Welcome to Dayton Parkway Interchange Open House. November 26, 2018
|
|
- Suzanna Lane
- 5 years ago
- Views:
Transcription
1 Welcome to Dayton Parkway Interchange Open House November 26, 2018
2 Project Partners Minnesota DOT Hennepin County City of Rogers Dayton
3 Project History NW Hennepin County I94 Study 2007/08 Interchange location Study 2012 EAW Funding procurement 2012 to 2018 EA and Final Plans 2018/19
4 Why Build the Interchange? Support economic development Improve safety and emergency response Reduce congestion on other I94 interchanges Provide good distribution on other arterial routes Address planned growth in this area
5 Dayton Parkway Interchange Design Safety Accommodate heavier truck volumes Provide for safety of pedestrians and bicycle traffic Provide capacity beyond 2040 planning horizon Minimize ROW required Manage risks and costs
6 Align with LU and System Plans The interchange needs to align with local land use and system plans
7 Dayton Parkway Interchange Design Set up for future county jurisdiction Maximize future development (value) Provide opportunities for aesthetics/gateway to community Construct Interchange in 2020 with opening in 2021
8 Dayton Parkway - Vision 4-lane Urban Arterial 40-45mph design speed Meet HC access spacing ROW 150 feet Trails/sidewalks 25K to 35K vpd
9 Optimize local development RDO Site Diverging Diamond Interchange Illustrative Development Concept Plan
10 DM1 Evaluation of Interchange Options Standard Diamond Folded Diamond Partial Cloverleaf Diverging Diamond Diverging Diamond
11 Slide 10 DM1 Dave Montebello, 11/20/2018
12 RDO Site Click to edit Master title style Sub-Title
13 Why the DDI? Better operations 50 % fewer stops; no loops Safety half as many conflict points High capacity handles a lot of traffic Less impacts Better intersection spacing on Dayton Parkway Lower costs
14 What are the Impacts? Wetland impacts Floodplain impact Historic/archeological Threatened and endangered species Contaminated materials Environmental justice Farmland impacts Additional impervious surfaces 2.6 acres 18,490 CY no no no no 9.3 acres 25.8 acres
15 Diverging Diamond Cost Hard Costs CR 101 Intersection $1.3 CR 81 Intersection $0.1 Dayton Parkway Roadway $9.1 Interchange - Bridge and Ramps $6.7 Change orders (4%) $0.8 Inflation (10%) $1.6 Contingency (10%) $ M These costs have a 10% contingency; 10% inflation and 4% change order factor included. They also include other costs for BNSF crossing, and wetland/floodplain mitigation.
16 Soft Costs (DBB) Preliminary Design (MnDOT/SRF) $0.6 Final Design $0.9 Construction Oversight/Quality $1.7 Optional wetland bank/flood Mit $0.2 Estimate of remaining ROW $0.62 Soft cost contingency $0.2 Subtotal $4.22 M
17 Revenue Sources (millions) Federal Grant $7.0 State GO Bonds $13.5 City of Rogers $1.5 City of Dayton $4.0 Hennepin County $1.5 (CIP request for CR 101/81) Corcoran MnDOT Note: MnDOT also has agreed to pay for EB Aux Lanes approx. $3M+ $0.25 (requested contribution) $0.5 (signals) $28.25
18 What is needed to move forward? MnDOT to submit EA document City to go through 429 process City to develop final design City to acquire remaining ROW City to work with adjacent landowners
19 Click to edit Master title style Sub-Title
20 Click to edit Master title style Sub-Title Diverging Diamond Interchange
21 How can I participate? Fill out comment card Talk with staff Follow cities web site Future open houses
22
23 Questions
24 MNDOT Projects for I-94
25 MnDOT Projects on I-94 Constructing two repaving and lane addition projects: St. Michael to Albertville Monticello to Clearwater Both in 2019 to 2021.
26 MnDOT Projects on I-94 Additional third Maple Grove to Rogers project: MnDOT and City of Dayton Construction in 2020 to 2021 Dayton Parkway Interchange was funded for 2020 City of Dayton leading separate interchange project MnDOT committed to building aux lanes to Hwy 610
27 I-94 Project Coordination Project Coordination Mitigates Traffic Impacts All three I-94 projects during similar time period All three projects planned to finish by 2021 US 10 Anoka and 169 Elk River can start 2022
28 Scope of I-94 projects St. Michael to Albertville Monticello to Clearwater Maple Grove to Rogers
29 I-94 St. Michael to Albertville Spring 2019 Fall 2021 Reconstruction of approximately 6 miles, both directions CR 19 in Albertville to Hwy 241 in St. Michael Replacement of the I-94 bridges over CR 19. Eastbound collector-distributor road from CR 19 to CR 37.
30 I-94 St. Michael to Albertville Additional general purpose lane in both directions Additional lane between CR 37 and Hwy 241 Adding a raised concrete median barrier Reconstruction of the interchange at I94 and Hwy 241. Construction of stormwater basins.
31 I-94 Monticello to Clearwater Spring 2019 Fall 2021 Reconstruction of 14 miles of I-94 in both directions East of Wright County Road 39 to Hwy 24 Additional general purpose lane in both directions Adding a raised concrete median barrier. Noisewall on north side of westbound I94, west of Monticello.
32 I-94 Maple Grove to Rogers Spring 2020 Fall miles of concrete overlay in both directions of I-94 Fish Lake Interchange in Maple Grove to Hwy 10 Additional lane in each direction from Hwy 610 to Hwy 101 Westbound Truck Enforcement lane on I-94 West of Brockton Lane
33 I-94 Maple Grove to Rogers Replacement of Road-kill Compost site Expansion of Truck Parking at Elm Creek rest area New Noisewalls in both directions Fish Lake Interchange and just west of Brockton Lane Construction of Stormwater basins
34 Questions
35 RDO Site Click to edit Master title style Sub-Title
US 19 Sunset Point Rd to Countryside Blvd.
Frontage Lanes Alternative Six-Lane Roadway Two-Lane, One-Way Frontage Lanes Close All Median Openings w/ Concrete Median Barrier Construct Within Existing Right-of-Way Status Update Construction started
More informationUS 380 FEASIBILITY STUDY
US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationPublic Open House. Chief Peguis Trail Project
Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationFuture Projects. District 3 Central Minnesota. mndot.gov/d3
Future Projects District 3 Central Minnesota 20 2021 mndot.gov/d3 Cass 20-2021 Construction Central Minnesota MnDOT District 3 Walker 34 Hackensack CASS 84 Remer 200 Longville Hill City Wadena 29 Osakis
More informationuser s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:
The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles
More informationRoute 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016
Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty
More informationFHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need
Highway 22 Segment 1 - US 169 to CSAH 2 Vehicle Mobility Congestion Intersection Congestion Existing Conditions - Based on Highway Capacity Manual methodology, corridor level of service is currently LOS
More information2009 Regional Solicitation Selected Projects*
2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationPUBLIC INFORMATION SESSION #2
Highway 16, Highway 779 to Kapasiwin Road, Planning Study PUBLIC INFORMATION SESSION #2 Wednesday June 20, 2012 4 to 8 pm HIGHWAY 16 Highway 779 to Kapasiwin Road Functional Planning Study Blueberry Community
More informationMETROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN Phone (651) TDD (651)
DATE: March 27, 2012 METROPOLITAN COUNCIL 390 North Robert Street, St. Paul, MN 55101 Phone (651) 602-1000 TDD (651) 291-0904 TO: Metropolitan Parks and Open Space Commission FROM: Arne Stefferud, Planning
More informationLake Erie Commerce Center Traffic Analysis
LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table
More informationBusiness Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.
Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting
More informationArlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager
Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationHonorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee
Memorandum DATE August 10, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Dallas Love Field Master Plan Update On Monday, August
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9
More informationCommittee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.
Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed
More informationFINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO
City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL
More informationPROGRESS PARK CONNECTOR
PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection
More informationInteroffice Memorandum
Supplemental Information Agenda Item No. 5.1 May 1, 2014 Interoffice Memorandum May 1, 2014... Date Honorable Planning Commission... To Rick Carter, PE... From Agenda Item 5.1-2014-2019 Capital Improvement
More informationDRAFT. Public Meetings November 7, 9, 15, Year UTP Planning Effort Cost/Revenue Matrix FY FY 2026
Collin FM 2478 FM 1461 to US 380 (Prosper) US 380/McKinney Bypass Candidate Project; Collin Roadway Action Plan #3 $32,600,000 $32,600,000 A Collin FM 2514 East of Lavon Parkway to North of Drain Dr. Roadway
More informationROUTE 630 DIVERGING DIAMOND INTERCHANGE
ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,
More informationMinnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects
Minnesota Department of Transportation 2011 Twin Cities Metro Area Construction Projects 1 N 14 9 Chisago Interstate Highway 2011 Project Sites 8 12 6 Anoka 1 6 0 6 22 6 6 9 12 7 7 7 284 74 2 41 71 29
More informationYonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services
PW9.7 STAFF REPORT ACTION REQUIRED Yonge Street / Highway 401 Improvements Update Date: October 26, 2015 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation
More informationNEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release
NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation
More informationFEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A
VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More informationThe Dulles Loop. Route 606. Route 28. Route 50
The Dulles Loop Route 606 Route 28 Route 50 1 Rt.50/Dulles Loop: Year 2000 Signal Queues (Intermittent) Signal Queues (Continuous) 4:30 6:00 p.m. Dulles Loop Source: SkyComp Report WATF 03/07 2 Rt.50/Dulles
More informationMemorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description
Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationAPPENDIX F List of Commitments
APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationFORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008
FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008 Transportation access to Fort Washington Office Center is negatively affected
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationWilliamsburg Town Hall Meeting
Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW
More informationSR 934 Project Development And Environment (PD&E) Study
SR 934 Project Development And Environment (PD&E) Study Project Advisory Group Meeting March 1, 2018 State Road 934/NE/NW 79th Street from west of I-95 (NW 13th CT) to N. Bayshore Drive PD&E STUDY SR 934/NE/NW
More informationProject Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)
Current Status (Tier 1, Tier 2 or New) Proposed Status (Tier 1 or Tier 2) Project Application General Information ODOT PID ODOT District County (3 char abrv) Facility Name (i.e. route, rail, terminal,
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationCommunity Development Committee
C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional
More informationDHS Consolidation at St. Elizabeths Master Plan Amendment. Transportation Interstate 295 / Malcolm X Avenue Interchange
Transportation Interstate 295 / Malcolm X Avenue Interchange Consulting Parties Meeting November 08, 2011 (Revised December 20, 2011) Transportation I-295 / Malcolm X Avenue Interchange AGENDA Follow-up
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationCity of Olathe, Kansas Capital Improvement Plan Projects 2016 thru 2020
Capital Improvement Plan Projects ECONOMIC VIABILITY PROJECTS 2016 2017 2018 2019 Page Coffee Creek Regional Detention 20905B 1,688,005 - - - - 1,688,005 31 Hedge Lane Relocation - Olathe Schools 3-B-080-13
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationDENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study
DENISON STREET EXTENSION Feasibility Study January 14, 2014 Transportation Committee Markham Transportation Strategic Plan (MTSP) analysis completed in 2012 reviewed transportation requirements to accommodate
More informationAdd-A-Lane Contract V. along a Section of I-95 includes 6 Bridges
Newton Needham Chamber of Commerce Add-A-Lane Contract V along a Section of I-95 includes 6 Bridges Project File No. 603711 July 29, 2014 1 Agenda Project Update Overview Bid and Contract Award Schedule
More informationSANTA CLARA COUNTY I-280 CORRIDOR STUDY
SANTA CLARA COUNTY I-280 CORRIDOR STUDY Appendix B 2 Technical Memorandum Existing Transportation Condition Memo SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) 1-1 Introduction The I-280 Corridor Study
More informationA VISION FOR I-95. January 12, Delaware Department of Transportation
A VISION FOR I-95 January 12, 2011 Delaware Department of Transportation The East Coast s Main Street Along with SR 1, the most significant highway in Delaware 29 miles to I ".', 2 Sponsoring / Cooperating
More informationFEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION
FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION Project Name: Boulder City/US 93 Corridor Study (Boulder City Bypass) Project Location: The
More information2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)
2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationI-3 DFW Extension Public Hearing. June 2, 2011
1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationNorthaven Trail Phase 2 Initial Project Overview
Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails
More informationUS 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD
US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE
More informationNew Hampshire Route 101 Corridor Plan
Amherst, Milford, Wilton Final Report September 2002 Bedford Amherst Wilton Milford Prepared for the Nashua Regional Planning Comission (NRPC) by: Wallace Floyd Design Group Vanasse Hangen Brustlin, Inc.
More informationMEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting
COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation
More informationAbbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd
Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationTreasure Island Supplemental Information Report Addendum
1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land
More informationINTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016
INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City
More informationCatExes vs. EAs When and How to Prepare
CatExes vs. EAs When and How to Prepare Panel: Steve Culberson, Ricondo & Associates Frank Smigelski, FAA Mary Vigilante, Synergy Tuesday December 10, 2013 Washington, DC 1 So you have a project Do I have
More information±2,066 to 4,474 SF Retail Space Available for Lease Diamond Lake Road South Rogers, Minnesota 55374
Property Highlights VISIBILITY The Crow River Plaza is located along Interstate I-94 in Rogers and is shadow-anchored by Target, Kohls, and Applebees. Each Tenant has signage and exposure to over 72,000
More informationCommittee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.
Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint
More informationPURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40
PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major
More informationParking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,
More informationConcord Road Interchange. Standard hours of work
Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationFairfax County Transportation Advisory Commission (TAC)
Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationNortheast Anthony Henday Drive Edmonton Ring Road Update. Strathcona Chamber of Commerce March 18, 2015
Northeast Anthony Henday Drive Edmonton Ring Road Update Strathcona Chamber of Commerce March 18, 2015 Project Background 2 Edmonton Ring Road Northwest opened Nov 2011 Northeast to open Oct 2016 Southwest
More informationUS 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012
US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda
More informationPublic Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019
APPLICANT: REFER TO: St. Louis and Lake Counties Regional Rail Authority 2018-01942-ARC Public Notice ISSUED: December 10, 2018 EXPIRES: January 9, 2019 SECTION:404 - Clean Water Act 1. APPLICATION FOR
More informationSegment 2: La Crescent to Miller s Corner
goal of the USFWS refuges is to conserve, protect and enhance fish, wildlife and plants and their habitats for the continuing benefit of the American people. Refuge lands are used largely for fishing,
More informationMetropolitan Parks and Open Space Commission
Business Item No. 2013-xxx Metropolitan Parks and Open Space Commission Meeting date: November 12, 2013 For the Community Development Committee meeting of November 18, 2013 Subject: Nine Mile Creek Regional
More informationSection 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps
Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and
More informationThe Baker/Carver Regional Trail is intended to
Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.
More information±22.22 acres of mixed-use land for sale
Howard Clear Forest Sr. H.S. Hwy 97 (Scandia Trail-17,400 VPD) 66,000 VPD Running Aces Harness Park Forest Motor Sports Forest Sports Complex Forest Airport Forest Blvd N (8,700 VPD) Hwy 50 Future International
More informationATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE
ATTACHMENT C CITY OF FEDERAL WAY ASPHALT OVERLAY PROJECT SCHEDULE NOTE: Unit Prices for all items, all extensions, and the total amount of the bid must be shown. Show unit prices in legible figures. Where
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationBecker County Trail Routing Feasibility Study
2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3
More informationPENDER COUNTY. North Carolina State Highway Patrol Coastal Evacuation Plan 1
North Carolina State Highway Patrol Coastal Evacuation Plan 1 Contact Information for Emergency Management Director and EOC Contact Address Telephone Number Tom Collins 605 E. Fremont St. 910-259-1210
More informationCLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS. Policy Session Worksheet
CLACKAMAS COUNTY BOARD OF COUNTY COMMISSIONERS Policy Session Worksheet Presentation Date: 10/10/17 Approx. Start Time: 1:30 PM Approx. Length: 60 minutes Presentation Title: An Update on the Sunrise Highway
More informationDOWNTOWN BRT ALTERNATIVE - 19th AVE
DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing
More informationScore. Category. Access Aesthetics Community Resources
NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationMEMORANDUM. Lynn Hayes LSA Associates, Inc.
MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG
More information