Smart Safety Tidal Flow Barrier
|
|
- Claire Parsons
- 5 years ago
- Views:
Transcription
1 ITS New Zealand Summit 2012 Auckland Harbour Bridge Martin Leak Managing Director, Resolve Group Ltd Auckland, N.Z. Auckland Harbour Bridge - demand for service: Opened in May 1959 with 4 lanes and an annual traffic flow at the end of 1960 of 4.9 million vehicles per year. Ten years after the opening in 1969, the annual flow was 13.8 million vehicles Demand for greater capacity: In additional lanes were added, giving the AHB added capacity for the then foreseeable future By the late 80 s demand was again challenging capacity Consequences of greater demand: Over a number of years, head-on crashes became increasingly frequent to the point where in the late 1980 s, action to address the situation became urgent In 1990: Foremost for reasons of safety a 610 mm wide concrete movable lane barrier (MLB) was installed This was a first in the world for traffic management of contra flow lanes with the MLB as a permanent installation The result: The result: Positive separation of the two fast moving opposing traffic flows, equating to a dramatic decrease in head-on crashes. 1
2 Original 4 lane structure opened for traffic in Extended to 8 lanes and in operation 1968 Equipped as a divided contra flow operation from 1990 Today The AHB now carries in excess of 57 million vehicle a year where weekday AM and PM peak contra flow lane configuration, supported by lane control and variable message signs are a vital necessity. In 2009: Original transfer machines and MLB replaced with narrower 457 mm barrier and lower impact deflection Looking to the future the new machine provided variable transfer width capacity from 2.6 metres to 4.3 metres New BTM More powerful and faster, with AHB barrier transferred in half the time allowing for a new extension through St Mary s Bay to the Victoria Park Tunnel Onboard GPS links the BTM to changing of the LCS ITS Support Variable lane control signs are a necessary requirement for safe and efficient operation even with a barrier divided contra flow operation 2
3 ITS Support Variable message signs ensure near real-time information is passed to drivers so that they are able to respond in a timely and safe manner Victoria Park Tunnel In conjunction with the commissioning of the tunnel, an extension of the MLB across the harbour bridge was put into operation through St Mary s Bay northbound Coordinated Operation SwiftGate opening to provide auxiliary PM peak access to Lane 5 on the Auckland Harbour Bridge to the right of the Victoria Park Tunnel exit portal Efficient Operation Auxiliary on ramp connecting to Lane 5 on Auckland Harbour Bridge open and available to PM peak traffic out of the city 3
4 BTM transfer through St Mary s Bay after PM peak Coordination between ITS and BTM Garaging under the Victoria Park Viaduct at the south end of the St Mary s Bay barrier string allow the BTM to display their artistic character Auckland Harbour Bridge In Conclusion Coordination of ITS Components BTM returning north completing the daily routine with the transfer of the St Mary s Bay and Auckland Harbour Bridge barrier strings back to their nominal positions For the safe and efficient operation of an urban highway network, such as is here in Auckland, ITS technologies needs to be coordinated seamlessly and at the very highest level of reliability 4
5 9 Marmion Street, Auckland Phone 64 (9)
CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE. By Mike Curran, Manager Strategic Policy, Transit New Zealand
CONGESTION MONITORING THE NEW ZEALAND EXPERIENCE 26 th Australasian Transport Research Forum Wellington New Zealand 1-3 October 2003 By, Manager Strategic Policy, Transit New Zealand Abstract New Zealand
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More information$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY
2015 18 National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY OVERVIEW Achieving an effective and efficient transport system is central to supporting Auckland s future. Auckland is home
More informationHow is air quality managed. in Sydney s road tunnels?
How is air quality managed in Sydney s road tunnels? The Sydney Orbital Network includes over 160 kilometres of surface roads, tunnels, bridges and underpasses. There are five main tunnels along the network;
More informationKING STREET TRANSIT PILOT
KING STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS TRANSIT RIDERSHIP TRANSIT CAPACITY To respond to this growth in ridership, the TTC has increased the capacity of
More informationA. CONCLUSIONS OF THE FGEIS
Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationStrategies to keep people and goods moving in and through Seattle. SR 99 Closure and the Seattle Squeeze
Strategies to keep people and goods moving in and through Seattle SR 99 Closure and the Seattle Squeeze 2018-2024 Puget Sound Regional Council Transportation Policy Board January 10, 2019 How we get around
More informationMEMORANDUM. for HOV Monitoring on I-93 North and the Southeast Expressway, Boston Region MPO, November, 2011.
MEMORANDUM Date: January 12, 2012 To: Congestion Management Process Files From: Seth Asante, Ryan Hicks, and Efi Pagitsas MPO Staff Re: Historical Trends: Travel Times and Vehicle Occupancy Levels for
More information1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District
1964 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems
More information1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District
1963 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems
More informationTOWPLOW TIME-SAVING, SAFE ADDITION TO CONVENTIONAL SNOW PLOWING TRUCKS. Clearing The Way To Keep America Moving
TOWPLOW TIME-SAVING, SAFE ADDITION TO CONVENTIONAL SNOW PLOWING TRUCKS Clearing The Way To Keep America Moving With just one truck (and operator) able to do the work of more than two conventional snow
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationAppendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group
Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM
More informationTraffic calming on major roads: a traffic calming scheme at Costessey, Norfolk
Traffic Advisory Leaflet 14/99 December 1999 Traffic calming on major roads: a traffic calming scheme at Costessey, Norfolk Introduction This leaflet summarises the impact of a traffic calming scheme on
More informationParking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
REPORT FOR ACTION between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director,
More informationI-405 Express Toll Lanes Coming in 2015
I-405 Express Toll Lanes Coming in 2015 Jennifer Charlebois Roadway Toll Systems PE, Toll Division Anne Broache Public Information, I-405/SR 167 Lynn Peterson Secretary of Transportation Market Neighborhood
More informationInterstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by
Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section
More information8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT
8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner
More information$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY
2015 18 National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY OVERVIEW Transport investment in the Bay of Plenty is targeted to support significant residential growth, new industrial
More informationResearch Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN
Research Report Agreement T4118, Task 24 HOV Action Plan HOV ACTION PLAN by John M. Ishimaru Senior Research Engineer Duane Wright Systems Analyst Programmer Mark E. Hallenbeck Director Jaime Kang Research
More informationWhy does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan
Why does Sydney need a new fast Metro to the West? (as shown in 10,000 Friends of Greater Sydney Stage 1 Rail Plan) The Stage 1 Rail Plan was developed to support an integrated transport plan that would
More informationNorthern Beaches Transport Action Plan
Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million
More informationAuckland Transport Quarterly Indicators Report 2018/19
Attachment 1 Auckland Transport ly Indicators Report 218/19 September 218 Table of Contents Page 2. 1. Executive summary 2. External indicators 3. Performance by Key Priority 3.1 Deliver an efficient and
More informationHospital Link Project Project Update Winter 2018
Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open
More informationRegional summary - Wellington
Regional summary Wellington Regional summary - Wellington This is a summary of data relevant to transportation in this region, viewed from a Land Transport NZ perspective. It s purpose is to inform the
More informationAUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION
AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected
More informationOrganization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator
Organization Puget Date Sound Regional Council Regional Project Evaluation Committee Brian Nielsen, Program Administrator October 26, 2018 TODAY S FOCUS The big picture #Realign99 closure/opening the tunnel
More informationCONTACT: Michelle T. Holland
FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS
More informationNight work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road
T 1800 997 057 (free call) E enquiries@northconnex.com.au PO Box 343 Pennant Hills NSW 1715 northconnex.com.au 28 April 2017 Ref: N0075M Night work update: and westbound on ramp at Dear resident, NorthConnex
More information2017/ Q1 Performance Measures Report
2017/2018 - Q1 Performance Measures Report Contents Ridership & Revenue... 1 Historical Revenue & Ridership... 1 Revenue Actual vs. Planned... 3 Mean Distance Between Failures... 5 Maintenance Cost Quarter
More informationTech Trends That Are Defining The Future Of Travel
Tech Trends That Are Defining The Future Of Travel 1. Mobile Is The Key Travel Management Device Since 2014, mobile has overtaken desktop usage for travel bookings, and that does not predict to change
More informationPolicy Communications. Policy highlights. Our plan. National is committed to connecting New Zealanders to each other and to the world.
Our plan National believes in connecting New Zealanders to each other and to the world. A more digitally connected New Zealand supports a growing economy and jobs, safer and healthier communities, our
More informationTexas Transportation Institute The Texas A&M University System College Station, Texas
1. Report No. FHWA/TX-05/0-4434-P1 2. Government Accession No. 3. Recipient's Catalog No. 4. Title and Subtitle GUIDANCE FOR FUTURE DESIGN OF FREEWAYS WITH HIGH- OCCUPANCY VEHICLE (HOV) LANES BASED ON
More informationMemorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility
Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,
More informationHOME OWNER PRE- DELIVERY INSTRUCTIONS
Congratulations on your decision to enjoy the finest spas available Welcome to the growing family of Sundance Spa owners HOME OWNER PRE- DELIVERY INSTRUCTIONS Please take the time to read these instructions
More information2018 Service Implementation Plan Executive Summary
2018 Service Implementation Plan Executive Summary March 2018 2018 SERVICE IMPLEMENTATION PLAN Executive Summary 2018 Service Implementation Plan Each year, Sound Transit prepares a Service Implementation
More informationCommercial Aircraft Customer Services
Commercial Aircraft Customer Services I Commercial Aircraft Customer Services CONTENTS P.5 THE BOMBARDIER FLIGHTADVANTAGE P.11 SUPPORT P.15 MAINTENANCE P.21 MATERIAL P.25 TRAINING 3 THE BOMBARDIER FLIGHTADVANTAGE
More informationPROJECT UPDATE BETTER TIMES AHEAD ON CLEM7 CLEM JONES TUNNEL. Fast facts AUGUST 2008
CLEM JONES TUNNEL PROJECT UPDATE AUGUST 2008 Two kilometres of tunnel has been excavated at Kangaroo Point and tunnel lining work is now under way. BETTER TIMES AHEAD ON CLEM7 Fast facts Road length 6.8
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationPublic Information Meetings. October 5, 6, 7, and 15, 2015
Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound
More information6 Road infrastructure
6 Road infrastructure 51 ƨƨsummary New Zealand does not score highly for its road infrastructure when compared to other developed nations. This may partly be due to geography and population size, which
More informationSCOPE Chapter 2D shall Apply to Any Road or
SCOPE Chapter 2D shall Apply to Any Road or Street other then Low-Volume Roads, Expressways, and Freeways Low Volume Roads: Shall be a Facility Lying Outside Built-Up Areas & Having a Traffic Volume Less
More informationPERTH-ADELAIDE CORRIDOR STRATEGY
INTRODUCTION The Royal Automobile Association of SA Inc (RAA), the State s principal advocate for motorists on a broad range of motoring-related issues, represents the views of more than 560,000 South
More informationDISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com
DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, 2017 FloridaExpressLanes.com This page intentionally left blank. TABLE OF CONTENTS List of Figures... ii List of Tables.... ii
More information5.7 Local road upgrades
5.7 Local road upgrades Local roads around the St Peters interchange and the intersection of Campbell Road and Euston Road would be upgraded to ensure safe and efficient connections with the New M5, and
More informationOBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT
PLANNING AND ENVIRONMENT ACT 1987 OBJECTION TO AMENDMENT TO PLANNING SCHEME AND GRANTING OF PLANNING PERMIT AMENDMENT C32 APPLICATION 0873/02 Public Transport Users Association Inc. 247-249 Flinders Lane
More informationEXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS
EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS Laura Major Forest & R. John Hansman C.S. Draper Laboratory, Cambridge, MA 9 USA; lforest@draper.com
More informationAustralian Ideal College
This PDF file contains information on: Home > Living in Sydney > Getting Around Monorail travelling through the CBD Finding a Location on an Online Map Page 1 International Driver Licence Pages 1-2 Transportation
More informationc2c s timetable consultation Passenger Focus report
c2c s timetable consultation Passenger Focus report August 2006 c2c s timetable consultation 16 March 2006 14 April 2006 Introduction Passengers were recently consulted on c2c s plans to make changes to
More informationMEMORANDUM. Open Section Background. I-66 Open Section Study Area. VDOT Northern Virginia District. I-66 Project Team. Date: November 5, 2015
MEMORANDUM To: VDOT Northern Virginia District From: I-66 Project Team Date: November 5, 2015 Subject: Open Section Background The purpose of this technical memorandum is to provide narrative and technical
More informationROAD SAFETY MANAGEMENT AND DATA SYSTEMS
PIARC International Road Safety Seminar Beijing, 18 th 2 th of October 25 ROAD SAFETY MANAGEMENT AND DATA SYSTEMS DR. JOSEF MIKULIK (mikulik@cdv.cz) DIRECTOR TRANSPORT RESEARCH CENTRE (CDV) BRNO, CZECH
More informationIMPACTS OF CHANGING USED IMPORT VEHICLE VOLUMES ON AUSTRALIAN AND NEW ZEALAND VEHICLE FLEET SAFETY
IMPACTS OF CHANGING USED IMPORT VEHICLE VOLUMES ON AUSTRALIAN AND NEW ZEALAND VEHICLE FLEET SAFETY by Mike Keall Laurie Budd Linda Watson & Stuart Newstead November, 2016 Supplement to Report No. 334 Project
More informationDraft City Centre Transport Proposals
Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport
More informationNovember 21, 2012 Barbara Kelleher, (954)
November 21, 2012 Barbara Kelleher, (954) 777-4090 barbara.kelleher@dot.state.fl.us BROWARD COUNTY TRAFFIC IMPACT REPORT November 26 to November 30, 2012 FORT LAUDERDALE -- Construction and maintenance-related
More informationf Adverse 1 ' ' A t c : city Arterlol 1 Adverse 1 1 Adverse 1 > 0 ' E Adverse ' A D ' t Adverse Boulevard Adverse
Traffic Assignment COIPARATIVE TRAFFIC USAGE OF KANAWHA BOULEVARD AND ALTESINATE CITY ARTEMALS AT CHARLESTON, WEST VIRGINIA C. A. Rothrock and E. Wilson Campbell Planning Division State Road Commission
More informationBridging Brisbane Survey 2017 Supplementary Report
1: Moggill Road Bridge (at Moggill ferry crossing) This river crossing connects Moggill Ferry Road at Riverview with the end of Moggill Road at Moggill where the ferry currently operates. It links the
More informationAuckland Transport - Transport Indicators Report June 2013
Thousands Auckland Transport Transport Indicators Report June 213 Economic Indicators 5 4 3 2 1 % 1 2 3 4 9 8 3 2 1 Auckland Economic Activity Composite index of Economic Activity Auckland Source : ANZ
More informationAratere Briefing BACKGROUND THE INTERISLANDER FLEET 2011 ARATERE EXTENSION PROPELLER FAILURE
Aratere Briefing 30 JUNE 2014 BACKGROUND THE INTERISLANDER FLEET Interislander operates three vessels the Arahura, the Kaitaki and the Aratere. All three ships are roll-on roll-off and take rail freight,
More informationMaidenhead Bridge. Proposed Work
W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be
More informationPattullo Bridge Replacement Project
FEBRUARY 2019 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority
More informationFor personal use only
asx release 21 October 2015 Presentation to Morgans Queensland Conference Please find attached the presentation that Transurban CEO Scott Charlton will be delivering at today s Morgans Queensland Conference.
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT
More informationWAIKARAKA CYCLEWAY: LESSONS LEARNT. Daniel Newcombe & Ina Stenzel Auckland City Council
WAIKARAKA CYCLEWAY: LESSONS LEARNT Daniel Newcombe & Ina Stenzel Auckland City Council Introduction Waikaraka cycleway is key link in Auckland regional cycle network Lessons learnt from two sections: Pikes
More informationProject Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design
RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall
More informationNeighbourhood Committee NDG - Westmount. September 12, 2016
Neighbourhood Committee NDG - Westmount September 12, 2016 2 Presentation Outline Requests from the committee members Feedback on previous questions Work update and hindrance of the Turcot Project Ministry
More informationWord Count: 3,565 Number of Tables: 4 Number of Figures: 6 Number of Photographs: 0. Word Limit: 7,500 Tables/Figures Word Count = 2,250
Katherine F. Turnbull, Ken Buckeye, Nick Thompson 1 Corresponding Author Katherine F. Turnbull Executive Associate Director Texas Transportation Institute Texas A&M University System 3135 TAMU College
More informationTraffic Calming Measures
REPUBLIC OF GHANA MINISTRY OF TRANSPORTATION Ghana Highway Authority Road Safety and Environment Division Traffic Calming Measures Design Guideline Version 1 / July 2007 Traffic Calming Measures Page 2
More informationWarehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport
Warehouse case study Cargo Facility, Stansted 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport This new facility shows how BAA Lynton can deliver large complex
More informationPolicy Transport. Policy highlights. Our plan
Policy 2017 Our plan Policy highlights National is committed to building the world-class infrastructure to ensure New Zealand continues to grow. Record investment in transport Delivering the Roads of National
More information1. Case Study Area and Character Sections
ARAGO STREET 1. Case Study Area and Character Sections Case Study Area Calle Aragó is an important streets in the centre of Barcelona. The street belongs to the Eixample district. The origins of Barcelona
More informationCURRENT STATUS OF THE MEYER NEPTUN PORTAL > INFORMATION > IN BRIEF > DATES > EVENTS. January 2010 N o 05.
January 2010 N o 05 > INFORMATION > IN BRIEF > DATES > EVENTS CURRENT STATUS OF THE MEYER NEPTUN PORTAL As we reported in the last issue of Im Dialog, the MEYER NEPTUN PORTAL opened in mid-may 2009. Much
More informationSelection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605.
ORANGE COUNTY TRANSPORTATION AUTHORITY Selection of a Locally Preferred Alternative for the Interstate 405 Improvement Project Between State Route 55 and Interstate 605 PowerPoint San Diego Freeway (Interstate
More informationTraffic Note 32. Use of fluorescent material on traffic signs - guidelines. Date: September Authorisation: Peter Croft, Manager Safer Roads
Traffic Note 32 page 1 of 6 Traffic Note 32 Date: September 2001 From: Safer Roads Authorisation: Peter Croft, Manager Safer Roads Signature: No. of pages: 6 Use of fluorescent material on traffic signs
More informationTolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division
Tolling in Washington State Craig J. Stone, P.E. Assistant Secretary, Toll Division Connecticut Department of Transportation Bridgeport, CT June 4, 2014 Tolling in Washington State Tolling is part of Washington
More informationUnion Station Queens Quay Transit Link Study
Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit
More informationPardon Our Dust Public Information Meeting
Pardon Our Dust Public Information Meeting Robert G. Ridgell, P.E. Virginia Department of Transportation, Fredericksburg District Area Construction Engineer July 12, 2018 Project Team and Leadership Virginia
More informationThe Importance of Service Frequency to Attracting Ridership: The Cases of Brampton and York
The Importance of Service Frequency to Attracting Ridership: The Cases of Brampton and York Jonathan English Columbia University CUTA Conference May 2016 Introduction Is density the most important determinant
More informationDirector King County Department of Transportation. King County Department of Transportation
Tolling in Washington State t Harold S. Taniguchi Director Why tolling Why Tolling? Gas tax down Electric collection technology Reduce peak demand and greenhouse gas emissions Tolling today in Washington
More informationContact details. Signage clarity
Toll Road Review The primary objective of this review of South East Queensland (SEQ) toll roads was to assess the adequacy and effectiveness of toll road price, payment and contact information signage
More informationImportant Lane Closures, April 3 9, 2011
March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route
More informationSydney Metro West A new railway for Western Sydney
Sydney Metro West A new railway for Western Sydney PROJECT OVERVIEW, SEPTEMBER 2017 SYDNEY METRO WEST A NEW RAILWAY FOR WESTERN SYDNEY 1 CONTENTS Project snapshot 4 The need for new rail 5 Sydney Metro
More informationHARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre
78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that
More informationThe Challenges for the European Tourism Sustainable
The Challenges for the European Tourism Sustainable Denada Olli Lecturer at Fan S. Noli University, Faculty of Economy, Department of Marketing, Branch Korça, Albania. Doi:10.5901/mjss.2013.v4n9p464 Abstract
More informationConcord Road Interchange. Standard hours of work
Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass
More informationRegional summary - Auckland
Regional summary Auckland Regional summary - Auckland This is a summary of data relevant to transportation in the Auckland region, viewed from a New Zealand Transport Agency perspective. The purpose of
More informationPattullo Bridge Replacement Project
Pattullo Bridge Overview This document will: Explain the challenges facing the Pattullo Bridge today Share how we propose moving forward translink.ca PAGE 1 History By Order of the Lieutenant Governor
More informationState Budget Comment
$ millions 2014-2015 State Budget Comment Introduction RACQ considers that the Queensland Government delivered motorists a good budget in 2014-15. Allocations for road and transport infrastructure remained
More informationSky Tower s Modernization Success. Arron Money, Executive Manager, SKYCITY Entertainment Group
Sky Tower s Modernization Success Arron Money, Executive Manager, SKYCITY Entertainment Group SKYCITY Auckland Introduction Who we are Catalyst for change The results Where to from here Questions? SKYCITY
More informationHong Kong International Airport (Chek-Lap Kok Airport)
Hong Kong International Airport (Chek-Lap Kok Airport) General Information Hong Kong International Airport (HKIA) is the principal airport serving Hong Kong. As the world's fifth busiest (2004) international
More informationTransport Services Public Transport Patronage Performance 12 months to March 2018
Addendum to Item 10 Business Report April 2018 Transport Services Public Transport Patronage Performance 12 months to March 2018 Ref:- AT Monthly Indicators Report 1.3 AT Metro patronage breakdown. For
More informationEAST-WEST STITCH. Connecting the Western Edge of the City to the Centre
98 AC_BEU_CCMP_2_TM1_4 _FD.indd 98 20/07/12 12:06 PM 02 EAST-WEST STITCH Connecting the Western Edge of the City to the Centre 01 02 Northern Motorway Daldy Street Fanshawe Street Nelson Street Hobson
More informationTransit Fare Review Phase 2 Discussion Guide
Transit Fare Review Phase 2 Discussion Guide January 2017 translink.ca Table of Contents How should we determine transit fares in Metro Vancouver? 1 Varying fares by distance travelled 2 Varying fares
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationWe are the end to end solution for. PaxBag
We are the end to end solution for baggage reconciliation systems PaxBag Baggage Reconciliation by In 2010 the global air transport industry (ATI) mishandled 29.44 million bags globally or some 12 mishandled
More informationPattullo Bridge Replacement Project
JULY 2018 PROJECT OVERVIEW Pattullo Bridge Replacement Project engage.gov.bc.ca/pattullobridge Artist s rendering of the proposed new Pattullo Bridge Pattullo Bridge Replacement Project 1 Priority Need
More informationMemorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:
Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update
More informationAuckland City Centre: Transport Capacity and Access Trends
Auckland City Centre: Transport Capacity and Access Trends Final Report Prepared for: Auckland Council Date: 8 August 2018 Version: Final QUALITY ASSURANCE REGISTER Issue Description Prepared by Reviewed
More informationDRAFT PLAN OF MANAGEMENT MASSY GREENE
DRAFT PLAN OF MANAGEMENT MASSY GREENE The draft Plan of Management for the Reflections Holiday Parks Massy Greene is on public exhibition from Monday, 19 November 2018 to Sunday, 6 January 2019. The plans
More information