1 Regular Board Meeting Tuesday, November 3, 2015 ACTION REPORT ITEM 8.3 FORMER ST. ANN EDUCATION RESOURCE CENTRE BUILDING DEMOLITION PURPOSE: To obtain Board approval to demolish the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville. BACKGROUND INFORMATION: At the October 20, 2015 Regular Meeting of the Board, Trustees received and reviewed Staff Report Item 9.1 Former St. Ann Education Resource Centre Proposed Building Demolition. St. Ann School, Oakville was constructed in 1965 and was closed as an active school in 1996 as part of a school consolidation and closure process, which included St. Dominic and St. Joseph Catholic Elementary Schools. As part of the consolidation and closure process, the Ministry approved a change in use of the St. Ann School site to Board administrative space. Since the closure of St. Ann School, the school building has accommodated the Board s Education Resource Centre (ERC). The accommodation of the ERC at the St. Ann building was considered temporary until a more permanent facility was available. Subsequently, building maintenance and repairs to the St. Ann facility have been frugal. In June 2015, after a review of the necessary repairs for the St. Ann building, it was determined that the strategy of minimal maintenance was no longer feasible for the ERC and some costly repairs were required. A new roof and heating system, at a cost of approximately $575,000, was required if the St. Ann building was to continue to accommodate the ERC. In addition, other costly building maintenance repairs and replacements would be required in the near future at the St. Ann facility. It was determined that the operations and maintenance expenditures for the St. Ann facility would not be financially viable in the long term. Consequently, the St. Ann building has been vacated and the ERC staff and its contents relocated to surplus classroom spaces in Burlington in close proximity to the Catholic Education Centre. Information Report 10.6 from the October 6, 2015 Regular Meeting of the Board contains more information regarding the relocation of the former St. Ann ERC to surplus classroom spaces. Please refer to Appendix A for site details, floor plans, and photos of the St. Ann facility. COMMENTS: Although the ERC has been relocated from the former St. Ann School site and the building is now vacant, the building repairs and the future use of the site need to be addressed. Vacant facilities can be a liability issue and the St. Ann School building is no exception. A vacant St. Ann School building can be prone to vandalism, pest infestations and other potential liability issues. In fact, windows Former St. Ann Education Resource Centre Building Demolition Page 1 of 3

2 have already been damaged by vandals in the past two months since the building has been vacant. Operations and maintenance cost will continue to be incurred for the St. Ann School site while the building is vacant. Refer to Table 1 Projected 2015/ Former St. Ann School Site Operating Expenses. To mitigate the risk of serious damage, the gas and water service to the St. Ann School building have been turned off. The electrical service is still intact to provide security lighting and alarm systems for the facility. In addition, the St. Ann facility is regularly monitored by staff and immediate concerns are addressed. Due to the current condition of the St. Ann School building there are no immediate uses planned for the St. Ann School facility. Furthermore, the cost to rehabilitate the building is high and perhaps cost prohibitive to repurpose the building for other school board uses. At this time it is unlikely that the St. Ann School building is viable and poses a liability risk to the Board. Therefore, staff recommends that the St. Ann school building be demolished to reduce the risk of liability, vandalism and avoid further operating expenses. As is the Board s regular practice with its vacant properties and as recommended by the Board s insurer (OSBIE), the former St. Ann School site will be completely fenced, including across the front of the property along Hixon Street. A 6 foot high chain linked galvanized fence with a lockable gate to allow access for grass cutting vehicles, fire trucks and ambulances to enter the site will be installed. The fencing work is in progress and is expected to be completed during the first week of November. There will be no gates or openings for pedestrians to access the site. In addition, a sign with the Board contact information will be posted on the fence along Hixon Street. The demolition and site remediation of the St. Ann School building and property is estimated at $200,000. This is only a preliminary estimate at this time and includes a $60,000 allowance for potential hazardous materials abatement (i.e. asbestos, mold, etc.). The demolition work would include deconstruction and disposition of all building materials, disconnection of services, fencing, grading of the site and top soil and grass seeding. Please refer to Table 2 Preliminary Building Demolition & Site Remediation Cost Estimate Former St. Ann School, Oakville. Upon completion of the building demolition and site remediation work, the site operating costs for the St. Ann School property would be reduced by an estimated $16,000 annually. This is in addition to the estimated annual average expenditure avoidance of approximately $80,000 as a result of relocating the ERC from the St. Ann School site, for a total annual operating expenditure reduction of approximately $96,000. The only remaining ongoing operating cost for the St. Ann School site would be lawn maintenance and perhaps some snow clearing. The estimated cost for this grounds maintenance expenditure is approximately $2,500 per year. Another benefit of the St. Ann School building removal is the expected increase in value of the Hixon Street property in the event of its future disposition. The disposition of the former St. Ann School site would be conducted in accordance with Ministry of Ontario Regulation 444/98 and the proceeds of such disposition would be held in the Proceeds of Disposition (POD) reserve, anticipated to be used for the acquisition of a site and construction of a future Board Administrative facility, as permitted in Ontario Regulation 193/10. The cost to demolish the St. Ann School building has not been budgeted in the Budget. Similarly, the operation and maintenance expenditure of approximately $96,000 for the St. Ann facility is included in the Budget since the decision to relocate the ERC or to repair the St. Ann School building was not determined at the time the Budget was established. Therefore, the budgeted $96,000 expenditure could be credited towards the demolition cost, if demolition of the St. Ann School building is approved. The remaining St. Ann School Building demolition costs will be temporarily funded from the Board s reserves, which will be replenished over the next two years by the annual operating budget savings identified above. Demolition of the St. Ann School building would require Ministry approval and municipal permits and approvals. The length of time required to complete this process is not certain at this time. In any event, it is recommended that the St. Ann School building be removed at the earliest opportunity to mitigate liability risk and reduce operating expenditures. Former St. Ann Education Resource Centre Building Demolition Page 2 of 3

3 In an effort to make use of the St. Ann School facility until a determination regarding the demolition of the St. Ann building is made, the facility has been offered to the Halton Regional Police Service for use in training exercises. The Halton Police Service is very grateful for the opportunity to use the St. Ann facility for police training purposes. Staff, in consultation with OSBIE and legal counsel, has entered into an agreement with the Halton Regional Police Services Board for Halton Police to use the former St. Ann School site for training purposes. See Appendix B CONCLUSION: The St. Ann School building is in need of major repairs. As a consequence the Educational Resource Centre (ERC) was relocated from the St. Ann School site and the facility is now vacant, but continues to be monitored by staff. There appears to be no future need for the St. Ann building and it would be very costly to rehabilitate the building. Moreover, a vacant facility has a number of inherent liability risks associated with it. The demolition of the St. Ann building is estimated at approximately $200,000 which includes an allowance for hazardous materials. The relocation of the ERC from the St. Ann School building resulted in a budget expenditure reduction of approximately $80,000. The demolition of the vacant building would result in an additional budget expenditure reduction of approximately $16,000 for a total annual operating expenditure reduction of approximately $96,000. The demolition costs will be temporarily funded from the Board s reserves, which will be replenished from the annual operating expenditure savings. Another benefit of the St. Ann School building is the expected increase in value of the property in the event of a future disposition of the St. Ann School site. The St. Ann School site will be completely fenced to prevent access to the property and it is recommended that the school building be demolished at the earliest opportunity to mitigate liability risk and reduce operating expenditures. RECOMMENDATION: The following recommendation is respectfully submitted for Trustee consideration and approval: RESOLUTION: Moved by: Seconded by: RESOLVED, that the Halton Catholic District School Board approve the demolition of the former St. Ann School building located at 2123 Hixon Street, Oakville; and that staff be directed to remove the building and restore the site at the earliest opportunity. REPORT PREPARED BY: REPORT SUBMITTED BY: REPORT APPROVED BY: R. MERRICK ADMINISTRATOR, SCHOOL OPERATIONS AND MAINTENANCE G. CORBACIO SUPERINTENDENT, FACILITY MANAGEMENT SERVICES P. DAWSON DIRECTOR OF EDUCATION AND SECRETARY OF THE BOARD Former St. Ann Education Resource Centre Building Demolition Page 3 of 3

4 APPENDIX A ST. ANN EDUCATION RESOURCE CENTRE FIGURE A.1 ST. ANN EDUCATION RESOURCE CENTRE SITE PLAN AND DATA Former St. Ann Education Resource Centre Building Demolition Page 1 of 4

5 FIGURE A.2 ST. ANN EDUCATION RESOURCE CENTRE FLOOR PLAN FIGURE A.3 ST. ANN EDUCATION RESOURCE CENTRE AERIAL PHOTO Former St. Ann Education Resource Centre Building Demolition Page 2 of 4

6 FIGURE A.4 ST. ANN EDUCATION RESOURCE CENTRE FRONT ELEVATION FIGURE A.5 ST. ANN EDUCATION RESOURCE CENTRE REAR ELEVATION Former St. Ann Education Resource Centre Building Demolition Page 3 of 4

7 FIGURE A.6 WATER DAMAGE FROM ROOF LEAKS AT ST. ANN EDUCATION RESOURCE CENTRE FIGURE A.7 ORIGINAL BOILER AT ST. ANN EDUCATION RESOURCE CENTRE Former St. Ann Education Resource Centre Building Demolition Page 4 of 4

8

9

10 Ta TABLE NO. 1 Projected 2015/2016 Site Operating Expenses Former St. Ann School Electricity $3,000 General Repairs (electrical, plumbing, etc.) $10,000 Snow Removal $3,000 Landscaping / Grounds* $2,500 Grand Total $18,500 *landscaping/grounds expense to continue after building disposition

11 TABLE NO. 2 Preliminary Building Demolition & Site Remediation Cost Estimate Former St. Ann School Designated Substance Survey $5,000 Demolition Plan and Permit $5,000 Demolition and Site Cleanup $100,000 Hazardous Materials Abatement $60,000 Site Fencing $5,000 Disconnection of Services $5,000 Subtotal $180,000 Contingency $20,000 Grand Total $200,000

To propose the demolition of the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville.

To propose the demolition of the former St. Ann School Education Resource Centre building located at 2123 Hixon Street, Oakville. Regular Board Meeting Tuesday, October 20, 2015 STAFF REPORT ITEM 9.1 FORMER ST. ANN EDUCATION RESOURCE CENTRE PROPOSED BUILDING DEMOLITION PURPOSE: To propose the demolition of the former St. Ann School

More information

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES

THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES BRITISH COLUMBIA MINISTRY OF TRANSPORTATION & INFRASTRUCTURE AVALANCHE & WEATHER PROGRAMS THRESHOLD GUIDELINES FOR AVALANCHE SAFETY MEASURES British Columbia Ministry of Transportation & Infrastructure

More information

Update Report - Etobicoke Creek and South Mimico Creek Trails

Update Report - Etobicoke Creek and South Mimico Creek Trails REPORT FOR ACTION Update Report - Etobicoke Creek and South Mimico Creek Trails Date: October 23, 2017 To: Etobicoke York Community Council From: General Manager, Parks Forestry and Recreation Wards: Ward

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES

DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES CITY OF VANCOUVER PLANNING AND DEVELOPMENT SERVICES DEVELOPMENT PERMIT STAFF COMMITTEE REPORT JUNE 19, 2013 FOR THE DEVELOPMENT PERMIT BOARD JULY 15, 2013 760 PACIFIC BOULEVARD (COMPLETE APPLICATION) DE408507/408622

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday June 18, 2015

COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday June 18, 2015 COOS COUNTY AIRPORT DISTRICT REGULAR BOARD MEETING Thursday June 18, 2015 Minutes of the regular monthly meeting of the Board of Commissioners of the Coos County Airport District held on Thursday, June

More information

X Respond to staff direction

X Respond to staff direction Page 1 of Report TO: Community Services Committee Corporate Services Division SUBJECT: Apeldoorn Mundalization Project Report Number: Report Date: February 17, 2010 File Number(s): Ward(s) Affected: 1

More information

CLIVE ELEMENTARY SCHOOL

CLIVE ELEMENTARY SCHOOL CLIVE ELEMENTARY SCHOOL This narrative, in conjunction with the revised cost estimate attached, represents the opinion of the Superintendency and recommendation to the Board of Education for consideration.

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018

HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018 HARBOR BRIDGE PROJECT COMMUNITY ADVISORY BOARD MEETING MINUTES April 5, 2018 The following notes are the Texas Department of Transportation s (TxDOT) summary of the meeting and are not designed to be an

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: KENNEDY INTERCHANGE STATION: METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT - PRELIMINARY CONCEPT

More information

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation

WAIMAKARIRI DISTRICT COUNCIL REPORT. Craig Sargison, Manager Community and Recreation WAIMAKARIRI DISTRICT COUNCIL REPORT FILE NO: GOV-26-01-07, CPR-04-04-01 / 150609090834 REPORT TO: Kaiapoi Community Board DATE OF MEETING: 15 June 2015 FROM: SUBJECT: Craig Sargison, Manager Community

More information

City of Kingston Report to Council Report Number

City of Kingston Report to Council Report Number To: From: Resource Staff: City of Kingston Report to Council Report Number 15-423 Mayor and Members of Council Date of Meeting: November 3, 2015 Subject: Executive Summary: Cynthia Beach, Commissioner,

More information

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016

Cabinet. The Future of Wareham Foot Level Crossing. Date of Meeting 24 February 2016 Page 1 The Future of Wareham Foot Level Crossing Cabinet Date of Meeting 24 February 2016 Cabinet Member(s) Peter Finney Cabinet Member for Environment Colin Jamieson - Cabinet Member for Economy and Growth

More information

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM

HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM HIGHWAY RAIL GRADE CROSSING CONSOLIDATION PROGRAM To decrease unnecessary train traffic exposure to life and property, promote public safety, and improve traffic conditions, the Texas Department of Transportation

More information

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur

INTERNAL AUDIT DIVISION REPORT 2017/051. Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur INTERNAL AUDIT DIVISION REPORT 2017/051 Audit of the aviation safety programme in the African Union-United Nations Hybrid Operation in Darfur There was a need to effectively address issues identified and

More information

REPORT TO COMMITTEE. COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 PROPOSED 2018 CAPITAL BUDGET AND CAPITAL PLAN

REPORT TO COMMITTEE. COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 PROPOSED 2018 CAPITAL BUDGET AND CAPITAL PLAN REPORT TO COMMITTEE COMMITTEE: PUBLIC WORKS COMMITTEE DATE: January 9, 2018 DEPARTMENT: FINANCE & ADMINISTRATION SUBJECT: PROPOSED 2018 CAPITAL BUDGET AND 2019 2027 CAPITAL PLAN RECOMMENDATION: THAT THE

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Municipality of Strathroy- Caradoc

Municipality of Strathroy- Caradoc Municipality of Strathroy- Caradoc Page 1 of 2 Staff Report Directed to: Mayor Vanderheyden and Members of Council Meeting Date: Sept. 2/14 Prepared by: Department: Subject: Angela Toth, Director, Corporate

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia September 18, 2013 Nicholas J. Roper, P.E. District Bridge

More information

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy

Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Agenda Item 7 Executive Open Report on behalf of Richard Wills, Executive Director for Environment and Economy Report to: Executive Date: 02 September 2014 Subject: Lincoln East West Link Road Phase 1

More information

The rezoning application is recommended for consideration of approval.

The rezoning application is recommended for consideration of approval. Date: November 26, 2012 To: From: Chairperson and Members Planning and Housing Committee Ken O Brien, MCIP Manager of Planning & Information Cliff Johnston, MCIP Director of Planning Re: Department of

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case

A21 TONBRIDGE TO PEMBURY DUALLING. Statement of Case A21 TONBRIDGE TO PEMBURY DUALLING Statement of Case In Respect of Applications for the Demolition of Listed Buildings Under the Provisions of the Planning (Listed Buildings and Conservation Areas) Act

More information

Yew Tree Road, Chamberlain House, Moseley, Birmingham, B13 8QG. Listed Building Consent for various external and internal alterations.

Yew Tree Road, Chamberlain House, Moseley, Birmingham, B13 8QG. Listed Building Consent for various external and internal alterations. Committee Date: 19/09/2013 Application Number: 2013/06022/PA Accepted: 09/08/2013 Application Type: Listed Building Target Date: 04/10/2013 Ward: Moseley and Kings Heath Yew Tree Road, Chamberlain House,

More information

New Orleans Municipal Yacht Harbor

New Orleans Municipal Yacht Harbor New Orleans Municipal Yacht Harbor 2018 Capital Projects Construction Updates MYH Floating Marina Community Sailing Center (Coordination with) MYH Boat Launch (MYHMC) MYH Administration Building (CPA &

More information

Provincial Railway Guides Section:

Provincial Railway Guides Section: This guide deals with the maintenance roles and responsibilities of provincial railways and road authorities regarding public grade crossing maintenance; development of public grade crossing maintenance

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Port Bruce. Interim Management Statement

Port Bruce. Interim Management Statement Port Bruce Interim Management Statement Port Bruce Interim Management Statement August 3, 1999 This Port Bruce Provincial Park Interim Management Statement provides direction for the custodial management

More information

Construction Staging Area Blue Jays Way (357 King Street West)

Construction Staging Area Blue Jays Way (357 King Street West) REPORT FOR ACTION Construction Staging Area Blue Jays Way (357 King Street West) Date: June 8, 2018. To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

Airport Closure Evaluation Report Prepared by MnDOT Aeronautics

Airport Closure Evaluation Report Prepared by MnDOT Aeronautics Airport Closure Evaluation Report Prepared by MnDOT Aeronautics Impacts of Closing The Murdock Municipal Airport (23Y) Summary Impacts of Closing the Murdock Municipal Airport (23Y) Closing a publicly

More information

Review and consider a list of factors to help guide the Board s decision-making process for existing structures, including the radar tower.

Review and consider a list of factors to help guide the Board s decision-making process for existing structures, including the radar tower. R-12-75 Meeting 12-24 July 18, 2012 AGENDA ITEM AGENDA ITEM 1 Informational Report on the Three Radar Tower Options under Consideration for the Mount Umunhum Environmental Restoration and Public Access

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

Los Angeles International Airport (LAX) Airside $907M

Los Angeles International Airport (LAX) Airside $907M Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE

VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE VI. ALTERNATIVES TO THE MASTER PLAN C. RENOVATED EAST BUILDING ALTERNATIVE INTRODUCTION The Renovated East Building Alternative would include the continued use of the renovated West Building and the renovation

More information

BOAT DOCKS AND LAUNCHES. Public Engagement Report July 2015

BOAT DOCKS AND LAUNCHES. Public Engagement Report July 2015 BOAT DOCKS AND LAUNCHES Public Engagement Report July 2015 TABLE OF CONTENTS BACKGROUND 3 STAKEHOLDER CONSULTATION 6 PARTICIPANT PROFILE 7 RESPONSE THEMES 8 CONCLUSION 16 BACKGROUND The North Saskatchewan

More information

TOWN OF GLEN ECHO COUNCIL MEETING June 12, 2017

TOWN OF GLEN ECHO COUNCIL MEETING June 12, 2017 TOWN OF GLEN ECHO COUNCIL MEETING June 12, 2017 ATTENDANCE: VISITORS: Willem Polak, Mayor Dia Costello, Councilmember Nancy Long, Councilmember Dan Spealman, Councilmember Matt Stiglitz, Councilmember

More information

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE 1 Report No. 1 of the Chief Administrative Officer Regional Council Meeting of June 21, 2007 THE REGIONAL MUNICIPALITY OF YORK REPORT NO. 1 OF THE REGIONAL CHIEF ADMINISTRATIVE OFFICER For Consideration

More information

RIO VISTA MUNICIPAL AIRPORT

RIO VISTA MUNICIPAL AIRPORT DRAINAGE TECHNICAL MEMORANDUM RIO VISTA MUNICIPAL AIRPORT RIO VISTA, CALIFORNIA Prepared for: City of Rio Vista 1 Main Street Rio Vista, CA 94571 (707) 374-5337 Prepared by: August 2012 Copyright 2012

More information

Date to Committee: January 13, 2014 Date to Council: January 27, 2014

Date to Committee: January 13, 2014 Date to Council: January 27, 2014 Page 1 of Report PB-01-14 TO: FROM: Development and Infrastructure Committee Planning and Building SUBJECT: Update on Graffiti Prevention and Abatement Report Number: PB-01-14 Wards Affected: All File

More information

TOWN OF JEFFERSON SELECT BOARD January 7, 2019

TOWN OF JEFFERSON SELECT BOARD January 7, 2019 TOWN OF JEFFERSON SELECT BOARD January 7, 2019 The regular meeting of the Board of Selectmen for the Town of Jefferson was held at the Select Board Office Monday January 7, 2019 at 7:00 pm PRESENT: Cindy

More information

Planning and Building Department

Planning and Building Department Page 1 of Report PB-27/11 CITY OF Burlington Planning and Building Department TO: Chair and Members of the Community Development Committee SUBJECT: Niagara Escarpment Plan Amendment 179 (NEPA 179) Addition

More information

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy PERTH AND KINROSS COUNCIL 7 16/234 Housing and Health Committee 25 May 2016 Perth and Kinross Local Housing Strategy 2016-2021 Report by Director (Housing and Social Work) PURPOSE OF REPORT This report

More information

Mechanized River Valley Access Public Engagement Report. April 2015

Mechanized River Valley Access Public Engagement Report. April 2015 Mechanized River Valley Access Public Engagement Report April 2015 Table of Contents Background... 1 Stakeholder Consultation... 3 What We Heard... 4 Conclusion... 7 Background The North Saskatchewan River

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

Restoration and Redevelopment of the Former Durango Paper Mill Site

Restoration and Redevelopment of the Former Durango Paper Mill Site Restoration and Redevelopment of the Former Durango Paper Mill Site 1 Durango Site Overview and History Durango-Georgia Bankruptcy LandMar Group Overview The Durango Challenge Environmental Challenges

More information

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services

Evaluation of the Grade Crossing Closure Program. Transport Canada Evaluation and Advisory Services Evaluation of the Grade Crossing Closure Program Transport Canada Evaluation and Advisory Services June 8, 2013 Evaluation of the Grade Crossing Closure Program The Grade Crossing Closure Program (GCCP)

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31 THOMAS P. DiNAPOLI STATE COMPTROLLER 110 STATE STREET ALBANY, NEW YORK 12236 STATE OF NEW YORK OFFICE OF THE STATE COMPTROLLER March 4, 2008 Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

SALISBURY NHS FOUNDATION TRUST

SALISBURY NHS FOUNDATION TRUST SALISBURY NHS FOUNDATION TRUST PAPER SFT 1868 TITLE CAPITAL DEVELOPMENT REPORT TO THE TRUST BOARD FOR THE PERIOD FEBRUARY 2008 MAY 2008 PURPOSE OF PAPER The purpose of this paper is to up-date the Board

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: ISLINGTON STATION TEMPORARY BUS TERMINAL ACTION ITEM RECOMMENDATIONS It is recommended that the Board: 1.

More information

TOWN OF CHESTER PLANNING BOARD MINUTES June 3, 2015

TOWN OF CHESTER PLANNING BOARD MINUTES June 3, 2015 Members present: Don Serotta, Chairman, Steve Denes, Ernie Damiani, Carl D Antonio, Robert Conklin and Frank Gilbert. Also present were Dave Donovan, Attorney, Al Fusco, Engineer and Tanya McPhee, Secretary.

More information

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee. PW Royal Bank of Canada Canadian Open

The Regional Municipality of Halton. Chair and Members of the Planning and Public Works Committee. PW Royal Bank of Canada Canadian Open Approved - Planning and Public Works - Jun 15, 2016 Adopted - Regional Council - Jun 22, 2016 The Regional Municipality of Halton Report To: From: Chair and Members of the Planning and Public Works Committee

More information

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee GM13.18 STAFF REPORT ACTION REQUIRED Expropriation of a portion of 5795 Yonge Street for public street purposes Date: May 25, 2016 To: From: Wards: Reference Number: Government Management Committee Chief

More information

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road Logo Department Name Agency Organization Organization Address Information United States Forest Coronado National Forest 5700 North Sabino Canyon Road Department of Service Santa Catalina Ranger District

More information

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004

CITY OF PEMBROKE 2004 BUDGET. July 6, 2004 2004 BUDGET July 6, 2004 2004 TAX RATES Municipal Education Total Residential 0.01434078 0.00296000 0.01730078 Multi-residential 0.02674555 0.00296000 0.02970555 Commercial 0.02940061 0.02268611 0.05208672

More information

5 September 9, 2015 Public Hearing

5 September 9, 2015 Public Hearing 5 September 9, 2015 Public Hearing APPLICANT: SHIP CABIN CLUB, INC. PROPERTY OWNER: RED HEAD REALTY CORPORATION REQUEST: Enlargement of a Nonconforming Use and Structures STAFF PLANNER: Kevin Kemp ADDRESS

More information

CITY OF CAMPBELL PARKS & RECREATION COMMISSION CAMPBELL, CALIFORNIA August 2, 2017 MINUTES

CITY OF CAMPBELL PARKS & RECREATION COMMISSION CAMPBELL, CALIFORNIA August 2, 2017 MINUTES CITY OF CAMPBELL PARKS & RECREATION COMMISSION CAMPBELL, CALIFORNIA August 2, 2017 MINUTES The Parks and Recreation Commission convened in regular session on Wednesday, August 2, 2017, at 6:00 pm, in the

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an

More information

SUBMISSION FROM SOUTH LANARKSHIRE COUNCIL

SUBMISSION FROM SOUTH LANARKSHIRE COUNCIL SUBMISSION FROM SOUTH LANARKSHIRE COUNCIL South Lanarkshire Council is committed to providing inclusive, high quality services to a range of people with differing needs, this includes the Gypsy Traveller

More information

Comment 2: Thank you for your presentation. Very informative. We would like to continue being informed with the project process.

Comment 2: Thank you for your presentation. Very informative. We would like to continue being informed with the project process. Comment 1: I appreciate the opportunity to learn about this project, and I m happy it s the Fancher Creek Trail. I think it will make our area nicer. Thank you! Response 1: Comment 2: Thank you for your

More information

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa

Final Environmental Impact Statement for the Merced Wild and Scenic River. Comprehensive Management Plan, Yosemite National Park, Madera and Mariposa This document is scheduled to be published in the Federal Register on 02/26/2014 and available online at http://federalregister.gov/a/2014-04061, and on FDsys.gov DEPARTMENT OF THE INTERIOR 4312-FF NATIONAL

More information

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about.

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about. The Adelaide City Council invites engagement from the community about Cirque du Soleil Feedback on a proposed Project Summary Adelaide City Council is currently planning for the development of a portion

More information

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses

Re: Item 7- PR13.{)35 - Region of York Municipal Parbtership Grant Application and Approval of Two Grade-Separated Underpasses Office of the Clerk John D. Leach Director of Customer and Legislative Servicesffown Clerk 905-727-3123 ext. 4771 jleach@aurora.ca Town of Aurora 100 John West Way, Box 1000 Aurora, ON L4G 6J1 August 14,

More information

CITY OF STEVENS POINT AGENDA

CITY OF STEVENS POINT AGENDA CITY OF STEVENS POINT BOARD OF PUBLIC WORKS MEETING Monday, February 13, 2017 6:00 p.m. (or immediately following previously scheduled meeting) Lincoln Center 1519 Water Street Stevens Point, WI 54481

More information

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc.

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc. Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) January 27, 2015 Development Services Committee Mark Schollen Schollen & Company Inc. Purpose of Presentation Update Council on

More information

Train Whistling at Public Grade Crossings

Train Whistling at Public Grade Crossings Train Whistling at Public Grade Crossings Train Whistling at Public Grade Crossings Train whistling is an important way to keep drivers, cyclists and pedestrians safe The Canadian Rail Operating Rules

More information

MEMORANDUM. CITY/BOROUGH OF JUNEAU City & Borough Manager s Office 155 S. Seward St., Juneau, Alaska

MEMORANDUM. CITY/BOROUGH OF JUNEAU City & Borough Manager s Office 155 S. Seward St., Juneau, Alaska MEMORANDUM CITY/BOROUGH OF JUNEAU City & Borough Manager s Office 155 S. Seward St., Juneau, Alaska 99801 Rod_Swope@ci.juneau.ak.us Voice (907) 586 5240 Fax (907) 586 5385 DATE: January 25, 2012 TO: FROM:

More information

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C.

THAT the Board approve the final proposed concept plan for the Jericho Marginal Wharf site as shown in Figure C-4 of Appendix C. Date: January 17, 2012 TO: Board Members Vancouver Park Board FROM: General Manager Parks and Recreation SUBJECT: Jericho Marginal Wharf Phase 2 Concept Plan RECOMMENDATION THAT the Board approve the final

More information

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must:

Prior to contacting the Whitecourt Trailblazers Snowmobile Club, applicants must: WHITECOURT TRAILBLAZERS Box 607 Whitecourt, AB T7S 1N7 www.whitecourttrailblazers.ca CNT AMENDMENT Restriction Code 710: See Comments Comments All applicants are required to contact: Whitecourt Trailblazers

More information

Investing in Brampton s downtown

Investing in Brampton s downtown Investing in Brampton s downtown 1 REVITALIZING DOWNTOWN BRAMPTON The Next Chapter Public Information Session November 2, 2011, 7 9 pm AGENDA Welcome and opening remarks: City of Brampton Southwest Quadrant

More information

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE

Northwest Triangle. Redevelopment Proposal. Property Acquisition, Engineering, and Demolition. December, 2005 REDEVELOPMENT AUTHORITY OF THE Northwest Triangle Redevelopment Proposal Property Acquisition, Engineering, and Demolition December, 2005 REDEVELOPMENT AUTHORITY OF THE CITY OF YORK York City Redevelopment Authority 14 West Market Street,

More information

PARK RULES AND REGULATIONS

PARK RULES AND REGULATIONS PARK RULES AND REGULATIONS These rules are designed to ensure that you and our other campers have a pleasant stay at our park. GENERAL: The occupants renting sites are responsible for all the rules and

More information

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario

Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario GM22.32 REPORT FOR ACTION Disposition of Spadina Expressway Properties - Memorandum of Understanding with Infrastructure Ontario Date: September 8, 2017 To: Government Management Committee From: Chief

More information

Park District Citizen Committee. November 24, Minutes

Park District Citizen Committee. November 24, Minutes Park District Citizen Committee November 24, 2014 Minutes In attendance: Jan Arnold, Diane Stanke, David Wick, Laura Stamp, Steven Miller, Nathan Halsabeck, Ben Ahring, Kassie Porreca, Kate Readling, Susan

More information

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and

Seek the Board s approval for the Donald Place kerb and channel renewal to progress to final design, tender and construction; and 3. DONALD PLACE - KERB AND CHANNEL RENEWAL General Manager responsible: General Manager City Environment Officer responsible: Transport and City Streets Manager Author: Michelle Flanagan, Streets Capital

More information

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE

BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE BILLY BISHOP TORONTO CITY AIRPORT 2018 MASTER PLAN UPDATE City of Toronto Local Issues & Initiatives Bryan Bowen City Planning Waterfront Secretariat June 25, 2018 PRESENTATION OUTLINE BACKGROUND: ISSUES

More information

REPORT. Engineering and Construction Department

REPORT. Engineering and Construction Department REPORT MEETING DATE: JUNE 19, 2017 FROM: Engineering and Construction Department DATE: May 29, 2017 SUBJECT: Flashing 40km/h Zone Sign Program LOCATION: Town-wide WARD: Town-wide Page 1 RECOMMENDATION:

More information

The Corporation of the City of Kawartha Lakes Council Report

The Corporation of the City of Kawartha Lakes Council Report The Corporation of the City of Kawartha Lakes Council Report Report Number ENG2017-008 Date: September 12, 2017 Time: 2:00 p.m. Place: Council Chambers Ward Community Identifier: All Subject: Author Name

More information

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17 MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE COMMISSION. MEMBERS PRESENT: BTV STAFF PRESENT: OTHERS PRESENT:

More information

1. That Council approve the pilot project for the City designated toboggan hill at Uplands Golf and Ski Club;

1. That Council approve the pilot project for the City designated toboggan hill at Uplands Golf and Ski Club; COMMITTEE OF THE WHOLE OCTOBER 19, 2009 PILOT PROJECT FOR CITY DESIGNATED TOBOGGAN HILLS Recommendation Regional Councillor Mario Ferri and Councillor Sandra Yeung Racco, Co-Chairs of the Recreational

More information

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering

City Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Meeting: February 28, 2017 Agenda Item: 3.H Subject: Award of Feasibility/Design-Build

More information

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD

2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD 2 YORK REGION TRANSIT VEOLIA AGREEMENT AMENDMENT 91 CALDARI ROAD The Transit Committee recommends the following: 1. Receipt of the presentation by Rick Takagi, Manager, Operations, York Region Transit;

More information

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018

Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 Holgate Taxpayers Association Spring Membership Meeting Minutes - June 2, 2018 The meeting was called to order by Dan Macone at 10.01 a.m. Dan thanked the membership for their support and remarked that

More information

City of Redding. Redding Police Facility. Enough study! Just do it!

City of Redding. Redding Police Facility. Enough study! Just do it! City of Redding Redding Police Facility City of Redding, 777 Cypress Ave. Redding, CA. 96001 (530) 339-7220 Enough study! Just do it! Background Since 1978 Redding Police Department (RPD) has occupied

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: October 29, 2009 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT STEELES WEST STATION APPROVAL OF CONCEPTUAL DESIGN

More information

Friedman Memorial Airport Authority. Regular Meeting April 09, 2013

Friedman Memorial Airport Authority. Regular Meeting April 09, 2013 Friedman Memorial Airport Authority Regular Meeting April 09, 2013 Approve Friedman Memorial Airport Authority Meeting Minutes March 12, 2013 Regular Meeting Minutes March 21, 2013 Special Meeting March

More information

DATE: October 13, 2016 SUBJ:

DATE: October 13, 2016 SUBJ: TAHOE CITY PUBLIC UTILITY DISTRICT MEMORANDUM TO: FROM: Cindy Gustafson General Manager Bob Bolton Director of Parks and Recreation DATE: October 13, 2016 SUBJ: Monthly Report September 8 October 13, 2016

More information

Commissioning Director - Environment

Commissioning Director - Environment Finchley and Golders Green Area Committee 27 April 2017 Title Report of Wards Status Urgent Key Enclosures Summers Lane,N12 Request for Pedestrian Improvements Commissioning Director - Environment Woodhouse

More information