Our Panelists SPEAKERS MODERATOR
|
|
- Karen Kennedy
- 6 years ago
- Views:
Transcription
1
2 SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation Alliance
3
4 The I-66 Story (76 miles from D.C. to 1-81) first proposed 1958 to 1964 Various segments west of the Beltway completed 1963 to lane divided freeway from the Beltway to Centreville constructed 1963 to 1964 Regional Metrorail system plan adopted 1986 VDOT recommends widening for 21 miles from Beltway to Gainesville at a cost of $600 million 1986 Orange line service from Ballston to Vienna initiated 1993 Additional lane and HOV lane open from Beltway to Route Began construction of additional general purpose lane and HOV lane west of Route 50
5 The I-66 Story 1995 Widened segment between Route 50 and Centreville opens 1996 Widened segment between Centreville and Manassas opens 1997 Initiated design for widening between Route 234 and Gainesville 1999 I-66 Major Investment Study final recommendations adopted 2010 Widening between Manassas and Gainesville with one general purpose lane and one HOV lane in each direction, including a reconstructed interchange at I-66/US 29 constructed as a series of projects Current VDOT improving 2.6-mile section of I-66 between US 29 in Gainesville and US 15 near Haymarket (scheduled completion 2015)
6
7 Project Briefing June 11, 2015 Gary Garczynski Commonwealth Transportation Board Member
8 I-66 Outside the Beltway Improvement Area
9 Project Scope Elements Two Express Lanes (convert existing HOV lane & add one lane) HOV-3 and buses travel free Non-HOV tolled Congestion-based tolls (similar to other Express Lanes in region) Converting HOV-2 to HOV-3 by 2020, consistent with the region s Constrained Long Range Plan Three regular lanes Open to all traffic No tolls Ramp-to-ramp connections (auxiliary lanes) Rapid bus service and other multimodal improvements High frequency of service during peak hours and new service available beyond peak hours Travel in express lanes for predictable travel times Park-and-Ride lots, Transportation Demand Management
10 Typical Section Alternatives 290 Alt. 1 Concrete Barrier with Full Shoulders and Median for Future Center Transit (with auxiliary lanes, if needed) 246 Alt. 2A Flexible Barrier with Buffer and Median for Future Center Transit (with auxiliary lanes, if needed) 206 Alt. 2B Flexible Barrier with Buffer and No Median (with auxiliary lanes, if needed) 10
11 Express Lanes Access Alternatives
12 Path to Preferred Alternative Transit, Park and Ride Lots, and TDM Mainline Alternatives Access Alternatives Interchange Alternatives Universe of Alternatives for Roadways and Interchanges Environmental Draft Alternative 2A Public Input Environmental Draft Alternative 2B Preferred Alternative (combination of best elements from each alternative)
13 Northern Virginia Express Lanes Update June 2015
14 EXPRESS LANES BY THE NUMBERS ECONOMIC BENEFITS 1 TIME SAVINGS 2 $5.3 billion generated in economic activity 28,000 jobs supported $765 million in DBE/SWaM contracts BENEFITS FOR TRANSIT/HOV 33 minutes average time savings per trip on I-95 Express Lanes 2.5 hours maximum time savings for one trip (Springfield to Stafford) 17.5 minutes average time savings per trip on I-95 general purpose lanes DELIVERY 20,000+ HOV trips per weekday in March 33% of weekday trips on I-95 Express Lanes 540 bus trips per weekday trips on I-95 Express Lanes 1 George Mason University, 2008 & Tranffic Analysis Feb 2015 Completed on time and under budget both construction of 495 and 95 Express Lanes 4.1 million man hours without a lost time incident 14
15 PUBLIC OPINION 78% customer satisfaction 50% of weekly Express Lanes users make less than $100K 74% of non-users agree Express Lanes are good for the region 2/3 of carpoolers rate the Express Lanes positively These new 95 Express lanes are the closest thing to a time machine we re ever gonna have. via Twitter 70% of users use both I-495 and I-95 Express Lanes
16 VALUE OF PUBLIC-PRIVATE PARTNERSHIP Virginia/Global Experience: P3 projects cost 15% to 40% less Cost of Capital Revenue Depoliticize to maximize revenue & travel flow Debt Capacity Protect AAA credit rating & preserve debt capacity Risk Shift long-term financial risk away from taxpayers Source: Colorado DOT Value for Money Report Dec Lifecycle Reduce operations and maintenance costs New Revenue Inject new revenue to free up funding for other projects Delivery Avoid delays and cost overruns; 3x more likely without P3s 16
17
18
19 Arlington Fairfax Loudoun Prince William Stafford Fauquier Number of working residents 139, , , ,782 67,040 33,428 % that commute to jobs outside of their home jurisdiction 67.6% 48.5% 53.6% 64.4% 66.2% 58.5% # that commute to jobs outside their home jurisdiction 94, ,500 88, ,300 44,300 19,500 Information from 2011 US Census, American Community Survey
20 Population Fairfax County 454, , , ,000 1,056,400 1,147,200 1,232,200 1,281,300 Loudoun County 37,200 57,400 86, , , , , ,500 Prince William County 95, , , , , , , ,500 Employment Fairfax County 173, , , , , , , ,600 Loudoun County 10,000 17,500 39,300 90, , , , ,400 Prince William County 32,800 37,000 68,800 94, , , , ,800
21 Follow and support VDOT s I-66 Project Support and join the Alliance (Northern Virginia Transportation Alliance) NVTA.org
22 Finding the right fix from the tenant s perspective June 11, 2015
23 Our 2015 market forecast. 1. The pullback in new construction will stabilize the market and skew large vacancies into mostly inferior, second-generation buildings. 2. Demand from traditional segments of the regional tenant base will remain subdued, as cost-cutting measures and improved efficiency allows law firms, federal agencies and contractors to reduce their footprints. 3. Growth within non-traditional sectors of the economy will boost tenant demand. Unparalleled workforce demographics and pro-business governance will help the region capture inbound tenant demand. Continued gains will be realized in healthcare, education, consumer technology and cyber security. 4. Walkable, mixed-use, transit-oriented submarkets will drastically outperform one-dimensional outlying markets over the next decade. Changing demographics and workforce preferences for walkable communities will shift demand from traditional suburban office parks on the side of a highway, to more vibrant, transit-accessible submarkets in the urban core. Generally speaking, this shift will create new inbound demand for submarkets inside the Beltway at the expense of submarkets outside the Beltway. 5. Investor interest in Washington, DC assets will remain high. Low interest rates and a relative lack of investment alternatives will continue to drive the DC investment sales market. Prices will remain high and cap rates will remain low as large pools of cash compete over finite buying opportunities. Source: JLL Research 24
24 Leasing activity has been flat in the submarkets along I ,000 Net absorption by submarket 200, , , , ,000-1,000,000-1,200, ,400, ,600,000 Tysons Springfield Merrifield Fairfax Center Route 28 South Reston Herndon Crystal City RB Corridor Alexandria Loudoun County Prince William County Source: JLL Research 25
25 Submarkets along I-66 offer a cheaper alternative to the rest of Northern Virginia Average Rent $50.00 $45.00 $40.00 $35.00 $30.00 $25.00 $20.00 $15.00 $10.00 $5.00 $0.00 Source: JLL Research 26
26 Total vacancy in Fairfax Corner has consistently been under the overall submarket vacancy Fairfax Corner Fairfax Center 20.0% 18.0% 16.0% 14.0% 12.0% 10.0% 8.0% 6.0% 4.0% 2.0% 0.0% Source: JLL Research 27
27 Fairfax Corner continues to have a 22.6 percent rent premium over the rest of Fairfax Center $40 $35 $30 Average asking rent ($ p.s.f.) $25 $20 $15 Fairfax Corner Fairfax Center $10 Source: JLL Research
28 Summary Price Easy Access Walkable / Close By Amenities Modern Facility With Efficient Floor Plan 29
29
30
Public Information Meetings. October 5, 6, 7, and 15, 2015
Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound
More informationElected Officials and Media Briefing I-395 Express Lanes Northern Extension
Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda
More informationArlington County Board Meeting Project Briefing. October 20, 2015
Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66
More informationTransAction Overview. Introduction. Vision. NVTA Jurisdictions
Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments
More informationMcLean Citizens Association Transportation Committee Project Briefing
McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight
More informationTransform66 Transportation Management Plan: Transit & TDM Strategies
Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp
More informationReport to the Dulles Corridor Advisory Committee
Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose
More informationPerformance Measure Summary
Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number
More informationCONTACT: Michelle T. Holland
FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project
More informationFIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66
FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK
More informationDulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009
Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road
More information395 Express Lanes Project Update
395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement
More informationFIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66
Subject: FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY From: VDOT-News To: Time: Tuesday, December 12, 2017 9:05:36 AM -08:00 RELEASE: IMMEDIATE Michelle Holland,
More informationDesign Public Hearing
Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,
More informationI-95/395 HOV/Bus/HOT Lanes Project Overview
I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationTransportation Supporting Dulles Airport
Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements
More informationI-66 Inside the Beltway Feasibility Study
I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation
More informationDulles Toll Road Rate Setting Process
Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On
More informationDulles Corridor Improvements. Drive to Ride
Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More information3 ASSESSMENT OF THE CORRIDOR
3 ASSESSMENT OF THE CORRIDOR 3.1 PHYSICAL CHARACTERISTICS OF THE CORRIDOR The 9-mile segment of I-66 from the Capital Beltway to the Theodore Roosevelt Memorial Bridge was opened to vehicular traffic in
More informationFairfax County Transportation Advisory Commission (TAC)
Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager
More informationFairfax County / Washington DC Transit Bus Advertising
GET ON THE BUS! Gateway Outdoor, through its partnership with Fairfax Connector, is the exclusive provider for Transit Advertising in Fairfax County, VA. Fairfax Commuter Fleet 290 Transit Buses 1,152,87
More informationA DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer
A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects
More informationUnderstanding Your I-66 Trip
Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic
More informationArlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager
Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak
More informationEvaluation of Significant Transportation Projects in Northern Virginia Transportation District
Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since
More informationNational Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014
National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration
More informationClick to edit Master title style
Click to edit Master title style 95 Second EXPRESS level LANES FAMPO BRIEFING NOVEMBER 17, 2014 Click Today s to edit briefing Master title style» What Click to drivers edit Master should text expect styles
More information2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION
2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION Travel Forecasting Subcommittee Friday, May 22, 2015 C. Patrick Zilliacus Figure 1 HOV System Overview Montgomery
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More informationTransform66: Inside the Beltway
Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More informationCHAPTER 5: Operations Plan
CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...
More informationConnecting Transportation and Economic Growth in Metropolitan Washington
Connecting Transportation and Economic Growth in Metropolitan Washington Summary of Report Prepared for The 23 Group John McClain, Senior Fellow Center for Regional Analysis George Mason University October
More information2018 Service Implementation Plan Executive Summary
2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation
More informationRECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES
RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor
More informationThe following items were handed out at the January 4, 2018 NVTC Meeting.
The following items were handed out at the January 4, 2018 NVTC Meeting. Blue Item #3D 2018 NVTC COMMITTEE AND BOARD APPOINTMENTS NVTC EXECUTIVE COMMITTEE Paul Smedberg, Chairman/WMATA Board* Matt Letourneau,
More informationA New Era of Transportation Solutions
A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016 What does the NVTA do? Working collaboratively
More informationREPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE
REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform
More informationINTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016
INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City
More informationAGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office
TECHNICAL ADVISORY COMMITTEE Wednesday, April 20, 2016, 7:00pm NVTA Office 3040 Williams Drive, Suite 200 Fairfax, Virginia 22031 AGENDA I. Call to Order/Welcome Chairman Boice II. Meeting Summary of March
More informationTier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews
Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix D FINAL MAY 2016 D. EXISTING TRANSIT/TDM PROVIDER OVERVIEWS Transit Service Providers Information about the type, frequency,
More informationTechnical Report Economic Impact Study
Technical Report 2009 Economic Impact Study Prepared for: Metropolitan Washington Airports Authority 1 Aviation Circle Washington, DC 20001 Prepared by: The Louis Berger Group, Inc. 2445 M Street, NW Washington,
More informationNORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018
NORTHERN VIRGINIA OPPORTUNITIES Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 VDOT s Responsibilities: Plan Design and Construct Operate and Maintain The Commonwealth s transportation
More informationUpdate on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan
Update on the I-680 Transit Corridor Improvement Project HOV on/off Ramps Environmental Impact Report Community Engagement Plan Presentation Overview Introductions Susan Miller, Director of Projects, Contra
More informationRoad Construction Ahead January-April 2015 NORTHWEST REGION
NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,
More informationMetropolitan Washington Airports Authority (MWAA)
RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President
More information5.1 Traffic and Transportation
5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationAppendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group
Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM
More informationTRANSPORTATION. Reston Market Profile
Reston Market Profile TRANSPORTATION Fairfax County Background A recent TIME Magazine featured rapidly growing Fairfax County as one of four "megacounties" in the nation-suburban counties that have outgrown
More informationA retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation
Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles
More informationA Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority
A Tour Across America s Managed Lanes Mike Heiligenstein, Executive Director Central Texas Regional Mobility Authority IBTTA Global Tolling Summit; Salzburg, Austria September 6, 2018 The Rise of Managed
More informationThe Dulles Loop. Route 606. Route 28. Route 50
The Dulles Loop Route 606 Route 28 Route 50 1 Rt.50/Dulles Loop: Year 2000 Signal Queues (Intermittent) Signal Queues (Continuous) 4:30 6:00 p.m. Dulles Loop Source: SkyComp Report WATF 03/07 2 Rt.50/Dulles
More informationHampton Roads Express Lane Network
More Choices For Travelers Hampton Roads Express Lane Network James Utterback, PMP Hampton Roads District Administrator Presented to HRTPO Board July 20, 2017 Regional Express Lane Network 2 History of
More informationSan Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1
San Mateo County Transportation Authority Board Meeting November 2, 2017 Item #10 1 OVERVIEW Brief recap from October Traffic Analysis Findings Draft Environmental Document Summarized Outcomes Questions
More informationReport to the Strategic Development Committee
Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationSilver Line Rail Project Update
Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION COMMONWEALTH TRANSPORTATION BOARD PUBLIC HEARING TRANSFORM 66 OUTSIDE THE BELTWAY CONCESSION PAYMENT PROJECTS
1 VIRGINIA DEPARTMENT OF TRANSPORTATION COMMONWEALTH TRANSPORTATION BOARD PUBLIC HEARING TRANSFORM 66 OUTSIDE THE BELTWAY CONCESSION PAYMENT PROJECTS PRESENTATION AND PUBLIC COMMENTS Northern Virginia
More informationTransportation Management Program Office Newsletter J A N U A R Y
I N S I D E THIS I S S U E : 95 Express Lanes/ South Parking Construction Updates FSD Director s Message Transportation Management Program Office Newsletter J A N U A R Y 0 9 95 Express Lanes/South Parking
More informationCommittee for Dulles. June 9, Jack Potter, MWAA President & CEO
Committee for Dulles June 9, 2016 Jack Potter, MWAA President & CEO Dulles International is the Premier International Gateway to the Capital Region Dom Intl Total Mainline Airlines 10 29 37* Destinations
More informationFigure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004
Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 24 Potomac and Rappahannock Transportation Commission Fairfax Connector Omni Ride Omni
More informationAPPENDIX B. Arlington Transit Peer Review Technical Memorandum
APPENDIX B Arlington Transit Peer Review Technical Memorandum Arlington County Appendix B December 2010 Table of Contents 1.0 OVERVIEW OF PEER ANALYSIS PROCESS... 2 1.1 National Transit Database...2 1.2
More informationI-405 Express Toll Lanes Coming in 2015
I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood
More informationCorporate Office Properties Trust
Fairview Park Drive Falls Church Dulles Tech Center Herndon Corporate Office Properties Trust Northern Virginia Portfolio April 2014 The Preferred Provider of Mission Critical Real Estate Solutions Patriot
More informationFor personal use only
asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.
More informationTolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division
Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington
More information95 Express Lanes: Before/After Study
95 Express Lanes: Before/After Study Exit 126 (Massaponax) to Exit 170 (Springfield) Before After 2010 2012 2015 Pictures show the Route 619 Interchange prior to the constructions of the Express Lanes,
More informationAppendix 1: Phase I Strategies
Washington Metropolitan Area Transit Authority RTSP Presentation to the Technical Advisory Group January 19, 2012 Appendix 1: Phase I Strategies Base Case Definition MWCOG 2009 Adopted CLRP (2009-2030
More informationQuarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR
Quarterly Report Transit Bureau, Local Transit Operations First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR A Arlington Transit ART 1) Introduction The purpose of ART is to provide
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationUpdate on Route 1 Efforts
County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section
More informationMMHP INVESTMENT SALES OPPORTUNITY. Investment Highlights. Property Overview. Manassas Mobile Home Park & 9011 Centreville Road Manassas, VA
MMHP INVESTMENT SALES OPPORTUNITY 9009 & 9011 Centreville Road Manassas, VA Investment Highlights Centrally located, 100% leased mobile home park in the strong-performing City of Manassas, VA The 10.02-acre
More informationRACINE COUNTY PUBLIC TRANSIT PLAN:
RACINE COUNTY PUBLIC TRANSIT PLAN: 2013-2017 Recommended Transit Service Improvement Plan NEWSLETTER 3 SEPTEMBER 2013 This newsletter describes the final recommended public transit plan for the City of
More informationProposed Dulles Toll Road Rate Adjustments
Proposed Dulles Toll Road Rate Adjustments Dulles Corridor Advisory Committee Meeting October 5, 2012 Discussion Outline Regulatory Process for Changing Toll Rates Information Provided at Public Hearings
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationInterstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by
Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section
More informationACI LEGAL COMMITTEE MEETING
ACI LEGAL COMMITTEE MEETING MWAA S RAIL TO DULLES PROJECT: WHAT IS IT AND HOW DOES IT FIT WITH THE PRINCIPLES OF REVENUE DIVERSION PHIL SUNDERLAND MWAA GENERAL COUNSEL TWO GOALS FOR THE NEXT TEN MINUTES
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The
More informationPROMOTING FAIRFAX COUNTY, EVERY DAY.
PROMOTING FAIRFAX COUNTY, EVERY DAY. MEASURABLE RESULTS, SIGNIFICANT ROI. HH H The Fairfax County Convention and Visitors Corporation (Visit Fairfax) is a non-profit marketing and promotional organization
More informationResearch Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN
Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN by John M. Ishimaru Senior Research Engineer Duane Wright Systems Analyst Programmer Mark E. Hallenbeck Director Jaime Kang Research
More informationHAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT
HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem
More informationMEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015
MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical
More informationRevolutionary Mobility
Northern Virginia Real-time Ridesharing i Pilot Jason M. Conley Director of Government Relations Avego Corporation HRTO February 14, 2012 Revolutionary Mobility Road Map Real-time Ridesharing Overview
More informationTBARTA: 2015 Master Plan and Tampa Bay Express Project
TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county
More informationFederal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority
2018-2019 Federal Budget Submission Prepared for the House of Commons Standing Committee on Finance Greater Toronto Airports Authority - August 2017 - Contact: Lorrie McKee Director, Public Affairs and
More informationOzaukee County Transit Development Plan
Ozaukee County Transit Development Plan Record of Public Comments and Recommended Transit Service Plan June 5, 2018 Kevin Muhs Deputy Director #242846 Status of the Transit Development Plan Existing Conditions
More informationDISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com
DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii
More informationDate: 11/6/15. Total Passengers
Total San Diego Metropolitan Transit System POLICY 42 PERFORMANCE MONITORING REPORT Page 1 of 6 OBJECTIVE Develop a Customer-Focused and Competitive System The following measures of productivity and service
More informationSECTION 106 ACTIVITIES ANNUAL REPORT
SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The
More informationWashington-Baltimore Regional Airport System Plan Ground Access Element Update
Washington-Baltimore Regional Airport System Plan Ground Access Element Update March 2007 Metropolitan Washington Council of Governments National Capital Region Transportation Planning Board ABSTRACT
More informationEvaluation of High-Occupancy-Vehicle
TRANSPORTATION RESEARCH RECORD 1446 Evaluation of High-Occupancy-Vehicle Lanes in Phoenix, Arizona MARK J. POPPE, DAVID J.P. HOOK, AND KEN M. HOWELL High-occupancy-vehicle (HOV) lanes were first introduced
More informationOFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL
SENIOR VICE PRESIDENT / EXECUTIVE SUMMARY Shane and Company is located in Greenwood Village, CO just south of Downtown Denver. The City of Greenwood Village is a located in Arapahoe County, Colorado, United
More informationSUMMARY MINUTES STRATEGIC DEVELOPMENT COMMITTEE MEETING OF OCTOBER 19, 2016
SUMMARY MINUTES STRATEGIC DEVELOPMENT COMMITTEE MEETING OF OCTOBER 19, 2016 Ms. Wells chaired the October 19 Strategic Development Committee Meeting, calling it to order at 9:35 a.m. A quorum was present
More informationDulles Area Association of Realtors
Dulles Area Association of Realtors Economic Summit October 3, 2014 Housing Pipeline Transportation Economic Development 1705 - Born in Scotland 5 May 1731 Became Lord Loudoun Served in the British Army
More information