1 Port Authority of New South Wales 24-Jan-2018 Review of Environmental Factors

2 Client: Port Authority of New South Wales ABN: Prepared by AECOM Australia Pty Ltd Level 21, 420 George Street, Sydney NSW 2000, PO Box Q410, QVB Post Office NSW 1230, Australia T F ABN Jan-2018 AECOM in Australia and New Zealand is certified to ISO9001, ISO14001 AS/NZS4801 and OHSAS AECOM Australia Pty Ltd (AECOM). All rights reserved. AECOM has prepared this document for the sole use of the Client and for a specific purpose, each as expressly stated in the document. No other party should rely on this document without the prior written consent of AECOM. AECOM undertakes no duty, nor accepts any responsibility, to any third party who may rely upon or use this document. This document has been prepared based on the Client s description of its requirements and AECOM s experience, having regard to assumptions that AECOM can reasonably be expected to make in accordance with sound professional principles. AECOM may also have relied upon information provided by the Client and other third parties to prepare this document, some of which may not have been verified. Subject to the above conditions, this document may be transmitted, reproduced or disseminated only in its entirety.

3 Quality Information Document Ref Date Prepared by Reviewed by 24-Jan-2018 B. Cavanough. S. Jeffries (AECOM), R. Prieto-Curiel (Port Authority of NSW), R. Bennett (Port Authority of NSW). Revision History Rev Revision Date Details Name/Position Authorised Signature 0 09-Oct-2017 Draft for client review D. Drysdale, Senior Environmental Scientist 1 20-Dec-2017 Final draft D. Drysdale, Senior Environmental Scientist 2 24-Jan-2018 Final (revised) D. Drysdale, Senior Environmental Scientist

4 Table of Contents Project Terms i Executive Summary iii 1.0 Introduction Purpose of the Report Existing Multi-User Facility Assessment / Approval Project Overview Strategic Need and Justification Glebe Island Background Strategic Context of the Project NSW Freight and Ports Strategy A Plan for Growing Sydney The Bays Precinct Green Port Guidelines Project Need Project Objectives Alternative Options Considered Do Nothing Option Option One Option Two Option Three (Preferred Option) Statutory Planning Framework Permissibility Environmental Planning and Assessment Act Biodiversity Conservation Act Protection of the Environment Operations Act Heritage Act Environmental Planning Instruments State Environmental Planning Policy (State and Regional Development) State Environmental Planning Policy No. 55 Remediation of Land State Environmental Planning Policy (State Significant Precincts) Sydney Regional Environmental Plan (Sydney Harbour Catchment) Sydney Regional Environmental Plan No. 26 City West Glebe Island and White Bay Master Plan Commonwealth Environmental Approval Project Description Project Location Project Infrastructure Existing Infrastructure and Uses Construction Construction Timeframe and Hours Construction Methodology Construction Plant and Equipment Operation Operational Plant and Equipment Consultation Consultation Objectives Ongoing Consultation by Port Authority Project Consultation Activities Prior to REF Determination Project Consultation during Construction and Operation of the Project Environmental Assessment Noise and Vibration Existing Environment 35

5 6.1.2 Methodology Impact Assessment Mitigation and Management Measures Air Quality Existing Environment Methodology and Impact Assessment Mitigation and Management Measures Traffic and Transport Existing Environment Methodology Impact Assessment Mitigation and Management Measures Soils, Water and Waste Existing Environment Methodology Impact Assessment Mitigation and Management Measures Safety and Emergency Response Heritage Existing Environment Methodology Impact Assessment Mitigation and Management Measures Visual Amenity Existing Environment Methodology Impact Assessment Mitigation and Management Measures Ecology Existing Environment Methodology Impact Assessment Mitigation and Management Measures Socio-Economic Existing Environment Methodology and Impact Assessment Mitigation and Management Measures Cumulative Impacts Mitigation Measures Climate Change and Sustainability Greenhouse Gas Emissions Climate Change Sustainability Environmental Management Environmental Management Plans Mitigation and Management Measures Conclusion References 111 Appendix A Consideration of Clause 228(2) of the Environmental Planning and Assessment Regulation 2000 Appendix B Green Port Guideline Checklist Appendix C Consultation Material A B C

6 Appendix D Noise Impact Assessment Appendix E Air Quality Impact Assessment Appendix F EPBC Act Protected Matters Search Results and NSW BioNet Atlas Search Results Appendix G Preliminary Waste Classification Appendix H Artist s Impressions D E F G H Figures Figure 1 Regional Context 3 Figure 2 Site Layout 4 Figure 3 Cross-section Diagram 5 Figure 4 Surrounding Road Network 75 Figure 5 Non-Aboriginal Heritage Items Located Within the Vicinity of the Project 86 Figure 6 Key Visual Receivers Assessed for the Project 89

7 i Project Terms Term ABS ACM AHIMS BC Act CBD CEMP CO CTMP DCP db EPA EP&A Act EPBC Act EPL ESD FM Act Meaning Australian Bureau of Statistics Asbestos Containing Material Aboriginal Heritage Information Management System Biodiversity Conservation Act 2016 (NSW) Central Business District Construction Environmental Management Plan Carbon monoxide Construction Traffic Management Plan Development Control Plan Decibel Environment Protection Authority Environmental Planning and Assessment Act 1979 (NSW) Environment Protection and Biodiversity Conservation Act 1999 (Cth) Environment Protection Licence Ecologically Sustainable Development Fisheries Management Act 1994 (NSW) ICNG Interim Construction Noise Guideline (DECC, 2009) Infrastructure SEPP State Environmental Planning Policy (Infrastructure) 2007 INP NSW Industrial Noise Policy (EPA, 1999) INSW LEP NML NO x NSW OEH OEMP PM POEO Act Port Authority Project Project site Infrastructure NSW Local Environmental Plan Noise Management Level Oxides of nitrogen New South Wales Office of Environment and Heritage Operational Environmental Management Plan Particulate matter Protection of the Environment Operations Act 1997 (NSW) Port Authority of New South Wales The construction and operation of a multi-user facility at Glebe Island by or on behalf of the Port Authority, for the handling, storage and distribution of bulk materials including sand, aggregate, and gypsum, as described in further detail in Sections 1.3 and 4.0. The Project site is within Lot 10 on DP at Glebe Island Berths 1 and 2 on the eastern side of Glebe Island, in Sydney Harbour.

8 ii Term REF RMS SEPP SO 2 SSI TfNSW WARR Act Meaning (prepared to satisfy the requirements of Section 111 of the EP&A Act) Roads and Maritime Services State Environmental Planning Policy Sulfur dioxide State Significant Infrastructure Transport for NSW Waste Avoidance and Resource Recovery Act 2001 (NSW)

9 iii Executive Summary This (REF) has been prepared on behalf of the Port Authority of New South Wales (Port Authority). The Port Authority is proposing the construction and operation of a multiuser import, storage and distribution facility for sand and other bulk construction materials delivered by ship (the multi-user facility, also referred to as the Project) on its site at Glebe Island, Sydney. The multi-user facility is intended to address a crucial need for Sydney, consistent with State government policy. This REF has considered the Project and its environmental impacts in accordance with the provisions of Part 5 of the Environmental Planning and Assessment Act 1979 (EP&A Act) and the Environmental Planning and Assessment Regulation 2000 (EP&A Regulation), and other relevant statutory requirements. In accordance with section 111 of the EP&A Act this REF has examined and taken into account to the fullest extent possible, all matters affecting or likely to affect the environment by reason of the Project. In particular, the REF has taken into account the factors set out in clause 228 of the EP&A Regulation. Project Need and Justification Since 1901, the NSW Government has owned and operated Glebe Island as a working port facility for a variety of uses including container handling, break bulk cargo (timber, paper, motor vehicles and steel) and dry bulk cargo (salt, cement, sugar, gypsum, aggregate etc.). The facility is also used for laying-up of vessels and other ad hoc port related activities. Glebe Island is within the Inner West Local Government Area and within the Bays Precinct Urban Transformation Program area a proposed urban renewal plan for land adjacent to Sydney Harbour. In the long-term, the plan proposes that port and maritime industries at Glebe Island be integrated with other land uses such as a potential new technological and innovation campus. In the short to mediumterm however, Glebe Island will provide a crucial low cost, low impact supply chain to support the importation of critical bulk construction materials for the existing inner city market and major infrastructure projects. Both the NSW Government s A Plan for Growing Sydney (NSW Government, 2014) and NSW Freight and Ports Strategy (Transport for NSW, 2013) recognise Glebe Island s strategic importance in supplying material to the Sydney construction market as well as receiving material by sea. In 2017, following an Infrastructure NSW (INSW) strategic review of Glebe Island, the NSW Government endorsed a recommendation that port facilities at Glebe Island be retained and expanded to meet the strategic supply needs of the construction industry, in particular the materials for concrete production being sand, cement and aggregates. There is now a crucial need for Sydney to import critical construction materials due to the depletion of local sand supplies. Glebe Island is in close proximity to Sydney s Central Business District (CBD), which is experiencing a construction boom and urban renewal driven by $70 billion of major infrastructure projects. Glebe Island is uniquely placed to provide a low cost, low impact, sustainable entry point for these materials needed in the CBD and Bays Precinct. The key objectives of the Project are: The construction and operation by or on behalf of the Port Authority of a facility that will receive, store and despatch bulk construction materials, including sand and aggregate, at the Glebe Island wharf, to meet the increased demand and forecast growth from the inner Sydney construction industry. Increase the Glebe Island wharves capability as an operational port facility consistent with the strategic goals for the area. Minimise associated environmental and amenity impacts. Permissibility Clause 68(1) of the State Environmental Planning Policy (Infrastructure) 2007 (Infrastructure SEPP) relevantly specifies that development for the purpose of port facilities may be carried out by or on

10 iv behalf of a Port Corporation without consent on any land provided that the development is directly related to an existing port facility. The proposed development is therefore permissible without development consent because: The Port Authority is a Port Corporation established under the Ports and Maritime Administration Act The Project is development that is directly related to an existing port facility, being Glebe Island Berths 1 and 2. The Project is proposed to be carried out by or on behalf of the Port Authority. Consequently the Project is an activity that is subject to assessment under Part 5 of the EP&A Act provided that the activity is not likely to significantly affect the environment. Project Description The Project is proposed to include construction and operation of a ship off-loading, storage and despatch facility for bulk construction materials such as sand, aggregates and other dry bulk construction materials. The Project site is located within Lot 10 on DP (owned by Port Authority) at Glebe Island Berths 1 and 2 on the eastern side of Glebe Island, in Sydney Harbour. The Project would include the following key features: An enclosed bulk material storage building consisting of storage bays designed to allow products to be conveyor fed through the building s wall/roof slot(s). The building slot(s) would be closed at times when material is not being unloaded from ships. The total storage capacity of the storage structure would be approximately 70,000m 3 distributed in stockpiles over the bays (e.g. 14,000m 3 per bay if it was operated in a five bay arrangement). Electric radial stackers on the wharf edge, with a maximum of two stackers operating at any one time. The stackers would deliver bulk materials directly into the individual storage bays through the building slot(s). Bulk material would be fed into the radial stacker/s from moored ships. Truck-loading located internally to the storage building allowing multiple trucks to be loaded. Truck loading would involve the use of front end loaders. The building and internal operations would be designed to minimise dust and noise emissions. A weighbridge located next to the storage building to ensure truck and dogs are loaded to acceptable limits. Demountable offices and amenities block. The amenities block would likely be connected to town water and sewerage systems. If required, a multi-user above ground diesel fuel tank with an approximate capacity of 20,000 litres. The storage tank would be bunded to meet the requirements of Australian Standard 1940: Storage and Handling of Flammable and Combustible Liquids, and include in-built dispensers. Operational lighting, connection to existing services, and associated plant and equipment. Common areas such as access ways and other areas where customer s users may interface with each other. The relevant transportation aspects of a multi-user facility at Glebe Island Berths 1 and 2 handling dry bulk goods from ship onto the wharf deck or directly into trucks (with subsequent truck movements to separate/remote locations), have previously been assessed by the former Sydney Ports Corporation in a REF prepared and determined under Part 5 of the EP&A Act in 2013 (SPC Reference: C13/115). There are no additional trucking movements associated with the current multi-user facility proposed. Environmental Assessment An environmental assessment has been completed to consider whether the Project is likely to significantly affect the environment. The assessment has also included assessment of:

11 v Whether there are likely to be impacts to matters of national significance under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act). Whether a species impact statement would be required under the Biodiversity Conservation Act This REF has found that the key potential environmental impacts associated with the Project include: Noise emissions during construction. Visual impacts to nearby receivers during operation. However impacts are expected to be within manageable limits. The impacts would also be mitigated by the design and management strategies that would be implemented as part of the Project. In this regard, it is noted that preliminary design undertaken for the multi-user facility s building has been aimed to ensure that acoustic and air quality impacts are managed and mitigated. Operational noise emissions associated with land-based activities have been assessed as compliant with the noise trigger levels established in accordance with the NSW EPA s Noise Policy for Industry at the nearest residential receivers. Potential environmental impacts associated with the Project during construction and operation would be mitigated and managed through the proposed implementation of the Construction Environmental Management Plan and Operation Environmental Management Plan as part of the Project. Conclusion The Project has been fully assessed in accordance with the requirements of Part 5 of the EP&A Act and the EP&A Regulation. Based on the assessment, the conclusion is reached that the project is not likely to significantly affect the environment and therefore does not require the preparation of an Environmental Impact Statement (EIS). The assessment includes an assessment of whether the Project is likely to have a significant impact to matters of national environmental significance under the EPBC Act. The Project is not likely to have a significant impact on matters of national environmental significance and therefore referral to the Commonwealth Government under the EPBC Act would not be required. Significant impacts on threatened species, populations, ecological communities or their habitats as defined by the Biodiversity Conservation Act 2016 would also not be expected as a result of the project and therefore a species impact statement is not required.

Newcastle Transport Program Newcastle Light Rail Determination Report

Newcastle Transport Program Newcastle Light Rail Determination Report Newcastle Transport Program Newcastle Light Rail Determination Report Date Author 25 July 2016 TfNSW Ref 5276649 Status Final TfNSW 2014 UNCONTROLLED WHEN PRINTED Page 1 of 19 Table of contents 1 Introduction

More information

U-Park Wyatt Street Temporary Event Space

U-Park Wyatt Street Temporary Event Space Adelaide City Council 26-May-2015 Doc No. 60427502-A15E01RP U-Park Wyatt Street Temporary Event Space Music Noise Assessment U-Park Wyatt Street Temporary Event Space Music Noise Assessment Client: Adelaide

More information

Submission to NSW Koala Strategy Consultation Process. March 2017

Submission to NSW Koala Strategy Consultation Process. March 2017 Submission to NSW Koala Strategy Consultation Process March 2017 Table of contents Opening 3 Response 3 Whole-of-government NSW koala strategy 3 State Environment Planning Policy (SEPP) 44 3 The draft

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Planning Approval Consistency Assessment Form

Planning Approval Consistency Assessment Form Integrated Management System Planning Approval Consistency Assessment Form SM ES-FT-414 Sydney Metro Integrated Management System (IMS) Applicable to: Document Owner: System Owner: Status: Sydney Metro

More information

Appendix F Public authorities responses

Appendix F Public authorities responses Planning Proposal under sec 55 of the EP&A Act LEP Refinements Appendix F Public authorities responses Appendix F Public authorities responses Prior to public exhibition, consultation was made with the

More information

Acid Sulfate Soil Management Advisory Committee, 1998, Acid Sulfate Soil Manual

Acid Sulfate Soil Management Advisory Committee, 1998, Acid Sulfate Soil Manual REFERENCES Acid Sulfate Soil Management Advisory Committee, 1998, Acid Sulfate Soil Manual ANZECC / ARMCANZ, 2000a, National Water Quality Management Strategy Paper No. 4: Australian and New Zealand Guidelines

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling Metropolitan Planning Authority Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling Thompsons Road, Clyde Creek and Casey Fields South (Residential)

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017. Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD 4560 Submitted via online portal 2 June 2017 Dear Sir /Madam, RE: DRAFT ENVIRONMENTAL AND LIVEABILITY STRATEGY The Green Building Council

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT G - 1 INTEGRA COAL OPERATIONS PTY LTD Part G Bibliography 6 INTEGRA COAL OPERATIONS PTY LTD G - 2 ENVIRONMENTAL ASSESSMENT This page has intentionally been left blank ENVIRONMENTAL

More information

NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY NO 44 KOALA HABITAT PROTECTION

NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY NO 44 KOALA HABITAT PROTECTION Director, Planning Frameworks NSW Department of Planning and Environment GPO Box 39 Sydney NSW 2001 16 December 2016 NCC SUBMISSION ON EXPLANATION OF INTENDED EFFECT: STATE ENVIRONMENTAL PLANNING POLICY

More information

E40. Temporary activities

E40. Temporary activities E40. Temporary activities E40.1. Background Temporary activities contribute to Auckland's vibrancy and to the social, cultural and economic well-being of communities. Temporary activities also enable filming

More information

F6. Coastal Ferry Terminal Zone

F6. Coastal Ferry Terminal Zone F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

APPENDIX E. Urban Design

APPENDIX E. Urban Design APPENDIX E Urban Design energy2u Alliance North Sydney Zone Substation Redevelopment September 2010 E August 2010 North Sydney Zone Substation Redevelopment Urban Design Impacts on 136-140 Walker Street

More information

Green Fields Leppington

Green Fields Leppington Green Fields Leppington CONNTENTS 1.0 URBAN GROWTH - SYDNEY 2.0 MACRO CONTEXT 3.0 LOCAL ENVIRONMENTAL PLAN - LEPPINGTON 4.0 CONCEPT 5.0 GREEN ROOFS 6.0 APARTMENT REALISATION SCHEDULE 7.0 INFRASTRUCTURE

More information

Development of the Port Botany Expansion would be undertaken in two principal stages:

Development of the Port Botany Expansion would be undertaken in two principal stages: Introduction CHAPTER 1 Summary of key outcomes: There is a clear need to provide additional container handling facilities at Port Botany by about 2010 to ensure sufficient port capacity is available in

More information

3 Pilbara ports provide gateways

3 Pilbara ports provide gateways COMMUNITY AND STAKEHOLDERS Community Consultation Committees 8 meetings each year across our 3 port locations Dampier, Port Hedland and Ashburton Community Support Initiative >$295,000 a year in financial

More information

TRANSPORT, TRAFFIC AND PARKING ASSESSMENT REPORT

TRANSPORT, TRAFFIC AND PARKING ASSESSMENT REPORT TRANSPORT, TRAFFIC AND PARKING ASSESSMENT REPORT APPENDIX P Appendix P Sydney Metro City & South West Victoria Cross Over Station Development: Traffic and transport report Applicable to: Author: Owner

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

Sydney Airport Master Plan

Sydney Airport Master Plan Sydney Airport Master Plan This document is printed on ecostar and is manufactured from 100% post consumer recycled paper in a process chlorine free environment under the ISO 14001 environmental management

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

APPENDIX E. Sydney Airport Master Plan

APPENDIX E. Sydney Airport Master Plan E APPENDIX E Sydney Airport Master Plan 2033 245 APPENDIX E PLANNING LAWS AND REGULATIONS Sydney Airport is subject to various airport specific and general laws and regulations. Set out below is an explanation

More information

Request for Secretary s Environmental Assessment Requirements Sydney Metro City & Southwest Crows Nest Over Station Development

Request for Secretary s Environmental Assessment Requirements Sydney Metro City & Southwest Crows Nest Over Station Development 29 August 2018 Sydney Metro City & Southwest Crows Nest Over Station Development Table of Contents 1. Introduction... 6 1.1. Sydney Metro and over station development... 6 1.2. Crows Nest over station

More information

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1. 54 PLANNING AND ECONOMIC COMMITTEE 8 JULY 2015 3 SUSTAINABLE PORTS DEVELOPMENT BILL Neil Quinn 1/58/14 #4771706 RECOMMENDATION: That Council endorses the Submission made to the Infrastructure, Planning

More information

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN

Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN Connecting People Building Opportunities BRISBANE AIRPORT 2014 MASTER PLAN MASTER PLAN 2014 PROPOSED AIRPORT DEVELOPMENT STRATEGY 2034 Important Notice This Master Plan has been prepared by Brisbane Airport

More information

Legislative Framework 6

Legislative Framework 6 Legislative Framework 6 6.1 IntroDUCTION This chapter describes the main legislative for the proposed expansion, including whole-of-project approvals and permits/licences for specific activities. It identifies

More information

2.0 AIRPORT ENVIRONMENT STRATEGY

2.0 AIRPORT ENVIRONMENT STRATEGY 2.0 AIRPORT ENVIRONMENT STRATEGY CHAPTER 2: AIRPORT ENVIRONMENT STRATEGY 2.1 Airport Environment Strategy requirements In accordance with the Airports Act 1996, Sydney Airport is required to prepare and

More information

How is air quality managed. in Sydney s road tunnels?

How is air quality managed. in Sydney s road tunnels? How is air quality managed in Sydney s road tunnels? The Sydney Orbital Network includes over 160 kilometres of surface roads, tunnels, bridges and underpasses. There are five main tunnels along the network;

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer   Tel: 7. TRAVELLER SITES ALLOCATIONS DOCUMENT REPORT OF: Contact Officer: Wards Affected: Key Decision: Report to: HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Email: nathan.spilsted@midsussex.gov.uk

More information

JUSTIN JONES CURRICULUM VITAE

JUSTIN JONES CURRICULUM VITAE JUSTIN JONES CURRICULUM VITAE ADDRESS: PO Box 499 PROSPECT TAS 7250 TELEPHONE: Mobile 0418 311 033 EMAIL ADDRESS: justin@justwaste.com.au www.justwaste.com.au LICENCES: Heavy Combination; Forklift; Wheel

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in

More information

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf

https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf GSC Sydney East Rev Draft -references Port Botany - 30 https://gsc-public-1.s3-ap-southeast-2.amazonaws.com/s3fs-public/draft-eastern-city-district-plan.pdf Pages 6. The District s freight routes, particularly

More information

port of brisbane Information Guide

port of brisbane Information Guide port of brisbane Information Guide A B O U T U S The Port of Brisbane, managed by the Port of Brisbane Pty Ltd, is Queensland s largest general cargo and container port, and a driver of economic growth

More information

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT

Sainsburys Store, Mere Green Road, Sutton Coldfield, Birmingham, B75 5BT Committee Date: 7/0/013 Application Number: 013/04/PA Accepted: 1/04/013 Application Type: Variation of Condition Target Date: 1/07/013 Ward: Sutton Four Oaks Sainsburys Store, Mere Green Road, Sutton

More information

Stakeholder Briefing The Bays Precint Urban Transformation Program

Stakeholder Briefing The Bays Precint Urban Transformation Program Stakeholder Briefing The Bays Precint Urban Transformation Program November 2014 Our Lifecycle Approach 3 Our Ambition & Narrative Our Ambition Statement for UrbanGrowth NSW is - Transforming City Living

More information

FUTURE AIRSPACE CHANGE

FUTURE AIRSPACE CHANGE HEATHROW EXPANSION FUTURE AIRSPACE CHANGE UPDATE SEPTEMBER 2018 On 25 June 2018, Parliament formally backed Heathrow expansion, with MPs voting in support of the Government s Airports National Policy Statement

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011 CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 Cairns Regional Council September 2011 Coffey

More information

Memorandum of Understanding with ACT Government

Memorandum of Understanding with ACT Government MEDIA RELEASE 8 April 2015 Memorandum of Understanding with ACT Government The ACT Government and Canberra Airport today entered into a new Memorandum of Understanding (MoU) on key areas of common interest

More information

JANDAKOT AIRPORT HERITAGE MANAGEMENT PLAN

JANDAKOT AIRPORT HERITAGE MANAGEMENT PLAN JANDAKOT AIRPORT HERITAGE MANAGEMENT PLAN CONSERVATION MANAGEMENT PLAN APPENDIX I Jandakot Airport Holdings Pty Ltd 16 Eagle Drive Jandakot WA 6164 Ref: CMP Appendix I Heritage Management Plan 2014 V1.Docx

More information

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN

SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN SUBMISSION BY THE BOARD OF AIRLINE REPRESENTATIVES OF NEW ZEALAND ON THE DRAFT QUEENSTOWN LAKES DISTRICT COUNCIL DRAFT PLAN Background to BARNZ BARNZ is an incorporated society comprising 19 member airlines

More information

Global Sustainable Tourism Destinations Criteria

Global Sustainable Tourism Destinations Criteria Global Sustainable Tourism Destinations Criteria Draft destination level Global Sustainable Tourism Criteria as proposed after Destinations and International Standards joint working group meeting and follow-up

More information

ARTC. Melbourne-Brisbane Inland Rail Alignment Study Final Report July 2010 Appendix N Stakeholders Consulted

ARTC. Melbourne-Brisbane Inland Rail Alignment Study Final Report July 2010 Appendix N Stakeholders Consulted Melbourne-Brisbane Inland Rail Alignment Study Final Report July 2010 Appendix N Stakeholders Consulted Stakeholders consulted The following stakeholders were consulted by the study team during the Melbourne-Brisbane

More information

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Helistrat - Place: Waste Report

Gatwick Airport Limited. Response to Airports Commission Consultation. Appendix. Helistrat - Place: Waste Report Gatwick Airport Limited Response to Airports Commission Consultation Appendix 19 Helistrat - Place: Waste Report Technical Report in Response to Airports Commission Consultation Module 10: Place (Waste

More information

Chancellery Projects. Melbourne Forum 4 May 2016 Vanessa Campbell, Director, Chancellery Projects

Chancellery Projects. Melbourne Forum 4 May 2016 Vanessa Campbell, Director, Chancellery Projects Chancellery Projects Melbourne Forum 4 May 2016 Vanessa Campbell, Director, Chancellery Projects Key Facts about the University Growing Esteem STEM-M Strategy Student Experience The University s Chancellery

More information

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001

Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Proposed amendments to the Air Navigation (Essendon Airport) Regulations 2001 Public Consultation Paper September 2017 Summary Purpose The purpose of this paper is to seek comments through public consultation

More information

The Government s Aviation Strategy Transport for the North (TfN) response

The Government s Aviation Strategy Transport for the North (TfN) response The Government s Aviation Strategy Transport for the North (TfN) response Transport for the North Background Good transport links are a crucial part of a strong economy supporting labour markets and delivering

More information

Aircraft Maintenance Organisations - Certification. Contents

Aircraft Maintenance Organisations - Certification. Contents Contents Rule objective... 3 Extent of consultation... 3 New Zealand Transport Strategy... 4 Summary of submissions... 5 Examination of submissions... 6 Insertion of Amendments... 6 Effective date of rule...

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE www.channelcapacityupgrade.com.au 2 $10 BILLION in trade value Introduction The Port of Townsville is the largest container and automotive port in Northern Australia and last financial year handled around

More information

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION

THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION EXPANSION UPDATE THE NEXT STAGES FOR DELIVERING HEATHROW EXPANSION DECEMBER 2017 In October 2016, the Government announced that a north west runway at Heathrow is its preferred scheme for the expansion

More information

Level Crossings Configuration Standards

Level Crossings Configuration Standards Discipline: Engineering (Track & Civil) Category: Standard Level Crossings Configuration Standards ETD-16-04 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS 01 Document

More information

Sustainable Procurement Policy for Heathrow Airport Limited

Sustainable Procurement Policy for Heathrow Airport Limited Sustainable Procurement Policy for Heathrow Airport Limited Date of policy: May 2017 Author: Dianne Armstrong / Chris Allen Approved by: Exec David Ferroussat Procurement Director Pete Hughes - Head of

More information

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES Proposed north west runway Stanwell Moor Stanwell All maps contain OS data Crown copyright and database right 2018 INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES JANUARY 2018 Airport Expansion

More information

LORD HOWE ISLAND MARINE PARK PROFILE OF LOCAL BUSINESSES. Department of Environment Climate Change & Water. Prepared For: Prepared By:

LORD HOWE ISLAND MARINE PARK PROFILE OF LOCAL BUSINESSES. Department of Environment Climate Change & Water. Prepared For: Prepared By: LORD HOWE ISLAND MARINE PARK PROFILE OF LOCAL BUSINESSES Prepared For: Department of Environment Climate Change & Water Prepared By: Arche Consulting Pty Ltd Version: June 2010 Arche Consulting T + 61

More information

Draft Marine and Harbour Facilities Strategy

Draft Marine and Harbour Facilities Strategy Draft Marine and Harbour Facilities Strategy Vision The Coromandel peninsula is a destination of choice for safe, sustainable and accessible marine and harbour facilities that are fit for purpose to meet

More information

Bankstown Airport. Master Plan 2004/05

Bankstown Airport. Master Plan 2004/05 Bankstown Airport Master Plan 2004/05 Bankstown Airport Master Plan 2004/05 > Foreword In December 2003, the BaCH Consortium purchased the long term leases over Bankstown Airport, together with Camden

More information

Supporting information to an application for preapplication 3 rd February 2017

Supporting information to an application for preapplication 3 rd February 2017 Development Services, West Lindsey District Council, Guildhall, Marshall s Yard, Gainsborough DN21 2NA Supporting information to an application for preapplication advice. 3 rd February 2017 Proposal for

More information

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1

Airdrie - Bathgate Railway and Linked Improvements Bill. Environmental Statement Page 1 Environmental Statement Page 1 1.0 INTRODUCTION 1.1 The Scheme Proposal The scheme proposals are to re-open the Airdrie to Bathgate section of the former Bathgate and Coatbridge Railway (Monklands Railway)

More information

WESTERN RECLAMATION & VIADUCT HARBOUR WATERFRONT VISION 2040

WESTERN RECLAMATION & VIADUCT HARBOUR WATERFRONT VISION 2040 WESTERN RECLAMATION & VIADUCT HARBOUR 20 18 WATERFRONT VISION 2040 The Western Reclamation and Viaduct Harbour will be a key component in any future redevelopment of the Auckland waterfront due to their

More information

Communication and consultation protocol

Communication and consultation protocol Communication and consultation protocol Airservices Australia 2011 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without

More information

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard

AS/NZS :2015. Lighting for roads and public spaces AS/NZS :2015. Part 4: Lighting of pedestrian crossings. Australian/New Zealand Standard Australian/New Zealand Standard AS/NZS 1158.4:2015 Lighting for roads and public spaces Part 4: Lighting of pedestrian crossings Superseding AS/NZS 1158.4:2009 AS/NZS 1158.4:2015 AS/NZS 1158.4:2015 This

More information

Local Development Scheme

Local Development Scheme Local Development Scheme August 2014 Local Development Scheme (August 2014) / Page 2 Contents Section 1: Introduction Great Yarmouth s Development Plan 4 Section 2: Plan Making Process Public participation

More information

The Strategic Commercial and Procurement Manager

The Strategic Commercial and Procurement Manager Item 3 To: Procurement Sub Committee On: 8 June 2016 Report by: The Strategic Commercial and Procurement Manager Heading: Renfrewshire Council s Community Benefit Strategy 2016 1. Summary 1.1. The purpose

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Annual Report /2016 Port Hedland Ambient Air Quality Monitoring Program

Annual Report /2016 Port Hedland Ambient Air Quality Monitoring Program Annual Report - 2015/2016 Port Hedland Ambient Air Quality Monitoring Program FINAL Port Hedland Industries Council 31 October 2016 Prepared by Katestone Environmental Pty Ltd DOCUMENT CONTORL Deliverable

More information

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda Overview of Port Maritime & Water-Dependent Uses Summary of Maritime Planning and Policies Q&A and Discussion of Operational

More information

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation. Memorandum To: From: Amex Corporation c/- Greg Wood, Tract Consultants Matthew Lee Cc: Date: 12 June 2013 Subject: Economic Statement for Amex site Tarneit North PSP Dear Greg, This economic statement

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

environmental defender s office new south wales

environmental defender s office new south wales environmental defender s office new south wales State Environmental Planning Policy No 44 Koala Habitat Protection December 2010 The EDO Mission Statement To empower the community to protect the environment

More information

CAA consultation on its Environmental Programme

CAA consultation on its Environmental Programme CAA consultation on its Environmental Programme Response from the Aviation Environment Federation 15.4.14 The Aviation Environment Federation (AEF) is the principal UK NGO concerned exclusively with the

More information

Open Report on behalf of Richard Wills Executive Director for Communities. Planning and Regulation Committee. County Matter Application - S38/0590/13

Open Report on behalf of Richard Wills Executive Director for Communities. Planning and Regulation Committee. County Matter Application - S38/0590/13 Agenda Item 5.10 Report Reference: 5.10 Regulatory and Other Committee Open Report on behalf of Richard Wills Executive Director for Communities Report to: Planning and Regulation Committee Date: 10 June

More information

Strategic Transport Forum

Strategic Transport Forum Strategic Transport Forum Friday 16 th March 2018 www.englandseconomicheartland.com Item 3: Innovation www.englandseconomicheartland.com Innovation work stream - EEH 1. Policy modelling 2. MaaS 3. EEH

More information

Airport Master Plans

Airport Master Plans October 2004 (Revised February 2005) Briefing Airport Master Plans The risks and potential pitfalls for local authorities The 2003 Air Transport White Paper (ATWP) asked airport operators to produce or

More information

SYDNEY S SECOND AIRPORT

SYDNEY S SECOND AIRPORT COLLIERS RADAR SYDNEY S SECOND AIRPORT The Catalytic Effect of Transport Infrastructure By Sass J-Baleh Manager Research sass.jbaleh@colliers.com Summary Industrial land values across the Sydney markets

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update Port Everglades Master/Vision Plan Update Environmental Stakeholder Meeting June 15, 2009 Discussion to Focus On: Updating the 2006 Port Everglades Master Plan Issues dealing with the Turning Notch Potential

More information

Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan

Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan Expert Witness Statement August 11 th, 2017 Prepared by Robert Panozzo Director, ASR Research Pty Ltd

More information

Great Barrier Reef Ports Strategy Have your say

Great Barrier Reef Ports Strategy Have your say Great Barrier Reef Ports Strategy Have your say Written submission form The Great Barrier Reef Ports Strategy presents the vision and principles guiding the Queensland Government s approach to future port

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

Agenda Item 5: Rail East Midlands Rail Franchise Consultation

Agenda Item 5: Rail East Midlands Rail Franchise Consultation Strategic Transport Forum 15 th September 2017 Agenda Item 5: Rail East Midlands Rail Franchise Consultation Recommendation: It is recommended that the Forum agree (subject to any amendments agreed by

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Page 1 of 11 Airspace Change Proposal - Environmental Assessment Version: 1.0/ 2016 Title of Airspace Change Proposal Change Sponsor Isle of Man/Antrim Systemisation (Revised ATS route structure over the

More information

PORT AUTHORITY OF NEW SOUTH WALES. Schedule of Port Charges Sydney

PORT AUTHORITY OF NEW SOUTH WALES. Schedule of Port Charges Sydney PORT AUTHORITY OF NEW SOUTH WALES Schedule of Port Charges Sydney Effective 1 July 2016 This page is intentionally left blank Contents General Trade Terms 2 Navigation Service Charge 3 Pilotage Charge

More information

Response to the London Heathrow Airport Expansion Public Consultation

Response to the London Heathrow Airport Expansion Public Consultation Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation

More information

University of Wollongong Innovation Campus Masterplan

University of Wollongong Innovation Campus Masterplan University of Wollongong Innovation Campus University of Wollongong Innovation Campus Masterplan Traffic and Transport Assessment Traffic and Transport Assessment Prepared for University of Wollongong

More information

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council

Date: 11 th January, From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group. Plaistow & Ifold Parish Council Date: 11 th January, 2017 From: Plaistow & Ifold Parish Neighbourhood Plan - Steering Group To: Plaistow & Ifold Parish Council Re: Neighbourhood Plan Report to Parish Council Meeting 17 Jan 2017 The Steering

More information

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS 2017-18 NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS Executive Summary The 2017-18 NSW State Budget presents an opportunity for the NSW Government to future-proof the tourism and transport sectors.

More information

9 June I:\CIRC\MSC\01\1305.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

9 June I:\CIRC\MSC\01\1305.doc INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T2-MSS/2.11.1 MSC.1/Circ.1305 9 June 2009 REVISED GUIDANCE TO MASTERS, COMPANIES

More information

SAMOA PORTS AUTHORITY

SAMOA PORTS AUTHORITY SAMOA PORTS AUTHORITY SAMOA PORTS AUTHORITY PRESENTATION OUTLINE: About SPA Port Facilities Port Statistics Challenges Developments SAMOA PORTS AUTHORITY ABOUT SPA: Established under the Ports Authority

More information

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group

More information

Cooloolabin Dam Recreation Management Discussion Paper. November 2013

Cooloolabin Dam Recreation Management Discussion Paper. November 2013 Cooloolabin Dam Recreation Management Discussion Paper November 2013 Contents November 2013... 1 Background... 3 Overview of Cooloolabin Dam... 6 Weed Management... 7 Cultural Heritage... 7 Commercial

More information

SUSTAINABLE DEVELOPMENT PLAN 2015

SUSTAINABLE DEVELOPMENT PLAN 2015 LAND USE SUSTAINABLE DEVELOPMENT PLAN 2015 EAST MINILANDS EAST MINILANDS SUSTAINABLE DEVELOPMENT SUSTAINABLE DEVELOPMENT DHL eastmidlandsairport.com OUR AIRPORT FOREWORD by Andy Cliffe Managing Director

More information

WICET WIGGINS ISLAND COAL EXPORT TERMINAL

WICET WIGGINS ISLAND COAL EXPORT TERMINAL WICET WIGGINS ISLAND COAL EXPORT TERMINAL WICET Wiggins Island Coal Export Terminal (WICET) is Queensland s newest, state-of-the-art coal export facility, which is a $2.6 billion industry-owned and privately

More information

Whangarei Airport. Prepared by Carine Andries 10/20173

Whangarei Airport. Prepared by Carine Andries 10/20173 Whangarei Airport Prepared by Carine Andries 10/20173 March 2010 TABLE OF CONTENTS 1 2 3 INTRODUCTION... 3 AIRPORT ROLE AND FUNCTION... 3 AIRPORT FEATURES AND CAPACITY... 3 3.1 3.2 3.3 3.4 3.5 3.5.1 3.5.2

More information