1 Transportation 2040 as amended in 2015 Appendix N: Regional Capacity Projects Note: Project costs are expressed in 2015 dollars and are sorted by sponsor. Sponsor: AUBURN Project ID: 2858 Title: A St Trail Estimated Cost: $2,062,420 Shared use bike path A St Trail 31st St SE 2030 Transit station at 1st & B St. Sponsor: AUBURN Project ID: 4516 Title: Auburn Pacific Phase 2 (trail) MTP Status: Completed Estimated Cost: $180,425 New east-west trail connection serving the residents of Auburn and Pacific and connecting through other existing trails to the Auburn urban center. 0 Ellingson Road SW 2011 Pacific Park

2 Sponsor: AUBURN Project ID: 1744 Title: Auburn Way South (SR 164) Corridor Improvements, Fir Street SE to Hemlock Street SEg & Non-Motorized Improvements Estimated Cost: $3,591,990 The Auburn Way South (SR 164) Corridor Improvement project is approximately 0.14 miles in length, from Fir ST SE to Hemlock ST SE. This project will design and construct a new 5 lane section of roadway with illumination. There will be 2 through lanes in each direction and a center turn-lane with a U-turn/Wedge and transit pullouts at Hemlock ST SE. There will also be 10-foot wide sidewalks and storm drainage improvements. The project includes a new traffic signal at the intersection of Hemlock ST SE and Auburn Way South (SR 164) with ADA compliant ramps, push buttons, and signal heads. Auburn Way South (SR 164) Fir St SE 2015 Hemlock St SE Sponsor: AUBURN Project ID: 4515 Title: BNSF Pedestrian/Bicycle Undercrossing Estimated Cost: $11,279,810 Non-motorized connection extending from the White River Trail to the Interurban Trail and all urban centers located proximate to the Interurban Trail. BNSF Underpass A Street SE 2017 Skinner Rd

3 Sponsor: AUBURN Project ID: 4510 Title: BPA Trail Estimated Cost: $2,472,030 New east-west trail connection from Federal Way urban center to Covington. BPA Trail west city limits 2020 east city limits Sponsor: AUBURN Project ID: 2871 Title: C St Trail Shared Use bike path 0 Interurban 15th St SW 2011 MTP Status: Completed Estimated Cost: $349,879 Pacific City Limits Sponsor: AUBURN Project ID: 4504 Title: Grade Separated Crossing of BNSF Railyard Estimated Cost: $34,967,411 Improved east-west connectivity and mitigation for potential future BNSF railyard expansion as a multimodal facility (at 6th Street SW/SE ) 6th Street SW/SE C Street SW 2030 A Street SE

4 Sponsor: AUBURN Project ID: 4511 Title: Green River Trail Estimated Cost: $2,472,030 New north-south non-motorized corridor that links to Auburn's urban center through future on-street bicycle lanes and sidewalks. Green River Trail S. 277th Street 2020 SR 18 Sponsor: AUBURN Project ID: 975 Title: M Street Widening and Underpass Estimated Cost: $26,116,619 GRADE SEPARATE RAIL XING, WIDEN TO 4 LANES, ADD SIDEWALK, BIKE LANES, AND ROADWAY LIGHTING. M St SE E MAIN 2019 AUBURN WAY S Sponsor: AUBURN Project ID: 976 Title: S 272nd/277th St Corridor Capacity Non Motorized Trail Improvements Estimated Cost: $8,293,101 Widen roadway between Auburn Way North and L St NE. Includes 2 new EB lanes, 1 new WB lane, separated non-motorized trail, intersection improvements, lighting, ITS improvements, and associated storm improvements. 52nd St NE AUBURN WAY N 2016 GREEN RIVER

5 Sponsor: AUBURN Project ID: 4287 Title: SR 164 Estimated Cost: $18,540,225 Widen to 4 lanes - Restrict access where appropriate (Project is from Dogwood to Auburn City limits with the exception of the segment between Fir and Hemlock that has been segmented out into a Candidate project - MTP 1744) SR 164 Dogwood 2040 Auburn City Limits Sponsor: AUBURN Project ID: 4513 Title: White River Trail Estimated Cost: $7,416,090 A new trail connection that will link south-east Auburn residents to the Auburn urban center via travel on the future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and the Interurban Trail. White River Trail Pacific 2030 Southeast Auburn along the White River

6 Sponsor: AUBURN Project ID: 4514 Title: Williams Trail Estimated Cost: $2,472,030 A new trail connection that will link south-east Auburn and Pierce County residents to the Auburn urban center via travel on the White River Trail, future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and Interurban Trail. Williams Trail Kersey Way/White River Trail 2020 Lake Tapps Parkway

7 Sponsor: BELLEVUE Project ID: 4264 Title: 120th Avenue NE Corridor Widening: NE 4th Street to Northup Way MTP Status: Approved Estimated Cost: $58,187,427 Improve and widen the 120th Avenue NE corridor in phases to increase connectivity between the Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen to five lanes with bike lanes and continuous sidewalk between NE 4th and NE 8th Streets; realign the roadway with sidewalks and bike lanes between NE 8th Street and Old Bel-Red Road; widen to five lanes with sidewalks and bike lanes between Old Bel-Red Road and NE 15th Street; and widen to five lanes with sidewalks and a separated multi-use path between NE 15th Street and Northup Way (this segment may primarily be implemented with four lanes on an interim basis). Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 16th Streets. 120th Ave NE NE 4th Street (new connection at 120th Ave NE) 2023 Northup Way Sponsor: BELLEVUE Project ID: 2865 Title: Bellevue Way Trail Estimated Cost: $1,516,547 Construct a multi-use pedestrian and bike facility. Project may be designed and constructed in coordination with Sound Transit and the implementation of the East Link project along this corridor. Bellevue Way Trail Parallel along Bellevue Way from SE 30th 2029 SE 8th St

8 Sponsor: BELLEVUE Project ID: 4527 Title: Bel-Red Regional Connectivity - 124th Ave NE Estimated Cost: $44,990,889 Improve and widen the 124th Avenue corridor in phases to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen for bike lanes between NE 8th Street and Bel-Red Road; widen to five lanes with sidewalks and bike facilities between Bel-Red Road and the planned NE 15th Street intersection; and widen to five lanes with sidewalks between NE 15th Street and Northup Way. Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 18th Streets. 124th Avenue NE NE 8th Street 2019 Northup Way Sponsor: BELLEVUE Project ID: 4523 Title: Bel-Red Regional Connectivity - NE 4th St Extension MTP Status: Approved Estimated Cost: $46,813,017 Construct a four/five lane extension of NE 4th Street from 116th Ave to 120th Ave, including sidewalks, and bike lanes to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. The extension will be designed to accommodate future development and uses of the BNSF corridor. NE 4th Street 116th Avenue NE th Avenue NE

9 Sponsor: BELLEVUE Project ID: 4524 Title: Bel-Red Regional Connectivity - NE 6th St Extension Estimated Cost: $86,666,660 Construct east half of NE 6th/I-405 HOV/HOT interchange to provide transit/hov access east of I-405. NE 6th Street 112th Avenue NE th Avenue NE Sponsor: BELLEVUE Project ID: 1100 Title: Coal Creek Parkway Estimated Cost: $3,714,693 Widen Coal Creek Pkwy to six lanes at the intersection between the I-405 ramps. COAL CREEK PKWY I-405 northbound on ramp 2020 I-405 southbound off ramp Sponsor: BELLEVUE Project ID: 5497 Title: Downtown-Overlake Connection Trail Estimated Cost: $1,219,089 Add a 10 to 14 foot wide off-street path on the north side of NE 12th Street from 100th Avenue NE to 116th Avenue NE. Component of priority bike corridor; Add foot-wide off street path along the north side of NE 16th Street from 116th Avenue NE to 140th Avenue NE. Component of priority bike corridor; north side of NE 12th Street 100th Ave NE th Ave NE

10 Sponsor: BELLEVUE Project ID: 2868 Title: I-90 Trail/124th Ave SE Connector MTP Status: Completed Estimated Cost: $1,706,725 Add a foot-wide off street path from the I-90 trail to SE 38th Street I-90 Trail/124th Ave SE Connector 124th Ave SE & SE 38th Pl 2011 I-90 Trail at Factoria Blvd. Sponsor: BELLEVUE Project ID: 2888 Title: Lake Washington Blvd Trail Shared use bike path Lake Washington Blvd Trail Southern terminus of existing Lk WA Blvd Trail near Bagley Ln 2029 Estimated Cost: $1,238,231 Along BNSF Corridor to Bellevue/Newcastle limits Sponsor: BELLEVUE Project ID: 5498 Title: Lake-to-Lake Trail Estimated Cost: $1,857,346 Add a 10 to 14 foot wide off street path on the south side of Main Street from Bellevue Way NE to 116th Avenue NE. Component of priority bike corridor. Main St Bellevue Way th Ave NE

11 Sponsor: BELLEVUE Project ID: 5499 Title: Lake-to-Lake Trail Estimated Cost: $1,238,231 Add a foot-wide off street path on the north side of Lake Hills Connector from Main Street to 140th Avenue SE. Component of priority bike corridor. north side of Lake Hills Connector Main St th Ave SE Sponsor: BELLEVUE Project ID: 5500 Title: Lake-to-Lake Trail Estimated Cost: $619,115 Add a foot-wide off street path on the south side of SE 8th Street from 114th Avenue SE to Lake Hills Connector. Component of priority bike corridor. on the south side of SE 8th Street 114th Ave SE 2029 Lake Hills Connector

12 Sponsor: BELLEVUE Project ID: 5501 Title: Mountain to Sound Greenway Estimated Cost: $30,676,746 A paved multiuse trail of 12 feet wide (where feasible) is proposed beginning at the current end of the trail at Factoria Blvd and running eastward along the south side of I-90 and the north side of SE 36th St to the curve near the 150th Ave SE interchange with I- 90, then following a new independent alignment to the south of the interchange and north of the 150th Avenue SE/SE 37th St intersection. Eastward from 150th Ave SE, the trail will continue on the south side of I-90 and the north side of SE 37th St. Eastward from the termination of SE 37th St, the trail will continue on the south side of I-90 and the north side of private properties and/or Newport Way to the intersection of Lakemont Blvd SE and Newport Way. Parallel to I-90 Factoria Blvd 2030 Lakemont Blvd Sponsor: BELLEVUE Project ID: 4473 Title: NE Spring Boulevard Multi-Modal Corridor Zone 1A Estimated Cost: $12,046,583 The project includes one segment of a new multi-modal arterial street connection between 116th Ave NE to the West Abutment of West Bridge. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate storm drainage and water quality treatment. Zone 1A will include a separated wide multi-use path on the north side and sidewalk on the south side; it will also include, new traffic signals connected to the city s traffic adaptive control system, landscaping and irrigation, and illumination for both Zone 1A and Zone 1B. NE Spring Boulevard 116th Ave NE 2020 West Abutment of West Bridge

13 Sponsor: BELLEVUE Project ID: 4526 Title: NE Spring Boulevard Multi-Modal Corridor -- Zone 1B MTP Status: Approved Estimated Cost: $22,607,475 The project includes one segment of a new multi-modal arterial street connection, including two travel lanes in each direction, turn pockets and center turn lanes where appropriate, storm drainage, and water quality treatment. Zone 1B will include a separated wide multi-use path on the north side and sidewalk on the south side, and two bridges spanning the north-south Eastside Rail Corridor and Sound Transit rail tracks. NE 15th Street West Abutment of West Bridge th Avenue NE Sponsor: BELLEVUE Project ID: 4474 Title: NE Spring Boulevard Multi-Modal Corridor Zone 2 Estimated Cost: $27,050,306 The project includes one segment of a new multi-modal arterial street connection from 120th Ave NE to 124th Ave NE. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate, new traffic signals connected to the city s traffic adaptive control system, landscaping and irrigation, illumination, storm drainage and water quality treatment. Zone 2 will include widened outside lanes for shared bicycle use and sidewalks on both sides. NE Spring Boulevard 120th Ave NE th Ave NE

14 Sponsor: BELLEVUE Project ID: 5495 Title: SR 520 Trail Estimated Cost: $3,657,267 Add a foot-wide off street path along the south side of NE Points Drive from the western part of the interchange area to the south side of Northup Way just east of the interchange. Component of priority bike corridor. Add a foot-wide off street path along SR-520 connecting NE Points Drive to Northup Way over the Bellevue Way Interchange area (just north of SR-520). Component of priority bike corridor. SR 520 Trail Bellevue Way I/C 2015 Bellevue Way Sponsor: BELLEVUE Project ID: 5496 Title: SR 520 Trail Estimated Cost: $14,326,046 Construct foot-wide path from Bellevue Way / Evergreen Point Bridge to the west terminus of existing SR-520 trail at 124th Avenue NE. This facility extends east of Bellevue Way along the south side of Northup Way to 108th Avenue NE; along the east side of 108th Avenue NE; continuing east along the north side of SR-520 and eventually leading back to the proposed BNSF regional trail. East of the BNSF regional trail, completing the connection along the north side of SR-520 and south side of NE 24th Street to the existing trail system. Component of priority bike corridor; EW-1: SR-520 Trail. SR 520 Trail Evergreen Point Bridge th Ave NE

15 Sponsor: BELLEVUE Project ID: 5502 Title: West Lake Sammamish Pkwy Path Estimated Cost: $36,572,670 Construct a ten foot multi-use path on the west side of the parkway and a four foot bike shoulder on the east side. Portions of the west side path will be separated from the vehicle travel lanes by two to five foot landscape planting. The project will include five midblock pedestrian crossings, three intersection crossings, and rehabilitation of existing pavement throughout the corridor. on the west side of West Lake Sammamish Pkwy North City Limit 2020 I-90

16 Sponsor: BOTHELL Project ID: 4262 Title: Bothell Way NE / Bothell-Everett Hwy Improvements Estimated Cost: $36,184,339 Widen to 4/5 lanes between NE 188th St and 240th St SE. SR 527 NE 188th St th St SE Sponsor: BOTHELL Project ID: 5446 Title: Bothell Way NE: Multiway Boulevard Project Estimated Cost: $32,308,938 Reconstruct and expand the existing 4-lane roadway between SR 522 and NE 188th St to a tree-lined boulevard with 5 travel lanes and business access lanes. SR 527 SR NE 188th St

17 Sponsor: BOTHELL Project ID: 4271 Title: Bothell-Everett Hwy Widening: 240th St SE to 228th St SE MTP Status: Completed Estimated Cost: $10,537,340 This project will widen Bothell-Everett Hwy from two lanes to four lanes with a center dual left turn lane, bike lanes, transit stops and sidewalks, curb/gutter/plantings, minor side street improvements, interconnect and coordinate signals, provide access management, retaining walls, storm drainage facilities, landscaping and illumination. SR 527 Snohomish County 240th St SE th St SE Sponsor: BOTHELL Project ID: 4172 Title: North Creek Trail - 220th St SE to SR 524 (Woodlands Technology Campus) MTP Status: Approved Estimated Cost: $1,589,240 The North Creek Trail north of 220th St SE to SR 524 will be constructed by project developers and the City of Bothell over the next several years. The project "Woodlands Technology Campus" has completed construction of a 12-foot wide mixed-use path on their property which runs from 220th St SE north to 214th St SE at SR 527. The next piece of mixed-use path from 214th St SE north to SR 524 will be built by a City contract in 2014/2015 using grant funding. North Creek Snohomish County 220th St SE 2016 SR 524

18 Sponsor: BOTHELL Project ID: 4169 Title: North Creek Trail, Section 1 Stage 1 MTP Status: Completed Estimated Cost: $1,047,307 The North Creek Trail - Section 1, Stage 1 project will construct a Class I non-motorized trail (missing trail segment) on NE 195th Street between North Creek and I-405/NE 195th Street interchange in Bothell. parallel to NE 195th I-405 ramp/ NE 195th Street 2011 North Creek (waterway) Sponsor: BOTHELL Project ID: 4170 Title: North Creek Trail, Section 1, Stage 2 (Schnitzer) MTP Status: Completed Estimated Cost: $1,220,896 The North Creek Trail, Section 1, Stage 2 (Schnitzer) project will construct Class I non-motorized trail segments along the North Creek levy top north of NE 195th Street to North Creek Parkway North in Bothell. along the North Creek levy (still on East side of waterway) NE 195th (just north of) 2011 North Creek Parkway North

19 Sponsor: BOTHELL Project ID: 4171 Title: North Creek Trail, Section 2, Stage 2 (Canyon Park Business Park) MTP Status: Completed Estimated Cost: $1,098,311 The North Creek Trail - Section 2, Stage 2 (Canyon Park Business Park) project will construct a Class I non-motorized trail from 228th Street SE north approximately 0.8 miles to 220th Street SE. North Creek Trail ROW Snohomish County 228th Street SE th Street SE Sponsor: BOTHELL Project ID: 4272 Title: SR West City Limits to NE 180th Street Stage 2A Improvements MTP Status: Completed Estimated Cost: $9,590,163 The west segment of the project (M.P to M.P. 8.85) includes construction of an exclusive BAT lane from 91st Ave NE to 1300 feet west of 96th Ave NE, retaining walls, landscaping, curbs/gutter/sidewalk, signal interconnect and access management. SR st Ave NE feet west of 96th Ave NE

20 Sponsor: BOTHELL Project ID: 5537 Title: SR West City Limits to NE 180th Street Stage 2b Improvements MTP Status: ROW Conditionally Ap Estimated Cost: $11,870,491 The east segment of the project (M.P to M.P. 9.61) includes installation of curbs/gutter/sidewalk, signal interconnect and access management. SR feet east of 96th Avenue NE 2019 Hall Road Sponsor: BOTHELL Project ID: 4002 Title: SR 522 West City Limits to NE 180th St. Stage 1 Improvements (at 96th Ave NE) - Wayne Curve. MTP Status: Completed Estimated Cost: $28,415,298 This project includes curb, gutters and sidewalks installation on both sides of the roadway; upgrade storm water facilities; street lighting improvements; widen through lanes; realign 96th Avenue NE approach, increase intersection capacity by adding left turn lanes; enhance transit operation by adding Business Access Transit (BAT) lanes and queue jump lane at the 96th Avenue NE intersection, and enhance traffic safety through access management and median installation. SR 96th Ave NE SR 96th Ave NE ' west of 96th Ave NE

21 Sponsor: BOTHELL Project ID: 4254 Title: SR 522, Stage 3 Estimated Cost: $46,934,926 The proposed project will provide corridor continuity, improve traffic flow (capacity), provide continuous westbound and eastbound BAT (Business Access and Transit) lanes and provide a continuous ADA pedestrian facility. SR rd Ave NE st Ave NE Sponsor: BOTHELL Project ID: 5536 Title: SR 527 Estimated Cost: $6,212,069 Widen to 4/5 lanes between 228th St. SE and I-405. SR 527 Snohomish County 228th St. SE 2030 I-405

22 Sponsor: BOTHELL Project ID: 4056 Title: Transit Center and Parking Garage (Bothell) Estimated Cost: $47,679,266 Construct a transit center/park-and-ride with up to 400 stalls in the vicinity of SR 527/Bothell Way NE and NE 185th Street in downtown Bothell. Vicinity of SR 527/Bothell Way NE and NE 185th Street Snohomish County Bothell Way NE at NE 185th Street 2040 #N/A

23 Sponsor: BUCKLEY Project ID: 2809 Title: Foothills Trail - White River Crossing Estimated Cost: $7,331,877 Shared use path Foothills Trail Pierce County South side of the White River 2016 North side of the White River Sponsor: BUCKLEY Project ID: 4286 Title: SR-165 Realignment, P2 Estimated Cost: $2,618,044 Phase 2 includes: realignment of SR-165 to form a T intersection with SR-410, signals at the SR-410/SR-165 intersection and at the SR- 165/Ryan/112th Street intersection, the addition of a right turn lane on the west leg of the SR-410/SR165 intersection, realignment of River Avenue north of Pearl Street, realignment of the Foothills Trail north of the intersection of SR-165/Ryan/112th Street. The road improvements include curb, gutter and sidewalk north of Ryan Rd and paved shoulders south of Ryan Road. The project includes street illumination and wetland mitigation. Intersection of SR-410, SR-165, Ryan Road, 112th Street Pierce County Intersection of SR-165,Ryan Rd,112th St 2015 Intersection SR-165, SR410

24 Sponsor: BUCKLEY Project ID: 1239 Title: SR-410/SR-165/Ryan Rd/ 112th St E Realignment, Phase 1 MTP Status: Completed Estimated Cost: $3,978,142 Phase 1 includes: realignment of Ryan and 112th to intersect with SR165, realignment of River Avenue and the Foothills Trail. Roads include curbs, gutters and sidewalks. Phase 1 includes a storm trunk line along Ryan, 112th, easements and Hinkleman. Intersection of SR-410, SR-165, Ryan Road, 112th Street Pierce County Intersection of SR-410, SR-165, Ryan Road, 112th Street 2012 Intersection of SR-410, SR-165, Ryan Road, 112th Street

25 Sponsor: BURIEN Project ID: 5449 Title: 1st Avenue South, Phase 2 (SW 140th Street to SW 146th Street) MTP Status: Completed Estimated Cost: $10,089,781 Reconstruct 1st Avenue South from SW 140th Street to SW 146th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies. 1st Ave S SW 140th Street 2013 SW 146th Street Sponsor: BURIEN Project ID: 5450 Title: 1st Avenue South, Phase 3 (SW 128th Street to SW 140th Street) Estimated Cost: $20,296,217 Reconstruct 1st Avenue South from SW 128th Street to SW 140th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies. 1st Ave S SW 128th Street 2018 SW 140th Street

26 Sponsor: BURIEN Project ID: 5451 Title: Ambaum Boulevard SW Corridor Study (SW 116th Street to SW 153rd Street) Estimated Cost: $922,555 Conduct study to determine current and projected requirements for Transit HOV/BAT capabilities, non-motorized upgrades for bicycle and pedestrian uses, center turn lane/left turn pocket additions and coordinated signalization enhancement for safety and volume improvement requirements. The study will identify locations of anticipated significant purchases of ROW and easements. Ambaum Boulevard SW 116th Street 2030 SW 153rd Street

27 Sponsor: COMMUNITY TRANSIT Project ID: 5466 Title: Core or Swift BRT - SR 527 Downtown Bothell to SR 526/I-5 MTP Status: Approved Estimated Cost: $51,286,830 Swift II Bus Rapid Transit will be Community Transit`s 2nd line of BRT, traveling between the Canyon Park Park Ride and Paine Field/Boeing. This 12 mile corridor will have 15 stations in each direction served by 60 ft articulated buses. Swift II BRT will meet a critical need for east-west transportation options in Snohomish County, connecting a Regional Growth Center (Canyon Park) with a Regional Manufacturing and Industrial Growth Center (Paine Field). This service will be all day bi-directional service operating at a 10 min frequency during peak hours. Swift Corridor Snohomish County Canyon Park Park Ride 2019 Seaway and 75th Street Transit Service Expansion Sponsor: COMMUNITY TRANSIT Project ID: 5478 Title: Core or BRT - 20th St US 2 to SR 9 Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 20th St from US 2 to SR 9. Requires speed & reliability improvements and accessible transit stops. 20th St Snohomish County US SR 9

28 Sponsor: COMMUNITY TRANSIT Project ID: 5476 Title: Core or BRT - 228th St Edmonds Ferry, SR 104, 228th, 236th, 228th to SR 9 Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 228th St from Edmonds Ferry to SR 9. Requires speed & reliability improvements and accessible transit stops. 228th St Snohomish County Edmonds Ferry 2040 SR 9 Sponsor: COMMUNITY TRANSIT Project ID: 5480 Title: Core or BRT - 35th Ave SE Bothell to Everett Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 35th Ave SE from downtown Bothell to Everett. Requires speed & reliability improvements and accessible transit stops. 35 Ave SE Snohomish County Downtown Bothell 2040 Everett

29 Sponsor: COMMUNITY TRANSIT Project ID: 5482 Title: Core or BRT - I-5 Smokey Point to Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on I-5 from Smokey Point to. Requires speed & reliability improvements and accessible transit stops. I-5 Snohomish County Smokey Point 2040 Sponsor: COMMUNITY TRANSIT Project ID: 5333 Title: Core or BRT - Mukilteo Speedway Estimated Cost: $7,688,635 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on Mukilteo Speedway (SR 525) from Mukilteo Ferry to I-405 (ramp just short of I-405). Requires speed & reliability improvements and accessible transit stops. Mukilteo Speedway (SR 525) Snohomish County Mukilteo Ferry 2040 I-405

30 Sponsor: COMMUNITY TRANSIT Project ID: 5484 Title: Core or BRT - SR 522 Monroe to Bothell Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 522 Monroe to Bothell. Requires speed & reliability improvements and accessible transit stops. SR 522 Snohomish County Monroe 2040 Bothell Sponsor: COMMUNITY TRANSIT Project ID: 5312 Title: Core or BRT - SR 526 from SR 525 to I-5 Estimated Cost: $4,379,234 Service hours and buses. Core service or Swift Bus Rapid Transit on SR 526 from SR 525 to I-5. Requires speed & reliability improvements and accessible transit stops. SR 526 Snohomish County SR I-5

31 Sponsor: COMMUNITY TRANSIT Project ID: 5470 Title: Core or BRT - SR 528 I-5 to SR-9 Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 528 from I-5 to SR 9. Requires speed & reliability improvements and accessible transit stops. SR 528 Snohomish County I SR 9 Sponsor: COMMUNITY TRANSIT Project ID: 5468 Title: Core or BRT - SR 531 I-5 to downtown Arlington Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 531 from I-5 to downtown Arlington. Requires speed & reliability improvements and accessible transit stops. SR 531 Snohomish County I Downtown Arlington

32 Sponsor: COMMUNITY TRANSIT Project ID: 5474 Title: Core or BRT - SR 9 Bothell to Arlington Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 9 from Bothell to Arlington. Requires speed & reliability improvements and accessible transit stops. SR 9 Snohomish County Downtown Bothell 2040 Arlington Sponsor: COMMUNITY TRANSIT Project ID: 5472 Title: Core or BRT - US 2 Everett to Monroe (via Ave D and 2nd St in Snohomish) Estimated Cost: $0 Service hours and buses. Core Service or Bus Rapid Transit (BRT) on US 2 from Everett to Monroe (via Ave D and 2nd St in Snohomish). Requires speed & reliability improvements and accessible transit stops. US 2 Snohomish County Everett 2040 Monroe

33 Sponsor: COMMUNITY TRANSIT Project ID: 5335 Title: Core or Swift BRT - 164th St Estimated Cost: $3,548,503 Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on 164th from SR 99 to SR 527. Requires speed & reliability improvements and accessible transit stops. 164th Snohomish County SR SR 527 Sponsor: COMMUNITY TRANSIT Project ID: 5334 Title: Core or Swift BRT - Airport Rd to Cathcart Way (Everett) Estimated Cost: $9,452,531 Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on Airport Rd, 128th, 132nd, Cathcart Way from SR 526 to SR 9. Requires speed & reliability improvements and accessible transit stops. Airport Rd, 128th, 132nd, Cathcart way Snohomish County SR SR 9

34 Sponsor: COMMUNITY TRANSIT Project ID: 5332 Title: Core or Swift BRT - Smokey Point Corridor Estimated Cost: $11,718,285 Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on N Broadway (Smokey Point corridor) from Everett Station up N Broadway, SR 529, State Ave, Smokey Pt to Arlington (SR 531). Requires speed & reliability improvements and accessible transit stops. Smokey Point corridor up N Broadway, SR 529, State Ave, Smokey Pt Snohomish County Everett Station 2030 SR 531 Sponsor: COMMUNITY TRANSIT Project ID: 5331 Title: Core or Swift BRT - SR 524 (196th) Estimated Cost: $5,832,454 Service hours and buses. Core service or Swift Bus Rapid Transit on SR 524 (196th, Filbert) from ferry to SR 527. Requires speed & reliability improvements and accessible transit stops. SR 524 (196th St and Filbert) Snohomish County Edmonds Ferry 2030 SR 527

35 Sponsor: COMMUNITY TRANSIT Project ID: 3654 Title: North Snohomish Co. Park & Ride Estimated Cost: $7,753,460 Create a new Park and Ride facility with approximately 350 stalls, bus bays and layover space, DART transfer space, platform with customer shelters, lighting, bike lockers & racks, information kiosks, driversæ restroom/utility building, pedestrian walkways, landscaping, safety & security features, and on-site surface water detention & treatment facilities. The exact location is to be determined. Arlington/Smokey Point Area, Vicinity I-5 Snohomish County 172nd in Smokey Pt 2030 Sponsor: COVINGTON Project ID: 4288 Title: SR 516 Jenkins Creek to 185th Place SE Estimated Cost: $17,896,151 This project is to widen and reconstruct a portion of SR 516 (SE 272nd St) between Jenkins Creek and 185th Place SE. This project will include the crossing of Jenkins Creek with a new structure for the stream, widening the street from 2-lanes to 5-lanes including curb and gutter, 8 sidewalks, access control features, landscaping and provisions for u-turns. SR 516 Jenkins Creek th Place SE

36 Sponsor: DES MOINES Project ID: 4299 Title: Barnes Creek Trail Estimated Cost: $1,731,106 Conduct prelimary design to provide a multipurpose non montorized trail connection to the regional Des Moines Creek Trail. Design will be developed in phases, from south to north, and will be used to assist in environmental assessement and identification of Right of Way requirements for the future trail as provided in the City of Des Moines Comprehensive Plan. Unused SR 509 Right of Way Des Moines Creek Trail 2017 Kent Des Moines Road Sponsor: DES MOINES Project ID: 4459 Title: Connecting 28th/24th Avenue South (S 208th Street to S 216th Street) MTP Status: Approved Estimated Cost: $11,330,587 The project will complete a five lane principal arterial corridor on 24th Avenue South between S. 216th Street and S. 208th Street. The improvements include bicycle lanes, curb, gutter, sidewalks, storm drainage collection and treatment facilities, street lighting, coordination of signal improvements at S. 216th Street, channelization, landscaping, utilities, and undergrounding of aerial utilities. 24th Avenue South S 208th Street 2014 S 216th Street

37 Sponsor: DES MOINES Project ID: 4297 Title: S. 216th Street Segment 1A Estimated Cost: $10,408,022 Utility coordination, finalize PS&E, acquire right of way and construct improvements as a Complete Street including widening of two additional lanes, a turn lane, transit stop improvements, bicycle lanes, curbs, gutters, sidewalks, stormwater retention and treatment, planter strips, sustainable street and pedestrian lights, utility undergrounding and signal modifications. South 216th Street 29th Avenue South th Avenue South Sponsor: DUPONT Project ID: 296 Title: DuPont-Steilacoom Rd Estimated Cost: $31,013,839 Scope of the project has not been fully defined. Widening Improvements to DuPont-Steilacoom Rd are anticipated to be necessary to accommodate expected growth in the City of DuPont and increased traffic flows from nearby areas, such as JBLM. The existing road is two lanes with left turn pockets onto the I-5 Exit 119 Interchange (which has been identified in various corridor studies for recommended improvements.) DuPont-Steilacoom Rd Pierce County [Not submitted] 2030

38 Sponsor: EDGEWOOD Project ID: 2890 Title: Interurban Trail & Trailhead Construction Project (114th St, E to 900ft S of Military Rd) MTP Status: Completed Estimated Cost: $1,758,809 Edgewood's segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". Interurban Trail Pierce County 114th St. E ft south of military road Sponsor: EDGEWOOD Project ID: 4285 Title: Interurban Trail Construction Project (114th Ave E to Edgewood/Pacific CL) Estimated Cost: $16,097,002 Edgewood's final segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". The project limits for the trail will extend from 114th St. E to Edgewood/ Pacific City Limits which will provide access to pedestrians and bicyclists, the trail improvements is approximately 1mile of a multi-use non-motorized path with shoulders, with viewing areas, interpretive display and seating. Interurban Trail Pierce County Edgewood/ Pacific City Limits th St. E

39 Sponsor: EDMONDS Project ID: 2483 Title: Edmonds Terminal Relocation/Expansion Phase I Estimated Cost: $124,055,356 Bus/Rail connection, vehicle holding lanes, toll-booth, parking, ferry pier, slip and terminal relocation Edmonds Terminal Relocation/Expansion Phase I Snohomish County [Not submitted] 2040 Sponsor: EDMONDS Project ID: 3415 Title: Edmonds Terminal Relocation/Expansion Phase II Estimated Cost: $103,896,361 Phase II or relocation; people mover. See 4072 for the parking structure and Sounder Station. Edmonds Terminal Relocation/Expansion Phase II Snohomish County [Not submitted] 2040

40 Sponsor: EDMONDS Project ID: 2812 Title: Interurban Trail MTP Status: Completed Estimated Cost: $1,896,579 The project will complete the missing link of the Interurban Trail between King and Snohomish counties. The project will include two 5- foot bike lanes along 76th Ave W. between SR 104 and 228th St SW. These bike lanes will then extend east on 228th St SW to the Interurban Trail. In addition, the project will include 1.37 miles of safety improvements along 74th Ave W., of which 2500 feet will be a 12 paved and grade-separated path. The project will also feature the Lake Ballinger Station located at the intersection of 76th Avenue and McAleer Way. Interurban Trail Snohomish County 228th St 2012 SR 104 (Snohomish/King county line)

41 Sponsor: ENUMCLAW Project ID: 361 Title: SR 410 Channelization: Mtn. Villa Dr. to Watson St. N. Estimated Cost: $1,944,706 This project will provide for channelization, roadway, and pedestrian facility improvements along an existing section of the State Route 410 corridor within the City of Enumclaw. The project will modify and optimize the existing 65-foot wide, variable (2-to-4) lane channelization to a proposed 5-lane configuration; one-through lane and one general purpose (through/right turning) lane for each direction with medians, continuous two-way left turn lanes, or left turn pockets as approved by WSDOT. The project will add or upgrade curb, gutters, sidewalks, driveways, storm drainage, illumination, and curb ramps along the SR 410 corridor between mileposts to SR 410 `Roosevelt Avenue` Mtn. Villa Dr. (Monroe Ave) 2017 Watson St. N. Sponsor: ENUMCLAW Project ID: 362 Title: SR 410 Estimated Cost: $730,221 Widen to 3 lanes, curb, gutter, sidewalk, Widening Project 2 SR 410 Farman St 2010 E city lim

42 Sponsor: ENUMCLAW Project ID: 4470 Title: SR 410 Estimated Cost: $6,317,845 Widen to 3 lanes, curb, gutter, sidewalk 244th to Mt Villa/Monroe Ave. Widen to 2/5 lanes Watson to Farman. SR th Ave SE to Mtn Villa Rd 2020 Watson St N to Farman St

43 Sponsor: EVERETT Project ID: 792 Title: 112th St - Beverly Park Rd Corridor MTP Status: Approved Estimated Cost: $69,597,117 Widen from 2 or 3 lanes to 5 lanes with sidewalks and bike lanes on both sides in 6 phases: 1) SR 99 to 3rd Ave SE 2) SR 99 to Airport Rd 3) Airport Rd to SR 525 4) 3rd Ave SE to I-5 5) I-5 to Silver Lake Road (No HOV ramps or P&R lot as part of this project) and 6) Silver Lake Road to SR th St - Beverly Park Rd Corridor Snohomish County SR SR 525 Sponsor: EVERETT Project ID: 5517 Title: Broadway Corridor Improvements Estimated Cost: $42,024,510 Widen to 5 lanes with bike lanes, sidewalks, new bridge. Transit signal priority. Broadway Ave Snohomish County SR th St.

44 Sponsor: EVERETT Project ID: 4005 Title: Everett Arterial Access Improvements Estimated Cost: $38,813,777 Arterial access improvements to US 2 and I-5 in Everett Vicinity of Walnut and Chestnut on various streets Snohomish County Everett Avenue 2018 Pacific Sponsor: EVERETT Project ID: 547 Title: 41st Street Interchange Access Improvements MTP Status: Completed Estimated Cost: $70,935,523 41st St Interchange improvement, improvement of arterial approaches and connections 41st Street Snohomish County Colby rd Ave Sponsor: EVERETT Project ID: 2834 Title: Interurban Trail Shared use bike path Interurban Trail Snohomish County Northern terminus of existing trail at Beverly Blvd st St MTP Status: Completed Estimated Cost: $2,887,388

45 Sponsor: EVERETT Project ID: 1885 Title: Riverfront Walkway MTP Status: Completed Estimated Cost: $85,288 Complete Phase I of Riverfront Walkway non-motorized improvements and construct overcrossing of BNRR. Riverfront Walkway Snohomish County Lenora Street 2011 Pacific Avenue Sponsor: EVERETT Project ID: 2680 Title: Riverfront/Interurban Connector Estimated Cost: $1,997,291 Shared use bike path Not in local plans Riverfront/Interurban Connector Snohomish County Everett City limits 2018 Interurban Trail at 84th St

46 Sponsor: EVERETT Project ID: 4467 Title: SR 526 Hardeson Road Half Interchange Estimated Cost: $53,545,110 This proposed project would improve access to the Paine Field Manufacturing and Industrial Center, a key commercial, aerospace, and industrial area in southwest Everett. Improving access and travel time to this area will benefit the local businesses and regional businesses who are vendors or customers of businesses in SW Everett. Businesses in this area work in local, regional and international markets. The proposed project will construct access ramps on SR 526 at Hardeson Road to improve traffic flow on SR 526 and local streets within the SW Everett industrial area. Access will be provided for SR 526 traffic to/from the east. The westbound off ramp will access 80th Street SW instead of Hardeson Road due to the location of the Federal Post Office Facility. SR 526 Snohomish County Milepost Milepost 3.00 Sponsor: EVERETT Project ID: 1879 Title: SR 99/ Evergreen Way MTP Status: Completed Estimated Cost: $803,044 Widen Evergreen Way from 5 to 7 lanes, with curb, gutters and sidewalks and drainage improvements. SR 99/ Evergreen Way Snohomish County 115th Street 2012 Airport Road

47 Sponsor: EVERETT Project ID: 621 Title: SR 99/ Evergreen Way Transit HOV Treatments Estimated Cost: $1,606,087 Construct BAT lanes on Evergreen Way / Highway 99 from 115th Street SW to 46th Street. Evergreen Way Transit HOV Treatments Snohomish County 115th St th Street Sponsor: EVERETT TRANSIT Project ID: 4007 Title: Everett Station Parking Structure Estimated Cost: $29,444,934 Everett Transit Project that provides structured parking for up to 900 vehicles at Everett Station. Providing additional parking on the East side of Rail tracks and close to the bus platforms. Smith Street Snohomish County 33rd Street th Street

48 Sponsor: FEDERAL WAY Project ID: 2103 Title: 21st Ave SW Estimated Cost: $3,094,918 Major Widening (5 lanes). Provides sidewalks; Bikes provided for on parallel route per Comp Plan 21st Ave SW SW 344th St 2030 SW 356th St Sponsor: FEDERAL WAY Project ID: 3351 Title: BPA Trail Phase IV Class 1 bike trail BPA Trail 51st Ave S 2020 Estimated Cost: $2,474,904 32nd Av S Sponsor: FEDERAL WAY Project ID: 3659 Title: City Center Access Phase 3C--32nd Ave S. Estimated Cost: $9,159,667 Extend and widen 32nd Ave S to 3 lane collector from Military Rd S to S 320th St and 3 intersection signal improvements at Military Rd S, S 312th St and S 320th S. The new facility to be constructed with bike lanes and sidewalks 32nd Ave S Military Rd S 2030 S 320th St

49 Sponsor: FEDERAL WAY Project ID: 3660 Title: City Center Access Phase 4A: S 320th I-5 I/C HOV lanes Estimated Cost: $120,615,838 Add two HOV lanes and widen existing bridge structure to the south with HOV lanes on S 320th St from 25th Ave S to 32nd Ave S, retrofit to current standards existing HAL loop ramp, modify existing ramps, add CD lane. S 320th I-5 I/C S 320th I-5 I/C 2025 Sponsor: FEDERAL WAY Project ID: 3350 Title: Federal Way Trail to Transit Center Class 1 bike trail Trail to Transit Center 28th Ave S 2030 Estimated Cost: $1,953,872 S 288th St Sponsor: FEDERAL WAY Project ID: 2019 Title: S 348th St Estimated Cost: $10,961,167 HOV - Widen to a 6 lane cross section, 2 GP, 1 HOV each direction. S 348th St 1st Ave S th Ave S

50 Sponsor: FEDERAL WAY Project ID: 2023 Title: S 356th St Estimated Cost: $7,710,214 Major Widening to 5 lanes. Provides sidewalks and bike lanes; improves freight movement; fixes bottlenecks at SR 161/S 356 St S 356th St SR SR 161 Sponsor: FEDERAL WAY Project ID: 2863 Title: S Park-and-Ride Trail Shared use bike path S Park-and-Ride Trail S 348th St 2020 Estimated Cost: $575,307 S 352nd St Sponsor: FEDERAL WAY Project ID: 2061 Title: SR 99 MTP Status: Approved Estimated Cost: $19,214,281 Add HOV lanes, sidewalks, street lighting, raised medians, access management, construct new traffic signal at S 344th Street, add southbound left-turn lane at SR 18. SR 99 S 359th St 2017 S 340th St

51 Sponsor: FEDERAL WAY Project ID: 1200 Title: SR 99 Phase IV MTP Status: Completed Estimated Cost: $25,455,371 CONSTRUCT HOV LANES SR 99 S 312TH ST 2012 SR 509 (S 297th vicinity) Sponsor: FEDERAL WAY Project ID: 3352 Title: Steel Lake Trail Class 1 Bike path Steel Lake Trail 28th Ave S 2030 Estimated Cost: $1,953,872 S 290th Pl

52 Sponsor: FIFE Project ID: 2897 Title: Puyallup Riverfront Trail Estimated Cost: $2,550,888 Shared use bike path Puyallup Riverfront Trail Pierce County Fife/Tacoma city limits 2025 Fife/Pierce Co limits Sponsor: FIFE Project ID: 122 Title: Valley Ave E MTP Status: Completed Estimated Cost: $17,265,439 Widen and reconstruct existing two-lane roadway to major arterial standards (to four lanes), including non-motorized plan elements. Valley Ave E Pierce County Freeman Rd E th Ave E

53 Sponsor: GIG HARBOR Project ID: 5520 Title: Cushman Trail (phase 3 and 4) Estimated Cost: $3,747,504 Shared Use path new Pierce County 96th Street NW 2015 Borgen Boulevard NW Sponsor: GIG HARBOR Project ID: 5504 Title: Cushman Trail (Phase 4) Shared use path Cushman Trail Pierce County Borgen Blvd NW 2040 Purdy Estimated Cost: $3,551,912

54 Sponsor: ISSAQUAH Project ID: 4113 Title: 12th Ave NW/SR900/NW Sammamish Rd Widening Estimated Cost: $7,134,529 Widen 12th Avenue NW at SR900/NW Sammamish Road to provide for an additional westbound left-turn lane that will provide dual left-turn lane capacity. In addition, add a northbound right turn lane approaching 12th Ave NW. Right of way will be required and the cost and amount necessary is undertermined at this time. SR-900 and 12th Ave NW SR Lake Drive Sponsor: ISSAQUAH Project ID: 265 Title: E Lake Sammamish Pkwy MTP Status: Approved Estimated Cost: $9,657,716 Design and roadway widening construction to provide for an additional south bound lane widening, constructing curb, gutter, bike lanes, street lights, sidewalks, landscaping and drainage system. E. Lake Sammamish Pkwy SE 56th St 2016 Issaquah-Fall City Rd

55 Sponsor: ISSAQUAH Project ID: 2883 Title: I-90 High Point Trail MTP Status: Completed Estimated Cost: $1,856,951 Shared use bike path I-90 Trail Planned E Lake Sammamish Trial 2007 Easterly End of 1st Ave NE Sponsor: ISSAQUAH Project ID: 4543 Title: I-90 HOV Direct Access Ramp Estimated Cost: $74,590,158 Will improve speed and reliability of transit and other HOV modes and, therefore, increase ridership and decrease SOV travel. Vanand car-pools, jitneys and buses all can use this to complement and support HCT and to provide smaller transit and HOV usage to activity centers that are too small to support HCT but of which there are many in. This project was identified in the I-90 Corridor Study. SR 900 SR

56 Sponsor: ISSAQUAH Project ID: 2270 Title: Newport Way Estimated Cost: $12,080,205 Widen Southbound direction to 2 lanes from Maple Street to south of Holly Street then transition to one lane each direction to Sunset Way. Northbound will continue to be one lane from Sunset Way to Maple St. Includes 3 roundabout intersections, bike lanes, sidewalk on one side, shared use facility with landscaping buffer on other side and stormwater system. Newport Way NW Maple St 2016 W. Sunset Way Sponsor: ISSAQUAH Project ID: 4112 Title: SR 900 Pedestrian/Non-Motorized Improvement MTP Status: Completed Estimated Cost: $7,785,642 New non-motorized multi-use trail along SR 900 SR 900 I-90 Eastbound Ramps th Avenue NW/NW Sammamish Rd Sponsor: KENMORE Project ID: 2292 Title: 68th Ave NE Estimated Cost: $3,690,221 Widen to add additional GP lanes - estimated additional NB lane 68th Ave NE NE 175th St 2018 NE 170th St.

57 Sponsor: KENT Project ID: 1563 Title: 212th Street Estimated Cost: $37,295,079 Grade Separated Railroad Crossing 212th St BNSF railroad crossing 2019 BNSF railroad crossing Sponsor: KENT Project ID: 3612 Title: East Valley Highway (84th Ave. S.) Improvement Project MTP Status: Completed Estimated Cost: $9,168,082 This project will widen East Valley Highway (84th Ave. S.) between SR 167 and S. 212th St by providing: Continuous SB GP lane from S. 216th St. to SR 167; Continuous NB GP lane from SR 167 to S. 212th St.; New deceleration lane SB at 216th St.; Complete sidewalk system on the E side of road with new curb, gutter, sidewalk where not currently existing; new sidewalk on W side of roadway from S. 212th to S. 224th where missing currently; overlay of entire roadway; upgrades to existing traffic signal system at S. 212th, S. 216th, S. 220th, and S. 224th streets as needed to accommodate widening. East Valley Highway (84th Ave. S.) SR S. 212th St.

58 Sponsor: KENT Project ID: 3643 Title: S 228th St Grade Separation MTP Status: Approved Estimated Cost: $29,911,563 Grade separation of the roadway from the Union Pacific Railroad tracks. A bridge will be constructed at the track locations, and the road will run over the tracks and the adjacent Interurban Trail. S 228th St 500 ft west of the Union Pacific Railroad tracks ft west of the Burlington Northern Santa- Fe railroad tracks Sponsor: KENT Project ID: 5538 Title: S 228th St Grade Separation MTP Status: Completed Estimated Cost: $28,428,345 Grade separation of the roadway from and BNSF railroad tracks. Bridges will be constructed at the track locations and the road will run under the tracks. new S 228th / BNSF railroad 2009

59 Sponsor: KENT Project ID: 2007 Title: S 272nd St Estimated Cost: $9,471,766 Major Widening Phase I (including HOV, sidewalks and bike lanes) S 272nd St Military Road 2019 Pacific Highway South Sponsor: KENT Project ID: 1564 Title: South 212th Street Estimated Cost: $31,967,211 Grade Separated Railroad Crossing in Kent - Fast Phase II 212th St UPRR crossing 2020 UPRR crossing Sponsor: KENT Project ID: 2026 Title: West Valley Highway Estimated Cost: $23,679,415 Major Widening including Complete Streets, three lanes each direction and center left-turn lane W Valley Hwy West Meeker Street 2023 Vicinity of South 218th Street

60 Sponsor: KENT Project ID: 5289 Title: Willis Street Grade Separations Estimated Cost: $55,646,626 Provides a critical, grade-separated link through the commercial/industrial center of Kent. Links the valley warehouse/industrial center to SR 167 and I-5. Willis St SR Central Avenue South

61 Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE) Project ID: 5375 Title: Passenger Only Ferry: Kenmore-UW Estimated Cost: $10,135,323 Passenger Only Ferry - new route: Kenmore-UW This future Ferry District passenger-only ferry route is a 8.3 nautical mile route serving Tracy Owen Station Park in Kenmore to the University of Washington. POF route Multicounty Kenmore 2020 UW Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE) Project ID: 5368 Title: Passenger Only Ferry: Kirkland-UW Estimated Cost: $494,406 Passenger Only Ferry - new route: Kirkland-UW This future Ferry District passenger-only ferry route is a 6.0 nautical mile route serving Marina Park in downtown Kirkland to the University of Washington. POF route Multicounty Kirkland 2020 UW

62 Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE) Project ID: 5374 Title: Passenger Only Ferry: Renton-Leschi Estimated Cost: $10,135,323 Passenger Only Ferry - new route: Renton-Leschi This future Ferry District passenger-only ferry route is a 7.1 nautical mile route serving the City of RentonÆs Gene Coulon Memorial Beach Park to Leschi Park on Lakeside Avenue South. POF route Multicounty Renton 2040 Leschi Park in Seattle Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (ROADS) Project ID: 4471 Title: East Lake Sammamish Trail, South Sammamish Segment A MTP Status: Approved Estimated Cost: $5,747,954 Develop a 1.3 mile-long paved regional trail segment within the City of Samammish. The trail will be constructed from SE 43rd Way to SE 33rd Street. County Owned ROW SE 43rd Way SE 33rd Street

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis

APPENDIX H Transportation Projects Considered for Cumulative Impact Analysis Final Supplemental Environmental Impact Statement on the Regional Transit Long-Range Plan APPENDIX H Transportation Projects Considered for Appendix H Transportation Projects Considered for Cumulative

More information

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements

Welcome! This open house provides an early look at: Garage layout and access Potential pedestrian, bicycle and transit improvements Welcome! Sound Transit is improving access to Station for drivers, pedestrians, bicyclists and bus riders, including construction of a new garage. This open house provides an early look at: Garage layout

More information

PLEASE READ Proposal for Sustainable Service

PLEASE READ Proposal for Sustainable Service IMPORTANT PLEASE READ 019 Proposal for Sustainable Service 019 Service Change Proposal IMPLEMENT A SUSTAINABLE NETWORK Everett Transit completed its Long Range Plan in May, and the plan was adopted by

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

November 21, 2012 Barbara Kelleher, (954)

November 21, 2012 Barbara Kelleher, (954) November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related

More information

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION WELCOME AND AGENDA Welcome At tonight s open house you will have the opportunity to: See updated design plans for the southeast and downtown stations and track Help shape the look and feel of light rail

More information

Additional Economic Development Strategy submissions- Klickitat County

Additional Economic Development Strategy submissions- Klickitat County Klickitat County Transportation Improvement Projects 1 White Salmon to Hood River Bridge Final EIS, design, bridge replacement 2 Klickitat County Rural Arterials Reconstruct to all-weather roads Part of

More information

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015 East Link Project Update Maintenance of Traffic During Construction April 21, 2015 1 Agenda TFP project 242 Bellevue Way HOV Bellevue Way - Maintenance of Traffic During Construction Early Work Utilities

More information

All questions in this survey were voluntary; all results are based on number of respondents who answered the relevant question.

All questions in this survey were voluntary; all results are based on number of respondents who answered the relevant question. Online Survey Results Sound Transit 3 Draft Plan Introduction An online survey was one of the primary methods employed to solicit feedback on Sound Transit 3 Draft Plan. The results of the March 29 May

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact:

user s guide to Transportation Improvements in Astoria Planning Efforts outside Astoria for more information, contact: The Miles Crossing/ Jeffers Garden transportation plan (underway), will identify needed improvements to the Warrenton Astoria Highway and local street improvements to serve expected growth in the Miles

More information

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON

CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON Council Meeting Date: August 8, 2016 Agenda Item: 8(a) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Adoption of Resolution No. 393 Stating the City Council s Support for Sound Transit

More information

Updating the vision for regional transit

Updating the vision for regional transit Updating the vision for regional transit Sound Transit is beginning the process of analyzing transportation corridors throughout the region to identify which are most appropriate for future high capacity

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

CENTRAL AND EAST CORRIDORS

CENTRAL AND EAST CORRIDORS HIGH-CAPACITY TRANSIT STUDY CENTRAL AND EAST CORRIDORS SEPTEMBER 2014 CORRIDOR REPORT: UNIVERSITY DISTRICT-KIRKLAND-REDMOND HIGH-CAPACITY TRANSIT CORRIDOR STUDY University District-Kirkland-Redmond Corridor

More information

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Analette Ochoa and Wana Chiu, WRECO Parag Mehta, Kimley Horn Date: November 7, 2017 Re: Santa Cruz Route 1 Tier I and Tier II HOV

More information

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP). A 7-day public comment period regarding the amendment begins January

More information

1.0 Purpose and Organization of the Community Impact Assessment Addendum

1.0 Purpose and Organization of the Community Impact Assessment Addendum Memorandum To: From: cc: Laura Prickett, Horizon Water and Environment Carie Montero, Senior Project Manager/Environmental Lead, Parsons Transportation Group Parag Mehta, Kimley Horn Date: September 24,

More information

Learn more and comment. See page 10 for details. Proposed Fall 2018 / Spring 2019 SERVICE EXPANSION. and FARE CHANGE

Learn more and comment. See page 10 for details. Proposed Fall 2018 / Spring 2019 SERVICE EXPANSION. and FARE CHANGE Learn more and comment. See page 10 for details. Proposed Fall 2018 / Spring 2019 SERVICE EXPANSION and FARE CHANGE Proposed Fall 2018/Spring 2019 Service Expansion & Fare Change Community Transit proposes

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Table of contents. Sound Transit 2 Plan map... A-2

Table of contents. Sound Transit 2 Plan map... A-2 Table of contents Sound Transit 2 Plan map... A-2 Total agency Summary of estimated ST2 program costs and revenues... A-3 Total sources/uses of funds... A-4 Financial plan sources and uses summary for

More information

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY Santa Fe, Oregon, and California ational Historic Trails : overview 99: p.134 100: p.135 GARDER JUCTIO 102: p.137 56: p.126 EDGERTO Burlington orthern Intermodal and Logistics 98: p.133 101: p.136 S Waverly

More information

October 12th 2015 DRAFT Service Implementation Plan

October 12th 2015 DRAFT Service Implementation Plan October 12th 2015 DRAFT 2016 Service Implementation Plan Page left intentionally blank 2016 Service Implementation Plan Executive Summary This coming year is shaping up to be one of the most significant

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd

Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Abbott Rd Rehabilitation Phase II - Elmore Rd to Birch Rd Project ID SOA07003 Department State of Alaska Project Type Improvement Start Date December 2017 Location Assembly: Section 4, Seats F & G, Assembly:

More information

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013 FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

(C)Flexible Fare Effective Date: May 1, 2014

(C)Flexible Fare Effective Date: May 1, 2014 1 st Revised Page 7 Tariff No. 11 Cancels Original Page 7 Door-to-Door Rate Schedule Fares named are for adults (persons 18 years age and over) stated in dollars and cents. One child 17 and under rides

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps Section 106 Update Memo #1 Attachment D Traffic Diversion & APE Expansion Methodology & Maps I-65/I-70 North Split Interchange Reconstruction Project (Des. Nos. 1592385 & 1600808) Traffic Diversion and

More information

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

SANTA CLARA COUNTY I-280 CORRIDOR STUDY SANTA CLARA COUNTY I-280 CORRIDOR STUDY Appendix B 2 Technical Memorandum Existing Transportation Condition Memo SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA) 1-1 Introduction The I-280 Corridor Study

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

4. Safety Concerns Potential Short and Medium-Term Improvements

4. Safety Concerns Potential Short and Medium-Term Improvements NH Route 104 Access Management Study Page 19 4. Safety Concerns Potential Short and Medium-Term Improvements Potential safety improvement strategies are listed by priority based on field observations by

More information

DRAFT Service Implementation Plan

DRAFT Service Implementation Plan 2017 Service Implementation Plan October 2016 SECTION NAME 2017 Service Implementation Plan October 2016 2017 SERVICE IMPLEMENTATION PLAN TABLE OF CONTENTS Table of Contents... I List of Tables... III

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) 2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE) TABLE OF CONTENTS Introduction 1 Transportation Planning Activities 2 Identification of Problem Areas and Recommended Solutions 7 DeKalb County Projects

More information

THREE MILE PLAN TOWN OF SUPERIOR COLORADO

THREE MILE PLAN TOWN OF SUPERIOR COLORADO THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate

More information

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars

FY Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars FY2016-2020 Regional Transportation Improvement Program Basic Project List () All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell 13055 2018 $1,367 10th Avenue

More information

FY Transportation Improvement Program Basic Project List (in Thousands)

FY Transportation Improvement Program Basic Project List (in Thousands) FY2010-2014 Transportation Improvement Program Basic Project List (in Thousands) Project Name Key # Year Project Cost 16th Avenue North, 7th Street North to Garrity Boulevard GU09308 2011 $592 21st Avenue

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

Sound Transit Service Standards and Performance Measures Edition

Sound Transit Service Standards and Performance Measures Edition Sound Transit Service Standards and Performance Measures 2018 Edition Table of Contents EXECUTIVE SUMMARY....1 INTRODUCTION TO SERVICE STANDARDS AND PERFORMANCE MEASURES....5 SERVICE DESIGN SERVICE PERFORMANCE

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP October 31, 2012 INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP ADOT FHWA MAG City of Phoenix City of Tempe City of Chandler Valley Metro/RPTA October 31, 2012 1 Agenda Introductions Background Purpose

More information

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY Final Report Research Project Agreement No. T1803, Task 4 HOV Monitoring V HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY by Jennifer Nee TRAC Research Engineer John Ishimaru TRAC Senior

More information

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION

LONG TERM (OPERATION) IMPACTS AND POTENTIAL MITIGATION 3.6 This chapter provides a project-level analysis of potential impacts to recreation sites in the study area including parks, natural areas, open spaces, trails, and playfields, as well as amenities such

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

East Link Extension. Park-and-ride options during East Link construction

East Link Extension. Park-and-ride options during East Link construction East Link Extension Park-and-ride options during East Link construction Spring 2017 When East Link opens in 2023, Eastside commuters will be able to travel from downtown Bellevue to downtown Seattle in

More information

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane

More information

Appendix 4.1 L. No-Build Project Descriptions

Appendix 4.1 L. No-Build Project Descriptions Appendix 4.1 L No-Build Project Descriptions No-Build Projects New Bedford A new traffic signal system was installed and activated in early 2009 at the intersection of King s Highway and Mount Pleasant

More information

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016 Route 141 and I-44 Design-Build Project Community Involvement Group March 21, 2016 Purpose of CIG 1. Share information with major stakeholders 2. Keep stakeholders informed of the process 3. Reduce uncertainty

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015 1 SEGMENT 1 2 THE WISHBONE Connects the TEXpress Managed Toll System to the 35Express Managed Toll System Limits: Crown Road (near Royal Lane) to Valley

More information

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness,

BROWARD COUNTY TRAFFIC IMPACT REPORT March 13 through March 20, March 13, 2015 Chuck McGinness, From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 03 13 15 through 03 20 15 Date: Friday, March 13, 2015 2:43:29 PM Attachments: image001.png BROWARD COUNTY

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

Title VI Analysis for Route Based Fares

Title VI Analysis for Route Based Fares ATTACHMENT 2 Title VI Analysis for Route Based Fares BACKGROUND Title VI policy requires analysis of proposed fare changes to identify disparate or disproportionate impacts to minority and low income populations.

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures

More information

Main Line System Recommendations

Main Line System Recommendations (Existing) Main Line System Recommendations This system recommendation focuses mobility investment in a central main line corridor proximate to I-290. A bus rapid transit (BRT) line at each end of the

More information

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No.

Georgetown-Lewes Rail/Trail Study. Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. Georgetown-Lewes Rail/Trail Study Rail/Trail Study: Cool Spring to Cape Henlopen State Park New Road Extension (House Resolution No. 47) August 22, 2011 Presentation Outline Background Benefits Statewide

More information

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday, September 10, 2018 through Monday, September 17, 2018 S. Perry Park Rd. (DC105) and Red Rocks Dr. Intersection Improvements Safety improvements on the S. Perry Park Road (DC 105) and

More information

Regional Wayfinding Sign Strategy Thurston County Trails 2017

Regional Wayfinding Sign Strategy Thurston County Trails 2017 Regional Wayfinding Sign Strategy Thurston County Trails 2017 Partners: Members and partnering organizations of the Thurston Thrives Community Design Action Team City of Lacey, City of Olympia, City of

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Non-Motorized Transportation

Non-Motorized Transportation Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane

More information

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015

May 1, 2015 Chuck McGinness, BROWARD COUNTY TRAFFIC IMPACT REPORT May 1 through May 8, 2015 From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 05 01 15 through 05 08 15 Date: Friday, May 01, 2015 3:10:15 PM Attachments: image001.png May 1, 2015

More information

5.7 Local road upgrades

5.7 Local road upgrades 5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and

More information

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015

FDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015 From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction

More information

Palm Beach County Traffic Report August 24 through August 31, 2012

Palm Beach County Traffic Report August 24 through August 31, 2012 For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will

More information

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required.

As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. REPORT FOR ACTION Construction Staging Area - 81 Bay Street Date: December 11, 2017 To: Toronto and East York, Community Council From: Acting Director, Transportation Services Toronto and East York District

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015 May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

October 31, 2014 Chuck McGinness, (954)

October 31, 2014 Chuck McGinness, (954) From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

Construction Update. Local Officials Briefing March 2016

Construction Update. Local Officials Briefing March 2016 Construction Update Local Officials Briefing March 2016 1 History: Chicago-St. Louis Corridor Since 1980 s IDOT has been looking at this corridor for high-speed service 1992 Designated a HSR Corridor EIS

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane

More information

APPENDIX F List of Commitments

APPENDIX F List of Commitments APPENDIX F List of Commitments s Table F.1 Standard Mitigation Measures Mitigation Measure MnDOT Specification Number Status Update Description Status Update Utilities Provide early notice to utility operators

More information

University Region Non-Motorized Plan 2015

University Region Non-Motorized Plan 2015 Non-Motorized Transportation Non-motorized facilities are important components to the transportation system. They provide an environmentally-friendly, low-cost mode of travel. Some of the facilities can

More information

FDOT Treasure Coast Traffic Report through

FDOT Treasure Coast Traffic Report through FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

2009 Regional Solicitation Selected Projects*

2009 Regional Solicitation Selected Projects* 2009 Regional Solicitation Selected Projects* Special Federal Allocation from the MPO Mn/DOT I-494/TH169 Interchange Reconstruction $34,000,000 Surface Transportation Program - Urban Guarantee AR-09-10

More information

Purpose and Need for the Proposed Project

Purpose and Need for the Proposed Project Purpose and Need for the Proposed Project Introduction Snohomish County Airport/Paine Field (PAE) is located in Snohomish County, Washington, approximately 20 miles north of Seattle. Figure A1 depicts

More information

PRIORITIES COMMITTEE MEETING

PRIORITIES COMMITTEE MEETING PRIORITIES COMMITTEE MEETING Meeting Date: 05/13/14 Agenda Item #: 13.1 Northeast Anthony Henday Drive Update Report Purpose To update the Priorities Committee on the progress of the Northeast Anthony

More information

Title VI Service Equity Analysis

Title VI Service Equity Analysis Pierce Transit Title VI Service Equity Analysis Pursuant to FTA Circular 4702.1B September 2013 Service Change February 2013 Page intentionally left blank PIERCE TRANSIT TITLE VI SERVICE EQUITY ANALYSIS

More information

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT 5.8 FUNDING TRAILS DEVELOPMENT The City has been successful in establishing dedicated local funding sources as well as applying for grants to develop the City s trail system, having received nearly $2.4

More information

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded

FY Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded FY2011-2015 Transportation Improvement Program Basic Project List (in Thousands) - Application Not Funded Requesting Agency: ACHD Project Name Key # Year Project Cost ACHD Thin Lift Overlay Projects 11922

More information

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014

May 16, 2014 Chuck McGinness, (954) BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 May 16, 2014 Chuck McGinness, (954) 777-4090 chuck.mcginness@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT May 16 through May 23, 2014 FORT LAUDERDALE -- Construction and maintenance-related lane

More information

Everett Riverwalk Life style explore

Everett Riverwalk Life style explore Life style explore Project Overview The 217-acre Everett Riverfront redevelopment is visible from I-5 with traffic counts charted at 170,000+ vehicles per day with direct freeway access from 4-way interchange.

More information

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts

Electric System Serving Pierce County Current system and future investments. Janet Olsen Steve Botts Electric System Serving Pierce County Current system and future investments Janet Olsen Steve Botts Project Manager Real Estate t / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information

Electric System Serving Pierce County Current system and future investments

Electric System Serving Pierce County Current system and future investments Electric System Serving Pierce County Current system and future investments Janet Olsen Project Manager Steve Botts Real Estate / Rights-of-Way April 13, 2011 Presentation overview Information requested

More information