Next Generation Air Transportation System Financing Reform Act of 2007

Size: px
Start display at page:

Download "Next Generation Air Transportation System Financing Reform Act of 2007"

Transcription

1 Next Generation Air Transportation System Financing Reform Act of 2007 Funding Proposal An ACC Summary of Key Provisions in the USDOT s FAA Reauthorization Proposal Overall, the change in the aviation financing system would take effect at the start of FY 2009 to give FAA time to establish interim user fees and implement a billing/collection system. The current excise tax would be extended through FY Also, the FAA proposes a new Governance Board (titled the Air Transportation System Oversight Board) to provide advice and recommendations to the FAA administrator on establishment of the fees. The Board is comprised of user representatives and public interest members appointed by the Administrator. (Note that the current Federal aviation tax and revenue system includes 1) a 7.5% passenger ticket tax that accounts for 48% of revenue; 2) a passenger flight segment tax that accounts for 18% of revenue; 3) international arrival/departure tax that accounts for 18% of revenue; 4) a fuel tax that accounts for 9% of revenue; and other sources.) For Air Traffic Control Services - three funding mechanisms are proposed: o Turbine commercial flights: pay through a new user fee Fees based on data derived from FAA s cost accounting and cost allocation systems including operation, maintenance, and overhead expenses; facilities and equipment used; and the projected costs for the period during which the services are provided. FAA can take into account other considerations in setting the fee, including airplane weight and time/day of operation at 30 of the most congested airports. The Essential Air Service program would be funded by this user fee, derived from the Aviation Trust Fund. This fee would account for 3/4ths of the new Air Traffic Organization s (ATO) budget. Includes establishment of a reserve fund to avoid shortfalls. o GA and Piston-powered flights: pay their share of air traffic control services through fuel taxes and a possible terminal user fee when they arrive or depart from a limited number of large hub airports Airport Consultants Council Page 1

2 The aviation fuel tax rate would be 70.0 cents per gallon it applies to all piston operations (commercial and GA) cents per gallon of this tax would finance GA s share of the air traffic control system and 13.6 cents/gallon of the tax would comprise GA s contribution to the AIP. (The current gasoline tax is 19.3 cents per gallon and jet fuel tax for non commercial aviation is 21.8 cents per gallon). The commercial fuel tax increases from 4.3 cents per gallon to 13.6 cents. GA s exemption from the user fee outlined above ceases if the income from the fuel tax does not pay for GA s cost of using the air traffic control system. The taxes and fees would be indexed to inflation. Just over 10% of ATO s budget would come from the fuel tax. o Costs for use of the airspace by Public Users and Others would derive from the Treasury s General Fund. For Funding Aviation Safety - a modest user fee is proposed to pay for the costs of 25 activities in the area of certification and regulation; a vast majority will be derived from the General Fund. o The proposal sets the fee for 12 specific services. o Approximately 10% of FAA s Aviation Safety budget would derive from the user fee. Activities Funded from the General Fund The DOT proposal caps the maximum authorization funding that can be derived from the Treasury s General Fund at the following levels: $2.6 billion in FY 2008; $2.5 billion in FY 2009; and $2.5 billion in General Fund expenditures are to be used for: o Air traffic costs for public users o Flight service stations o Low activity towers o Safety regulation and oversight o Commercial space transportation o Safety portion of Research, Engineering & Development AIP Reforms Overall, DOT states that their proposal addresses needs by empowering local airports with strong local revenue sources and strategically targeting federal dollars to airports where they will have most impact. Proposed AIP Funding Levels: o FY $2.75 billion o FY $2.9 billion o FY $3.05 billion Changes to AIP Funding Structure: Airport Consultants Council Page 2

3 o Overall, FAA proposes funding AIP through taxes which are primarily built on existing collection mechanisms. Specifically, FAA proposes funding AIP through a series of simplified excise taxes including: A flat, universal fuel 13.6 cents per gallon tax for domestic commercial and all GA flights. This tax would be combined with the proposed GA ATO fuel taxes for GA users; and A $6.39 passenger head tax for international commercial passenger flights (a decrease from the current $14.50). o The tax levels would be indexed to inflation. o These taxes would be deposited into the Airport and Airway Trust Fund (like the ATO taxes) and be subject to annual Congressional appropriation. o These taxes would be the funding sources for all of the Essential Air Service (EAS) program and most of RE&D. The taxes would cover the FAA s proposed reauthorization level for AIP, (EAS), and the Trust Fund s portion of RE&D. Changes to AIP Entitlements/Apportionments/Set-Asides: o The DOT proposes to phase out passenger entitlements for medium and large hub airports after FY 2009, while preserving discretionary funding for these airports. Passenger entitlements would be reduced by 50% from current levels in FY 2008 and FY o The proposal retains the higher passenger entitlements for the remaining smaller airports, at all levels of AIP, protecting these entitlements from cuts if AIP fall below $3.2 billion. o The minimum discretionary fund level is increased from $148 million to $520 million, giving FAA more authority to target AIP investments where needed. o Reforms to the GA Entitlement Program: Establishes a separate state apportionment fund with spending levels at 10% of AIP, providing a minimum funding level of $300 million. Eliminates the existing $150,000 individual non-primary airport entitlements with a tiered system of entitlements: The largest non-primary and reliever airports (more than 100 operational registered aircraft) would receive $400,000; Airports with based aircraft would receive $200,000; Airports with 10 to 49 based aircraft could receive up to $100,000; Airports with less than 10 based aircraft would receive no annual guaranteed funding (although these airports would be eligible for state apportionment dollars) Airport Consultants Council Page 3

4 o The proposal eliminates the Military Airport Program and Reliever airport setaside and funds these needs through regular discretionary funds. o No change is made to the cargo apportionment. o The set-aside (about $5 million/year) for reliever airports is eliminated since these airports will be receiving more entitlements under the DOT proposal and can compete for more discretionary dollars. o A new small airport set-aside is created and would replace the existing small airport fund for projects at small-hub, non-hub, non-primary commercial service, reliever or general aviation airports. It would be tied to 20% of discretionary AIP funds, and replace funds lost due to the elimination of passenger entitlements. This would also preserve FAA s ability to give non-primary airports discretionary grants. AIP Reforms: The FAA is proposing several amendments to AIP: o Definitions: Several definitions are changed or added, including adding firefighting and rescue equipment and mobile fuel truck containment systems as an airport development activity, and the addition of revenue producing aeronautical support facilities so that non-primary airports may use their entitlements to build or rehabilitate new facilities that can help generate revenue. o Grant Assurances: Two changes are made. First, a limited exception to a current requirement would be allowed to permit an airport owner to use AIP entitlement funds to move or replace a facility when the need to relocate or replace it was beyond the owner s control (such as new design standards that render the facility a safety hazard). Second, language is added to clarify provisions dealing with the disposition of proceeds from the sale of land that an airport acquired for a noise compatibility purpose but is no longer needed. The change allows the Secretary to permit other uses of the government s share of the proceeds, giving priority, in descending order, to the following: Reinvestment in another noise compatibility project at the airport; Reinvestment in another environmentally related project; Reinvestment in another otherwise eligible AIP project; Transfer to another public airport for a noise compatibility project; and Payment to the Trust Fund. o Government Share of Project Costs: A number of changes are made to the FAA s matching share of AIP projects: Current law allows the Federal share to either be a set percentage of a project s cost or a maximum percentage of a project s cost (i.e. the government may fund up to a percentage). The DOT proposes to eliminate the first option altogether. Airport Consultants Council Page 4

5 PFC Reforms The Federal maximum share for pavement and rehabilitation projects for runways, taxiways and aprons at large and medium airports would be reduced from a 75% to 50% share, but other projects at these airports would retain the 75% share. A new provision provides up to a 95% Federal share of project costs at non-primary airports that would no longer receive minimum entitlement funds. o Allowable AIP Project Costs: No major changes are made regarding the eligibility of AIP project funding. FAA moves the description of terminal development allowed under AIP to a new section. A new section is added relating to the relocation of airport-owned facilities due to design standards beyond the sponsor s control (similar to the provision in grant assurances). o Environmental Set-Aside: The DOT substantially broadens the uses of what is commonly referred to as the noise set-aside to include water quality mitigation projects that are approved as part of a ROD and for carrying out projects authorized as part of a new environmental research pilot program (that will be proposed as part of a separate bill concerning FAA programs). The set-aside apportionment would be changed from the current 35% of the AIP discretionary funds to 8% of all AIP apportioned funds, which should provide more stable funding. o The pilot program for the purchase of airport development rights, established in Vision 100, has been sunsetted. o Grant authorization to states and local governments to support land use compatibility planning and projects has been extended. The current Passenger Facility Charge program was established by Congress in 1990 and currently has a congressionally-established cap of $4.50 per enplanement. The FAA proposes numerous changes to the program. The maximum PFC rate would be increased from $4.50 to $6.00. Airports approved for a newly proposed terminal navigation aid pilot program would be able to charge a maximum PFC of $7.00. PFC eligibility would be expanded to include any capital cost than an airport could pay for with airport revenue. This includes most airport capital development projects in nonexclusive areas, including revenue producing facilities. Statutory PFC provisions are amended to make it easier to use PFCs to help finance intermodal ground access projects, including privately owned projects that are available for public use and otherwise eligible. Eligibility would also extend to in-line baggage screening installation. Airport Consultants Council Page 5

6 The PFC application, approval and amendment process would be streamlined, allowing local authorities to tap available revenue sources and determine appropriate use of the funds. Specifically, a three-tier system application/approval process is proposed: o Old projects: Airports would be required to submit an annual status report on PFCs that includes information on how the PFCs were used in the previous year and how an airport intends to use PFCs in the coming year. If all projects proposed for collection in the coming year had been approved under the old system or were subject to second or third tier procedures before submission on a prior annual status report, no further action would be required. o New projects: If an airport is proposing a PFC for a new project (not previously approved or subject to 2 nd or 3 rd tier during a prior year) the airport must provide a local notice and comment period for carriers operating at the airport and a local public notice and comment period before filing its PFC status report. o New intermodal ground access projects: This type of project is defined as a public or privately owned rail project that is a component of, or connects to, a general transit system. DOT would have to provide approval before an airport uses PFC revenue on the project. Program Reforms/Changes The DOT proposes to replace the existing Operations and Facilities and Equipment (F&E) accounts with a new Air Traffic Organization (ATO) account and a new Safety and Operations account. o The Air Traffic Organization account provides funds for the operation, maintenance, communications, and logistical support of the air traffic control system, including the deployment of communications, navigation, surveillance and related equipment and technology. It is funded from three sources: the Trust Fund, user fees, and the General Fund. o The Safety and Operations Account would cover aviation safety and efficiency, specifically supporting the Office of Aviation Safety to ensure the safe operation of airlines and certification of new aviation products. It is funded from the Trust Fund; user fees (both the air traffic and the registration and certification funds); and the General Fund. Other Provisions Environmental o Environmental Streamlining: DOT proposes several reforms: Amends the State Block Grant program to codify that participating states have responsibility and authority to comply with NEPA and other environmental requirements for projects within the purview of the program. The FAA would remain responsible for completing the Federal environmental review process for actions outside the State Block Grant program; Airport Consultants Council Page 6

7 Provides an additional $5 million per year to the Airport Cooperative Research Program for R&D related to the airport environment; o Environmental Set-Asides: The noise set-aside is substantially broadened for other uses and the apportionment formula is changed so that the environmental set-aside receives 8% of overall AIP apportioned funds (see above under AIP). o Staffing: A provision is included to broaden the authority of FAA to enter into reimbursable agreements to fund additional FAA staff and/or contract support by including voluntary agreements with airports that request FAA support to conduct special environmental studies that have research and development aspects for ongoing environmental reviews, along with similar studies resulting from approved Part 150 program measures. o Environmental Mitigation Pilot Program: The proposal includes a new pilot program that would allow FAA to fund six projects at public use airports that have promising environmental research concepts proven in the laboratory into actual demonstration at airports. o Flight Procedure Assessments: The proposal makes AIP funding eligible to encourage implementation of environmentally-friendly aircraft flight procedures. Research o The proposal authorizes $128 million for research in FY 2008; $144 million in FY 2009; and $144 million in FY The funding is derived from the General Fund or the Airport and Airways Trust Fund. o $15 million per year is authorized for the Airport Cooperative Research Program (ACRP) a $5 million increase per year over current levels. $5 million per year shall be dedicated to airport environmental research. o Directs the FAA to enter into a cooperative agreement with the Partnership for AiR Transportation Noise and Emissions Reduction (PARTNER) Center for Excellence to form a research consortium for development, maturing and certification for continuous lower energy, emissions and noise (CLEEN) engine and airframe technology. Privatization o Expands the existing pilot program on private ownership of airports from 5 to 15 airports. Restrictions on participation by airport category (i.e. hub, GA) would be eliminated. o The veto power of airlines to prevent privatization is eliminated. The Secretary can grant an exemption from the current super-majority (65% of airports) approval if the airport sponsor showed it consulted with the airlines using the airport. At non-primary airports, the exemption would continue to be based on consultation with at least 65 percent of the based-aircraft owners. o The proposal eliminates the effective airline veto power to prevent fee increases higher than inflation rates. Congestion Charges - DOT proposes two provisions that authorize the use of marketbased mechanisms, or auctions or congestion pricing, to control congestion and delays at capacity-constrained airports. One provision gives FAA statutory authority to use Airport Consultants Council Page 7

8 market-based mechanisms at New York s LaGuardia Airport. The second establishes a 15 airport pilot program to allow the participating airports to set the fees charged to aircraft operators. The proposal allows the Secretary to adopt market-based congestion management programs at the most severely congested airports. Essential Air Service Several changes are proposed for EAS. o The DOT proposal would limit eligibility for the subsidy to communities: 1) that are currently being subsidized under EAS; 2) that are more than 70 driving miles from the nearest large- or medium-hub airport; and 3) at which the subsidy per passenger does not exceed $200 if the community is less than 210 driving miles from the nearest large- or medium-hub airport. o The EAS program would be funded through a mandatory appropriation of $50 million each year from the Trust Fund; o Alaskan communities are exempt. Realignment and Consolidation of Aviation Facilities and Services DOT proposes a process to help FAA realign and consolidate it services and facilities, with the support of a new five-member Realignment and Consolidation of Aviation Facilities and Services Commission, the President and Congress. NextGen Overall, DOT proposes a new management strategy for NextGen, primarily by decentralizing the current system into a series of networks, similar to the telecommunications sector, allowing competitive forces and private sector innovation to drive modernization of the system. The new model consists of three main categories of services: o Decentralized non-federal services that are provided by multiple, competing nonfederal entities, with the FAA responsible for licensing, regulation, and certification. Examples would include contract towers and weather services; o Centralized non-federal services that are provided by a single, competitively selected, non-federal entity, with FAA awarding the license and responsible for regulation and certification. Examples of these services include ADS-B and a recent flight service station contract; o FAA-responsible services such as national defense. The services would be placed into the categories by DOT, in consultation with JPDO, the new oversight Board, and stakeholders. In this approach, the system would gradually evolve so that FAA becomes primarily a regulatory and safety oversight agency rather than a service provider, while private sector, states, regional consortia, and local airport authorities assume the roles of service provisions for many functions. Six provisions in the proposal outline the new management support: o Broad language clarifying FAA s general leasing and licensing authority; o A pilot program for airports to take responsibility for maintaining, operating and replacing certain terminal navigation aids and weather equipment (Sec. 318); Airport Consultants Council Page 8

9 o A pilot program for accelerating deployment of ADS-B by states or regions taking responsibility for ownership and maintenance of ground-based equipment for the program; o Deregulation of airports and reform of entitlement programs to target federal investments to the airports with the greatest capital needs; o Facilitation of the transition to NextGen satellite-based approaches, such as those using WAAS technology, through dedicated funding after FY 2008; and o Certification of third parties to develop WAAS and other approach procedures. Prepared By: TJ Schulz Vice President, ACC Airport Consultants Council Page 9

SENATE PASSES FAA REAUTHORIZATION BILL

SENATE PASSES FAA REAUTHORIZATION BILL SENATE PASSES FAA REAUTHORIZATION BILL February 17, 2011 What s at Issue The U.S. Senate has passed S.223, the FAA Air Transportation Modernization and Safety Improvement Act. Why It s Important The legislation

More information

Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding

Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding Session Ten: Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau in Omnibus

More information

AirportInfo. Airport Improvement Program

AirportInfo. Airport Improvement Program AirportInfo Airport Improvement Program April 2014 Airport Improvement Program (AIP) AIP provides grants to airport sponsors for the planning and development of public-use airports. To be eligible for

More information

Session 6 Airport Finance 101 Funding Sources for Airports

Session 6 Airport Finance 101 Funding Sources for Airports Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin

More information

FAA Reauthorization Issues & Impacts on Airports

FAA Reauthorization Issues & Impacts on Airports Issues & Impacts on Airports Presentation to Mid America Association of State Transportation Officials July 21, 2011 Presented by Greta J. Hawvermale Sr. Director of Engineering & Environmental Matters

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Financing Airport Improvements

Financing Airport Improvements (name redacted) Analyst in Transportation and Industry (name redacted) Specialist in Transportation Policy March 24, 2016 Congressional Research Service 7-... www.crs.gov R43327 Summary There are five

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

National Association of State Aviation Officials. John Shea Government Relations Manager (703)

National Association of State Aviation Officials. John Shea Government Relations Manager (703) National Association of State Aviation Officials John Shea Government Relations Manager (703) 610-0272 jshea@nasao.org Fiscal 2018 Omnibus: DOT Highlights Department of Transportation (DOT) The bill provides

More information

Issue Brief for Congress Received through the CRS Web

Issue Brief for Congress Received through the CRS Web Order Code IB10026 Issue Brief for Congress Received through the CRS Web Airport Improvement Program Updated July 1, 2002 Robert S. Kirk Resources, Science, and Industry Division Congressional Research

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

AIRPORT NOISE AND CAPACITY ACT OF 1990

AIRPORT NOISE AND CAPACITY ACT OF 1990 AIRPORT NOISE AND CAPACITY ACT OF 1990 P. 479 AIRPORT NOISE AND CAPACITY ACT OF 1990 SEC. 9301. SHORT TITLE This subtitle may be cited as the Airport Noise and /Capacity Act of 1990. [49 U.S.C. App. 2151

More information

Airport Funding FAA Airport Improvement Program (AIP)

Airport Funding FAA Airport Improvement Program (AIP) Airport Funding FAA Airport Improvement Program (AIP) Presented to: Texas Aviation Conference By: Mike Nicely, Manager Texas ADO Date: May 15, 2013 Discussion Topics Enabling Legislation Authorization

More information

Aviation Tax Report. June 30, 2016

Aviation Tax Report. June 30, 2016 Aviation Tax Report June 30, 2016 Prepared by The Minnesota Department of Transportation 395 John Ireland Boulevard Saint Paul, Minnesota 55155-1899 Phone: 651-296-3000 Toll-Free: 1-800-657-3774 TTY, Voice

More information

Airport Finance 101 Session 3 - Capital Funding

Airport Finance 101 Session 3 - Capital Funding Airport Finance 101 Session 3 - Capital Funding Capital Development Funding Improvement Projects usually require substantial funding to be implemented In business world capital is associated with funds

More information

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS Pocatello Regional Airport Airport Master Plan APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS The Airport and Airway Improvement Act of 1982

More information

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP

More information

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions ECONOMIC MASTER PLAN Florida s airport industry indicates the following programs are needed to maximize its impact on the State s economy: AIRPORT SECURITY Develop Model Security Plan for General Aviation

More information

THE FAA MODERNIZATION AND REFORM ACT OF 2012

THE FAA MODERNIZATION AND REFORM ACT OF 2012 THE FAA MODERNIZATION AND REFORM ACT OF 2012 A. Introduction... 1 A.1 Structure of the 2012 Reform Act... 1 B. AIP Funding... 2 B.1 Level and Duration of Funding Authority... 2 B.2 Apportionment Formulas

More information

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HOUSE AND SENATE FAA REAUTHORIZATION BILLS

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HOUSE AND SENATE FAA REAUTHORIZATION BILLS 409 West Huron Street Suite 400 Chicago, IL 60654 Tel. (312) 988-3360 Fax. (312) 988-3370 Email: barrymolar@unison-ucg.com Website: www.unison-ucg.com ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009 ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009 By Barry Molar, Director, Unison Consulting June 30, 2009 409 W. Huron Street Suite 400 Chicago,

More information

Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress

Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress Bart Elias, Coordinator Specialist in Aviation Policy April 29, 2011 Congressional Research

More information

Manager of Strategy and Policy. SUBJECT: LEGISLATIVE UPDATE DATE: April 28, Federal. Raising the Passenger Facility Charge Cap

Manager of Strategy and Policy. SUBJECT: LEGISLATIVE UPDATE DATE: April 28, Federal. Raising the Passenger Facility Charge Cap TO: AIRPORT COMMISSION FROM: Matthew Kazmierczak Manager of Strategy and Policy SUBJECT: LEGISLATIVE UPDATE DATE: Federal Raising the Passenger Facility Charge Cap With recent proposals for a $1 billion

More information

Chapter VI Implementation Planning

Chapter VI Implementation Planning Chapter VI Implementation Planning This chapter presents a general financial plan for the capital improvements recommended in the Master Plan. The purpose of the financial plan is to demonstrate that the

More information

WikiLeaks Document Release

WikiLeaks Document Release WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RL33920 Federal Aviation Administration Reauthorization: An Overview of Selected Provisions in Proposed Legislation Bart

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

2017 Accomplishments

2017 Accomplishments CY2017 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the needs of the communities we serve. 2017

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

Airport Improvement Program: Issues for Congress

Airport Improvement Program: Issues for Congress Order Code RL33891 Airport Improvement Program: Issues for Congress February 26, 2007 Robert S. Kirk Specialist in Transportation Resources, Science, and Industry Division Airport Improvement Program:

More information

Passenger Facility Charge Application #1

Passenger Facility Charge Application #1 Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures

More information

Minnesota Airports Conference

Minnesota Airports Conference Minnesota Airports Conference Federal Aviation Administration Presented to: By: Date: Conference Attendees Barry D. Cooper April 17, 2015 World Air Traffic Control as the Sun Rises Legislation: FAA Reauthorization

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

2018 Accomplishments

2018 Accomplishments CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL Section 341 Comprehensive Plan -Codifies in title 49 the requirement in the 2012 FAA reauthorization Act that a comprehensive plan to safely accelerate

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

Airport Improvement Program (AIP): Reauthorization Issues for Congress

Airport Improvement Program (AIP): Reauthorization Issues for Congress Airport Improvement Program (AIP): Reauthorization Issues for Congress Robert S. Kirk Specialist in Transportation Policy May 29, 2009 Congressional Research Service CRS Report for Congress Prepared for

More information

Annual Airport Finance and Administration Conference Innovative Funding Strategies. March 4, 2013 Destin, Florida Bonnie Deger Ossege

Annual Airport Finance and Administration Conference Innovative Funding Strategies. March 4, 2013 Destin, Florida Bonnie Deger Ossege Annual Airport Finance and Administration Conference Innovative Funding Strategies March 4, 2013 Destin, Florida Bonnie Deger Ossege OVERVIEW Trends- Capital Improvement Programs Determine Your Airport

More information

Financial Feasibility Analysis

Financial Feasibility Analysis CHAPTER F Financial Feasibility Analysis 1. Introduction This chapter presents a funding plan for completion of recommended capital projects at Friedman Memorial Airport (the Airport) through FY 2034,

More information

BILATERAL TEMPLATE AIR SERVICES AGREEMENT

BILATERAL TEMPLATE AIR SERVICES AGREEMENT BILATERAL TEMPLATE AIR SERVICES AGREEMENT Throughout this document: 1) an asterisk is used to indicate that a specific provision within an article is common to each of the traditional, transitional and

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Communications and Information Technology Alert

Communications and Information Technology Alert Communications and Information Technology Alert Communications and Information Technology Alert: Drones and Urban Air Mobility in the President s Budget April 9, 2019 President Trump recently released

More information

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles

Business Plan INTRODUCTION AIRPORT ENTERPRISE FUND OVERVIEW. Master Plan Guiding Principles 5 Business Plan INTRODUCTION Just as previous chapters have outlined plans for the airport s physical development, this chapter outlines a plan for the airport s financial development. More specifically,

More information

Chapter 1 EXECUTIVE SUMMARY

Chapter 1 EXECUTIVE SUMMARY Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic

More information

Subtitle B Unmanned Aircraft Systems

Subtitle B Unmanned Aircraft Systems H. R. 658 62 (e) USE OF DESIGNEES. The Administrator may use designees to carry out subsection (a) to the extent practicable in order to minimize the burdens on pilots. (f) REPORT TO CONGRESS. (1) IN GENERAL.

More information

AirportInfo. Passenger Facility Charge

AirportInfo. Passenger Facility Charge AirportInfo Passenger Facility Charge May 2014 PFC A Cornerstone of Airport Capital Programs PFC user fees were first authorized by Congress in 1990 and are tied directly to local airport projects that:

More information

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting

Passenger Facility Charge (PFC) Program: Eligibility of Ground Access Projects Meeting This document is scheduled to be published in the Federal Register on 05/03/2016 and available online at http://federalregister.gov/a/2016-10334, and on FDsys.gov [ 4910-13] DEPARTMENT OF TRANSPORTATION

More information

Stimulating Airports is Stimulating the Economy

Stimulating Airports is Stimulating the Economy Stimulating Airports is Stimulating the Economy House of Commons Standing Committee on Finance Pre-budget 2010 Submission August 14 th, 2009 Executive Summary Atlantic Canada Airports Association s (ACAA)is

More information

AIRPORT CAPITAL DEVELOPMENT NEEDS

AIRPORT CAPITAL DEVELOPMENT NEEDS AIRPORT CAPITAL DEVELOPMENT NEEDS 2013-2017 January 2013 TABLE OF CONTENTS BACKGROUND... 1 RESULTS IN BRIEF... 2 ACI-NA ESTIMATE OF CAPITAL DEVELOPMENT NEEDS... 4 PROJECT DEVELOPMENT COSTS BY LOCATION

More information

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee ...while at FAA By: Kelvin L. Solco, P.E., MBA, President, The Solco Group Presented to the: NCTCOG Air Transportation Advisory Committee Presented to the: NCTCOG Air Transportation Advisory Committee

More information

DALLAS LOVE FIELD MAY 2015 DRAFT

DALLAS LOVE FIELD MAY 2015 DRAFT 8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

South Dakota Airports Conference

South Dakota Airports Conference South Dakota Airports Conference Federal Aviation Presented to: By: Date: Conference Attendees Barry D. Cooper March 18, 2015 Legislation: FAA Reauthorization Annual Appropriation Sequester Federal Aviation

More information

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and

More information

CHAPTER 7 IMPLEMENTATION PLAN

CHAPTER 7 IMPLEMENTATION PLAN CHAPTER 7 IMPLEMENTATION PLAN INTRODUCTION An implementation plan for Blue Grass Airport (LEX) has been prepared based upon the facility needs identified in the Facility Requirements and the Alternatives

More information

Airports and UAS: Managing UAS Operations in the Airport Vicinity

Airports and UAS: Managing UAS Operations in the Airport Vicinity ACRP Problem Statement 17-10-09 Recommended Allocation: $350,000 Airports and UAS: Managing UAS Operations in the Airport Vicinity ACRP Staff Comments This is one of four UAS-themed problem statements

More information

Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority

Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority September 12, 2017 Contents 1. Funding Sources for Airport Projects 2. Financial Metrics 3. CIP Summary and Funding

More information

Public Law th Congress An Act

Public Law th Congress An Act PUBLIC LAW 104 264 OCT. 9, 1996 110 STAT. 3213 Public Law 104 264 104th Congress An Act To amend title 49, United States Code, to reauthorize programs of the Federal Aviation Administration, and for other

More information

EMBARGOED FOR 5AM ET JUNE 5, 2017 PRESIDENT DONALD J. TRUMP S PRINCIPLES FOR REFORMING THE U.S. AIR TRAFFIC CONTROL SYSTEM.

EMBARGOED FOR 5AM ET JUNE 5, 2017 PRESIDENT DONALD J. TRUMP S PRINCIPLES FOR REFORMING THE U.S. AIR TRAFFIC CONTROL SYSTEM. EMBARGOED FOR 5AM ET JUNE 5, 2017 PRESIDENT DONALD J. TRUMP S PRINCIPLES FOR REFORMING THE U.S. AIR TRAFFIC CONTROL SYSTEM Overview The U.S. Air Traffic Control (ATC) system is one of the most important

More information

Frequently Asked Questions

Frequently Asked Questions CAA Funding Review Why has CAA s funding been reviewed? New Zealand has a well-regarded civil aviation system and a good aviation safety record. However, both the government and a range of reviews (including

More information

Section (a)(1). Description of Projects Impose and Use

Section (a)(1). Description of Projects Impose and Use November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear

More information

CONTACT: Investor Relations Corporate Communications

CONTACT: Investor Relations Corporate Communications NEWS RELEASE CONTACT: Investor Relations Corporate Communications 435.634.3200 435.634.3553 Investor.relations@skywest.com corporate.communications@skywest.com SkyWest, Inc. Announces Second Quarter 2016

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

U.S. ATC Reform: Why, When, and How? by Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation

U.S. ATC Reform: Why, When, and How? by Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation U.S. ATC Reform: Why, When, and How? by Robert W. Poole, Jr. Director of Transportation Studies Reason Foundation Underlying ATC Problems Airspace congestion a serious long-term problem. Modernization

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) November 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered

More information

Submitted electronically via

Submitted electronically via Docket Operations, M-30 U.S. Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 RE: DOCKET NUMBER FAA-2010-0997, NOTICE OF PROPOSED RULEMAKING, SAFETY MANAGEMENT SYSTEMS FOR CERTIFICATED

More information

COMMERCIAL AVIATION. Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects Less Certain

COMMERCIAL AVIATION. Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects Less Certain United States Government Accountability Office Report to Congressional Requesters December 2014 COMMERCIAL AVIATION Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Chapter 9: Financial Plan Draft

Chapter 9: Financial Plan Draft Chapter 9: Draft TABLE OF CONTENTS 9... 5 9.2.1 ABIA Accounting... 6 9.2.2 Legal Environment... 6 9.2.3 Governing Documents... 8 9.3.1 FAA AIP Grants... 13 9.3.2 Local ABIA Funds... 14 9.4.1 Defer or Delay

More information

US Safety. Management Activities. Federal Aviation Administration

US Safety. Management Activities. Federal Aviation Administration US Safety Management Activities Presented to: Safety Management Workshop, Kuwait Presented by: Aaron Wilkins, FAA Date: May 25-27, 2015 Agenda 1. US State Safety Program (SSP) 2. FAA Safety Management

More information

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of

Department of Transportation, Federal Aviation Administration (FAA). SUMMARY: Under this notice, the FAA announces the submission deadline of This document is scheduled to be published in the Federal Register on 05/09/2018 and available online at https://federalregister.gov/d/2018-09894, and on FDsys.gov [4910-13] DEPARTMENT OF TRANSPORTATION

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

NATIONAL AIRSPACE POLICY OF NEW ZEALAND NATIONAL AIRSPACE POLICY OF NEW ZEALAND APRIL 2012 FOREWORD TO NATIONAL AIRSPACE POLICY STATEMENT When the government issued Connecting New Zealand, its policy direction for transport in August 2011, one

More information

FAA Requirements for Engine-out Procedures and Obstacle Clearance

FAA Requirements for Engine-out Procedures and Obstacle Clearance FAA Requirements for Engine-out Procedures and Obstacle Clearance Presentation to: CAAC Engine-out Procedures Seminar Name: Chuck Friesenhahn Date: 11/29/2005 Flight Standards Senior Advisor, Advanced

More information

Land Use Policy Considerations

Land Use Policy Considerations Land Use Policy Considerations Challenges to Implementing Successful Land Use Strategies at Airports ACRP Insight Event: Washington DC Stephen D. Van Beek, Ph.D. April 11, 2018 Land Use Policy Considerations

More information

AIRPORT FUND. Description. Summary

AIRPORT FUND. Description. Summary Description In March 1941 construction started for the airport at its present site. After Pearl Harbor, the airport, known as Pinellas Army Airfield, was used as a military flight-training base. After

More information

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015

THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP) 3 RD QUARTER 2016 MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT (MSP) PUBLIC INPUT MEETING Metropolitan Airports Commission Noise Program Office July 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office TERMS OF REFERENCE Drone Advisory Committee (DAC) Committee Leadership Role Name or Title Organization Chairman Lead Designated Federal Officer Subcommittee Oversight Oversight Brian Krzanich Administrator

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) September 13, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered

More information

Community Noise Consortium Meeting (CNC)

Community Noise Consortium Meeting (CNC) Community Noise Consortium Meeting (CNC) May 10, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:

More information

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016) AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, 23-26 August 2016) Aerodromes Certification- ICAO Requirements Arthemon Ndikumana RO/AGA, Nairobi 08/09/2016 AFI Plan

More information

Chapter 9 Airport Financial Plan

Chapter 9 Airport Financial Plan Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Rates & Charges Analysis

Rates & Charges Analysis Aeronautics Division Rates & Charges Analysis Executive Summary Executive Summary In This Report: Airlines Rates and Charges Other Building Rental Rates Landing Fees Parking Rates Tie-Downs Special Use

More information

Office of Aviation Analysis (X50), Department of Transportation (DOT).

Office of Aviation Analysis (X50), Department of Transportation (DOT). This document is scheduled to be published in the Federal Register on 05/01/2014 and available online at http://federalregister.gov/a/2014-09830, and on FDsys.gov 4910-9X DEPARTMENT OF TRANSPORTATION 14

More information