OFFICE OF THE CITY MANAGER

Size: px
Start display at page:

Download "OFFICE OF THE CITY MANAGER"

Transcription

1 OFFICE OF THE CITY MANAGER August 28, 2015 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager General Information AT Good News The California High-Speed Rail Authority held a Community Open House this past Tuesday to discuss the Bakersfield F Street Station alignment. The event appeared to be a success as many citizens of Bakersfield attended. Staff from the City and from the High-Speed Rail Authority were present to discuss with residents the future alignment and answer their questions. Another open house will be held in October. Please see the attached pictures. The State Route 99/Hosking Avenue Interchange marked a major milestone on August 18 th when the contractor placed concrete for the stems and soffit (girders and bottom of the bridge). The pour required 1,800 cubic yards of concrete, which totaled more than 180 truckloads. The operation began at 3 a.m. and concluded around 4:30 p.m. There were no impacts to traffic. The contractor is planning another concrete pour for the bridge deck in late-september.

2 General Information August 28, 2015 Page 2 I will be taking vacation September 3 rd, 4 th, and 8 th. Steve Teglia will be in charge during my absence. The office will have my contact information as usual. There are no Council meetings during this time frame. Council Referrals TRIP Councilmember Smith o Reduced Flow Nozzles Councilmember Maxwell o Potential High-Speed Rail Station Property Acquisition Report UPDATE: Around-the-Clock Lane Closure on State Route 58 Postponed The around-the-clock lane closure originally scheduled to begin tonight on eastbound State Route 58, has been postponed. This work will be rescheduled in September. The intermittent lane closures on southbound Wible Road, between Belle Terrace and Wilson Road, will continue for the next four to six weeks. The closures will be needed to off-load materials for the retaining wall currently under construction in this area. Construction crews will be working in various areas throughout the construction zone during daytime hours next week. The majority of work will occur behind the temporary concrete barrier rail and is not expected to affect traffic. Motorists should drive with caution while traveling through this area and watch for personnel and equipment that may be entering or leaving the roadway. Streets Division work schedule for the week of August 31 st Event Notifications Event Calendar for Rabobank Arena Theater and Convention Center and the Bright House Networks Amphitheatre

3 High-Speed Rail Community Open House

4

5

6

7 Page 1 of 2 STREETS DIVISION WORK SCHEDULE Week of August 31, 2015 September 4, 2015 Resurfacing/Reconstructing streets in the following areas: Sealing streets in the area south of Ming between Stine Rd & Wible Rd Reconstruction of streets in the Auto Mall area East of Wible Rd and north of Pacheco Preparing Panama Ln. between Freeway 99 and Stine Rd for a Maintenance Grind & Pave Preparing Hagen Oaks between Ming Ave and Camino Media for a Maintenance Grind & Pave Maintenance Grind & Pave on Easton Dr from California Ave east end to California Ave west end Maintenance Grind & Pave on Chester Ln from California to Easton Paving various streets in the area east of Calloway and south of Brimhall Miscellaneous Streets Division projects: Video inspection of City owned Sewer & Storm lines to evaluate condition of pipes Repairing damaged sewer line found during video inspection Miscellaneous concrete repairs throughout the city Dirt work and storm line installation at Sports Village Working on Brick repairs at Centennial Plaza Grading for new parking lot at Mesa Marin Sports Complex Working on Temporary Fire Station #8 NOTE: If raining, there will be no street sweeping service and all street cleaning personnel will be assigned to cleaning plugged drains and part circle culverts. This also applies when a large number of street sweeper are in Fleet for repairs. Areas that have been missed during this time will be swept at the end of the month only when possible. THIS SPACE INTENTIONALLY LEFT BLANK Week of August 31_2015_Work Schedule

8 Page 2 of 2 STREETS SWEEPING SCHEDULE Monday, August 31, 2015 Between Golden State & 16 th St. -- F St. & Oak St. /kern River Boundary Between 34 th St. & 30 th St. Chester Ave. & San Dimas St. Between San Dimas St. & Beale Ave. 34 th /Bernard St. & Niles St. Between Olive Dr. & Riverlakes Dr. (ext.) Riverlakes Dr. & Coffee Rd. Tuesday, September 1, 2015 Between California Ave. & Brundage Ln. Oak St. & Union Ave. Between Renfro Rd. & Jenkins Rd. Stockdale Hwy. & Kern River Boundary. Wednesday, September 2, 2015 Between Panorama Dr. & Bernard St. -- Union Ave. & Loma Linda Dr. Between River Blvd. & E. Columbus St. Panorama Dr. & Columbus St. Between College Ave. & Azalea Ave. Mountain Dr. & Raval St. Between Ming Ave. & White Ln. Allen Rd. & Buena Vista Rd. Thursday, September 3, 2015 City areas between Kentucky St. & Quincy St. Owens St. & Virginia St. Between Union Ave. & Washington St. E. Truxtun Ave. & Brundage Ln. Between Progress Rd. & Old River Rd. Panama Ln. & Pacheco Rd. (alignment) City areas between Progress Rd. & Old River Rd. Meadow Falls Dr. & Rose Creek Dr. Friday, September 4, 2015 Between Buena Vista Rd. & Allen Rd. Harris Rd. & Panama Ln. Between Buena Vista Rd. & Mountain Vista Dr. Panama Ln. & Birkshire Rd. Between 178 Hwy. & Paladino Dr. W. Columbus St. & Morning Dr. City areas between Sterling Rd. & Morning Dr. 178 Hwy. & College Ave. Between Valley St. & Lene Pl Hwy & Hickory Dr. Between 178 Hwy. & Reynard Rd. Kern Canyon Rd. & McKenna St. Between Stockdale Hwy. & Joseph Dr. McDonald Wy. & N. Stine Rd. Week of August 31_2015_Work Schedule

9 BOX OFFICE HOURS Mon-Fri 10 AM - 5 PM Closed Saturday & Sunday (Excluding Event Days) UPCOMING EVENTS TICKETMASTER LOCATIONS Walmart Fashion Place Walmart Colony Street Walmart Rosedale Hwy CHARGE-BY-PHONE GROUP SALES INFORMATION SEASON TICKET INFORMATION Bakersfield Condors PUCK (7825) Bakersfield Symphony Bakersfield Community Concert Association July 24 WWE Live 7:30 PM $95, $65, $50, $35, $25, $15 On Sale Now August 27 - Florida Georgia Line 7:30 PM $54.75, $34.75 On Sale Now September 10 Ringling Bros. Circus 7:00 PM $70, $38, $10 On Sale 7/31 September Ringling Bros. Circus $70, $38, $25, $20 On Sale 7/31 September 21 Kings vs Coyotes 7:00 PM $115, $65, $40, $29 On Sale Now October 16 Pepe Aguilar 8:00 PM $149, $119, $89, $49 On Sale Now September 18 - Firefall 8:00 PM $15 On Sale Now October 1 - Gary Allan 7:00 PM $57, $37, $27 On Sale Now October 2 - Hotel California 8:00 PM $15 On Sale Now July 14 Dancing With The Stars Live 8:00 PM $74, $48, $34 On Sale Now July 28 Juanes 7:30 PM $73.50, $48, $38, $28 On Sale Now August 7 Espinoza Paz 9:00 PM $125, $95, $80, $65, $50, $30 On Sale 7/14 August 12 Fifth Harmony 7:00 PM $47.50, $27.50 On Sale Now September 25 Wild Kratts Live! 7:00 PM $43.75, $37.75, $27.75 On Sale Now October 20 J Balvin with Becky G 7:30 PM $73, $47.50, $37.50, $27.50 On Sale Now -

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER August 29, 2014 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT / al General Information City offices will be closed on Monday, September 1 st,

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER February 27, 2015 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager General Information AT Good News The Bakersfield Police Department s Citizen Volunteer

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER November 26, 2014 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information City offices will be closed Thursday and Friday, November

More information

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013

OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013 OFFICE OF THE CITY MANAGER MEMORANDUM August 30, 2013 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT/ al SUBJECT: General Information In observation of Labor Day, City offices will

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER March 27, 2015 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager General Information CH Notable Items We learned this past week that Arthur L Rockoff,

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER March 31, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items Great news! We were informed this week that Pacific

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER January 27, 2017 TO: FROM: SUBJECT: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items During the storms this past weekend, Recreation

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information May 26, 2017 Good News: City offices will be closed Monday, May 29 th, in

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER December 6, 2013 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items: On Wednesday, the ribbon was cut to signal

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER December 28, 2018 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT SUBJECT: General Information City offices will be closed on Monday, December 31 st and

More information

OFFICE OF THE CITY MANAGER AT/ST

OFFICE OF THE CITY MANAGER AT/ST OFFICE OF THE CITY MANAGER September 4, 2015 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager General Information AT/ST City offices will be closed Monday, September 7 th in

More information

OFFICE OF THE CITY MANAGER AT/CH

OFFICE OF THE CITY MANAGER AT/CH OFFICE OF THE CITY MANAGER July 28, 2017 TO: Honorable Mayor and City Council FROM: SUBJECT: Alan Tandy, City Manager General Information AT/CH Notable Items This week City staff from the Departments of

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT September 7, 2012 SUBJECT: General Information Miscellaneous News The month of August was very busy for

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER November 21, 2014 TO: FROM: Subject: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information City offices will be closed next Thursday and Friday, November

More information

OFFICE OF THE CITY MANAGER. AT/al

OFFICE OF THE CITY MANAGER. AT/al OFFICE OF THE CITY MANAGER February 1, 2013 TO: FROM: SUBJECT: Honorable Mayor and City Council AT/al Alan Tandy, City Manager General Information Miscellaneous News Attached is information that shows

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER September 28, 2018 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT SUBJECT: General Information Good News! Earlier this summer, the 5 th District Court

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER January 19, 2018 TO: Honorable Mayor and City Council FROM: SUBJECT: Alan Tandy, City Manager General Information AT Notable Items The City conducted its annual budget kick-off

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager ST / RS / al General Information July 5, 2013 Good News! Staff has confirmed that $7,186,399 in Prop

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER July 22, 2016 TO: FROM: SUBJECT: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items On August 2, the Bakersfield Police Department

More information

OFFICE OF THE CITY MANAGER MEMORANDUM

OFFICE OF THE CITY MANAGER MEMORANDUM OFFICE OF THE CITY MANAGER MEMORANDUM August 2, 2013 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT /al SUBJECT: General Information Good News! The Westside Parkway was officially

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council June 9, 2017 FROM: SUBJECT: Alan Tandy, City Manager General Information AT Notable Items With 100 percent of precincts reporting, we like

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER August 25, 217 TO: Honorable Mayor and City Council FROM: SUBJECT: Alan Tandy, City Manager General Information AT Notable Items When the Thomas Roads Improvement Program (TRIP)

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER March 21, 2014 TO: FROM: Honorable Mayor and City Council Alan Tandy, City Manager AT/ al Subject: General Information Good News! The City of Bakersfield and the Kern County

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information April 21, 217 Notable Items Good news! The 18 th and Eye Street Parking Garage

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER March 11, 216 TO: FROM: SUBJECT: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items We are excited to announce the opening of the

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER March 15, 213 TO: FROM: SUBJECT: Honorable Mayor and City Council Alan Tandy, City Manager AT /al General Information Welcome! It is my pleasure to welcome Julie Drimakis as

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER October 14, 2016 TO: FROM: SUBJECT: Honorable Mayor and City Council Alan Tandy, City Manager AT General Information Notable Items Good news! The City recently learned it will

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information April 14, 2017 Notable Items Preliminary information from the League of California

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER September 23, 2016 TO: Honorable Mayor and City Council FROM: SUBJECT: Alan Tandy, City Manager General Information AT Notable Items The Centennial Corridor project required

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER TO: FROM: SUBJECT: OFFICE OF THE CITY MANAGER Honorable Mayor and City Council Alan Tandy, City Manager AT General Information May 19, 2017 Notable Items: This past Wednesday the State Route 178 Widening

More information

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

Milestone: Bridge to Nowhere scheduled for demolition Aug 14 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Blanca Del Valle (915) 790-4341 Blanca.DelValle@txdot.gov August 12, 16 Milestone: Bridge to Nowhere scheduled for demolition Aug 14

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov A daytime lane closure on Mesa all week is needed to complete Sunday s demo

More information

Bakersfield Recreation Profile

Bakersfield Recreation Profile 1725 Eye Street PO Box 1947 Bakersfield, CA 93303 661-327-4421 Fax 661-327-8751 www.bakersfieldchamber.org Bakersfield Recreation Profile The Greater Bakersfield Chamber of Commerce is dedicated to: Building

More information

All closures this week happen at night, including full closures of Mesa and I-10

All closures this week happen at night, including full closures of Mesa and I-10 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov May 25, 2018 North Mesa Tuesday, May 29 through Thursday, May 31 9 p.m. each

More information

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015

EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage

More information

OFFICE OF THE CITY MANAGER

OFFICE OF THE CITY MANAGER OFFICE OF THE CITY MANAGER December 8, 2017 TO: Honorable Mayor and City Council FROM: Alan Tandy, City Manager AT SUBJECT: General Information Notable Items The Bakersfield Fire Department has deployed

More information

Progress Report for Projects of Regional Significance

Progress Report for Projects of Regional Significance SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on

More information

Important Lane Closures, April 3 9, 2011

Important Lane Closures, April 3 9, 2011 March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov August 31, 18 No closures scheduled for Labor Day weekend. Traffic lane patterns

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018 BUILD C O N ST R U C T I O N Update August 2018 In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4 AVENUE 12 CEDAR VIADUCT A VIEW FROM ROAD 27 ABOVE HSR CONSTRUCTION FRESNO

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All

More information

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg) RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information

More information

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov September 1, 2017 I-10 night closures scheduled for September 5-7. 27-hour full

More information

Long water shutdown scheduled for Tuesday, September 18

Long water shutdown scheduled for Tuesday, September 18 Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov Major Operation: 36 massive beams will be placed at Sunland & I 10. Operation

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov March 31, 2017 This Sunday, I 10 East traffic lanes will switch onto new lanes.

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Weekly East Tennessee Construction Report for May 31-June 6, 2018 Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane

More information

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Rebecca Reyes (915) 790-4205 Rebecca.Reyes@txdot.gov I-10 will close overnight Sunday through Thursday next week. Crews continue to make

More information

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS

Sierra Roadwork Schedule Sunday through Saturday, October 1-7, 2017 LONG-TERM PROJECTS Date: September 29, 2017 #17-292 District: District 3 - Marysville, www.dot.ca.gov/dist3 Amarjeet S. Benipal, District Director Contact: Liza Whitmore, liza.whitmore@dot.ca.gov Phone: Office: (530) 634-7640

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: October 28, 2011 #11-267 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov (530) 741-4566 desk

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release. NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov January 18, 2017 Mesa Continuous for 6 weeks The following closures started

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018 Crenshaw/LAX Transit Project Construction Update Community Meeting November 15, 2018 Project Overview Walsh Shea Corridor Constructors (WSCC) Main Line & Stations Contractor Hensel Phelps Herzog (HPH)

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour www.peachpass.com NOVEMBER 2013 Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour In This Issue GA 400 Tolls End on November 22 Lanes Closures for GA 400/I-85

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

MEMORANDUM VILLAGE OF NORTHBROOK

MEMORANDUM VILLAGE OF NORTHBROOK MEMORANDUM VILLAGE OF NORTHBROOK TO: Staff COPY: Village President & Board of Trustees Department Heads FROM: Richard Nahrstadt, Village Manager DATE: April 29, 2016 SUBJECT: STAFF BRIEFING WEEK OF April

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new

More information

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop. GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop. I-10 & Mesa Continuous Until further notice The right turn-only

More information

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019 BUILD CONSTRUCTION Update FEBRUARY 2019 In this issue: ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEATURED PROJECT: KENT AVENUE * Featured Project KENT AVENUE CP 2-3 CONSTRUCTION UPDATE February 2019 At

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell) RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,

More information

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg) RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information

More information

Virtual Enterprises 2017 California State Trade Show & Business Plan Competition

Virtual Enterprises 2017 California State Trade Show & Business Plan Competition Virtual Enterprises 2017 California State Trade Show & Business Plan Competition The 2017 California State Trade Show will be held at the Rabobank Convention Center, 1001 Truxtun Avenue, in the city of

More information

PennDOT MAJOR ROAD PROJECTS

PennDOT MAJOR ROAD PROJECTS file:lancastercountyroadwork 2014 - Lancaster County Road Work July 21 through July 25 Note: Holiday on Friday www.co.lancaster.pa.us/planning Prepared by LCPC - Transportation Division 1 Notes: >Headlights:

More information

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex

More information

PennDOT MAJOR ROAD PROJECTS

PennDOT MAJOR ROAD PROJECTS 1 file:lancastercountyroadwork Revision #1 Page 1. Lancaster County Road Work Mar 03 through Mar 07 www.co.lancaster.pa.us/planning Prepared by LCPC - Transportation Division Notes: >Headlights: Must be

More information

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012 Today s Date: Friday, September 7, 2012, #12-255 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566

More information

Weekly construction update

Weekly construction update November 4, 2011 For more information, contact: Kim A. Rudat, Regional Communications Manager Kim.Rudat@dot.wi.gov, (920) 492-5743 For US 41 Expansion Project information, contact: Kris Schuller, US 41

More information

City of Grand Island Tuesday, December 12, 2017 Council Session

City of Grand Island Tuesday, December 12, 2017 Council Session City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All

More information

Lancaster County Road Work Jan 06 through Jan 10

Lancaster County Road Work Jan 06 through Jan 10 file:lancastercountyroadwork 1 Lancaster County Road Work Jan 06 through Jan 10 www.co.lancaster.pa.us/planning Prepared by LCPC - Transportation Division Notes: >Headlights: Must be Turned On while driving

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

State Project Reconstruction I-84

State Project Reconstruction I-84 State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/5/2018 2:12:06 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 9/5/2018 2:12:06 PM ROUTE ORE99EB 2 3 @ Salem, Hyacinth/Verda Hwy100 15 22 7 Mi W of Ainsworth St Park Southbound

More information

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed

Expo E-News. Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2. Keeping Our Community Informed Expo E-News Keeping Our Community Informed Winter 2014 Santa Monica s Getting Ready for Expo! Phase 2 Update Page 2 In this Issue : Page 4: Construction Update Page 6: Artist Profiles For more information

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities

Road Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities **11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 9/14/ :00:05 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 9/14/2018 10:00:05 PM ROUTE Hwy100 15 22 7 Mi W of Ainsworth St Park Closure Information Westbound (Right

More information

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager

CITY OF PALMDALE. REPORT to the Mayor and Members of the City Council from the City Manager .. CITY OF PALMDALE REPORT to the Mayor and Members of the City Council from the City Manager DATE: SUBJECT: June 1, 2016 Approval of City of Palmdale's 2016 Ten-Year Capital Improvement Plan ISSUING DEPARTMENT:

More information

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration

More information

Capital Improvement Program Fiscal Year

Capital Improvement Program Fiscal Year Capital Improvement Program Fiscal Year 2013-2014 Tustin City Council Mayor Al Murray Mayor Pro Tem Charles E. Chuck Puckett Council Members John Nielsen Rebecca Beckie Gomez Allan Bernstein CITY OF TUSTIN

More information

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell) RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)

More information

Florida Department of Transportation MIKE DEW SECRETARY

Florida Department of Transportation MIKE DEW SECRETARY RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY July 5, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #27 FOR WEEK OF

More information

See Yellow Highlighted for Major Closures Mill/Overlay (Temporary Road Closures Possible)

See Yellow Highlighted for Major Closures Mill/Overlay (Temporary Road Closures Possible) Projects Report Week of Apr 02-08, 2018 Street/Intersection From To CURRENT PROJECTS of Auburn Dr. Georgetown Bowling Green 2/19/18 4/30/18 of Completion Brief Description of Letters See Yellow Highlighted

More information