2012 Additional Design Funding Primary Improvement
|
|
- Teresa Poole
- 5 years ago
- Views:
Transcription
1 48 Boston Hollow Road over Branch of Wylie Run replacement on State Route 48 (Boston Hollow Road) over Branch of Wylie Run in Elizabeth Township and Elizabeth Borough, $300, Washington Co Line to Millers Run Rd Reconstruction Reconstruction of State Route 50 from the Washington County Line to Millers Run Road in South Fayette Township, $800, Elizabeth rehabilitation and painting on State Route 51 over SR 837 and Monongahela River, in Elizabeth Borough, $1,000, Beaver County Line to Business 376 Restoration Highway restoration including, crack and seat, milling and overlay, as well as bridge repair and preservation on Interstate 376 from the Beaver County Line to Business 376, in Moon and Findlay Townships, $3,500, SR 910 over Deer Creek restoration on State Route 910 over Deer Creek at the intersection with State Route 1022 in West Deer Township, 1001 Freeport Rd over Norfolk Southern RR Removal Demolition with possibility of convert to rail to trail program on SR 1001 (Freeport Road) over Norfolk Southern Railroad in O'Hara Township, 1018 Alpha Drive over SR 28 rehabilitation on State Route 1018 (Alpha Drive) over SR 0028 in O'Hara Township, 1019 Days Run Rd over Days Run replacement on State Route 1019 (Days Run Road) over Days Run in East Deer Township, 1020 Campbell Snitze Rd over Cunningham Run replacement on State Route 1020 (Campbell Snitze Road ) over Cunningham Run in West Deer Township, $300, Lardington Rd over Lardington Run replacement on State Route 1031 over Lardington Run in Fawn Township, 2152 Ramp - Rodi Rd over Chalfont Rd replacement on Rodi Road ramp over Chalfont Road in Wilkins Township, Page 1 of 9
2 3048 Noblestown Road over Scotts Run on State Route 3048 (Noblestown Road) over Scotts Run in Collier Township, $200, Babcock Blvd over Girtys Run replacement on State Route 4009, Babcock Boulevard over Girtys Run in Shaler Township, $350,000 Armstrong 422 Kittanning Elementary School Intersection Realignment of US 422 from Silvis Hollow Road to east of Graham Road in Kittanning Township, Armstrong $515,000 Armstrong 422 Wray Road Cut improvements along US 422 from Ping Wing Hollow Road to Lasher Road in Kittanning and Manor Townships, Armstrong $531,000 Beaver 376 Vanport Rehab Beaver 1026 Reno St over Stream Preservation Activities preservation on Interstate 376 over the Ohio River in Vanport Township, Beaver replacement on SR 1026 (Reno Street) over small stream in Rochester Borough, Beaver $1,700,000 Beaver 4034 Westwood Rd over Upper Dry Run on SR 4034 (Westwood Road) over Upper Dry Run in Ohioville Township, Beaver $225,000 Beaver 8029 Ramp A Rd over SR 65 at SR 2002 Interchange Preservation Activities Preservation on Ramp A Road over State Route 65 at SR 2002 Interchange in Freedom Borough, Beaver Beaver 8037 Ramp F over SR 51 Ramp D and SR 65 NB Preservation Activities preservation on Ramp F Road over State Route 51 (Ramp D) and State Route 65 Northbound in Rochester Borough, Beaver $300,000 Bedford 915 Hopewell replacement on PA915 (Front Street) over Raystown Branch of Juniata River at the intersection of PA26 (Raystown Road) in Broad Top Township and Hopewell Borough, Bedford $500,000 Page 2 of 9
3 Berks 78 I-78/SR 61 Interchange Interstate 78 (I-78) and State Route 61 (SR 61) Interchange improvements including roadway reconstruction and bridge replacement on I-78 over Reading/Northern Railroad and on SR 61 over I-78 in Hamburg Borough and Tilden Township, Berks $3,500,000 Blair 36 Altoona Union Ave over Mill Run Br replacement on State Route 36 over Mill Run near the intersection of Whittier Avenue in the City of Altoona, Blair $300,000 Blair 453 Janesville Pike Rockfall Stabilization Restoration Stabilize rockfall area along PA 453 from Schoch Hollow Road (Township Road 510) continuing for 3 miles in Tyrone Borough and Snyder Township, Blair $325,000 Bradford 6 US 6 over Wallace Creek Deck Repair on US 6 over Wallace Run in Burlington Township, Bradford $200,000 Bradford 549 SR 549 over Seeley Creek replacement on State Route 549 (Crossover Road) over Seeley Creek in Wells Township, Bradford $275,000 Bradford 549 SR 549 over Beckwith Creek on State Route 549 (Crossover Road) over Beckwith Creek in Wells Township, Bradford $275,000 Bucks 1 US 1 s Corridor Preventative maintenance and corridor improvements on the 2.1 mile frontage road corridor between the Penndel interchange and the PA 413 in Middletown Township and Langhorne Manor Borough, Bucks The proposed improvements for this segment include rehabilitation of the bridge carrying US 1 over Highland Avenue (8B), replacement of the existing double-face guide rail median barrier with concrete glare screen, pavement rehabilitation, potential replacement of the existing raised concrete traffic islands located between the mainline travel lanes and the frontage roads with concrete median barrier and full width shoulders, and potential drainage and ITS relocations. Final Design $5,825,000 Page 3 of 9
4 Butler 228 Pittsburgh Street Intersection improvements and culvert replacement at the intersection of PA 228 (Mars Crider Road) and State Route 3019 (Pittsburgh Street) in Adams Township, Butler $547,000 Butler Degree Road Intersection Resurface Resurfacing and safety improvements including roadway realignment at the intersection of PA 228 (Mars Crider Road) and State Route 3007 (Three Degree Road) in Adams Township, Butler $525,000 Butler 4007 Moraine State Park Access New Interchange Construction of an access road (replacing the existing partial SR 8002 interchange) just east of the State Route 4007/Township Road 890 (West Park Road) overpass, to provide access to and from the north shore of Moraine State Park onto eastbound and westbound US 422 in Muddy Creek and Worth Townships, Butler $350,000 Cambria 3041 Cooper Ave Laurel Run on State Route 3041 (Cooper Avenue) over Laurel Run near the intersection of Laura Street (Township Road 394) in West Taylor Township, Cambria County $325,000 Centre 3014 Atherton Reconstruction/Drainage Reconstruction Reconstruction and Drainage work on State Route 3014 (North and South Atherton Street) in Ferguson, Harris, Patton and College Townships and State College Borough, Centre $1,500,000 Clarion 68 Reidsburg Curve improvement, realignment of the existing horizontal and vertical geometry and bridge replacement on State Route 68 over Reids Run, an abandoned Conrail Railroad, and Piney Creek in Monroe Township, Clarion $480,000 Clinton 120 SR 120 Slide s Restoration Slide Hazard s on State Route 120, near Shintown Lane North, approximately 0.1 miles southwest of Shintown in Noyes Township, Clinton $500,000 Page 4 of 9
5 Crawford 198 SR 198 over French Creek This project includes the restoration of the State Route 198 (Brookhouser Road) over French Creek in Hayfield Township, Crawford Work involves a new superstructure and widening. The bridge is 301 feet in length. $500,000 Dauphin 83 I-83 East Shore Section 1 Add Lane Highway reconstruction, widening to add a lane and bridge rehabilitations on I-83 from Derry Street to the Colonial Park Interchange (US 22) in Lower Paxton and Swatara Townships, Dauphin, Final Design $5,100,000 Dauphin 2043 School House Rd Painting Painting on SR 2043 (School House Road) over PA-283 in Londonderry Township, Dauphin $50,000 Delaware 322 US 322 s: US 1 to I-95 Add Lane Erie 4012 SR Interchange Road s Widen Indiana 119 Grove Chapel Climbing Lane Add Lane This project serves as the final design phase for the corridor improvements to Route 322/Conchester Road in Upper Chichester, Bethel and Concord Townships, Delaware Options being considered would enable US 322 to meet future traffic needs and include widening the road to four lanes, the construction of jughandles, and the installation of median barriers. This project includes 1.01 miles of reconstruction on State Route 4012 from Zuck Road (State Route 4015) to the Mall Entrance in Millcreek Township, Erie Work involves widening the road and the existing Zimmerly Road over Walnut Creek, which is 166 feet in length; rehabilitating the Zimmerly Road over Interstate 79, which is 243 feet in length; and adding left turn lanes to the Interstate 79 ramps. Construction of a truck climbing lane and turning lanes along US 119 from Township Road 487 (Park Road) south of the Village of Grove Chapel north to Township Road 491 (Craig Road) in Rayne Township, Indiana Final Design $6,600,000 $800,000 Final Design $180,000 Indiana 119 Home Railroad on State Route 119 over the Buffalo and Pittsburgh Railroad near the Village of Home in Rayne Township, Indiana Final Design $500,000 Page 5 of 9
6 Indiana 119 Wake Robin Curve Jefferson 830 Falls Creek Intersection Relocation/ Realignment Intersection Juniata 22 US 22 Resurfacing Corridor Restoration Two-lane relocation of US 119 south of the intersection with State Route 4008 (Chambersville Road) in Rayne Township, Indiana Intersection improvements including radius and sight distance improvements, lane widening, turn lanes, new pavement, and new shoulder, curb and gutter at the existing at-grade intersection of State Route 830 (Washington Avenue/Main Street) and State Route 950 (Third Street) in Falls Creek Borough, Jefferson Restoration of State Route 22 from Mifflintown to County Line, Mifflintown Borough and Delaware Township, Juniata $450,000 $325,000 $150,000 Lancaster 340 Old Philadelphia Pike Br on PA 340 (Old Philadelphia Pike) over Pequea Creek in Salisbury Township, Lancaster Lancaster 2033 Leacock Road replacement on State Route 2033 (Cherry Hill Road) over Pequea Creek in Leacock and Paradise Townships, Lancaster Lawrence 19 SR 19 over Branch of Slippery Rock Creek replacement on State Route 19 over Branch of Slippery Rock Creek in Scott Township, Lawrence Lawrence 65 Elwood Rd over B&O RR Removal Demolition with possibility of convert to rail to trail program on State Route 65 (Ellwood Road) over abandoned B&O Railroad in Shenango Township, Lawrence Lawrence 2014 Hemmerle Road over Beaver River Tributary rehabilitation including superstructure replacement on State Route 2014 (Hemmerle Road) over Beaver River Tributary in Wayne Township, Lawrence Lawrence 2020 Pleasant Rd over Camp Run replacement on 2020 (Pleasant Road) over Camp Run in Perry Township, Lawrence Page 6 of 9
7 Lawrence 2030 Mountville Rd Br over Slippery Rock Ck replacement on SR 2030 (Mountville Road) over Slippery Rock Creek in Slippery Rock and Perry Townships, Lawrence $500,000 Lawrence 3004 Petersburg Rd over Branch of Honeycreek replacement on State Route 3004 (Carries Petersburg Road) over Branch of Honey Creek in North Beaver Township, Lawrence Lehigh 329 Cementon replacement on State Route 329 (Cementon ) over the Lehigh River in Whitehall Township, Lehigh $2,500,000 Luzerne 309 PA 309 Steel Girder replacement on State Route 309 (Hunter Highway) over Nescopeck Creek in Butler Township, Luzerne $400,000 Lycoming 220 Pine Run to Harvest Moon Study for potential safety improvements on US 220 in Woodward and Piatt Townships, Lycoming Study $350,000 Lycoming 3027 SR 3027 over US 220 Approach Paving Deck on State Route 3027 (Thomas Street) over US 220 in Porter Township, Lycoming Final Design $300,000 Mercer 19 SR 19: 5 Leg Intersection Existing Signal This project includes.78 miles of replacing/upgrading the signalization and restricting turning movements on North Street on State Route 19 (Perry Highway) at the five legged intersection with State Routes 62, 58 (Greenville Road) and North Street in the Borough of Mercer, Mercer Monroe 80 I-80 Reconstruction Reconstruction Reconstruction of Interstate 80, improvements to interchange ramps and bridge replacement/rehabilitation from Exit 303 to Forge Road in Stroud Township, Stroudsburg and East Stroudsburg Boroughs, Monroe $6,500,000 Monroe 715 SR 715 over Pocono Creek on State Route 715 over Pocono Creek in Pocono Township, Monroe $1,000,000 Philadelphia 1007 SR 1026 Adams Avenue Connector Reconstruction This project is the extension of State Route 1026 (Adams Avenue) from the Betsy Ross Interchange with Aramingo Avenue to Torresdale Avenue in the City of Philadelphia., Final Design $3,000,000 Page 7 of 9
8 Pike 84 I-84 E&W I-4R Wayne to E26 Reconstruction Interstate reconstruction and bridge preservation on Interstate 84 from the Wayne County line to Exit 34, State Route 739 (Lords Valley/Dingman's Ferry) in Greene and Palmyra Townships, Pike $4,000,000 Pike 84 I-84 E&W I-4R MP 40 - E46 Restoration Interstate restoration and bridge preservation of Interstate 84 from milepost 40 to Exit 46 (State Route 6/Milford) in Dingman Township, Pike $4,000,000 Pike 84 I-84 E&W I-4R E26 to E34 Reconstruction Interstate Reconstruction and bridge preservation on Interstate 84 from Exit 26, PA 390 (Promised Land/Tafton) to Exit 34, PA 739 (Lords Valley/Dingman's Ferry) in Palmyra and Blooming Grove Townships, Pike $4,000,000 Potter 7208 Iva Jen on Township Road 487 (Iva Jen Road) over North Branch Cowanesque River, Harrison Township, Potter $280,000 Schuylkill 209 SR 209 over Reading N. RR on State Route 209 over Reading Northern Railroad in Branch Township, Schuylkill $1,000,000 Susquehanna 706 Bradford County line to Village of Rush Restoration Restoration on State Route 706 from the Bradford County line East to the Village of Rush, Rush Township, Susquehanna Final Design $1,500,000 Tioga 549 SR 549 over Seeley Creek on State Route 549 (Roseville Road) over Seeley Creek in Jackson Township, Tioga $275,000 Tioga 4009 SR 4009 over Troups Creek replacement on State Route 4009 over Troups Creek in Brookfield Township, Tioga $275,000 Washington 837 Donora/Webster Area Roadway Network Repairs Restoration This project is the select roadway network repairs of PA 837 in Donora Borough, Washington Final Design $500,000 Wayne 1018 SR 1018 S. Br. Equinunk Creek replacement on State Route 1018 over South Branch Equinunk Creek in Manchester Township, Wayne $350,000 Page 8 of 9
9 Wayne 3019 Jones Creek of the bridge carrying State Route 3019 (Maplewood Road) over Jones Creek in Lake Township, Wayne $400,000 Westmoreland 119 US 119: County Line to Crossover Road Reconstruction Reconstruction of US 119 from the Fayette/Westmoreland County Line to Crossover Road in East Huntingdon Township, Westmoreland $2,250,000 Westmoreland 906 PA 906 Rockfall Repair This project is the repair of a rock fall area on PA 906 as well as additional repairs PA 906 in Belle Vernon Borough, Fayette Final Design $750,000 York 83 North York Widening Study Study to look at reconstructing and Widening I-83 to six lanes from North of Exit 18 to PA-181 interchange (Exit 22) in Spring Garden, Springettsbury and Manchester Township and North York Borough, York Totals: Study $2,000, $79,933,000 Page 9 of 9
RD INSTRUCTION 1980-D, EXHIBIT C PAGE 240 GUARANTEED HOUSING PROGRAM INCOME LIMITS
RD INSTRUCTION 1980-D, EXHIBIT C PAGE 240 Allentown-Bethlehem-Easton, PA-NJ MSA Allentown-Bethlehem-Easton, PA HUD Metro FMR Area VERY LOW INCOME 25700 29350 33000 36650 39600 42550 45450 48400 LOW INCOME
More informationPennsylvania Emergency Preparedness Guide:
EMERGENCY CONTACT SHEET FOR RESOURCES IN PENNSYLVANIA Disaster Center Pennsylvania: Disaster Message Board, Family Disaster Plan, Weather Warnings, Animals in Disaster Lost and Found, Health and Welfare
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationWeight-Based Vehicle Class Information. Gateway to Warrendale. Overview. Turnpike Extensions. Mainline. Delaware River Bridge to Neshaminy Falls
A Listing of E-ZPass Rates for All Classes of Vehicles Overview Pennsylvania Turnpike Information...Page 2 Exit Validated Fare Receipt/Turnpike Roadway Information Program...Page 3 Pennsylvania Turnpike
More informationBedford County 2015 Construction Projects
Bedford County 2015 Projects Estimate 91605 30 Juniata River Bridge to SR 2029 96522 1003 US 30 to Lower Snake Spring Road 96520 220 US 220 Evitts Creek to SR 4009 Resurfacing on US 30 from the Village
More informationARMSTRONG COUNTY. Roadway realignment of PA 28 from State Route 1027 to State Route 1016 (Calhoun School Road) in Boggs Township 1 $ 7,850,
BRIDGE SD MILES IMPROVED BASE Bridge Replacement Lower Pine Run Bridge Replacement Bridge Replacement on Township Road 748 over Pine Run in Redbank Township 1 $ 1,600,000 1 1 0 BASE Bridge Replacement
More informationCounties Designated Nonattainment or Maintenance for Clean Air Act s National Ambient Air Quality Standards (NAAQS)
Application ID#: NCR39566 PAMS Pin#: 1342_19_3 Address: 10 East Ocean Avenue, Sea Bright Counties Designated Nonattainment or Maintenance for Clean Air Act s National Ambient Air Quality Standards (NAAQS)
More information2010 Planned Construction STATEWIDE
Altoona/Southern Alleghenies Region 2010 Planned Construction STATEWIDE BEDFORD COUNTY U.S. 30, Bedford Bypass, EB, WB, pavement resurfacing, shoulder and guiderail upgrades, lane restrictions, delays
More informationtoll schedule 2017 Safety starts with you. SECTION 1: E-ZPass Rates SECTION 2: Cash Rates SECTION 3: PA Turnpike TOLL BY PLATE Locations / Rates
A Listing of E-ZPass, Cash and PA Turnpike TOLL BY PLATE Rates for All Classes of Vehicles PENNA toll schedule 2017 SECTION 1: E-ZPass Rates SECTION 2: Cash Rates SECTION 3: PA Turnpike TOLL BY PLATE Locations
More informationA Listing of Cash Rates for All Classes of Vehicles Effective January 8, toll schedule 2017 PENNA TURN PIKE. Cash Rates. Safety starts with you.
A Listing of Cash Rates for All Classes of Vehicles PENNA toll schedule 2017 Cash Rates Safety starts with you. Overview Pennsylvania Turnpike Information...Page 2 Validated Fare Receipt/Turnpike Roadway
More informationBEDFORD COUNTY START PERIOD
BASE Bridge Rehabilitation South Loysburg Beaver Creek BASE Bridge Replacement Township Road 397 Shaffers Creek #8 BASE Bridge Replacement Ashcom Bridge BASE Bridge Replacement Buffalo Run Bridge BASE
More informationPHA Contact Information
HUD > Program Offices > Public and Indian Housing > Public Housing Agency (PHA) Plans > PHA Contact Information > Contact Information PHA Contact Information Pennsylvania This listing is ordered by city.
More informationPENNSYLVANIA SCENIC BYWAYS
PENNSYLVANIA SCENIC BYWAYS THE GREAT LAKES SEAWAY TRAIL BYWAY EFFECTIVE: 2003 DISTRICT: 1-0 COUNTY: ERIE STATE ROUTES: 0005 AND ALTERNATE 0005 SEAWAY TRAIL INCLUDES PA. ROUTE 5 AND ALTERNATE ROUTE 5 BEGINNING
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationCONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018
FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures
More informationSpringettsbury Township. Road Improvement Projects
Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route
More informationSOUTHWESTERN PENNSYLVANIA COMMISSION YEAR DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY WASHINGTON. 5 Clarksville MORGAN
76 422 3 4 3 422 79 79 79 7 579 8 422 1 76 3 22 SOUTHWESTERN PENNSYLVANIA COMMISSION YEAR 29-2 DRAFT TRANSPORTATION IMPROVEMENT PROGRAM GREENE COUNTY Legend TIP Projects TIP Routes Major Roads ««MORRIS
More informationThe Pioneer Corridor OBJECTIVES: CORRIDOR 16
CORRIDOR 16 The Pioneer Corridor This east-west corridor connects Harrisburg to western Pennsylvania. This corridor pioneered transportation in North America and is responsible for some of the world s
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationDistrict Construction Progr am. John R. Kasich, Ohio Governor Jerry Wray, ODOT Director Steve Mary, P.E., District Deputy Director
District 8 2014 Construction Progr am Preble Greene Butler Warren Clinton Lebanon Hamilton Clermont Serving Butler, Clermont, Clinton, Greene, Hamilton, Preble and Warren Counties. John R. Kasich, Ohio
More informationVisit a local museum and view Pennsylvania artifacts that are thousands of years old.
Visit a local museum and view Pennsylvania artifacts that are thousands of years old. The following is a list of museums in Pennsylvania which have archaeological collections from our state. They represent
More information* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties
New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More informationProject Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design
RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall
More information2 Construction Program
2018 C P 2018 Districtonstruction 2 Construction Program rogram district 2 Governor John Kasich ODOT Director Jerry Wray District Deputy Director Pat McColley, PE, SI 2018 Construction Program Thank you
More informationBUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION
BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR A P R I L 2 0 0 6 CAPTION
More informationTRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE October 12, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 167 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationPlease click on the following product to view meetings in your area.
Please click on the following product to view meetings in your area. Medicare Advantage Medicare Prescription Drug Coverage Medicare Supplement Coverage Adams Gettysburg Hampton Inn 1280 York Road Gettysburg,
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationBUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION
BUREAU OF TRANSPORTATION AND SAFETY SECRETARIAL LETTERS RAILROAD SAFETY DIVISION Please call the Commission s file room (717-787-1013) for the official report DOCKET # MONTH/YEAR AUGUST 2005 CAPTION TYPE
More informationPlease click on the following product to view meetings in your area.
Please click on the following product to view meetings in your area. Medicare Advantage Medicare Prescription Drug Coverage Medicare Supplement Coverage Adams Gettysburg Days Inn 865 York Road Gettysburg,
More informationEXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015
EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley
More informationProjected Advertisement Date
2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationFY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars
FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue
More informationConstruction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County
Construction Update Contact: The District Two Public Information Office at (419) 373-4428 or email D02.PIO@dot.ohio.gov For Immediate Release Thursday, October 18, 2018 ODOT District Two Construction Update
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationWhittier Bridge Project
Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits
More informationPennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20
PennDOT's NORTHEASTERN PENNSYLVANIA District 4 (includes Pike and Wayne counties) ROADWORK SCHEDULE - June 14-20 DUNMORE (June 13, 2008) PennDOT announces its work schedule for June 14-20. Be alert for
More information(Jo Daviess, Stephenson, Winnebago, Boone, Carroll, Ogle, Whiteside, Lee, Rock Island, Henry counties)
District 1 (Cook, DuPage, Will, McHenry, Kane and Lake Counties) District 2 -Jane Byrne Interchange reconstruction in Chicago o $76.6 million; $31.8 million spent o Spread over four separate contracts
More informationRELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)
RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers 540-332-9201 (office) STA12-130 540-292-2500 (cell) Sandy.Myers@VDOT.Virginia.gov Marshall Barnhill 540-332-9264 (office) 540-414-5670 (cell)
More informationMost people notice when ODOT builds something
ODOT District 8 2016 Construction Program Taking Care of What We Have Most people notice when ODOT builds something new. However, we actually spend 93 percent of our time and resources taking care of what
More informationMEMORANDUM. DATE: February 1, 2007
DATE: February 1, 2007 TO: FROM: SUBJECT: NW PA Regional Operations Forum (ROF) Edwards and Kelcey Inventory of Existing and Planned Regional Operations Projects (DRAFT) The Regional Operations Forum (ROF)
More informationTourism Satellite Account Calendar Year 2016
Tourism Satellite Account Calendar Year 2016 Key Definitions 1. Tourism/Tourist: Refers to the leisure travel/traveler segment. 2. Travel/Traveler: Includes both leisure and business travel/travelers.
More informationEXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015
EXTERNAL COMMUNICATIONS COMMITTEE MEETING APRIL 2015 35EXPRESS PROJECT OVERVIEW 2 SEGMENT 1 3 SOUTH OF I-635 May Shift northbound mainlane traffic east in the southeast quadrant Miscellaneous frontage
More informationINTERSTATE MANAGEMENT PROGRAM FOR THE FY2015 TIP FOR DVRPC SUBREGION
INTERSTATE MANAGEMENT PROGRAM FOR THE FY215 TIP FOR DVRPC SUBREGION Roadmap for the I-95 Reconstruction Project in More than $2 billion will provide for the repair, reconstruction and restoration of I-95
More informationGovernor Corbett Announces State Investment in 24 Rail Projects
News for Immediate Release Nov. 9, 2012 Governor Corbett Announces State Investment in 24 Rail Projects Harrisburg Twenty-four freight-rail projects across Pennsylvania will improve businesses rail access,
More informationWichita Falls MPO - MTP Project List 1 of 6
Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationWeekly East Tennessee Construction Report for May 31-June 6, 2018
Weekly East Tennessee Construction Report for May 31-June 6, 2018 Thursday, May 31, 2018 01:30pm ANDERSON COUNTY, SR 62 between Union Valley Road and SR 162: Motorists should be alert for possible lane
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationTRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 7, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 187 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationTENNESSEE DEPARTMENT OF TRANSPORTATION Project Status. No Projects Under Development in Blount County
SR-33 No Projects Under Development in Blount County PIN: 118351.00 FROM OLD KNOXVILLE PIKE TO EAST LINCOLN ROAD Length - 0.6 (Intersection Improvements and Signals) SR-33 US-411 PIN: 118422.00 INTERSECTION
More informationProgress Report for Projects of Regional Significance
SR 58 BELTWAY IMPROVEMENTS MARCH 2018 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance OCTOBER 2018 EDITION This report is updated quarterly and posted on
More informationProgress Report for Projects of Regional Significance
Rosedale Highway facing west January 2017 What s Inside? Kern Council of Governments Progress Report for Projects of Regional Significance EDITION Status Information on: Safety & Maintenance...this section
More informationRoads to Prosperity Program. Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018
Roads to Prosperity Program Asphalt Pavement Association 38 th Annual Asphalt Paving Conference March 1, 2018 Part A Surge Part B GARVEE 1 Turnpike 1 GO Bond 1 PART B GARVEE 2 3.3 B +/- Roads to Prosperity
More informationFor-Profit Participation
For-Profit Participation TC2008-0303 O-1115 R DIAMOND STREET INITIATIVE 3113 W Diamond St Philadelphia, PA 19121-1111 Philadelphia County City of Philadelphia Mr Mark H Dambly (267) 386-8600 49 of 49 $1,253,571
More information2014 Project Update. PennDOT District 2-0 Karen Michael
2014 Project Update PennDOT District 2-0 Karen Michael District 2-0 entre County Over the last 5 Years completed: 17 Bridge Replacements 23 Bridge Preservations 8 Highway Projects 5 Enhancement Project
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationSEARCH Penn National Insurance Agent List BY COUNTY
SEARCH Penn National Insurance Agent List BY COUNTY AGENCY NAME ADDRESS CITY STATE ZIP CHAMBER AFFILIATION ALLEGHENY ALTANY LOYND LINDQUIST 1122 BRACKENRIDGE AVE BRACKENRIDGE PA 15014 Allegheny Valley
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationAdditional Fee Free ATM Locations For Elliott Federal Credit Union Members (1 st Commonwealth Bank) Locations for Westmoreland County
Additional Fee Free ATM Locations For Elliott Federal Credit Union Members (1 st Commonwealth Bank) Locations for Westmoreland County Allegheny Township Office Delmont Office Derry Office 1147 South Leechburg
More informationPassaic Morris Sussex. Burlington Camden. Cumberland Gloucester
Quarter 1 - July 2014 through September 2014 Rt 45 CR 653 to CR 616, Pavement Salem Mannington Twp. Pilesgrove Twp. Rt 40 Corso Lane to Babcock Rd, Pavement Atlantic Buena Vista Twp. Hamilton Twp. Rt 1,
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationHIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR ENACTMENT Act of Dec. 14, 1992, P.L. 894, No. 143 A SUPPLEMENT To
HIGHWAY-RAILROAD AND HIGHWAY BRIDGE CAPITAL BUDGET SUPPLEMENTAL ACT FOR 1991-1992 - ENACTMENT Act of Dec. 14, 1992, P.L. 894, No. 143 Cl. 86 A SUPPLEMENT To the act of December 8, 1982 (P.L.848, No.235),
More informationProgram Project Name Project Description
Program Project Name Project Description PAVING BERLIN-BARRE CITY ***List Provided by Vermont's Agency of Transportation*** RESURFACE VT62 IN BERLIN AND BARRE CITY, BEGINNING APPROX. 0.2 MILE EAST OF THE
More informationProject ID Project Description Date Sum of Obligation. Grand Total $7,942,419.19
N Middlesex 608420 LOWELL- RECONSTRUCTION AND REHABILITATION OF SIX BRIDGES (ENEL BRIDGES) TIGER 07/29/2016 $100,000.00 GRANT 601426 BILLERICA- RECONSTRUCTION OF ALLEN ROAD, FROM ROUTE 3A TO WEBB BROOK
More informationMarch Center for Arts & Technology- Brandywine 1635 East Lincoln Highway Coatesville PA Adm Asst/Secr Sci, Gen
Administrative Assistant/Secretarial Science, General 52.0401 The following list shows new programs in this CIP that were approved by year, followed by a list of programs deleted by year. 2009-2010 Approval
More informationRoad Commission for Oakland County 2016 Road and Permit Projects (6/29/16 Update) Community or Communities
**11 Mile culvert over the Blackwood Drain East of Milford **12 Mile Inkster and Southfield and Northwestern Hwy Farmington Hills **Adams bridge over Clinton River **Airport **Conklin **Greenfield (northbound
More informationPennsylvania Turnpike Commission 03/30/ YEAR CAPITAL PLANNING PROCESS
Pennsylvania Turnpike Commission 3/3/29 1 YEAR CAPITAL PLANNING PROCESS PRIORITIZED LISTING OF FINAL COPY FOR FISCAL YEAR 26-27 FOR ALL EXCEPT INDEPENDENTLY FUNDED PROGRAM, ALL TYPES, ALL PHASES (in $)
More informationRoad Construction Ahead January-April 2015 NORTHWEST REGION
NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,
More informationLPA Location Federal Funds Awarded to LPA. Fairfield Avenue, SR 101 and Oxford Pike
LPA Location Federal Funds Awarded to LPA Allen County Allen County Bridge #271: South County Line Road over St Marys River $1,091,200.00 Boone County On CR 500W, approximately 750' South of Middle Jamestown
More informationMagisterial District Court Offices
Magisterial District Court Offices www.alleghenycourts.us Bell Acres Borough Brackenridge Borough Aleppo Township Bellevue Borough Braddock Borough Aspinwall Borough Ben Avon Borough Braddock Hills Borough
More informationDISTRICT CONSTRUCTION PROGRAM PROGRAM DISTRICT CONSTRUCTION
ODOT ODOT DISTRICT 7 2018 CONSTRUCTION DISTRICT 7 PROGRAM 2018 CONSTRUCTION PROGRAM SERVING AUGLAIZE, CHAMPAIGN, CLARK, DARKE, LOGAN, MERCER, MIAMI, MONTGOMERY & SHELBY COUNTIES JOHN R. KASICH, OHIO GOVERNOR
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationWEEKLY HIGHWAY ALERT RICHMOND DISTRICT
CONTACT: VDOT Customer Service 1-800-367-7623 November 18, Richmondinfo@VDOT.virginia.gov WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Below is a forecast of road construction that is expected
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationINSTRUCTIONS AND INFORMATION FOR COMPLETING THE APPLICATION FOR OFF-PREMISE OUTDOOR ADVERTISING DEVICE PERMIT (FORM RW-745)
INSTRUCTIONS AND INFORMATION FOR COMPLETING THE APPLICATION FOR OFF-PREMISE OUTDOOR ADVERTISING DEVICE PERMIT (FORM RW-745) 67 Pa. Code, Chapter 445, Outdoor Advertising Devices, is available on the web
More informationTRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationFOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY
TRAFFIC ADVISORY FOR IMMEDIATE RELEASE Fiorella Teodista 954-934-1130 January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY FORT LAUDERDALE Florida s Turnpike announces
More informationFORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.
FORT WORTH DISTRICT Springtown Area Projects Loyl C. Bussell, P.E. Acting District Engineer Photo by Liam Frederick Footer Text Thursday, February 8, 2018 Date Maintaining a Safe System TxDOT is responsible
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationTRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE September 14, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 149 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationOhio Department of Transportation Construction Update
Ohio Department of Transportation Construction Update DISTRICT 5 DAVE RAY, P.E., P.S., DISTRICT DEPUTY DIRECTOR 9600 Jacksontown Road Jacksontown, OH 43030 www.transportation.ohio.gov/dist5 ODOT District
More informationSECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY
WEEK ENDING FEBRUARY 1, 2019 SECTION 55A1 ROBINSON TOWNSHIP IN WASHINGTON COUNTY Contractor: Independence Excavating Inc. 1. Work Shift Day shift (M-F), with Saturday as a makeup day. 2. Traffic The new
More information