1 From the Philadelphia Inquirer $60M Montco transportation project gets rolling Jessica Parks, Inquirer Staff Writer POSTED: Wednesday, September 11, 2013, 1:08 AM 60M_Montco_transportation_project_gets_rolling.html NORRISTOWN A revitalization effort decades in the making took off this week, when local officials broke ground on a $60 million transportation project. The Lafayette Street expansion is expected to reduce traffic, spur economic development in the dilapidated Montgomery County seat, and restore access to a riverfront long hidden behind industrial walls and abandoned lots. Norristown has suffered from a lack of easy highway access, with developers gravitating toward hubs like Upper Merion and Plymouth Meeting. But the municipality has been planning for a comeback, pinning its hopes on downtown and the riverfront. "This is the catalyst we've been waiting for," Norristown Planning Director Jayne Musonye said of the project. On Monday, officials from across the region gathered for a groundbreaking ceremony to mark the first phase - extending Lafayette Street from where it dead-ends at Ford Street to Conshohocken Road in Plymouth Township. Musonye said developers are already calling about the area.
2 Closing that half-mile gap on Lafayette will open up a new route to the Norristown Transit Center and train station, and the Montgomery County courthouse, cutting traffic in half on commuter-choked Ridge Pike and Main Street, County Commissioner Leslie S. Richards said. At Monday's gathering of current and former county and municipal officials, Richards also touted plans to widen Ridge Pike; add parking areas, landscaping, and streetlights; relocate and widen the Schuylkill River Trail; and add "parklike" access points to the river. The long-range project calls for new exits off the Pennsylvania Turnpike and Route 202. Planning and funding for those phases are still being worked out. According to the 2009 Economic Revitalization Strategy, Norristown's top three long-term priorities revolve around the Lafayette Street project and its promise of river access. "So many people now drive through Norristown and do not even realize that we are on the Schuylkill River," Richards said. Ruth Damsker, who worked on the Lafayette project as a county commissioner a decade ago, said Norristown "is really a jewel... that just needs some TLC." Musonye said the borough's revitalization plan was modeled in part after areas like Manayunk and Conshohocken that have used the river as a focal point of redevelopment. "We need to be able to use that as an asset," she said. Traffic in the area will get worse during construction. But Richards said she hoped people will see "the promise on the other side." "Construction is painful. There will be a lot of it before things get better," said Richards, who commutes from Whitemarsh to Norristown. "I will be sharing in your pain." Contact Jessica Parks at jparks@philly.com, , or follow on JS_Parks.
3 From the Norristown Times-Herald Lafayette Street corridor groundbreaking set for Monday in Norristown By POSTED: 09/07/13, 5:15 PM EDT NORRISTOWN A groundbreaking ceremony for the first contract to extend Lafayette Street into Plymouth and widen it to four lanes will be held at 2 p.m. Monday at Ford and Lafayette streets. The $11.5 million contract with Allan A. Myers Inc. of Worcester will extend the existing Lafayette Street from Ford Street to Conshohocken Road. The 0.6-mile extension will have two lanes in each direction and a 12-foot landscaped median in the center. We are building a new road bridge over Ross Street for Lafayette Street. Ross Street is where the Schuylkill River Trail crosses under the Norfolk Southern railway bridge, said Leo Bagley, the assistant director of the Montgomery County Planning Commission. We are building a noise wall from Ross Street toward Conshohocken Road to protect the residences on Ross Street and Chestnut Street in Plymouth. The Schuylkill River Trail will be relocated and rebuilt next to the Lafayette Street extension, where it will serve as a sidewalk for the roadway. Trail users around the Ross Street crossing may be affected by limited closures for bridge work. Construction on the 15-month project started on Aug. 12 in the Ross Street area with work on relocating sewer, natural gas and power lines. We are doing this to improve road access into Norristown and into Plymouth, Bagley said. The project will improve traffic flow and lessen congestion on Main Street and Ridge Pike. It will encourage the redevelopment of Norristown in the downtown area and the riverfront area. Updates on the progress of the construction project will be posted at every two weeks. Construction will be paid by 80 percent federal funding and 20 percent funding from Montgomery County. The extension of Lafayette Street will continue in August 2014 with a second contract for about $20 million. The second contract award will be made in spring The second project will extend Lafayette Street to Diamond Avenue in Plymouth and reconstruct and widen Diamond Avenue, as well as Ridge Pike from the Pennsylvania
4 Turnpike bridge to the Norristown border line. As part of Phase II, the Conshohocken Road connection to Ridge Pike will be abandoned, and the Diamond Avenue intersection with Ridge Pike will replace it with a new traffic light. Phase II will take two years to complete and will be finished in summer Funding for the second contract has already been secured, Bagley said. A third contract of about $20 million to widen the existing Lafayette Street in Norristown will be awarded in late 2015 and begin in spring The reconstruction and widening of the existing Lafayette Street in Norristown, from Ford Street to Barbadoes Street, will include two lanes in each direction and the landscaped median. The Schuylkill River Trail in that area will be relocated and rebuilt. As part of that project, the Saw Mill Run storm culverts will be replaced during a 12- week period in 2016 when traffic will detoured off Lafayette Street. The two-year project, to be completed in late 2017, has not been funded yet. The proposed connection of the Lafayette Street extension into a new Pennsylvania Turnpike interchange depends on new state revenue for the Pennsylvania Turnpike Commission and the Pennsylvania Department of Transportation (PennDOT). Another proposal to build a Dannehower Bridge interchange with Lafayette Street may come in 30 years, when PennDOT replaces the Dannehower Bridge. The bridge was built in the 1960s and will be 80 years old at that time, Bagley said. The invited guests for the groundbreaking ceremony include state and federal elected officials, the current and former county commissioners, elected officials from Norristown and Plymouth and business supporters of the project. Since we have been at this for 13 years we have a lot of people who have had a hand in the project. There has been a lot of bipartisan support, Bagley said. Business people have championed the cause for this project. It is going to make downtown Norristown and the riverfront more marketable along with Plymouth. The commitment over a long period of time speaks to the understanding of the importance of the project to Plymouth and, in particular, to Norristown, said Frank Custer, the Montgomery County director of communications. People have remained committed to it, and interest has not waned. The $50 million-plus Lafayette Street project and the ongoing reconstruction of Markley Street for $45 million represents a huge investment in Norristown and the county seat, Bagley said. It will benefit motorists who travel everywhere. Follow Carl Rotenberg on
5 From the Norristown Times-Herald Lafayette Street corridor project underway in Norristown Montgomery County Commissioners Josh Shapiro and Leslie Richards hold a ground breaking ceremony for the Lafayette Street Project near Ford Street in Norristown Sept. 9, Photo by Gene Walsh / Times Herald Staff By crotenberg@timesherald.com">carl Rotenberg,crotenberg@timesherald.com POSTED: 09/09/13, 5:45 PM EDT UPDATED: 18 HRS AGO NORRISTOWN The Monday afternoon groundbreaking ceremony for the $11.5 million Lafayette Street corridor project attracted nearly 100 state and local leaders and community members to the intersection of Ford and Lafayette streets. Today we break ground on a transformative project more than a decade in the making, said Montgomery County Commissioners Chairman Josh Shapiro. It will open up a critical corridor to our county seat, create jobs, make our waterfront more accessible and ease congestion.
6 The 0.6-mile extension of the existing Lafayette Street, from Ford Street to Conshohocken Road, will have two lanes in each direction and a 12-foot landscaped median in the center. The Schuylkill River Trail will be relocated and become the sidewalk for the Lafayette Street extension. Shapiro said the project began in March 2000 when the commissioners awarded a $50,000 contract in March 2000 to improve road access to Norristown. He thanked former Congressman Joseph Hoeffel for securing a $10 million federal highway grant in 2001 that was followed by an additional $20 million obtained by Hoeffel, Congressman (James) Gerlach and (U.S.) Senator (Arlen) Specter for the project. This project is critical to both Plymouth and Norristown, Shapiro said. It will improve access to both municipalities, increase traffic flow and reduce congestion on Ridge Pike and Main Street and will encourage development of Norristown s downtown and its under-utilized riverfront area. This is how government is supposed to work. With everyone working together, Shapiro said. It s also an example of the critical role that government can play when we work together at each level - federal, state, county and local. Montgomery County Vice Chairman Leslie Richards said the project would change the way Norristown is perceived. This is a huge day for transportation, Richards said. I m very excited to see the changes coming over the next years. Crandall Jones, the Norristown municipal administrator, called the road project an economic infusion of capital into the community. We are excited to partner with everyone, Jones said, and we are looking forward to seeing this transformation come to life. Plymouth Council Chairman Sheldon Simpson said the project would relieve the congestion of traffic on Ridge Pike for Plymouth residents. This project will open up Ridge Pike, Simpson said. Over the next 15 years it will open up new opportunities for businesses on Conshohocken Road. We re excited by that prospect. The 15-month project, the first of three contracts, will be completed with 80 percent federal funding and 20 percent funding from Montgomery County. The extension of Lafayette Street will continue in August 2014 with a second contract for about $20 million. That contract award will be made in spring The second project will extend Lafayette Street to Diamond Avenue in Plymouth and reconstruct and widen Diamond Avenue, as well as Ridge Pike from the Pennsylvania Turnpike bridge to the Norristown border line. As part of Phase II, the Conshohocken Road connection to Ridge Pike will be abandoned, and the Diamond Avenue intersection with Ridge Pike will replace it with a new traffic light. Phase II will take two years to complete and will be finished in summer Funding for the second contract has already been secured.
7 A third contract of about $20 million to widen the existing Lafayette Street in Norristown will be awarded in late 2015 and begin in spring The reconstruction and widening of the existing Lafayette Street in Norristown, from Ford Street to Barbadoes Street, will include two lanes in each direction and the landscaped median. The Schuylkill River Trail in that area will be relocated and rebuilt. The two-year project, to be completed in late 2017, has not been funded yet. Hoeffel, a former Montgomery County commissioner, attended the groundbreaking along with former county commissioners Jim Matthews and Ruth Damsker. Hoeffel called the road project an economic development opportunity of the highest order. It is huge to open up the Norristown waterfront and it will grant enough access to encourage development of the waterfront. Follow Carl Rotenberg on
8 From the Doylestown Intelligencer Montco breaks ground on transportation project to spark Norristown's economy Photo: Rick Kintzel Groundbreaking for Lafayette Street Corridor Transportation Project intended to boost economic growth in Montco's county seat in Norristown. Posted: Tuesday, September 10, :00 am Updated: 7:00 am, Tue Sep 10, By Margaret Gibbons Staff writer Montgomery County and Norristown officials are hoping that a $100 million investment in asphalt, concrete and greenery will breathe new life into the county s economically downtrodden county seat in Norristown. This is a transformative project that has been more than a decade in the making, said county Commissioner Chairman Josh Shapiro. It will open up the critical corridor of our county seat. It will create jobs. It will make our under-utilized waterfront more accessible and will relieve congestion in Norristown and Plymouth. Shapiro s comments came Monday during a groundbreaking ceremony, attended by some 70 past and current government officials and planners, for the Lafayette Street Corridor construction project. The overall project, which has been on the drawing board since 2000 and has been through various design and engineering phases since that time, will cost an estimated $100 million, with some $60 million earmarked for actual construction. The federal government will pay 80 percent of the tab, with the county picking up the remaining 20 percent.
9 The first phase of the construction work began last month. That phase involves extending Lafayette Street, which now dead-ends at Ford Street in Norristown, 0.6 of a mile to Conshohocken Road and Diamond Avenue in Plymouth. This portion of the construction project, which also involves building a new bridge, carries an $11.5 million price tag. It should be completed within the next 15 months. The second phase calls for the widening and improvements of Ridge Pike, Diamond Avenue and Fairfield Road in Plymouth. During the third phase, Lafayette Street will be reconstructed and widened, and the county s popular Schuylkill River Trail will be relocated off of an existing viaduct and into a more park-like setting. Officials said they are hoping that construction on these two phases, which have not yet been put out to bid but will each cost an estimated $20 million, will wrap up by fall Future plans call for the construction of two new interchanges on the Pennsylvania Turnpike, one that would bring traffic into the Lafayette Street Corridor from the Ridge Pike area in Plymouth and another at Route 202 near the Dannehower Bridge between Norristown and Upper Merion. Officials have said they hope the Lafayette Street Corridor project will bring more traffic into the downtown Main Street business section of Norristown while also providing easy access to the riverfront along the Schuylkill River. Officials have looked at the 2 miles of riverfront as a prime area for new development that could spark the town s economy. Michael D. Marino, a Norristown native who was elected county commissioner in November 1999, immediately after his election went to the county planning commission, asking it to brainstorm what the county could do to help Norristown. One of those responses came from county transportation planning chief Leo Bagley, who suggested that access to the county seat needed to be improved if development and redevelopment was to take place. The Lafayette Street Corridor project evolved from that brainstorming session and had been carried through by subsequent administrations and planning commission boards. Margaret Gibbons: ; mgibbons@calkins.com;
10 From the Norristown Patch Lafayette Street Corridor Project Kicks Off in Groundbreaking Ceremony The project, to improve Norristown access, is over 10 years in the making. Posted by Nicole Foulke (Editor), September 10, 2013 at 04:00 PM Norristown Municipal Hall. The $11.5 million Lafayette Street corridor project groundbreaking ceremony brought almost 100 government and community members together at Ford Street and Lafayette Street in Norristown on Monday, according to The Times Herald. Today we break ground on a transformative project more than a decade in the making. It will open up a critical corridor to our county seat, create jobs, make our waterfront more accessible and ease congestion, said Josh Shapiro, Chairman of the Montgomery County Commissioners. The extension, 0.6 miles, will affect Lafayette Street from Ford Street to Conshohocken Road. There will be 2 lanes in each direction, as well as 12-foot-long median in the middle. The Schuylkill River Trail will be moved and will then be converted into the Lafayette Street extension sidewalk. According to Shapiro, the project was started in March 2000 when the thencommissioners bestowed a $50,000 contract that month to improve road access
11 going to Norristown. Shapiro thanked Joseph Hoeffel, the former Congressman, for obtaining a $10 million federal highway grant in There came later $20 million more obtained by Hoeffel, Congressman (James) Gerlach and (U.S.) Senator (Arlen) Specter for the project. The project is slated to take 15 months and is the first of three contracts. The funding breaks down into 20 percent from Montgomery county funds and 80 percent from federal funds. The Lafayette Street extension, which is to extend Lafayette Street to Diamond Avenue in Plymouth township, widen Diamond Avenue, and reconstruct a section of Ridge Pike, has a second contract of $20 million and will continue in Aug The connection between Conshohocken Road and Ridge Pike will be let go and replaced with a new traffic light where Diamond Avenue and Ridge Pike intersect. This is set to be completed in 2014 and funding has been obtained. A third, $20 million contract for increasing the size of Lafayette Street in Norristown is to be awarded in 2015 and is set to begin in early 2016.
Transportation Summary. Project Scope. Findings. Pennsylvania Turnpike Corridor Reinvestment Project Montgomery County
Pennsylvania Turnpike Corridor Reinvestment Project Montgomery County Transportation Summary Project Goal: To enhance Pennsylvania Turnpike accessibility within Montgomery County through new and modernized
More informationState Route 8 Corridor. Northern Summit County s Path to Success
State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity
More informationU.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County
U.S. ROUTE 202 SECTION 300 IMPROVEMENT PROJECT East Whiteland Township Tredyffrin Township Chester County TMACC Information Session January 24, 2011 U.S. Route 202 Section 300 Project Limits U.S. ROUTE
More informationSOUTHEASTERN PENNSLYVANIA TRANSPORTATION AUTHORITY TARIFF NO. 270 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION BY SEPTA S ROUTE 4
SOUTHEASTERN PENNSLYVANIA TRANSPORTATION AUTHORITY TARIFF NO. 270 GOVERNING THE FURNISHING OF PASSENGER TRANSPORTATION BY SEPTA S ROUTE 4 FILED: October 5, 2011 EFFECTIVE: On a date to be determined by
More informationProject Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design
RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall
More informationA. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1
Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia
More informationGuide to. Road Construction Projects
Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationTransportation TRANSPORTATION PROJECTS
Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William
More informationTRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE December 21, 2017 CONTACT: Sandy Myers 540-332-9201 (office) STA17-204 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationSTAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk
STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationTRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE January 11, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-007 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationPalm Beach County Traffic Report July 13 through July 20, 2012
For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be
More informationExit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)
RELEASE: IMMEDIATE March 1, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 3 March 9, 2019 All work is scheduled weather permitting. Real-time information
More informationOther Principle Arterials Minor Arterial Major Collector Minor Collector Local
CHAPTER 10 TRANSPORTATION Introduction The system of public roads in East Pikeland Township is decidedly rural in character. Since the 1984, the road network has remained much the same, with the addition
More informationPennDOT Interstate Work next week March 30-April 3:
PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)
More informationLong water shutdown scheduled for Tuesday, September 18
Thank you for your interest in the Center City Connector Streetcar. In this weekly update, you ll find information about ongoing construction for the 1st phase of utility work in Pioneer Square. Utility
More informationFDOT Treasure Coast Traffic Impact Report October 9 through October 16, 2015
From: Kathleen Dempsey To: Kathleen Dempsey Subject: FDOT Treasure Coast Traffic Report 10 09 15 through 10 16 15 Date: Friday, October 09, 2015 2:10:36 PM Attachments: image003.png CR 714_Median Construction
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Aug. 10, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT August 12 August 18, 2018 All
More informationDULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016
DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption
More informationFDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015
June 19, 2015 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015 TREASURE COAST Construction and maintenance-related lane
More information25 th Avenue Grade Separation. September 13, 2017
25 th Avenue Grade Separation September 13, 2017 Agenda I. Overview II. III. IV. Project Description Project Benefits Project Construction V. Next Steps VI. Questions 2 Overview Project Location 4 E. 25
More informationNTARIO S INFR STRUCTURE
INVESTING IN NTARIO S INFR STRUCTURE MOVING ONTARIO FORWARD Infr structure solutions. Made in ntario. Ontario s new 10-year economic plan includes over $130 billion in infrastructure investments to create
More informationFDOT Treasure Coast Traffic Report through
FDOT Treasure Coast Traffic Report 02 26 16 through 03 04 16 Kathleen Dempsey Fri 2/26/2016 2:56 PM To:Kathleen Dempsey ; 1 attachment 355 KB CR 714_Median Access Modifications.pdf;
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work
More informationINVESTMENT SUMMARY. RESIDENTIAL COMMERCIAL ** *
2017 Annual Report Belton Gateway Phase 2 Rendering INVESTMENT SUMMARY RESIDENTIAL 2015 2016 2017* NUMBER OF PERMITS ISSUED 18 106 101 INVESTMENT VALUE $2 Million $18 Million $20 Million COMMERCIAL 2015
More information1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET
Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt
More informationArea of Potential Effect Report
Area of Potential Effect Report Southeastern Pennsylvania Transportation Authority (SEPTA) King of Prussia Rail, Extension of the Norristown High Speed Line Upper Merion Township, Montgomery County, and
More informationStage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge
Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium
More informationNaugatuck River Greenway Steering Committee
This letter is being submitted in strong support of the City of Ansonia s application to the Department of Energy and Environmental Protection Recreational Trails Program for the funding to conduct a routing
More informationFDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016
March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016
RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationExit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)
RELEASE: IMMEDIATE Feb. 22, 2019 CONTACT: Darragh Frye 540-907-8409 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Feb. 24 March 2, 2019 All work is scheduled weather permitting. Real-time information
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT
RELEASE: IMMEDIATE Sept. 28, 2018 CONTACT: Darragh Frye 540 899 4119 (office) 540 907 8409 (cell) Darragh.Frye@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Sept. 30 Oct. 6, 2018 All
More informationSpringettsbury Township. Road Improvement Projects
Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route
More informationFor Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS
TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane
More informationWilliamsburg Town Hall Meeting
Williamsburg Town Hall Meeting DEVELOPMENT UPDATE ORANGE COUNTY PLANNING DIVISION November 30, 2017 1 AREA CONTEXT FUTURE LAND USE MAP MEADOW WOODS MEADOW WOODS GINN PROPERTY ZONING MEADOW WOODS MEADOW
More informationConstruction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013
FREDERICK COUNTY STATE HIGHWAY ADMINISTRATION -- Frederick County -- Line 1 PROJECT: I-7, Baltimore National Pike INTERSTATE CONSTRUCTION PROGRAM DESCRIPTION: Widen I-7 east of MD 355 to east of MD 144
More informationPennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects
PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned
More informationCarlisle Connectivity Projects Communication Plan and Project Status
Carlisle Connectivity Projects Communication Plan and Project Status Overview Communication Plan Communication Plan Communication Plan Objective The Borough staff will develop and execute timely and effective
More informationTHREE MILE PLAN TOWN OF SUPERIOR COLORADO
THREE MILE PLAN TOWN OF SUPERIOR COLORADO February 23, 2015 INTRODUCTION This document has been prepared by the Town of Superior, Colorado, to address the existing and proposed land uses within an approximate
More information2017 POLICY DOCUMENT. M1 Action Plan. Putting Queenslanders First
2017 POLICY DOCUMENT Putting 2 Contents Message from the Premier 3 Our Commitment 4 The Newman-Nicholls Legacy 5 The Palaszczuk 6 Government s Record Our Plans: Putting 8 Call: 07 3844 8101 Mail: PO Box
More informationViaduct Demolition at Girard Interchange
i-95news summer/fall 2015 2015 Stay current with construction at the Cottman Avenue, Betsy Ross Bridge/Aramingo Avenue and Girard Avenue interchanges at. PennDOT is enhancing communications with its I-95
More informationPalm Beach County Traffic Report August 24 through August 31, 2012
For Immediate Release August 24, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report August 24 through August 31, 2012 Palm Beach County Palm Beach County traffic will
More informationDecember 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program
December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South
More informationNorthern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017
Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society
More informationMiddle States Geographer, 1997,30: THE BLUE ROUTE: PAST, PRESENT, AND FUTURE
Middle States Geographer, 1997,30:124-134 THE BLUE ROUTE: PAST, PRESENT, AND FUTURE Kenneth W Reynolds Department of Geography and Urban Studies Temple University Philadelphia, PA 19122 ABSTRACT: This
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationN. Central St. & W. Jackson Ave. Streetscape Projects
N. Central St. & W. Jackson Ave. Streetscape Projects October 13, 2016 Meeting Overview North Central Street City of Knoxville KUB History & Vision Plan Timing Project Area Overview Schedule Communications
More informationApril 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014
April 4, 2014 Chuck McGinness, 954-777-4090 Chuck.McGinness@dot.state.fl.us FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014 TREASURE COAST Construction and maintenance-related lane closures
More informationTRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 2, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-042 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationFuller/Fuller Heights Road Improvements
Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to
More informationMonday, September 18, 2017 Sunday, October 1, 2017
Monday, September 18, 2017 Sunday, October 1, 2017 CONSTRUCTION UPDATE* Hurricane Irma cleanup is complete and some landscaping repairs are underway. The project was secure and no major damages were encountered.
More informationMANHEIM TOWNSHIP PLANNING COMMISSION MINUTES Wednesday September 19, 2007
MANHEIM TOWNSHIP PLANNING COMMISSION MINUTES Wednesday A meeting of the Manheim Township was held on Wednesday, at 6:30 p.m. The following members were present: Mr. Jeffrey Sturla; Mr. Steven Geisenberger;
More informationCity of Grand Island Tuesday, December 12, 2017 Council Session
City of Grand Island Tuesday, December 12, 2017 Council Session Item E-3 Public Hearing on One & Six Year Street Improvement Plan Council action will take place under Resolution item I-1. Staff Contact:
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More information35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS
35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS 35EXPRESS PROJECT OVERVIEW 2 ABOUT THE 35EXPRESS PROJECT 3 DESIGN-BUILD TEAM 4 PROJECT PARTNERS Great partnerships make this project work Collaboration
More informationFREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018
FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening
More informationBuilding Kendall a toll expressway: Traffic relief or 'Band-aid over a gaping wound?'
Building Kendall a toll expressway: Traffic relief or 'Band-aid over a gaping wound?' By Douglas Hanks April 20, 2018 08:47 PM Traffic is bad in West Kendall. Will extending the Dolphin Expressway, pictured
More informationExit 148 (Quantico) to Exit 133 (Route 17/Falmouth)
RELEASE: IMMEDIATE March 8, 2019 CONTACT: Tina.Bundy 540-907-8325 (mobile) VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT March 10 March 16, 2019 All work is scheduled weather permitting. Real-time information
More informationRELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)
RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye 540-899-4019 (office) 540-907-8409 (cell) Darragh.Frye@VDOT.Virginia.Gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT October 8 October 14,
More informationUnion Square. & Park Place. Project Summary Submitted by DeHoff Development Company
Union Square & Park Place Submitted by DeHoff Development Company December 18, 2012 encompass a 250-acre, mixed-use corporate campus that includes office, hotel, retail and residential components. The
More informationLANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS
LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS Presented at the SEE Development Excellence Workshop By Councilmember Wendy Davis, City of Fort Worth March 24,
More informationSusan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group
Susan Jones Moses Susan Jones Moses and Associates Glen Weisbrod Economic Development Research Group 2 SHRP2 C03: Interactions between Transportation Capacity, Economic Systems, and Land Use Economic Development
More informationTRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE March 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18 057 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationFuller Road/Fuller Heights Road Improvements
Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of
More informationSouth of Fraser Transportation Priorities March 2017 Engagement
March 20 Engagement Welcome to the South of Fraser Transportation Priorities Engagement A robust and reliable highway network is needed to serve the needs of a growing population and diverse economy. The
More informationVDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016
RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov
More informationAirport Planning Area
PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose
More informationCapital Beltway HOT Lanes Project
New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%
More informationCell: (408) Release MA June 25, 2012
VTA NEWS CONTACT: Bernice Alaniz FOR IMMEDIATE RELEASE Cell: (408) 888-9983 Release MA 12 06 08 Bernice.Alaniz@vta.org June 25, 2012 Construction Activities Underway For BART Silicon Valley The Santa Clara
More informationMay 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015
May 1, 2015 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 1 through May 8, 2015 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationMajor Projects Overview
Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls
More informationCORNWALL WATERFRONT PLAN 2007
CANAL LANDS CANAL LANDS Page 58 Introduction This chapter details areas of possible development or redevelopment, and lands to be protected from any form of development in the Canal Lands area. As outlined
More informationChairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building
LA.09.TOR TORONTO DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Edward R. Sajecki, Commissioner of Planning and Building Proposed Rezoning and Master Plan Union
More informationFDOT Treasure Coast Traffic Impact Report
July 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 7 through July 14, 2017 TREASURE COAST Construction and maintenance related lane
More informationCHURCH AVENUE CHULA VISTA, CA 91910
For Additional Information: Sean Bascom 619.916.9179 bascom@scc1031.com Lic# 01862044 CHURCH AVENUE CHULA VISTA, CA 91910 CHULA VISTA DEVELOPMENT OPPORTUNITY Excellent Location Near Vibrant Third Avenue
More informationUPPER MERION TRANSPORTATION AUTHORITY April 13, 2016
UPPER MERION TRANSPORTATION AUTHORITY April 13, 2016 The members of the Upper Merion Transportation Authority met for their regular meeting on Wednesday, April 13, 2016 in the Township Building, 175 West
More informationRoute 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.
EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in
More informationNAIOP. Marcia McAllister Metropolitan Washington Airports Authority
NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business
More information1430 DeKalb Street, 1 st Floor Room 1164 Norristown, PA
University of Pittsburgh, School of Social Work The Pennsylvania Child Welfare Resource Center 403 E. Winding Hill Road, Mechanicsburg, PA 17055 Phone: 717-795-9048 Fax: 717-795-8013 1430 DeKalb Street,
More information3. COLTA / HUGA CONNECTIONS - PRELIMINARY
9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The
More informationAGENCY NAME TRANSPORTATION
TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller
More informationThe Atlanta BeltLine. Project Overview Map
The Atlanta BeltLine Project Overview Map The Atlanta BeltLine is a dynamic and transformative project for Atlanta. Through the development of a new transit system, multi-use trails, greenspace, and affordable
More informationLand O Lakes, FL Vacant Land for Commercial Development
FOR SALE Land O Lakes, FL Vacant Land for Commercial Development SR 52 & LAND O LAKES BLVD., LAND O LAKES, FL 34639 Tampa Bay Florida View of SR 52 Traffic westbound, west of US 41 Looking East at westbound
More informationHospital Link Project Project Update September 2015
Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service
More informationFORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008
FORT WASHINGTON OFFICE CENTER TRANSPORTATION IMPROVEMENTS By Orth-Rodgers & Associates, Inc., Adrienne Eiss, PTP August 8, 2008 Transportation access to Fort Washington Office Center is negatively affected
More information26 APPLICATION FOR APPROVAL TO EXPROPRIATE WIDENING AND RECONSTRUCTION OF ST. JOHN'S SIDEROAD PROJECT 97100, TOWN OF AURORA
Clause No. 26 in Report No. 12 of the was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 26, 2014. 26 APPLICATION FOR APPROVAL TO EXPROPRIATE
More informationCREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017
CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an
More informationDirections to Unisys East Coast Development Center (Malvern) 2476 Swedesford Road, Malvern, PA 19355
Unisys From Philadelphia Airport: Directions to Unisys East Coast Development Center (Malvern) 2476 Swedesford Road, Main phone: (610) 648-4000 Arnold s phone : (610) 648-2055 Take I-95 South to exit 7,
More informationSTITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH. Re-connect the city to the waterfront and link the east and west Core Circle landscapes
SHORE STITCH TRANSFORMATIVE IDEA 3. SHORELINE STITCH Re-connect the city to the waterfront and link the east and west Core Circle landscapes 126 LINE PUBLIC WORK 127 TRANSFORMATIVE IDEA 3. SHORELINE STITCH
More informationOur Panelists SPEAKERS MODERATOR
SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation
More informationFDOT Treasure Coast Traffic Impact Report
July 22, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report July 22 through July 29, 2016 TREASURE COAST Construction and maintenance-related lane
More informationCONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND
BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK
More informationOctober 31, 2014 Chuck McGinness, (954)
From: McGinness, Charles To: McGinness, Charles Subject: FDOT Broward County Traffic Impact Report 10 31 14 through 11 07 14 Date: Friday, October 31, 2014 2:59:04 PM Attachments: image002.png October
More informationMontgomery County Bridges 3/27/2018. Page 1 of 5
0 Ridge Pike Norfolk Southern Railroad Plymouth NA 1 Markley Street Stony Creek Norristown NA 4 Conshohocken State Road Mill Creek Lower Merion N/A 5 Old Gulph Road Mill Creek Lower Merion NA 6 Mill Creek
More informationG Street Undercrossing. City Council Meeting Date: November 3, 2008
G Street Undercrossing City Council Meeting Date: November 3, 2008 Introduction G Street undercrossing Long-term goal of the City In General Plan since 1997 In City s Public Facilities Financing Plan
More informationTwo townships received top
Awards 35 TH ANNUAL ROAD AND BRIDGE SAFETY IMPROVEMENT AWARDS Townships Are Recognized for Projects That Increase Safety on Roads and Bridges Two townships were recognized during PSATS 95 th Annual Educational
More information