1 Essendon Airport Office Major Development Plan - Transport Impact Assessment TIA001E-F.docx 6 October 2017 onemilegrid.com.au 1/59 Keele Street, Collingwood, VIC 3066 (03)

2 onemilegrid ABN: (03) /59 Keele Street COLLINGWOOD, VIC DOCUMENT INFORMATION Prepared for Essendon Airport Pty Ltd File Name TIA001E-F.docx Report Date 6 October 2017 Prepared by James Dear Reviewed by Valentine Gnanakone Signature Signature One Mile Grid Pty Ltd. This document has been prepared by onemilegrid for the sole use and benefit of the client as per the terms of engagement. It may not be modified or altered, copied, reproduced, sold or transferred in whole or in part in any format to any person other than by agreement. onemilegrid does not assume responsibility or liability to any third party arising out of use or misuse of this document. Page 2

3 CONTENTS 1 INTRODUCTION PLANNING POLICY Airports Act Essendon Airport Land Use Plan EXISTING CONDITIONS Location and Land Use Subject Site Existing Airport Uses English Street Precinct Beaufort North Precinct and Wirraway North Precinct Aviation Precinct 1 and Airfield Precinct Hart Precinct Bulla Precinct Road Network Tullamarine Freeway English Street Wirraway Road Larkin Boulevard Nomad Road Public Transport Bicycle Network Walkability CityLink-Tulla Widening Collector Distributor Projects Existing Traffic Volumes Intersection Operations DEVELOPMENT PROPOSAL CAR PARKING CONSIDERATIONS Statutory Car Parking Requirements Planning Scheme Parking Provision Requirements Recommended Car Parking Provision TRAFFIC CONSIDERATIONS Traffic Volumes Development Traffic Generation Traffic Distribution Intersection Operation Traffic Generation Traffic Volumes Traffic Impacts CONCLUSIONS TABLES Table 1 Public Transport Services Summary Table 2 SIDRA Results Existing Operating Conditions Table 3 Clause Car Parking Rates Table Development Summary Table 5 SIDRA Results 2017 Operating Conditions Post Construction Table 6 Anticipated Traffic Generation Rates (Movements / Space) Table 7 Anticipated Traffic Generation Table 8 Post-Development Intersection Performance Page 3

4 FIGURES Figure 1 Site Location... 6 Figure 2 Subject Site Aerial View... 7 Figure 3 Essendon Airport Master Plan Precincts... 8 Figure 4 Public Transport Routes Figure 5 Principal Bicycle Network Figure 6 English Street Bridge Widening Figure 7 English Street Bridge Existing Arrangement (1 st September 2017) Figure 8 English Street Bridge Previous Arrangement (Prior to February 2017) Figure 9 Collector-Distributor Links Figure 10 Mathews Avenue / English Street / Tullamarine Freeway - AM Peak Figure 11 Mathews Avenue / English Street / Tullamarine Freeway - PM Peak Figure 12 Wirraway Road / Melrose Drive / Tullamarine Freeway AM Peak Figure 13 Wirraway Road / Melrose Drive / Tullamarine Freeway PM Peak Figure 14 Traffic Generation Rates Figure 15 Mathews Avenue / English Street / Tullamarine Freeway - AM Peak (2017) Figure 16 Mathews Avenue / English Street / Tullamarine Freeway - PM Peak (2017) Figure 17 Wirraway Road / Melrose Drive / Tullamarine Freeway AM Peak (2017) Figure 18 Wirraway Road / Melrose Drive / Tullamarine Freeway PM Peak (2017) Figure 19 Mathews Avenue / English Street / Tullamarine Freeway - AM Peak (Post- Development) 35 Figure 20 Mathews Avenue / English Street / Tullamarine Freeway - PM Peak (Post- Development) 36 Figure 21 Wirraway Road / Melrose Drive / Tullamarine Freeway AM Peak (Post-Development) 37 Figure 22 Wirraway Road / Melrose Drive / Tullamarine Freeway PM Peak (Post-Development) 38 Page 4

5 1 INTRODUCTION onemilegrid has been engaged by Essendon Airport Pty Ltd to assist with preparation of a Transport Impact Assessment (TIA) for the proposed office development located on English Street. The TIA will detail any potential impacts arising from the development, and outline any measures necessary to mitigate these impacts. As part of this assessment the subject site has been inspected with due consideration of the development proposal, traffic data has been sourced and relevant background reports have been reviewed including the following: Federal Airports Act 1996; Essendon Airport Ground Transport Plan (GTA, Feb 2013); Essendon Fields Ground Transport Plan Transport Survey Report (Jacobs, Feb 2016); Essendon Fields Ground Transport Plan Stage 1 Traffic Report (Jacobs, May 2016); Essendon Fields Development Pipeline; Essendon Airport Master Plan 2013; and Bulla Road Interchange, Essendon Diverging Diamond Interchange PRC Report (Arup, Dec 2014). 2 PLANNING POLICY 2.1 Airports Act 1996 Planning and development on leased federal airport sites is regulated under Commonwealth law, and is not subject to state, territory or local government planning laws. Under the Commonwealth Airports Act 1996 (The Act) and associated regulations, the leased federal airports are subject to a range of obligations to manage and mitigate the impacts of planning and development at the airport. Where development on the airport land is proposed that may have significant impacts on the community, Section 89 of the Airports Act requires that a Major Development Plan be prepared that sets out a number of items including the likely effect of the proposed developments that are set out in the major development plan, or the draft of the major development plan, on traffic flows at the airport and surrounding the airport. The Act outlines specific criteria for triggering the Major Development Plan process, which incudes that applicable to the proposed development as follows: (e) constructing a new building, where: (i) the building is not wholly or principally for use as a passenger terminal; and (ii) the cost of construction exceeds $20 million or such higher amount as is prescribed; The following report has been prepared to address the requirements above, and sets out an assessment of traffic impacts arising from the proposed use. 2.2 Essendon Airport Land Use Plan The Essendon Airport Land Use Plan sets out policies and requirements for the use, development and protection of Commonwealth land at Essendon Airport. The Land Use Plan was last amended by the Victorian Government via VC100 on 15 July 2013, with any changes considered and incorporated as part of a wider review of the Land Use Plan for the Airport s 2019 Master Plan. Page 5

6 The Land Use Plan is generally consistent with land use planning, zoning and development legislation in force in Victoria, including in the City of Moonee Valley, and outlines policy framework, zone requirements, overlay requirements, particular provisions, general provisions, and general definitions. 3 EXISTING CONDITIONS 3.1 Location and Land Use Essendon Airport is an aviation, retail and commercial precinct located some 11 kilometres northwest of Melbourne s CBD. The precinct accommodates the Essendon Airport, Essendon Fields Direct Factory Outlet (DFO) and Homemaker Hub, and various commercial and industrial uses as shown in Figure 1 below. Figure 1 Site Location Essendon Airport Subject Site Essendon Airport is bound by Tullamarine Freeway to the south and west. The north and east of the airport are bound predominantly by residential areas and also bound by the Moonee Ponds Creek. The airport includes three road access connections to Tullamarine Freeway; at the north-west corner, midway on the western side and midway on the southern side. There is a semi-private connection to the residential area to the north-east however it is understood that this is not intended for general public use. A single pedestrian overpass provides connectivity between Vaughan Street and Matthews Avenue over the freeway, with one overpass recently removed south of English street to be replaced as part of the Tullamarine Freeway widening works. Page 6

7 3.2 Subject Site The subject site is located on the north-eastern corner of the intersection between English Street and Nomad Road. An aerial view of the site location is provided in Figure 2 below. The site has frontages of approximately 65 metres to Nomad Road and 80 metres to English Street, with a site area of approximately 5,200m 2. The site is currently vacant, with no vehicular access to either frontage road. Figure 2 Subject Site Aerial View Subject Site Page 7

8 3.3 Existing Airport Uses The master plan for the Essendon Airport proposed in 2013 separates the site into seven precincts, summarised below and demonstrated in Figure 3. English Street Precinct; Beaufort North Precinct; Wirraway North Precinct; Aviation Precinct 1; Hart Precinct; Bulla Precinct; Airfield Precinct; Figure 3 Essendon Airport Master Plan Precincts Page 8

9 3.3.1 English Street Precinct The English Street Precinct is predominantly occupied by office uses and a neighbourhood shopping precinct, which includes approximately 15 speciality shops and two large format supermarkets. The English Street Precinct is located at the main road connection to Tullamarine Freeway on the western side of the site. Construction of a hotel and events centre has recently been completed on the northern side of English Street, whilst construction of a large office facility on the southern side of English Street is also nearing completion Beaufort North Precinct and Wirraway North Precinct The Beaufort North Precinct and Wirraway North Precincts are located in the northern end of the site and include a mix of uses including: 11 automotive sale facilities; Australia Post; Police and Ambulance Air Wing; Multiple pre-delivery centres; and Multiple aviation hangars and air service buildings. The Beaufort North Precinct and Wirraway North Precincts include the main road connection to Tullamarine Freeway in the north-west corner of the site Aviation Precinct 1 and Airfield Precinct These precincts are used for predominantly aviation uses only Hart Precinct The Hart Precinct was previously land-locked by the Aviation Precinct and the residential areas to the north-east of the site. In 2016 a new access road was constructed, linking the precinct to the site s internal road network. Two aircraft hangars were recently completed within the precinct, adjacent to a runway. Uses proposed in the Hart Precinct in the longer term include hangars, vehicle storage and office/warehouse providing commercial and light industrial office facilities for both aviation and non-aviation related uses Bulla Precinct The Bulla Precinct is located at the southern end of the site and includes DFO and homemaker retail land uses. The DFO retail uses include multiple restricted retail tenancies and are understood to provide employment for around 1,000 employees. The Bulla Precinct includes the road connection to the Tullamarine Freeway at the southern end of the site. The road connection currently provides access to the Bulla Precinct only. However, new road connections to other precincts are proposed. Page 9

10 3.4 Road Network Tullamarine Freeway The Tullamarine Freeway connects the site to the Inner Melbourne area to the south-east and extends beyond the site to the north-west, towards Melbourne Airport. At the south-west corner of the site there is a major intersection between Tullamarine Freeway and Calder Freeway. In the vicinity of the site, Tullamarine Freeway includes a dual carriageway width of approximately 25m with generally six traffic lanes, three in either direction, with road works currently underway for widening. Previous vehicle counts undertaken in the area have identified that Tullamarine Freeway carries in the order of 45,000 80,000 vehicles per day in each direction English Street English Street is an internal road under the control of Essendon Airport. English Street is aligned generally east-west, extending from the main connection to Tullamarine Freeway at the western side of the site. English Street generally comprises two traffic lanes in each direction within separate carriageways. There is a roundabout on English Street, located approximately 150 metres east of the Tullamarine Freeway interchange Wirraway Road Wirraway Road is one of the major internal roads under the control of Essendon Airport. Wirraway Road is aligned generally north-south and is connected to Tullamarine Freeway and Melrose Drive at the northern road connection to the site. Wirraway Road generally comprises dual carriageways with two traffic lanes in each direction Larkin Boulevard Larkin Boulevard is an internal road under the control of Essendon Airport. Larkin Boulevard comprises dual carriageways with two traffic lanes in each direction, with kerbside parking within the kerbside traffic lane. It is understood that Larkin Boulevard will ultimately provide a link through to Wirraway Road and will be progressively extended as development continues Nomad Road Nomad Road is a lower order internal road under the control of Essendon Airport. It is aligned generally north-south between Bristol Street and Short Street, bisected by English Street in the centre. North of English Street, it provides a single traffic lane in each direction, with kerbside parking along the western side adjacent to the subject site, and the eastern side further to the north. A raised pedestrian crossing provides for continuous pedestrian connectivity across Nomad Road to the site s north. Page 10

11 3.5 Public Transport The subject area is serviced by public transport with bus and tram services operating along Matthews Avenue on the western side of Tullamarine Freeway. The public transport services in the area are shown in Figure 4 and then further detailed within Table 1 overleaf. overleaf. The nearest train station to the site is Essendon Station which is located 3.2km to the southeast. Figure 4 Public Transport Routes Subject Site There are a number of public transport services in the vicinity of Essendon Airport however with the exception of the Smart Bus Connection to the DFO during business hours, the overall quality of connections both to the existing public transport stops and the wider public transport network are poor. In order to access the English Street precinct from the metropolitan rail network, a person would need to transfer to the Route 59 tram or a Matthews Avenue Buses from Essendon Station. Essendon Airport management have recognised this as an issue and operate an independent bus for visitors and staff of Essendon Airport to and from Essendon Station. This service currently runs at 30 minute intervals between 7:15AM-9:30AM and 4:15PM-6:30PM, picking up adjacent to Essendon Railway Station, and dropping off along both sides of English Street. It is noted however that this service could be extended to provided additional stops within Essendon Airport subject to demand. Page 11

12 Table 1 Public Transport Services Summary Service Route No. Route Description Nearest Stop Tram 59 Airport West Flinders Street Station, City Matthews Avenue Bus Moonee Ponds Broadmeadows Station via Essendon, Airport West, Gladstone Park Airport West SC Melbourne Airport via Melrose Drive Airport West SC Sunbury Station via Melbourne Airport Airport West SC Melbourne Airport via South Centre Road Airport West to Gowanbrae via Melrose Drive, Gowanbrae Drive 501 Moonee Ponds Niddrie via Strathmore 902 Chelsea Airport West (SMARTBUS Service) 952 Night Bus City Footscray Maribyrnong Airport West Gladstone Park Broadmeadows Matthews Avenue Airport West Shopping Centre Matthews Avenue Page 12

13 3.6 Bicycle Network Limited bicycle connections are currently provided to the Essendon Airport from the surrounding areas, however it is noted that Matthews Avenue is included within the Principal Bicycle Network in the vicinity of the site. The Principal Bicycle Network, released in 2012, is shown in Figure 5. The site does have good connectivity to the Moonee Ponds Creek Trail to the east. Figure 5 Principal Bicycle Network Subject Site 3.7 Walkability The pedestrian access to Essendon Airport is generally restricted by Tullamarine Freeway. Pedestrian access is provided via the western and southern road connections, as well as the two pedestrian overpasses on the western side of the airport. Page 13

14 3.8 CityLink-Tulla Widening As part of the ongoing CityLink-Tulla Widening works, the English Street Bridge will be lengthened and widened to cater for additional through-lanes beneath, and provide for increased capacity to and from Essendon Airport. The works will provide the following: An additional dedicated turn lane for both inbound and outbound freeway directions on the bridge deck; Removal of one lane from the southbound freeway offramp; Extension of northbound freeway offramp turn lanes; and Construction of two additional outbound lanes from Essendon Airport. The work is currently being undertaken by Lend Lease, but line marking and signal works have not yet been completed for the ultimate configuration. A view of the future layout is provided in Figure 6 below. Figure 6 English Street Bridge Widening A view of the existing interim arrangement is provided in Figure 7, with a view of the previous layout (prior to February 2017) provided in Figure 8 below. Page 14

15 Figure 7 English Street Bridge Existing Arrangement (1 st September 2017) Figure 8 English Street Bridge Previous Arrangement (Prior to February 2017) Page 15

16 3.9 Collector Distributor Projects As part of far-reaching improvements to the Tullamarine Freeway operation, VicRoads have prepared plans for the construction of two Collector-Distributor projects. The first, the Bell Street Collector-Distributor, will provide an early freeway exit for southbound drivers wishing to exit to Bell Street, by removing them from the main carriageway at the Bulla Road offramp location. The second, the English Street Collector-Distributor, will provide an early freeway exit prior at Bulla Road for northbound Tullamarine Freeway vehicles exiting to Matthews Avenue. Both projects are intended to reduce weaving and merging issues along the freeway and create additional off-ramp capacity. Both Collector-Distributors, in conjunction with the ongoing Tullamarine Freeway widening works, and the Bell Street Collector-Distributor and intended to provide a package of works will facilitate increased traffic growth along the freeway and improved travel times and capacity. The overall concept for the Collector-Distributors are shown in Figure 9. Figure 9 Collector-Distributor Links Calder Freeway Bell Street Exit Tulla Freeway Bell Street Exit Realigned Bulla Road Onramp Tulla Freeway Matthews Ave Exit Realigned Bulla Road Onramp The Bell Street component of the works has recently been opened. Page 16

17 3.10 Existing Traffic Volumes To assist with the transport planning for Essendon Airport, Jacobs was engaged to collect and survey all traffic and pedestrian movements at the access points to Essendon Airport during October to November The surveys were undertaken at all access points to Essendon Airport from the surrounding road network and selected internal locations over a 12 hour period for a typical weekday. This was obtained from a combination of video-based traffic surveys, and SCATS-based automatic count data from the adjacent signalised intersections. The surveys revealed three distinct peak periods as follows: A morning peak hour from 7:45am-8:45am (2,420 vehicles per hour); An evening peak hour from 4:30pm -5:30pm (2,770 vehicles per hour); An afternoon peak from 12:15pm-1:15pm (2,800 vehicles per hour). From the above counts, the base condition traffic volumes were established at each of the three site accesses; Matthews Avenue / Tullamarine Freeway, Bulla Road / Tullamarine Freeway, and Melrose Drive / Wirraway Road as summarised in the following figures. It is noted that since the traffic counts were undertaken, the Melrose Drive / Wirraway Road / Tullamarine Freeway has undergone significant reconstruction. As such, existing conditions traffic volumes have been estimated based on the previously surveyed traffic volumes and distribution. The AM and PM weekday peak hours have been analysed as they will represent the greatest impact on the overall road network. It is further noted that as no internal connections are provided between the Bulla Precinct and the remainder of the airport, those traffic volumes, and associated traffic impacts have been omitted from this report. Page 17

18 Figure 10 Mathews Avenue / English Street / Tullamarine Freeway - AM Peak Page 18

19 Figure 11 Mathews Avenue / English Street / Tullamarine Freeway - PM Peak Page 19

20 Figure 12 Wirraway Road / Melrose Drive / Tullamarine Freeway AM Peak Page 20

21 Figure 13 Wirraway Road / Melrose Drive / Tullamarine Freeway PM Peak Page 21

22 3.11 Intersection Operations To assess the surveyed operation of the intersection the traffic volumes have been input into SIDRA Intersection, a traffic modelling software package. The SIDRA Intersection software package has been developed to provide information on the capacity of an intersection with regard to a number of parameters. Those parameters considered relevant are, Degree of Saturation (DoS), 95th Percentile Queue, and Average Delay as described below: Degree of Saturation (DoS) - The DoS represents the ratio of the traffic volume making a particular movement compared to the maximum capacity for that particular movement. The value of the DoS has a corresponding rating depending on the ratio as shown below. Degree of Saturation Rating Up to 0.60 Excellent Very Good Good Fair Poor Above 1.00 Very Poor It is noted that whilst the range of is rated as poor, it is acceptable for critical movements at an intersection to be operating within this range during high peak periods, reflecting actual conditions in a significant number of suburban signalised intersections. Average Delay (seconds) - Average delay is the time delay that can be expected for all vehicles undertaking a particular movement in seconds. 95th Percentile (95%ile) Queue - 95%ile queue represents the maximum queue length in metres that can be expected in 95% of observed queue lengths in the peak hour The results of the analysis are provided in Table 2 for each of the intersections identified above. It is noted that the Mathews Avenue / English Street / Tullamarine Freeway intersection was modelled with the previous intersection layout and operation. Table 2 SIDRA Results Existing Operating Conditions Intersection D.o.S. Delay (s) Queue (m) AM Peak Hour Matthews Ave / English St / Tullamarine (W) Matthews Ave / English St / Tullamarine (E) Wirraway Rd / Melrose Dr / Tullamarine (N) Wirraway Rd / Melrose Dr / Tullamarine (S) PM Peak Hour Matthews Ave / English St / Tullamarine (W) Matthews Ave / English St / Tullamarine (E) Wirraway Rd / Melrose Dr / Tullamarine (N) Wirraway Rd / Melrose Dr / Tullamarine (S) As identified above, the Matthews Avenue / English Street / Freeway Interchange intersection was operating at close to capacity during the AM peak period, with lengthy delays and queues experienced on most approaches. The eastern portion of this intersection, at the exit of the airport, operates with improved conditions. The Wirraway Road / Melrose Drive / Tullamarine Freeway intersection is operation under excellent conditions in both AM and PM peaks, with minimal queues and delays on all approaches. Page 22

23 The analysis indicates that there is limited capacity at the English Street and Bulla Road intersections to accommodate traffic growth from the precinct based on 2015 traffic volumes, and the 2015 arrangement of the English Street bridge and freeway interchange. Page 23

24 4 DEVELOPMENT PROPOSAL It is proposed to develop the subject site for a six-storey (plus basement) office building, comprising a total of 14,047m 2 Net Leasable Floor Area. In addition, a café (230m 2 ) is proposed to be provided on the ground floor, which will be ancillary to the main office use. A basement car park accommodating 50 parking spaces is proposed to be provided for the use, accessed from a two-way crossover to Nomad Road adjacent to the site s north-western corner. Additional car parking is to be provided for the use within at-grade parking areas adjacent to the site. Bicycle parking and end-of-trip facilities are also proposed to be accommodated within the basement area, with a total of 114 bicycle parking spaces, 22 shower / changerooms, and 236 lockers provided for staff of the use. Loading vehicles and waste collection activity will be accommodated within a dedicated loading bay, also accessed from Nomad Road. Primary pedestrian access to the building is proposed to be provided from mid-way along the English Street frontage. Page 24

25 5 CAR PARKING CONSIDERATIONS 5.1 Statutory Car Parking Requirements Planning and development on leased federal airport sites is regulated under Commonwealth law, and is not subject to state, territory or local government planning laws. It is noted however that Clause of the Essendon Airport Land Use Plan does outline the car parking requirements for new uses within the airport. Amongst others, the Clause outlines the following purposes: To provide the opportunity to use parking precinct plans in appropriate locations; To promote efficient use of car spaces through the consolidation of car parking facilities; and To ensure the provision of an appropriate number of car spaces having regard to the activities on the land and the nature of the locality. For office uses, it requires that car parking be provided at a rate of 3.5 spaces per 100m 2 of office net floor area. Application of this rate to the 14,047 m 2 net floor area proposed gives a requirement for 491 car spaces. For the 230 m 2 café use (most appropriately classified as a Restaurant ), the clause requires car parking be provided at a rate of 0.6 car spaces to each seat available to the public. Whilst no seat numbers are indicated on development plans, it is estimated that approximately 100 seats may be accommodated within the tenancy. This equates to a requirement for 60 car spaces. Based on the above, a total of 551 car spaces are required under Clause of the Land Use Plan. It is noted that the café component is unlikely to attract parking demands in its own right, instead trading largely from employees of the office use above, and other businesses in the area. As such, these requirements above are considerable inflated from the actual requirements of the use. The Clause specifically notes that approval may be given to reduce or to waive the number of car spaces required by the table. Before a requirement for car spaces is reduced or waived, the applicant must satisfy the Airport Operator that the reduced provision is justified due to: Any relevant parking precinct plan. The availability of car parking in the locality. The availability of public transport in the locality. Any reduction in car parking demand due to the sharing of car spaces by multiple uses, either because of variation of car parking demand over time or because of efficiencies gained from the consolidation of shared car parking spaces. Any car parking deficiency or surplus associated with the existing use of the land. Any credit which should be allowed for a car parking demand deemed to have been provided in association with a use which existed before the change of parking requirement. Local traffic management. Local amenity including pedestrian amenity. An empirical assessment of car parking demand. Any other relevant consideration. 5.2 Planning Scheme Parking Provision Requirements Notwithstanding the above, the Victorian Planning Scheme, upon which the above requirements are based, is considered to provide an appropriate baseline for assessing car parking provision for the new use. Page 25

26 The car parking provision requirements for most new developments within Victoria are currently outlined within Clause of the Planning Scheme. The Clause outlines two rates for parking provision: Column A which are the standard rates: and Column B which are alternate (lower) rates which only apply where specified by a Parking Overlay. A summary of the relevant parking provision rates for office and café uses is provided in Table 3 below. As identified above, the café component is unlikely to attract additional parking demands in its own right, instead trading largely from employees of the precinct. Table 3 Clause Car Parking Rates Use Column A Rates Column B Rates Office 3.5 spaces per 100 m 2 NFA 3.0 spaces per 100 m 2 NFA Café (Food and Drinks Premises) 4 spaces per 100 m 2 LFA 3.5 spaces per 100 m 2 LFA Application of the above rates to the 14,047m 2 Net Leasable Floor Area for the office proposed onsite equates to parking provisions of 491 and 421 car spaces for the two respective provision rates above. Additionally, the café generates a parking requirement for between 8-9 car spaces. It is noted that current planning trends are for reductions in the above rates (below the Column B requirements) in locations where access to sustainable transport modes and amenities, and sharing of public parking across activity centres drives reduced demand for car parking. Further to the above, car parking surveys undertaken by a variety of consultants have recorded car parking generation rates for office uses ranging from spaces per 100 square metres of office floor area depending on the location of the site, access to public transport, proximity to amenities and type of business. 5.3 Recommended Car Parking Provision Office parking demands are, in part, dependant on the supply of parking. Where unlimited car parking is provided, and at no cost, parking demands will be high as there are no incentives to alter travel mode choices. Where there is a limited supply of long-term parking, or where a cost is associated with its use (e.g. paid parking, or inconvenience from shuffling time-restricted parking spaces), employees are encouraged to shift to more sustainable travel modes from private vehicle transport. Providing limited long-term car parking is in line with current planning policy to limit private car usage and encourage take-up of sustainable transport modes, and thus it is recommended that parking provisions are not based on upon maximum estimated demands. Based on our experience, and having regard to the location and context of the subject site, it is recommended that car parking be provided at a rate of between car spaces per 100m 2 for the office use. This equates to a recommended provision of between car spaces. With 50 parking spaces proposed to be accommodated within the basement car park, it is recommended that a further parking spaces are provided off-site for occupants of the use. As any parking demands associated with the café will be minimal, it is considered that the above supply of parking will be sufficient to accommodate for all users on-site. It is noted that not all parking provided for the use would need to be newly constructed. This provision may include any vacancies within existing parking areas within the airport site. If newly constructed, this provision of parking would require approximately 8,000-9,600m 2 area put aside. Page 26

27 6 TRAFFIC CONSIDERATIONS Traffic Volumes Development Noting that the traffic volumes utilised for analysis were gathered during late-2015, they will not necessarily be representative of current traffic volumes to and from the site. In order to estimate the current volumes, and develop an appropriate base for assessing development impacts, traffic generation for the development works undertaken between November 2015 and April 2017 has been estimated. This development includes auto retail, office, hotel and aviation projects throughout the Essendon Airport site summarised in Table 4 below. Table Development Summary Precinct Use Floor Area (m 2 ) Wirraway North Precinct Auto Retail 9,073 English Street Precinct Office 4,696 Hotel 12,334 Hart Precinct Aviation 8,147 Aviation Precinct Office 3,325 Aviation 1,875 Recreation 1, Traffic Generation In assessing the level of traffic generated by these recent developments, the following assumptions have been made with regard to traffic generation rates and distributions. Traffic generation rates for the various land-use classifications were sourced from a combination of site-specific rates established by surveys, case-study data held by onemilegrid and from traffic studies undertaken by other consultants. Figure 14 Use Traffic Generation Rates Rate / 100m 2 AM Peak PM Peak Daily In Out Rate / 100m 2 Office 2 90% 10% 2 10% 90% 10 Auto Retail % 20% % 80% 7 In Out Rate / 100m 2 Aviation % 20% % 70% 0.5 Hotel % 40% % 60% 5 Recreation 1 70% 30% 3 30% 70% 20 This level of development is estimated to equate to an additional peak hour traffic generation of 252 and 435 trips during the AM and PM peaks, with an additional 2,364 vehicle movements per day. These trips will be spread amongst the two main freeway connections from the site. Page 27

28 6.1.3 Traffic Distribution The following external traffic distribution has been adopted, based on existing traffic distributions identified in traffic studies previously prepared by Jacobs and GTA, which included employee location of residence and origin-destinations surveys. North (via Tullamarine Freeway) 18% North (via Melrose Drive) 12% West 15% South (via Keilor Road or Bulla Road) 15% South (via Tullamarine Freeway) 40% Superimposing these additional traffic volumes onto the existing volumes identified in Section 3.10 above allows us to estimate the 2017 base-case traffic volumes presented in Figure 10 to Figure 13 overleaf. Page 28

29 Figure 15 Mathews Avenue / English Street / Tullamarine Freeway - AM Peak (2017) Page 29

30 Figure 16 Mathews Avenue / English Street / Tullamarine Freeway - PM Peak (2017) Page 30

31 Figure 17 Wirraway Road / Melrose Drive / Tullamarine Freeway AM Peak (2017) Page 31

32 Figure 18 Wirraway Road / Melrose Drive / Tullamarine Freeway PM Peak (2017) Page 32

33 Intersection Operation Following completion of the road works in the coming months, all lanes at the English Street intersection will open/re-open and the operation will markedly improve. The post-construction operation of this intersection and that of the Wirraway Road / Melrose Drive / Tullamarine Freeway intersection is detailed in Table 5 below. Table 5 SIDRA Results 2017 Operating Conditions Post Construction Intersection D.o.S. Delay (s) Queue (m) AM Peak Hour Matthews Ave / English St / Tullamarine (W) Matthews Ave / English St / Tullamarine (E) Wirraway Rd / Melrose Dr / Tullamarine (N) Wirraway Rd / Melrose Dr / Tullamarine (S) PM Peak Hour Matthews Ave / English St / Tullamarine (W) Matthews Ave / English St / Tullamarine (E) Wirraway Rd / Melrose Dr / Tullamarine (N) Wirraway Rd / Melrose Dr / Tullamarine (S) As shown above, the operation of the Mathews Avenue / English Street / Tullamarine Freeway intersection operation will return to fair conditions, with reasonable queues and delays on all approaches, freeing up considerable capacity for additional flows. The Wirraway Road / Melrose Drive / Tullamarine Freeway intersection will only slightly reduce. 6.2 Traffic Generation In determining the appropriate traffic generation rate for the office use, reference is made to the Inner Municipalities Parking Study prepared in 1991 by the Inner Metropolitan Regional Association. This study provides details the outputs of comprehensive traffic and parking surveys undertaken at 24 office sites within inner metropolitan Melbourne. The survey results showed average traffic generation rates of 2.15 and 1.96 movements per 100m 2 of net floor area in the AM and PM peak periods respectively. Further analysis of the results indicates that during the morning peak period, an average traffic generation of 0.64 inbound trips and 0.01 outbound trips per parking space (peak demand) was observed. Similarly, in the PM peak period, an average traffic generation of 0.58 outbound trips and 0.02 inbound trips per parking space (peak demand) was observed. The above suggests that in a constrained situation, where parking is expected to be fully utilised, approximately 65% of the car park turns over during the AM peak (with 1% in the counter peak direction), and approximately 60% of the car park turns over during the PM peak (with 2% in the counter peak direction). Noting that a reduced supply of parking is proposed, traffic generation is assumed to be related to parking provision (rather than floor area). The following traffic generation rates have been adopted. Table 6 Anticipated Traffic Generation Rates (Movements / Space) Period Inbound Outbound Total AM Peak PM Peak Page 33

34 It is noted that these traffic generation rates do not assume any reduction attributable to the implementation of green travel initiatives, which have been demonstrated in the mast to measurably reduce traffic generation. Application of the above rates to the maximum of 420 spaces gives the anticipated traffic generated by the proposed development, shown in Table 7. It is noted that this is a conservative assessment of traffic impacts, adopting the upper range of parking provision. Table 7 Anticipated Traffic Generation Period Inbound Outbound Total AM Peak PM Peak Traffic Volumes The above traffic volumes were distributed across the internal road network having regard to the ultimate destinations presented in Section above, and the relative convenience of each route internally. This gives the anticipated post-development traffic volumes presented in Figure 19 to Figure 22 overleaf. Page 34

35 Figure 19 Mathews Avenue / English Street / Tullamarine Freeway - AM Peak (Post-Development) Page 35

36 Figure 20 Mathews Avenue / English Street / Tullamarine Freeway - PM Peak (Post-Development) Page 36

37 Figure 21 Wirraway Road / Melrose Drive / Tullamarine Freeway AM Peak (Post-Development) Page 37

38 Figure 22 Wirraway Road / Melrose Drive / Tullamarine Freeway PM Peak (Post-Development) 39 Page 38

39 6.4 Traffic Impacts In order to assess the impacts of these additional development-generated traffic volumes upon the external intersections, the abovementioned traffic volumes have been input into SIDRA and reanalysed. A comparison of the pre- (2017 post-construction) and post-development scenarios are shown below in Table 8. Table 8 Post-Development Intersection Performance Intersection D.o.S. Delay (s) Queue (m) Ex. Future Ex. Future Ex. Future AM Peak Hour Matthews Ave / English St / Tullamarine (W) Matthews Ave / English St / Tullamarine (E) Wirraway Rd / Melrose Dr / Tullamarine (N) Wirraway Rd / Melrose Dr / Tullamarine (S) PM Peak Hour Matthews Ave / English St / Tullamarine (W) Matthews Ave / English St / Tullamarine (E) Wirraway Rd / Melrose Dr / Tullamarine (N) Wirraway Rd / Melrose Dr / Tullamarine (S) As shown above, operation of the Matthews Avenue / English Street / Freeway Interchange intersection is expected to slightly decrease following the introduction of the new office, however it will still represent a marked improvement from the base-case 2015 conditions. A significant level of capacity will remain to accommodate any additional flows to and from the airport, remaining under fair operating conditions. The Wirraway Road / Melrose Drive / Tullamarine Freeway intersection will experience negligible increases to queues and delays and will remain operating under excellent conditions. It is noted that the above traffic modelling has been undertaken assuming a slight reduction in parking provision from the rates specified within the Airport s Land Use Plan. This document specifies a provision of 491 car spaces for the office use, as opposed to a recommended provision of spaces. Should the additional parking be provided, this represents an increase of 71 car spaces, and up to 46 additional peak hour movements that may need to be accommodated onsite. A review of the critical Matthews Avenue / English Street / Freeway Interchange intersection with the addition of these traffic flows indicates no significant change to operation, with queues and delays on increasing by no more than 5% during the AM peak, and less than 5% during the PM peak. In consideration of the above analysis, it is determined that the proposed development will not adversely impact on traffic flows surrounding the airport. It is noted that as development continues within the airport that additional permeability will be provided between the various sections, with loop roads proposed be constructed at some stage in the future to provide connectivity between the Bulla Precinct and northern areas. Page 39

40 7 CONCLUSIONS It is proposed to develop part of the Essendon Airport site for an office development, comprising a six-storey (plus basement) buildings accommodating 14,047m 2 Net Leasable Floor Area. The development triggers the requirements for preparation of a Major Development Plan under the Airports Act of 1996, and thus this report has been prepared to assess the potential impacts arising from the development. Having regard to the above report, the following can be concluded: The development is to be serviced by a basement car park accommodating 50 parking spaces. Additional at-grade parking is to be provided to support the use; Bicycle parking and end-of-trip facilities are proposed to be accommodated within the basement area, with a total of 114 bicycle parking spaces, 22 shower / changerooms, and 233 lockers provided for staff of the use; It is recommended that parking be provided at a rate of spaces per 100m 2 to ensure that parking impacts are not created within and around the airport site. This recommendation is equivalent to total car spaces, requiring car parking spaces to be provided off-site for the use; An assessment of development-generated traffic impacts was undertaken, using 2017 estimated traffic volumes as a base-case for assessment. The additional traffic, estimated at between peak hour movements, would be readily accommodated within the soon-tobe upgraded Matthews Avenue / English Street / Freeway Interchange and existing Wirraway Road / Melrose Drive / Tullamarine Freeway intersection without need for additional mitigation works; and The proposed development does not raise any issues that have a significant impact on the local or regional community. Page 40

Sky Temporary Car Park Transport Statement

Sky Temporary Car Park Transport Statement 001 Issue 26 August 2016 This report takes into account the particular instructions and requirements of our client. It is not intended for and should not be relied upon by any third party and no responsibility

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

London Borough of Barnet Traffic & Development Design Team

London Borough of Barnet Traffic & Development Design Team London Borough of Barnet Traffic & Development Design Team AERODROME ROAD PEDESTRIAN FACILITY AND BUS STOP INTRODUCTION FEASIBILITY REPORT Job Number: 60668 Doc Ref: S106/12-13/60668 Author: Manoj Kalair

More information

5 Rail demand in Western Sydney

5 Rail demand in Western Sydney 5 Rail demand in Western Sydney About this chapter To better understand where new or enhanced rail services are needed, this chapter presents an overview of the existing and future demand on the rail network

More information

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network

Saighton Camp, Chester. Technical Note: Impact of Boughton Heath S278 Works upon the operation of the Local Highway Network Technical Note: Impact of Boughton Heath S278 Works July 2013 SAIGHTON CAMP CHESTER COMMERCIAL ESTATES GROUP TECHNICAL NOTE: IMPACT OF BOUGHTON HEATH S278 WORKS UPON THE OPERATION OF THE LOCAL HIGHWAY

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

November 11, 2009 BY . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr.

November 11, 2009 BY  . Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1. Dear Mr. November 11, 2009 Planning and Growth Management Department 110 Laurier Avenue West, 4 th Floor Ottawa, Ontario K1P 1J1 BY E-MAIL Attention: Mr. Don Herweyer Dear Mr. Herweyer: Reference: Abbott-Fernbank

More information

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

MEMORANDUM. Lynn Hayes LSA Associates, Inc. MEMORANDUM To: Lynn Hayes LSA Associates, Inc. Date: May 5, 217 From: Zawwar Saiyed, P.E., Senior Transportation Engineer Justin Tucker, Transportation Engineer I Linscott, Law & Greenspan, Engineers LLG

More information

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2 Job No. 15-019 Page 2 TABLE OF CONTENTS 1.0 INTRODUCTION... 4 2.0 EXISTING CONDITIONS... 5 3.0 TRAFFIC GENERATION... 7 4.0 TRIP DISTRIBUTION... 8 5.0 FUTURE CONDITIONS... 8 6.0 SITE ACCESS...13 7.0 CONCLUSION...13

More information

Traffic and Transport Assessment

Traffic and Transport Assessment Traffic and Transport Assessment Section 96A Residential Subdivision, Wincity Sunbury CG140997 Prepared for Wincity Development 4 December 2015 Document Information Prepared for Wincity Development Project

More information

University of Wollongong Innovation Campus Masterplan

University of Wollongong Innovation Campus Masterplan University of Wollongong Innovation Campus University of Wollongong Innovation Campus Masterplan Traffic and Transport Assessment Traffic and Transport Assessment Prepared for University of Wollongong

More information

Table of contents 1. Executive Summary 4

Table of contents 1. Executive Summary 4 MDP REPORT 1 Table of contents 1 Executive Summary 4 1.0 Introduction 5 1.1 Purpose of This Report 5 1.2 Structure 5 1.3 Essendon Fields Airport 5 1.4 Essendon Airport Master Plan 2013 6 1.5 Overview of

More information

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO#

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO# February 20, 2018 RV Sites Canada 300, 1933A 10 Avenue SW Calgary, AB T23C 0K3 Attn: Re: Rick Halpern Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Transport Impact Assessment

Transport Impact Assessment Transport Impact Assessment Springbok Hotel Erf 5206, Springbok Northern Cape March 2018 5th Floor Imperial Terraces Carl Cronje Drive Tyger Waterfront Bellville, 7530 (021) 914 6211 (T) e mail: mail@itsglobal.co.za

More information

Hume Amendment C207 Sunbury South PSP

Hume Amendment C207 Sunbury South PSP s Hume Amendment C207 Expert Evidence Traffic and Transport V171123 Prepared for HWL Ebsworth Lawyers 11 August 2017 Document Information Prepared for HWL Ebsworth Lawyers Project Name File Reference V171123_PAN001F01.docx

More information

Essendon Airport stakeholder engagement activities Annual Report

Essendon Airport stakeholder engagement activities Annual Report Aviation Display at EF Expo 2016 Essendon Airport stakeholder engagement activities Annual Report 2016-17 Introduction This report summarises the nature and outcomes of Essendon Airport s stakeholder engagement

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

PARKING CAPACITY REQUIREMENTS

PARKING CAPACITY REQUIREMENTS PARKING CAPACITY REQUIREMENTS Presented to: Antaramian Development Corporation 365 5 th Avenue South Naples, Florida 34102 CONTENTS Page INTRODUCTION... 1 BACKGROUND... 2 EXISTING PARKING CONDITIONS...

More information

Pedestrian Safety Review Spadina Avenue

Pedestrian Safety Review Spadina Avenue STAFF REPORT ACTION REQUIRED Pedestrian Safety Review Spadina Avenue Date: October 13, 2015 To: Toronto and East York Community Council From: Director, Transportation Services, Toronto and East York District

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility Memorandum To: From: The Honorable Dow Constantine, King County Executive; The Honorable Ed Murray, City of Seattle Mayor; The Honorable Bruce Bassett, City of Mercer Island Mayor; The Honorable John Stokes,

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

Treasure Island Supplemental Information Report Addendum

Treasure Island Supplemental Information Report Addendum 1 1 1 1 0 1 0 1 0 1 Treasure Island Supplemental Information Report Addendum Introduction Purpose The purpose of this Supplemental Information Report (SIR) Addendum is to determine if the current land

More information

Major Scheme Business Case Summary Report for Programme Entry

Major Scheme Business Case Summary Report for Programme Entry Paper A Heart of South West Local Transport Board Major Scheme Business Case Summary Report for Programme Entry M5 Junction 25, Taunton July 2016 1 SCHEME SUMMARY Scheme Name M5 Junction 25, Taunton Date

More information

PSP 1078 Plumpton and PSP 1080 Kororoit

PSP 1078 Plumpton and PSP 1080 Kororoit PSP 1078 Plumpton and PSP 1080 Kororoit METROPOLITAN PLANNING AUTHORITY Revision D 17 March 2015 PSP 1078 Plumpton and PSP 1080 Kororoit Project no: Document title: Revision: IS078200 Date: 17 March 2015

More information

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation.

This economic statement provides analysis with respect to land at Tarneit North, and has been prepared on behalf of Amex Corporation. Memorandum To: From: Amex Corporation c/- Greg Wood, Tract Consultants Matthew Lee Cc: Date: 12 June 2013 Subject: Economic Statement for Amex site Tarneit North PSP Dear Greg, This economic statement

More information

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON March 2017 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 THE SUBJECT SITE 4 3.0 STRATEGIC PLANNING CONTEXT 6 4.0 SUMMARY AND CONCLUSIONS

More information

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling

Metropolitan Planning Authority 25-Jul Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling Metropolitan Planning Authority Thompsons Road, Clyde Creek and Casey Fields South (Residential) PSPs 53, 54 & 57.1 Transport Modelling Thompsons Road, Clyde Creek and Casey Fields South (Residential)

More information

Site Location and Setting

Site Location and Setting Memorandum Date: To: From: Subject: Kristy Le, Gary Black Steve Orem Santa Teresa County Park Historic Area Traffic and Parking Study Hexagon Transportation Consultants, Inc. has completed a traffic and

More information

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL. Project No. 121-22908 N o v e m b e r 2 0 1 2 Traffic Impact Study Transportation Planning th GENIVAR Inc., 600 Cochrane Drive, 5 Floor, Markham, Ontario L3R 5K3 Telephone: 905.475.7270 Fax: 905.475.5994

More information

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?:

E08. Kaufland Stores in Victoria Advisory Committee Epping. Request to be heard?: Kaufland Stores in Victoria Advisory Committee Epping E08 Request to be heard?: Yes Full Name: Organisation: Affected property: Attachment 1: Attachment 2: Attachment 3: Comments: Bernard McNamara BMDA

More information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information

PSP 75 Lancefield Road. Northern Jacksons Creek Crossing Supplementary Information PSP 75 Lancefield Road Northern Jacksons Creek Crossing Supplementary Information September 2017 The northern crossing of Jacksons Creek proposed within the Lancefield Road PSP is a key part of the ultimate

More information

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by Interstate 90 and Mercer Island Mobility Study APRIL 2017 Commissioned by Prepared by Interstate 90 and Mercer Island Mobility Study Commissioned by: Sound Transit Prepared by: April 2017 Contents Section

More information

Sunshine Coast Airport Master Plan September 2007

Sunshine Coast Airport Master Plan September 2007 Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT

More information

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy 1. Introduction This submission is a response to Infrastructure Victoria s assessment of the need to construct a heavy rail

More information

ESSENDON AIRPORT HOTEL DEVELOPMENT

ESSENDON AIRPORT HOTEL DEVELOPMENT ESSENDON AIRPORT HOTEL DEVELOPMENT PRELIMINARY DRAFT MAJOR DEVELOPMENT PLAN MAY 2014 Introduction 1 Figure 1: Essendon Airport aerial view with site of proposed hotel indicated. Indicates location of hotel

More information

Armstrong Creek Horseshoe Bend Precinct Traffic Impact Assessment

Armstrong Creek Horseshoe Bend Precinct Traffic Impact Assessment ` Armstrong Creek Horseshoe Bend Precinct Job Number: CG111786 Cardno Victoria Pty Ltd ABN 47 106 610 913 150 Oxford Street, Collingwood Victoria 3066 Australia Telephone: 03 8415 7777 Facsimile: 03 8415

More information

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW

7272 WISCONSIN AVENUE LOCAL AREA TRANSPORTATION REVIEW 7272 LOCAL AREA TRANSPORTATION REVIEW AND TRANSPORTATION POLICY AREA REVIEW MONTGOMERY COUNTY, MARYLAND Submitted on behalf of Carr Properties Prepared by: Wells + Associates, Inc. Submission: July 1,

More information

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street STAFF REPORT ACTION REQUIRED Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street Date: March 12, 2007 To: From: Toronto and East York Community Council Director, Transportation Infrastructure

More information

Non-technical summary

Non-technical summary Introduction NTS1 NTS2 NTS3 Troika Developments Ltd (Troika) has submitted a planning application to Bournemouth Borough Council (BBC) for an extension of time to implement planning permission 7/2004/16450/G,

More information

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A VIRGINIA DEPARTMENT OF TRANSPORTATION I-85 / I-95 INTERCHANGE FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A Columbia Rd REFINED CONCEPT 1 PROJECT A Bellevue Rd COST: $3.3M Siege Rd Eliminate the loop ramp

More information

Part four. In this part you will find: The next steps to deliver the master plan

Part four. In this part you will find: The next steps to deliver the master plan Part four NEXT STEPS In this part you will find: The next steps to deliver the master plan 6. How COULD the Master Plan be delivered? There are a number of steps required to take the proposals in the master

More information

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University Property Strategy The property strategy delivers improved legibility, responds to the locational attributes of the site, and facilitates essential operational efficiencies. 9.1 INTRODUCTION Non-aviation

More information

Lake Erie Commerce Center Traffic Analysis

Lake Erie Commerce Center Traffic Analysis LOCATION: East of NYS Route 5 at Bayview Road Town of Hamburg Erie County, New York PREPARED BY: Wendel Companies 140 John James Audubon Parkway Suite 200 Amherst, New York 14228 January 2012 i ii Table

More information

Chapter 6 Route Window NE5 Seven Kings station. Transport for London

Chapter 6 Route Window NE5 Seven Kings station. Transport for London Chapter 6 Route Window NE5 Seven Kings station Transport SEVEN KINGS STATION 6 Route Window NE5 Seven Kings Station Transport Introduction 6.1 All construction activities in this route window are associated

More information

Capital & Counties. October 2007

Capital & Counties. October 2007 Capital & Counties October 2007 Contents!" # $ % % $ & ' "&( # Appendix 1 Appendix 2 1 Introduction 1.1.1 Wincheap regeneration scheme proposes a 600 space Park and Ride facility to replace the existing

More information

Airport Planning Area

Airport Planning Area PLANNING AREA POLICIES l AIRPORT Airport Planning Area LOCATION AND CONTEXT The Airport Planning Area ( Airport area ) is a key part of Boise s economy and transportation network; it features a multi-purpose

More information

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY MAY 2011 SW1132SWD NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 CURRENT TRAVEL PATTERNS

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0

COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0 COMMUTING MASS TRANSPORT CALCULATOR GUIDE Version 1.0 Green Star SA Multi Unit Residential v1 Commuting Mass Transport Calculator Guide First Released: 27 th October 2011 Last Update: 27 th October 2011

More information

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave

Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Greater Shepparton City Council Planning Scheme Amendment C192 and C193 VicRoads Submission to Traffic Conclave Prepared by: Raelene Stratton Team Leader Integrated Transport and Land Use, North Eastern

More information

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Frequently Asked Questions on the Route 29 Solutions Improvements Projects Frequently Asked Questions on the Route 29 Solutions Improvements Projects Background What are the Route 29 Solutions improvement projects? These projects include the Route 29/250 Interchange ( Best Buy

More information

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013

ITS. Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning. January 9, 2013 ITS Intermountain Transportation Solutions Traffic Studies Transportation Analysis Signal Design Site Planning Raymond Wright, P.E. City of Spokane Transportation Department 11707 East Sprague Avenue,

More information

Arlington County Board Meeting Project Briefing. October 20, 2015

Arlington County Board Meeting Project Briefing. October 20, 2015 Arlington County Board Meeting Project Briefing October 20, 2015 Project Map 2 Project Context Only Interstate in the Country limited to HOV only traffic during rush hours Stoplight at the end of I-66

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Movement Strategy. November On behalf of Barton Oxford LLP

Movement Strategy. November On behalf of Barton Oxford LLP Movement Strategy November 2014 On behalf of Barton Oxford LLP BARTON PARK, OXFORD. Movement Strategy 17/11/2014 Quality Management Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Date

More information

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London

Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts. Transport for London Chapter 14 Route Window C12 Mile End Park and Eleanor Street shafts MILE END PARK AND ELEANOR STREET SHAFTS 14 Route Window C12 Mile End Park and Eleanor Street shafts Introduction 14.1 Crossrail s twin

More information

PLANNING THE SUNBURY GROWTH CORRIDOR

PLANNING THE SUNBURY GROWTH CORRIDOR SUNBURY GROWTH CORRIDOR NOVEMBER 2016 PLANNING THE SUNBURY GROWTH CORRIDOR Sunbury Planning Background The Victorian Planning Authority, in consultation with Hume City Council, is undertaking a number

More information

Madison Metro Transit System

Madison Metro Transit System Madison Metro Transit System 1101 East Washington Avenue Madison, Wisconsin, 53703 Administrative Office: 608 266 4904 Fax: 608 267 8778 TO: FROM: SUBJECT: Plan Commission Timothy Sobota, Transit Planner,

More information

Chapter 2 Route window W25 Maidenhead station. Transport for London

Chapter 2 Route window W25 Maidenhead station. Transport for London Chapter 2 Route window W25 Maidenhead station MAIDENHEAD STATION 2 Route window W25 Maidenhead station 2.6 The drawings provided at the end of this chapter present the main features of the route window,

More information

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group

Appendix 4.1 J. May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group Appendix 4.1 J May 17, 2010 Memorandum from CTPS to the Inter Agency Coordinating Group CTPS CENTRAL TRANSPORTATION PLANNING STAFF Staff to the Boston Region Metropolitan Planning Organization MEMORANDUM

More information

Glasgow Street Traffic Review

Glasgow Street Traffic Review Glasgow Street Traffic Review Recommendation That the Standing Policy Committee on Transportation recommend to City Council: 1. That the Administration proceed with removing the pinch points installed

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS Prepared for Skip Coddington GSC Development, Inc PO Box 1623 Woodinville WA 9872 Prepared by 1141 NE 124 th St., #59 Kirkland, WA 9834 425.522.4118

More information

1.2 Corridor History and Current Characteristics

1.2 Corridor History and Current Characteristics SECTION 1 Description and Background of Study Area 1.1 Introduction This preliminary engineering report was prepared for the Alaska Department of Transportation and Public Facilities (ADOT&PF). It is part

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

John Betts School Crossing Review

John Betts School Crossing Review John Betts School Crossing Review Paddenswick Road London Borough of Hammersmith & Fulham August 2015 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from the

More information

Regulatory Committee

Regulatory Committee Page 1 - Proposed Turning Movement Bans at South Gate Junction, Dorchester Regulatory Committee Date of Meeting 16 March 2017 Officer Subject of Report Executive Summary Andrew Martin Service Director

More information

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS Draft Environmental Impact Statement/Environment Impact Report Appendix H Milestone 2 Traffic Operations Analysis of the At-Grade Crossings APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE

More information

Traffic Analysis Final Report

Traffic Analysis Final Report SR-71 Widening Project Project Approval/Environmental Documentation Traffic Analysis Final Report Prepared for Caltrans District 7 August 2012 6 Hutton Centre Drive, Suite 700 Santa Ana, California 92707

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Chapter 4 Route Window NE3 Manor Park station. Transport for London

Chapter 4 Route Window NE3 Manor Park station. Transport for London Chapter 4 Route Window NE3 Manor Park station MANOR PARK STATION 4 Route Window NE3 Manor Park station 4.7 Highway access to Manor Park station is very good. A117 Station Road connects with A116 to the

More information

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA

Project No Brent Cross, Cricklewood London, UK Phase 1A North RMA Project No. 431679 Brent Cross, Cricklewood London, UK Phase 1A North RMA River Overshadowing Impact Study For Waterman Energy, Environment & Design 18 th November 2014 431679 Report 2 Rel.3 1 of 23 431679rep2v3.docx

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Christ Church Grammar School, Claremont

Christ Church Grammar School, Claremont Christ Church Grammar School, Claremont TRAFFIC MANAGEMENT AND TRANSPORT PLAN Prepared for CHRIST CHURCH GRAMMAR SCHOOL Prepared by Uloth and Associates 11 Sep 2014; Updated 17 Aug 2015; 29 July 2016,

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

CORPORATE ACCOMMODATION SOLUTIONS

CORPORATE ACCOMMODATION SOLUTIONS CORPORATE ACCOMMODATION SOLUTIONS TABLE OF CONTENTS EXECUTIVE SUMMARY 3 THE LOCATION 4 KEY FEATURES 5 MASTERPLAN 8 TRANSPORT & PARKING 9 EAST VILLAGE 10 INDICATIVE SCHEME 11 ABOUT THE DEVELOPER 14 2 EXECUTIVE

More information

ACORNS PROJECTS LIMITED

ACORNS PROJECTS LIMITED ACORNS PROJECTS LIMITED A4 London Road, M4 J5 to Sutton Lane, Slough, Berkshire Combined Stage 1 and 2 Road Safety Audit For Slough Borough Council Prepared by Acorns Projects Limited Safety Traffic Project

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

Kent Pedestrian Guard Railing Assessment

Kent Pedestrian Guard Railing Assessment Kent Pedestrian Guard Railing Assessment Canterbury Final Report for JTB March 2012 Project Number B1649000 Jacobs Eng UK Ltd, Miller House, Lower Stone Street, Maidstone, Kent ME15 6GB Document control

More information

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905) !" # $ !" # $ Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) 882-4100 Fax: (905) 882-1557 www.itransconsulting.com November 2009 %&'('$&$ 1. West Brampton Road Network...

More information

Prepared for Ashurst Lawyers. Prepared by Stephen Hunt. 3 August traffic:evidence. West Gate Tunnel Project. Inquiry and Advisory Committee

Prepared for Ashurst Lawyers. Prepared by Stephen Hunt. 3 August traffic:evidence. West Gate Tunnel Project. Inquiry and Advisory Committee Prepared for Ashurst Lawyers Prepared by Stephen Hunt 3 August 2017 West Gate Tunnel Project Inquiry and Advisory Committee. traffic:evidence ratio:consultants 9 Clifton Street Richmond VIC 3121 ABN 93

More information

Amendments C207 & C208

Amendments C207 & C208 Amendments C207 & C208 Hume Planning Scheme Julia Bell August 2017 Instructed by KING&WOOD MALLESONS On behalf of Hume City Council Amendments C207 & C208 Hume Planning Scheme Contents 1.0 Introduction...

More information

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40 Project Description The primary purpose of this project is to improve the major

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: November 18, 2013 SUBJECT: YONGE-EGLINTON AND EGLINTON WEST INTERCHANGE STATIONS METROLINX EGLINTON CROSSTOWN LIGHT RAIL TRANSIT PROJECT

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Summary Proof of Evidence Traffic

Summary Proof of Evidence Traffic Adran yr Economi a r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction

More information

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub

Report to: Greater Cambridge Partnership Joint Assembly 18 January A10 Foxton level crossing bypass and travel hub Report to: Greater Cambridge Partnership Joint Assembly 18 January 2018 Lead officer: Chris Tunstall GCP Director of Transport A10 Foxton level crossing bypass and travel hub 1. Purpose 1.1 The list of

More information

1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2

1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2 Green Star SA COMMUTING MASS TRANSPORT GUIDE 1 Introduction 2 2 Acknowledgements 2 3 Differences between Green Star SA rating tools 2 4 About the Calculator 2 5 How to Use the Calculator 2 5.1 Step 1:

More information

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys

PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys PORTS TORONTO Billy Bishop Toronto City Airport Summary of 2015 Traffic and Passenger Surveys 1 Summary of 2015 BBTCA Traffic and Passenger Surveys Surveys of traffic volumes and pedestrian activity were

More information

Pre-application submission for Committee: Phase 4 development at West Hendon

Pre-application submission for Committee: Phase 4 development at West Hendon Pre-application submission for Committee: Phase 4 development at West Hendon 1. Development Details Phase 4 of the West Hendon Estate Regeneration. 2. Background The redevelopment of the West Hendon Estate

More information

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report)

Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) STAFF REPORT ACTION REQUIRED Toronto 2015 Pan Am/Parapan Am Games Temporary Traffic By-law Amendments for High Occupancy Vehicle Lanes (Supplementary Report) Date: March 25, 2015 To: From: Wards: Reference

More information

Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan

Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan Review of Government Secondary School Requirements within the Sunbury South Precinct Structure Plan Expert Witness Statement August 11 th, 2017 Prepared by Robert Panozzo Director, ASR Research Pty Ltd

More information

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging Chapter four Route selection and staging Gold Coast Rapid Transit Chapter four Route selection and staging Chapter content Route selection...73 Section one: Helensvale to Griffith University...74 Section

More information