGHTON MAINLINE
UNLOCKING THE BRIGHTON MAINLINE The highly successful Coast to Capital region, which runs from South London to Brighton and across the coast to Chichester, needs significant long-term rail investment to
More information