1 Brewster Road Widening and North Avenue Bridge PA04009 This project will provide for the widening of Brewster Road at the south end of the airport as well as the replacement and realignment of the North Avenue Bridge. The project cost is estimated to be $12.2 million. Essex Corbin Street Roadway Realignment PA003 This project will improve traffic patterns into and out of the new Maher Terminal entrance and exit gate complex. Total project cost is $7.5 million. Page 1

2 E-Z Go Toll Plaza Program PA04005 This project would provide for the redesign of the toll plaza to create an open road free flowing plaza at Bayonne Bridge for EZ Pass customers. The project cost is estimated to be $8.2 million. Hudson Goethals Bridge Deck Rehabilitation PA04007 This project will provide for the deck rehabilitation of the existing Goethals Bridge. The project cost is estimated to be $66.5 million. Page 2

3 Goethals Bridge Modernization PA04006 This project will provide for the construction of a new parellel structure south of the existing bridge. The project cost is estimated to be $788.7 million. Hoboken Permanent Ferry Terminal PA04003 The project will provide for design and construction of a permanent ferry facility at Hoboken within the Hoboken Train Terminal Building. The project cost is estimated to be $313.8 million. Hudson Page 3

4 McLester Street Dual Lead Track PA008 The project will provide for the construction of a second lead track that parallels the McLester Street grade separation. The work provides an opportunity to handle forecasted cargo growth. Total project cost is estimated at $30.4 million. New Expressrail Facility PA016 This project will provide for the construction of a new Expressrail site. The site will be located on approximately 70 acres of land between the Maher and APM terminals. Project cost is estimated to be $23.2 million. Page 4

5 New Jersey Turnpike Exit 14 Ingress and Egress PA007 The project consists of a connector road from Exit 14 to the Port area. The subject project has been changed (NJ Exit 14 Access and Egress) and is now part of a "Comprehensive Roadway Improvement Plan," which calls for looking at the entire structure of the Port to improve access and egress from Exit 14, as well as within the Port facilities. The project/plan is now tied into the PA's security efforts for emergency evacuation. The municipalities include Elizabeth and Port Newark. This is a $15-16 million project that is expected to start in 2003 and be completed in Essex Outerbridge Crossing Deck Rehabilitation PA009 This project will provide for the Outerbridge Crossing deck rehabilitation. The entire concrete deck will be rehabilitated including structural steel supports and replacement of truss span sidewalks. The project cost is estimated to be $63.9 million. Hudson Page 5

6 Palisades Interstate Parkway Connector Ramp PA019 This project will provide a connection between the lower level of the George Washington Bridge and the Palisades Interstate Parkway. Project cost is estimated to be $92.5 million. Bergen PATH Exchange Place Improvements PA04002 This project will provide rock tunneling and installation of crossover tracks east of the station to enable trains to turn around. This would allow earlier service to Exchange Place before completion of the WTC. The project cost is estimated to be $160.0 million. Hudson Page 6

7 PATH Extension to Newark Liberty International Airport Study PA04001 A study will be conducted as to the feasibility of extending the PATH system from Newark Penn Station South Yard to EWR monorail station. This proposed extension would include new east/west trackage, stations, power supply and 40 cars. The project cost is estimated to be $31.0 million. Essex Port Newark Intermodal Terminal PA015 This project will expand the intermodal rail capacity by opening an interim rail terminal to handle international container traffic. Project cost is estimated to be $22.4 million. Essex Page 7

8 Rehabilitation of 14th Street and Jersey Avenue PA04004 This project will provide for the removal of traffic islands, relocation of signs and signals, and improvements to signaling and lighting to increase the traffic flow and mobility on 14th Street. The project cost is estimated to be $24.6 million. Hudson Page 8

Governor s Mobility Plan. Corridors, Segments and Projects. Allied Junction Corridor 10/12/89

Governor s Mobility Plan. Corridors, Segments and Projects. Allied Junction Corridor 10/12/89 Governor s Mobility Plan Corridors, Segments and Projects 10/12/89 Allied Junction Corridor northern terminus of New Jersey Turnpike/Hudson County Extension Segment I-A - New Rail Spur from Bergen Line

More information

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike FAMECO

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike FAMECO RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth center elizabeth, nj off exit 13a of the new jersey turnpike Steven Winters O: +1 732 50 2867 C: +1 732 768 88 steven.winters@cbre.com Overview Retail Leasing

More information

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City): Directions IBM Recovery Center One Evertrust Plaza Jersey City, NJ 07302 1. Path Train From World Trade Center site (Downtown New York City): - Path Train service from World Trade Center site to Exchange

More information

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike

elizabeth center RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth, nj off exit 13a of the new jersey turnpike RETAIL LEASING OPPORTUNITIES AVAILABLE elizabeth center elizabeth, nj off exit 13a of the new jersey turnpike Steven Winters O: +1 732 50 2867 C: +1 732 768 88 steven.winters@cbre.com Overview Retail Leasing

More information

V. DATA COLLECTION PROGRAM

V. DATA COLLECTION PROGRAM V. DATA COLLECTION PROGRAM As discussed in Section IV, an extensive data assembly and data collection program was undertaken to develop the data necessary to calibrate the existing Portway Extensions model

More information

Office Units Available

Office Units Available Office Units Available Colgate Waterfront Corporate Campus Colgate Ferry Exchange Place Station Grand Hyatt Outstanding Location with a Variety of Transportation Options Take advantage of: Outstanding

More information

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE SUITES AVAILABLE OUTSTANDING LOCATION WITH A VARIETY OF TRANSPORTATION OPTIONS Colgate Ferry 15 Exchange Place Exchange Place Station Grand Hyatt FERRY LIGHT RAIL : 5 MINUTES TO WFC FERRY: 8-13 MINUTES

More information

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE OFFICE SUITES AVAILABLE OUTSTANDING LOCATION WITH A VARIETY OF TRANSPORTATION OPTIONS Colgate Ferry Exchange Place Station Grand Hyatt FERRY LIGHT RAIL : 5 MINUTES TO WFC FERRY: 8-13 MINUTES TO W. 39TH

More information

OFFICE SUITES AVAILABLE

OFFICE SUITES AVAILABLE OFFICE SUITES AVAILABLE OUTSTANDING LOCATION WITH A VARIETY OF TRANSPORTATION OPTIONS Colgate Ferry Exchange Place Station Grand Hyatt FERRY LIGHT RAIL : 5 MINUTES TO WFC FERRY: 8-13 MINUTES TO W. 39TH

More information

The Port of New York & New Jersey A Leading Indicator of Globalization Transportation Research Forum Plenary Session March 23, 2006

The Port of New York & New Jersey A Leading Indicator of Globalization Transportation Research Forum Plenary Session March 23, 2006 The Port of New York & New Jersey A Leading Indicator of Globalization Transportation Research Forum Plenary Session March 23, 2006 R.M. Larrabee Director Port Commerce Department Port Authority of New

More information

This quarterly brochure is compiled by the New York Metropolitan Transportation Council. Data Monitoring and Analysis Unit

This quarterly brochure is compiled by the New York Metropolitan Transportation Council. Data Monitoring and Analysis Unit Travel Patterns in the New York Metropolitan Area for 2017 s Second Quarter provides an overview of regional travel patterns. On an average weekday in the Second Quarter, there were 10,326,385 total bus,

More information

SITUATION REPORT # 11 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 31, 2012, 8:00 a.m.

SITUATION REPORT # 11 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 31, 2012, 8:00 a.m. SITUATION REPORT # 11 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 31, 2012, 8:00 a.m. A. CURRENT SYNOPSIS: The NJ ROIC and NJOEM are responding to the effects from Hurricane Sandy. The NJ ROIC

More information

ELIZABETH PUBLIC LIBRARY NEW JERSEY CENSUS MICROFILM INVENTORY

ELIZABETH PUBLIC LIBRARY NEW JERSEY CENSUS MICROFILM INVENTORY 130 1855 Atlantic, Bergen, Camden, Cumberland, Gloucester 1885/1865/1885 131 1855 Hunterdon, Hudson, Monmouth, Morris 132 1855 Somerset, Passaic, Sussex, Warren 133 1865 Atlantic, Bergen, Burlington, Camden

More information

NJ GLOUCESTER B(N/S) 4 NEW JERSEY TURNPIKE WOOLWICH TWP. B INTERCHANGE 2 & B(N/S)

NJ GLOUCESTER B(N/S) 4 NEW JERSEY TURNPIKE WOOLWICH TWP. B INTERCHANGE 2 & B(N/S) PHCACTLS-2C 05/14/04 NEW JERSEY DEPARTMENT OF TRANSPORTATION PAGE 1 9-2-001 NJ700 1.32 SALEM 14 2003 B(N/S) 4 NEW JERSEY TURNPIKE PENNSVILLE TWP. B INTERCHANGE 1 & 2 2002 B(N/S) 4 0 54980 54980 9-2-002

More information

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy Philadelphia Regional Port Authority Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy April 19, 2006 Philadelphia Regional Port Authority The Philadelphia

More information

South Jersey Port Corporation

South Jersey Port Corporation South Jersey Port Corporation An Agency of the State of New Jersey Rail / Port Infrastructure Enhancements Jay Jones, Deputy Executive Director South Jersey Port Corporation SJPC s enabling legislation

More information

NJ TRANSIT ANNOUNCES ALTERNATE SERVICE PLAN FOR POSSIBLE RAIL STOPPAGE

NJ TRANSIT ANNOUNCES ALTERNATE SERVICE PLAN FOR POSSIBLE RAIL STOPPAGE ` FOR IMMEDIATE RELEASE March 3, 2016 NJT-16-011 Contact: Nancy Snyder or Jen Nelson 973 491-7078 NJ TRANSIT ANNOUNCES ALTERNATE SERVICE PLAN FOR POSSIBLE RAIL STOPPAGE Commuters advised to expect unusual

More information

THE RESTAURANT OPPORTUNITIES AT

THE RESTAURANT OPPORTUNITIES AT THE RESTAURANT OPPORTUNITIES AT NEWPORT IS DEFINED BY IVE WORK Newport is an unbelievable mixed-use development where, the epitome of live, work and play. This Hudson River waterfront community is minutes

More information

Score. Category. Access Aesthetics Community Resources

Score. Category. Access Aesthetics Community Resources NO BUILD ALTERNATIVE The No Build Alternative is the do nothing option that is used for comparison to the build alternatives. The screening assumes no new facilities are constructed as part of the I-93

More information

Oak Creek Assembly of God FOR YOUR SAFETY

Oak Creek Assembly of God FOR YOUR SAFETY Oak Creek Assembly of God New York City-"The Big Apple" 6 Days/5 Nights Departing from: Start Date: Thursday, May 22, 2014 Oak Creek Assembly of God Church (South Side by Door #10) 7311 South 13th Street

More information

Wichita Falls MPO - MTP Project List 1 of 6

Wichita Falls MPO - MTP Project List 1 of 6 Wichita Falls MPO - MTP Project List 1 of 6 FUNDING SCHEDULE FOR WICHITA FALLS MPO 2015-2040 M TxDOT Ten-Year Plan 2016-2026 TxDOT STATE, PROJECTS (TABLE I) ESTIMATED STATUS HIGHWAY CSJ PROJECT LIMITS

More information

2015%Ironbound%Spring%Warmup% Directions!

2015%Ironbound%Spring%Warmup% Directions! Riverfront Park 3 Brill St (Corner of Brill St and Raymond Boulevard) GSP Parkway: EXIT 145 to Route 280 East Exit 16 (Harrison Ave), make right at F.E. Rodgers Blvd, go past Wendy's, Path Station, cross

More information

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1

A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 Mon-Fayette Transportation Project A. From I-68 in Monongalia County, West Virginia to SR 6119 in Fayette County, Pennsylvania 1 The Mon/Fayette Transportation Project (MFTP) from I-68 in West Virginia

More information

New Jersey Turnpike Authority 2018 Capital Project & Investment Plan

New Jersey Turnpike Authority 2018 Capital Project & Investment Plan New Jersey Turnpike Authority 2018 Capital Project & Investment Plan New Jersey Turnpike Authority / PO Box 5042 / Woodbridge, NJ 07095-5042 / www.njta.com - 2 - Table of Contents 1. Introduction 2. Capital

More information

Student Information for NY Times Square

Student Information for NY Times Square New York DoubleTree Times Square Address: 1568 Broadway New York, NY 10036 For Room Availability: (212)719-1600 Registration Questions: Phone: 901-748-0293 Fax: 901-748-0297 Facility Description: DoubleTree

More information

Getting to The Juilliard School

Getting to The Juilliard School Getting to The Juilliard School TRANSPORTATION FROM AREA AIRPORTS Airport Shuttles Super Shuttle (800) BLUE-VAN (800-258-3826) https://www.supershuttle.com/ NYC Airporter (718) 777-5111 http://www.nycairporter.com/

More information

A. CONCLUSIONS OF THE FGEIS

A. CONCLUSIONS OF THE FGEIS Chapter 11: Traffic and Parking A. CONCLUSIONS OF THE FGEIS The FGEIS found that the Approved Plan will generate a substantial volume of vehicular and pedestrian activity, including an estimated 1,300

More information

State Route 8 Corridor. Northern Summit County s Path to Success

State Route 8 Corridor. Northern Summit County s Path to Success State Route 8 Corridor Northern Summit County s Path to Success Construction Guide: 2008-2009 State Route 8 corridor work description State Route 8 Corridor 10 projects $262 million With its close proximity

More information

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY

SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY SOUTHERN BELTWAY I-79 TO MON/FAYETTE EXPRESSWAY Section 1 Purple Alternative (Revised: January 2007) I-79 to Mon/Fayette Expressway Purple Alternative Section 1 Photo Presentation Photo Presentation The

More information

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018 FOR IMMEDIATE RELEASE Wednesday March 28, 2018 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction March 28-April 4, 2018 Per TDOT Specifications, there will be no temporary lane closures

More information

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM The Robert B. Balter Company (Balter) has an extensive and continuously active involvement with the expansion of Washington Dulles International Airport (IAD) and Ronald Reagan Washington National Airport

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016 RELEASE: IMMEDIATE Aug. 12, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Stafford County Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

PROGRESS PARK CONNECTOR

PROGRESS PARK CONNECTOR PROGRESS PARK CONNECTOR Project No. 9999 098 R65, P102 ALTERNATIVES ANALYSIS 6 April 2015 Revised for updated dates PROGRESS PARK CONNECTOR ROAD ALTERNATIVES ALTERNATIVE # 1 West from the intersection

More information

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties

* Short term resurfacing projects are not included in this listing. 4T39.07 Project: Annual Rural County Sign Improvements, Genesee/Orleans Counties New York State Department of Transportation 2008 Highway/Bridge Construction Projects * Short term resurfacing projects are not included in this listing. Genesee 4T39.07 Project: Annual Rural County Sign

More information

Road Construction Ahead January-April 2015 NORTHWEST REGION

Road Construction Ahead January-April 2015 NORTHWEST REGION NORTHWEST REGION 1 Interstate 64 Augusta, Nelson, Albemarle counties: Installing communications conduit in median for active traffic management system on Afton Mountain. Periodic left-shoulder closures,

More information

Guide to. Road Construction Projects

Guide to. Road Construction Projects Guide to Road Construction Projects 2018 Spring is here and so is road construction season. This year PennDOT District 11-0 will invest an estimated $208 million on 68 projects to improve, preserve or

More information

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue Alternative A South Park Avenue Alternative A Summary Alternative A extends Metro Rail service around the foot of Main Street east along South Park Avenue to serve a new station platform located along

More information

Transportation TRANSPORTATION PROJECTS

Transportation TRANSPORTATION PROJECTS Transportation TRANSPORTATION PROJECTS Balls Ford Road Interchange Total Project Cost $142.9M This project includes the construction of a new diverging diamond interchange at Route 234 Bypass (Prince William

More information

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE:

College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Note: From New Jersey Turnpike (North or South) NOTE: College Avenue Campus Mettler, Stonier, and Tinsley Residence Halls General Instructions: Print directions and name of assigned building. Write your room number and phone number under the name of your

More information

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

ROUTE 630 DIVERGING DIAMOND INTERCHANGE ROUTE 630 DIVERGING DIAMOND INTERCHANGE Virginia Department of Transportation Contract Value and Dates Contract Value: $99,949,969.50 Start of Construction: Summer 2017 Final Completion Date: July 31,

More information

PennDOT Interstate Work next week March 30-April 3:

PennDOT Interstate Work next week March 30-April 3: PennDOT Interstate Work next week March 30-April 3: Interstate 80 Interstate 81 DELAYS THIS WEEK: Exit 256 to the Schuylkill County line. Eastbound & Westbound. Bridge cleaning Monday (3/30), Tuesday (3/31)

More information

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects

PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects PennDOT Announces 2016 Allegheny County Highway and Bridge Improvement Projects Pittsburgh - PennDOT is pleased to announce the 2016 Allegheny County transportation improvement project list for state-owned

More information

PRIME HOTEL GROUND LEASE SITE AVAILABLE TO BUILD 172 Rooms Focused Service Hotel

PRIME HOTEL GROUND LEASE SITE AVAILABLE TO BUILD 172 Rooms Focused Service Hotel LOCATION DETAILS: Site Available to build a Focused Service Hotel 72 Rooms/.5 Acres Meadowlands Convention Center is across the street from the site 20 conventions 250,000 people each year 2 Million SF

More information

The Transportation Corridor Overlay District

The Transportation Corridor Overlay District The Transportation Corridor Overlay District The Transportation Corridor Overlay District is a policy framework under which certain potentially beneficial development proposals may be considered, given

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016 RELEASE: IMMEDIATE June 10, 2016 CONTACT: Kelly Hannon 540-374-3344 (office) 540-656-0321 (cell) Kelly.Hannon@VDOT.Virginia.Gov Tina Bundy 540-899-4560 (office) 540-907-8325 (cell) Tina.Bundy@VDOT.Virginia.Gov

More information

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018 FREDERICKSBURG DISTRICT District Engineer Marcie Parker, P.E. May 8, 2018 3 Interstate 95 Projects Fredericksburg Area Fredericksburg region will see greatest degree of I-95 construction since widening

More information

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S. Table 1: South Entrance Table 2: North Entrance 20th St. S 18th St. S Proposed Second Entrance Crystal Drive Existing Station Location Platform Future 4 th Track Future New Airport Connection (by others)

More information

Whittier Bridge Project

Whittier Bridge Project Amesbury / Newburyport / Salisbury Whittier Bridge / I-95 Improvement Project Original Whittier Bridge Proposed Whittier Bridges 10/21/2016 Whittier Bridge Project 1 Project Description The project limits

More information

Transportation Supporting Dulles Airport

Transportation Supporting Dulles Airport Transportation Supporting Dulles Airport Committee for Dulles Economic Development and Transportation Committee July 12, 2018 Tom Biesiadny, Director Fairfax County Multiple Transportation Improvements

More information

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT

PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International

More information

Projected Advertisement Date

Projected Advertisement Date 2013 Planned s CY 2013 and CY 2014 Richmond District Schedule Preliminary Engineering Task Order Contracts SR 288/SR 145 Survey, 288 90349 Chesterfield Ramp and Signal Design 2/27/2013 $ 0.19 I-64 Over

More information

8. Community Facilities

8. Community Facilities 8. Community Facilities 8.. Chapter Overview 8... Introduction Community facilities are public or publicly-funded facilities, such as police and fire protection, emergency medical response, hospitals,

More information

State Project Reconstruction I-84

State Project Reconstruction I-84 State Project 151-273 Reconstruction I-84 Waterbury, Connecticut FROM WASHINGTON STREET TO PIERPONT ROAD I-84 Constructors J.V. Robert Turner Area Engineer Ken Fargnoli District Engineer John Dunham Assistant

More information

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge Texas Department of Transportation Corpus Christi District Corpus Christi Harbor Bridge Presented by Russel W. Lenz, P.E. Corpus Christi District Engineer For 2009 Texas Ports and Waterways Conference

More information

Local Information. Below you will find travel tips and estimated costs for travel both to and from the airport and around town.

Local Information. Below you will find travel tips and estimated costs for travel both to and from the airport and around town. Local Information Travel/Transportation Below you will find travel tips and estimated costs for travel both to and from the airport and around town. Transportation To/From Airports Below, a list of transportation

More information

PFC Quarterly Status Report September 30, 2016

PFC Quarterly Status Report September 30, 2016 PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority

More information

5.1 Traffic and Transportation

5.1 Traffic and Transportation 5.1 When it opens in 2009, the Bellevue Nickel Improvement Project will increase the number of vehicles able to travel through the study area, improve travel speeds, and improve safety by reducing the

More information

Hospital Link Project Project Update September 2015

Hospital Link Project Project Update September 2015 Hospital Link Project Project Update September 2015 General The project provides a link between Riverside Drive and the Transitway to the Hospital Ring Road. This link is needed to improve transit service

More information

THE RICHMOND REGION Transportation Priority Projects

THE RICHMOND REGION Transportation Priority Projects Priority Order Project Description Estimated Need (in millions) 1* Main Street Station Phase III - Station facility improvements Route 360 East of I-295 Widen to 6 & 8 lanes (I-295 to Walnut Grove Rd)

More information

Southern Beltway Projects Summary

Southern Beltway Projects Summary Southern Beltway Projects Summary The Pennsylvania Turnpike Commission is proposing the construction of a 30-mile, tolled fourlane limited-access highway, known as the Southern Beltway that will be located

More information

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS TRAFFIC ADVISORY For Immediate Release Christine Girardin 407-264-3069 January 19, 2018 Central and West Central Florida Weekly Lane Closures and Work Zone Advisory OCOEE Florida s Turnpike announces lane

More information

I-66 Inside the Beltway Feasibility Study

I-66 Inside the Beltway Feasibility Study I-66 Inside the Beltway Feasibility Study Feasibility Study Study Process Context Sensitive Dialogues Corridor Assessments / Data Collection Problem Statement Refinement Concept Development Concept Evaluation

More information

SAN RAFAEL City Council January 20, 2015

SAN RAFAEL City Council January 20, 2015 SONOMA MARIN AREA RAIL TRANSIT SMART CENTRAL SAN RAFAEL STATUS UPDATE SAN RAFAEL City Council January 20, 2015 CENTRAL SAN RAFAEL SMART SOUTH OF PUERTO SUELLO TUNNEL 1. Active Construction 2. Construction

More information

CONTACT: Michelle T. Holland

CONTACT: Michelle T. Holland FOR IMMEDIATE RELEASE Thursday, December 7, 2017 CONTACT: Michelle T. Holland 703-586-0487 (C) Michelle.Holland@vdot.virginia.gov Jennifer McCord 571-230-2926 Jennifer.McCord@vdot.virginia.gov 66 EXPRESS

More information

LG ELECTRONICS U.S.A., INC., AIR-CONDITIONING ACADEMY VISITORS INFORMATION

LG ELECTRONICS U.S.A., INC., AIR-CONDITIONING ACADEMY VISITORS INFORMATION LG ELECTRONICS U.S.A., INC., AIR-CONDITIONING ACADEMY VISITORS INFORMATION Atlanta Metro...3-4 New York City Metro...5-7 Dallas Metro... 8 Los Angeles Metro...9-10 Thank you for your interest in LG air-conditioning

More information

RW Bruhn Bridge and Approaches Project

RW Bruhn Bridge and Approaches Project RW Bruhn Bridge and Approaches Project The Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project involves four-laning approximately 1.9 km of Highway 1 in Sicamous, including replacement of the

More information

Public Informational Meeting

Public Informational Meeting Public Informational Meeting April 17, 2007 Bow-Concord I-93 I Transportation Planning Study Bow-Concord Interstate 93 Transportation Planning Study Context Sensitive Solutions Planning Steps Screen Alternatives

More information

Dufferin Jog Elimination Project

Dufferin Jog Elimination Project Project Project Status Update November 14 2007 Project History Planning Alternatives Criteria Measured Project Benefits Structural Configurations Considered Structural Design Considerations The Preferred

More information

Carlisle Connectivity Projects Communication Plan and Project Status

Carlisle Connectivity Projects Communication Plan and Project Status Carlisle Connectivity Projects Communication Plan and Project Status Overview Communication Plan Communication Plan Communication Plan Objective The Borough staff will develop and execute timely and effective

More information

A New Trans-Hudson Passenger Rail Tunnel

A New Trans-Hudson Passenger Rail Tunnel A New Trans-Hudson Passenger Rail Tunnel THE Tunnel TRANS HUDSON EXPRESS Build THE Tunnel TRANS HUDSON EXPRESS A new trans-hudson rail tunnel is critical to alleviating growing congestion and attracting

More information

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

3. COLTA / HUGA CONNECTIONS - PRELIMINARY 9 3. COLTA / HUGA CONNECTIONS - PRELIMINARY 3.1 COLTA The Chain of Lakes Trail Association (COLTA) trail, formerly identified as the Chester Spur Line, was completed and opened for use in June 2011. The

More information

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017

Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 Airport Preliminary Master Plan Workshop Board of County Commissioners April 18, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Agenda (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR

More information

Important Lane Closures, April 3 9, 2011

Important Lane Closures, April 3 9, 2011 March 31, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures, April 3 9, 2011 RESCHEDULED: Lane Shifts of Westbound Route 7 at Route

More information

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND BAY VILLAGE WESTLAKE OLMSTED NORTH TOWNSHIP OLMSTED FALLS OLMSTED BEREA STRONGSVILLE ROYALTON NORTH BROOK PARK PARMA PARMA BROADVIEW BRECKSVILLE HILLS SEVEN INDEPENDENCE BROOKLYN RIVER ROCKY LAKEWOOD PARK

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017

FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 FLL Master Plan Update Policy Advisory Committee (PAC) Briefing #2 July 10, 2017 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY PAC Committee (PRELIMINARY DRAFT) WORK IN PROGRESS -

More information

Public Information Center August 12, 2010

Public Information Center August 12, 2010 Route 52 Causeway Bridge Replacement & Somers Point Circle Elimination Project Somers Point Atlantic County Public Information Center August 12, 2010 Ocean City Cape May County Presentation Overview General

More information

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5

SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, Presented By Suzanne Phillips, P.E., FDOT District 5 SR 429/WEKIVA PARKWAY FTBA CONFERENCE March 20-21, 2012 Presented By Suzanne Phillips, P.E., FDOT District 5 Project Description The Wekiva Parkway project constructs 25 centerline miles of new toll expressway.

More information

AVAILABLE: 153 HALSEY ST STREETSCAPE 153 HALSEY ST STREETSCAPE

AVAILABLE: 153 HALSEY ST STREETSCAPE 153 HALSEY ST STREETSCAPE AVAILABLE: 8th Floor: 21,135 SF & 5,180 SF OFFICE SPACE 1st Floor: 8,143 SF OFFICE/RETAIL SPACE The building is a short walk to Penn Station, connecting the entire metro region and beyond. NYC in 15 minutes

More information

Palm Beach County Traffic Report July 13 through July 20, 2012

Palm Beach County Traffic Report July 13 through July 20, 2012 For Immediate Release July 13, 2012 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report July 13 through July 20, 2012 Palm Beach County Palm Beach County traffic will be

More information

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT RELEASE: IMMEDIATE July 27, 2018 CONTACT: Tina Bundy 540 899 4560 (office) 540 907 8325 (cell) Tina.Bundy@VDOT.Virginia.gov VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT July 29 August 4, 2018 All work

More information

100 KIMBALL DRIVE ONE JEFFERSON ROAD

100 KIMBALL DRIVE ONE JEFFERSON ROAD P ARSIPPANY, NEW J ERSEY 100 KIMBALL DRIVE ONE JEFFERSON ROAD PROPERTY DESCRIPTION One Jefferson Road 100 Kimball Drive LOCATION: SITE: CAMPUS: OWNERSHIP: CONSTRUCTION MANAGER: At the southeast corner

More information

H U D S O N P A L I S A D E S

H U D S O N P A L I S A D E S 14 H U D S O N P A L I S A D E S Hudson Palisades The southernmost sections of the Long Path follow the Hudson River and the Hudson Palisades north, staying close to the river and to civilization. Although

More information

PROGRESS CONTINUES ON FEDERALLY-MANDATED PTC; SERVICE ADJUSTMENTS REQUIRED EFFECTIVE OCTOBER 14, 2018

PROGRESS CONTINUES ON FEDERALLY-MANDATED PTC; SERVICE ADJUSTMENTS REQUIRED EFFECTIVE OCTOBER 14, 2018 ` FOR IMMEDIATE RELEASE September 20, 2018 NJT-18-067 Contact: Press Office 973-491-7078 PROGRESS CONTINUES ON FEDERALLY-MANDATED PTC; SERVICE ADJUSTMENTS REQUIRED EFFECTIVE OCTOBER 14, 2018 10% Rail Discount

More information

DOT 0200 HR ROAD CLOSURE REPORT

DOT 0200 HR ROAD CLOSURE REPORT DOT 0200 HR ROAD CLOSURE REPORT Rt. 1 & 9 N&S MP 58.35, N. Bergen Twp., Hudson Co., All lanes closed Rt. 42 N.B. 13.0, Deptford Twp., Gloucester Co. Two lanes open, two lanes closed. Rt. 73 N.& S.B. 29.86,

More information

Awards of Excellence for 2016 Presented January 26, 2017 in Baltimore, Maryland

Awards of Excellence for 2016 Presented January 26, 2017 in Baltimore, Maryland Awards of Excellence for 2016 Presented January 26, 2017 in Baltimore, Maryland MdQI Planning Award Baltimore Washington International (BWI) Thurgood Marshall Airport, Concourse D Art Competition Agency:

More information

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5

CONTENTS. 1 Introduction Always Moving Forward while Building on the Past A Dynamic Destination... 5 2010 STRUCTURE PLAN - 2 - CONTENTS 1 Introduction... 5 1.1 Always Moving Forward while Building on the Past... 5 1.2 A Dynamic Destination... 5 2 Map A... 6 Exhibition Place and its Neighbours... 7 3 Demonstration

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Your guide to the Route 29 Solutions Projects For full details & continued engagement please visit www.route29solutions.org The Route 29 Solutions Package is a $230 million investment into the improvement

More information

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design

Project Location MP A44.5 MP A38 PRELIMINARY. A A57 (Future Project) A42 - A44.5 (Fall Fall 2019) A38 - A42. A31 - A38 - In Design RECONSTRUCTION AND WIDENING PROJECT Project Location A44.5 - A57 (Future Project) MP A44.5 Steinsburg Road (Fall 2015 - Fall 2016) John Fries Highway (Fall 2017 - Fall 2019) A42 - A44.5 (Fall 2017 - Fall

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

Springettsbury Township. Road Improvement Projects

Springettsbury Township. Road Improvement Projects Springettsbury Township Road Improvement Projects 2009 2016 2016 Township Road Improvement Projects Springettsbury Township is divided into the following 4 Sectors: Northwest Sector Sherman Street Route

More information

AVAILABLE: Hartz Mountain Industries, Inc. Leasing Department Phone: Fax: HALSEY ST STREETSCAPE

AVAILABLE: Hartz Mountain Industries, Inc. Leasing Department Phone: Fax: HALSEY ST STREETSCAPE AVAILABLE: 8th Floor: 21,135 SF & 5,180 SF OFFICE SPACE 1st Floor: 8,143 SF OFFICE/RETAIL SPACE The building is a short walk to Penn Station, connecting the entire metro region and beyond. NYC in 15 minutes

More information

Guide to Public Transportation. Funded by:

Guide to Public Transportation. Funded by: Guide to Public Transportation Funded by: Updated Version Accurate as of October 2015 PAGE 1 Introduction New Jersey, and Montclair in particular, enjoys the benefits of an excellent public transportation

More information

Guide to Public Transportation

Guide to Public Transportation Guide to Public Transportation Updated Version Accurate as of December 2017 PAGE 1 Introduction New Jersey, and Montclair in particular, enjoys the benefits of an excellent public transportation system.

More information

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016

FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 March 25, 2016 Chuck McGinness, 954-777-4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report March 25 through April 1, 2016 TREASURE COAST Construction and maintenance-related

More information

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place.

Route 29 Business Replacing bridge over river and railroad in Altavista. Signed detour in place. EASTER 2019 VDOT will lift most lane closures for holiday travel from noon Friday, April 19 until noon Tuesday, April 23. However, motorists may encounter semi-permanent work zones or travel delays in

More information

Northern Branch Corridor DEIS December Appendix H: Historic Properties and Resources

Northern Branch Corridor DEIS December Appendix H: Historic Properties and Resources Appendix H: Historic Properties and Resources Appendix H: Historic Properties and Resources H. Historic Background: History of the Northern Branch H.1. Introduction The rail line now known as the Northern

More information

Hospital Link Project Project Update Winter 2018

Hospital Link Project Project Update Winter 2018 Hospital Link Project Project Update Winter 2018 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction of the Hospital Link facility is open

More information

1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

1963 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District 1963 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems

More information

1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District

1964 HISD REPORTS. Highway Mileage on State, State Toll, County and Municipal Systems by County and by District 1964 HISD REPORTS This is a description of the HISD reports compiled annually by HISD. HISD-4 HISD-4T HISD-5 HISD-6 HISD-7 HISD-8 HISD-9 Highway Mileage on State, State Toll, County and Municipal Systems

More information