B.SC NURSING COLLEGES WITH HOSTEL

Size: px
Start display at page:

Download "B.SC NURSING COLLEGES WITH HOSTEL"

Transcription

1 Mar-2018 B.SC NURSING COLLEGES WITH HOSTEL Amount (in rs COMPLETION UP TO DATE Date (Rs in STAGE % (Rs in 1 Patna B.Sc Nursing College at PMCH, Patna Jul-16 Dhanpat Aug Aug-19 Not started 0% 0 Work is kept on hold because of PMCH redevelopment 2 Darbhanga B.Sc Nursing College at DMCH, Laheriasarai (Darbhanga) Jul-16 BBCPL-SKPL (JV) Mar Mar-19 Hostel Block-Roof casted (2nd Floor) Academic block- Roof casted (F.F) 18% Muzaffarpur B.Sc Nursing College at SKMCH, Muzaffarpur Jul-16 M/S Satyam Builder Mar Mar-19 Hospital Block-Pile cap work is in progress. Academic block-pile work completed 12% Gaya 5 Bhagalpur B.Sc Nursing College at ANMMCH, Gaya B.Sc Nursing College at JLNMCH, Bhagalpur Jul-16 Raj Construction May May Jul-16 Lalan, Bhagalpur Mar Mar-19 College Block-Brick work is in progress. Hostel Block- Roof Shuttering (F.F) Hostel Block- Column work (2nd.F) Academic Block- Roof shuttering (2nd Floor) 35% % Nalanda B.Sc Nursing College at Vardhaman Ayurvigyan Sansthan, Pawapuri, Nalanda Jul-16 Balkrishna Bhalotia Mar Mar-19 Hostel Block-Finishing Work Academic Block- Finishing Work 70% Bettiah B.Sc Nursing College at Govt. Medical College, Bettiah Jul-16 Larsen & Turebo Jul Jul-20 work is going on 0 Md Nasim Akhtar Ansari Being Constructed with Medical College 8 Purnea B.Sc Nursing College at Govt. Medical College, Purnea (Sadar Hospital Campus) & Para Medical Institute Jul-16 Umakant, Katihar Mar Mar-19 Hostel Block-Roof reinforcement binding work is in progress. 12% Total

2 PARA-MEDICAL INSTITUTE WITH HOSTEL PLACES COMPLETIO N Date (Rs in STAGE % (Rs in 1 Arariya Building of ANM, GNM & Para medical Institute with Hostel at Mauja- Basantpur Arariya = Jul-16 nath Builder & Housing co. pvt ltd Mar Mar-19 Foundation work 3% 0.00 Letter sent to electricity department for removing wire on proposed site 2 Banka Construction of Para Medical Institute at Sadar Hospital (Old Campus), Banka Jul-16 Rana construction May Oct-18 Academic Block-Plaster work. Girls Hostel- Finishing work, Boys Hostel- Roof shuttering (F.F) 65% Buxar Construction of Para Medical Institute at Sadar Hospital, Buxar Jul-16 B Aug Nov-18 Girl's Hostel-Finishing work, Boys Hostel- Structure completed Admin Block- Roof casted (F.F) 30% Gopalganj Construction of Para Medical Institute at Sub-Divisional Hospital, Gopalganj (Hathuwa) Jul-16 construction Mar Jun-18 Academic Block-Roof reinforcement binding (G.F). Girls Hostel- Roof reinforcement binding (G.F), Boys Hostel-Roof reinforcement binding (G.F) 20% Jamui Building of GNM & Para medical Institute at Vill-Mahuli, Jamui (GNM & para Medical) = Jul-16 Sudesh & Company Const. Pvt ltd Feb Aug-19 Academic Block-Tie Beam Hostel- Column cated (G.F) 12% Jehanabad Construction of Para Medical Institute at Vill-Jamuawan, Jehanabad Jul-16 Kaushlendra /08/2017 (Clear land not available) 7 Katihar Building of GNM & Para medical Institute at Sadar Hospital, Katihar = Jul-16 Adyaraj /12/2016. Available land is disputed, Letter sent to D.M for alternative land 8 Khagaria Building of GNM & Para medical Institute at Old Subdivisional Hospital, Khagaria = Jul-16 Macro const. pvt ltd Mar Sep-18 Academic Block-Column work (3rd.F) Hostel Block- Column work (2nd.F) 30% Lakhisarai Construction of Para Medical Institute at Mesona, Lakhisarai Jul-16 Kanhaiya Contractor pvt ltd /08/ Madhubani Construction of Para Medical Institute at Sadar Hospital, Madhubani Jul-16 Sanjay May Aug Letter sent to D.M for alternative Land

3 PLACES COMPLETIO N Date (Rs in STAGE % (Rs in 11 Munger Building of GNM & Para medical Institute at Leprosy Hospital Munger (GNM & para Medical) = Jul-16 Lalan Mar Sep-18 Academic Block- Roof Shuttering (F.F), Hostel Block- Roof Shuttering (G.F) 27% Rohtas Construction of Para Medical Institute at Sadar Hospital, Rohtas Jul-16 Ramesh Pandey Aug Nov-18 Girl's Hostel-Finishing work, Boys Hostel-Finishing work, Admin Block- Finishing work 65% Saharsa Construction of Para Medical Institute at Sadar Hospital, Saharsa Jul-16 C.S construction Mar Aug-18 Pile cap casting work is in process 10% Saran Construction of Para Medical Institute at Sadar Hospital Chhapra,Saran Jul-16 construction Sub-Divisional hospital Jul-16 Construction of Para Medical Md Nasim West 15 Institute at Sadar Hospital, West Jul-16 Larsen & Turebo Jul Jul Akhtar Champaran Champaran Ansari 05/08/2017 (Site clearence work in progress.) 16 Nawada Building of GNM & Para medical Institute at Budhaul, Nawada = Jul-16 Dhanpat Jan Jul-19 Foundation work is going on 10% Arwal Building of ANM, GNM & Para medical Institute with Hostel at Sadar Hospital, Arwal = Jul-16 B.Rai Feb Feb-20 Tie beam is in process 12% Purnea Building of B.Sc Nursing college & Para Medical Institute at Govt. Medical College, Purnea (Sadar Hospital Campus) = Jul-16 Umakant, Katihar Mar Mar-19 Hostel Block-Roof reinforcement binding work is in progress.(g.f) 15% East Building of GNM & Para medical Champaran Institute at Sadar Hospital, East Champaran = Jul-16 Rama & Sons Md Nasim Akhtar Ansari LoA issued on 02/02/2018

4 PLACES COMPLETIO N Date (Rs in STAGE % (Rs in 20 Sitamarhi Construction of Para Medical Institute at Sadar Hospital, Sitamarhi Jul-16 Shashikant LoA issued on 16/01/ Supaul Construction of Para Medical Institute at Mauja Supaul, ward no12, Supaul Jul-16 Indra Narayan contract pvt ltd LOA to be issued 22 Siwan Building of GNM & Para medical Institute at SDH Mahrajganj, Siwan = Jul-16 M/s B. & Company LoA issued on 02/01/ Madhepura Building of ANM & Para medical Institute at Vill-Parariya, Madhepura = Jul-16 M/S Satyanarayan, Jharkhand /01/ Nalanda Building of ANM & Para medical Institute at Pavapuri Medical College Campus, Nalanda = Jul-16 M/S Satyanarayan, Jharkhand /01/ Bhojpur 26 Aurangaba d Building of GNM & Para medical Institute at Bhojpur Building of GNM & Para medical Institute at Sadar Hospital, Aurangabad Total = = Jul Jul-16 Simens Construction Corporation M/s Raj Construction /01/ /02/2018

5 CONSTRUCTION OF GENERAL NURSE MIDWIFERY (G.N.M) PLACES APPROVAL DETAIL COMPLETIO N Date (Rs in STAGE % (Rs in NAME OF 1 Arariya Building of ANM, GNM & Para medical Institute with Hostel at Mauja- Basantpur Arariya = Jul-16 nath Builder & Housing co. pvt ltd Mar Mar-19 Foundation started 3% 0 Letter sent to electricity department for removing wire on proposed site 2 Gopalganj Construction of GNM Training Institute at Sub-Divisional Hospital Hathua, Gopalganj Jul-16 AIPLGMC-JV Birendra 05/08/2017, Transformer and Electrical Pole Reloction work in progresss 3 Katihar Building of GNM & Para medical Institute at Sadar Hospital, Katihar = Jul-16 Adyaraj Construction Apr Oct /12/2016. Available land is disputed, Letter sent to D.M for alternative land 4 Khagaria Building of GNM & Para medical Institute at Old Subdivisional Hospital, Khagaria = Jul-16 Macro const. pvt ltd Mar Sep-18 Acadmic Block- Roof Slab shuttering (F.F),Hostal Block -G. F slab shuttering progress. 30% Lakhisarai Construction of GNM Training Institute at Balguddar Ashokdham, Lakhisarai Jul-16 M/S Kanhaiya Contractor Pvt Ltd /08/2017 (Land not available) 6 Munger Building of GNM & Para medical Institute at Leprosy Hospital Munger = Jul-16 Lalan Mar Sep-18 Academic Block- Roof Shuttering (F.F), Hostel Block- Roof Shuttering (F.F) 27% Nawada Building of GNM & Para medical Institute at Budhaul, Nawada = Jul-16 Dhanpat Jan Jul-19 Foundation work is going on 10%

6 PLACES APPROVAL DETAIL COMPLETIO N Date (Rs in STAGE % (Rs in NAME OF 8 Arwal Building of ANM, GNM & Para medical Institute with Hostel at Sadar Hospital, Arwal = Jul-16 B.Rai Feb Feb-20 Tie beam is in process 12% Supaul Construction of GNM Training Institute at Mauja- Kharail, ward no-01, Supaul Jul-16 Ashok Patori, Saharsa /12/2017 (Land not available) 10 Jamui Building of GNM & Para medical Institute at Vill- Mahuli, Jamui = Jul-16 Sudesh & Company Const. Pvt ltd Feb Aug-19 Academic Block-Tie Beam Hostel- Column cated (G.F) 12% Aurangab ad Building of GNM & Para medical Institute at Sadar Hospital, Aurangabad = Jul-16 M/s Raj Construction /02/ East Champara n Building of GNM & Para medical Institute at Sadar Hospital, East Champaran = Jul-16 Rama & Sons Md Nasim Akhtar Ansari LoA issued on 02/02/ Sitamarhi Construction of GNM Training Institute at Vill-Mirzapur, Dumra, Dist- Sitamarhi Jul-16 Shashikant /01/ Siwan Building of GNM & Para medical Institute at SDH Mahrajganj, Siwan = Jul-16 M/s B. & Company Birendra LoA issued on 02/01/ Kaimur Construction of GNM Training Institute at Vill-Barka Katra, Bhabhua (Kaimur) Jul-16 Yashaswi Infrastructure, Ranchi LoA issued on 02/01/ Madhuba ni Construction of GNM Training Institute at Mauja-Raghopur Balat, Dist- Madhubani Jul-16 SKS & KKT /01/ Bhojpur Building of GNM & Para medical Institute at Bhojpur = Jul-16 Simens Construction Corporation /01/2018 Total

7 CONSTRUCTION OF AUXILIARY NURSE MIDWIFERY (A.N.M) DISTRI CT PLACES Amount (in rs COMPLETI ON Date (Rs in STAGE % (Rs in NAME OF 1 Arariya Building of ANM, GNM & Para medical Institute with Hostel at Mauja- Basantpur Arariya = Jul-16 nath Builder & Housing co. pvt ltd Mar Mar-19 Foundation work is going on 3% 0 Pankaj Letter sent to electricity department for removing wire on proposed site 2 Arariya Divisional Farbisganj, Arariya 3 Arwal Building of ANM, GNM & Para medical Institute with Hostel at Construction Sadar Hospital, of ANM Arwal Training 4 Bhagal Institute & Hostel atsubpur Divisional Kahalgaon, Bhagalpur 5 Bhojpur Divisional Jagdispur, Bhojpur Jul = Topline Infra Projects Pvt ltd, Katihar Jul Jul Jul-16 B.Rai Feb Feb-20 Roof Shuttering work is going on (F.F) Tie beam is in process 30% % Jul-16 Ramesh, Patna Mar-19 Tie beam 10% Jul-16 Ramesh Pandey Sep Sep-18 Column Shuttering (Terrace Floor) 32% Pankaj Pankaj 6 Bhojpur Jul-16 Anil Divisional Piro, Bhojpur 7 Sub-Divisional Dumrao, Buxar Jul-16 0 Darbha Jul-16 Kuwar Construction Work order - 0 nga Divisional Biraul, Darbhanga 8 East Champ aran 9 Gaya 10 Gaya Divisional Areraj, East Champaran Divisional Neemchak Bathani, Gaya Divisional Sherghati, Gaya Jul-16 M/s S. K Enterprises Dec Dec-18 Academic Block- Pile cap is going on, Hostel Block- Pile cap is going on Jul-16 Anil Jan Jan-19 Roof casted (G.F) 25% Jul-16 Ambe Infra Nov Nov-18 Plinth Beam is in progress % Md Nasim Akhtar Ansari Pankaj Pankaj 02/08/2017 (T.S in process) Old building demolition work is in process

8 DISTRI CT 11 Gaya PLACES Divisional Tekari, Gaya Amount (in rs COMPLETI ON Date (Rs in STAGE % (Rs in Jul-16 Mukesh Nov Nov-18 Roof shuttering (G.F) 20% NAME OF Pankaj 12 Katihar Divisional Manihari, Katihar Jul-16 Sudesh & co. Pvt ltd., Jamui Sep Sep-18 Roof casted (F.F) 35% Pankaj Khagari a Madhe pura Divisional Gogri, Khagaria Divisional Uda Kishanganj, Madhepura Jul-16 Arvind Jan Jan-19 Plinth Level 15% Jul-16 C.S. Construction May May-18 Roof casted (F.F) 30% /08/ Madhu bani Divisional Jainagar, Madhubani Jul-16 Maa Tara Jun Jun-18 Acadmic block - Roof casted (G.F), Hostel.Block- Roof reinforcement binding (G.F) 30% Madhu bani Madhu bani Madhu bani 19 Munger Divisional Benipatti, Madhubani Divisional Jhanjharpur, Madhubani Institute & Hostel atsub- Divisional Phulparas, Madhubani Divisional Tarapur, Munger Jul-16 M/s Kuwar Const., Darbhanga Jul-16 Gridhari Lal Poddar Nov Nov-18 Pile work is in progress. College - Roof casted (G.F) Hostel - Column work above Plinth level 0 20% Jul-16 Sanjay,Darbhanga Jul-16 Lalan Jun Jun-18 Roof shuttering (G.F) 25% LOA ISSUED ON 08/12/2017 LOA ISSUED ON 08/12/2017 (Design to be changed)

9 20 DISTRI CT Darbha nga PLACES Divisional Benipur, Darbhanga Amount (in rs 21 Patna Sub-Divisional Paliganj, Patna Jul-16 COMPLETI ON Date (Rs in STAGE % (Rs in Jul-16 Sanjay Tie beam is going on Foundation work is going on 10% 0 5% 0 NAME OF LOA ISSUED ON 08/12/ Purnea Divisional Banmankhi, Purnea Jul-16 Bambam Jan Jan-19 Column work (G.F) 18% Pankaj 23 Purnea Divisional Dhamdaha, Purnea Jul-16 M/S C.S Construction, Arariya Aug Aug-18 0 Pankaj Work will be started after demolished the Old buildings. Letter sent to D.M Purnea for given the C by BCD Purnea vide ltr no- 1121, dt- 24 Rohtas Divisional Bikramganj, Rohtas Jul-16 Ram Babu Feb Feb-19 Plinth Level 15% 0 25 Saharsa Samasti pur Samasti pur 28 Saran 29 Saran 30 Sitamar hi 31 Supaul Divisional Simri Bakhtiyarpur, Saharsa Divisional Dalsinghsarai, Samastipur Divisional Patori, Samastipur Divisional Madhaura, Saran Divisional Sonpur, Saran Institute & Hostel atsub- Divisional Pupri, Sitamarhi Divisional Birpur, Supaul Jul-16 Santosh, Saharsa Jul Jul-18 Foundation work is in progress 4% Jul-16 Vinod Oct Oct-18 Column work (G.F) 18% Jul-16 Vinod Oct Oct-18 Roof shuttering (G.F) 25% Jul Jul-16 Kaushal buildcon Jul Jul Jul-16 Sanjay Jul-16 Kunal Kush Jul Jul-18 Roof reinforcement binding work is in Roof reinforcement binding (2nd.F) 25% 0 50% Pankaj Birendra Birendra In Tender, Nit no- 39/2017 (T.s in process)

10 DISTRI CT 32 Supaul 33 Vaishali West Champ aran West Champ aran East Champ aran PLACES Divisional Nirmali, Supaul Divisional Sahdei Bujurg (Mahnar), Vaishali Divisional Bagha, West Champaran Divisional Narkatiyaganj, West Champaran Institute & Hostel atsub- Divisional Sikarhana, East Champaran 37 Munger Divisional Haveli Khargpur, 38 Suapul Begusa rai Begusa rai Begusa rai 42 Purnea Madhe pura Samasti pur Institute & Hostel at Vill- Kharail, Supaul Divisional Baliya, Begusarai Divisional Bakhri, Begusarai Divisional Manjhaul, Begusarai Divisional Vayasi, Purnea Building of ANM & Para medical Institute at Vill- Parariya, Madhepura Divisional Rosara, Samastipur Amount (in rs COMPLETI ON Date (Rs in STAGE % (Rs in Jul-16 Santosh, Saharsa Jun Jun Jul-16 Kuwar Construction Dec Dec-18 Tie beam work is in progress Roof shuttering (G.F) Jul-16 Academic block- Roof Shiva Infra Solution pvt May May-18 Reinforcement ltd, binding is in progress. Hostel Academic block Jul-16 Rama and sons, Patna Nov Nov-18 Roof casted (G.F) Hostel Block- Roof shuttering (G.F) Academic block Jul-16 Roof Shuttering M/S Virendra Feb Jan-19 (F.F) Hostel Block- Chaudhary Roof Shuttering (F.F) 9% 0 25% 0 25% % % Jul-16 Not Started Jul-16 Arvind Jul Jul Jul-16 M/S Satyanarayan, Jharkhand M/S Satyanarayan, Jharkhand M/S Satyanarayan, Jharkhand Jul-16 Umakant = Jul Jul-16 M/S Satyanarayan, Jharkhand Sanjay, Darbhanga NAME OF Md Nasim Akhtar Ansari Md Nasim Akhtar Ansari Md Nasim Akhtar Ansari Pankaj In Tender 02/08/ /11/ /11/ /11/ /01/ /01/ /01/2018

11 45 46 DISTRI CT East Champ aran Gopalg anj PLACES Divisional Chakia, East Champaran Institute & Hostel at APHC Baikunthpur, Gopalganj Amount (in rs Jul-16 COMPLETI ON Date (Rs in STAGE % (Rs in Asiana Contract Pvt Ltd, Gopalganj Jul-16 Baranwala Contract Pvt Ltd Mar-19 Total Pile work under Progress 8% NAME OF Md Nasim Akhtar Ansari Birendra 12/01/2018

12 CONSTRUCTION OF GENERAL NURSE MIDWIFERY (G.N.M) under GOI schemes 1 Rohtas 2 Banka 3 Jahanabad 4 Saharsa. 5 Saran 6 Buxar 7 Purnea Sheikhpur a Madhepur a Construction of G.N.M Training school & hostels in Sadar hospital, Sasaram (Rohtas) Construction of G.N.M at Sadar Hospital Banka Construction of G.N.M at Sadar Hospital Jahanabad Construction of G.N.M at Sadar Hospital Saharsa Construction of G.N.M at Sadar Hospital Chapra (Saran) Construction of G.N.M at Sadar Hospital Buxar Construction of G.N.M at Sadar Hospital Purnea Construction of G.N.M at Sadar Hospital Sheikhpura Construction of G.N.M at Medical College & Hospital Madhepura West Construction of G.N.M at Champara Bettiah, West Champaran n Total Amount (in rs 1, Oct-13 EXPENDITURE WITH CENTAGE Date (Rs in STAGE % (Rs in M/S B & co. Anishabad, Patna Jun Dec-15 Completed 100% 1, , Oct-13 M/S Lalan Nov May-16 Completed 100% Oct-13 1, Oct-13 1, Oct-13 M/S Yashaswi construction, Anishabad (Patna) Baba Hans construction Pvt. Ltd M/S Harishankar Nov May-17 Completed 100% 1, Dec Jun-16 Completed 100% , Dec Jun-16 1, Oct-13 Rajesh May Nov-18 1, Oct-13 M/S Satyanarayan COMPLETION Dec Jun-17 Block A-Finishing work Block B- Finishing work Finishing work is in progress. Academic Block- Finishing work is in progress 80% % % Oct-13 Arun Deo Dec Jun-17 Completed 100% , Oct , Oct-13 Rama & Sons May Nov-18 Finishing work is in progress. Plaster work is in progress. 70% % , , , Birendra Md Nasim Akhtar Ansari Letter written to C.S for Clear land not available for hostel block. Being constructed with Medical College. Hence separate expenditure not given.

13 1 Darbhanga Construction of A.N.M school & hostel at refferal hospital Jale, Darbhanga Amount (in rs Sep-13 EXPENDITURE WITH CENTAGE Date (Rs in STAGE % (Rs in Avaneesh Enterprises, Ghaziabad CONSTRUCTION OF AUXILIARY NURSE MIDWIFERY (A.N COMPLETION Jul Jul-15 Completed 100% under GOI schemes 2 Nawada Construction of A.N.M school & hostel at refferal hospital Rajauli, Nawada Sep-13 Bipin, Nawada Aug Aug-15 Completed 100% Siwan Construction of A.N.M Training school & Hostel in Referral hospital, Mairwa (Siwan) Sep-13 Construction, Ahmedabad Jul Jul-15 Completed 100% Construction of A.N.M Training school & Hostel in Referral 4 Aurangabad hospital, Daudnagar (Aurangabad) Sep-13 Yashswi Infrastructure pvt. Ltd., Ranchi Jan Jan-16 Completed 100% Kaimur Construction of A.N.M Training school & Hostel in Sadar hospital, Bhabhua (Kaimur) Sep-13 Anil, Rohtas Aug Completed 100% Khagaria Construction of A.N.M Training school & Hostel in Sadar hospital, Khagaria Sep-13 Surendra, Begusarai Jan Jan-16 Completed 100% Lakhisarai Construction of A.N.M Training school & Hostel in Sadar hospital, Lakhisarai Sep-13 Rama construction, Patna Jul Jul-15 Completed 100%

14 Amount (in rs COMPLETION EXPENDITURE WITH CENTAGE Date (Rs in STAGE % (Rs in 8 Supaul Construction of A.N.M school & hostel at Sub-divisional hospital Triveniganj, Supaul Sep-13 Avaneesh Enterprises, Ghaziabad Jul Jul-15 Completed 100% Letter written to C.S for 9 Sheohar Construction of A.N.M school & hostel at sadar hospital, sheohar Sep-13 Virendra Chaudhary Dec Dec-15 Completed 100% Jamui Construction of A.N.M at Refferal Hospital Lakshmipur (Jamui) Sep-13 M/S Balkrishan Dholakiya construction pvt ltd Aug May-16 Completed 100% Total 5, , ,121.92

15 1 DISTRIC T PROJECTS IN MEDICAL COLLEGES {UNDER DFID (Department for International Development, U.K.) FUNDING} CONSTRUCTION OF CENTRE OF EXCELLENCE AT NMCH, PATNA EXPENDITURE COMPLETION Date (RS IN LAKH) STAGE % (RS IN LAKH) NMCH, Patna Nov-14 M/S B. Rai 3, Nov May-17 Completed 100% 4, Handed Over 2 3 Patna CONSTRUCTION OF B.SC NURSING AT NMCH, PATNA CONSTRUCTION OF VACCINE CENTRE AT NMCH, PATNA Mar-15 Indra Narayan contractors pvt ltd, Patna 2, Dec Jun-17 Completed 100% Sep-15 M/S B Apr Oct-17 Completed 100% Handed Over 4 CONSTRUCTION OF MODEL RECORD ROOM AT NMCH, PATNA Apr-15 R.K infra services pvt ltd, Patna Feb Nov-16 Completed 100% Handed Over Patna Sub Total of NMCH , CONSTRUCTION OF LECTURE THEATRE (250 seater) AT PMCH, PATNA CONSTRUCTION OF MODEL RECORD ROOM AT PMCH, PATNA CONSTRUCTION OF 150 BEDDED HOSTEL AT PMCH, PATNA Mar Apr Apr-15 Ramesh Pandey Ramesh Pandey Sudhesh & company pvt ltd PMCH, Patna Sub Total of PMCH , Dec Jun-17 Completed 100% Dec Jun-17 Completed 100% Dec Jun-17 Completed 100% Handed Over Handed Over

16 DISTRIC T EXPENDITURE COMPLETION Date (RS IN LAKH) STAGE % (RS IN LAKH) ANMMCH, Gaya 8 9 CONSTRUCTION OF CENTRAL LIBRARY AT ANMMCH, GAYA CONSTRUCTION OF MODEL RECORD ROOM AT ANMMCH, GAYA (Above central library) Apr Dec Dec Apr Dec Dec-17 Finishing work is in progress 80% Gaya CONSTRUCTION OF EMERGENCY WARD AT ANMMCH, GAYA Simens construction Apr-15 2, Dec Dec-17 corporation, Patna Finishing work is in progress 82% CONSTRUCTION OF 136 BEDDED GIRLS HOSTEL AT ANMMCH, GAYA Apr Dec Dec-17 Finishing work is in progress 82% CONSTRUCTION OF 250 SEATER LECTURE THEATRE (2 units) ANMMCH, GAYA Sub Total of ANMMCH, Gaya Mar Dec Dec , SKMCH, Muzaffarpur Finishing work is in progress 82% CONSTRUCTION OF 75 BEDDED GIRLS HOSTELAT SKMCH, MUZAFFARPUR Mar Dec Jun-17 Completed 100% Muzaffar pur CONSTRUCTION OF 250 CAPACITY LECTURE THEATRE (2 units) AT SKMCH, MUZAFFARPUR Mar-15 Mother India pvt ltd Dec Jun-17 Completed 100% CONSTRUCTION OF MODEL RECORD ROOM AT SKMCH, MUZAFFARPUR Apr Dec Jun-17 Completed 100% Handed Over Sub Total of SKMCH, Muzaffarpur

17 DISTRIC T EXPENDITURE COMPLETION Date (RS IN LAKH) STAGE % (RS IN LAKH) JLNMCH, Bhagalpur 16 CONSTRUCTION OF CENTRAL LIBRARY AT JLNMCH, BHAGALPUR Apr Sep Mar-17 Completed 100% Bhagalpu r CONSTRUCTION OF GIRL'S HOSTEL (75 capacity) AT JLNMCH, BHAGALPUR CONSTRUCTION OF 250 CAPACITY LECTURE THEATRE (1 units) JLNMCH, BHAGALPUR Mar Sep Mar-17 Completed 100% Nandlal & Company 1, Mar Sep Mar-17 Completed 100% CONSTRUCTION OF MODEL RECORD ROOM AT JLNMCH, BHAGALPUR Apr Sep Mar-17 Completed 100% Sub Total of JLNMCH, Bhagalpur , , DMCH, Darbhanga 20 Darbhan ga CONSTRUCTION OF MODEL RECORD ROOM AT DMCH, DARBHANGA Apr-15 Shaurya Premier Infrastructure Pvt ltd Aug Aug-17 Completed 100% CONSTRUCTION OF DIAGSTIC CENTRE IN 6 MEDICAL COLLEGES (Prefabricated) Not started 0% 0.00 In Tender Total

18 1 JAMUI 2 VAISHALI 3 CHC AT PHC GIDHAURE (JAMUI) CHC AT PHC RAJAPAKAR (VAISHALI) EAST CHC AT PHC SANGRAMPUR CHAMPARA (EAST CHAMPARAN) N 4 NAWADA 5 JEHANABA D 6 SUPAUL 7 BHAGALPU R 8 SITAMARHI 9 SAMASTIPU R 10 SAMASTIPU R 11 VAISHALI 12 SIWAN CHC AT PHC NARDIGANJ (NAWADA) CHC AT PHC HULASGANJ (JEHANABAD) CHC AT SARAIGARH BHAPTIYAHI (SUPAUL) CHC AT ISMAILPUR (BHAGALPUR) CHC AT BOKHRA (SITAMARHI) CHC AT MOHANPUR (SAMASTIPUR) CHC AT KHANPUR (SAMASTIPUR) CHC AT PHC BHAGWANPUR (VAISHALI) CHC AT PHC HASANPURA (SIWAN) Amount (in rs AGREEMEN T UP TO DATE COMPLETIO Date (Rs in N STAGE % (Rs in Sep-14 Ashok & co niwas pvt ltd, Jamui Rana Sep-14 construction, Kadamkuan Nagendra Sep-14, Muzaffarpur Sep-14 Arun Deo, Nalanda M/S Om Sai Sep-14 construction, Indra Jehanabad Narayan Sep-14 Contract pvt ltd, Patna Sep-14 Pankaj construction Aug Aug-16 Completed 100% Aug Aug-16 Completed 100% Aug Aug-16 Completed 100% Sep Sep-16 Completed 100% Aug Aug-16 Completed 100% Apr Apr-17 Completed 100% Jun Jun-17 Finishing work is in progrerss Sep-14 Sanjay May May-17 Completed 100% Sep-14 Vinesh May May Sep Sep Sep-14 PHC TO CHC (30 BEDDED) {Health deptt-38 nos} M/S Shyam babu Chaudhary Nagendra, Muzaffarpur Asiana contract pvt ltd, Gopalganj May May-17 Roof shutterinfg (3rd.F) Roof casted(f.f) Md Nasim Akhtar Ansari 85% % % Aug Aug-17 Completed 100% Aug Aug-16 Plaster work is in progress 70% NAME OF Land available on May-2017

19 13 GOPALGAN J CHC AT PHC THAWE (GOPALGANJ) Amount (in rs Sep GAYA CHC AT PHC MOHRA (GAYA) Sep SAMASTIPU R 16 MADHUBA NI CHC AT BITHAN (SAMASTIPUR) CHC AT KALUAHI (MADHUBANI) Sep Sep ARWAL CHC AT KALER (ARWAL) Sep SAHARSA 19 NAWADA 20 MUZAFFAR PUR 21 SIWAN 22 JAMUI 23 DARBHANG A CHC AT SATAR KATAIYA (SAHARSA) CHC AT KASHICHAK (NAWADA) CHC AT BANDRA (MUZAFFARPUR) CHC AT LAKRI NABIGANJ (SIWAN) CHC AT HARLALNAGAR,ALIGANJ (JAMUI) CHC AT HANUMAN NAGAR (DARBHANGA) Sep Sep-14 AGREEMEN T UP TO DATE COMPLETIO Date (Rs in N STAGE % (Rs in Construction, Siwan Mohan Sharma, Gaya M/S Surendra, Begusarai Abhay kumar, Sitamarhi B.M Construction, Jehanabad M/S R. K. Construction, Begusarai Avani Devcon pvt ltd, Patna Aug Aug-16 Completed 100% Nov Nov-17 Finishing work is in progress 80% Mar Completed 100% Feb Feb Oct Oct Oct Oct Feb Feb-18 Roof reinforcemen t binding (F.F) Column work (F.F) Finishing work is in progress Roof shuttering (Terrace Floor) 35% % % % Sep-14 Nalin Dec Dec-17 Not Started Sep KATIHAR CHC AT SAMAILI (KATIHAR) Sep-14 Asiana contract pvt ltd, Gopalganj Aug Aug-17 Completed 100% Sep-14 A.K Construction Jun Jun Sep-14 Sanjay Mar M/S C.S Construction Sep Sep-17 Brick work (3rd Floor) Roof casted (Terrace Floor) Finishing work is in progrerss 55% % % NAME OF Land not available

20 Amount (in rs 25 KATIHAR CHC AT MANSAHI (KATIHAR) Sep SHEOHAR 27 GAYA 28 MADHEPUR A CHC AT DUGRI KATHSARI (SHEOHAR) CHC AT BANKEBAZAR (GAYA) CHC AT PURAINI (MADHEPURA) Sep Sep Sep SITAMARHI CHC AT SUPPI (SITAMARHI) Sep JEHANABA D CHC AT RATNIFARIDPUR (JAHANABAD) Sep-14 AGREEMEN T UP TO DATE COMPLETIO Date (Rs in N STAGE % (Rs in M/S C.S Construction Ashok, Sitamarhi Kishor, Aurangabad Topline Infra Projects pvt ltd, Kolkata, Patna Nripendra Sinha, Patna Sep Sep-17 Finishing work is in progrerss 75% Feb Feb-18 Work started Oct Oct Dec Dec-17 Finishing work is in progrerss Finishing work is in progrerss 70% % Work start Aug Aug-18 Roof casted (F.F) 30% NAME OF LOA issued LOA issued 31 MADHEPUR A 32 SUPAUL 33 BHAGALPU R CHC AT GWALPARA (MADHEPURA) CHC AT PRATAPGANJ (SUPAUL) CHC AT RANGRACHOWK (BHAGALPUR) Sep Sep Sep-14 Trimurti Engicon & Traders Pvt. Ltd, Patna Indra Narayan Contract pvt ltd, Patna Trimurti Engicon & Traders Pvt. Ltd, Patna Feb Feb Feb Feb Jan Jan-18 Finishing work is in progrerss Plaster in progress Finishing work is in progress 65% % % MADHUBA NI 35 SITAMARHI 36 MADHEPUR A 37 NAWADA CHC AT LAKHNAUR (MADHUBANI) CHC AT CHORAUT (SITAMARHI) CHC AT BIHARIGANJ (MADHEPURA) CHC AT MESKAUR (NAWADA) Sep Sep Sep Sep-14 Mother India const. pvt ltd Mother India const. pvt ltd Trimurti Engicon & Traders Pvt. Ltd, Patna Archana Contractor pvt ltd Mar Jul Jul Feb Feb Jul Jul-18 Roof shuttering (F.F) Roof Shuttering (2nd.F) Roof reinforcemen t binding Excavation work 28% % % % 0.00 Work sttoped due to hard rock

21 38 KATIHAR CHC AT DANDKHORA (KATIHAR) Amount (in rs Sep-14 AGREEMEN T UP TO DATE COMPLETIO Date (Rs in N STAGE % (Rs in Bambam Roof casted May May-18 (3rd Floor) 40% Total NAME OF

22 1 MADHUBANI CHC ARARIA SANGRARM,BLOCK- JHANJHARPUR APPROVAL DETAIL (Rs in COMPLETION Date STAGE % Feb-14 2 NAWADA CHC KHANWA, Feb-14 M/S Dhramnath construction, Madhubani Bipin, Nawada PHC TO CHC (30 BEDDED) (Individual) (IN RS. LAKH) /11/2015 8/10/2016 Completed 100% /28/2015 8/27/2016 Completed 100% Handed Over 3 PATNA CHC PHULWARISARIFF, Feb-15 4 Gopalganj 5 DARBHANGA CHC AT PAKRI, BLOCK- SIDHWALIA CHC ALINAGAR, BLOCK- ALINAGAR Mar-15 M/S B. & Company, Patna M/S Cohesive Infrastructure Pvt. Ltd, Patna Sanjay, Darbhanga /15/ /14/2016 Completed 100% /9/2015 8/9/2016 Completed 100% /6/2016 9/5/2017 Completed 100% Handed Over 6 PATNA CHC AT BAKHTIYARPUR, Jul-15 Associates, Ranchi /16/2016 6/15/2017 Completed 100% Handed Over 7 JAHANABAD CHC SHAKURABAD, BLOCK-RATNIFARIDPUR Nov-14 Mukesh, Gaya /8/2016 6/7/2017 Completed 100% SUPAUL CHC BALUA BAJAR, BLOCK-CHHATAPUR, Nov-14 INCPL, Patna /6/2016 7/5/2017 Finishing work is in progress. 95% GAYA CHC MAHKAR, BLOCK- KHIZIRSARAI Nov-14 Kaushlendra, Jehanabad /20/2016 7/19/2017 Completed 100% Handed Over 10 W. CHAMPARAN 11 SARAN CHC BALMIKINAGAR BAGHA-2, DIST-WEST CHAMPARAN CHC ISUAPUR, DIST- SARAN Nov Maa Vindhyavasini construction, W. Champaran Yashaswi Infrastructure pvt ltd Not started Column Work (G.F) 15% 0 Md Nasim Akhtar Ansari (Agreement done on 08/07/2016) Land not available Land made available on 20 July NALANDA CHC IAMPUR, Dist- NALANDA M/S B. & Company, Patna /6/2016 9/5/2017 Completed 100% MUZAFFARPU R CHC MUSHARI, DIST- MUZAFFARPUR Mohan Developers & construction pvt ltd /6/2017 3/5/2018 Roof casted (2nd floor) 38% ROHTAS CHC KOCHAS, BLOCK- KOCHAS Jun-15 - Not started Tender to be done 15 ROHTAS CHC KARGAHAR, BLOCK-KARGAHAR Jun-15 - Not started Total , ,754.23

23 CHC AT DIGHALBANK, 1 KISHANGANJ KISHANGANJ CHC AT THAKURGANJ, 2 KISHANGANJ KISHANGANJ CHC AT BAHADURGANJ, 3 KISHANGANJ KISHANGANJ 4 KISHANGANJ CHC AT KOCHADHAMAN, KISHANGANJ AGREEMEN T Date (RS in STAGE % (RS in Apr-15 Shafique Alam Apr Apr-17 Completed 100% Apr-15 Shafique Alam Apr Apr-17 Not Started Apr-15 Shafique Alam Apr Apr-17 Completed 100% Apr-15 Shafique Alam Apr Apr-17 Completed 100% ARARIYA CHC AT PALASI, ARARIYA Apr-15 Topline Infra Apr Apr-17 Finishing work 85% KATIHAR 7 BHAGALPUR 8 KATIHAR 9 KATIHAR 10 ARARIYA 11 MADHUBAN I CHC AT AZAMNAGAR, KATIHAR CHC AT JAGDISHPUR, BHAGALPUR CHC AT BALRAMPUR, KATIHAR CHC AT AMADABAD, KATIHAR CHC AT RANIGANJ, ARARIYA CHC AT MADHUBANI SADAR, MADHUBANI Apr-15 Pankaj Apr Apr-17 Completed 100% Apr Apr Apr-15 Balkrishna Bhalotia construction pvt ltd, jamui Birendra, Katihar Birendra, Katihar Apr Apr-17 Completed 100% May May-17 Tie Beam Completed 15% May May-17 Not Started Apr-15 INSCPL Jul Jul-17 Finishing work 70% Apr-15 PHC TO CHC (30 BEDDED) (Under MSDP) Satyanarayan, Deoghar COMPLETION Jul Jul-17 Not Started 0.00 Letter sent to D.M for land Handed Over (Land not available) Letter sent to D.M for land Work will be started after demolished the old building 12 KATIHAR CHC AT KADWA, KATIHAR Apr-15 Satyanarayan, Deoghar Jun Jun-17 Finishing work is in progress 82% KATIHAR CHC AT BARSOI, KATIHAR Apr KATIHAR CHC AT BARARI, KATIHAR Apr-15 Satyanarayan, Deoghar Satyanarayan, Deoghar Jun Jun-17 Not Started Jun Jun-17 Finishing work 82% Land not available, Letter send for land

24 AGREEMEN T COMPLETION Date (RS in STAGE % (RS in 15 ARARIYA CHC AT SIKTI, ARARIYA Apr-15 Basant Banijya Limited, Gaya Feb Feb-19 Plinth Level 15% Agreement done on 23/02/ ARARIYA 17 DARBHANG A 18 KISHANGANJ 19 KATIHAR 20 EAST CHAMPARA N 21 VAISHALI CHC AT TERHAGACH, ARARIYA CHC AT KIRATPUR, DARBHANGA CHC AT POTHIA, KISHANGANJ CHC AT HASANGANJ, KATIHAR CHC AT BANJARIA, EAST CHAMPARAN CHC AT CHEHRA KALAN, VAISHALI Apr-15 M/S C.S construction Sep Sep-17 Column work (G.F) 20% Apr-15 Kuwar construction Jul Jul-18 Not Started Apr-15 Anil Jun Jun-18 Plinth Level 15% Apr-15 Rita Devi Jul Jul-18 Not Started Apr Not Started Apr Not Started ARARIYA CHC AT JOKIHAT, ARARIYA Apr Not Started KATIHAR 24 ARARIYA 25 KATIHAR CHC AT KATIHAR SADAR, KATIHAR CHC AT FORBESGANJ, ARARIYA CHC AT MANIHARI, KATIHAR Apr Not Started Apr Not Started Apr Not Started 0.00 Total Md Nasim Akhtar Ansari work started after demolished the old building Land not available, Letter send to D.M Land made available after Tree cutting on 02 August 2017 Letter sent for land Land not available (Letter Send to P.S MWD, Bihar vide Letter no- BMSIC/80015/ /959, Dated- 21/06/2016 Project dropped Project dropped

25 CONSTRUCTRED AS MODEL UNDER 100 APHC SANCTIONED BY HEALTH DEPT. 1 PATNA 2 KAIMUR 3 SAMASTIPUR 4 SAMASTIPUR 5 GAYA 6 SIWAN 7 VAISHALI CONSTRUCTION OF APHC IN SAMASTICHAK, PATNA CONSTRUCTION OF APHC IN NATAIYA, KAIMUR APHC NARHAN, DIST- SAMASTIPUR (FROM SHS) CONSTRUCTION OF APHC IN BANDHAR, SAMASTIPUR CONSTRUCTION OF APHC IN MAIN GRAM, GAYA CONSTRUCTION OF APHC NARENDARPUR, SIWAN APHC BHAGWANPURRATI, DIST-VAISHALI (BY PREFAB MATERIAL) Amount (in rs Mar-11 AGREEMEN T (in COMPLETION Date rs STAGE % Pintu Construction, Masaurhi (Rs in Apr Jan-14 completed 100% Sep-12 Smt Rita Devi Jul Apr-14 completed 100% Mar Aug-12 Mr. A Khan Aug May-14 completed 100% Oct-12 M/S Rita Devi Sep Jun-14 completed 100% Nov-09 ADDITIONAL PRIMARY HEALTH CENTRE (A.P.H.C) Jiradei Narendrapur Engineering & Construction Company Synergy thrillingston, chandigarh Aug May-14 completed 100% completed 100% Tender not Invited 8 VAISHALI APHC ROOPNARAYANPUR, BLOCK-JANDAHA, DIST- VAISHALI (BY PREFAB MATERIAL) Nov-09 Revirie Ventures Pvt. Ltd, Chhatishgarh completed 100% PATNA APHC DATMAI, BLOCK- MASAURHI, DIST-PATNA (BY PREFAB MATERIAL) Nov-09 Sai Baba Builders & Consultants Pvt. Ltd completed 100% GAYA CONSTRUCTION OF APHC AT MAHKAR, BLOCK- KHIZIRISARAI (GAYA) BY PRE- FAB MATERIAL Jun-14 Acme Cleantech Solutions Ltd,Gurgaon (Haryana) Aug Nov-14 completed 100% NALANDA CONSTRUCTION OF APHC AT KACHHARIYA, BLOCK- THARTHARI (NALANDA) BY PRE-FAB MATERIAL Jul-14 Beardsell ltd Dec Apr-15-0 (work rescined) 12 BEGUSARAI CONSTRUCTION OF APHC AT SONVARSA,SAMHO (BEGUSARAI) Jan-14 Ramniwas, Begusarai Aug May-16 Completed 100% 75.00

26 ADDITIONAL PRIMARY HEALTH CENTRE (A.P.H.C) Amount (in rs AGREEMEN T (in COMPLETION Date rs STAGE % (Rs in 13 GOPALGANJ CONSTRUCTION OF APHC AT SIDHWALIA,GOPALGANJ Bajrangi,Chhapra Aug May-16 Completed 100% GOPALGANJ CONSTRUCTION OF APHC AT BALRA,BARAULI (GOPALGANJ) Nov-14 Baranwala Contact Pvt. Ltd, Gopalganj Aug Feb-16 Completed 100% GOPALGANJ CONSTRUCTION OF APHC AT REVTITH, BAIKUNTHPUR (GOPALGANJ) Nov-14 Baranwala Contact Pvt. Ltd, Gopalganj Aug Feb-16 Completed 100% JAHANABAD CONSTRUCTION OF APHC AT BAJITPUR, BLOCK- GHOSHI,DIST- JAHANABAD Nit-22/2017, Financial bid opened 17 JAHANABAD 18 JAHANABAD 19 ROHTAS 20 ROHTAS 21 ROHTAS 22 VAISHALI APHC AT MURAHARA, BLOCK-RATNIFARIDPUR, DIST-JAHANABAD APHC AT AVGILLA, BLOCK- RATNIFARIDPUR, DIST- JAHANABAD CONSTRUCTION OF APHC AT BARHARI BLOCK- KARGAHAR,DIST-ROHTAS CONSTRUCTION OF APHC AT KOWATH,BLOCK- DAWATH, DIST-ROHTAS CONSTRUCTION OF APHC AT KHAIRHI, BLOCK- DAWATH, DIST-ROHTAS CONSTRUCTION OF APHC AT SONHO, BLOCK-GOROUL (VAISHALI) Feb Sep Jun-15 completed 100% mati Rita Devi, Sasaram Feb-15 completed 100% Feb Feb Feb-15 Rajesh,Sasaram Rajesh,Sasaram Rajesh,Sasaram Aug May-16 Completed 100% 31-Aug May-16 completed 100% 31-Aug May-16 completed 100% Randhir Sep Jun-16 completed 100% NALANDA CONSTRUCTION OF APHC AT AMBA (NALANDA) Lallu Jan Oct-16 completed 100% BHAGALPUR 25 KAIMUR CONSTRUCTION OF APHC AT POTHIA SANHAULA (BHAGALPUR) APHC AT BITHWAR DIST- KAIMUR Jan-14 Lalan Kamlesh May May-17 Completed 100% T.S in process

27 ADDITIONAL PRIMARY HEALTH CENTRE (A.P.H.C) Amount (in rs AGREEMEN T (in COMPLETION Date rs STAGE % (Rs in 26 PATNA 27 JAHANABAD APHC AT GOPALPUR (MANER) DIST-PATNA APHC AT KIYUR, BLOCK- HULASHGANJ, DIST- JEHANABAD Brajesh Mar Dec Jul-15 Kaushlendra Oct Jul-17 completed 100% Land not available 28 BEGUSARAI SMRITISHESH PARMESHWARI DEVI APHC AT KESAWE, BARAUNI, DIST- BEGUSARAI Agni May Feb-18 completed 100% BEGUSARAI APHC AT BAHALPUR (NAYAGAON) MATIHANI, DIST-BEGUSARAI Jan-14 Ramniwas kumar Mar Dec-17 completed 100% PATNA APHC SAKSOHRA AT BELCHI, DIST-PATNA M/s Devendra May completed 100% MUNGER APHC AT BANGALWA, DIST- MUNGER Feb-14 P PRAKASH CONT /02/ MUNGER APHC AT GHATWARI, DIST- MUNGER (BY PREFAB) Feb-14 P PRAKASH CONT Feb Nov-17 0 Land not available 33 VAISHALI APHC AT MADARNA DIST- VAISHALI Sep-14 Rohit Raj Construction, Patna Aug May-17 completed 100% MADHUBANI APHC AT BHAIRAVSTHAN BLOCK-JHANJHARPUR, DIST- MADHUBANI Feb-15 M/S Delta Enterprises Feb Nov-17 Finishing work 90% BEGUSARAI APHC AT SIHMA, BLOCK- MATIHANI DIST-BEGUSARAI M/S Surendra, Begusarai Feb Nov-17 completed 100% SAMASTIPUR APHC AT DEVDHA, (HASANPUR) DIST- SAMASTIPUR Retender invited by NIT-22/ MADHUBANI APHC AT BASAITH, BLOCK- BENIPATTI (MADHUBANI) Feb-16 Tufail Ahmed Khan const. pvt ltd May Feb-18 Finishing work 85% 33.76

28 ADDITIONAL PRIMARY HEALTH CENTRE (A.P.H.C) Amount (in rs AGREEMEN T (in COMPLETION Date rs STAGE % (Rs in 38 MADHUBANI 39 MADHUBANI APHC AT NAWANI, BLOCK- JHANJHARPUR, DIST- MADHUBANI APHC AT BHAUR, BLOCK- PANDAUL, DIST- MADHUBANI Aug Aug-16 Regal Infratrading Pvt. Ltd., Patna MDS Infranirman Pvt ltd, Patna Feb Nov Jul Apr-18 Roof Shuttering (G.F) Roof shuttering (G.F) 35% % 0 Work stopped 40 ARWAL APHC AT LARI, BLOCK- KURTHA, DIST-ARWAL Jan-17 Praveen, Jehanabad Sep Jun-18 Brick work is in process 45% MADHUBANI APHC AT MOHAN BARIYAM,NARPAT NAGAR, BLOCK-PANDAUL, DIST- MADHUBANI Shaurya Premiere Infrastructure pvt ltd, Patna Oct Jul-17 Plinth Level 15% 42 WEST CHAMPARAN APHC AT PATILAR, DISTw. Champaran May-16 Anil /02/ Sep-18 Roof shuttering (G.F) 30% Md Nasim Akhtar Ansari 43 SIWAN 44 SIWAN APHC AT NANDA MUNDA, BLOCK-SISWAN, DIST- SIWAN APHC AT JAMO BLOCK- GORIYAKOTHI, DIST-SIWAN Sep Sep-17 Pratap Construction, New Delhi Savitri Technocrate Pvt Ltd, Gopalganj /03/ /02/2018 SUBTOTAL , GRAND TOTAL #REF! #REF!

29 AGREEMEN T Date (RS in Lakh) STAGE % (RS in Lakh) 1 Darbhanga Brahmpur (Darbhanga) Feb Feb-17 Completed 100% Darbhanga Kamtaul (Darbhanga) C.G.G Feb Feb-17 Completed 100% construction 3 Darbhanga Sarwara (Darbhanga) Feb Feb-17 Roof reinforcement binding 35% Katihar Morsanda (katihar) Jun Jun-17 Roof casted 40% Katihar Bharwara (katihar) B.K Jun Jun-17 Finishing work is in progress 80% Katihar Surjapur (katihar) Jun Jun-17 Not Started West Champaran Gokhula (West Champaran) Apr Apr-17 Finishing work is in Sharda chandel progress West Dumaria (West contract pvt ltd. Finishing work is in Apr Apr-17 champaran Champaran) progress 9 Kishanganj Kalpeer, Tedhagach (Kishanganj) APPROVAL DETAIL CONSTRUCTION OF ADDITIONAL PRIMARY HEALTH CENTRE (MSDP) M/S Shankar Construction, Begusarai COMPLETION Dec Sep-17 Not Started % 85% Md Nasim Akhtar Ansari Md Nasim Akhtar Ansari Land not available Land not available 10 Kishanganj 11 Kishanganj 12 Supaul 13 Kishanganj 14 Kishanganj Bual Dah, Block- Kochadhaman (Kishanganj) Maudha, Block- Kochadhaman (Kishanganj) Deenbandhu, Basantpur (Supaul) chichubadi, Kasba- Kaliyaganj, Block- Pothia (Kishanganj) Tipijhari Magurjohn, Block- Pothia (Kishanganj) M/S Shankara 27-Dec Sep-17 Construction, Begusarai Finishing work is in progress 72% Dec Sep-17 Not Started Purnea Abdullah Nagar (Purnea) Madhubani Loha,Kaluahi (Madhubani) East Champaran 18 Kishanganj 19 Sitamarhi Karsahiya, Barharwa Lakhansen, (Dhaka E. Champaran) Powakhali Thakurganj (Kishanganj) Bajpatti Got Abidpur (Sitamarhi) Mahendra Plaster work is in Jan Oct-17 55% progress Narayan Mandal, Katihar Jan Oct Rana pratap M/S Dayaram Vikash Gupta Sudesh &co. construction pvt ltd, jamui Oct Jul-18 Finishing work is in progress 80% Not Started Jul Apr-18 Plinth Level 15% Feb Nov-17 Finishing is in progress 70% Md Nasim Akhtar Ansari Land not available 12/05/2016 Land not clear 12/05/2016 (Land not available) Retender to be invited

30 CONSTRUCTION OF ADDITIONAL PRIMARY HEALTH CENTRE (MSDP) APPROVAL DETAIL AGREEMEN T COMPLETION Date (RS in Lakh) STAGE % (RS in Lakh) 20 Darbhanga Harihath, Block- Alinagar (Darbhanga) Girdhari Lal Poddar 06-Mar Not Started 0.00 Land not available 21 Darbhanga Garaul, Block- Alinagar (Darbhanga) Girdhari Lal Poddar Mar Not Started 0.00 Land not available 22 Darbhanga Narman, Block- Alinagar (Darbhanga) Girdhari Lal Poddar 06-Mar Completed 100% Kishanganj 24 Kishanganj 25 Kishanganj 26 Kishanganj 27 Kishanganj Dhangada, Block- Dighalbank (Kishanganj) Baruamani Garnchavdaga, Block-Dighalbank (Kishanganj) Kadogaon, Block- Thakurganj (Kishanganj) Budhnayi, Block-Pothia (Kishanganj) Fala Tarni Block-Pothia (Kishanganj) Anil 13-Jan Oct Anil Sudesh &co. construction pvt ltd, jamui Plaster work is in progress. Plaster work is in progress. 55% % Feb Nov Sudesh Jan Oct-17 Completed 100% &co construction pvt ltd, jamui 13-Jan Oct-17 Completed 100% Banka Pardhadi, Dhuria (Banka) Lalan Ram Pukar Jamalpur, Block-Kiratpur 29 Darbhanga Feb-17 Yadav, (Darbhanga) Darbhanga 30 Darbhanga 31 Darbhanga 32 Sitamarhi 33 Purnea 34 Purnea 35 Purnea 36 Purnea 37 Purnea 38 Purnea Manighachhi, Block- Manigachhi (Darbhanga) Nehra, Block-Manigachhi (Darbhanga) Benol, Block-Bokhra (Sitamarhi) Mahendrapur, Block- Purnea (Purnea) Ranipatra, Block-Purnea Purva (Purnea) Harda, Block-Purnea Purva (Purnea) Sabdalpur, Block-Kasba (Purnea) Echalo, Block-Dagarua (Purnea) Muchhatta, Block-Amaur (Purnea) Feb Feb Feb Feb Feb Feb Feb Feb Feb-17 Mother India Construction Pvt. Ltd., Mother India Construction Pvt. Ltd., M/s Bharti Const., Sitamarhi Anil, Katihar Shiv Shankar, Katihar Prakash Sah, katihar Rohit Raj Construction, Rohit Vaishali Raj Construction, Vaishali Prashant Const., Purnea Plinth Level 15% Land not available T.S in process 08/12/ /12/ /12/ /12/ /12/ /12/2017 (T.S in process) 08/12/ /12/2017 (T.S LOA in process) issued on 08/12/2017 (T.S LOA in process) issued on 08/12/2017 (T.S in process)

31 APPROVAL DETAIL 39 Purnea Sirshi, Block-Baisa (Purnea) Feb Purnea 41 Purnea 42 Purnea Katorhat, Block-Baisa (Purnea) Kajha, Block-K.Nagar (Purnea) Banbhag, Block-K.Nagar (Purnea) CONSTRUCTION OF ADDITIONAL PRIMARY HEALTH CENTRE (MSDP) AGREEMEN T COMPLETION Date (RS in Lakh) STAGE % (RS in Lakh) Feb Feb Feb-17 Prashant Const., Purnea Parshant Const., Purnea Total /12/2017 (T.S in process) 08/12/2017 In Tender 07/2017 In Tender 07/2017

32 HEALTH SUB CENTRE (Under MSDP) APPROVAL DETAIL COMPLETION Date (RS in STAGE % (RS in 1 WEST HSC AT MANGALPUR BLOCK-SIKTA CHAMPAR (WEST CHAMPARAN) AN Brajesh, Bettiah 16-Dec Aug-16 Finishing work 95% Md Nasim Akhtar Ansari WEST HSC AT BHAURA,BLOCK-SIKTA CHAMPAR (WEST CHAMPARAN) AN WEST HSC AT TILOJPUR,BLOCK- CHAMPAR MAINATAND (WEST CHAMPARAN) AN WEST HSC AT JIGNA,BLOCK-MAINATAND CHAMPAR (WEST CHAMPARAN) AN Brajesh, Bettiah Brajesh, Bettiah Brajesh, Bettiah Dec Aug-16 Finishing work 95% 16-Dec Aug-16 Finishing work 95% 16-Dec Aug-16 Finishing work 95% Md Nasim Akhtar Ansari Md Nasim Akhtar Ansari Md Nasim Akhtar Ansari 5 SIWAN HSC AT KHODAIBARI,BLOCK- HUSAINGANJ (SIWAN) Brajesh, Bettiah 16-Dec Aug-16 Land not available 6 DARBHAN GA HSC AT BASDIH, BLOCK-HAYAGHAT (DARBHANGA) vivek Jha, Darbhanga 15-Feb Oct-17 Not Started 7 DARBHAN GA HSC AT SIRNIA, BLOCK-HAYAGHAT (DARBHANGA) vivek Jha, Darbhanga 15-Feb Oct-17 Not Started 8 DARBHAN GA HSC AT RATANPURA, BLOCK- HAYAGHAT (DARBHANGA) vivek Jha, Darbhanga Land not available 15-Feb Oct-17 Not Started 9 DARBHAN GA HSC AT HORALPATTI, BLOCK- HAYAGHAT (DARBHANGA) vivek Jha, Darbhanga 15-Feb Oct-17 Not Started 10 DARBHAN GA HSC AT DRAHWAJPUR, BLOCK- DARBHANGA (DARBHANGA) Dinesh Pd. 20-Mar Nov-17 Not Started 11 DARBHAN GA HSC AT KHARUA, BLOCK- DARBHANGA (DARBHANGA) Dinesh Pd. 20-Mar Nov-17 Not Started 12 DARBHAN GA 13 DARBHAN GA HSC AT BHALPATTI, BLOCK- DARBHANGA (DARBHANGA) HSC AT BADHAUL-DEVRA BANDHAUDI, BLOCK-JALE (DARBHANGA) Dinesh Pd Mar Nov-17 Completed 100% Dinesh Pd. 20-Mar Nov-17 Not Started 14 DARBHAN GA HSC AT GARDI, BLOCK-JALE (DARBHANGA) Dinesh Pd. 20-Mar Nov-17 Not Started

CONSTRUCTION OF B.SC NURSING COLLEGES

CONSTRUCTION OF B.SC NURSING COLLEGES Mar-208 CONSTRUCTION OF B.SC NURSING COLLEGES Name of work Administrative Approval Amount (in Rs. Lakh) Amount Received (in Rs. Lakh) Expenditure Till Date (in Rs Lakh) Total no. of Completed Ongoing Not

More information

ह उस ग ए ड अर बन ड वलपम ट क प र शन सलसमट ड

ह उस ग ए ड अर बन ड वलपम ट क प र शन सलसमट ड ह उस ग ए ड अर बन ड वलपम ट क प र शन सलसमट ड LIST OF STATES, DISTRICTS, TOWNS WITH CODE FOR CLSS S.No. State State Name Dist District Name Town Town Name (4041) 1 10 Bihar 203 Pashchim Champaran 801279 Bagaha

More information

Office of the Accountant General(Audit), Bihar, Patna

Office of the Accountant General(Audit), Bihar, Patna Letter No. GS/HQ/2015-16/75 Tour Programme for 1 st Qtr.(2016-17) in r/o Party No-I 11.04.2016 27.04.2016 Under Secretary, Finance 10 Department, patna 28.04.2016 Transit to Purnia 29.04.2016 05.05.2016

More information

3 rd quarter tour programme

3 rd quarter tour programme 3 rd quarter ur programme 2017-1 Sl. No. Name of the audit entity Annual Expenditure/ Revenue (Rs. in crore) Risk Category Audit of the entity due for the period Audit be taken up for the period Names

More information

Notification with regard to the KYP New centre registration 2017 phase 2 process dated 20th of February 2018

Notification with regard to the KYP New centre registration 2017 phase 2 process dated 20th of February 2018 Notification with regard to the KYP New centre registration 2017 phase 2 process dated 20th of February 2018 Dear Applicant Organization, This has a reference to your registration as a KYP SDC applicant

More information

Combined Report Combined Report. Sl No. Fertilizer. Differ. (+/-) % age. Sample Received.

Combined Report Combined Report. Sl No. Fertilizer. Differ. (+/-) % age. Sample Received. 1 No Combined Report Combined Report Fertilizer Annual Target Sample Received Differ. (+/-) 1 2 3 5 6 7 1 Inorganic Fertilizer % age 4000 3141-859 79 2 Organic Fertilizer 760 325-435 43 3 Bio Fertilizer

More information

BIHAR STATE AIDS CONTROL SOCIETY SHEIKHPURA, PATNA-14 TI- NGO IN DIFFERENT DISTRICTS OF BIHAR

BIHAR STATE AIDS CONTROL SOCIETY SHEIKHPURA, PATNA-14 TI- NGO IN DIFFERENT DISTRICTS OF BIHAR NGO 1 Rohtas + Aurangabad Societal Upliftment and Rural Action for Job and Empowerment (SURAJE) Kasturba Sadan, Baulia Road, Sasaram, Rohtas, Pin-821115, Mr. Arun Kumar Tiwary, Programme Manager, 06184-228417

More information

Kusheshwar Asthan (East) Marketing Officer Sri Narendra Kumar

Kusheshwar Asthan (East) Marketing Officer Sri Narendra Kumar Sr. No State District Department Block Designation Name Mobile 1 Bihar Araria FCP Narpatganj Marketing Officer Chandra Shekhare Jha 9430587207 2 Bihar Araria FCP Palasi Marketing Officer Suresh Kumar Mandal

More information

Office of the Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna

Office of the Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna Office of Accountant General (Audit), Mahalekhakar Bhawan, R. Block, Beer Chand Patel Marg, Patna-800 001 TOUR PROGRAMME FOR THE 2 nd QUARTER (2017-18) (Consolidated Party- wise: Economic Secr (Commercial)

More information

As per BIADA record Final List of Appeal Cases pending before the

As per BIADA record Final List of Appeal Cases pending before the As per BIADA record Final List of Appeal Cases pending before the S. No. Case No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 01@2014 03@2014 04@2014 05@2014 07@2014 19@2014 21@2014 22@2014 23@2014 24@2014 25@2014

More information

History of Posting Place From To. Father s Name (Shri) Name(S/Sri/Smt.), Designation, Date of Birth, Home Town. Date of Promotio ns, If any

History of Posting Place From To. Father s Name (Shri) Name(S/Sri/Smt.), Designation, Date of Birth, Home Town. Date of Promotio ns, If any Name(S/Sri/Smt.), Father s Name Promotio ns, Babban Prasad 31.10.07 C.Ex.,Hqrs,Patna 02.07.1984 02.05.1988 Havildar Head Havildar LCS, Raxaul 08.02.1988 01.02.1990 22.10.1963 Cus.Div.,MZP 12.02.90 25.01.93

More information

flfoy lwph CIVIL LIST

flfoy lwph CIVIL LIST Hkkjrh; ou lsok INDIAN FOREST SERVICE flfoy lwph CIVIL LIST 217 Hkkjr ljdkj i;kzoj.k] ou,oa tyok;q ifjorzu ea=ky; GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST & CLIMATE CHANGE 1 BH/67 2 BH/74 3

More information

Tentative Applicant Name wise BSDC Block allotment List (RFP No: BSDM/RFP/04/ Dated 13/08/2016)

Tentative Applicant Name wise BSDC Block allotment List (RFP No: BSDM/RFP/04/ Dated 13/08/2016) Tentative Applicant Name wise BSDC allotment List (RFP No: BSDM/RFP/0/016-1 Dated 1/08/016) Important Note: The allotments stated below are tentative and finalization of the same is subject to completion

More information

List of Co-Operative Department Officers/Staff having Vigilance Case registered against them

List of Co-Operative Department Officers/Staff having Vigilance Case registered against them List of Co-Operative Department Officers/Staff having Vigilance Case registered against them SL NO NO / YEAR SECTION 468/471/477/ 1 027/99 17.07.99 1999 120(B) 5(2) 5(1)(D) PC. Act.1947Changing Act- 13(2)

More information

Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report

Bihar Rajya Pul Nirman Nigam Ltd, Patna Details of Mega Progress Report Construction of 2x2 Lane Bridge with footpath across river Ganga between Sultanganj 17177. 1 (Bhagalpur ) and 2.46 Aguwani Ghat (Khagaria 2.3 2.21 8797 (S) 38.95 ) including 84.11 6.29 dated RCC / (Main

More information

ik;s x;s rks mldk fooj.k 1 Dr. Pranav Kumar MBBS Civil Surgeon Cum C.M.O.

ik;s x;s rks mldk fooj.k 1 Dr. Pranav Kumar MBBS Civil Surgeon Cum C.M.O. 1 Dr. Pranav Kumar MBBS Civil Surgeon Cum C.M.O. 2 Dr. Bireshwar Pd. MBBS 1/1/1954 25.06.1981 27.10.06 Sadar Block Dumka 25.06.81 03.01.85 A.C.M.O. Patna Referal Hospital Lalganj, Vaishali 09.01.85 18.07.85

More information

January 2018 Air Traffic Activity Summary

January 2018 Air Traffic Activity Summary January 2018 Air Traffic Activity Summary Jan-2018 Jan-2017 CY-2018 CY-2017 Passengers 528,947 505,421 4.7% 528,947 505,421 4.7% Passengers 537,332 515,787 4.2% 537,332 515,787 4.2% Passengers 1,066,279

More information

CFMS OFFICE CREATION FORM

CFMS OFFICE CREATION FORM ) indiates MI..a.tory lields CFMS OFFICE CREATION FORM l)level: levl'l2d LEVEL3D L \lei.4d (PI clickis eppropriat.1 2)OfficeName'(I" En'lish}..._, _, _, 3)Offlt. Nlme'lln Hindll _,. ) Reportln, Offlce._,

More information

FARM HARVEST PRICES OF PRINCIPAL CROPS IN INDIA

FARM HARVEST PRICES OF PRINCIPAL CROPS IN INDIA FARM HARVEST PRICES OF PRINCIPAL CROPS IN INDIA 2014-2015 DIRECTORATE OF ECONOMICS AND STATISTICS DEPARTMENT OF AGRICULTURE, COOPERATION AND FARMERS WELFARE MINISTRY OF AGRICULTURE AND FARMERS WELFARE

More information

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID

Afghanistan. Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID Gardez- Khost Road Project Afghanistan Supply, Installation, Rehabilitation, Construction Testing and Commissioning of Gardez To Khost Road in Afghanistan, Funded by USAID LBG B& V "JV" INR 3526.00 Million

More information

POLICY PLANNING AND GOVERNANCEOFOF BIHAR

POLICY PLANNING AND GOVERNANCEOFOF BIHAR POLICY PLANNING AND GOVERNANCEOFOF BIHAR APRIL 2010 1 INDIA AT A GLANCE BIHAR Population 1130 M Land area 2,973,190 sq.km. States : 29 Union Territories: 6 Districts: 593 Coast line 7,000 km Water 314,400

More information

MID-TERM SESSION & SEMINAR ON "STATE-OF-THE-ART BUILDING TECHNOLOGY" April 26-28, 2013

MID-TERM SESSION & SEMINAR ON STATE-OF-THE-ART BUILDING TECHNOLOGY April 26-28, 2013 MID-TERM SESSION & SEMINAR ON "STATE-OF-THE-ART BUILDING TECHNOLOGY" April 26-28, 2013 S.K. Memorial Hall, North Gandhi Maidan, Patna Co-Organisers : Building Construction Department, Government of Bihar

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA (As on 9 June 2017) 1 Executive Summary... 3 Advantage State........ 4 Bihar Vision.. 5 Bihar An Introduction.... 6 Annual State Budget 2016-17... 16 Infrastructure Status... 17 Business Opportunities.....

More information

izcu/k funs kd fcgkj jkt; lgdkjh csad fy0 ivuk

izcu/k funs kd fcgkj jkt; lgdkjh csad fy0 ivuk fcgkj jkt; lgdkjh csad fy0] ivuk fcgkj jkt; lgdkjh csad fy0] ivuk,oa fcgkj jkt; ds vu; 20 dsunzh; lgdkjh csadks ds fy, lgk;d ¼ogqns kh;½ in 2016 ds fokkiu ds vuq:ik fcgkj ljdkj ds vkj{k.k izko/kku&{ksfrt

More information

MADE EASY students Top in ESE 2010

MADE EASY students Top in ESE 2010 MADE EASY students Top in ESE 2010 1st Rankers in three streams : ME, EE, E&T 26 in Top 10 (all Branches) 51 in Top 20 (all Branches) 295 selections out of 584 vacancies MADE EASY has consistently produced

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA TOMB OF SHER SHAH SURI, SASARAM, THE LAND OF BUDDHA August 2018 Table of Content Executive Summary......3 Introduction......4 Economic Snapshot...9 Physical Infrastructure.....14 Social Infrastructure.......22

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA TOMB OF SHER SHAH SURI, SASARAM, THE LAND OF BUDDHA September 2018 Table of Content Executive Summary......3 Introduction......4 Economic Snapshot...9 Physical Infrastructure.....15 Social Infrastructure.......23

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA 1 Executive Summary... 3 Advantage State........ 4 Bihar Vision.. 5 Bihar An Introduction.... 6 Annual State Budget 2016-17... 16 Infrastructure Status... 17 Business Opportunities..... 37 Doing Business

More information

OFFICERS' TRAINING PROGRAMME

OFFICERS' TRAINING PROGRAMME OFFICERS' TRAINING PROGRAMME - 2015-16 Course No. Start Date End Date Course Name Institute Name Place Apr-15 Duration (in weeks) Vac Course Fee (Incl of Service Tax) Officer's Share (40%) Army Navy AF

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA TOMB OF SHER SHAH SURI, SASARAM, THE LAND OF BUDDHA April 2018 Table of Content Executive Summary...3 Advantage State.....4 Bihar Vision.....5 Bihar An Introduction.........6 Annual State Budget 2017-18.16

More information

Government of Bihar Department of Registration, Excise and Prohibition

Government of Bihar Department of Registration, Excise and Prohibition Government of Bihar Department of Registration, Excise and Prohibition Based on the advertisement for Transportation of Liquor and related items, as per the interaction with the various Transporters, the

More information

BIHAR THE LAND OF BUDDHA

BIHAR THE LAND OF BUDDHA THE LAND OF BUDDHA February 2018 Table of Content Executive Summary...3 Advantage State.....4 Bihar Vision.....5 Bihar An Introduction.........6 Annual State Budget 2017-18.16 Infrastructure Status 17

More information

RCOF, Jabalpur to to Bilaspur (CG) to Raipur (CG) to

RCOF, Jabalpur to to Bilaspur (CG) to Raipur (CG) to 1 Title 30 Days Certificate Course on Organic Farmg 10 Days Refresher on Organic Farmg 05 Days- Traers on Organic Farmg Ghaziabad Imphal, Jabalpur Panchkula Bangalore Bhubaneshwar Date Place Date Place

More information

Name of RRA : Rural Youth Co-ordination Centre Amnaur, Saran, Bihar LIST OF THE APPROVED PROPOSAL FOR NEAC ARARIA

Name of RRA : Rural Youth Co-ordination Centre Amnaur, Saran, Bihar LIST OF THE APPROVED PROPOSAL FOR NEAC ARARIA Name of RRA : Rural Youth Co-ordination Centre Amnaur, Saran, Bihar LIST OF THE APPROVED PROPOSAL FOR NEAC 2004-05 Name Address 1. ARARIA Committee 01 04 SHIV SEVA Hospital Chawk At + P. O. - Narpatganj

More information

Name & address of the promoter (s) at least main three in case of more than three)

Name & address of the promoter (s) at least main three in case of more than three) BIHAR STATE FINANCIAL CORPORATION FRASER ROAD, PATNA-1 Re: (1) Tender Notice for sale of the mortgaged/hypothecated assets of assisted units of the Corporation U/S 29 of the State Financial Corporations

More information

Fastest growing state in India. Fastest per capita income growth. Leader in the production of fruits and vegetables. Strong agriculture sector

Fastest growing state in India. Fastest per capita income growth. Leader in the production of fruits and vegetables. Strong agriculture sector Fastest growing state in India At 11.95 per cent, Bihar s growth was the highest among all Indian states during the 11 th Five Year Plan Fastest per capita income growth Bihar has also topped in per capita

More information

SITREP NO-95/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 3 rd September, 2008

SITREP NO-95/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 3 rd September, 2008 SITREP NO-95/2008 1700 hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 3 rd September, 2008 Subject: SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT SUMMARY OF

More information

SITREP NO-91/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 30 th August, 2008

SITREP NO-91/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 30 th August, 2008 SITREP NO-91/2008 1700 hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 30 th August, 2008 Subject: SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT SUMMARY OF

More information

LIST OF REGIONAL MSME CARE CENTER / MSE REHABILITATION CELL (MRC) S.No. Nodal Officer. Sh. Bobby Tanwar. Sh. R.J. Verma. Sh.

LIST OF REGIONAL MSME CARE CENTER / MSE REHABILITATION CELL (MRC) S.No. Nodal Officer. Sh. Bobby Tanwar. Sh. R.J. Verma. Sh. LIST OF REGIONAL MSME CARE CENTER / MSE REHABILITATION CELL (MRC) S.No. Address Designatio Contact Numbers Name of the Regional Centre 1 Agra Oriental Bank of 2 nd Floor, Ispat Bhawan, 85/4, Sanjay Place,

More information

MECON LIMITED, RANCHI. CSR & Sustainability Programme. Report for the period April,2015 to June,2015

MECON LIMITED, RANCHI. CSR & Sustainability Programme. Report for the period April,2015 to June,2015 MECON LIMITED, RANCHI CSR & Sustainability Report for the April,2015 to June,2015 A. Total fund earmarked for FY 2015 16 on CSR & Sustainability The approved budget for FY 2015 16 is ` 491.51 lakhs (including

More information

NTPC Ltd. Barh Thermal Power Plant Vendor Payments From To

NTPC Ltd. Barh Thermal Power Plant Vendor Payments From To NTPC Ltd. Barh Thermal Power Plant Vendor Payments From 01.04.2014 To 30.04.2014 Vendor Name Vendor City Vendor Id Pmt Date Doc No Cheque No Amount Invoice Ref Doc PO No Mode A K CONSTRUCTION PATNA 1112231

More information

Jul2005-Regular Session. List Of Pass Candidates. PILOT General Examination. Flight Despatchers Examination (General)

Jul2005-Regular Session. List Of Pass Candidates. PILOT General Examination. Flight Despatchers Examination (General) PILOT General Examination Jul2005-Regular Session Flight Despatchers Examination (General) List Of Pass Candidates NOTE 1. NAMES WHICH ARE NOT APPEARING IN THE LIST BELOW, HAVE EITHER FAILED OR REMAINED

More information

NEWSLETTER NZC-USI. Dear Friends

NEWSLETTER NZC-USI. Dear Friends NEWSLETTER NZC-USI Official Newslett er North Zone Chapter of Urolog ical Society of India President's Message March 2008 From the Desk of Honorary Secretary Dear Friends Dear Friends At the outset, it

More information

Selection List (Open Merit)

Selection List (Open Merit) GOVERNMENT OF AND KASHMIR, SERVICES SELECTION BOARD, Sehkari Bhawan Near Bahu Plaza Jammu. (www.jkssb.nic.in) ANNEXURE ***** "A" Selection List (Open Merit) 1 82 107066089 NA MUKESH MADAN LAL VILL BALSARO

More information

DELHI TRANSCO LIMITED STATE LOAD DESPATCH CENTER (REGD. OFFICE : SHAKTI SADAN BUILDING, KOTLA ROAD, NEW DELHI

DELHI TRANSCO LIMITED STATE LOAD DESPATCH CENTER (REGD. OFFICE : SHAKTI SADAN BUILDING, KOTLA ROAD, NEW DELHI Computation of Transmiossion Losses of STU Delhi i.e. Delhi Transco Limited system for FY 2007-08 Sl. No. 6=(1 to 5) 8= (6+7) 14=(9 to 13) 15= (8-14) 16=15*100/8 Total Injection to Delhi System Apr-07

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 4 2015 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 3 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report Contents DTTAS Quarterly Aviation Statistics Snapshot Quarter 1 2018 Report 1.1 Dublin Airport Key Statistics... 1 1.2 Cork Airport Key Statistics... 3 1.3 Shannon Airport Key Statistics... 5 1.4 Total

More information

SUPREME COURT BAR ASSOCIATION Directory Membership no: Res: Res: Membership no: Res: Tel: Membership no: Res: Tel: Res: Tel: Res:

SUPREME COURT BAR ASSOCIATION Directory Membership no: Res: Res: Membership no: Res: Tel: Membership no: Res: Tel: Res: Tel: Res: 1 Agarwal,Madhukar 6 Barua,Bedabrata (Sr.) A-00015 B-00004 Jharkhandi, Faizabad, Uttar Pradesh 224001 05278-24010 Mobile: 9868316229,09839369836 2 Agarwal,Rajesh Kumar (Justice) A-00012 No.62,, Lal Bahadur

More information

M GENRAL FALAT NO 302 AYODHYA APARTMENT SINHA LIBRARY ROAD FORNT OF BIHAR BIDYALAYA SAMATI PATNA

M GENRAL FALAT NO 302 AYODHYA APARTMENT SINHA LIBRARY ROAD FORNT OF BIHAR BIDYALAYA SAMATI PATNA APPLICANT 1 VINAY KUMAR HARIDAWAR 1/3/1955 9/10/1999 ASST.AGRIC. OFFICER UCO BANK (UP) 2 SANJAY NARAYAN M GENRAL KAILASH KUNG PURVE GALI DEVI ASTHAN CHIRIYATAND MAHESHWAR 15-1-1952 31-1-2012 A.S.O JAMSHEDPUR

More information

NTPC Ltd. Gadarwara Super Th Power Plant. Vendor Payments From To

NTPC Ltd. Gadarwara Super Th Power Plant. Vendor Payments From To NTPC Ltd. Gadarwara Super Th Power Plant Vendor Payments From 01.09.2016 To 30.09.2016 Vendor Name Vendor City Vendor Id Pmt Date Doc No Cheque No Amount Invoice Ref Doc PO No Mode A K VERMA WAIDHAN 1044746

More information

RAJIV AWAS YOJNA (RAY) Proposal for 2 nd Installment Rs lacs

RAJIV AWAS YOJNA (RAY) Proposal for 2 nd Installment Rs lacs RAJIV AWAS YOJNA (RAY) Proposal for 2 nd Installment Rs. 1236.64 lacs 1. NAGAR PALIKA PARISHAD BARKOT (UTTARAKASHI) 2. NAGAR PALIKA PARISHAD BHEEMTAL (NAINITAL) 3. NAGAR PANCHAYAT UKHIMATH (RUDRAPRAYAG)

More information

DETAILS OF CONTRACT AWARDED DURING THE MONTH OF OCTOBER ( ABOVE RS. 5 LAKHS) Nos. and names of parties qualified after technical evaluation

DETAILS OF CONTRACT AWARDED DURING THE MONTH OF OCTOBER ( ABOVE RS. 5 LAKHS) Nos. and names of parties qualified after technical evaluation Tender No. Item / Nature of works Mode of Tender Enquiry Date of Publicaiton of NIT DETAILS OF CONTRACT AWARDED DURING THE MONTH OF OCTOBER - 2015 Type of Bidding (Single/ Two Bid system) Last date of

More information

Group-II Master Trainers for Social Science (Primary) State: AP, Bihar, CG, MP, Jharkhand, Maharashtra&Gujarat, Odisha & WB.

Group-II Master Trainers for Social Science (Primary) State: AP, Bihar, CG, MP, Jharkhand, Maharashtra&Gujarat, Odisha & WB. Group-II Master Trainers for Social Science (Primary) State: AP, Bihar, CG, MP, Jharkhand, Maharashtra&Gujarat, Odisha & WB. Training Coordinator Mrs. Seetha Kiran (Telangana) Sr. No: Cluster Head, Place

More information

HIMACHAL PRADESH : OPERATIONAL AS ON 06 NOV 2017

HIMACHAL PRADESH : OPERATIONAL AS ON 06 NOV 2017 HIMACHAL PRADESH : OPERATIONAL AS ON 06 NOV 2017 1 Validity 3623 15 Nov 17 05 Jun 20 3623/ Sudesh Pathania First Sudesh Singh Pathania 11-2017 Ward No- 9, Bauzoyr, Tehsil- Nurpur, Distt- Kangra, Himachal

More information

Investment climate of a state is determined by a mix of factors

Investment climate of a state is determined by a mix of factors BIHAR April 2010 1 BIHAR April 2010 Investment climate of a state is determined by a mix of factors Skilled and cost-effective labour Labour market flexibility Labour relations Availability of raw materials

More information

mùkjk[k.m xzkeh.k csad]

mùkjk[k.m xzkeh.k csad] Dear Candidates, This has reference to your online application in response to our advertisement. Our Bank has invited applications for the post of Officer Scale-I in Uttarakhand Gramin Bank from the candidates

More information

Decisions where applications for information rejected. 4. No. of times various provisions were invoked. 4b.

Decisions where applications for information rejected. 4. No. of times various provisions were invoked. 4b. Annexure-I NATIONAL UNIVERSITY OF EDUCATIONAL PLANNING AND ADMINISTRATION (Declared by the Govt. of India under Section 3 of the UGC Act 1956) 17-B, Sri Aurobindo Marg, New Delhi-110016 Proforma for Annual

More information

Sub: Status of tenders (Floated in FY ) dealt by RPO/Kol Division in the month of January, 2018

Sub: Status of tenders (Floated in FY ) dealt by RPO/Kol Division in the month of January, 2018 Sub: Status of tenders (Floated in FY 201617) dealt by RPO/Kol Division in the month of January, 2018 SL No No. Name of work Mode of Enquiry Date publication of NIT / LIT of Type of Last date of No. of

More information

Colindale Gardens Site Visit

Colindale Gardens Site Visit Colindale Gardens Site Visit 04 April 2017 Agenda Introduction John Tutte Group Chief Executive Colindale Gardens Overview Mark Parker Managing Director Tour of marketing suite Site visit 2 Introduction

More information

Selection List (Open Merit) ANNEXURE "A" RAHUL PANDITA KRISHAN LAL MEERA KISHEN BHAT JAI KISHEN BHAT PAIRAY LAL PANDITA AMIT PANDITA

Selection List (Open Merit) ANNEXURE A RAHUL PANDITA KRISHAN LAL MEERA KISHEN BHAT JAI KISHEN BHAT PAIRAY LAL PANDITA AMIT PANDITA Selection List (Open Merit) ANNEXURE "A" Selection List of caniates for the post of Teacher (Eucation Department), District Care Pulwama, Item 029 (01 of 2012), 10+2 ETT/ NTT B.E E Total Gran Points 9

More information

SITREP NO-69/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 8 th August, 2008

SITREP NO-69/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 8 th August, 2008 SITREP NO-69/2008 1700 hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 8 th August, 2008 Subject: SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT SUMMARY OF IMPORTANT

More information

SITREP NO-93/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 1 ST September, 2008

SITREP NO-93/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 1 ST September, 2008 SITREP NO-93/2008 1700 hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 1 ST September, 2008 Subject: SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT SUMMARY OF

More information

Road construction Department, Bihar Progress Report of ongoing Road Schemes for Administrative Approval

Road construction Department, Bihar Progress Report of ongoing Road Schemes for Administrative Approval ( which of value target 1 Banka Kachhi Kawariya road Sultanganj to Dumma (Bihar B) km 0 to 84.20 for the year 2016-17 (Land Acquisi) Plan P 78.727 3738.25 Lt no-4406 (s) dt-17.06.16 1757.56 1980.69 3738.25

More information

Opioid Surveillance Jun 2017

Opioid Surveillance Jun 2017 Opioid Surveillance Jun 217 Medical Examiner Source: Ingham County Medical Examiner Data is current as of Jun 13, 217 22 total drug-related Ingham resident deaths occurred in Ingham County 17 deaths were

More information

MADHYA PRADESH:OPERATIONAL AS ON

MADHYA PRADESH:OPERATIONAL AS ON MADHYA PRADESH:OPERATIONAL AS ON 08-02-2017 S.: Service 1 2661 Janki Security IC-39897L Col B B Vats (Retd) 06 Mar 1960 F-01, Bima Kunj, Services Windsor Plaza, Bhopal-462042 2 2733 SOMNATH SECURITY SERVICES

More information

List of Members of MM (M) (O) (F) (TF) (M)

List of Members of MM (M) (O) (F) (TF) (M) 1 Shri R.R. Bhatnagar,IPS (UP:83), Director General (Group Leader) Narcotics Control Bureau West Block-1, Wing-5 New Delhi-110066 2 Shri Pradeep Kumar, IPS (AM:84), DGP, Home Guard Civil Defence and Commandant

More information

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline

LOUIS ARMSTRONG NEW ORLEANS INTERNATIONAL AIRPORT For the Period Ending September 30, Enplaned Passengers by Airline Domestic Scheduled Enplaned Passengers by Airline Alaska Airlines 7,070 4,331 63.2% 59,552 42,265 40.9% 1.2% 1.0% Virgin America 0 803-100.0% 12,231 803 1423.2% 0.3% 0.0% Allegiant Air 1,333 2,063-35.4%

More information

32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) SITREP NO-65/2008 1700 hours Dated, 4 th August, 2008 Subject: SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT SUMMARY OF IMPORTANT

More information

Details of CSR Schemes/Projects for the Quarter ending April-June, 2011 (Q1) SAIL Unit : SAIL Corporate Office, New Delhi

Details of CSR Schemes/Projects for the Quarter ending April-June, 2011 (Q1) SAIL Unit : SAIL Corporate Office, New Delhi Details of CSR Schemes/Projects for the Quarter ending April-June, (Q1) SAIL Unit : SAIL Corporate Office, New Delhi 1 Shanti Sahyog, Delhi 2 Special Olympics Bharat, New Delhi 3 Heritage Transport Museum,

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

4-Jan-19 6-Jan-19 Royal Rajasthan Rally 2019 Stage Rally Open 4W Jaipur

4-Jan-19 6-Jan-19 Royal Rajasthan Rally 2019 Stage Rally Open 4W Jaipur 2019 Tentative Calendar of Events Updated : 24th Dec 2019 Please contact the organizers directly for further details of their event like Supplementary Regulations, Entry form, etc, etc. Start Date End

More information

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India Page 1 of 1 S.No. Name of the Scheme Actual 2009-10 Expenditure in 2010-11 (Cumulative) (Rs. In Crores) Grand Total 2010-11 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr 1 CSI Airport Mumbai Target 570.00 982.00 1645.00

More information

MEMBERS OF THE GOVERNING COUNCIL

MEMBERS OF THE GOVERNING COUNCIL MEMBERS OF THE GOVERNING COUNCIL 1. Shri Virbhadra Singh Hon ble Union Minister Micro, Small & Medium Enterprises, New Delhi 2. Shri R.K. Mathur Secretary, Government of India, New Delhi 3. Shri S. Chandra

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

PUBLIC INFORMATION OFFICERS & ASSISTANT PUBLIC INFORMATION OFFICERS AT CWC, CO, AS ON

PUBLIC INFORMATION OFFICERS & ASSISTANT PUBLIC INFORMATION OFFICERS AT CWC, CO, AS ON CENTRAL WAREHOUSING CORPORATION (A GOVT. OF INDIA UNDERTAKING) 4/1, Siri Institutional Area, Hauz Khas New Delhi 110016 PUBLIC INFORMATION OFFICERS & ASSISTANT PUBLIC INFORMATION OFFICERS AT CWC, CO, AS

More information

JCOs/OR & Equivalent Training :

JCOs/OR & Equivalent Training : JCOs/OR & Equivalent Training : 2017-18 Sl No Course No. Courses Name Name of Institute Place Start Date End Date Duration (in weeks) NSQF Level Duration (in Hours) Common Norms Rates Category Cost In

More information

1.0 TRAFFIC SUMAPRY 2.0 AIRCRAFT MOVEMENTS:

1.0 TRAFFIC SUMAPRY 2.0 AIRCRAFT MOVEMENTS: 1.0 TRAFFIC SUMAPRY During the month of 2010, all operational airports (taken together) handled 111.40 thousand aircraft movements (excludes general aviation movements), 11.01 million passengers and 180.10

More information

Flight Dispatchers (FDEG) Examination, March, 2008 Session

Flight Dispatchers (FDEG) Examination, March, 2008 Session Flight Dispatchers () Examination, March, 008 Session Category Examination Date Time Air Regulation 1.0.008 1000 Hrs Aviation Meteorology 100 Hrs Air Navigation 1.0.008 1000 Hrs Flight Planning 100 Hrs

More information

LIST OF PARTIES WITH WHOM BUSINESS DEALINGS HAVE BEEN BANNED/SUSPENDED THROUGHOUT NTPC. Address of the Agency

LIST OF PARTIES WITH WHOM BUSINESS DEALINGS HAVE BEEN BANNED/SUSPENDED THROUGHOUT NTPC. Address of the Agency LIST OF PARTIES WITH WHOM BUSINESS DEALINGS HAVE BEEN BANNED/SUSPENDED THROUGHOUT NTPC Name of the Agency M/s Laxmi Sharma Packages for which Agency has been banned/suspended BANNED ONLY FOR BGTPP (Bongaigaon)

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 17 Aug, 2016 Price Insight This section aims to show the detailed price of a project

More information

SUB:- Status of Tenders dealt by CP Division for month of September, Nos and names of parties qualified after Technical evaluation

SUB:- Status of Tenders dealt by CP Division for month of September, Nos and names of parties qualified after Technical evaluation SUB:- Status of s dealt by CP Division for month of September, 2012 S. ) of of s names of not contract Award & er/evalu 1 / CP/ AU/ FURNITURE/ Pkg- I/2011 (One ) Supply and Installation of Furniture for

More information

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No.

DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH TO Tende r No. CVC Office Order No. 13/3/05 Dt. 16 03 2005 :PSSR:CONTRACTS DETAILS OF CONTRACTORS CONCLUDED DURING THE MONTH 01 02 2011 TO 28 02 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Tende r No. Item/Nature of work Mode

More information

DISTRICT PROFILE ARWAL

DISTRICT PROFILE ARWAL DISTRICT PROFILE ARWAL INTRODUCTION Arwal district is one of the thirty-eight districts of Bihar. Arwal town is situated on the right side bank of the river Son, which is a tributary to the river Ganges.

More information

Name of Trust and Chairman

Name of Trust and Chairman 1 School Details 1. Name of School with Address : Gyan Devi Middle School Sector-10, Gurgaon, Haryana Pin Code=122001 (i) Email gdssec10@hotmail.com (ii) Ph.No. 0124-2212059, 2210259 2. Year of Establishment

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

Block Level Officer Contact Details Mobile Number 1 Bihar Sharif Rahui Circle Officer SUDARSAN SINGH

Block Level Officer Contact Details Mobile Number 1 Bihar Sharif Rahui Circle Officer SUDARSAN SINGH Sl No Block Level Contact Details Sub Division Block Designation Name 1 Bihar Sharif Rahui Circle SUDARSAN SINGH 9431605640 ssingh.corahui@gmail.com 2 Bihar Sharif Bind Circle AFZAL HUSSAIN 9931049321

More information

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to OUT-OF-PRODUCTION MANUAL LIST. DASH 7 New PSM Number Description -7- Operating Data Manual 0 Nov. 0/05-7A-A-DOT Airplane Flight Manual 5 June 02/05 TA 0-7A-A-UK Airplane Flight Manual 20 Aug. 5/05-7-2

More information

PLACEMENT LIST OF HSRT CANDIDATES VENUE:-HOTEL DRONA,DEHRADUN Dated: 28 July & 29 th July 2014

PLACEMENT LIST OF HSRT CANDIDATES VENUE:-HOTEL DRONA,DEHRADUN Dated: 28 July & 29 th July 2014 The following Candidates are selected under a Job Fair organised by GMVN at Hotel Drona GMVN HSRT Team wishes all candidates for their Job. PLACEMENT LIST OF HSRT CANDIDATES VENUE:-HOTEL DRONA,DEHRADUN

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

3 Day s of Intense Business Networking. VENUE : D.D.A Ground, Behind Japanese Park, Near Rithala Metro Station, Sector-10, Rohini, New Delhi

3 Day s of Intense Business Networking. VENUE : D.D.A Ground, Behind Japanese Park, Near Rithala Metro Station, Sector-10, Rohini, New Delhi UNIQUE ID of VO/NGO : DL/2018/0194425 GSTIN No.07AAFFF8349A1ZK 3 Day s of Intense Business Networking 31 August- 1-2 September 2018 VENUE : D.D.A Ground, Behind Japanese Park, Near Rithala Metro Station,

More information

Sl. No. Shri Raj Singh, Mob. NO Institute of Plasma Research, Gandhi Nagar, Gujarat. 22 DAE Guset House

Sl. No. Shri Raj Singh, Mob. NO Institute of Plasma Research, Gandhi Nagar, Gujarat. 22 DAE Guset House Sl. ALLOTMENT OF ACCOMMODATION REG DAE OL MEET AT KALPAKKAM (21-26 MARCH 2018) Name of the Affiliation Name of the participants Designation Arrival Time Departure time Dep. Guest House 1 Institute of Plasma

More information

Manual Status List DHC-2 to DHC-7

Manual Status List DHC-2 to DHC-7 OUT-OF-PRODUCTION MANUAL LIST. DASH 7 New PSM Number Description -7- Operating Data Manual 0 Nov. 0/05-7A-A-DOT Airplane Flight Manual 5 June 02/05 TA 0-7A-A-UK Airplane Flight Manual 20 Aug. 5/05-7-2

More information

PROPINSIGHT A Detailed Property Analysis Report

PROPINSIGHT A Detailed Property Analysis Report PROPINSIGHT A Detailed Property Analysis Report 40,000+ Projects 10,000+ Builders 1,200+ Localities Report Created On - 7 Oct, 2015 Price Insight This section aims to show the detailed price of a project

More information

UTTAR PRADESH:OPERATIONAL AS ON DISCREPANCIES, IF ANY, BE INTIMATED TO DRZ (CENTRAL) BY 28 DEC 2016

UTTAR PRADESH:OPERATIONAL AS ON DISCREPANCIES, IF ANY, BE INTIMATED TO DRZ (CENTRAL) BY 28 DEC 2016 UTTAR PRADESH:OPERATIONAL AS ON 21-12-2016 DISCREPANCIES, IF ANY, BE INTIMATED TO DRZ (CENTRAL) BY 28 DEC 2016 S.: Agency Name Service Rank First Name Last Name DOB Commercial Address 1 617 Ghatak Sec

More information

NHBC NEW HOME STATISTICS REVIEW Q3 2017

NHBC NEW HOME STATISTICS REVIEW Q3 2017 NHBC NEW HOME STATISTICS REVIEW 2017 NHBC statistics represent a unique source of detailed up-to-date information on new home construction and the house-building industry. The figures relate to new homes

More information

Flight Dispatchers (FDEG) Examination, August, 2007 Session

Flight Dispatchers (FDEG) Examination, August, 2007 Session Flight Dispatchers () Examination, August, 007 Session Category Examination Date Time Air Regulation 9.08.007 1000 Hrs Aviation Meteorology 100 Hrs Air Navigation 0.08.007 1000 Hrs Flight Planning 100

More information

Sponsorship Proposal for Patna Book Fair 2010

Sponsorship Proposal for Patna Book Fair 2010 Promoting books and Reading since 1985 Sponsorship Proposal for Patna Book Fair 2010 From 10 th December 2010 to 21 st December 2010 At Gandhi Maidan, Patna Our Faith Our Books Some books are to be tasted,

More information