Environmental Assessments - April 2018

Size: px
Start display at page:

Download "Environmental Assessments - April 2018"

Transcription

1 Meadowlily Secondary Plan and Integrated and Sanitary Assessments - April Ongoing AECOM Ashley Rammeloo G. Barrett Needed Next Steps tes Online Preferred options - Land use,, and Sanitary Updates to background technical studies required Meadowlily Secondary Plan Psychiatric Hospital Lands Municipal, for Storm Drainage and Servicing Works Stantec Dave Gough B. Debbert Integrated with Act process Thames Valley Parkway - rth Branch - Richmond to Adelaide Prevention and Fall 2014 Dillon Ongoing March CH2MHILL - Jacobs Colonel Talbot Pumping Station Stantec Pottersburg-Vauxhall Interconnect AECOM Marcy McKillop J. Bruin Detailed design Finalizing report for the third and final phase, including the implementation plan approved by MOECC April The City is progressing detailed design. Final PIC held v. 1, 2017 Thames Valley Parkway PPCP In Design, built by Funded by Charges PSCT In Design, built by PCPX East Park PS Upgrades RVA Detailed Design. Construction. Design to be tender ready. Timing depended on need and funding. PSEP Solid Waste Solid Waste Vauxhall WWTP Flood Protection Dillon East End Sanitary Servicing Study Ongoing Q1 CH2MHILL South London Sanitary Servicing Study Ongoing Q1 AECOM Vauxhall WWTP Expansion Adelaide WWTP Expansion Long Term Resource Recovery and Waste Disposal W12A Landfill Service Area Amendment Dingman Creek Subwatershed: Servicing Strategy - Schedule 'C' Golder Jay Stanford & Wesley Abbott Hydraulic modelling and consult with UTRCA, then tice of PIC planned; MOECC has been consulted, CWWF Project Vauxhall 30 day review March CWWF Project ELSS PIC Feb 26,. 30-day review EIS to be undertaken as part of March detailed design Will include consolidation with Potts Growth Projection Flow Analysis ECA Growth Projection Flow Analysis Pending findings of internal study - N.A. Staff Wesley Abbott - N.A. Starting January 2016 December Aquafor Beech West London Dyke Master Repair Plan Stantec Dingman Creek Management Facility. B-4 Dingman Creek rth Lambeth Management Facility. P9 Airport Road South Industrial Management Facilities Delcan Stantec Adrienne Sones of Proposed Terms of Reference (TOR) for submission to MOECC (July ) A. Macpherson Public Meeting #2 April J. Bruin Finalize Report AECOM Dave Gough Select consultant as part of RFOI/RFP Select consultant as part of RFOI/RFP Phase 1-7, Phase 8 subject to Industrial Land Requirements approved by the MOECC in EPA approvals completed in 2016 Encompasses SWM for entire Dingman Creek Subwatershed; funded by DC and Capital. Funded by capital and Ministry of Resources Currently Funded by Owner Currently Funded by Owner W12A WLD MRP Page 1 of 5

2 Dayus Creek Drainage Area Storm/Drainage and Storm Water Management Remediation and Servicing Works - Dingman Creek Management Erosion Wetland Facility Fox Hollow Area Storm/Drainage, Management and Sanitary Servicing - Schedule 'C' Addendum Green Valley Drain Green Valley Drain Management and Remediation Works Hyde Park Community Storm Drainage and Management Schedule B Murray Marr Management Facilities Old Oak Area Storm Drainage and Management Servicing Old Victoria Storm/Drainage and Management Servicing Works Schedule 'C' Pincombe Drain Storm/Drainage, Management Servicing and Drain Restoration Works Schedule 'C' Pottersburg Creek downstream of Hamilton Road Slope Stability Pottersburg Creek Storm Drainage and Channel Remediation Project Schedule 'C' Stoney Creek Undeveloped Lands Storm/Drainage and Management Servicing Works - Sunningdale Area Storm/Drainage and Management Servicing for Undeveloped Lands Tributary C Storm/Drainage and Management (SWM), and Sanitary Trunk Servicing Works located within the Downstream Thames River Subwatershed Area Schedule 'C' Assessments - April Next Steps tes Online Delcan Dave Gough Implementation Delcan Dave Gough Constructed Stantec Dave Gough Phase 1, 2, 3 complete, Phase 4 scheduled for 2014 Funded by DC, Capital Delcan Dave Gough Constructed Earth Tech Dave Gough Earth Tech Dave Gough Earth Tech Dave Gough Dave Gough Stantec Dave Gough Phase 1, 2, 3, 4 complete, Phase 5, 6 schedule Phases 1, 2 Constructed, Phases 3,4, 5 subject to Industrial land requirements Phase 1 scheduled for construction, Phases 2 & 3 subject to Industrial Land requirements Phase 1 complete, Phase 2 schedule Phases 1 and 2 Phases 3, 4, 5 scheduled for 2013, 2015, 2020 respectively Funded by DC Riggs Dave Gough Implementation Funded by owner Dave Gough Delcan Dave Gough Earth Tech Dave Gough Phase 1, 2 complete Phase 3 scheduled based on servicing requirements Phase 1, 2, 3 Phase 4, 5, 6 subject to servicing needs Phases 1, 2, 3, 4 complete, Phases 5, 6, 7, 8 & 9 scheduled based on servicing requirements Funded by owner AECOM Dave Gough Functional Design Funded by DC Page 2 of 5

3 White Oak Area - Storm/Drainage and Management Works - Municipal Class Addendum Wickerson Road Area Storm Drainage and Management Servicing Works Schedule 'C' Municipal Class Assessments - April Next Steps tes Online AECOM Dave Gough Functional Design Funded by DC Dave Gough Phase 1 complete 2005/2008, Phase 2, scheduled for completion 2012 Phase 3, 4 scheduled for 2014 & 2020 respectively Funded by owner Mud Creek CH2MHILL Dave Gough Review of Draft /EIS Hyde Park Addendum Fall 2016 Fanshawe Park Widening - Adelaide to Highbury Hamilton Road - Old Victoria to Veterans Memorial Parkway Hyde Park - Oxford to Sunningdale Road Sarnia Road - Hyde Park to Wonderland Sarnia Road - Wonderland to Sleightholme Sunningdale Road - Wonderland to Adelaide Veterans Memorial Parkway Interchanges Veterans Memorial Parkway South Extension Wonderland Rd - Interchange at Highway 401 Delcan Ted Koza AECOM Dave Gough Issue tice of Commencement Addendum to existing Stantec Josh Ackworth IBI Group Ted Koza Phase 1 to be constructed in 2023 Includes intersection improvements at Old Victoria, Commissioners and Hamilton Hamilton Rd Dillon Ted Koza Sarnia Rd Dillon Josh Ackworth AECOM Josh Ackworth Detailed design Giffels MRC URS s Southdale Road and Boler Sept 2014 Dillon Fanshawe Park Road and Richmond St May 2015 Dillon G. Barrett Construction in years Phased widenings tentative to start 2019 G. Barrett Warranty period In Partnership with MTO Maxim Kireev G. Barrett Under construction In Partnership with MTO Ted Koza Sunningdale Rd Veterans Memorial Parkway VMP South Extension Southdale Road & Boler Road Highbury Ave and Hamilton Road October 2014 Dillon Page 3 of 5

4 Western Road Widening - Platts Lane to Oxford Street W Assessments - April January 2014 AECOM Wonderland Rd South MMM Shift Rapid Transit September 2014 Fall IBI Group/ WSP Maxim Kireev/Ted Koza Jennie Ramsay Cycling February 2015 MMM Doug MacRae Wharncliffe Road widening/optimization - Becher Street to Commissioners Rd vember 2014 Blackfriars Bridge Dillon Uplands Pathway/Richmond St Crossing Next Steps tes Online Western Rd Construction from 401 to 402 starts. DD for other sections within 20 years. Wonderland Rd John Fleming EPR Report early Spring Next steps TPAP SHIFT Andrew Macpherson/ Jeff Bruin Implementation London on Bike Early MMM Josh Ackworth File ESR/start detailed design Wharncliffe May 2014 on hold AECOM K. Gonyou/ J. Bruin Maybe J. Bruin Detailed design Part II bump up received and under review with MOECC & OMB Blackfriars Bridge Recreational Path Richmond rth Western Rd/Sarnia Rd & Philip Aziz Avenue February 2015 on hold AECOM (using Huron St. Water crossing EIS) PIC 2 Pending resolution of SHIFT/RT/Western University reviews Dundas Place June 2015 Dillon Commissioners Rd W Realignment v/dec 2015 Spring CIMA Adelaide/CPR Grade Separation January 2016 Late MMM Wonderland Road Feb Dillon Bostwick Rd March 2016 Spring Parsons Victoria Bridge Feb 2017 Spring AECOM Southdale Road from Pine Valley to Colonel Talbot, including Bostwick Rd from Southdale to Pack Road Southdale Road from Boler to Wickerson Richmond Street Municipal Underground Utilities Realignment Fall 2016 Spring AECOM August 2016 Spring Dillon K. / A. Spahiu J. Ackworth/ T. Koza Ardian Spahiu/J. Ackworth J. Ackworth/ T. Koza M. / J. Ackworth Ted Koza/Sam Shannon Ted Koza/Maxim Kireev Jim Yanchula File ESR/start detailed design Jerzy Smolarek PIC #3 Spring K. Gonyou/ J. Bruin PIC #1 Spring Finalize Report Jerzy Smolarek PIC 2 for PIC 2 - Spring Coordination with South-East Byron Secondary Plan Coordination with Bostwick and Southdale My Dundas Place Adelaide St and CPR Grade Separation Bostwick Road Southdale Road West Richmond St IBI Group/WSP Edward Soldo tice of Coordinated with RT Project Underground Utilities Page 4 of 5

5 Assessments - April Next Steps tes Online Clarke Road Widening from VMP Extension to Fanshawe Park June 2017 Spring Stantec Sam Shannon/ Ardian Spahiu Britt O'Hagan PIC 2 Coordination with VMP Extension Clarke Road Adelaide St rth May Winter 2019 M. Kireev/ Matt Davenport Appointment Southwest Area Sanitary Servicing & Schedule B for the Southland Plant Stantec Shawna T. Grawey Implementation to evaluate sanitary servicing options for rth Talbot, Bostwick West, rth Lambeth, and existing Lambeth neighbourhoods. SASS Tributary C Schedule B Sanitary and Crossing Huron St/William St Storm Sewer/Outfall Reconstruction AECOM 2016 Q2 Dillon Watson Park 2016 Q2 AECOM Avalon Street 2017 Q2 RV Anderson Mornington 2017 Q4 Stantec Shawna L. Mottram Preferred sanitary servicing option to be finalized in conjunction with SWM servicing J. Bruin tice of J. Bruin tice of PIC complete; finalizing report tice of Commencement Water Huron Watermain Crossing Stantec Kevin Graham A. Macpherson Construction completed in 2016 Water Long Term Water Storage To commence in 2019 Pat Lupton A. Macpherson Identified to undertake screening and subject lands status reports Beavers in area. New storm outfall for William St. New outfall for Wellington Road storm drainage (river to Commissioners Rd); Recommended alternative is Schedule A+ Schedule B initiated due to potential need to open cut sanitary crossing under Pottersburg Creek at Clarke Road Storm servicing needs for Quebec Street; to determine preferred alternative for ultimate storm servicing Close RFP Feb 23 RFQ completed in 2017 William St Watson Avalon Mornington Watermain Crossing Report te: Some of the information in the table may not be up to date Page 5 of 5

SCHEDULE 14 - HEAVY TRUCK RESTRICTIONS

SCHEDULE 14 - HEAVY TRUCK RESTRICTIONS CHEDULE 14 - HEAVY TRUCK RETRICTIO Column 1 Column 2 Column 3 Column 4 treet From To Permitted Time for Adelaide treet orth City limit York treet Adelaide treet York treet Adelaide treet E Beaverbrook

More information

SCHEDULE 8 - PROHIBITED TURNS

SCHEDULE 8 - PROHIBITED TURNS SCHDUL 8 - PROHIBITD TURNS Column 1 Column 2 Column 3 Adelaide N with Dundas (7:00 a.m. to 10:00 p.m., Monday to Friday) Adelaide N with Dundas Adelaide N with Horton Adelaide N with Horton Adelaide N

More information

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation

Microsoft Enterprise Agreement Renewal and Software License Management Awarded to Softchoice Corporation City of Coquitlam Closed Bids 2010 Closed Request for Information (RFI) 84431 - Engineering Consultant Design Services 2010/2011 Infrastructure Projects Kerr Wood Leidal Associates Ltd. Dayton and Knight

More information

Appendix H: North Corridor Alternatives Through Western University - July 2017

Appendix H: North Corridor Alternatives Through Western University - July 2017 Appendix H: North Corridor Alternatives Through Western University - July 2017 1 Overview The North corridor to Masonville Place from Downtown was examined with respect to three possible routings: 1. Utilizing

More information

Table E1 Summary of Annual Revenue Service Hours. System LTC Routes 581, , , , ,082 (Quick Start)

Table E1 Summary of Annual Revenue Service Hours. System LTC Routes 581, , , , ,082 (Quick Start) L O N D O NT R A N S I TC O MMI S S I O N T r a n s i t N e t w o r k R a p i dt r a n s i t I n t e g r a t i o nf r a me w o r k FI NAL REPORT Augus t2016 Su bmi t t e dby : Di l l on Consul t i ng Li

More information

CAPITAL PROGRAM SUMMARY

CAPITAL PROGRAM SUMMARY 2017 2018 CAPITAL PROGRAM SUMMARY MISC A 2017 NEIGHBOURHOOD REHABILITATION Pitt River Road - Mary Hill to Kingsway Victoria Drive - Toronto to Holtby Pooley Avenue - High Pressure Watermain Culvert Replacement

More information

EXISTING CONDITIONS: SITE 6 - WESTMINSTER PONDS EAST OF WELLINGTON ROAD

EXISTING CONDITIONS: SITE 6 - WESTMINSTER PONDS EAST OF WELLINGTON ROAD SITE 6 BOUNDARY k AMPHIBIAN SURVEY LOCATION PROVINCIALLY SIGNIFICANT WETLANDS WATER FEATURES ESA SUBWATERSHED BOUNDARY UTRCA REGULATION LIMIT S WILKIN T ST REE SANDR INGHA SCE NT M CR E NG DI FO M AN EE

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

DRAFT. Dorabelle Campground Rehabilitation

DRAFT. Dorabelle Campground Rehabilitation DRAFT Dorabelle Campground Rehabilitation September 2012 1.1 REGIONAL SETTING AND PROJECT LOCATION The Dorabelle Campground is located on the western shore of Shaver Lake in Fresno County, California (Section

More information

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1

CITY OF COACHELLA CAPITAL IMPROVEMENT PROGRAM TOTAL PROJECTS REVENUE SUMMARY TABLE ES-1 Funding Prior Years Expenditures to 6-30-10 Total Project Cost Estimated Expenditures for FY 2006 Non- Taxable Non- Housing RDA Bonds Bond Proceeds 2005 Prop. 1B USDA Loans/ Grants Dev Impact Fees TUMF

More information

Alberta Transportation 2013 Request for Expression of Interest (RFEI) Awards

Alberta Transportation 2013 Request for Expression of Interest (RFEI) Awards Alberta Transportation 203 Request for Epression of Interest (RFEI) Awards Please note that the following lists were compiled for information purposes only. In the event that a discrepancy is present between

More information

Ministry of Transportation. OHMPA 2016 Partners In Quality Road Tour Jasan Boparai, P. Eng. Manager/ A, Program Planning Office

Ministry of Transportation. OHMPA 2016 Partners In Quality Road Tour Jasan Boparai, P. Eng. Manager/ A, Program Planning Office OHMPA 2016 Partners In Quality Road Tour Jasan Boparai, P. Eng. Manager/ A, Program Planning Office Outline Capital Budgets - Provincial West Region 2015/16 The Year Past Accomplishments 2016/17 The Year

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE

2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 2 ROADS CAPITAL CONSTRUCTION PROGRAM UPDATE The Transportation Services Committee recommends: 1. Receipt

More information

Developmental Cost Charge (DCC) Program Summary

Developmental Cost Charge (DCC) Program Summary Developmental Cost Charge (DCC) Program Summary In 1997, Metro Vancouver implemented a Development Cost Charge (DCC) Program in the Liquid Waste function of the Greater Vancouver Sewerage and Drainage

More information

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT Welcome KROSNO CREEK DIVERSION PROJECT PUBLIC INFORMATION CENTRE # 1 Tonight s Presentation Study Overview Background Existing Conditions Alternative Solutions Preliminary Preferred Solution Next Steps

More information

Prequalified Service Provider Registry

Prequalified Service Provider Registry Engineering and Operations Division and Water Management and Structures Division For Internal and External Use Managed by: Engineering Services Contract Engineer Contract Services Branch Effective: 21

More information

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY

Village of Lombard, Illinois Capital Improvement Plan FUNDING SOURCE SUMMARY Village of Lombard, Illinois Capital Improvement Plan FY 15 FY 24 thru FUNDING SOURCE SUMMARY Source FY 15 FY 16 FY 17 FY 18 FY 19 FY 20 FY 21 FY 22 FY 23 FY 24 Construction Fund 6,318,700 2,354,800 2,430,800

More information

Teltow Contracting, Inc.

Teltow Contracting, Inc. Tim Horton s we are a Sub Leonard C. Carnaghi AEW 199,395.50 201,609.52 586 791-7171 24388 Sorrentino Count Brian Clinton MI 48035 Date Started: 4-01-08 Finished 7-15-08 Work Performed: storm, water, grading

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,

More information

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route February 2015 Valley ine-stage 1 RT EISA Update FINA REPORT Page A1 Memorandum AECOM ConnectEd Transit Partnership 10235

More information

List of Our Ongoing Noise and Vibration Monitoring Projects

List of Our Ongoing Noise and Vibration Monitoring Projects List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Client: Metrolinx-Eglinton Crosstown

More information

Request to Qualification and Quote Summary of Awarded Contracts (April 1, 2016 to February 28, 2017)

Request to Qualification and Quote Summary of Awarded Contracts (April 1, 2016 to February 28, 2017) The following is a list of the Summary of Awards made for Request to Qualify and Quote (RQQ) Procurements for the period April 1, 2016 to February 28, 2017 Background: The Procurement & Contract Services

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

Neighbourhood Decision Making Voting Results CENTRAL LONDON

Neighbourhood Decision Making Voting Results CENTRAL LONDON CENTRAL LONDON 041 - Clay Mosaics along Dundas in Old East Village 128 048 - Plant Fruit Trees Near Community Gardens 121 015 - Public Piano in Market Lane 110 014 - Community Garden and Gathering Space

More information

Neighbourhood Decision Making Voting Results CENTRAL LONDON

Neighbourhood Decision Making Voting Results CENTRAL LONDON CENTRAL LONDON 001 - Garbage Cans for Old East Village Residents 37 002 - Bishop Hellmuth Beautification and Doidge Park Enhancement 46 003 - Addiction and Crisis Support Info Signs 91 004 - Richmond Row

More information

Community Development Services

Community Development Services Ted Salisbury, General Manager City Hall, 100 Wellington Square (519) 759-4150, ext. 2335 tsalisbury@brantford.ca DEPARTMENTS Building Services, Property Standards & Bylaws Economic Development and Tourism

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Agenda Report Subject: Prepared By: Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer Steven M. Saunders, Director of Public Works/Village Engineer Date: August 12, 2012 On March 8, 2012

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,

More information

2016 Development Cost Charges (DCC) UPDATE

2016 Development Cost Charges (DCC) UPDATE 2016 Development Cost Charges (DCC) UPDATE City of Richmond Public Meeting November 3, 2016 Outline Development Cost Charges (DCC) Overview DCC Rate Calculation DCC Recoverable Costs (DCC Programs) Estimated

More information

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT

Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT 01051-09004 Attachment D: PHOTO LOG CITY OF ARCATA RAIL-WITH-TRAIL CONNECTIVITY PROJECT DRAFT: June 30, 2010 Applicant: City of Arcata 736 F Street Arcata, CA 95521 Phone (707) 825-2154 Prepared by: Winzler

More information

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake

Federal Gas Tax Fund-Strategic Priorities Approved and Conditionally Approved Projects 2017 Intake Local Government Project Title Category Approved Projects Regional District of Alberni Clayoquot Asset Management Implementation Project Capacity Building -Asset Management $ 196,000.00 Regional District

More information

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JANUARY 25, 2011 Item 1, Report No. 1, of the Priorities and Key Initiatives Committee, which was adopted without amendment by the Council of the City of Vaughan on January 25,. 1 RAPID TRANSIT UPDATE TORONTO-YORK SPADINA

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Corridor Management Committee Meeting. April 2, 2014

Corridor Management Committee Meeting. April 2, 2014 Corridor Management Committee Meeting April 2, 2014 1 Today s Topics Welcome Approval of Minutes Resolutions Response to March 26 CMC Questions Staff Recommendation on Project Scope and Budget Public Testimony

More information

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Community Liaison Committee Meeting #3 July 15, 2013 6:30 to 8:30 pm Flemingdon Park Library Agenda 1. Welcome 2. Housekeeping and Updates a) Housekeeping b) CLC

More information

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO York Region Lake to Lake Trail Implementation City of Markham Staff Presentation PRESENTATION TO DEVELOPMENT SERVICES COMMITTEE September 6, 2016 1 Lake to Lake Route 2 Lake to Lake Route In 2008, the

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 4, 2014 Approval of City of Palmdale's 2014 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

SAN FRANCISCO INTERNATIONAL AIRPORT

SAN FRANCISCO INTERNATIONAL AIRPORT 1 SAN FRANCISCO INTERNATIONAL AIRPORT Runway Safety Area Program ACI-NA Operations and Technical Affairs Conference April 7, 2011 RSA Status Completed RSA Studies Environmental Assessment ongoing and on

More information

Creating Connections in Niagara Region

Creating Connections in Niagara Region Creating Connections in Niagara Region GERRY CHAPUT, CHIEF CAPITAL OFFICER - METROLINX ERIN MOROZ, DIRECTOR OF COMMUNICATIONS AND COMMUNITY RELATIONS - METROLINX METROLINX PRESENTATION TO NIAGARA REGION

More information

BUNT & ASSOCIATES ENGINEERING (ALBERTA) LTD.

BUNT & ASSOCIATES ENGINEERING (ALBERTA) LTD. PRE-QUALIFICATION FOR PRIME CONSULTANTS MAJOR FUNCTIONAL PLANNING AND MINOR FUNCTIONAL PLANNING 31/10/2018 CONSULTANT MAJOR Funtional Planning MINOR Funtional Planning AECOM CANADA LTD. AL-TERRA ENGINEERING

More information

DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION

DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION Agenda Item # Page # 1 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON APRIL 20, 2015 JAY STANFORD DIRECTOR, ENVIRONMENT, FLEET, & SOLID WASTE UPDATE: REGIONAL RIDESHARE PROGRAM RECOMMENDATION

More information

District of Squamish Financial Plan for the Years Capital Revenues and Expenditures

District of Squamish Financial Plan for the Years Capital Revenues and Expenditures Reserves 2007 Budget Reserves C 118 Application of Capital Funding: C 119 C 124 Buildings C 129 Municipal Hall - Outside Paint / Canopy 3,148 3,148 2,300 2,300 C 134 Total Buildings 3,148 3,148 - - - -

More information

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc.

Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) Development Services Committee. January 27, Schollen & Company Inc. Markham Multi-use Pathway (MUP) (16 th Avenue to Bob Hunter Memorial Park) January 27, 2015 Development Services Committee Mark Schollen Schollen & Company Inc. Purpose of Presentation Update Council on

More information

Finn Creek Park. Management Direction Statement Amendment

Finn Creek Park. Management Direction Statement Amendment Finn Creek Park Management Direction Statement Amendment November 2013 Management Direction Statement Amendment Approved by: Jeff Leahy Regional Director, Thompson Cariboo BC Parks November 12, 2013 Date

More information

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING

9 CONSTRUCTION OF BATHURST STREET FROM GREEN LANE WEST TO SOUTH OF HIGHWAY 11, TOWN OF EAST GWILLIMBURY AND TOWNSHIP OF KING Clause No. 9 in Report No. 9 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on May 15, 2014. 9 CONSTRUCTION OF BATHURST

More information

Water & Wastewater Project Activity Report

Water & Wastewater Project Activity Report Water & Wastewater Project Activity Report A. Project Activity - Construction Phase MUNICIPALITY DESCRIPTION OR RN.08-32 Fort Erie Nigh Road Sewage PS Odour Control CRL Campbell Construction & Drainage

More information

PUBLIC WORKS DEPARTMENT

PUBLIC WORKS DEPARTMENT PUBLIC WORKS DEPARTMENT Monthly Report Kevin D. Blayton, PE Director ENGINEERING DIVISION Engineering Manager UTILITY DIVISION Ralph Norris, Operations Manager STREET & DRAINAGE DIVISION Robert Turner,

More information

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation

Northeast Anthony Henday Drive. Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation Northeast Anthony Henday Drive Bill van der Meer Urban Construction Manager - Edmonton Alberta Transportation Project Background 2 Edmonton Ring Road Northwest completed Nov 2011 Northeast to be completed

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204)

Tenders. Manitoba Heavy Construction Association Unit Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) Fax: (204) Tenders Manitoba Infrastructure Manitoba Heavy Construction Association Unit 3-1680 Ellice Ave. Winnipeg, MB R3H 0Z2 Tel: (204) 947-1379 Fax: (204) 943-2279 www.mhca.mb.ca Reference No. 0000087389 SUPPLY

More information

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report

More information

2017 Annual Service Plan

2017 Annual Service Plan 2017 Annual Service Plan 2017 Annual Service Plan 2017 Annual Service Plan Objectives Transition to a Frequent Transit Network (FTN) with a strong grid network Preparing the Viva Network Expansion Plan

More information

(1) GENERAL POLICIES (2) EXISTING USES

(1) GENERAL POLICIES (2) EXISTING USES (1) GENERAL POLICIES (d) (e) The policies of Section 20 shall apply to all lands located within the area shown on Schedule A - Land Use and Roads Plan as Oak Ridges Moraine. Schedule E-1 - Oak Ridges Moraine

More information

Capital Budget

Capital Budget 2017-2026 Capital Budget Project Number Fleet Reserve PW-11-09 Capital Project Changes from Prior Year 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Fleet Management - Vehicle Replacement by $101K

More information

APPENDIX. I. Meeting Minutes and Presentations

APPENDIX. I. Meeting Minutes and Presentations APPENDIX I. Meeting Minutes and Presentations Public Meeting Agenda 6:00-6:20 Welcome and Refreshments 6:20-6:40 Project Presentation 6:40-7:30 Facilitated Open House www.denvergov.org/parkprojects Please

More information

Town of Oakfield Agricultural and Farmland Protection Plan

Town of Oakfield Agricultural and Farmland Protection Plan SECTION III COMMUNITY OVERVIEW A. Regional Setting / Location The Town of Oakfield is located in the northwestern portion of Genesee County. Located west of New York's Finger Lakes, the Town is uniquely

More information

2018 Development Cost Charges (DCCs) Update

2018 Development Cost Charges (DCCs) Update 2018 Development Cost Charges (DCCs) Update Agenda DCC Overview DCC Update Proposed DCC Rates Next Steps DCCs - OVERVIEW Why do we have DCCs? DCCs pay for the costs of expanding and upgrading the community

More information

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also,

The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The north half of Section 18, Township 37 North, Range 6 East, Second Principal Meridian, Jefferson Township, Elkhart County, Indiana; also, The east half of Sections 21, 28, and 33, Township 37 North,

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

WASTEWATER ENGINEERING PROJECTS - FY19

WASTEWATER ENGINEERING PROJECTS - FY19 WASTEWATER ENGINEERING S - FY19 12565 BISSELL & LEMAY WWTF FLUIDIZED BED INCINERATORS 12033 BISSELL - COLDWATER - MISSOURI - CONTRACT A 12030 BISSELL - COLDWATER - MISSOURI - CONTRACT B 12027 BISSELL -

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

Bear Creek Habitat Improvement Project

Bear Creek Habitat Improvement Project 06/10/10 Bear Creek Habitat Improvement Project El Paso County, Colorado Pike National Forest and Colorado Springs Utilities Owned Land Report prepared by: Eric Billmeyer Executive Director Rocky Mountain

More information

COUNCIL MEETING AGENDA

COUNCIL MEETING AGENDA CITY OF VAUGHAN COUNCIL MEETING AGENDA Council Chambers Monday, March 17, 2003 Vaughan Civic Centre 2141 Major Mackenzie Drive Vaughan, Ontario 1:00 p.m. 1. PRESENTATIONS 2. CONFIRMATION OF AGENDA 3. DISCLOSURE

More information

I. Call to Order. A. Invocation. B. Pledge of Allegiance. Employee Awards. Public Information Update. 1. PIO Update- Page: 6

I. Call to Order. A. Invocation. B. Pledge of Allegiance. Employee Awards. Public Information Update. 1. PIO Update- Page: 6 Agenda Okaloosa County Board of Commissioners Tuesday, April 16, 2019 8:30 AM Okaloosa County Administration Building In accordance with Section 286.011, Florida Statutes, this meeting was publicly noticed

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President

York Region Rapid Transit Corporation Board of Directors. Mary-Frances Turner, President Meeting of the Board of Directors On June 9, 2011 To: From: Subject: Ref: York Region Rapid Transit Corporation Board of Directors Mary-Frances Turner, President Spadina Subway Project Update YORK-#3369547

More information

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than

More information

Mayor s State of the Town Message Presented 01/17/2013

Mayor s State of the Town Message Presented 01/17/2013 Mayor s State of the Town Message Presented 01/17/2013 Plans for the Next Four Years Governance Issues Create a "Vision Plan" for the town to guide the Municipal Government for the next four years Create

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager .. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

Action Recommendation: Budget Impact:

Action Recommendation: Budget Impact: City of Fayetteville Staff Review Form Matt Mihalevich 1/16/2019 DEVELOPMENT SERVICES (620) Submitted By 2019 0050 Legistar File ID February 5th, 2019 City Council Meeting Date Agenda Item Only N/A for

More information

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail

COMMUNITY MEETING NOVEMBER 1, Wheaton Regional Park Pine Lake Trail COMMUNITY MEETING NOVEMBER 1, 2012 MEETING AGENDA I. Introduction of Project Team II. Trail Renovation Process III. Wheaton Regional Park IV. Pine Lake Trail Renovation Project V. Comments and Questions

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 1, 2011 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT CONTRACT AMENDMENT NO. 8 ACTION ITEM RECOMMENDATION It is recommended

More information

2018 Capital Improvement Budget Department Summary by Funding Source

2018 Capital Improvement Budget Department Summary by Funding Source Department Summary by Funding Source Department Bonds State Federal Other Total Fire 3,470 - - 290 3,760 Health & Human Services 217 - - 75 292 Information Technology - - - 5,937 5,937 Library 590 - -

More information

Building the transportation network we need for the future in Niagara Region

Building the transportation network we need for the future in Niagara Region Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006

More information

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development

Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development Region of Waterloo Planning, Development and Legislative Services Region of Waterloo International Airport Office of Economic Development To: Chair Tom Galloway and Members of the Planning and Works Committee

More information

Zorra. Beachville. South-West Oxford km. WHPA Overview RD 74. WHPA Significant Threat Area Municipal Boundaries

Zorra. Beachville. South-West Oxford km. WHPA Overview RD 74. WHPA Significant Threat Area Municipal Boundaries Mount Elgin and Map 2-1-3 () Significant Threat Policy Applicability Area Source Protection Plan Significant Threat Areas -A -B -C DNAPL Policy Area -A,B,C 1 0.5 0 1 km Mount Elgin Vulnerability Score

More information

CULTUS LAKE PARK BOARD AMENDED AGENDA

CULTUS LAKE PARK BOARD AMENDED AGENDA CULTUS LAKE PARK BOARD AMENDED AGENDA (1) CALL TO ORDER WEDNESDAY, MARCH 18, 2015 PARK OFFICE BOARDROOM 7:00 PM Regular Meeting (2) RESOLUTION TO PROCEED IN CAMERA (4:00) THAT the meeting be closed to

More information

MORGAN CREEK GREENWAY Final Report APPENDICES

MORGAN CREEK GREENWAY Final Report APPENDICES APPENDICES MORGAN CREEK GREENWAY Appendix A Photos of Existing Conditions in Trail Corridor Photos of existing conditions Main trail corridor - February 2009 Photos of existing conditions south bank Morgan

More information

Huntington Metro Station Joint Development

Huntington Metro Station Joint Development Finance and Capital Committee Information Item II-C September 13, 2018 Huntington Metro Station Joint Development Page 120 of 284 Washington Metropolitan Area Transit Authority Board Action/Information

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

Fiscal Year

Fiscal Year Fiscal Year 2017-2018 Workshop May 2, 2017 CIP Overview Based on Board Priorities Based on Board Priorities Balanced, Generally on a Pay-as-You-Go Basis FY17-18 Closely Mirrors this Year s Approved Plan

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County

U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities **11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound

More information

THE RICHMOND REGION Transportation Priority Projects

THE RICHMOND REGION Transportation Priority Projects Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)

More information

5.1 Licence to Use Renewal Penticton & District Community Resources Society (470 & 500 Edmonton Ave.).

5.1 Licence to Use Renewal Penticton & District Community Resources Society (470 & 500 Edmonton Ave.). REGULAR COUNCIL MEETING TO BE HELD AT THE CITY OF PENTICTON, COUNCIL CHAMBERS 171 MAIN STREET, PENTICTON, BC ON MONDAY, FEBRUARY, 20, 2012 at 6:00 P.M. 1. CALL THE REGULAR COUNCIL MEETING TO ORDER: 2.

More information

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Business Case Approved. Under Construction. Business Case Approved. Under Construction Item 6 Appendix A: LGF Project Summary for South Essex Update September Project and A127 Network Resilience (Essex) Basildon Integrated Transport Package (Essex) Range of improvements at key locations

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information