Road Construction Department AT A GLANCE

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Road Construction Department AT A GLANCE"

Transcription

1 Road Construction Department AT A GLANCE

2 Road Network under RCD (in Km) Category Total Length Single lane Intermediate Lane 2-Lane More than 2 lane National Highways State Highways Major District Roads Total

3 The turnaround of the Road Construction Department is reflected in these accelerated graphs of development Rs. in Crores Outlay & Expenditure Outlay Expenditure Financial Year

4 PHYSICAL ACHIEVEMENT (KM) [UNDER ALL HEADS] Financial Year

5 Sl. No. PLAN OUTLAY FOR Name of Scheme Outlay (Crores) Expenditure (Crores) 1 Training Machine and equipment State Plan (Major Roads) Major Roads (SC Component) Mukhya Mantri Setu Nirman Yojana Central Road Fund (State Share) Indo-Nepal Border Road State Plan (Bridge) Central Road Fund (Central Share) RIDF (NABARD) Road (ADB Loan Project) LWE (State Share) LWE (Central Share) Total % Expenditure 25.57%

6 ONGOING PROJECTS Sr. No. Sector No. of schemes A/A Amount (in Crores) 1. Road Sector Bridge Sector NABARD (RIDF) ADB CRF Indo-Nepal Border Road

7 NATIONAL HIGHWAYS Total length of NHs in Bihar : Kms. a) Length of NHs with RCD : Kms. b) Length of NHs with NHAI : Kms.

8 NATIONAL HIGHWAYS Annual Plan Total length Kms Total provision Crores Expenditure Crores Annual Plan Total length Kms Total provision Crores Expenditure Crores

9 NHs under WORLD BANK PROJECTS [NHIIP] World Bank Projects (NHIIP) Sl. NH. Length Name of Project No. No. (Km) Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders 1 98 configuration and Strengthening to Anishabad-Aurangabad-Hariharganj Section (Km 0.00 to Km ) of NH-98 in State of Bihar for Lot-1 (Km 0.00 to Km 62.00) and Lot-II (Km to Km ) under Phase-I of NHIIP A Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders configuration and Strengthening to Birpur-Bihpur Section (Km 0.0 to Km 106) of NH-106 inthe State of Bihar under Phase-I of NHIIP. Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders configuration and Strengthening to Fathua-Harnaut-Barh Section (Km 0.0 to Km 69.0) of NH-30A inthe State of Bihar under Phase-I of NHIIP Rehabilitation and upgrading to 2 lanes/2 lane with paved shoulders configuration and Strengthening to Sheohar - Sitamarhi - Jainagar - Narahia (Km 40 to Km 214) of NH-104 in the State of Bihar under Phase-I of NHIIP. 175 Total Say

10 NATIONAL HIGHWAYS 37 various roads comprising of MDRs & SH of total length 2241 Km declared in-principle NH by MoRTH DPR preparation /submission is under different stages In addition to this Feasibility Study of 22 various roads categorised as MDRs & SHs of total length of Km is being done for consideration & upgradation as NH by MoRT&H Tender for preparation of PPR with feasibility report is under process.

11 Status of NHs under NHAI 1. Projects under implementation: S. No Name of Project Length (Km) TPC/ Annuity/ Grant L Hazipur - Muzaffarpur and construction of Muzaffarpur Bypass NH-77 4L Patna Bakhtiarpur NH-30 2L with PS Piprakothi-Motihari- Raxaul NH-28A 4L Forbesganj- Jogbani NH-57A 2L with PS Khagaria-Purena NH-31 2L with PS Gopalganj- Chapra NH-85 Concessionaire/ Concession Period / M/s Gammon Semi -Infrastructure Annuity-94.6 Projects Ltd./ /Grant- 113 Cr /Grant Appointed Date Schedule /likely date of completion / June,2018 (PCC issued on ) Physical Progress (in % age)/length completed 78.32%/ Km M/s BSC-C&C JV / Sept., %/ Km (PCC issued on ) M/s Tantiya /04/2014/ 50.98%/ Construction Ltd Km M/s JKM Infra %/ 0.63 Projects Ltd. Km (EPC) / Semi Annuity-56 Cr. M/s Punj Lloyd /04/2014/ 99.14% / Ltd. June, 17 (PCC Km issued on %/ Km M/s G R Infra. Project Ltd.(EPC)

12 S. No Name of Project Length (Km) L Patna to Koilwar section NH-30 4L Koilwar to Bhojpur NH- 30&84 4L Bhojpur - Buxar section NH-84 4L Bakhtiyarpur- Mokama NH-31 4L Simaria- Khagaria NH-31 4/2L Chhapra- Hazipur NH-19 2L with PS Muzaffarpur Sonbarsa NH-77 2L with PS Mokama-Munger NH-80 Status of NHs under NHAI TPC/ Annuity/ Grant Concessionaire/Co ncession Period Appointed Date Schedule /likely Physical Progress date of completion (in % age)/length completed M/s MadhuconAgreement signed on with M/s. Projects Ltd. Madhucon Projects Ltd. Appointed Date is yet (EPC) to be fixed M/s PNC-Agreement signed on with M/s. SPSCPL(JV) PNC-SPSCPL (JV). Appointed Date is being (EPC) fixed with 62% length with the consent of the Contractor M/s PNC-Agreement signed on with M/s. SPSCPL(JV) PNC-SPSCPL(JV). Appointed Date is yet to be (EPC) fixed M/s BSCPL (EPC) M/s Punj Lloyd Subgrade work Ltd. (EPC) in progress / M/s Muducon /11/2013 / 61.00% / Semi Projects Ltd. March, Km Annuity Cr / Semi Annuity Cr / Semi Annuity Cr. M/s BSC-C&C JV / % / (PCC)/31.1 Km M/s BSC-C&C JV /05/2013(PCC % / issued onkm (Balance ) work under negative CoS)

13 S. No Name of Project Length (Km) L Patna - Gaya- Dobhi NH-83 2L with PS Chapra- Rewaghat- Muzzafarpur NH L with PS Biharsharif - Barbigha Mokama NH-82 6L Varanasi Aurangabad NH- 2 4L Gopalganj- Muzzafarpur LMNHP-10 NH- 28 Status of NHs under NHAI TPC/ Annuity/ Grant Concessionaire/C oncession Period M/s IL&FS Engineering and Construction ltd.(item Rate) Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed % / 0.96 Km M/s G R Infra % / Project Km Ltd.(EPC) M/s G R Infra. Agreement signed on with M/s GR Project Ltd.(EPC) Infra projects Ltd. Appointed date is yet to be fixed. Appointed date delayed due to stage I forest clearance which has been now obtained 192 (57 km in UP and 135 km in Bihar) 2848/ Grant- 565 Cr. M/s Soma Isolux (JV) Balance work be awarded vide MoEF letter dated /03/2014 / March, % / Km(58.54 Km in Bihar & Km in UP) All works completed except 2 lane bridge at Gandak river and approaches. Due to nonperformance of contractor the contract was terminated on Length completed Km. DPR for remaining work is under progress.

14 S. No Name of Project Length (Km) L Gorakhpur- Gopalganj LMNHP-9 NH-28 2L with PS Maheshkoot- Saharsa- Purnea (Pkg- II) NH-107.(on EPC) Construction of 2-lane approach road to Munger Ghat Road cum Rail Bridge at Munger NH- 333B.(on EPC) Status of NHs under NHAI TPC/ Annuity/ Grant Concessionaire/C oncession Period Appointed Date M/s PCL October M/s Punj Lloyd Ltd./Item Rate 5 M/s Gammon India Ltd Cr Cr. M/s S.P. Singla Constructions Pvt. Ltd. Schedule /likely date of completion / Terminated on Physical Progress (in % age)/length completed 46%/ Km %/ Km LOA issued on Agreement to be signed which is delayed due to change in name of the bidder. Agreement signed on Appointed date yet to be fixed.

15 2. Projects yet to be awarded : Sl. No Name of Project 2L with PS Maheshkoot- Saharsa-Purnea (Pkg-I) NH-107 4L Aunta- Simaria (including 6 lane Ganga bridge) NH-31 Development of newly declared NH-527C from Majholi to Charout Section to 2lane Standard Upgradation to 4-lane standard of NH-131A from km near Narenpur to km near Purnea (design chainage km 6.00 to km 55.00) Construction of 4 Lane bypass around Kishanganj Town on NH-31 Status of NHs under NHAI Length (km) TPC/ Civil Cost (in cr.) Target for Award July, July, March March March 2018 Present Status 2 nos. of Bids on EPC received on bid due date of Evaluation is underway. 03 nos. of bids on HAM received on due date Evaluation is underway. EFC proposal was submitted to the Ministry which was returned due to non-availability of adequate land. 3D in progress Revised PPPAC proposal was submitted to the Ministry which was returned for want of sufficient land. 3D in progress. EFC proposal was submitted to the Ministry which was returned due to non-availability of adequate land. 3D in progress

16 Sl. No Name of Project 4-laning of Munger- Mirzachowki section of NH-80 Patna Ring Road ( M/s CES India Pvt Ltd) 2L with PS Ekangarsarai- Jehanabad Arwal NH laning of Bakhtiyarpur- Biharsharif-Rajauli- Barhi section of NH- 31 from km to km L of Aurangabad Barachatti- Bihar/JH border NH-02 Status of NHs under NHAI Length (km) TPC/ Civil Cost (in cr.) To be updated To be updated To be updated To be updated Target for Award March 2018 March 2018 March 2018 March 2018 Present Status The DPR of the project was being undertaken by the Ministry which transferred the project to NHAI in June, (a) done for Bihar portion and 3A in progress. For Jharkhand portion, 3(a) is in progress. Design Consultant M/s SAI Engineers Pvt. Ltd. Feasibility report is under preparation by consultant in consultation with State Govt. reg alignment which is yet to be finalized Since entire stretch has been taken up by Ministry. It was proposed to drop this stretch from NHDP. However, the same has not been agreed to. The project was with BSRDC which has been transferred to NHAI recently. DPR is to be updated. Under finalization of contract The project is under RO-Jharkhand package

17 Total length Km 2-laning already done under- State Highways RSVY Km ADB Km CRF/LWE Km Others Km 2-laning ongoing under ADB Km Maintained under OPRMC Km SBD/CMBD (ongoing) Km Under process for AAP (3 rd Phase) [SH-70, 71, 96, 54, 74 & 75] Km

18 State Highways in process of ADB financing Sl. No. SH No. Name of SH Length Total Project Cost (Rs. In Cr.) District Covered 1 58 Kishunganj Vijay Ghat Road Madhepura & Bhagalpur 2 82 Kadirganj Sonho Road Upto Khaira ) Nawada and Jamui Districts 3 84 Ghogha Barahat Road (Up to Pinjwara) Bhagalpur and Banka 4 85 Akabarnagar Amarpur Road Bhagalpur & Banka Bihia (NH-84)-Jagdishpur Piro Bihta (SH-81) Bhojpur Betiah to Bhikhnathori West Champaran

19 Major District Roads Total length Km Length maintained under OPRMC Km Periodic Maintenance done Km Length under different ongoing schemes Km Plan Km NABARD Km LWE Km Under Tender Process Km Approved in AAP (Upto 2 nd Phase) Km Under process for AAP (3 rd Phase) Km

20 Long term Output and Performance Based Road Maintenance Contract (OPRMC) Provision of Initial Rectification, Ordinary Maintenance, Minor Improvement, Periodic Maintenance & Emergency Works in roads taken up under OPRMC Road Maintenance Grievance Redressal System working at HQ GPS enabled Road Ambulance working. Online OPRMC Monitoring System working. Toll Free Helpline Number Schemes Details: Sanctioned Length 9,064 km No. of packages 76 Sanctioned Amount 2,579 crore Currently maintained: SH : MDR : PM Work done till date : 1569 Km 6516 Km Km

21 Patrol Maintenance Units

22 Maintenance work in progress

23 Status of Bridge Schemes under Road Division Year Total no. of sanctioned bridge Completed Ongoing Under Tender TOTAL

24 Indo-Nepal Border Road Project under Road Divisions

25 SALIENT FEATURES: Approval by Cabinet Committee on Security (CCS) so far For portion within Bihar Length Km Cost Cr. Average cost per km 3.02 cr. Approval communicated to Govt. of Bihar vide Ministry of Home Affairs, Govt. of India letter no /11/2010 BM-V dt State Govt. to bear cost of : i) Land Acquisition ii) Statutory clearances including Environment, Forest & Wildlife iii) Maintenance of road assets after completion of project. 121 no. of bridges additionally required for the road has been sanctioned under Nabard,the State Plan cost Rs Cr.

26 ALIGNMENT Road alignment in Bihar (NW to SE) : Madanpur (near Gobarahiya) on NH 28B (Distt- West Champaran Km) near UP Border. The adjacent BOP in UP is Patlawa. East Champaran Km, Sitamarhi Km, Madhubani Km, Supaul Km, Araria km Galgalia (District Kishanganj Km) on Bihar West Bengal Border. The adjacent BOP in West Bengal is Dangujote.

27 Stretch wise revised tentative cost & time line Road District Length (in km) 1. Madanpur near Gobarahiya to Bhangaha. 2. Bhangaha to Dhutaha River Bridge. 3. Dhutaha River Bridge to Phulwaria Ghat at Lalbakiya River. West Champaran West Champaran East Champaran Cost (in cr.) Tentative revised cost( in cr) Revised target of completion Phulbaria Ghat at Lalbakiya River to Bahar Village. 5. Bahar Village to Kanhauli. 6. Kanhauli to Sursand Sitamarhi Sitamarhi Sitamarhi Bhittha More to Parsa Sitamarhi

28 Stretch wise revised tentative cost & time line Road District Length (in km) Cost (in cr.) Tentative revised cost ( in cr) Revised target of completion 8. Parsa to Akharar Ghat Madhubani Jhori Chowk to Bhutaha Chowk 10. Saraigarh (Gariya Chowk) to Refugee Colony 11. Refugee Colony to Mirganj Chowk on NH-57A 12. Mirganj Rly. crossing to kuari Bypass (33.70 km) & Sikti to Dhabeli (12.10 km) Madhubani Supaul Araria Araria Kuari to Sikti Araria Dhabeli to Fatehpur Kisanganj Fatehpur to Galgalia Kishanganj Total Rs 4.41 cr. / km

29 Status of Annual Action Plan Category As per A/A issued Present Status No. / Length (Km) Cost (Crores) Tender Status NIT Not NIT Work in progress Completed Road Schemes 73 nos. ( Km) Bridges Schemes 27 nos

30 Status of Annual Action Plan (1 st & 2 nd Phase) Category As per approved Action Plan As per A/A issued Status of Tender invitation Length (Km) Cost (Crores) Length (Km) Cost (Crores) (No/Length) Major District Roads (including NABARD, CRF) Km (69 nos.) Km (23 nos) (91.64 Km) Bridges (nos) 20 nos nos

31 Contractor's Performance Evaluation based on work done from to : Sl. No. Reported by No. of contractors 1. Road & NH Divisions (As per report received from56 divisions) Defaulter contractors 2. BSRDC 13 Nil 3. BRPNNL Remarks Evaluation of performance going on Disciplinary action against defaulter contractors under RCD 1. Blacklisting - 09 Nos. (i) For 10 years - 07 Nos. (ii) For 15 years - 01 Nos. (iii) For Indefinite period - 01 Nos. 2. Suspended Contractors - 03 Nos. 3. Demoted Contractors from Class I to II - 02 Nos. 4. Debarred Contractors - 71 Nos.

32 ifkksa ds vf/kxzg.k,oa dk;z ;kstuk dh LohÑfr gsrq fuxzr ekxznf'kzdk ds eq[; fcunq jkt; ljdkj ds n`f"v ifk 2020 (Vision 2020) ds v/khu jkt; ds fdlh Hkh dksus ls jkt/kkuh ivuk vkus esa vf/kdre ik p?k.vs dk le; yxs] bl fu.kz; ds vkyksd esa ifk fuekz.k fohkkx }kjk fueu izkfkfedrk fu/kkzfjr dh x;h gs%& (i) (ii) (iii) (iv) lhkh jkt; mpp ifkksa dks U;wure 2&ysu (7-00 ehœ) esa pksm+hdj.k dk;za lhkh o`gn ftyk ifkksa dk U;wure buvjesfm,v ysu (5-50 ehœ) esa pksm+hdj.k dk;za fohkkxh; ifkksa ij flfkr ladh.kz,oa ttzj dks vkj0lh0lh0 ls izfrlfkkiua jkt; mpp ifkksa,oa o`gn ftyk ifkksa ij c<+ s gq, ;krk;kr?kuro (Traffic Density),oa O;kolkf;d Hkkjh okgu (Axle Load) ds dkj.k ifkksa ij flfkr LØww ikbzy iqyksa ds LFkku ij mpp Lrjh; vkj0lh0lh0 iqy dk pj.kc) rjhds ls fuekz.ka

33 (v) ckjgeklh lm+d leidz (All-weather road connectivity) ds eísutj ck/kk;qdr iqy&iqfy;ksa (;Fkk submersible bridge, (vi) (vii) causeway, low level culverts etc.) ds LFkku ij ck/kk jfgr pksm+s iqyksa dk fuekz.ka jkt; ds fdlh Hkh dksus ls jkt/kkuh ivuk igq pus esa vf/kdre ik p?kavs le; yxs] bl fufeùk lacaf/kr fohkkxh; ifkksa ds lkfk&lkfk osdfyid ekxksza dk vf/kxzg.k,oa rn~uqlkj ;krk;kr?kuro,oa okgu Hkkj ds vuqlkj i;kzir Js.kh (adequate configuration) esa fodflr djuka jkt; ds ifkks a ij c<+rs ;krk;kr?kuro (Traffic Density),oa Hkkjh okguksa (Axle Load) dks ns[krs gq, NH, SH,oa MDR ds Missing Link dks tksm+ +dj Star-Grid Pattern ij mpp xfr xfy;kjk (High Speed Corridor) fodflr djuka (viii) 'kgjksa esa tke dh lel;k dks ns[krs gq, ;krk;kr dks lqxe cukus gsrq fohkktd lfgr cgq ysu ifk (Multi Lane with Divider),oa nzqr xfr ls ty fudklh gsrq ukyk dk fuekz.k djuka

34 (ix) (x) (xi) osls ladh.kz 'kgjh ifk (Bottleneck) tgk yxkrkj tke dh lel;k jgrh gs,oa ifk dk pksm+hdj.k lahko ugha gs] osls 'kgjh {ks= esa osdfyid ekxz ds :i esa ckbzikl dk fuekz.k djuka jkt; ds v/khu i;zvu] lklñfrd egro] fof'kf"v Ñf"k mriknd {ks= rfkk jkt; ds izeq[k cktkj dks fpfugr dj buds mùke lm+d leidzrk (road connectivity) ds fy, izeq[k ekxksza dk p;u,oa rn~uqlkj i;kzir Js.kh (adequate configuration) esa fodkl dk;za ifk iz{ks= esa jk"vªh;,oa vurjkz"vªh; Lrj ij iz;qdr u;s rduhd (technology) dk mi;ksx dj jksm ls Vh (Road Safety) ds ekud izko/kkuks a ds vuq:i jksm usvodz (Road Network) dk O;kid,oa lqn`<+ fodkla

35 (xii) (xiii) ftyk eq[;ky; dks vuqeamy,oa iz[k.m dk;kzy;ksa ls tksm+us okys fohkkxh; ifkksa dk vko';drk,oa ;krk;kr?kuro ds vuqlkj pksm+hdj.k rfkk lqn`<+hdj.k djuk vksj vkink izca/ku,oa iz'kklfud laosnu'khyrk ds vkyksd esa u;s csdfyid ckbzikl dk fuekz.ka mijksdr y{; dks izkir djus gsrq vke tu izfrfuf/k;ksa ls izkir lq>ko dh leh{kk dj fuekz.k ij fopkj fd;k tk,xka

36 vu; fohkkxksa ls ifkksa dk vf/kxzg.k ifk fuekz.k fohkkx ds v/khu miyc/k lalk/kuksa ds Optimum mi;ksx,oa lq'kklu ds dk;zøe ds vurxzr fu/kkzfjr y{;] ;Fkk&jkT; ds lqnwj ftys ls ik p?kavs esa jkt/kkuh ivuk igq puk] Traffic Congestion dks nwj djus,oa?kuh vkcknh okys {ks=ksa esa osdfyid ekxz dk fuekz.k vkfn gsrq u;s ifkksa dk vf/kxzg.k fufer fohkkxh; ladyi la0 935¼,l½ fnukad }kjk ekinam fueuor~ fu/kkzfjr dh xbz gs%& ¼i½ ¼ii½ ifk] ljdkjh ds v/khu gks,oa iwoz ls ifk dk ekxz js[kkad.k ¼alignment½ fu/kkzfjr gksa,sls ifk tks nks jk"vªh; mpp ifkksa] nks jkt; mpp ifkksa],d jkt; mpp ifk ls nwljs o`gn~ ftyk ifk],d jk"vªh; mpp ifk ls nwljs jkt; mpp ifk ;k o`gn ftyk ifk vfkok nks o`gn ftyk ifkksa vfkok egroiw.kz LFkkuksa ;Fkk egroiw.kz i;zvu LFky] egroiw.kz Ñf"k mriknu {ks=] fodkl'khy vks ksfxd {ks=] egroiw.kz lkalñfrd {ks= br;kfn dks tksm+rk gksa

37 ¼iii½ ¼iv½ ¼v½ ivuk jkt/kkuh {ks= (Patna Capital Region),oa 'kgjh {ks= esa im+us okys ifkks a ds ekeys esa ifk Hkwfe dh pksm+kbz ¼Right of Way½ 8-5 ehvj okanuh; gksxh] ijurq U;wure 6-0 ehvj ifk pksmkbz ds ifkksa dk Hkh p;u fd;k tk;sxk] c'krsz Hkfo"; esa mldh pksm+hdj.k dh lehkko;rk gksa ifk fodkl n`f"vifk&2020 ds vuq:i fu/kkzfjr ds vkyksd esa xzkeh.k {ks= esa im+us okys ifkksa ds ekeys esa ifk Hkwfe dh pksm+kbz ¼Right of Way½ 8-5 ehvj okanuh; gksxh] ijurq U;wure 6-0 ehvj pksm+kbz ds ifkksa dk Hkh p;u fd;k tk,xk] c'krsz Hkfo"; esa mldh pksm+hdj.k dh lehkko;rk gksa lkfk gh ifk esa ;krk;kr?kuro de ls de 2000 gksa iz/kku ea=h xzke lm+d ;kstuk ds izlrkfor f}rh; pj.k ds vurxzr muu;u gsrq xzkeh.k ifkksa dk vf/kxzg.k ugha fd;k tk,xka

38 ¼vi½ fo'ks"k ifjflfkfr esa ifk _a[kyk ds fodkl ¼Road Network Development½] i;zvu] jkt; lhek ls lacaf/kr ifkks a ds fy, mijksdr fu/kkzfjr ekinam esa NwV fn;k tk ldsxka ¼vii½ osls ifk tks fdlh l?ku vkcknh {ks= okys o`gn ftyk jkt; mpp jk"vªh; mpp ifk dks ckbzikl djrk gks mls ifk fuekz.k fohkkx }kjk vf/kxzg.k dh tk ldrh gs ftlds fy, vu; 'krksza esa NwV nh tk ldrh gsa ¼viii½ ifk fodkl n`f"vifk&2020 ds vurxzr fcgkj ds fdlh nwjlfk LFkku ls 5?kaVs es a ivuk igq pus ds eísutj osdfyid ifk ds :i esa fdlh xzkeh.k ifkksa dk p;u dj vf/kxzg.k fd;k tk ldsxk, ftlds fy, vf/kxzg.k ds mijksdr 'krksza esa NwV fn;k tk ldsxka ¼ix½ ifk esa dksbz nkf;ro yafcr u gksa vu; fohkkx ls glrkarfjr ifk] tks iwoz esa ljdkj ds fdlh Hkh ;kstuk ds vurxzr fufezr dh x;h gks vksj vke tuksa }kjk ftldk mi;ksx fd;k tkrk gs] osls ifkksa ds ifk fuekz.k fohkkx }kjk vf/kxzg.k ds i'pkr~ oùkzeku ROW (Right of Way) ij fdlh Hkh js;r dk fdlh Hkh izdkj dh Hkwfe vf/kxzg.k ds eqvkots dk nkok jkt; ljdkj vksj ifk fuekz.k fohkkx }kjk eku; ugha gksxka

39 dk;z ;kstuk p;u gsrq xfbr lfefr orzeku esa ifk fuekz.k fohkkx }kjk mijksdr fu/kkzfjr izkfkfedrk ds vuq:i,oa miyc/k lalk/ku ds eísutj iqy&iqfy;ksa ds muu;u gsrq okf"kzd dk;z ;kstuk LohÑr dj bldk dk;kzuo;u fd;k tkrk gs] ftls cnyrs ifjos'k esa bls ikjn'khz] lalfkkxr,oa ifj;kstuk dk;kzuo;u esa dq'ky izca/ku gsrq ekxzn'khz fl)kar fuxzr fd;k x;k gsa lhfer lalk/ku ls o`gn isekus ij iqy&iqfy;ksa dks j[k&j[kko gsrq fohkkx }kjk LohÑr fd;s tkus okys okf"kzd dk;z ;kstuk dks vksj O;kid] izhkkoh,oa ikjn'khz cukus dh vko';drk eglwl dh tk jgh gsa rn~vkyksd esa fohkkx }kjk okf"kzd dk;z ;kstuk ds LohÑfr,oa vu; fohkkx ds ifkksa ds vf/kxzg.k gsrq fueuor~ ekxzn'kzu fl)kur fu:fir fd;k x;k gs%&

40 iz/kku ifk fuekz.k fohkkx dh v/;{krk esa,d lfefr dk xbu fueuor~ fd;k x;k gs%& ¼i½ iz/kku ifk fuekz.k fohkkx] fcgkj & v/;{k ¼ii½ ¼iii½ vfhk;ark izeq[k&lg&vij vk;qdr&lg&fo'ks"k lfpo] ifk fuekz.k fohkkx] fcgkj & lnl; lfpo vfhk;ark izeq[k&lg&vij vk;qdr&lg&fo'ks"k lfpo] xzkeh.k dk;z fohkkx] fcgkj & fo'ks"k vkeaf=r lnl; ¼iv½ eq[; vfhk;ark] uxj fodkl,o vkokl fohkkx & fo'ks"k vkeaf=r lnl; ¼v½ eq[; vfhk;ark ¼vuqJo.k½] i0fu0fo0 & lnl; ¼vi½ eq[; vfhk;ark] mùkj fcgkj mihkkx] i0fu0fo0 & lnl; ¼vii½ eq[; vfhk;ark] nf{k.k fcgkj mihkkx] i0fu0fo0 & lnl; ¼viii½ eq[; vfhk;ark] jk0m0i0 mihkkx] i0fu0fo0 & lnl;

41 lfefr ifj;kstukvksa ;Fkk vu; lajpukvksa ds gsrq LFky fujh{k.k,oa lehkko;rk izfrosnu (Feasibility Report) ds lkfk izkir izlrko dh leh{kk dj okf"kzd dk;z ;kstuk dh vuq'kalk djsxha lfefr bl ckr ij Hkh /;ku j[ksxh fd ;kstukvksa ds p;u esa {ks=h; vlekurk HkkSxksfyd n`f"vdks.k ls de ifk /kuro okys {ks= ds lkfk fu/kkzfjr y{; dks gkfly djus gsrq vko';drkuqlkj ifk dks 'kkfey djus dk iz;kl djsxha okf"kzd dk;z ;kstuk dh LohÑfr gsrq ;kstukvksa dk p;u fu/kkzfjr izkfkfedrk,oa ekxzn'khz ekin.m ds vuq:i dh tk;sxha {ks=h; inkf/kdkfj;ksa ls mdr ds vkyksd esa lahkko;rk izfrosnu (feasibility report ) izkir dj lfefr ds le{k fopkjkfkz izlrqr fd;k tk,xk,oa lfefr dh ij iz/kku ds ek/;e ls fohkkxh; ea=h ls vuqeksnu izkir djsaxsa

42 okf"kzd dk;z ;kstuk ds dk;kzuo;u gsrq fuf/k ds lzksr & nh?kzdkyhu n`f"vifk ¼Vision Document½ ds vk/kkj ij ;kstukvksa ds p;u esa okf"kzd mn~o;; dk /;ku j[kk tk;sxk,oa jkt; ;kstuk en] ukckmz ¼RIDF½] dsunzh; lm+d fuf/k] ckg~; leiksf"kr fuf/k ¼;Fkk&,f'k;u fodkl csad ¼ADB½] JICA] fo'o csad ¼World Bank½,oa vu; lalfkkvksa½ ds vurxzr izkir _.k,oa fuos'k dk vkdyu dj blds vurxzr p;u dh tkus okyh ;kstukvksa ds dk;kzuo;u ds fy, dqy lalk/ku ij foùk fohkkx dh lgefr izkir dh tk;sxha fu/kkzfjr izkfkfedrk ds vuq:i p;fur ifk ;fn orzeku esa OPRMC ds v/khu la/kkfjr fd, tk jgs gsa rks vksfpr; ds lkfk foyksiu (Deletion) dh vko';drk dks m)`r djrs gq, fu;ekuqlkj,sls dks OPRMC isdst ls foyksiu (Deletion) djus ds mijkar gh ifj;kstuk dh LohÑfr fn;k tkuk gs,oa vu; fohkkxksa ls vf/kxzfgr gksusokys ifkksa dks j[k&j[kko dh lwph ls foyksiu Hkh lacaf/kr fohkkx }kjk fd;k tkuk gsa

43 Bihar Rajya Pul Nirman Nigam Ltd. The Corporation was on the verge of closure on account of massive accumulated losses till Turnover (work done) Increased from Crores in (Actual) to Crores in (Estimated) Profit after tax Increased from Crores in (Actual) to Crores in (Estimated) 1736 bridges constructed till date Rs Crores contributed to CM s Relief Fund.

44 Turn over (Rs. crore) (Estimated)

45 BRIDGES Mega bridges ( above 100 Cr) - (i) Ganges (a) Karjan (Bakhtiyarpur)-Tajpur (1602 Cr) on BOT Work started 8 th Apr-2011 Completion Date July 2019 (as per EOT) Status work in progress. (b) Arrah - Chapra (676 Cr) Work started July-2010 Expected completion June 2017 Status Inaugurated (c) Sultanganj Aguwani Ghat (1710 Cr) Work started May 2015 Scheduled completion Nov 2019 Status work in progress

46 BRIDGES contd (ii) Gandak (a) Between Bettiah & Gopalganj (Rs. 826 Cr.), Work started June 2009 Revised date of completion March 2016 Status Bridge Inaugurated & Land acquisition for connectivity part is in progress. (b) Sattarghat in 27 th Km of Chakia-Kesaria-Sattarghat Road (Rs. 263 Cr) Work started Oct 2012 Likely Date of Completion June 2018 Status Work in progress (c) Bangraghat between Muzaffarpur and Saran (Rs. 509 Cr) Work started April 2014 Likely Date of Completion December 2018 Status Work in progress

47 BRIDGES contd.. (iii) Kamla - (iv) Sone - (v) Falgu (Vi) Koshi Bridge between Gandaul and Biraul including other structures and 11 Km approach road (Rs. 332 Cr.) Work started March 2013 Likely date of completion Dec 2017 Status Work in progress Between Daudnagar and Nasriganj (619 Cr) Work started March 2014 Likely date of completion March 2018 Status Work in progress 6-Lane bridge between Gaya and Manpur (65 Cr.) Work started March 2013 Likely completion date Dec 2015 Status Inaugurated 4-Lane HL RCC Bridge at Vijay Ghat with ROB(368 Cr.) Work started July 2010 Likely completion date Sept 2017 Status Bridge Completed & Inaugurated, ROB Parts is in Progress, L.A. Issue in 850m approach at Pratap Nagar Vill.

48 Mukhya Mantri Setu Nirman Yojana Sanctioned nos. Cost Cr. Completed nos.

49 BRIDGES contd.. FLYOVERS 1. Flyover between Mithapur ROB round about to Chiraiyatanr bridge via Station Road and extension of Exhibition Road arm of Chairaiyatanr bridge upto Gandhi Maidan (168 Cr) Work started June 2013 Likely date of completion June 2016 Status Exhibition Road arm completed and inaugurated Mithapur ROB to Chiraiyatand Arm Work in progress Likely date of completion Sept Mithapur ROB to Bhikhari Thakur Flyover via R' Block (166 Cr) Work started Nov 2015 Scheduled completion Nov 2018 Status Foun-62%, Sub St 25% (Now work stop due to Design Issue)

50 BRIDGES contd.. FLYOVERS 3. Mithapur flyover to Chiraiyatand Flyover via Karbigahiya (122 Cr) Work started Nov 2015 Scheduled completion Nov 2018 Status Foundation 36 % (Now work stop due to Design Issue) 4. Lohiya Path Chakra between Lalit Bhawan and Vidyut Bhawan on Bailey Road (392 Cr) Work start date Jan 2016 Scheduled completion Dec 2017 Status Work in progress.

51 BRIDGES contd.. OTHER IMPORTANT PROJECTS (above 100 Cr) 1. North Road approach of Rail cum Road Bridge over river Ganga between Digha and Sonepur (245 Cr) Work started Dec 2015 Date of completion June, 2017 Status-Inaugurated 2. Extended approach road of Dhanha Ratwal bridge over river Gandak in West Champaran district (125 Cr) Work started Aug 2015 Scheduled completion Nov 2017 Status Work in progress. 3. Const. of Pontoon Bridge in U/S & D/S Parallel to M.Gandhi Setu. Work started Dec 2015 Scheduled completion June 2017 Status One lane completed and Inaugurated. Work of another lane in progress.

52 Sl. Ongoing Schemes under Bihar Rajya Pul Nirman Nigam Ltd Head No. of Ongoing Schemes Rs in Crore 1 Nabard RCD Nabard Indo-Nepal RCD Nabard RWD CRF MMSNY ACA BDF Deposit MP Fund Non Plan Plan ROB World Bank Total

53 Summary of schemes to be completed till March, 2018 by Bihar Rajya Pul Nirman Nigam Ltd Sl. Head Schemes to be completed till March, 2018 Rs in Crore 1 Nabard RCD Nabard Indo-Nepal RCD Nabard RWD CRF MMSNY ACA BDF Deposit MP Fund Non Plan Plan ROB World Bank Total

54 Details of Interchanges Flyovers: ROBs: Constructed - 2 Under Construction - 3 Proposed - 1 Constructed - 28 Under Construction - 6 Proposed - 47

55 Bihar State Road Development Corporation Incorporated on 20 th April, 2009 under Companies Act, Objectives: To construct, execute, carryout, improve, work, develop, administer, manage, control or maintain in Bihar and elsewhere all types of roads, highways, express routes, paths, streets, bridges, sideways, tunnels and other infrastructure, works and conveniences, approach road, sheds, temporary dwelling huts in case of calamity or any emergency pertaining to all departments of Government of Bihar or any other department, agency, organization or body through Road Construction Department or directly. To undertake projects under PPP (Public Private Partnership) including arranging finances for such projects.

56 PROJECTS UNDERTAKEN BSHP-I (Bihar State Highway Project Phase-I) : BSHP-II (Bihar State Highway Project Phase-II) : BSHP-II AF (Addl. Fin. Bihar State Highway Project Phase-II) : Bihar New Ganga Bridge Project : PPP Projects (Public Private Partnership Projects) EPC Turnkey Projects (Engineering Procurement & Construction Projects) 4-Laning of NH-82 (Funded by JICA)

57 Mega Projects in Patna Metropolitan Area Kachchi Dargah

58 Flyover Projects in Patna to reduce congestion

59 PATNA RING ROAD Doriganj Dighwara Chak Sikandar Hajipur Koilwar NH-30 New Kanahuli Zero Mile Kachhi Dargah Legend NHAI Alignment SH-78 NH Portion 6 Lane Bridge Masuri Lakhna Fatuha Dainawan SH-01 NEXT

60 PPP PROJECTS UNDER BSRDC Bakhtiyarpur-Tajpur Greenfield bridge with approach : 4 Lane Length of Bridge 5.53 Kms. Length of Approach Road Kms. Total Project Cost 1600 Crores. Concessionaire M/s Navyuga Jahnavi, Toll Bridge Pvt. Ltd., Hyderabad. Concession period 30 Years (Including 4.5 Years Construction Period) Appointment date Scheduled Completion Date May 2016 Completion date as per EOT Status Work in progress Physical Progress : % Financial Progress : %

61 Greenfield Bridge across Ganga Connecting Bakhtiyarpur to Tajpur (Bridge Length km, Road Length km) BRIEF OVERVIEW A 4-Lane Controlled access Greenfield Bridge & Highway, PPP Project originates at Karjan on new NH-31 crosses old NH-31 (Jamalpur Badahiya), passes through a bridge on river Ganga & terminates at Tajpur on NH-28. The work was scheduled to be commissioned on Physical Progress of 48.44% & Financial Progress of 53.26% has been achieved. A total of 190 Ha of land against Ha was handed over to Concessionaire. Hence Completion date has been extended to without increasing the Concession period. Launching gantry at Main Ganga bridge collapsed on due to heavy storm. The work is likely to be further delayed by 6 months. The work has been mainly delayed due to non-handing over of encumbrance free land. Villager demanding RCC Culvert in place of Hume Pipe Culvert due to flooding. Concessionaire instructed to submit justification. Compensation for LA not being accepted by the land owners in Jamalpur Village, Patna. Demanding higher rate of Compensation. LA under new act for 4.98 km is under process.

62 4 Lane Bakhtiyarpur Tajpur Back

63 GANGA PATH

64 Project Details DESCRIPTION Project DETAIL Ganga Path (Digha to Didargunj), Length 21.5 Km. Status Value Contractor Authority Engineer Work in Progress Rs Crores Navayuga Engineering Company Limited AECOM- RODIC JV Appointed Date Completion Date Highway Portion Elevated Portion Toll Plaza Km Km 02 Nos. Physical Progress Pile -325/662, Pile cap- 67/136 Pier - 66/136, Pier cap- 66/136 Segment- 353/2534 Earth work- 2 Km (in progress)/5.9 km

65 GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length km) BRIEF OVERVIEW A 4-Lane Controlled access highway originates from Digha, passes along the river Ganga, crosses old NH-30 & terminates at Deedarganj. 2 Lane Connectivity with Bankipur-Danapur Road and Ashok Rajpath has been proposed at LCT Ghat, Ch km, A.N Sinha Institute, Ch. 5.7 km, Krishna Ghat, Ch. 8.5 km, Gai Ghat, Ch km, Kangan Ghat, Ch km and Patna Ghat, Ch km. Transfer of Govt. land, Land Acquisition, Mining of Soil, Ganga channel, Design of Pile foundation, SEIAA have been the main reason of delay which have been partly resolved. Mainly land issue persists at Ch. 0.0 to 0.7 (Digha), 12.0 to 12.8 (Gai Ghat), 13.6 to 21.5 (from Nauzar Ghat to Deedarganj). Physical Progress :- Pile- 325/662, Pile Cap- 67/136, Pier - 66/136, Pier Cap- 66/136, Segment- 353/2534, Earth work- 2 Km (in progress)/5.9 km Financial Progress: % (Rs Crores )

66 GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length km) BRIEF OVERVIEW Possibility of providing connectivity at Khajekalan Ghat is being explored. From Ch onward there was a provision of Embankment in main design of Ganga Path, but due to shifting of river towards City side a detailed study has been conducted by IIT Roorkee, elevated structure has been recommended from km 13.5 to Accordingly centre line has been modified & revised proposal has been prepared-

67 GANGA PATH FROM DIGHA TO DEEDARGANJ AT PATNA (Length km) BRIEF OVERVIEW Elevated Ch (Nauzar Ghat) to 16.0 (west of Patna Ghat) & Ch to 20.4 (Deedarganj) Embankment Ch (west of Patna Ghat) to 19.9 (Deedarganj) & Ch to (Deedarganj) Cost as Per Sch.- H (In Crores) Additional Civil Cost* (In Crores) * Considering the reduced project length from Ch to Ch ( Old NH-30 instead of New NH-30) Less private land acquisition will be needed as ROW is reduced to 45m (Land between Ch KM to Ch KM is private land). This will also resolve the issue of Guest house of Khankahe Munimiya at Mitan Ghat. Re-location of Khajekalan burning Ghat will not be required & free access to river front will be available. Most of the hindrances can be minimized due to less ROW requirement.

68 Back

69 Elevated Road from AIIMS to Digha Starting from AIIMS, Patna (NH-98) and terminating at DIGHA (on Ganga Path), the length of the project road is km. Important connectivity : NH-98, NH-30, NH-19 & Ganga Path

70 Project Details DESCRIPTION Project Status Value Contractor Authority Engineer DETAIL Elevated Corridor (AIIMS-DIGHA) Length : Km. Work in Progress Rs Crores Gammon India Ltd. AECOM- RODIC JV Appointed Date Completion Date Physical Progress 87.56% Financial Progress Crores

71 Connectivity to J P Setu Elevated Rd over Bailey Road ROB Elevated Corridor Digha Sonepur Bridge Approach Bailey Rd to B D Rd Connectivity Aerial View of Elevated Corridor

72 Status of South side approach of Digha Rail-cum-Road Bridge (NHAI left over portion) Length : Kms. Administrative Approval : Crores.[Including Elevated corridor and NHAI left over portion Agreement Amount (work) : Rs Crores Name of the Contractor : M/s Gammon Engineers and Contractors Pvt. Ltd. Authority Engineer : M/s AECOM-Rodic Consultants Pvt. Ltd. (JV) Connectivity : Bankipur-Danapur Road & South Side of Railcum- Road Bridge Agreement Date : Completion Date : Physical Progress : % Financial Progress : Cr. Note: Target to connect Bankipore- Danapur Road Bailey Road by 15 Nov 2017.

73 Construction of South Side Approach Road, 2 Lane with Paved Shoulder of Digha Rail- Cum-Road Bridge from AIIMS to Digha (NHAI Leftover Portion) Total Length km BRIEF OVERVIEW The Project starts from junction of NH-98 (near AIIMS), runs along eastern embankment upto Khagaul, L-2 km and Khagaul to Bailey Road & upto Bankipur- Danapur Road, L 8.5 km runs along western embankment of Rupaspur canal. The connectivity to Digha-Sonepur Bridge provided through One flyover at Bankipur-Danapur Road. The Project was initially assigned to NHAI. Encroachment in different stretches, Court Cases, Relocation of Govt. Buildings & Co-ordination with Railways were the main issues which has been resolved by BSRDCL. BSRDCL started the work in Oct Connectivity to Bridge from Bankipur-Danapur Road has been provided. Connectivity from Bailey Road to Bankipur Danapur Road is targeted on 15 Nov Re-location of Electric Poles, Sluice Gates & Mining of Earth are the major issues. Balance work is targeted to be completed in Apr 2018.

74 ELEVATED CORRIDOR FROM AIIMS TO DIGHA (Length km) BRIEF OVERVIEW The Project starts from junction of NH-98 (near AIIMS), runs along eastern embankment upto 2 km (2 Lane), then 4 Lane elevated over the Canal upto Bankipur-Danapur Road & beyond. Vertical alignment near Bailey Road has been modified & now it crosses over present ROB. Launching of 12 nos. Steel Girders over Bailey Road have completed. The issue of 106 m span ROB near Khagaul has been resolved & design is under approval by Railways. Re-location of School buildings, Indira Aawas, underground Electric Cables & Towers have almost been completed. The CWJC Case regarding land dispute near Ch is running on daily list. The work is targeted to be completed in March 2018.

75 ELEVATED CORRIDOR (AIIMS-DIGHA) Back

76 6-Lane Bridge Over River Ganga from Kachhi Dargah (NH-30) to (NH-103) Bidupur Google Earth 76

77 Project Details DESCRIPTION Project DETAIL 6-Lane Ganga Bridge Length : 22.8 Km. Status Value Contractor Authority Engineer Pre-construction work Progress Rs Crores Daewoo-L&T-JV AECOM- RODIC JV in Length of Project Appointed Date Status Km (Main Bridge 9.76 Km) L/A in progress. Preconstruction activities in progress

78

79

80 SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length km, Approach Length- 13 km) BRIEF OVERVIEW 6-Lane Bridge with approach road originates from New NH-30 (Sabalpur) and passes through Raghopur Diara, Bidupur & terminates at Sarmastpur (Rajapakar) on NH-103. The connectivity has been provided at 1. Old NH-30 / Ganga Path, 2. Raghopur Diara, 3. Bidupur. Provision of 2- Toll Plazas and Highway Museum. The project was awarded to M/s Daewoo-L&T (JV) on The appointed date is and Schedule of Completion is The Contractor has been mobilized and Camp established at Patna & Raghopur. Batch Mix Plant at Patna & Raghopur and Other Machineries have been mobilized. Sufficient construction material has been stored at Raghopur Diara to ensure unintruppted work in monsoon period. A Barge has been mobilized for all weather transportation of Man-Material & Machinaries through Ganga.

81 SIX LANE BIHAR NEW GANGA BRIDGE PROJECT (Bridge Length km, Approach Length- 13 km) BRIEF OVERVIEW Total nos. of Well in main Bridge is 67. The first concreting of Well Kerb has been completed on nos. of cutting edge have been fabricated & placed 3 nos. placed in alignment. The 1 st working pile is scheduled on Acres out of 313 Acres of land has been handed over to Contractor. The land of Patna Sadar & Raghopur Block has been transferred to BSRDCL by Collector Patna & Raghopur. The land of Bidupur & Rajapakar are yet to be transferred. Payment of compensation is slow. The Villagers of Sabalpur in Patna & Telia, Sarmastpur are demanding higher compensation. Villagers of Sabalpur file Case & hearing is being done by Authority, Patna. The Villagers between North channel of Ganga & Mahnar Road are opposing the approved alignment due to less return value of the land.

82 New Six Lane Ganga Bridge Back

83 Proposed Project under Japan International Co-operation Agency (JICA) 4-LANING OF NH - 82 (GAYA - HISUA - RAJGIR -NALANDA - BIHARSHARIF SECTION) (Funded by JICA) Length : Km. Project Sanctioned Amount- : INR Cr. JICA Finance Portion (Project cost and Consultancy cost): INR Cr. Balance Amount to be Budgeted by MoRT&H, GOI (R &: INR Cr. R, Land Acquisition, Utility shifting and Local taxes.) Approval of PIB : Approval of CCI : Loan signing between JICA & GoI : Date of Agreement : Date of Completion : (3 years) DLP : 3 Years Upto date Physical Progress : 10% Financial Progress : 7.77 %

84 NH 82

85 SH-78 (BIHTA-DANIYAWAN-CHANDI-SARMERA ROAD) SH-78 (Bihta-Daniyawan ) ( Package 1):- Name of Contractor : M/s BSCPL Infrastructure Ltd., Hyderabad Contract Length : Km Contract Amount : Cr Date of commencement : Date of Completion : Upto date Physical Progress : % Financial Progress : % Work Completed : 8.85 Km upto DBM SH-78 (Chandi Sarmera ) ( Package 2):- Name of Contractor : M/s BSCPL Infrastructure Ltd., Hyderabad Contract Length : Km Contract Amount : Cr Date of commencement : Date of Completion : Upto date Physical Progress : % Financial Progress : 15.15% Work Completed : Km upto DBM

86 BIHTA SARMERA ROAD (SH-78) (Length km) BRIEF OVERVIEW This State Highway starts from Kanhauli on Siwala Bihta Road. Provides direct connectivity to Patna from 1. Naubatpur on NH-98, 2. Dumari on NH-83, 3. Beldarichak on SH-2, 4. Daniyawan on NH-30A, 5. Bhaganbigha on NH-31 & terminates at Sarmera on NH Lane highway with bridges there upon are being constructed where as the land is being acquired for 4-Lane highway i.e. 60 m ROW. The work was awarded to M/s Ranmky Infra Structture Ltd. on against agreement value of Rs Crore and was scheduled to be completed on Only km of Earthwork, GSB km, WMM km, DBM km could be done in 4 years. Due to unsatisfactory performance of the Contractor the Agreement was terminated on The Contractor also terminated the Contract on on the ground of non-handing over of encumbrance free land & non-availability of aggregates in Bihar.

87 BIHTA SARMERA ROAD (SH-78) (Length km) BRIEF OVERVIEW The Road length was divided into 2 parts i.e from Bihta to Daniyawan (L km) & Chandi to Sarmera (L-47.5km). Daniyawan to Chandi is part of NH-30A. Work of both the Packages was awarded to M/s BSCPL on and Targeted date of Completion & respectively. The work is delayed due to multiple reasons like; Handing Over of Land to Contractor, Soil treatment & sub-grade failure issue and poor financial condition of the Contractor. The Soil stabilization issue has been resolved. 8.5 km Road length of Part-I is severely affected due to different types of Land Acquisition issues. The notification under section 19 of LA act has been notified for the remaining length of 2.7 km of part-ii and is expected to be handed over in Sept The proposed revised target date of Completion is The ADB Loan closure date is

88 SH 78 SH 78 Back

89 NH-83 (PATNA - GAYA - DOBHI) 4 LANE S. No Name of Project Length (Km) TPC/ Annuity/Gr ant (Crore) Concessionaire/ Concession Period Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 1 4L Patna - Gaya- Dobhi NH M/s IL&FS Engineering and Construction ltd.(item Rate) % / 0.96 Km Back

90 NH-30A (Fatuha Harnaut - Barh) 2 lane with paved shoulders S. No Name of Project Length (Km) Cost (Crore) Agency Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 1 2 lane with paved shoulder Fatuha Harnaut - Barh Monte Carlo Ltd % / 25 Km Back

91 NH-98 (Anisabad Arwal Aurangabad - Hariharganj) 2 lane with paved shoulders S. No Name of Project Length (Km) Cost (Crore) Agency Appointed Date Schedule /likely date of completion Physical Progress (in % age)/length completed 1 Lot-1 : Anisabad Arwal 2 Lot-2: Arwal Aurangabad Hariharganj DRA-SNP (JV) % / 50 Km LA issue in Bikram Bypass and slow progress by the contractor Monte Carlo Ltd Work completed except one ROB Back

92 Replacement of Super-Structure of M.G. Setu S. No Name of Project Length (Km) Cost (Crore) Agency Appointed Date Schedule /likely date of completion Current Status 1 Replacement of Super Structure of M.G. Setu AFCON SBMOST (JV) Dismantling completed in Pier 1 & 4 Dismantling in progress in Pier 2 Back

93 Construction of Flyover (2x2 lane, carriageway 5.5 m wide) from Mithapur ROB to Chiraiyatand Flyover via Station Road And Extension of Chiraiyatand Flyover (1x2 Lane, Carriageway 7.5 m wide) up to Gandhi Maidan in Exhibition Road Administrative Approval Rs Crore Agreement Value Rs Crore Variation Sanctioned Rs Crore Agreement No. 43/ dated Contractor S.P. Singla Construction Pvt. Ltd. Date of Start Schedule Date of Completion ST Extension up to nd Extension up to Expected Date of Completion Supervision Consultant STUP in Association with Transtek

94 PLAN MITHAPUR ~ CHIRAIYATAND SECTION 94

95 PHYSICAL PROGRESS A. Foundation - 100% B. Substructure - 100% C. Superstructure - 88% OVERALL PROGRESS OF WORK S.N. DESCRIPTION In terms of Rupees in Crores In terms of % against overall cost 1 2 FINANCIAL PROGRESS % PHYSICAL PROGRESS %

96 96 Back

97

98 BAILEY ROAD PATNA ZOO HIGH COURT END

99 1. Administrative approval Vide RCD Letter No. 7192(S) dated Under Plan Head Salient features of the Project: Crore 2. Agreement No. 02/ Agreement Amount Crore 4. Date of Start 19 th Dec Date of Completion 18 th Dec Upto date expenditure Lacs

100 Uptodate Status of Work 1. Extra Dosed Cable Stayed Bridge at Daroga Rai Path Foundation work (a) Piles 64 Nos. Piles of A1, A2, P1, P2 & P3 are completed out of 64 Nos. of total Piles (b) Pile Cap Pile Cap works of P3 is in progress. 2. Integral Spine Beam Bridge Near Lalit Bhawan Junction (i) Foundation Work (a) Piles 83 Nos. Piles of R01 P1, P2, A1, A2 & R02 P1, P2, A1, A2 are completed out of 83 Nos. of total Piles. (b) Pile Cap Pile Cap of R01-P1 & A1 are completed and Pile Cap work of R01-A2 is in progress. (ii) Sub-Structure - Pier Shaft of R01-P1 & A1 are completed. 3. Extra Dosed Cable Stayed Bridge Near BPSC Office (i) Foundation work - (a) Pile 81 Nos. Piles are completed out of total 96 Nos. of Piles. (b) Pile Cap Pile Cap of R03- A1, A2 & P4 are completed & Pile Cap work of R03 P1 is in progress (ii) Sub-Structure - Pier Shaft of R03-A1, A2 & P4 are completed.

101 Uptodate Status of Work 4. Miscellaneous Work a) Service Road (Traffic Diversion) m are completed. b) Widening m PQC Completed m Bituminous road completed. c) Boundary Wall m Pre Cast boundary wall Completed at Vishwesharaiya Bhawan m boundary wall completed in between to along R1 3. Boundary wall work is in progress 5. Load Test a) Initial Load Test 1. Test Piles Casting All Completed (05 Locations). 2. Load Test : All Vertical and Lateral Completed (Result Submitted). b) Routine Load Test on Working Pile 1. Daroga Rai Path Swap Pile 01 No. (Completed). 2. Lalit Bhawan Integral Spine Beam Bridge (R02 A2 P8 Pile) 01 No. (Completed) 3. BPSC Bhawan Extra dosed cable stayed bridge R03 (A1-6 & P3-15) & 02 Nos. (Completed)

102 Pier & Pier Cap concreting work is in Progress (R03 P4) BPSC Bhawan Pile Cap Concrete work is in Progress (R03 A1) BPSC Bhawan Pile Cap Concreting work is completed ( R03 A1) Lalit Bhawan Abutment Wing Wall Reinforcement Binding work is in Progress (R01 A1) Lalit Bhawan 102 Back

103 Construction of Flyover connecting with Mithapur flyover to Bhikhari Thakur (Yarpur) Flyover via R. Block Junction including approach road, retaining wall, service road, elevated rotary & electrification etc Project Detail Employer Contractor Contract Price : Bihar Rajya Pul Nirman Nigam Limited : Rachana Construction Company, Gujarat : 104,2087,456/- Rs. Commencement Date : 12 December 2015 Completion Date : 36 Months from date of commencement (11 Nov 2018) Defect Liability Period : 24 Month from date of completio

104 LINE DIAGRAM PLAN

105 Salient Features o Elevated Structure Length Meter o Solid Approach Length Meter o Total Flyover Length Meter o Span 60 Span o No. of Lanes 4 (2x7.5 mtrs) ARM Nomenclature Details as per site location. :- A. ARM 01 : From GPO to R-Block Junction ( Mtrs.) B. ARM 02 : From Bhikhari Thakur Bridge to R-Block Junction ( Mtrs.) C. ARM 03 : From JDU Office to R-Block Junction ( Mtrs.) D. Rotary Junction : Over R-Block Junction ( Mtrs.) E. Merging Portion : Two Lane merging in Bhikhari Thakur Bridge ( Mtrs.)

106 Financial Progress Rs Crores (As on ) Note : Work is stopped vide letter no BRPNNL/SWD/474, Dated of Senior Project Engineer, Special Work Division Patna.

107 107 Back

108 Construction of Flyover connecting Mithapur flyover to Chiraiyatand Flyover via Karbigahiya including Approach Road, Service Road and side drain etc in Patna Town Project Detail Employer : Bihar Rajya Pul Nirman Nigam Limited Contractor : Rachana Construction Company, Gujarat Contract Price : 101,75,44,507/- Rs. Commencement Date : 12 November 2015 Completion Date : 36 Months from date of commencement (11 Nov 2018) Defect Liability Period : 24 Month from date of completion

109

110 Salient Features o Elevated Structure Length : Meter o Solid Approach Length : Meter o Total Flyover Length : Meter o Service road with Junction Improvement : 2 X 1500 Meter o Span : 51 Span o No. of Lanes : 4(2x7.0 mtrs) & 2(1x7.5 mtrs) ARM Nomenclature Details as per site location :- A. ARM 01 : From Mithapur Flyover to Mithapur Bus Stand B. ARM 02 : From Mithapur Flyover to Chirayatand Flyover C. Merging : At End of Mithapur Flyover

111 Financial Progress Rs Crores (As on ) Note : Work is stopped vide letter no BRPNNL/SWD/474, Dated of Senior Project Engineer, Special Work Division Patna.

112 112 Back

113 Construction of Northern Approach (Sonpur Side) of Rail cum Road Bridge over river Ganga near Digha Ghat Patna. Project Status Administrative approval(5.703 Km) Phase- 1(up to 2.56 km.) Rs Crore Agreement No. 26/ dated Agreement Value Contractor Rs Crore M/s S.P. Singla Construction Pvt. Ltd. Date of Start Date of Completion (As per Agreement) Date of Inauguration

114 2 Physical Progress Achievement 1 Financial Progress 73.55% (Rs Crore) Phase- 1(up to 2.56 km.) Foundation - 100% Substructure - 100% Superstructure - 99% Approach Road - 99% Expenditure - Rs Cr. 114

115 Layout Plan 115

116 Back

117 Patna Ring Road MORTH Government of India has proposed for construction of 4-Lane Ring Road for Patna. NHAI has engaged M/S Jacob as DPR Consultant. The Consultant has suggested the alignment of SH-78 Bihta-Sarmera Road from Kanhauli to Lakhna and from Lakhna to Kachhi Dargah through Greenfield. This stretch will require huge land acquisition. It has been therefore considered to take up the alignment of SH-78 Bihta- Sarmera Road from Kanhauli to Daniawan (55 Km) for 4-lanning. From Daniawan to Fautha, NH-30A, 7 Km will be widened to 4-lanning which is currently widened to 2 Lane with Paved Shoulders. From Fatuha to Kachhi Dargah, 5 Km which is SH-105 will also be widened to 4-lane. Also SH-01 Sadikpur-Pabheri-Masauri Road (39 Km) is being considered to take-up for 4-lanning under this scheme. The total length, =107 Km, does not require any land acquisition for4-lanning.

118 Sl No. A. Civil Cost NHAI Proposal Particulars Cost Estimate Amount ( In Crore) 1 Roadworks ( Including Earthwork, RE Wall, Pavement, Drainage, Road Furniture, Bus Bays, Toll Plaza and 230 other Miscellaneous items ) 2 Structure Works ( Including Viaduct Ramps, Major Bridge, Minor Bridge, Culvert & Pedestrain and Vehicular Underpass) 196 Total Civil Cost (Roadworks & Structure Works) 426 Total Civil Cost considering PMC IE, Financial Cost, IDC, 25% 533 B. Other Cost 1 Land Acquisition Cost Resettlement & Rehablitation Cost 4 3 Environmental Monitoring and Mitigation Cost 3 4 Utility Shifting Cost 4 Total Other Cost 511 Total Project Cost (A+B) ( In Crore) 1,044

119

120 Patna Master Plan Proposal Madhopu r (Km 0+000) Kanhauli (Km 6+940) Muradpur (Km ) Manglicha k (Km ) Gopalpur (Km ) Pundadih (Km )

121 All Ring Road Proposal Doriganj Dighwara Chak Sikandar Hajipur Koilwar NH-30 New Kanahuli Zero Mile Kachhi Dargah Lakhna Fatuha Legend SH-1 SH-78 NH Portion 6 Lane Bridge Masuri SH-01 Dainawan

122 Final Ring Road Proposal It starts at Kanhauli on New NH-30, passes through Naubatpur on NH-98, Dumri on NH-83, Beldarichak on SH-01 and ends at Dinawan on NH-30A. It uses NH-30A from Daniawan to Fautha. From Fatuha to Kachhi Dargah via SH-106 Total Length of proposed Ring Road is approx 70 Km from Kanhauli to Kachhi dargah

123 From Village Madhopur (Old NH-30) Kanhauli (New NH-30) Korra (Danapur- Naubatpur Road) Muradpur (NH-98) Manglichak (NH-83) Gopalpur (SH-01) Pundadih (NH-30) To Village Kanhauli (New NH- 30) Korra (Danapur- Naubatpur Road) Muradpur (NH-98) Manglichak (NH-83) Connecting Villages Narayanpur, Daulatpur Semri, Parkotimpur Painthi Painal, Jaintipur, Goriadera, Makhdumpur Budhgawan, Karagchak, Majhauli Alampur Gonpura, Nadiawan, Nasirpura Length (Km) Land Requirement (Hec.) Gopalpur (SH-01) Chhatna, Chipra Pundadih (NH-30) Mahuli, Gauharpur Khizirpur (SH-106) Government Land (Hec.) Remaining Land (Hec.) Total Back

124 Feasibility Study for reducing traffic congestions in Bankipur Danapur Road (from Gandhi Maidan (DM Patna residence) to Danapur Auto Stand (11.25 Km stretch) Stretch represented on Google map

Development of Road Infrastructure in India

Development of Road Infrastructure in India Development of Road Infrastructure in India By Nirmal Jit Singh Director General (Road Development & Special Secretary) Ministry of Road Transport & Highways Road Network in India Total Road Length about

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Alternatives Study of Alignment

Alternatives Study of Alignment Project: 4-lanning of Barhi Rajauli Section of NH-31 Sheet: 1 of 6 Alternatives Study of Alignment 1 Objectives The following objectives were kept in view while locating the alternative bypass alignments:

More information

SECTION DESCRPTIONS PAGE NOS.

SECTION DESCRPTIONS PAGE NOS. Four Laning of Farakka Raiganj Section of NH -34 from Km 295.00 to Km 398.00 in the State of West Bengal under NHDP phase III on Design, Build, Finance, Operate SECTION DESCRPTIONS PAGE NOS. 1 Summary

More information

Office of the Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna

Office of the Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna Office of Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna-800 001 TOUR PROGRAMME FOR THE 2 nd QUARTER (2017-18) (Consolidated Party- wise: Economic Secr (Commercial)

More information

Network Size and Growth

Network Size and Growth 16.50 25.10 30.30 11.40 5.10 9.63 10.00 8.26 64.94 km 208.24 Overview Network Size and Growth At present, metro systems are operational in seven cities in India Bengaluru, Chennai, Delhi, Gurgaon, Jaipur,

More information

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period)

PROJECT INFORMATION. Place of the Project Bangalore City District. Bangalore Urban Sector. 30 years (concession period) DETAILED PROJECT INFORMATION GENERAL INFORMATION Project High Speed Rail Link to BtA State Karnataka Location Place of the Project Bangalore City District Bangalore Urban Sector Urban Transport Capacity

More information

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra 20 th March 2013 By: SVR Srinivas (IAS), Addl Metropolitan Commissioner & MD MMRC & PRK Murthy, Chief T&C Division MMRDA & Director MMRC

More information

Karnataka Evaluation Policy and Karnataka Evaluation Authority

Karnataka Evaluation Policy and Karnataka Evaluation Authority Karnataka Evaluation Policy and Karnataka Evaluation Authority Evaluation Policy, 2000 & Guidelines, 2003 1. All schemes with a budget outlay of Rs. 5 crore and above should be evaluated at least once

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments.

The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments. Disclaimer The presentation has been prepared for information purpose, it is not a solicitation of any offer to buy or sell any security or instruments. This presentation contains forward-looking statements.

More information

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314)

Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314) Indiabulls Real Estate Limited (CIN : L45101DL2006PLC148314) Earnings Update Audited Financial Results FY 2013-14 April 23, 2014 Safe Harbor Statement This document contains certain forward looking statements

More information

DECONGESTION OF ROADS IN NAIROBI

DECONGESTION OF ROADS IN NAIROBI DECONGESTION OF ROADS IN NAIROBI PRESENTED DURING THE REGIONAL WORKSHOP ON PROMOTING SUSTAINABLE TRANSPORT SOLUTIONS HELD ON 7 TH AUGUST, 2012 UNEP HEADQUARTERS NAIROBI By: ENG. M. M. NJONGE KENYA URBAN

More information

Maidenhead Bridge. Proposed Work

Maidenhead Bridge. Proposed Work W1.1 Maidenhead Bridge Proposed Work The Maidenhead Bridge over the River Thames at Maidenhead is a Grade II* listed structure. Installation of overhead electrification on top of the structure would be

More information

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016

SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 SOUTH GLOS COUNCIL UPDATE FOR SUSCOM - JANUARY 2016 Go Ultra Low City Bid Success Announced on Monday 25 January, the Department for Transport (DfT) allocated 7M to the four West of England authorities

More information

EXPLANATORY STATEMENT

EXPLANATORY STATEMENT THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT) ORDER 200- AND THE LONDON TO FISHGUARD TRUNK ROAD (A40) (PENBLEWIN TO SLEBECH PARK IMPROVEMENT SIDE ROADS) ORDER 200-1.

More information

Multimodal Logistics Professionals

Multimodal Logistics Professionals Multimodal Logistics Professionals 1 CONCOR - THE COMPANY INCORPORATED - MARCH 1988 OPERATIONAL - NOVEMBER 1989 AUTHORISED CAPITAL - Rs.400 CRORE SHARE CAPITAL - Rs.64.99 CRORE (RECEIVED DURING 1988-89

More information

Ferrovial increases net profit by 12%, to 287 million euro

Ferrovial increases net profit by 12%, to 287 million euro All-time record backlog: 23.695 billion euro Ferrovial increases net profit by 12%, to 287 million euro Revenues expanded by 2.8% to 3.758 billion euro, supported by solid performance in the international

More information

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 A63 Castle Street, Hull HullBID Network Lunch 24 August 2017 James D Leeming Senior Project Manager What we will cover today? Introduction to Highways England and the Road Investment Strategy A63 Scheme

More information

Road Development in India Weekly Newsletter June 24 June 30,

Road Development in India Weekly Newsletter June 24 June 30, Road Development in India Weekly Newsletter June 24 June 30, 2017 INSIDE THIS ISSUE PROJECTS 2 PMO proposes bypasses for top 10 cities to reduce traffic clogging 2 Central government initiates road connectivity

More information

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones.

WEEKLY PROVINCIAL HIGHWAY CONSTRUCTION UPDATE FOR THURSDAY, OCTOBER 6, 2016 The law is black and white. Slow to 60 km/hr in Work Zones. NEW WORK PROJECT/WORK: Highway 354 near Dilke ESTIMATED COST: $3.4M START OF THIS YEAR'S CONSTRUCTION: October 1, 2016 DESCRIPTION: About 17 km of surfacing on Highway 354 from the junction with Highway

More information

Development of Convention-cum-Trade Zone in Bhubaneswar PRE-PROPOSAL MEETING

Development of Convention-cum-Trade Zone in Bhubaneswar PRE-PROPOSAL MEETING Development of Convention-cum-Trade Zone in Bhubaneswar PRE-PROPOSAL MEETING 20.04.2013 Background To cater to the local, domestic and international corporate market for their meeting and conference needs

More information

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included:

Corridor of growth. Corridor Description and Rating NEW GURGAON. Areas Included: Corridor of growth Corridor Description and Rating Areas Included: NEW GURGAON Sectors 76, 77, 78, 79, 79A, 79B, 80, 81, 81A, 82, 82A, 83, 84, 85, 86, 88, 88A, 88B, 89, 89A, 90, 91, 92, 93, 95 and 95A

More information

Delhi Airport Metro Express A Case of Public Private Partnership Project

Delhi Airport Metro Express A Case of Public Private Partnership Project 1 Delhi Airport Metro Express A Case of Public Private Partnership Project Surya Raj Acharya, PhD Visiting Professor Institute of Engineering, Tribhuvan University, Kathmandu 20 Feb 2017 Contents 2 1.

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA TOMB OF SHER SHAH SURI, SASARAM, THE LAND OF BUDDHA April 2018 Table of Content Executive Summary...3 Advantage State.....4 Bihar Vision.....5 Bihar An Introduction.........6 Annual State Budget 2017-18.16

More information

For personal use only

For personal use only Aspire Mining Limited ABN: 46 122 417 243 Suite B3, 431-435 Roberts Road Subiaco WA 6008 PO Box 1918 Subiaco WA 6904 Tel: (08) 9287 4555 Fax: (08) 9388 1980 Web: www.aspiremininglimited.com Email: info@aspiremininglimited.com

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program December 2012 Update I-95 New Haven Harbor Crossing Corridor Improvement Program Prepared by: Connecticut Department of Transportation District 3A 424 Chapel Street New Haven, CT 06511 Prepared for: South

More information

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche:

The original needs analysis carried out in 2001 identified three options for acquiring or leasing land for the crèche: 5. REDCLIFFS/SUMNER COMMUNITY CRÈCHE RELOCATION Officer responsible Author Property Manager Kevin Mara, DDI 941 6401 The purpose of this report is to update the Council on the status of this project, in

More information

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL

Domestic LPG Stove INTRODUCTION MARKET POTENTIAL 13 Domestic LPG Stove PRODUCT CODE : 340504005 QUALITY AND STANDARDS : IS 4246 : 1984 for LPG Stove : IS 11480:1985 for LPG Grillers : IS 5116:1985 for General requirements for domestic and commercial

More information

Comparison of Bangkok & Kuala Lumpur

Comparison of Bangkok & Kuala Lumpur Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Yong Hee Kong PPP Resource & Research Centre, Kuala Lumpur KL: Historical Background Study by JICA 1987 Appeared in Mid-Term Review of 6th

More information

Current Status of Airport PPP Projects

Current Status of Airport PPP Projects Current Status of Airport PPP Projects Presented by Aerodrome Standards & Safety Division DEPARTMENT OF CIVIL AVIATION MINISTRY OF TRANSPORT 1 Contents 1 Backgroud 2 Condition and Requirements of Project

More information

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT NOVEMBER 2012 1.0 INTRODUCTION This report has been prepared in support

More information

Design and Construction Features of Nivedita Bridge

Design and Construction Features of Nivedita Bridge Design and Construction Features of Nivedita Bridge Prof S S Chakraborty FNAE, Managing Director, Consulting Engineering Services (India) Private Limited, New Delhi. The tradition is one of iconic crossings

More information

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL Frequently Asked Questions August 2014 Blackburn Road Blackburn Level Crossing Removal GENERAL What is the project? The Victorian Government has committed to eliminating a number of the busiest level crossings

More information

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services.

A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure and services. BRIEFING NOTE FOR BUS OPERATORS Inverclyde statutory Quality Partnership Scheme - 2015 What is an sqps? A Quality Partnership Scheme is a statutory agreement between parties to provide improved bus infrastructure

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW SCOPING March 10, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

Presentation to Working Group II-B, UTTIPEC

Presentation to Working Group II-B, UTTIPEC Integrated transit corridor development and street network/connectivity plan for the corridor/influence zone along with details of all intersections and mid-sections based on traffic and feasibility studies

More information

Curragh Operational Tour

Curragh Operational Tour Curragh Operational Tour Analyst Briefing Wednesday 17 May 2006 Curragh Operational Tour 17 May 2006 1 Overview Stewart Butel Director Coal Operations Wesfarmers Energy Curragh Operational Tour 17 May

More information

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan New Plan Acheson Industrial Area Structure Plan Amendment Parkland County Municipal Development Plan Board Reference

More information

SmartCity (Kochi) Infrastructure Private Limited SEZ

SmartCity (Kochi) Infrastructure Private Limited SEZ SmartCity (Kochi) Infrastructure Private Limited SEZ 15th MEETING (1/2016) OF APPROVAL COMMITTEE DATE: 17-02-2016 Venue: Conference Hall CSEZ Administrative Office, Kakkanad, Kochi- 682 037 Agenda for

More information

A Review on the Recent Large Scale Infrastructure Projects in Hong Kong

A Review on the Recent Large Scale Infrastructure Projects in Hong Kong A Review on the Recent Large Scale Infrastructure Projects in Hong Kong Part I A general understand and Review of the scope and nature of Infrastructure Developments in Hong Kong 1 General Classification

More information

Japan India Cooperation on Railway Sector

Japan India Cooperation on Railway Sector Japan India Cooperation on Railway Sector 14 th October, 2015 IREE 2015 Takema Sakamoto Chief Representative India Office Japan International Cooperation Agency (JICA) 1 Contents 1. Overview and Strategy

More information

Grade Crossing Regulations

Grade Crossing Regulations Grade Crossing Regulations An Overview of Municipal Roles and Responsibilities at Federally Legislated Grade Crossings March 21, 2017 presentation to Alberta Municipal Supervisor Association, Edmonton,

More information

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise; GOVERNMENT OF INDIA MINISTRY OF RAILWAYS LOK SABHA STARRED QUESTION NO.334 TO BE ANSWERED ON 09.08.2017 DOUBLING AND ELECTRIFICATION OF RAILWAY LINES *334. SHRI B.S. YEDIYURAPPA: Will the Minister of RAILWAYS

More information

Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3

Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, The Mumbai Metro Line-3 Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) Civil work contracts awarded to five contractors Mumbai, July 5, 2016 - The Mumbai Metro Line-3 (Colaba-Bandra-SEEPZ) project takes a big leap as the Mumbai Metro

More information

Phoenix Sky Harbor transit guideway bridge

Phoenix Sky Harbor transit guideway bridge Phoenix Sky Harbor transit guideway bridge by David A. Burrows, Gannett Fleming The evolution of the PHX Sky Train s crossing of Taxiway Romeo At one of the 10 busiest airports in the United States, cast-in-place,

More information

THE REPUBLIC OF THE UNION OF MYANMAR

THE REPUBLIC OF THE UNION OF MYANMAR THE REPUBLIC OF THE UNION OF MYANMAR MINISTRY OF TRANSPORT AND COMMUNICATIONS 5 th Meeting of the Working Group on the Trans-Asian Railway Network and Global Smart Rail Conference Current Status and Challenges

More information

BIHAR STATE AIDS CONTROL SOCIETY SHEIKHPURA, PATNA-14 TI- NGO IN DIFFERENT DISTRICTS OF BIHAR

BIHAR STATE AIDS CONTROL SOCIETY SHEIKHPURA, PATNA-14 TI- NGO IN DIFFERENT DISTRICTS OF BIHAR NGO 1 Rohtas + Aurangabad Societal Upliftment and Rural Action for Job and Empowerment (SURAJE) Kasturba Sadan, Baulia Road, Sasaram, Rohtas, Pin-821115, Mr. Arun Kumar Tiwary, Programme Manager, 06184-228417

More information

Home About us Contact

Home About us Contact Page 1 of 5 Home About us Contact IN THIS EDITION 1. A message from IPA s Chief Executive Brendan Lyon 2. Added 3. Status Changes 4. Updates 1. A message from IPA s Chief Executive Brendan Lyon I am delighted

More information

South East Traffic Solution

South East Traffic Solution South East Traffic Solution A MAJORITY LIBERAL GOVERNMENT WILL: Complete the Hobart Airport Interchange project Fix the Tasman Highway near Tasmania Golf Club Replace the Midway Point Roundabout with additional

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA (As on 9 June 2017) 1 Executive Summary... 3 Advantage State........ 4 Bihar Vision.. 5 Bihar An Introduction.... 6 Annual State Budget 2016-17... 16 Infrastructure Status... 17 Business Opportunities.....

More information

@ jk Vªh; jkt/kkuh {ks=] fnyyh ljdkj] x`g ¼iqfyl&2½ ½ fohkkx] 5 oka ry] lh [.M] fnyyh lfpoky;] b0iz0,lvsv] ubz fnyyh

@ jk Vªh; jkt/kkuh {ks=] fnyyh ljdkj] x`g ¼iqfyl&2½ ½ fohkkx] 5 oka ry] lh [.M] fnyyh lfpoky;] b0iz0,lvsv] ubz fnyyh Lak0 Qk0 @28 @28 @2012 @x`g&2 @ jk Vªh; jkt/kkuh {ks=] fnyyh ljdkj] x`g ¼iqfyl&2½ ½ fohkkx] 5 oka ry] lh [.M] fnyyh lfpoky;] b0iz0,lvsv] ubz fnyyh Lak0 Qk0 @28 @28 @2012 @x`g&2 @ fnukad Lksok esa] mi&lfpo

More information

L.F. Wade International Airport Redevelopment

L.F. Wade International Airport Redevelopment L.F. Wade International Airport Redevelopment David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport Purvis Primary January 27, 2015 History of the L.F. Wade

More information

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by: Proposals for the Harrogate / New Line Junction Improvement Scheme August / September 2016 Supported by: Introduction Key Benefits Proposals are currently being developed for changes to the junction of

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

City Deal in South Lanarkshire. Gordon Mackay, Head of Roads & Transportation Services

City Deal in South Lanarkshire. Gordon Mackay, Head of Roads & Transportation Services City Deal in South Lanarkshire Gordon Mackay, Head of Roads & Transportation Services 6 November 2015 To cut a long story short... 3 SLC Transport projects made the top 20 from Local Transport Strategy

More information

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program,

Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, Welcome to the Illinois High-Speed Rail Chicago to St. Louis Construction Update Meeting. Today s meeting will provide an overview of the Program, updates on construction to be held in this area, and how

More information

3 rd quarter tour programme

3 rd quarter tour programme 3 rd quarter ur programme 2017-1 Sl. No. Name of the audit entity Annual Expenditure/ Revenue (Rs. in crore) Risk Category Audit of the entity due for the period Audit be taken up for the period Names

More information

North Cruise Berth Projects PortMiami

North Cruise Berth Projects PortMiami North Cruise Berth Projects PortMiami AAPA 2017 Facilities Engineering Seminar Oct 24 26, 2017 Carlos J. Arboleda, PE Vice President Project Director Intermodal Ports 1 PortMiami The Cruise Capital of

More information

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses;

- detour drawings with traffic directions; - staging schemes with traffic directions; - number of lifts of pavement courses; B710 - - OPSS 710 710.1 GENERAL 710.1.1 Tender Items Pavement marking may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly

More information

Beaufort County. Hilton Head Island Airport fhxdi, Hilton Head. SC.

Beaufort County. Hilton Head Island Airport fhxdi, Hilton Head. SC. TOWER OPERATING AGREEMENT BETWEEN FEDERAL AVIATION ADMINISTRATION (FAA) AND Beaufort County. Hilton Head Island Airport fhxdi, Hilton Head. SC. ARTICLE I. PARTIES The parties to this Agreement are the

More information

Hungarian Public Road Nonprofit PLC

Hungarian Public Road Nonprofit PLC Hungarian Public Road Nonprofit PLC 2 Magyar Közút Nonprofit Zrt. The Hungarian Public Road Nonprofit PLC is responsible for the operation and maintenance of more than 31 000 km of national roads. www.kozut.hu

More information

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure

Public-Private Partnerships (P3) for Social Infrastructure. Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure Public-Private Partnerships (P3) for Social Infrastructure Alberta Schools Alternative Procurement (ASAP Team) Alberta Infrastructure John Gibson March 2010 Presentation Outline The Alberta Infrastructure

More information

Guidelines for availing LTC

Guidelines for availing LTC Guidelines for availing LTC Eligibilty: Any employee with one year of continuous service on the date of journey performed by him/his family is eligible. Employees whose spouses are working in Indian Railways/National

More information

Fastest growing state in India. Fastest per capita income growth. Leader in the production of fruits and vegetables. Strong agriculture sector

Fastest growing state in India. Fastest per capita income growth. Leader in the production of fruits and vegetables. Strong agriculture sector Fastest growing state in India At 11.95 per cent, Bihar s growth was the highest among all Indian states during the 11 th Five Year Plan Fastest per capita income growth Bihar has also topped in per capita

More information

South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009

South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009 South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers Chesapeake City Council Update June 23, 2009 A Private Bridge Proposal To: Restore a critical regional transportation link Reconnect

More information

Planned Procurement Opportunities Report. June 2017

Planned Procurement Opportunities Report. June 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Welcome HAI Delegates

Welcome HAI Delegates Welcome HAI Delegates We fly for you Presentation by Dr. B P Sharma PAWAN HANS LIMITED Helicopter Industry: Indian Prospective MoCA-GoI New Civil Aviation Policy Pawan Hans Ltd-A Mini Ratna CPSE: A Profile

More information

The district of Kaimur came into existence in the year 1991, carved out of the

The district of Kaimur came into existence in the year 1991, carved out of the Introduction 1. KAIMUR AT A GLANCE The district of Kaimur came into existence in the year 1991, carved out of the erstwhile Rohtas district. It lies between 25 0-26' and 83 0-84' longitude and at an altitude

More information

The Corporation of the City of Kawartha Lakes Council Report

The Corporation of the City of Kawartha Lakes Council Report The Corporation of the City of Kawartha Lakes Council Report Report Number ENG2017-008 Date: September 12, 2017 Time: 2:00 p.m. Place: Council Chambers Ward Community Identifier: All Subject: Author Name

More information

532 - PAVEMENT MARKING - OPSS 532

532 - PAVEMENT MARKING - OPSS 532 532 - - OPSS 532 532.1 GENERAL 532.1.1 Tender Items may be carried out by district forces under Services (sundry) or by the contractor. While in the past all pavement marking was strictly a maintenance

More information

LOCATION ANALYSIS PURVA ATTRIA. March 2013

LOCATION ANALYSIS PURVA ATTRIA. March 2013 LOCATION ANALYSIS PURVA ATTRIA March 2013 Contents 1 Bangalore City Overview 1 2 3 Micro-market Overview Key Residential & Commercial Development & Social Infra 2 3 4 Infrastructure Initiatives 4 4 5 5

More information

Key Projects Carmichael Rail Line (CRL)

Key Projects Carmichael Rail Line (CRL) 01 Aarvee Associates Pty Ltd is a multi-disciplinary engineering design consultancy company established in 2011 and based at Brisbane, Australia. We are an ISO 9001, ISO 14001 and ASNZS 4801 certified

More information

GMR Infrastructure Limited

GMR Infrastructure Limited GMR Infrastructure Limited Corporate Office: IBC Knowledge Park. Phase 2. "D" Block. 10th Floor. 4/1. Bannerghatta Road. Bangalore 560 029 T +91 8040432000 F +91 80 40432333 W www.gmrgroup.in November

More information

Warm Welcome. From K.K.SHARMA EXECUTIVE DIRECTOR PROJECT PLANNING AND MONITORING

Warm Welcome. From K.K.SHARMA EXECUTIVE DIRECTOR PROJECT PLANNING AND MONITORING Warm Welcome From K.K.SHARMA EXECUTIVE DIRECTOR PROJECT PLANNING AND MONITORING 29 MARCH 2010 CII National Conference, 26 th Nov 2012 1 - A Quick Snapshot NTPC in Power Business... NTPC, India's largest

More information

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION The A19 Trunk Road The A19 tends to live in the shadow of the more well known A1 it runs more or less parallel with. However, it is no less important

More information

For personal use only

For personal use only For the period ended 30 September 2014 HIGHLIGHTS STORMONT (TASMANIA) JOINT VENTURE GOLD PROJECT MINING AND PRODUCTION COMPLETED. LORENA GOLD PROJECT CONSTRUCTION CONTINUES TO ADVANCE. COMMISSIONING EXPECTED

More information

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1. Item 1 To: Leadership Board On: 1 April 2015 Report by: Director of Development and Housing Services Heading: Update on City Deal 1. Summary 1.1 This report seeks to update the Board on the work that has

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

Queen s Circus Roundabout

Queen s Circus Roundabout Stage 2 Road Safety Audit Ref: 1128-RSA-01 Prepared for: Steer Davies Gleave By: Capital Traffic Prepared by: Checked by: Approved by: Andy Haunton, Audit Team Leader Jonathan Thompson, Audit Team Member

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

CONSTRUCTION COMMITTEE MEETING AGENDA

CONSTRUCTION COMMITTEE MEETING AGENDA CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, December 19, 2017 TIME: 8:30 a.m. PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS), 5855 CARGO ROAD, ORLANDO INTERNATIONAL

More information

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC June 07, 2017 PREPARED FOR: GEORGETOWN COUNTY DEPARTMENT OF PUBLIC SERVICES PREPARED BY: The EARTHWORKS Group 11655

More information

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation)

ANNEXURE. Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation) ANNEXURE Government of India Ministry of Housing & Urban Poverty Alleviation (National Buildings Organisation).. SCHEDULES FOR SLUM/SOCIO-ECONOMIC SURVEY IN CITIES & TOWNS Part A: Part B: Part C: Annexure-I:

More information

Main Points in the Results for FY2015

Main Points in the Results for FY2015 0 1 2 Main Points in the Results for FY2015 Operating profit increased to 75.4 billion yen, exceeding the goal of 75.0 billion yen for the final year of the medium-term management plan in the first year

More information

Design Meeting Presentation

Design Meeting Presentation Contract No. 17ECS-TI-05SP April November 2017 Design Meeting Presentation November 2015 Agenda Items: Introduction (5 min) Overview (10 min) Scope of work (60 min): Schedule and Traffic Staging / Closures

More information

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices Nasser Hossain Senior Engineer, Roads & Structural Assets, City of Sydney City of Sydney (COS) LGA The City of Sydney LGA

More information

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville

Project Location. Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll facility. Jacksonville First Coast Outer Beltway August 2012 Project Location DUVAL Jacksonville First Coast Outer Beltway CLAY ST. JOHNS Connects I-10 in Duval County to I-95 in St. John County Four lane limited access toll

More information

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update

SALISBURY NHS FOUNDATION TRUST. Transport Strategy & Green Travel Update SALISBURY NHS FOUNDATION TRUST Paper: SFT 1922 Title: Transport Strategy & Green Travel Update Purpose of the Paper: To present an update on the Trust Transport Strategy and present a range of proposals

More information

L.F. Wade International Airport Redevelopment. David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport

L.F. Wade International Airport Redevelopment. David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport L.F. Wade International Airport Redevelopment David Burt, JP, MP Shadow Minister of Finance Lawrence Scott, JP, MP Shadow Minister of Transport History of the L.F. Wade International Airport The airfield

More information

Administration Policies & Procedures Section Commercial Ground Transportation Regulation

Administration Policies & Procedures Section Commercial Ground Transportation Regulation OBJECTIVE METHOD OF OPERATION Definitions To promote and enhance the quality of Commercial Ground Transportation, the public convenience, the safe and efficient movement of passengers and their luggage

More information

Provincially led initiative to implement electronic payments system across GTA (2004) GO Transit 905 transit + Hamilton Ottawa

Provincially led initiative to implement electronic payments system across GTA (2004) GO Transit 905 transit + Hamilton Ottawa TTC and PRESTO Commission Meeting December 19, 2012 Presentation Outline PRESTO system current status Overview of TTC/Metrolinx Agreements Moving forward PRESTO System Provincially led initiative to implement

More information

Receiving date of application/ case. The case was considered by the SEAC in. its 67 th meeting held on and

Receiving date of application/ case. The case was considered by the SEAC in. its 67 th meeting held on and List of the cases/ projects, which have been delisted by the SEIAA. Sr. No. Name of the Type of Name of the Promoter / Industry Receiving date of application/ case Status of the case with SEAC Status of

More information

ITA AITES WORLD TUNNEL CONGRESS 2009

ITA AITES WORLD TUNNEL CONGRESS 2009 ITA AITES WORLD TUNNEL CONGRESS 2009 Budapest, Hungary, May 23 29, 2009 OF SAFE AND EFFICIENT UNDERGROUND URBAN ROAD AND RAIL INFRASTRUCTURES Manuel Arnáiz Ronda PhD. Civil Engineering President of AETOS

More information

Update on Capital Schemes April SIG Update April SARC/The Rowan 96k

Update on Capital Schemes April SIG Update April SARC/The Rowan 96k Update on Capital Schemes April 2014 1. SARC/The Rowan 96k 2. ED & 24 Bedded Ward at Antrim Area Hospital 1.1m + 406k for Pre-Assessment Area Design & Construction Work is on-going to complete a number

More information

Downtown Tunnel/Midtown Tunnel/MLK Extension Project

Downtown Tunnel/Midtown Tunnel/MLK Extension Project Downtown Tunnel/Midtown Tunnel/MLK Extension Project Presented to: HRTPO Board, January 19, 2012 Presented by: Frank Fabian, P.E., Senior Project Manager, Virginia Department of Transportation 1 PROJECT

More information

Bayview Escarpment. Interim Management Statement

Bayview Escarpment. Interim Management Statement Bayview Escarpment Interim Management Statement Bayview Escarpment Provincial Nature Reserve Interim Management Statement January 15, 1995 REGIONAL DIRECTOR'S APPROVAL STATEMENT This Interim Management

More information