1 PBN TF/8 WP/07 23/01/2013 EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF) EIGHTH MEETING (Paris, France, 23 to 24 January 2013) Agenda Item 8: Review the PBN TF ToR and action plans. Organizational matters and future work programme EUR PBN TF ToR (Presented by the Secretariat) SUMMARY This paper proposes some changes to the PBN TF ToR to accommodate the decision of the EANPG to merge the activities of the ICAO EUR PBN TF and RAISG of Eurocontrol 1. Every eight to ten years, ICAO organises the Air Navigation Conferences. The main point of discussion for this year s conference was the deployment of the Aviation System Block Upgrades (ASBUs) in a sequenced manner. Performance Based Navigation (PBN) is considered to be one of the key enablers to many of the described Modules composing the various Blocks. Within Block 0, which is considered to be mature at this date already, and for several applications foreseen to be ready for deployment in 2018, PBN is a key enabler. 2. In view of the above, ICAO organised a PBN Symposium in October this year. The intention of the symposium was to re-iterate the urgency of the on-time deployment of PBN, in accordance with ICAO Resolution During the workshop, several presentations stressed the importance of a collaborative approach to achieve a successful implementation. 3. During the 4 th Eurocontrol Agency Advisory Body held the week after the Symposium, it was noted that the current organisational set-up dealing with PBN implementation (both within ICAO and Eurocontrol) was not optimal. The AAB advised the PD-ATM of Eurocontrol to identify a better collaboration, so that in the end, the participating Stakeholders would also be able to take more advantage of the knowledge from both entities and also to hopefully reduce travel costs related to the participation in the various meetings. 4. Eurocontrol and ICAO, at the management level and in coordination with the Chairs of the respective working arrangements propose to initiate a grouping of the existing working arrangements. Potential concerns from either side were discussed and the resolution of these duly considered. To this effect, several principles were elaborated and are listed below: (6 pages)

2 -2- PBN TF/8 WP/07 5. By way of background, an overview is given of existing working arrangements and the work areas they cover in the two organisations and some basic principles elaborated concerning the rationalisation of working arrangements. Existing working arrangement Abridged TOR Potential rationalisation 1. ICAO EUR PBN TF The ToR includes the following: With RAISG (on approach related issues) 2. Eurocontrol Navigation Steering Group (NSG) 6. Eurocontrol RNAV Approach Implementation Support Group (RAISG) 7. Eurocontrol Landing and Take Off Focus Group (LATO) Develop an EUR Regional PBN Implementation Plan Amend the contents of the EUR ANP and SUPPS with respect to PBN Carry out specific studies, develop guidance and training material to assist States with RNAV/RNP implementation in en-route, terminal, and approach Monitor the status of PBN and national PBN implementation documentation to ensure harmonisation Address other regional PBN implementation issues as needed Reports to the EANPG COG Administrative function: 1. Steers RAISG and LATO-FG; 2. Reports to and is tasked by NETOPS for PBN and xls applications; 3. Reports to and is tasked by CNS-T for PBN and xls Infrastructure; Technical/Operational functions: 4. PBN en route and terminal applications; 5. Navaid Infrastructure for all PBN and xls applications (incl. ILS, GBAS, GNSS and its augmentations) including related tools such as DEMETER, PEGASUS, AUGUR etc; PBN Approach implementation support including, as necessary, relevant Navaid Infrastructure and Tools xls applications, primarily GBAS including, as necessary relevant Navaid Infrastructure and Tools. This paper does not propose rationalisation of Eurocontrol NSG with an ICAO EUR PBN group at present. Current working arrangements of NSG are relatively complex and the range of stakeholders extensive. If appropriate, the proposed rationalisation between RAISG and the EUR PBN (Approach) TF could be considered in a second (later) phase of rationalisation. With EUR PBN TF (on approach related issues) n/a 6. Mindful that Eurocontrol has two groups dealing with PBN (NSG and RAISG), and recognising that PBN s complexity and the vastness of the subject (see Note 1) makes it impracticable for all phases of flight to be covered in one co-chaired meeting. As such, it is initially proposed to rationalise only the EUR PBN TF and RAISG. Given the complexities of the NSG s scope it would not be appropriate to immediately merge NSG with an ICAO EUR en route and terminal equivalent group.

3 -3- PBN TF/8 WP/07 Note 1 both the RAISG and NSG technical/operational discussions enter into a considerable level of detail, particularly the NAVAID infrastructure component of the NSG which also serves as a consultation forum to several SESAR projects. 7. The new resulting working arrangement will have a chair and a co-chair, one selected from the ECAC States and one coming from the non-ecac States. The Chairman of the current PBN-TF has already offered to continue in the role, if no other candidate from the currently established Task-Force is nominated thereby allowing a clean transition into the new working arrangement. Relevant arrangements relating to secretariat functions would also need to be clarified, as would the storing and uploading of meeting documents to avoid unnecessary duplication. 8. The meetings will be held alternatively within the EUROCONTROL facilities and in the ICAO EUR/NAT Office facilities. 9. The support for development provided by EUROCONTROL will be available for the entire ICAO EUR Region, as needed. 10. The timeframe for transition, foreseen to start in the first semester of 2013, will allow the governing bodies, be it the COG for the ICAO EUR Region and the AAB for the Eurocontrol/ECAC areas to validate the finalisation of the transitional agreements and the relevant Terms of Reference of the Group. 11. The new working arrangement will not retain the names currently used by the ICAO EUR/NAT and Eurocontrol groups dealing with PBN. It is foreseen that the PIPT (PBN Implementation Project Team) abbreviation could be potentially accepted...transition arrangements are intended to be concluded in the second half of For organisational purposes, the following currently planned meeting dates for the existing structures will not be changed and will be conducted within the currently established framework: ICAO EUR PBN-TF 23 rd -24 th January, 2013 EUROCONTROL RNAV Applications Implementation TF 9 th -10 th April These meetings will also serve to gather additional comments or concerns from the participants, so that these can be adequately addressed in the transition phase, allowing a clean and commonly understood transition. 13. The EANPG supported in principle the proposal and noted that some administrative issues would need to be further discussed and agreed through the drafting of the Terms of Reference. To this effect, the following points have been raised: a) The new resulting working arrangement would have a chair and a co-chair, one selected from the ECAC States and one coming from the non-ecac States; b) The Chairman of the EUR PBN-TF offered to continue his work, unless other candidates would be nominated from the task force; c) Relevant arrangements relating to the Secretariat functions would need to be clarified, including the storing and uploading of meeting documents to avoid unnecessary duplication, reporting, etc; d) The meetings would be held alternatively in the ICAO EUR/NAT Office and Eurocontrol premises; e) The support for development provided by Eurocontrol would be available for the entire ICAO EUR Region, as needed;

4 -4- PBN TF/8 WP/07 f) The new working arrangement would not retain the names currently used by the ICAO EUR/NAT and Eurocontrol groups dealing with PBN. It was foreseen that the PIPT (PBN Implementation Project Team) abbreviation could be potentially accepted. 14. Considering the preceding elements, the European Air Navigation Planning Group concluded on the following: EANPG Conclusion 54/27 - EUR Performance Based Navigation Implementation Project Team (PIPT) That, while acknowledging the good work done in the ICAO EUR Region for the implementation of Performance Based Navigation (PBN), the ICAO Regional Director, Europe and North Atlantic, initiate coordination between ICAO EUR/NATand Eurocontrol to: a) Undertake the transition activities to the new working arrangement (set-up of the EUR PBN Implementation Project Team) during the first semester of 2013; b) Develop a draft Terms of Reference for the PBN Implementation Project Team (PIPT), not later than by the end of May 2013; and c) Merge the activities of the two current working arrangements within ICAO and Eurocontrol by the end of 2013, with a view to optimise the use of resources. EANPG Decision 54/1 - EUR Performance Based Navigation Implementation That, the EANPG Coordination Group (COG) be mandated to approve the Terms of Reference of the new working arrangement at its 56th meeting (July 2013). 15. In view of the above, the ICAO Secretariat in coordination with Eurocontrol have prepared the following draft ToR (Attachment A) for the review and agreement of the Task Force.

5 A-1 PBN TF/8 WP/07 ATTACHMENT A ICAO EUR/EUROCONTROL JOINT PBN IMPLEMENTATION PROJECT TEAM TERMS OF REFERENCE Composition The PBN IPT is composed of experts nominated by the ICAO contracting/member States and recognized international organizations and industry. The members of the ICAO EUR PBN TF and Eurocontrol RAISG will automatically continue their membership with the PBN IPT. Chairmanship A Chairman is proposed through nomination by one ICAO Member State and approved by the ICAO EUR EANPG and Eurocontrol AAB upon the PBN IPT recommendation. Reporting and Secretariat The PBN IPT reports in parallel to the ICAO EUR EANPG and Eurocontrol AAB. The ICAO EUR/NAT and Eurocontrol provide the necessary secretariat support in the conduct of the PBN IPT meetings, as well preparatory and follow-up activities Meeting arrangements The PBN IPT meets twice a year, once in the ICAO EUR/Nat premises and once in Eurocontrol. Deliverables Maintain the EUR regional PBN implementation plan and other regional documentation, including the EUR SUPPS (Doc 7030), EUR Doc 025 RNP APCH implementation guidance material. Develop necessary guidance material to assist implementation of PBN Provide a forum to share knowledge, lessons learnt and best practices in the EUR Monitor the progress of PBN implementation in the EUR and report to the ICAO EANPG and Eurocontrol AAB Identify and report to ICAO EANPG and Eurocontrol AAB potential challenges and impediments to the successful implementation of PBN and develop and implement regional mitigation plans Assist States in developing and implementation of the national PBN plans Organize and conduct PBN workshops and seminar to increase awareness Provide direct assistance to States(preferably groups of States) on the development and implementation of the national PBN plans Facilitate implementation of the new PBN specifications and develop necessary guidance material in support of this work.

6 A-2 PBN TF/8 WP/07 Ensure regional harmonization and for possible inclusion in ICAO-developed model documentation; Address other regional PBN implementation issues as needed. Working methods The PBN IPT coordinates its work with other ICAO and Eurocontrol groups as required through mediation of the Secretariat. The PBN IPT conducts its work as much as practicable through electronic means of communication. END

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring

2018 LSSIP Event. ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring 2018 LSSIP Event ASBU monitoring in the ICAO European Region Using the Master Plan reporting mechanism for ASBU monitoring Cornelia LUDORF ICAO EUR/NAT Office Ana Paula FRANGOLHO EUROCONTROL/DECMA/ACS/PRM

More information

European Joint Industry CDA Action Plan

European Joint Industry CDA Action Plan Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in

More information

ICAO EUR Region Performance Framework

ICAO EUR Region Performance Framework ICAO EUR Region Performance Framework Regional Performance Framework Workshop Baku, Azerbaijan, 10-11 April 2014 ICAO European and North Atlantic Office 9 April 2014 Page 1 OUTLINES Why a Regional Performance

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/19 24/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 6: Future direction 6.1: Implementation plans

More information

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation

The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation The ICAO Global Air Navigation Plan and the monitoring of ASBU implementation EUROCONTROL LSSIP Kick Off Event 2016 EUROCONTROL, Brussels, Belgium, 11 12 October 2016 11 October 2016 Page 1 ICAO European

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

PBN and Flight Planning

PBN and Flight Planning PBN and Flight Planning 2nd ICAO EUR PBN TF - RAiSG meeting Aline TROADEC / Charlie ELIOT EUROCONTROL Brussels / Belgium 12-14 March 2014 Table of content Current PBN codes for FPL (FPL 2012) Latest PBN

More information

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING

JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & EUROCONTROL RAISG MEETING PBNTF ECTL-RAISG/2 - WP/01 13/03/2014 JOINT ICAO EUR PERFORMANCE BASED TASK FORCE & RAISG MEETING SECOND MEETING (, Brussels 12 14 March 2014) PROPOSED DETAILED AGENDA V8 Agenda Item Supporting material

More information

LSSIP Mechanism serving ICAO The ASBU implementation monitoring report

LSSIP Mechanism serving ICAO The ASBU implementation monitoring report LSSIP Mechanism serving ICAO The ASBU implementation monitoring report EUROCONTROL LSSIP Kick Off Event 2017 EUROCONTROL Brussels, Belgium, 16 17 October 2017 1 ICAO Global Air Navigation Plan (GANP) Evolution

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Using LSSIP information for ATM Master Plan and ICAO ASBU monitoring

Using LSSIP information for ATM Master Plan and ICAO ASBU monitoring Using LSSIP information for ATM Master Plan and ICAO ASBU monitoring WAC Madrid Danny DEBALS EUROCONTROL Sven HALLE ICAO EUR/NAT Office 8 th and 9 th March 2017 Presentation Overview What is: LSSIP information?

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

EURNAT-DGCA 2017/1 ICAO EUR

EURNAT-DGCA 2017/1 ICAO EUR MAIN CONCLUSIONS AND ACTIONS AGREED Agenda Item 1: Opening Remarks The EURNAT-DGCA/2017 Meeting was opened by the Secretary General of ICAO, Dr. Fang Liu, and the EUR/NAT Office Regional Director, Luis

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION INTERNATIONAL CIVIL AVIATION ORGANIZATION Twenty First Meeting of the Africa-Indian Ocean Planning and Implementation Regional Group (APIRG/21) (Nairobi, Kenya, 9-11 October 2017) Agenda Item 5: Regional

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION

INTERNATIONAL CIVIL AVIATION ORGANIZATION APIRG/19 WP16D INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP NINETEENTH MEETING (APIRG/19) (Dakar, Senegal (28 to 31 October 2013) Agenda Item 3 Performance Framework

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

PBN/TF/7 DRAFT Appendix D to the Report D-1

PBN/TF/7 DRAFT Appendix D to the Report D-1 DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.

More information

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO Training Institute Kyiv and UkSATSE Boryspil, Ukraine, 28-31 October 2013 ICAO European and North Atlantic Office 6 November 2013 Page 1

More information

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan

Regional Air Navigation Plan - Planning Methodologies and Tools. H. Sudarshan International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/30 Regional Air Navigation Plan - Planning Methodologies and Tools H. Sudarshan Workshop on preparations for ANConf/12 ASBU methodology

More information

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017)

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017) APIRG/21 WP5/6 AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP TWENTY FIRST MEETING (APIRG/21) (Nairobi, Kenya (9 to 11 October 2017) Agenda Item 3: Performance Framework for Regional Air Navigation Planning

More information

GANP ASBU Symposium 2017

GANP ASBU Symposium 2017 GANP ASBU Symposium 2017 ICAO EUR NAT Office/ACAC Tunisia, 27-30 March 2017 Session 3: ASBU Implementation Monitoring Report Ana Paula FRANGOLHO EUROCONTROL EUROCONTROL DPS/PEPR ASBU Implementation Monitoring

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

EUROCONTROL approach to the execution of the PBN IR Mandate

EUROCONTROL approach to the execution of the PBN IR Mandate EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

www.worldairops.com This document is part of the World Air Ops online Library The Library contains maps, charts, flight planning documents, international trip planning tools and other public domain resources,

More information

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010 The Single European Sky and SESAR, the European ATM modernisation programme Patrick Ky, Executive Director 26 May 2010 TODAY S SITUATION IN EUROPE 4 Fragmentation of the European AIrspace THE CONTEXT Traffic

More information

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1. International Civil Aviation Organization IVATF/2-WP/21 10/6/11 WORKING PAPER INTERNATIONAL VOLCANIC ASH TASK FORCE (IVATF) SECOND MEETING Montréal, 11 to 15 July 2011 Agenda Item 5: Report of the International

More information

Regional implementation ASBU Bn-AMET

Regional implementation ASBU Bn-AMET Regional implementation ASBU Bn-AMET Christopher Keohan Regional Officer Air Navigation Systems Meteorology EUR/NAT ICAO RO Vienna/13 October 2015 Global Air Navigation Plan Aviation System Block Upgrade

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES. International Civil Aviation Organization MIDADD SG*/1-WP/7 18/01/ 12 MID Region AIS Database Study Group First Meeting (MIDADD SG*/1) (Cairo, Egypt, 20 22 February 2012) Agenda Item 8: Legal & Institutional

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY 21/10/15 Twenty-sixth Directors of Civil Aviation of the Eastern Caribbean Meeting (E/CAR/DCA/26) New Orleans, United States, 1-3 December 2015 Agenda Item 6: Air Navigation Matters 6.1 GREPECAS Update

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 22/6/16 ASSEMBLY 39TH SESSION EXECUTIVE COMMITTEE Agenda Item 31: Other high-level policy issues to be considered by the Executive Committee THE

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Measurement of environmental benefits by ICAO Secretariat

Measurement of environmental benefits by ICAO Secretariat International Civil Aviation Organization Measurement of environmental benefits by ICAO Secretariat ICAO PBN TF Sven Halle ICAO EUR/NAT Office ICAO EUR/NAT Office PBN Workshop 1 Overview KPA ASSEMBLY RESOLUTION

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

ICAO Performance Based Approach

ICAO Performance Based Approach ICAO Performance Based Approach Regional Performance Framework Workshop, Baku, Azerbaijan, 10-11 April 2014 ICAO European and North Atlantic Office April 2014 Page 1 Aviation Traffic Flow April 2014 Page

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 28/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 1 The attached report has been approved by thee Committee for submission

More information

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY ICAO UNIVERSAL SAFETY OVERSIGHT AUDIT PROGRAMME (USOAP) Continuous Monitoring Approach (CMA) FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY (16 to 20 November

More information

55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS

55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS DGCA 55/DP/8/12 55 TH CONFERENCE OF DIRECTORS GENERAL OF CIVIL AVIATION ASIA AND PACIFIC REGIONS Denarau Island, Nadi, Fiji 22 26 October 2018 AGENDA ITEM 4: AIR NAVIGATION FLIGHT PROCEDURE SERVICES IN

More information

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements. Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs

More information

EUR Doc 001 EANPG HANDBOOK EUROPEAN AIR NAVIGATION PLANNING GROUP. International Civil Aviation Organization. First Edition

EUR Doc 001 EANPG HANDBOOK EUROPEAN AIR NAVIGATION PLANNING GROUP. International Civil Aviation Organization. First Edition EUROPEAN AIR NAVIGATION PLANNING GROUP International Civil Aviation Organization EUR Doc 001 EANPG HANDBOOK First Edition - 2013 Amendment 4 December 2017 Prepared by the ICAO European and North Atlantic

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap The Information Paper of the China s PBN implementation roadmap Table of Contents News Briefs Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

EUR Doc 001 EANPG HANDBOOK EUROPEAN AIR NAVIGATION PLANNING GROUP. International Civil Aviation Organization. First Edition

EUR Doc 001 EANPG HANDBOOK EUROPEAN AIR NAVIGATION PLANNING GROUP. International Civil Aviation Organization. First Edition EUROPEAN AIR NAVIGATION PLANNING GROUP International Civil Aviation Organization EUR Doc 001 EANPG HANDBOOK First Edition - 2013 Amendment 5 December 2018 Prepared by the ICAO European and North Atlantic

More information

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING AFI Plan-SC/19/2017-DP/03 17/05/2017 English only COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA (AFI PLAN) NINETEENTH AFI PLAN STEERING COMMITTEE MEETING (Gaborone, Botswana,

More information

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING

SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING International Civil Aviation Organization 18/8/08 WORKING PAPER SPECIAL AFRICA-INDIAN OCEAN (AFI) REGIONAL AIR NAVIGATION (RAN) MEETING Durban, South Africa, 24 to 29 November 2008 Agenda Item 6: Development

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF)

International Civil Aviation Organization. Aerodrome Certification Implementation Task Force (ADCI TF) International Civil Aviation Organization Aerodrome Certification Implementation Task Force (ADCI TF) Second Meeting (Doha, Qatar, 12 14 May 2013) Agenda Item 3: Aerodromes Certification Requirement REQUIREMENTS

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat) INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account

More information

FACILITATION PANEL (FALP)

FACILITATION PANEL (FALP) International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR

More information

RUNWAY SAFETY GO-TEAM METHODOLOGY

RUNWAY SAFETY GO-TEAM METHODOLOGY RUNWAY SAFETY GO-TEAM METHODOLOGY INTRODUCTION The ICAO Runway Safety Programme (RSP) promotes the establishment of Runway Safety Teams (RSTs) at airports as an effective means to reduce runway related

More information

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING International Civil Aviation Organization FIT-Asia/5 WP/02 05-06/05/2016 The Fifth Meeting of the Future Air Navigation Systems Interoperability Team- Asia (FIT-Asia/5) Bangkok, Thailand, 05 06 May 2016

More information

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015

EGNOS based Operations Implementation Status and Plans for EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 EGNOS based Operations Implementation Status and Plans for 2016 EGNOS Service Provision Workshop Copenhagen 29 th -30 th September 2015 Table of Contents Drivers for APV Implementation LPV Implementations:

More information

ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG) PROCEDURAL HANDBOOK

ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG) PROCEDURAL HANDBOOK ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG) PROCEDURAL HANDBOOK FIFTH EDITION SEPTEMBER 2016 RECORD OF AMENDMENT A/L No DATE ENTERED BY A/L No DATE ENTERED BY 2 FOREWORD

More information

ICAO - ACAC Civil Military Workshop

ICAO - ACAC Civil Military Workshop ICAO - ACAC Civil Military Workshop Experience in the EUR Region ENNA, Algiers, Algeria 26-28 March 2018 ICAO EUR/NAT Office 1 Regional Implementation Results from the Global ATM Forum should be communicated

More information

Asia Pacific Regional Aviation Safety Team

Asia Pacific Regional Aviation Safety Team International Civil Aviation Organization (ICAO) Regional Aviation Safety Group (Asia & Pacific Regions) Asia Pacific Regional Aviation Safety Team GUIDANCE FOR AIR OPERATORS IN ESTABLISHING A FLIGHT SAFETY

More information

Open Questions & Collecting Lessons Learned

Open Questions & Collecting Lessons Learned Open Questions & Collecting Lessons Learned 2nd joint ICAO EUR PBN TF EUROCONTROL RAiSG meeting Rick Farnworth EUROCONTROL 12-14 March 2014 Summary Objective List of Open Questions Options for making Information

More information

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1 ICAO updates ICAO European and North Atlantic Office 12 September 2013 Page 1 ICAO State Letters and Amendments to ICAO Annexes Reference # Title and date issued 2013/19 Adoption of Amendment 14 to Annex

More information

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY PA RAST/31 WP/03 19/02/18 Thirty First Pan America Regional Aviation Safety Team Meeting (PA RAST/31) of the Regional Aviation Safety Group Pan America (RASG PA) South Florida, United States, 20 to 22

More information

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT/20 WP/10 Attachement A PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT Region PROJECT DESCRIPTION (PD) Title of the Project Starting date Ending date Meetings on The Improvement of Air Traffic Services

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

Proposal for the updating of the FASID ATM Evolution Tables

Proposal for the updating of the FASID ATM Evolution Tables WP/24 22/09/03 International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions Sixth Meeting/workshop of Air Traffic Management

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS Appendix A WP/2 Joint Meeting of the APIRG Performance Based Navigation and Global Navigation Satellite System Implementation Task Forces () (PBN/TF/3, GNSS/TF/I/5) (Nairobi, 8-10 September 2009) Special

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

Information Paper 2 SUMMARY

Information Paper 2 SUMMARY COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional

More information

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)

More information

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat) International Civil Aviation Organization 23/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

PBN Implementation in the UK

PBN Implementation in the UK PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

Tel.: +1 (514) ext Ref.: SWG 21/1-09/94 16 December 2009

Tel.: +1 (514) ext Ref.: SWG 21/1-09/94 16 December 2009 International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-8219

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar Critical Elements of a State s Aviation Security Oversight System Cairo, Egypt, 26 to 28 January 2015 Module

More information

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013 International Civil Aviation Organization ATConf/6-WP/52 15/2/13 WORKING PAPER WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING Montréal, 18 to 22 March 2013 Agenda Item 2: Examination of key

More information

COMMISSION IMPLEMENTING REGULATION (EU)

COMMISSION IMPLEMENTING REGULATION (EU) 18.10.2011 Official Journal of the European Union L 271/15 COMMISSION IMPLEMENTING REGULATION (EU) No 1034/2011 of 17 October 2011 on safety oversight in air traffic management and air navigation services

More information

Safety Management 1st edition

Safety Management 1st edition Annex 19 Safety Management 1st edition ISM Integrated Safety Management 10 June 2013 initial version Page 1 Why a new Annex? Page 2 Why a New Annex? The ICAO High-level Safety Conference (HLSC) held in

More information

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview International Civil Aviation Organization Aviation System Block Upgrade (ASBU) Methodology An Overview Outline Today s Challenges Tomorrow s Needs Why ASBU methodology ASBU explanation Global Plan Next

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Status of PBN implementation in France

Status of PBN implementation in France Status of PBN implementation in France PBN TF/4 Dec 2010 Benoit ROTURIER (DSNA) 1 Context supporting DSNA navigation strategy ICAO Navigation strategy Performance Based Navigation (PBN) concept Resolutions

More information

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM

ICAO PBN GO TEAM PBN Implementation Workshop ENAC / ATM ICAO PBN GO TEAM PBN Implementation Workshop Tunis, 24-28 February 2014 ENAC / ATM Bertrand FOUCHER 1 PERSONAL BACKGROUND ATC in Paris Charles de Gaulle ATC Supervisor in Paris Charles de Gaulle, ATC Instructor

More information

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the

More information

Enhancing capacity beyond infrastrucutre

Enhancing capacity beyond infrastrucutre Enhancing capacity beyond infrastrucutre Safety The air traffic management (ATM) industry is undergoing major changes, including: New entrants to airspace drones, remote air traffic control towers and

More information