Designing & Building for People on Bikes within evolving constraints Auckland Central City
|
|
- Isaac Nichols
- 6 years ago
- Views:
Transcription
1 Designing & Building for People on Bikes within evolving constraints Auckland Central City Asia Pacific Cycle Congress 19 October 2017 Graeme Bean MEngSc (Transport), BE (Civil), PGDipBus (Mktg), MEngNZ, CMEngNZ, PRINCE2 Registered Practitioner
2 Connected, attractive, safe and separated cycle facilities supporting a variety of user types and confidence levels Quality of Service???????? 2
3 3??????? Cycleways map
4 Evolving Constraints 4 Evolving constraints or evolving opportunities? The city fabric evolving (public & private development) KSAs of AT specialists and consultants is evolving Local policy and national guidelines are evolving Some lessons learnt
5 VUCA Developing projects in the central area could be described as a VUCA environment Volatile Uncertain Complex Ambiguous
6
7 ???????
8 ???????
9 ???????
10 10 Urban Cycleway Programme launched 30 Jan 2015 Nelson Street Motorway Offramp
11 Te Ara I Whiti 11
12 Phase 1 Nelson St opened 3 Dec ?
13 Phase 1 Nelson St opened 3 Dec ?
14 Phase 1 Nelson St opened 3 Dec ?
15 Nelson / Victoria remove left turn slip lane 15
16 Dec 2015 Phase 1 opened Oct 2015 Phase 2 public consultation 16
17 Phase 2 Nelson St North of Victoria St to Quay St 17 Bi-directional cycleway, some shared path
18 Phase 2 Constraints / Interfaces 18 MRT Sturdee St 2019 early/ 2035 late CRL Sturdee St disrupted PT buses resulting in new bus lanes and layovers Sturdee St/ Fanshawe St Busway next 3 to 4 years
19 Phase 2 Nelson St North of Victoria St to Quay St 19 2 events brought about the need to re-scope: Phase 2 public consultation (Oct 15) feedback requested the cycleway be on the left side of Nelson St March 2016, CRL disruption means AT Metro need to operate about 160 buses per day through Lower Hobson St east side
20 Understand the pedigree of the Mandate and PID (Project Initiation Document) - Auckland Cycle Network as shown in the Project Mandate are excluded from the project Evolving items Auckland Cycle Network CRL Busway, MRT Lessons Learnt Beware futureproofed items may over influence your decision making Needed to engage earlier with Bike Advocacy Groups (Bike Auckland, Gen Zero, Greater Auckland)
21 Video downhill on Nelson
22 Revised route 22
23 Grade and Turning 23 Grade: 19 to 26% Turn 90 degrees across slip lane Spatial requirements for pedestrians and cyclists at splitter island
24 Splitter Island little space for Peds & PoB
25 Nelson St (& Market Place) 25
26 Oct 2017 construction (Left Turn slip lane removed)
27 Process & Learnings Many iterations of lane layouts and SIDRA modelling for intersection Signal Phasing changes [Fanshawe St is major PT route to North Shore] PARAMICS modelling of network effects based on CRL construction and future scenarios AT staff were evolving Bicycle Quality of Service Evaluation Tool for Auckland was evolving [useful for confirming intuitive perceptions of various options] Recognising the person signing documentation might not be the person making the decision Working closely with Bike Advocacy groups (Bike Auckland, Gen Zero, Greater Auckland)
28 AT values Using organisational values and culture to drive outcomes
29 The Green Link Council April 2016 Part of the Midtown cycleway will likely become integrated with Linear Park in the long term.
30 30 The Green Link Victoria St. Linear Park Wellesley St. Bus Boulevard
31 >90,000 jobs, >30,000 residences, 80,000 students
32 cycle network & future assumptions
33 33
34 Midtown Cycleway College Hill (Vic Park) to Grafton Rd (Auckland Domain) Preferred Route & Alternatives Considered
35 Projects that may (temporarily) affect the design/ delivery of the cycleway CRL Linear Park Light Rail City Centre Bus Circulation particularly Wellesley St (& Victoria St) Parking and loading Private development or other major public works
36 Queen St post MRT
37 2026 Strategic Traffic/Freight Network 37
38 38 Currently planned post-crl routes Eastern buses Isthmus buses North Shore buses 5 Note: Until CRL construction completed, buses will need to use Victoria St, as per New Network consultation
39 39 Crossover route option Isthmus buses North Shore buses Eastern buses Note: Until CRL construction completed, buses will need to use Victoria St, as per New Network consultation
40 Wellesley Street bus corridor 40
41 Wellesley Street bus corridor 41
42 Midtown cycling connections 42
43 City Rail Link 43
44 Mass Transit 44
45 Victoria St cycleway (Beaumont to Hobson)
46 Scheme Design removing splitter islands
47 Process & Learnings Involved on working groups for other projects in order to push the cause of cycleway Using experts already involved with modelling for CRL to assist with understanding and selling the effects of cycleway project SCOT (Separated Cycleways Options Tools) good for supporting intuitive expectations of safety Ensuring our MCA had good alignment with Operations and Metro (PT bus) drivers Detailed Design Panel Physical Works Panel
48
49 Private development Temporary works
50 Keep Calm 50 Carry On Design & Build Cycleways View west: Victoria St towards Wellesley/ Halsey intersection
Draft City Centre Transport Proposals
Draft City Centre Transport Proposals Introduction This draft position paper provides an overview of the current City Centre transport issues, including concepts of the possible future City Centre transport
More informationWorking document. Updates underway to executive summary, costs and economics. February 2017
Working document. Updates underway to executive summary, costs and economics February 2017 East-West Midtown PT Link Project no: IZ047400 Document title: Indicative Business Case Document no: IZ061800-0000-CT-RPT-002
More informationCycling as part of the NZ transport system
Cycling as part of the NZ transport system New Zealand s journey so far and where we re headed next Asia Pacific Cycle Congress, 19 October 2017, Christchurch Claire Pascoe, Lead Advisor Multi-modal, NZ
More informationAUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION
AUCKLAND AUCKLAND $5.7 BILLION FORECAST TOTAL AUCKLAND INVESTMENT The next 10 years are expected to underline Auckland s performance as the fastest growing major city in Australasia. The city is expected
More informationAuckland City Centre: Transport Capacity and Access Trends
Auckland City Centre: Transport Capacity and Access Trends Final Report Prepared for: Auckland Council Date: 8 August 2018 Version: Final QUALITY ASSURANCE REGISTER Issue Description Prepared by Reviewed
More informationHave your say... on the Ian McKinnon Drive Cycleway Project
Have your say... on the Ian McKinnon Drive Cycleway Project The missing cycleway link connecting the Northwestern Cycleway and Dominion Road cycle lanes to the Grafton Gully Cycleway, Te Ara I Whiti Lightpath
More informationPart four. In this part you will find: The next steps to deliver the master plan
Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master
More informationHARBOUR EDGE STITCH. Uniting the Waterfront with the City Centre
78 AC_BEU_CCMP_2_TM1_4 _FD.indd 78 20/07/12 12:04 PM 01 HARBOUR EDGE STITCH Uniting the Waterfront with the City Centre 01 VISION OUR 2032 VISION IS: Quay Street as a high-quality Harbour Edge space that
More informationCREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017
CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than an
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationCalderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan
Calderdale MBC Wards Affected: Town Economy and Investment Panel: 20 October 2016 Halifax Station Gateway Masterplan Report of the Acting Director, Economy and Environment 1. Purpose of the Report 1.1
More information$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY
2015 18 National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY OVERVIEW Achieving an effective and efficient transport system is central to supporting Auckland s future. Auckland is home
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationStrategic Transport Forum
Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE ERIN MOROZ, DIRECTOR, COMMUNICATIONS AND COMMUNITY RELATIONS NIAGARA FALLS CITY COUNCIL NOVEMBER 28,
More informationWELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION
WELLINGTON WELLINGTON $1.9 BILLION FORECAST TOTAL WELLINGTON INVESTMENT The Wellington region s transport challenges are dominated by the region s concentration of population in the metropolitan cities,
More informationNorthern Beaches Transport Action Plan
Northern Beaches Transport Action Plan The NSW Government is taking action now to deliver transport improvements for the Northern Beaches, as well as planning for the future growth of the area. $633 million
More informationBasic Project Information
FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check
More informationHave your say on Let s Get Wellington Moving PUBLIC FEEDBACK IS OPEN UNTIL FRIDAY 15 DECEMBER 2017
Have your say on Let s Get Wellington Moving PUBLIC FEEDBACK IS OPEN UNTIL FRIDAY 15 DECEMBER 2017 Getting Wellington moving Let s Get Wellington Moving is a joint initiative between Wellington City Council,
More informationLongmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT
Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use
More informationSustainable mobility and the transition to a low-carbon retailing economy
Sustainable mobility and the transition to a low-carbon retailing economy Project at a glance Transport for Greater Manchester (TfGM) is working with partners across Europe to find ways of supporting the
More informationCREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017
CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017 CONGESTION COSTS OUR ECONOMY The average commute in Ontario is already over 45 minutes, and that figure jumps to more than
More informationAppendix D Media. Document No. NCI-1PRM-4COM-RPT-0103 Project No
Appendix D Media Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 This page has been intentionally left blank. Document No. NCI-1PRM-4COM-RPT-0103 Project No. 250310 Auckland s Northern Motorway
More informationCREATING CONNECTIONS IN THE CITY OF ST. CATHARINES
CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES LEON STAMBOLICH, DIRECTOR, CORRIDOR INFRASTRUCTURE BRIAN GALLAUGHER, DIRECTOR, PROJECT PLANNING RER ST. CATHARINES CITY COUNCIL NOVEMBER 13, 2017 A REGION
More informationWESTERN RECLAMATION & VIADUCT HARBOUR WATERFRONT VISION 2040
WESTERN RECLAMATION & VIADUCT HARBOUR 20 18 WATERFRONT VISION 2040 The Western Reclamation and Viaduct Harbour will be a key component in any future redevelopment of the Auckland waterfront due to their
More informationCUSTOMS STREET CITIGROUP CENTRE TARGETING 4 STAR NABERSNZ
CUSTOMS STREET CITIGROUP CENTRE TARGETING 4 STAR NABERSNZ ICONIC LANDMARK OF DOWNTOWN AUCKLAND A featured landmark of the city scape for many years, the 15 storey tower sits in a prime location at the
More informationMajor Scheme Business Case Summary Report for Programme Entry
Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date
More informationBus Priority Package. Presentation to Leigh Business Forum. 11 December 2015
Bus Priority Package Presentation to Leigh Business Forum 11 December 2015 Over 25 miles of bus routes improved What is the bus priority package? Key Strategic Benefits Shorter journey times, more punctual
More informationSouth Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings
South Bay Metro Light Rail Extension Summer/Fall 2017 Project Briefings Meeting Agenda 2 Project History Project Development Schedule Feedback 3 Project History Alternatives Analysis Measure R $272M 2008
More informationA63 Castle Street, Hull HullBID Network Lunch 24 August 2017
A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme
More informationEAST-WEST STITCH. Connecting the Western Edge of the City to the Centre
98 AC_BEU_CCMP_2_TM1_4 _FD.indd 98 20/07/12 12:06 PM 02 EAST-WEST STITCH Connecting the Western Edge of the City to the Centre 01 02 Northern Motorway Daldy Street Fanshawe Street Nelson Street Hobson
More informationRoundhouse Way Transport Interchange (Part of NATS City Centre Package)
Roundhouse Way Transport Interchange (Part of NATS City Centre Package) 15/16 16/17 17/18 18/19 19/20 Total TOTAL COST Roundhouse Way Transport Interchange 0.5m 0.5m FUNDING CIL 0.05m 0.05m Growth Deal
More informationSarawia Street Laxon Terrace Rail Level Crossing Removal
Sarawia Street Laxon Terrace Rail Level Crossing Removal Recommendations It is recommended that the Board: Receives the report. Executive summary The removal of the Sarawia Street to Laxon Terrace rail
More informationSouth Bay Light Rail Extension Summer/Fall 2017 Project Briefing
South Bay Light Rail Extension Summer/Fall 2017 Project Briefing Meeting Agenda 2 Project History Project Development Schedule Feedback Study Area Project History 4 Alternatives Analysis 2008 Measure R
More informationRoute 29 Solutions Projects
Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement
More informationCHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010
CHRISTCHURCH MOTORWAYS Project Summary Statement February 2010 Table of Contents 1. Purpose of Document 2. Strategic Context 3. Benefits 4. Project Scope and Economics 5. Implementation Plan 1 ROADS OF
More informationCITY RAIL LINK. New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter
134 AC_BEU_CCMP_3_TM5_8_FD.indd 134 20/07/12 12:30 PM 05 CITY RAIL LINK New Public Transport Stations and Development Opportunities at Karangahape Road, Newton and Aotea Quarter 5 MO VE 0 1 2 8 KEY 1 Britomart
More informationUrban Cycleways Programme Announcement Questions and Answers
Urban s Programme Announcement Questions and Answers 1. What is the Urban s Programme? The Urban s Programme is an investment of $100 million over the next four years, dedicated to urban cycling infrastructure.
More informationProposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street
STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure
More informationPolicy Transport. Policy highlights. Our plan
Policy 2017 Our plan Policy highlights National is committed to building the world-class infrastructure to ensure New Zealand continues to grow. Record investment in transport Delivering the Roads of National
More informationKING STREET PILOT STUDY PUBLIC MEETING
KING STREET PILOT STUDY PUBLIC MEETING 2017.02.13 PUBLIC WORK with GEHL STUDIO / NEW YORK SWERHUN ASSOCIATES SAM SCHWARTZ CONSULTING LLC STARTING POINTS 17 1 - TRANSIT FIRST! Transit service is beyond
More informationWynyard Precinct: Urban Design Framework February 2014
Wynyard Precinct: Urban Design Framework February 2014 Contents 0 Introduction Realising Auckland s Waterfront Potential 1 Introduction 2 Background 3 Purpose 4 Relationship to the Operative District
More informationWellington $312 $49 $456 OVERVIEW WELLINGTON REGIONAL SUMMARY
National Land Transport Programme 2015 18 Wellington WELLINGTON REGIONAL SUMMARY OVERVIEW The Wellington region is made up of a number of cities, urban areas and supporting rural hinterland. The city is
More informationSTRATEGIC FIT THE MASTERPLAN IS A NON-STATUTORY SUPPORTING DOCUMENT TO THE AUCKLAND PLAN, AND IS AN INPUT TO THE UNITARY PLAN.
28 STRATEGIC FIT THE MASTERPLAN IS A NON-STATUTORY SUPPORTING DOCUMENT TO THE AUCKLAND PLAN, AND IS AN INPUT TO THE UNITARY PLAN. Together, the Auckland Plan and the Unitary Plan provide the overall vision
More informationMember-led Review of Cycling Infrastructure
Member-led Review of Cycling Infrastructure Survey Results: Hills Road, Cambridge June 2017 0 cambridgeshire.gov.uk Contents 1. Introduction... 3 2. About you... 3 2.1 Age... 3 2.2 What is your gender?...
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More information2013 Base Plan TransLink Technical Briefing
2013 Base Plan TransLink Technical Briefing September 17, 2012 0 A better place to live based on transportation excellence Reasons we are here today Demand is growing We are being fiscally responsible
More informationAuckland Transport - Transport Indicators Report June 2013
Thousands Auckland Transport Transport Indicators Report June 213 Economic Indicators 5 4 3 2 1 % 1 2 3 4 9 8 3 2 1 Auckland Economic Activity Composite index of Economic Activity Auckland Source : ANZ
More informationCommunity Advisory Panel Meeting #
Community Advisory Panel Meeting # 6 02.13.19.. Agenda Welcome and Introductions Community Conversations City Council Meeting Debrief Review Citywide Tunnel Video (North Portal Only) Churchill Pedestrian
More informationBorders Railway - Scottish Borders Work Plan
Borders Railway - Scottish Borders Work Plan March 2015 This Scottish Borders Work Plan sets out the short, medium and longer term actions that the Council and other local partners need to take to ensure
More informationWhether travelling on two wheels or two feet, we help communities stay active and sustainable.
Creating pathways Whether travelling on two wheels or two feet, we help communities stay active and sustainable. Stantec is a local leader in providing cycleway expertise to clients throughout New Zealand.
More information$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY
2015 18 National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY OVERVIEW Transport investment in the Bay of Plenty is targeted to support significant residential growth, new industrial
More informationBrisbane Metro Infrastructure Association of Queensland 14 February 2018
Brisbane Metro Infrastructure Association of Queensland 14 February 2018 Agenda Brisbane Metro project update Packaging and procurement overview Panel discussion Audience Q&A The journey so far Planning
More informationBuilding the transportation network we need for the future in Niagara Region
Building the transportation network we need for the future in Niagara Region Niagara@metrolinx.com Metrolinx.com/Niagara Metrolinxengage.com INSERT FOOTER 1 WHO IS METROLINX? Metrolinx was created in 2006
More informationCoca-Cola Zero Belfast Bikes.
Coca-Cola Zero Belfast Bikes www.belfastbikes.co.uk Background BelfastBike Share Scheme October 2009 - Notice of Motion July 2011 - Outline Business Case OBC concluded that a public bike share scheme could
More informationPuketapapa Local Board
ATTACHMENT A July September 2017 Puketapapa Local Board This report provides a picture of Auckland Transport activities over the July September 2017 Quarter. The report is in two sections: (a) Information
More informationResort Municipality Initiative Annual Report 2015
Resort Municipality Initiative Annual Report 2015 Submitted by: City of Rossland in association with Tourism Rossland Prepared by: Deanne Steven Acknowledgements The City of Rossland would like to thank
More information3.0 Greenways Mapping. Waitematā Greenways
3.0 Greenways Mapping Waitematā Greenways 19 4.0 Future Development Waitematā Greenways 32 References Waitematā Greenways 34 Image reference Cover page 1. Auckland Council Stock Photo (2012).
More informationSection A: Scheme Summary
Section A: Scheme Summary Name of Scheme: PMO Scheme Code: Lead Organisation: Senior Responsible Officer: Lead Promoter Contact: Case Officer: North East Calderdale Transformational Programme WYTF-PA4-054
More informationWelcome. Green Line in Your Community
Welcome Green Line in Your Community Today s session will provide you with information on options The City is exploring for connecting the Green Line in the Beltline to the future Inglewood/Ramsay station.
More informationDraft Auckland Regional Land Transport Plan
1 Table of Contents Table of Contents Table of Contents 2 01. Our Vision 3 02. Purpose and Scope of the Regional Land Transport Plan 5 03. Auckland s Challenges 12 04. Addressing Auckland s Challenges
More informationRW Bruhn Bridge and Approaches Project
RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the
More informationROTORUA INTEGRATED NETWORK STRATEGY
ROTORUA INTEGRATED NETWORK STRATEGY 2012-2042 May 2013 This photo provided by RDC Cover photos provided by RDC and BOPRC Contents Context Issues for the Strategy to Address Outcomes and Interventions Implementation
More informationDavid Tickle, Principal, Urban Design, Hassell
David Tickle, Principal, Urban Design, Hassell August 2015 NEWCASTLE URBAN TRANSFORMATION & TRANSPORT PROGRAM REVITALISATION POTENTIAL Establishing a Vision and Objectives VISION: RE-ESTABLISH NEWCASTLE
More informationN4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction
Chapter 2 Need for the Scheme 2.1 Introduction The National Primary Route N4, Dublin to Sligo is a strategic corridor from Dublin to the northwest and border counties (See RCSR 101 in Volume 2). The National
More informationwaterview connection Completing the Western Ring Route the Waterview Connection
waterview connection MAY 2009 Completing the Western Ring Route the Waterview Connection The NZ Transport Agency (NZTA) has a new proposal to complete the Western Ring Route around Auckland by connecting
More informationCONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5
2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration
More informationREPORT ON SUBMISSION TO LET S GET WELLINGTON MOVING
CITY DIRECTION COMMITTEE 31 JANUARY 2018 REPORT ON SUBMISSION TO LET S GET WELLINGTON MOVING PURPOSE This paper outlines the submission made by the Chief Executive under delegated authority to Let s Get
More informationBus Reliability and Punctuality Performance
Bus Reliability and Punctuality Performance Recommendation(s) That the Board: Board Meeting 26 August 2014 i. Notes the changes to the reporting of bus reliability and punctuality. As at July 2014 the
More informationNLTF 2020/21 ($000) Funding Priority NLTF 2018/19 ($000) NLTF 2019/20 ($000)
Funding Priority Wellington - Carterton District Council - Local road improvements Low cost / low risk improvements 2018-21 Local Roads 2 341 HM 53% 1,050 194 149 214 Approved Street Light LED conversion
More informationUniversity of Wollongong Innovation Campus Masterplan
University of Wollongong Innovation Campus University of Wollongong Innovation Campus Masterplan Traffic and Transport Assessment Traffic and Transport Assessment Prepared for University of Wollongong
More informationPCAL Case Study Retail Areas: Rouse Hill Town Centre
PCAL Case Study Retail Areas: Rouse Hill Town Centre Introduction Rouse Hill Town Centre is a new mixed use development on a greenfield site in Sydney s North West. It has been planned to be a major hub
More informationReport to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub
Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of
More informationRE: Victoria Road upgrade (RTA December 2007). Thank you for the briefing from your department and the invitation to comment on the above.
Iain Macleod Project Manager Victoria Road upgrade Roads and Traffic Authority PO Box 743 Drummoyne NSW 1470 e : Victoria_Road_Info@rta.nsw.gov.au 21 February 2008 RE: Victoria Road upgrade (RTA December
More informationIEC BOARDWALK CYCLEWAY FEASIBILITY STUDY
1 IEC BOARDWALK CYCLEWAY FEASIBILITY STUDY The aim of this study is to review the role and value of including a cycleway in the proposed boardwalk under the Island Eastern Corridor, and then to consider
More informationDavid acts an Independent Hearing Commissioner and has considered plan changes, resource consents and notices of requirements.
Director David is a Director with Hill Young Cooper Ltd, a resource management, environmental policy and planning consultancy with offices in Auckland and Wellington. David has over 25 years experience
More informationSharing the Way with Sustainable Transport Options
Sharing the Way with Sustainable Transport Options Planning Institute Australia Professional Development Seminar Adelaide, SA Thursday 1 st May 2008 John Devney Sustainable Transport What is Sustainable
More informationIsland Eastern Corridor Boardwalk-Cycleway Feasibility Study
For discussion on 12 January 2012 Island Eastern Corridor Boardwalk-Cycleway Feasibility Study PURPOSE The purpose of this paper is to understand and promote the feasibility of incorporating the Harbourfront
More informationA summary report on what the community told us
DECEMBER 2015 A summary report on what the community told us During August and September 2015, UrbanGrowth NSW in partnership with Newcastle City Council ran the Revitalising Newcastle community engagement
More information[REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ]
2018 Ben Ross Talking Southern Auckland Picture 1: Manukau Bus Station with MIT and rail station in the background [REGIONAL LAND TRANSPORT PROGRAM AND REGIONAL FUEL TAX SUBMISSION ] Submission to the
More informationJAKARTA TRANSPORTATION
Toward A Better TRANSPORTATION AGENCY DKI JAKARTA PROVINCIAL GOVERNMENT (INDONESIA) FERDINAND GINTING JAKARTA TRANSPORTATION Jakarta a Capital City, and many more roles! Capital City of Indonesia and Centre
More informationCreating a High Quality Business District
Date Month Date Month Friday 7 November 2014 Nine Elms on the South Bank A Bilfinger Real Estate company Creating a High Quality Business District New London Architecture Introduction Nine Elms Vauxhall
More informationFINCH HYDRO CORRIDOR TRAIL PROJECT
FINCH HYDRO CORRIDOR TRAIL PROJECT Pharmacy Avenue to Birchmount Road January 29 th, 2018 L Amoreaux Community Centre (2000 McNicoll Avenue) 1 Purpose of Drop In Event The purpose of today s drop-in event
More informationWest Midlands Sustainable Urban
West Midlands Sustainable Urban Transport Strategy and its Delivery: Movement for Growth Liveable City Conference Transport and Connectivity Seminar - 30/11/2017 Adam Harrison, Strategy & Intelligence
More informationGold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging
Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section
More informationAppendix 6 Fulbourn Greenway Review
Appendix 6 Fulbourn Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown
More informationMacleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts
Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:
More informationFEASIBILITY CRITERIA
This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street
More informationLESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation
LESLIE BARNS & CONNECTION TRACK Project Update Construction and Traffic Management Consultation PRESENTATION SUMMARY Part 1 Brief Project Update (New Streetcars & Streetscape Improvements) Part 2 Construction
More informationInvesting in Greater Manchester transport 2017/2018
TRAFFIC Investing in Greater Manchester transport 2017/2018 INFORMATION www.greatermanchester-ca.gov.uk Transport is an important part of life for residents and businesses in Greater Manchester. It connects
More informationA Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures
West Belfast Partnership 218-226 Falls Road Belfast BT12 6AH T: 02890809202 A Response to: Belfast On The Move Transport Masterplan for Belfast City Centre, Sustainable Transport Enabling Measures Issued
More informationNDC is a response to 3 challenges that exist in today s airline distribution eco-system:
1 NDC is a response to 3 challenges that exist in today s airline distribution eco-system: Airlines don t have the ability to distribute their products across the travel agent channel without being,owing
More informationStatistics Report. May Page 1
Statistics Report May 214 Page 1 TABLE OF CONTENTS PUBLIC TRANSPORT... 3 1. HIGHLIGHTS... 3 2. PUBLIC TRANSPORT PATRONAGE... 4 3. PUBLIC TRANSPORT SERVICE PERFORMANCE... 14 4. SPECIAL EVENT PUBLIC TRANSPORT
More informationFrequently Asked Questions on the Route 29 Solutions Improvements Projects
Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy
More informationITA AITES WORLD TUNNEL CONGRESS 2009
ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS
More informationAuckland Port and the Unitary Plan Dr Douglas Fairgray
Auckland Port and the Unitary Plan Dr Douglas Fairgray Source: Auckland 1886 - Sir George Grey Special Collections, Auckland Libraries, NZ Map 374 Scope The interface between the Unitary Plan and the Port
More information#1. Why is the City doing this project?
Community Workshop #2 January 2016 #1. Why is the City doing this project? Broadway and Lincoln are in constant change Broadway and Lincoln are in constant change Broadway and Lincoln are in constant change
More informationBridging Brisbane Survey 2017 Supplementary Report
1: Moggill Road Bridge (at Moggill ferry crossing) This river crossing connects Moggill Ferry Road at Riverview with the end of Moggill Road at Moggill where the ferry currently operates. It links the
More informationBARANGAROO. Integrated Transport Plan
BARANGAROO Integrated Transport Plan BARANGAROO Integrated Transport Plan DISCLAIMER While every reasonable effort has been made to ensure that this document is correct at the time of printing, the State
More informationProgress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport
Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport Jack van der Merwe (Pr. Eng) CEO: Gautrain Management Agency 09 March 2010 Gautrain in a nutshell Scope Currently the largest
More information