A New Era of Transportation Solutions

Size: px
Start display at page:

Download "A New Era of Transportation Solutions"

Transcription

1 A New Era of Transportation Solutions Committee for Dulles Economic Development & Transportation Committee Monica Backmon, Executive Director October 6, 2016

2 What does the NVTA do? Working collaboratively and transparently to plan, prioritize and fund transportation projects in Northern Virginia. 2

3 NVTA Composition The NVTA embraces the counties of Arlington, Fairfax, Loudoun and Prince William and the cities of Alexandria, Fairfax, Falls Church, Manassas and Manassas Park. Composed of 17 Members: Chief elected officer from the 9 member localities or his/her designee Two members of the House of Delegates One State Senator Two citizen members appointed by the Governor including one member of the Commonwealth Transportation Board The chief elected officer of one town in a county which the Authority embraces (non-voting) The Commonwealth Transportation Board Commissioner, or his/her designee (non-voting) The Director of the Department of Rail and Public Transportation (DRPT), or his/her designee (non-voting) 3

4 NVTA Responsibilities Provide Northern Virginia with a regional transportation organization responsible for: Providing long-range transportation planning for regional transportation projects in Northern Virginia (TransAction). Allocating to priority regional transportation projects funds made available to the Authority and, at the discretion of the Authority, directly overseeing such projects (HB 2313). Recommending to federal, state, and regional agencies regional transportation priorities, including public-private transportation projects and funding allocations (CMAQ and RSTP). 4

5 NVTA Responsibilities Provide Northern Virginia with a regional transportation organization responsible for: Serving as an advocate for the transportation needs of Northern Virginia before the state and federal governments. Developing, in coordination with affected counties and cities, regional priorities and policies to improve air quality. Providing general oversight of regional transportation issues of a multijurisdictional nature, including intelligent transportation systems, signalization, and preparation for and response to emergencies. 5

6 Legislation Legislation that governs the Authority and the usage of the Authority s revenues and project funding requirements. SB 576 (2002) HB 599 (2012) HB 2313 (2013) HB 2 (2014) 6

7 NVTA Regional Revenue HB 2313 revenues generate approximately $340 million annually for transportation projects. 70% Regional Revenue provided to the NVTA and utilized for: Regional projects included in TransAction 2040, or updates, that have been evaluated by VDOT for congestion mitigation or emergency evacuation (HB 599); The Authority gives priority to selecting projects that are expected to provide the greatest congestion reduction relative to the cost of the project. 7

8 NVTA Local Revenues 30% (Local funds) will be distributed to the individual localities and utilized for their transportation needs: additional urban or secondary road construction; for other capital improvements that reduce congestion; for other transportation capital improvements which have been approved by the most recent long range transportation plan adopted by the Authority; or for public transportation purposes. 8

9 NVTA Revenues Total 30% Revenue $272,972,824 NVTA TOTAL REVENUE RECEIVED* $912,153,300 NVTA REVENUE RECEIVED BY TAX TYPE* $912,153,300 Transient Occupancy Tax $80,167,189 NVTA Fund Interest $2,627,329 Grantor's Tax $130,009,104 Total 70% Revenue $639,180,476 Regional Sales Tax $699,349,678 *Revenues received through FYE June 30,

10 Regional Transportation Investments Funded to Date 79 Projects $990 million Total 8 Completed 10

11 Example of NVTA Regional Investments I-66/Route 28 Interchange Improvements Route 28 Widening (multiple segments) Route 1 Widening (multiple segments) Route 7 Widening (multiple segments) Loudoun County Parkway Fairfax County Parkway Columbia Pike Multimodal Improvements Belmont Ridge Road (multiple segments) 11

12 Example of NVTA Regional Investments 34 New Bus Purchases Providing 20 new and/or expanded bus service/routes 2 Bus Garage Facilities New 300 Space Park & Ride Facility 2 New Metro Stations (Innovation & Potomac Yard) New Crystal City Multimodal Center Metrorail Traction Power Upgrades (Orange & Blue Lines) 8 VRE System/Infrastructure Expansion Projects Additional station parking Platform expansions 12

13 Fairfax County Projects FY Programs Jurisdiction/ Agency Project Title NVTA Funding Program NVTA Funding Project Cost Phase Funded Fairfax Innovation Center Metrorail Station FY2014 $41,000,000 $89,000,000 Design/Build Fairfax Innovation Center Metrorail Station FY $28,000,000 $89,000,000 Construction Fairfax/VDOT Route 28 Widening 6 to 8 lanes (NB from McLearen Road to Dulles Toll Road) FY2014 $11,100,000 $13,300,000 Design/Build Fairfax/VDOT Route 28 Widening 6 to 8 lanes (SB from the Dulles Toll Road to Route 50) FY2014 $20,000,000 $22,200,000 Design/Build Fairfax/VDOT Route 7 Bridge Widening: Over Dulles Toll Road FY $13,900,000 $34,400,000 Construction Fairfax Route 28 Widening: Prince William County Line to Route 29 FY $5,000,000 $47,350,000 Design, Preliminary Eng. Fairfax Route 28 Widening: Prince William County Line to Route 29 FY2017 $5,000,000 $68,910,000 Fairfax Fairfax County Parkway Improvements Study FY $10,000,000 $396,100,000 Design, Environmental, Eng., ROW, Construction Study, Environmental, Preliminary Eng. Fairfax Rolling Road Widening: Old Keene Mill Road to Franconia Springfield Parkway FY $5,000,000 $35,200,000 Design, Preliminary Eng., ROW Fairfax Frontier Drive Extension & Interchange Improvements FY $2,000,000 $84,500,000 Design, Environmental, Preliminary Eng. Fairfax Route 1 Widening: Mount Vernon Memorial Highway to Napper Road FY $1,000,000 $90,000,000 Environmental, Preliminary Eng. Fairfax Connector Buses (12 New) FY $6,000,000 $11,000,000 Bus Purchase Fairfax West Ox Bus Garage Expansion FY $20,000,000 $20,000,000 Construction Fairfax I-66/Route 28 Interchange Improvements FY2017 $300,000,000 $385,000,000 Design, Environmental, Eng., ROW, Construction Fairfax Route 7 Widening: Colvin Forest Drive to Jarrett Valley Drive FY2017 $10,000,000 $135,900,000 ROW Fairfax Route 286 Fairfax County Parkway Widening: Route 123 to Route 29 FY2017 $10,000,000 $82,400,000 ROW Herndon Herndon Parkway Intersection Improvements at Van Buren St. FY2014 $500,000 $3,000,000 Design/ROW Herndon Herndon Metrorail Intermodal Access Improvements FY2014 $1,100,000 $2,000,000 Design/ROW Herndon Herndon Parkway Intersection Improvements at Sterling Road FY2014 $500,000 $500,000 Design/ROW/ Construction Herndon East Elden Street Improvements & Widening FY $10,400,000 $30,902,000 ROW NVTC Transit Alternatives Analysis Study in the Route 7 Corridor (King Street, Alexandria to Tyson's Corner) (Phase II) FY2014 $838,000 $838,000 Study VRE VRE Lorton Station Second Platform FY2014 $7,900,000 $9,240,000 Design/Construction VRE Franconia-Springfield Platform Improvements FY $13,000,000 $13,000,000 Preliminary Eng., Environmental, Construction WMATA Traction Power Upgrades on the Orange Line in Virginia* FY2014 $4,978,685 $496,000,000 Design WMATA Blue Line Traction Power Upgrades* FY2017 $17,443,951 $88,625,564 Eng, Construction NVTA Funding Total: $522,238,000 *These projects benefit Fairfax County and other jurisdictions.

14 Example of Projects Utilizing 30% Revenues $273 Million Total Jurisdiction Project Name Phases Funded 30% Local Fund Amount Arlington County Capital Bikeshare Operations, Expansion $ 484,000 Arterial Street Safety Improvements Design, CN $ 150,000 Walter Reed Dr (5 th Street to Columbia Pike) Design, CN $ 356,000 McKinley Rd Safe Routes to School Accessibility Design, CN $ 100,000 Bus Stops and Shelters (Clarendon, Courthouse, Shirlington) Design, CN $ 95,000 Old Dominion Dr, Phase II (Route 309 from 38th St N to Glebe Rd) Design, CN $ 500,000 Five Points Intersection CN $ 300,000 Carlin Springs Rd Signal Rebuilds CN $ 50,000 Washington Blvd Signal Rebuilds CN $ 350,000 Transit Development Plan & ART Asset Management Plan Study $ 45,000 Traffic Counts Other $ 250,000 Fairfax County Town Center Pwy DTR Underpass Rail Support PE, Design $ 2,104,067 Seven Corners Interchange Improvements PE, Design $ 103,595 Soapstone Dr DTR Overpass PE, Design $ 15,055 Shirley Gate Extn/Fairfax County Pwy/Popes Head Interchange PE, Design $ 136,237 Braddock Rd Multimodal Study PE, Design $ 251,190 Spot Roadway Program All $ 69,250 Frontier Dr Extension PE, Design $ 2,000,000 Herndon Metrorail Parking Garage PE, Design $ 11,770 Innovation Center Metrorail Parking Garage PE, Design $ 347,600 Studies/Planning (Traffic Counts) N/A $ 21,860 Fairfax Connector Service Expansion, including additional service in the Dulles Corridor and from Springfield to Tysons N/A $ 3,281,743 Various Project Implementation Works N/A $ 302,033 Loudoun County Riverside Pwy (Lexington Dr to Loudoun County Pwy) ROW, Utility, CN $ 6,000,000 Sterling Blvd Extended (Pacific Blvd to Moran Rd) Design, ROW, Utility, CN $ 5,890 Prince William County Minnieville Rd (Dumfries Rd to Spriggs Rd) CN $ 21,700,000 Jefferson Davis Hwy (Neabsco Mills to Featherstone) ROW $ 1,200,000 City of Alexandria Route 1 Transitway Operations Operations $ 1,800,000 Access to Transit CN $ 60,000 Bus Shelters and Benches CN $ 1,100,000 WMATA Capital Contribution Design, CN $ 2,500,000 DASH Bus Fleet Replacement Bus Procurement $ 4,550,000 Seminary Rd at Beauregard St Ellipse Design $ 425,000 Route 1 at E Reed Intersection Improvements CN $ 350,000 City of Fairfax George Snyder Trail CN $ 60,000 Old Town Traffic Study Study $ 14,841 Jermantown Road CN $ 869,302 CUE Operations Operations $ 1,352,000 City of Falls Church Bus Stop Changes - Shelters and Wayfinding PE, ROW, CN $ 250,000 Pedestrian Access to Transit (Rt 29 S Washington St) PE, ROW, CN, Inspection $ 1,465,000 City of Manassas Prince William St (Grant Ave to Wellington Rd) ROW, CN $ 1,100,000 City of Manassas Park No projects Town of Dumfries Sidewalk along Possum Point Road CN $ 97,289 Town of Herndon Elden St and Center St Intersection Improvements PE, Final Eng, ROW, Utility, CN $ 850,000 Town of Leesburg Evergreen Mill Rd Widening (Leesburg S Corporate Limits to S King St) Design, ROW, CN $ 1,864,037 Town of Purcellville Nursery Ave Improvements Design, CN $ 389,850 Town of Vienna No projects 14

15 Investments Throughout the Region Route 28 Groundbreaking Belmont Ridge Road Groundbreaking West Ox Road Bus Garage Groundbreaking 15

16 Investments Throughout the Region Ribbon Cuttings for New Buses 16

17 Investments Throughout the Region Route 28 Improvements Route 1 Widening and Improvements 17

18 Looking Ahead Transparency and Collaboration Update of TransAction, Region s Long-Range Transportation Plan First update since the passage of HB 2313 Incorporation of HB 599 Scenario Planning Land Use/Alternative Future Scenarios Disruptive and Alternative Technologies Guide the Region s first Six Year Program (FY ) $1.7 billion in anticipated Revenues for the Six Year Program Continue to focus on Regional Projects and Priorities, not different Local Interests 18

19 TransAction Schedule NOVEMBER 2015 TransAction Kickoff SPRING 2016 Confirming Objectives and Needs Public Outreach FALL 2016 Developing Scenarios Public Outreach WINTER Identifying Regional Priorities SPRING 2017 Draft Report and Public Hearings Public Outreach SUMMER/FALL 2017 Anticipated Adoption by NVTA 19

20 Significant Milestones HB 599 HB 2313 TransAction 2040 TransAction Update FY2014 Program FY Program FY2017 Program FY Six Year Program Note: Milestones shown in Calendar Year in which event was/will be enacted or adopted 20

21 How You Can Get Involved? Visit our websites: and Engage with your local governments (counties, cities and towns) and attend NVTA public meetings. Join our list: Like us on Facebook. Follow us on Watch us on YouTube. 21

22 The Authority: Working Regionally 22

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Evaluation of Significant Transportation Projects in Northern Virginia Transportation District Fact Sheet #3 Winter 2015 Virginia Department of Transportation Update - Project Evaluation And Rating Since

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: November

More information

Performance Measure Summary

Performance Measure Summary Performance Measure Summary Congestion Duration = reduction in the number of hours of the day auto and transit passengers experience heavily congested travel conditions. of Delay = reduction in the number

More information

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015 Evaluation of Significant Transportation Projects in Northern Virginia Transportation District HB 599 Ratings Overview NVTA - January 22, 2015 Study Approach NVTA and CTB nominate projects Define Project

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office

AGENDA. Discussion/Information. Adjournment. Next Meeting: May 18, :00pm NVTA Office TECHNICAL ADVISORY COMMITTEE Wednesday, April 20, 2016, 7:00pm NVTA Office 3040 Williams Drive, Suite 200 Fairfax, Virginia 22031 AGENDA I. Call to Order/Welcome Chairman Boice II. Meeting Summary of March

More information

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

TransAction Overview. Introduction. Vision. NVTA Jurisdictions Introduction Vision NVTA Jurisdictions In the 21 st century, Northern Virginia will develop and sustain a multimodal transportation system that enhances quality of life and supports economic growth. Investments

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017 Northern Virginia District State of the District Helen L. Cuervo, P.E. District Engineer October 18, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation American Society

More information

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT December 8, 2016 Northern Virginia District A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Jeff Southard, Esq. VTCA Executive Vice President A DIALOGUE WITH

More information

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016 DULLES AREA HIGHLIGHTS Gary Garczynski Commonwealth Transportation Board Northern Virginia District Committee for Dulles August 4, 2016 Smart Scale (formerly HB2) Overview Round 1 completed with the adoption

More information

Fuller Road/Fuller Heights Road Improvements

Fuller Road/Fuller Heights Road Improvements Transportation Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4M This project will widen Fuller Road, which is the entrance road serving the Quantico Marine Corps Base, the Town of

More information

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004 Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 24 Potomac and Rappahannock Transportation Commission Fairfax Connector Omni Ride Omni

More information

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014 National Society of Professional Engineers Charles S. Carnaggio, PE Project Director July 2, 2014 Phase 1 Opening Date: July 26, 2014 Dulles Corridor Metrorail Project At-a-Glance Seamless integration

More information

Silver Line Rail Project Update

Silver Line Rail Project Update Silver Line Rail Project Update April 2013 Project Map 2 Silver Line, Phase 1 Service Pattern 3 Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project

More information

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Elected Officials and Media Briefing I-395 Express Lanes Northern Extension Updates on: I-95 Express Lanes Southern Extension Transform 66: Inside and Outside the Beltway March 31, 2016 Today s Agenda

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING

BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING BOARD OF SUPERVISORS AND VIRGINIA DEPARTMENT OF TRANSPORTATION JOINT PUBLIC HEARING Date of Hearing: September 14, 2016 #1 SUBJECT: ELECTION DISTRICT: Proposed FY2017-FY2022 Secondary Road Six-Year Plan

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: January

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer Agenda Dashboard 2019 Project Advertisements for Construction 2019 New Projects

More information

McLean Citizens Association Transportation Committee Project Briefing

McLean Citizens Association Transportation Committee Project Briefing McLean Citizens Association Transportation Committee Project Briefing November 10, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager Arlington County Board Work Session Eastbound Widening January 17, 2017 Amanda Baxter, VDOT Special Projects Development Manager Program Area Map 2 Program Scope Tolling during weekdays, peak hours, peak

More information

Public Information Meetings. October 5, 6, 7, and 15, 2015

Public Information Meetings. October 5, 6, 7, and 15, 2015 Public Information Meetings October 5, 6, 7, and 15, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66 eastbound

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY XV NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M TO: FROM: Chairman Martin E. Nohe and Members Northern Virginia Transportation Authority Monica Backmon, Executive Director DATE: March

More information

Appendix 1: Phase I Strategies

Appendix 1: Phase I Strategies Washington Metropolitan Area Transit Authority RTSP Presentation to the Technical Advisory Group January 19, 2012 Appendix 1: Phase I Strategies Base Case Definition MWCOG 2009 Adopted CLRP (2009-2030

More information

Report to the Dulles Corridor Advisory Committee

Report to the Dulles Corridor Advisory Committee Report to the Dulles Corridor Advisory Committee Information Report on Dulles Toll Road Toll Rate Adjustment Process and Tentative Schedule and Overview of Traffic and Revenue Study Update May 2018 Purpose

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

Understanding Your I-66 Trip

Understanding Your I-66 Trip Understanding Your I-66 Trip DETERMINING YOUR TRIP Identify the location of your most convenient entrance and then follow the map to your exit. Pricing is tracked by four gantries along the corridor. Traffic

More information

Fairfax County Transportation Advisory Commission (TAC)

Fairfax County Transportation Advisory Commission (TAC) Fairfax County Transportation Advisory Commission (TAC) January 17, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Amanda Baxter, Special Projects Development Manager

More information

Design Public Hearing

Design Public Hearing Design Public Hearing Monday, March 7, 2016 Washington-Lee High School Cafeteria 1301 N. Stafford Street, Arlington, VA 22201 Tuesday, March 8, 2016 Eagle Ridge Middle School Cafeteria 42901 Waxpool Road,

More information

Update on Route 1 Efforts

Update on Route 1 Efforts County of Fairfax, Virginia Update on Route 1 Efforts Transportation Advisory Committee October 20, 2015 Leonard Wolfenstein, FCDOT Jane Rosenbaum, FCDOT Doug Miller, FCDOT Route 1 Corridor 16- mile section

More information

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission is seeking an EXECUTIVE DIRECTOR ABOUT THE ORGANIZATION The Potomac Rappahannock Transportation Commission (PRTC) is a multi-jurisdictional agency that

More information

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE INFORMATION REPORT ON METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SUPPORT TO REGIONAL TRANSPORTATION PLANNING EFFORTS JUNE 2013 Purpose To inform

More information

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009 Patty Nicoson President Dulles Corridor Rail Association Proposed Toll Rate Increase on Dulles Toll Road

More information

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018

NORTHERN VIRGINIA OPPORTUNITIES. Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 NORTHERN VIRGINIA OPPORTUNITIES Helen Cuervo, P.E. District Engineer, Northern Virginia April 27, 2018 VDOT s Responsibilities: Plan Design and Construct Operate and Maintain The Commonwealth s transportation

More information

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority NAIOP Marcia McAllister Metropolitan Washington Airports Authority 1 The Vision Realized Northern Virginia Today Tysons Corner is the largest employment center in the Commonwealth Larger than central business

More information

Dulles Toll Road Rate Setting Process

Dulles Toll Road Rate Setting Process Dulles Toll Road Rate Setting Process Public Hearings Slides FOR HNTB June 22, 2018 Dulles Toll Road Operations The Dulles Toll Road is a critical transportation link to the region s infrastructure. On

More information

Silver Line Operating Plan

Silver Line Operating Plan Customer Service and Operations Committee Information Item IV-A December 6, 2012 Silver Line Operating Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Our Panelists SPEAKERS MODERATOR

Our Panelists SPEAKERS MODERATOR SPEAKERS Our Panelists Jennifer Aument, Transurban Gary Garczynski, Commonwealth Transportation Board Russ Gestl, Buchanan Partners, LLC Robert Shue, JLL MODERATOR David Birtwistle, Northern Virginia Transportation

More information

Transform66 Transportation Management Plan: Transit & TDM Strategies

Transform66 Transportation Management Plan: Transit & TDM Strategies Transform66 Transportation Management Plan: Transit & TDM Strategies Commuter Connections Committee November 15, 2016 1 Transforming I-66 A short introduction. http://outside.transform66.org/meetings/video_recordings.asp

More information

I-95/395 HOV/Bus/HOT Lanes Project Overview

I-95/395 HOV/Bus/HOT Lanes Project Overview I-95/395 HOV/Bus/HOT Lanes Project Overview 2 I-95/395 HOV/Bus/HOT Lanes Meetings Agenda 7 p.m. to 9 p.m. Open House Information Stations and Q&A With Project Staff 7:30 p.m. and 8:30 p.m. Project Overview

More information

CHAPTER 5: Operations Plan

CHAPTER 5: Operations Plan CHAPTER 5: Operations Plan Report Prepared by: Contents 5 OPERATIONS PLAN... 5-1 5.1 Proposed Service Changes... 5-2 5.1.1 Fiscal Year 2017... 5-2 5.1.2 Fiscal Year 2018... 5-6 5.1.3 Fiscal Year 2019...

More information

Transform66: Inside the Beltway

Transform66: Inside the Beltway Transform66: Inside the Beltway Result of a multi-year planning that started during the McDonnell Administration 2016 compromise reached with General Assembly Convert I-66 to express lanes from 5:30a-9:30a

More information

Metropolitan Washington Airports Authority (MWAA)

Metropolitan Washington Airports Authority (MWAA) RONALD REAGAN WASHINGTON NATIONAL DULLES TOLL ROAD DULLES METRORAIL WASHINGTON DULLES INTERNATIONAL Metropolitan Washington Airports Authority (MWAA) Andrew Rountree Chief Financial Officer & Vice President

More information

WAGS Tournament Field Directions (October 8-10, 2016)

WAGS Tournament Field Directions (October 8-10, 2016) WAGS Tournament Field Directions (October 8-10, 2016) Arrowbrook Park (Herndon) 2330 Centreville Rd, Herndon, VA 20171 From the Dulles Toll Road: Take the Herndon/Chantilly exit onto Centreville Road and

More information

The following items were handed out at the January 4, 2018 NVTC Meeting.

The following items were handed out at the January 4, 2018 NVTC Meeting. The following items were handed out at the January 4, 2018 NVTC Meeting. Blue Item #3D 2018 NVTC COMMITTEE AND BOARD APPOINTMENTS NVTC EXECUTIVE COMMITTEE Paul Smedberg, Chairman/WMATA Board* Matt Letourneau,

More information

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation Page 2 of 20 Background TPB staff has been managing data collection along the region s HOV facilities since the late 1990's, and documenting the results, which include counts of auto occupants, vehicles

More information

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section

Leesburg Streets and Highways. Tom Brandon Manager, Office of Capital Projects Potomac Section Leesburg Streets and Highways Tom Brandon Manager, Office of Capital Projects Potomac Section About Leesburg Accessible 35 miles from DC On the W&OD Trail On the Potomac River 15 miles from the Appalachian

More information

Dulles Corridor Improvements. Drive to Ride

Dulles Corridor Improvements. Drive to Ride Dulles Corridor Improvements Dulles Corridor Improvements Status Update v Condition assessment of Toll Road facilities is complete v Dulles Airport Access Highway/I-495 Interchange Safety Improvements

More information

Fairfax County / Washington DC Transit Bus Advertising

Fairfax County / Washington DC Transit Bus Advertising GET ON THE BUS! Gateway Outdoor, through its partnership with Fairfax Connector, is the exclusive provider for Transit Advertising in Fairfax County, VA. Fairfax Commuter Fleet 290 Transit Buses 1,152,87

More information

The Dulles Loop. Route 606. Route 28. Route 50

The Dulles Loop. Route 606. Route 28. Route 50 The Dulles Loop Route 606 Route 28 Route 50 1 Rt.50/Dulles Loop: Year 2000 Signal Queues (Intermittent) Signal Queues (Continuous) 4:30 6:00 p.m. Dulles Loop Source: SkyComp Report WATF 03/07 2 Rt.50/Dulles

More information

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION

2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION 2014 PERFORMANCE OF HIGH-OCCUPANCY VEHICLE FACILITIES ON FREEWAYS IN THE WASHINGTON REGION Travel Forecasting Subcommittee Friday, May 22, 2015 C. Patrick Zilliacus Figure 1 HOV System Overview Montgomery

More information

Table of Contents. List of Tables

Table of Contents. List of Tables Table of Contents 1. Introduction... 1 2. Service Recommendations... 1 A. Extend Service on Fort Belvoir to New Post Exchange/Commissary Complex... 1 B. Improve Service Frequencies on Sunday from Current

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests

More information

TRANSPORTATION. Reston Market Profile

TRANSPORTATION. Reston Market Profile Reston Market Profile TRANSPORTATION Fairfax County Background A recent TIME Magazine featured rapidly growing Fairfax County as one of four "megacounties" in the nation-suburban counties that have outgrown

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

SMART SCALE Round 2 Update. Nick Donohue

SMART SCALE Round 2 Update. Nick Donohue SMART SCALE Round 2 Update Nick Donohue Deputy Secretary of Transportation January 2017 Round 2 Summary 436 applications submitted 33 applications screened out $1.393 billion SMART SCALE request $1.864

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Recommendation to Approve the Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route

More information

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3 ORANGE COUNTY TRANSPORTATION AUTHORITY Go Local Fixed-Guideway Program History and Project Update PowerPoint 3 Santa Ana-Garden Grove Fixed Guideway Project OCTA Board of Directors September 26, 2011 Project

More information

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016 Project numbers do not signify ranking they are for mapping identification purposes only. 1. 15th Street East The

More information

PROMOTING FAIRFAX COUNTY, EVERY DAY.

PROMOTING FAIRFAX COUNTY, EVERY DAY. PROMOTING FAIRFAX COUNTY, EVERY DAY. MEASURABLE RESULTS, SIGNIFICANT ROI. HH H The Fairfax County Convention and Visitors Corporation (Visit Fairfax) is a non-profit marketing and promotional organization

More information

Major Projects Overview

Major Projects Overview Major Projects Overview Miami-Dade Expressway Authority February 2018 About MDX MDX operates 5 roads in Miami Dade County SR 924, SR 112, SR 836, SR 874 and SR 878 MDX Primary Source of Revenue: User Fees-Tolls

More information

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES Proposed Amendment to the Regulation that Establishes Toll Rates for Use of the Dulles Toll Road November 2018 Purpose To brief the Dulles Corridor

More information

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report Appendix D FINAL MAY 2016 D. EXISTING TRANSIT/TDM PROVIDER OVERVIEWS Transit Service Providers Information about the type, frequency,

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016 INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION Traffic and Transportation Technical Report City

More information

Proposed Dulles Toll Road Rate Adjustments

Proposed Dulles Toll Road Rate Adjustments Proposed Dulles Toll Road Rate Adjustments Dulles Corridor Advisory Committee Meeting October 5, 2012 Discussion Outline Regulatory Process for Changing Toll Rates Information Provided at Public Hearings

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

3 ASSESSMENT OF THE CORRIDOR

3 ASSESSMENT OF THE CORRIDOR 3 ASSESSMENT OF THE CORRIDOR 3.1 PHYSICAL CHARACTERISTICS OF THE CORRIDOR The 9-mile segment of I-66 from the Capital Beltway to the Theodore Roosevelt Memorial Bridge was opened to vehicular traffic in

More information

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary Report by Finance Committee (B) 07-28-2016 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201753 Resolution: Yes No TITLE: National Harbor

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION COMMONWEALTH TRANSPORTATION BOARD PUBLIC HEARING TRANSFORM 66 OUTSIDE THE BELTWAY CONCESSION PAYMENT PROJECTS

VIRGINIA DEPARTMENT OF TRANSPORTATION COMMONWEALTH TRANSPORTATION BOARD PUBLIC HEARING TRANSFORM 66 OUTSIDE THE BELTWAY CONCESSION PAYMENT PROJECTS 1 VIRGINIA DEPARTMENT OF TRANSPORTATION COMMONWEALTH TRANSPORTATION BOARD PUBLIC HEARING TRANSFORM 66 OUTSIDE THE BELTWAY CONCESSION PAYMENT PROJECTS PRESENTATION AND PUBLIC COMMENTS Northern Virginia

More information

Dulles Area Association of Realtors

Dulles Area Association of Realtors Dulles Area Association of Realtors Economic Summit October 3, 2014 Housing Pipeline Transportation Economic Development 1705 - Born in Scotland 5 May 1731 Became Lord Loudoun Served in the British Army

More information

Public Open House. Chief Peguis Trail Project

Public Open House. Chief Peguis Trail Project Public Open House Chief Peguis Trail Project CHIEF PEGUIS TRAIL OPEN HOUSE Welcome! Please browse the display boards Project Engineers and City of Winnipeg representatives are available to address your

More information

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.

More information

REPORT OF THE SUBCOMMITTEE on TRANSPORTATION

REPORT OF THE SUBCOMMITTEE on TRANSPORTATION REPORT OF THE SUBCOMMITTEE on TRANSPORTATION Mr. Chairman and Members of the Committee: I am extremely pleased to report that the Subcommittee recommendations for Transportation commit more than $2.1 billion

More information

Sree Nampoothiri From: Keith Jasper Sent: Tuesday, May 22, 2018 5:03 PM To: Sree Nampoothiri Cc: Yolanda Thomas-Jones Subject: FW: Over the Fencepost Community Newsletter May Mid-Month 2018 Just realized

More information

Measure R Program Update

Measure R Program Update Item 1 Program Update March 17, 2011 Independent Taxpayers Oversight Committee February 18 th Meeting held: Reviewed Audits of FY10 Expenditures Set Public Hearing Date on Audit Findings for April 18th

More information

395 Express Lanes Project Update

395 Express Lanes Project Update 395 Express Lanes Project Update Key Dates Milestone Date Limited Notice to Proceed February 2017 Early Works March-June 2017 Full Notice to Proceed July 2017 Preparatory Work Summer 2017 Draft Noise Abatement

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

To: Mary Beth Avedesian B.F. Saul Company

To: Mary Beth Avedesian B.F. Saul Company 1140 Connecticut Avenue NW Suite 600 Washington, DC 20036 202.296.8625 TECHNICAL MEMORANDUM To: Mary Beth Avedesian B.F. Saul Company From: Daniel B. VanPelt, P.E., PTOE Felice B. Brychta, P.E. Tricia

More information

Capital Beltway HOT Lanes Project

Capital Beltway HOT Lanes Project New Travel Choices Ahead Some things can t wait for traffic Capital Beltway HOT Lanes Project Project Update August 16, 2011 Major Milestones Reached Some things can t wait for traffic Project over 75%

More information

APPENDIX B. Arlington Transit Peer Review Technical Memorandum

APPENDIX B. Arlington Transit Peer Review Technical Memorandum APPENDIX B Arlington Transit Peer Review Technical Memorandum Arlington County Appendix B December 2010 Table of Contents 1.0 OVERVIEW OF PEER ANALYSIS PROCESS... 2 1.1 National Transit Database...2 1.2

More information

TBARTA: 2015 Master Plan and Tampa Bay Express Project

TBARTA: 2015 Master Plan and Tampa Bay Express Project TBARTA: 2015 Master Plan and Tampa Bay Express Project The Real Story Who: Tampa Bay Area Regional Transportation Authority What: Develop and implement a Regional Transportation Master Plan for the seven-county

More information

Presented By: Deputy Executive Director February 17, 2011

Presented By: Deputy Executive Director February 17, 2011 TRANSPORTATION PROJECT PRIORITIZATION Presented By: Camelia Ravanbakht, Ph.D. Ca e a aaba t,.. Deputy Executive Director February 17, 2011 OVERVIEW 2034 Long-Range g Transportation Plan (LRTP) Process

More information

Attachment A - FY 2018 Revenue Sharing Program Allocations - Approved

Attachment A - FY 2018 Revenue Sharing Program Allocations - Approved Attachment A - - Approved Name Bristol District Wytheville Town East Main Street 107236 $315,000 Lithia Road Withers Road/Cassell Road Wytheville Town (summary) $315,000 Culpeper District Charlottesville

More information

MANASSAS. From Manassas To Pentagon and Downtown Washington. Potomac River E ST. EXPWY I-66. Theodore Roosevelt Memorial Bridge I-66.

MANASSAS. From Manassas To Pentagon and Downtown Washington. Potomac River E ST. EXPWY I-66. Theodore Roosevelt Memorial Bridge I-66. Trips from to Washington Trips from to DC Bus Stop (Bus also stops at the numbered timepoints) Transfer Center Point of Interest Metrorail Station VRE Train Station 207, Potomac Rappahannock Transportation

More information

Draft Year 2040 Cost Feasible Plan

Draft Year 2040 Cost Feasible Plan Year 2040 Plan Ranking of Desires Plan Projects And Matching of Available Revenues Palm Beach Metropolitan Planning Organization (MPO) Technical Advisory Committee (TAC) Citizens Advisory Committee (CAC)

More information

REPORT TO THE DULLES CORRIDOR COMMITTEE

REPORT TO THE DULLES CORRIDOR COMMITTEE REPORT TO THE DULLES CORRIDOR COMMITTEE RECOMMENDATION TO AWARD A SOLE SOURCE CONTRACT FOR ELECTRICAL POWER SERVICE FOR INTERIM TESTING, COMMISSIONING AND PRE-REVENUE OPERATIONS FOR PHASE 2 OF THE DULLES

More information

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications

Current Amendment or Modification. Prior Amendment or Modification. All other Amendments and Modifications Individual HIGHWAYS Bridge - On State System SR46598 P-4 Region 4 Bridge - On System Pool CDOT Region 4 Bridge Federal National Highway Performance Program - - 956 483 719 719 2,877 State State Highway

More information

Trailside Park, Herndon

Trailside Park, Herndon Trailside Park, Herndon Herndon is not the little rail stop it used to be. Like many of the smaller towns around Washington, D.C. Herndon has grown and changed. It even installed it s own little beltway,

More information

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66

FIRST WEEK UPDATE: 66 EXPRESS LANES INSIDE THE BELTWAY Data from first four days shows faster, more reliable trips on I-66 FOR IMMEDIATE RELEASE Tuesday, December 12, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov FIRST WEEK

More information