Temporary Radio Mandatory Zone

Size: px
Start display at page:

Download "Temporary Radio Mandatory Zone"

Transcription

1 Introduction This safety notice contains a briefing and information about the establishment of Temporary airspace in the vicinity of Southend Airport in the form of a Radio Mandatory Zone (RMZ). The RMZ will be introduced on 18 July 2014 at 0100 Local Time. Recipients are requested to distribute this notice to all members of staff and club members and visiting pilots who may wish to fly within or in the vicinity of the RMZ. Purpose The RMZ is in place to provide further awareness to pilots and ATC on aircraft operating in the vicinity of Southend. This will in turn allow ATC to provide greater traffic information and Deconfliction advice to aircraft in the critical stages of flight. The RMZ is temporary and will be reviewed by Southend and the CAA in Spring RMZ Dimensions The RMZ extends laterally to a distance of 10.5nm to the South West and 13nm to the North East of Southend Airport and 6nm either side of the final approach tracks to runway 06/24. The RMZ extends vertically from the surface to the base of controlled airspace. Exact coordinates of the RMZ are contained within NOTAM C3430/14 Link to CAA announcement: Link to RMZ Chart on CAA site:

2 Definition and Requirements as per SARG policy A RMZ is airspace of defined dimensions wherein the carriage and operation of suitable/appropriate radio equipment is mandatory. The requirement for communications within an RMZ is as follows: VFR flights operating in parts of Classes E, F or G airspace and IFR flights operating in parts of Classes F or G airspace designated as a RMZ by the competent authority, shall establish two-way communication before entering the dimensions of the RMZ and maintain continuous air-ground voice communication watch, as necessary, on the appropriate communication channel, unless in compliance with alternative provisions prescribed for that particular airspace by the Controlling Authority. Before entering a RMZ, an initial call containing the designation of the station being called, call sign, type of aircraft, position, level, the intentions of the flight and other information as prescribed by the competent authority, shall be made by pilots on the appropriate communication channel.

3 How this relates to the Southend RMZ Southend RMZ is situated within Class G airspace. A RMZ does not change or affect the provision of services as detailed in the CAP774. If a pilot wishes to fly within the Southend RMZ they shall establish contact with Southend Radar on MHz in good time and prior to entering the RMZ. Following initial contact pilots shall inform Southend of their: Callsign Type of Aircraft Point of departure and destination Position Level Intended route Type of service being requested Other pertinent information Southend Radar will normally issue a squawk to transponder equipped aircraft for the purposes of identification or to assist other ATCUs. Pilots must remain on frequency while in the RMZ unless instructed otherwise by Southend ATC. Clearances into and within a RMZ There are no requirements for pilots to receive a clearance to enter the Southend RMZ after establishing two-way communications and passing the information detailed above. Southend appreciate that pilots may request a clearance to enter the RMZ in some manner. To save Southend ATC entering into explanatory conversations on the radio and in the interests of flight safety, ease of application and to reduce RT loading Southend ATC will approve any entry requests as per Appendix A, Example 2. Coordination Southend ATC may seek to coordinate level or routing instructions to assist in achieving deconfliction minima or to improve the efficiency of traffic management.

4 Non Radio Aircraft intending to operate non radio within the RMZ shall contact Southend ATC by telephone ( ) prior to departing. Pilots shall state the route and level of the flight along with the estimated time and duration the flight will remain within the RMZ. Southend will provide a squawk to aircraft with a functioning transponder. Pilots should display the squawk whilst within the RMZ and preferably a minimum of 5 miles prior to the RMZ boundary. Lower Airspace Radar Service (LARS) Pilots should be aware that the introduction of the RMZ does not change the provision of a LARS. Pilots are reminded that Southend provide a LARS within 25 miles of Southend airport and are encouraged to make contact and receive a service where appropriate, even if they are not requiring entry into the RMZ. Following the recent closure of Manston and their associated LARS, pilots are advised that Southend can provide a LARS to the South East extending to Manston, Ashford and Dover. Southend has recently taken steps to address high RT workload by introducing a second radar position. This should allow a more efficient service to all airspace users requiring a service from Southend radar. The initial contact frequency remains MHz unless otherwise instructed. Any questions on this Safety should be directed to Southend ATC on

5 APPENDIX A RT samples Example 1: Establishing contact with ATC Southend Radar, GAAAA GAAAA, Southend Radar GAAAA, C152 from Lydd to Andrewsfield, at Sittingbourne 2400ft, routing via Billericay, request Basic Service GAA, squawk 5050, Southend QNH 1013, Basic Service, report passing west abeam Southend Example 2: Establishing contact with ATC and a request to enter the RMZ Southend Radar, GAAAA GAAAA, Southend Radar GAAAA, C152 from Lydd to Andrewsfield, at Sittingbourne 2400ft, routing via Billericay, request Basic Service and clearance into the RMZ * GAA, squawk 5050, Southend QNH 1013, Basic Service, RMZ entry approved

6 Number: SEN 2014/002 APPENDIX Issued: 4 th B July 2014

LETTER OF AGREEMENT LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD

LETTER OF AGREEMENT LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD LETTER OF AGREEMENT BETWEEN LONDON SOUTHEND AIRPORT AND STOKE AIRFIELD LOA LSA/ Stoke Airfield Version 1.1 Page 1 of 11 Date: 16 July 2014 Letter of Agreement Between London Southend Airport and Stoke

More information

CLASS D CONTROLLED AIRSPACE GUIDE

CLASS D CONTROLLED AIRSPACE GUIDE CLASS D CONTROLLED AIRSPACE GUIDE Introduction Norwich International Airport is surrounded by Class D Controlled Airspace (CAS). This airspace is made up of a Control Zone (CTR) and a Control Area (CTA).

More information

CLASS D CONTROLLED AIRSPACE GUIDE

CLASS D CONTROLLED AIRSPACE GUIDE CLASS D CONTROLLED AIRSPACE GUIDE Introduction Norwich International Airport is surrounded by Class D Controlled Airspace (CAS). This airspace is made up of a Control Zone (CTR) and a Control Area (CTA).

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA

FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA FLIGHT ADVISORY WASHINGTON D.C. SPECIAL FLIGHT RULES AREA LEESBURG MANUVERING AREA EFFECTIVE October 11, 201609 0400 This Notice does not supersede restrictions pertaining to the use of airspace contained

More information

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this

More information

WP 09 Language proficiency for GA

WP 09 Language proficiency for GA WP 09 Language proficiency for GA Vladimír Foltín ATM/ANS Standardisa5on Team Leader Flight Standards Directorate GA NAA Group & GA sub- SSCC Mee1ng 14 th April 2015 TE.GEN.00409-001 Aircrew requirements!

More information

LETTER OF AGREEMENT. Between. and RELATING TO

LETTER OF AGREEMENT. Between. and RELATING TO LETTER OF AGREEMENT Between NATS (En Route) plc, Scottish Area Control (Prestwick) NATS (Services) Ltd, Edinburgh ATC NATS (Services) Ltd, Glasgow ATC and BRITISH GLIDING ASSOCIATION (BGA) RELATING TO

More information

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control SUBJ: Air Traffic Control This order prescribes air traffic control procedures and phraseology for use by personnel providing air traffic control services. Controllers are required to be familiar with

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

UNIVERSITY OF ALABAMA FOOTBALL

UNIVERSITY OF ALABAMA FOOTBALL UNIVERSITY OF FOOTBALL SPECIAL AIR TRAFFIC PROCEDURES TUSCALOOSA, AL September 16, 2017 November 18, 2017 The following procedures will be implemented to enhance safety and minimize delays during the following

More information

NATS Edinburgh / BGA LOA effective 24 November 2005

NATS Edinburgh / BGA LOA effective 24 November 2005 Letter of Agreement NATS Edinburgh Air Traffic Control and British Gliding Association 1. General This Letter Of Agreement (LOA) is effective from the day that Edinburgh's revised Class 'D' Airspace is

More information

Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry

Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry AIRPROX REPORT No 2017080 Date: 29 Apr 2017 Time: 1119Z Position: 5226N 00112W Location: 10nm ENE Coventry PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft C560 PA28

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information

A Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association

A Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association A Letter of Agreement Between: Robin Hood Airport Doncaster Sheffield and British Gliding Association Contents Part Subject Page Introduction: Title Page and Signatures 2 PART ONE: Definitions of the Airspace

More information

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011 ZTL ARTCC Asheville Regional Air Traffic Control Tower Standard Operating Procedures AVL 7110.65B Effective: May 1, 2011 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1 1-1-1. Callsign Usage and Frequency

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

Airspace Namibia 2017/18. Released Version

Airspace Namibia 2017/18. Released Version Airspace Namibia 2017/18 Released Version 1.00 28.09.2017 Released Version 0.06 08.09.2017 Spelling error corrected 0,05 19.04.2017 South of FIR Windhoek 0.04 13.04.2017 After Meeting at Windhoek 0.03

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough

Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough AIRPROX REPORT No 2018103 Date: 01 Jun 2018 Time: 0959Z Position: 5121N 00048W Location: 6nm N Farnborough PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft DA62 BE90

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2017006 Date: 06 Jan 2017 Time: 0839Z Position: 5744N 00046E Location: 95nm NE Aberdeen PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft S92 EC175

More information

CLEARANCE INSTRUCTION READ BACK

CLEARANCE INSTRUCTION READ BACK CLEARANCE INSTRUCTION READ BACK 1. Introduction An ATC clearance or an instruction constitutes authority for an aircraft to proceed only in so far as known air traffic is concerned and is based solely

More information

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport A PILOT S GUIDE To understanding ATC operations at Lancaster Airport - 1 - Welcome to the Lancaster Airport (This material shall be used for informational purposes only) The Air Traffic Controllers at

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original

AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0532 V2 15 June 2016 15 June 2016 BRITISH GLIDING ASSOCIATION : COMPETITIONS 2016

More information

AIRPROX REPORT No

AIRPROX REPORT No AIRPROX REPORT No 2013022 Date/Time: Position: 25 Apr 2013 1233Z 5156N 00324W (1nm W Liverpool) Airspace: Liverpool CTR (Class: D) Reporting Ac Reported Ac Type: A319 PA38 Operator: CAT Civ Club Alt/FL:

More information

FLIGHT PLAN VALIDATION

FLIGHT PLAN VALIDATION FLIGHT PLAN VALIDATION 1. Introduction When operating an active air/ground traffic control position, one of your tasks is the flight plan check of all aircraft under your responsibility. The flight plan

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No / EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Draft Brussels, C COMMISSION REGULATION (EU) No / of [ ] amending Commission Regulation (EU) No / laying down the common rules of the air and operational

More information

Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport

Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport AIRPROX REPORT No 2018158 Date: 29 Jun 2018 Time: 1502Z Position: 5325N 00312W Location: 5nm NW Liverpool Airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR

ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR ATM REGIONAL CONTINGENCY PLAN FOR.. CTA/UTA/FIR OBJECTIVE: This ATS Contingency plan s objective is to ensure the continued safety and supplies of air navigation services in the event of partially or total

More information

Advisory Circular AC61-3 Revision 12 SUPERSEDED Describe the duties of the pilot-in-command, as laid down in CA Act 1990 S13 and 13A.

Advisory Circular AC61-3 Revision 12 SUPERSEDED Describe the duties of the pilot-in-command, as laid down in CA Act 1990 S13 and 13A. Subject No 4 Air Law Each subject has been given a subject number and each topic within that subject a topic number. These reference numbers will be used on knowledge deficiency reports and will provide

More information

ASIA-PACIFIC ECONOMIC COOPERATION (APEC) NOVEMBER

ASIA-PACIFIC ECONOMIC COOPERATION (APEC) NOVEMBER TEL : (675) 3121581 AFTN : AYPMYNYX Fax :(675) 3121593 E-mail: ais@pngairservices.com.pg AERONAUTICAL INFORMATION SERVICES P.O. BOX 273 BOROKO, NCD 111 NATIONAL CAPITAL DISTRICT PAPUA NEW GUINEA AIP SUPPLEMENT

More information

AIRPROX REPORT No Date/Time: 27 Aug Z. (5nm NE Coventry Airport) Airspace: London FIR (Class: G)

AIRPROX REPORT No Date/Time: 27 Aug Z. (5nm NE Coventry Airport) Airspace: London FIR (Class: G) AIRPROX REPORT No 2013123 Date/Time: 27 Aug 2013 1452Z Position: 5225N 00122W (5nm NE Coventry Airport) Airspace: London FIR (Class: G) Reporting Ac Type: ATP C172 Reported Ac Operator: CAT Civ Pte Alt/FL:

More information

ZTL ARTCC. Augusta Regional

ZTL ARTCC. Augusta Regional ZTL ARTCC Augusta Regional Air Traffic Control Tower Standard Operating Procedures AGS 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign Usage and Frequency

More information

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC. AD 2.ELLX-15 DISKI 2Y GTQ 7X GTQ 7Y MMD 7X RAPOR 4X 3.2.2 Climb Requirements RWY 24 Designator Route Remarks R-238 LUX to 8 DME LUX, RT to intercept R-222 NTM to 24 DME NTM, RT R-156 DIK, LT R-115 LUX

More information

COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP

COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP 2017 College Football Playoff National Championship Notices to Airmen COLLEGE FOOTBALL PLAYOFF NATIONAL CHAMPIONSHIP SPECIAL AIR TRAFFIC PROCEDURES TAMPA, January 8 10, 2017 In anticipation of a large

More information

Chapter 9 - Airspace: The Wild Blue, Green & Red Yonder

Chapter 9 - Airspace: The Wild Blue, Green & Red Yonder I5 Class G Airspace 38. [I4/3/3] What minimum visibility and clearance from clouds are required for VFR operations in Class G airspace at 700 feet AGL or lower during daylight hours? A. mile visibility

More information

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK KOUN WESTHEIMER AIRPORT NORMAN, OK 17 09/08 09/09 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon CDT until 7:30 PM CDT Thursday, September 7, 2017 7:00 AM CDT until 7:30 PM CDT Friday, September

More information

The NOTAM described will replace previously issued FDC NOTAMs 6/2550 and 7/7778 for the DC ADIZ/FRZ.

The NOTAM described will replace previously issued FDC NOTAMs 6/2550 and 7/7778 for the DC ADIZ/FRZ. This advisory covers published NOTAMs 7/0206 for the DC ADIZ, 7/0211 for the DC FRZ and FDC 7/0204 for the outer speed restriction. WARNING This document only contains an overview of the new rules for

More information

Greenville Spartanburg International

Greenville Spartanburg International ZTL ARTCC Greenville Spartanburg International Airport Traffic Control Tower Standard Operating Procedures GSP 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 2-1-1. Callsign

More information

Cape Area Airports Standard Operating Procedures

Cape Area Airports Standard Operating Procedures Cape Area Airports Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world

More information

Time: 1111Z Position: 5049N 00016W Location: 1nm SE Brighton City Airport

Time: 1111Z Position: 5049N 00016W Location: 1nm SE Brighton City Airport AIRPROX REPORT No 2017181 Date: 29 Jul 2017 Time: 1111Z Position: 5049N 00016W Location: 1nm SE Brighton City Airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

Safety Brief. 21st March Operations in Somali Airspace

Safety Brief. 21st March Operations in Somali Airspace Safety Brief 21st March 2017 Operations in Somali Airspace Background IATA is aware of safety reports detailing various high risk events related to operations within the Mogadishu (Somalia) FIR (HCSM).

More information

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows)

ENR 1.1 GEN. RULES (Insert para 13 in ENR 1.1 of AIP India as follows) TEL: +91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: +91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT NEW

More information

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC

FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC FEDERAL AVIATION ADMINISTRATION CENTRAL EN ROUTE AND OCEANIC AREA OPERATIONS FORT WORTH ARTC CENTER, MAJORS ATCT, AND SKYDIVE TANDEM GREENVILLE, LLC LETTER OF AGREEMENT Effective: April 10,2012 SUBJECT:

More information

APPENDIX F AIRSPACE INFORMATION

APPENDIX F AIRSPACE INFORMATION APPENDIX F AIRSPACE INFORMATION Airspace Use DEFINITION OF AIRSPACE Airspace, or that space which lies above a nation and comes under its jurisdiction, is generally viewed as being unlimited. However,

More information

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service

More information

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51)

Northern Regional Training Scheme. EGNT Newcastle Aerodrome Pilot s Guide. REVISION 2 (Wednesday, 03 August 2011 at 15:51) Northern Regional Training Scheme EGNT Newcastle Aerodrome Pilot s Guide REVISION 2 (Wednesday, 03 August 2011 at 15:51) PUBLISHED Wednesday, 03 August 2011 1 Contents 1 Contents... 2 2 Departures... 3

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW / EDINBURGH AREA CAT Z

AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW / EDINBURGH AREA CAT Z AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-06-0216 V1 01 June 2016 Date. AERIAL LiDAR SURVEY OF OVERHEAD POWERLINES GLASGOW /

More information

ERIE ATCT STANDARD OPERATING PROCEDURES

ERIE ATCT STANDARD OPERATING PROCEDURES ORDER ERI ATCT 7110.10I ERIE ATCT STANDARD OPERATING PROCEDURES August 1, 2014 VATUSA CLEVELAND ARTCC VIRTUAL AIR TRAFFIC SIMULATION NETWORK VIRTUAL AIR TRAFFIC SIMULATE NETWORK UNITED STATES DIVISION

More information

LETTER OF AGREEMENT. Between

LETTER OF AGREEMENT. Between LETTER OF AGREEMENT Between Romania vacc and Moldova vacc Bucharest FIR Chisinau FIR Effective: 01/12/2015 Version: 1.0 Purpose: The purpose of this Letter of Agreement is to define the coordination procedures

More information

Date: 14 Jun 2017 Time: 1600Z Position: 5121N 00102W Location: 7nm NW Blackbushe airport

Date: 14 Jun 2017 Time: 1600Z Position: 5121N 00102W Location: 7nm NW Blackbushe airport AIRPROX REPORT No 2017113 Date: 14 Jun 2017 Time: 1600Z Position: 5121N 00102W Location: 7nm NW Blackbushe airport PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft

More information

Letter of Agreement. between. and

Letter of Agreement. between. and Munich FIR (EDMM) IVAO Germany 1 Document purpose Letter of Agreement between and Zürich FIR (LSAZ) IVAO Switzerland Effective: 02-APR-2015 Edition: 1.1 The purpose of this Letter of Agreement is to define

More information

PILOT BRIEFING GENEVA RFE 2018

PILOT BRIEFING GENEVA RFE 2018 PILOT BRIEFING GENEVA RFE 2018 Introduction The aim of this pilot briefing for the RFE is to inform pilots about local procedures and to prepare them for a lot of traffic. To be able to achieve a good

More information

NDS Subject to NOTAM: No

NDS Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2017-00-0131 1.1 29 November 2016 29 November 2016 RAF VALLEY (MONA) MSSR CALIBRATION NDS

More information

Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016

Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016 Sherburn Aero Club CAP1122 Review CAP 725 Framework Meeting October 26, 2016 The Structure of the Presentation The Draft CAP725 ACP Document The Safety Case Document Discussion Actions The Draft CAP725

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

Burlington ATCT Standard Operating Procedures

Burlington ATCT Standard Operating Procedures This air traffic control procedural document is provided for virtual air traffic control in the ZBW ARTCC of the VATSIM network only. It is not for real-world ATC use. These procedures are approved for

More information

INDEMNITY APPLICATION FORM

INDEMNITY APPLICATION FORM INDEMNITY APPLICATION FORM The following forms may only be completed by pilots and aircraft based at Gloucestershire Airport. Operator indemnity refers to all operators and flying schools/clubs that will

More information

Runway Crossings at Brisbane International Airport

Runway Crossings at Brisbane International Airport Runway Crossings at Brisbane International Airport All instructions to cross runways will be issued by Ground on 121.7 MHz All runway crossings require a specific CROSSING clearance. Runway Crossing Requirements

More information

AIP Supplement. Effective at: NZDT ( UTC) This AIP Supplement is issued separately and should be retained until cancelled.

AIP Supplement. Effective at: NZDT ( UTC) This AIP Supplement is issued separately and should be retained until cancelled. AIP New Zealand AIRAC AIP Supplement Effective 29 MAR 18 Effective at: 1813290000 NZDT (1803281100 UTC) This AIP Supplement is issued separately and should be retained until cancelled. WARBIRDS OVER WANAKA

More information

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION

UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. GRANT OF EXEMPTION In the matter of the petition of the DEPARTMENT OF DEFENSE UNITED STATES OF AMERICA FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Exemption No. 5100B For an exemption from the provisions 25863 Of sections

More information

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT

Effective: AUSTRALIAN INTERNATIONAL AIRSHOW AVALON 2019, AVALON AIRPORT 19 FEBRUARY - 5 MARCH 2019, IFR OPERATIONS AVALON AIRPORT AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 02/19

More information

RESTRICTED AREA (TEMPORARY) Subject to NOTAM: Yes (by Airspace Regulation)

RESTRICTED AREA (TEMPORARY) Subject to NOTAM: Yes (by Airspace Regulation) AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-08-0026 1.1 13 July 2016 13 July 2016 HERNE BAY AIR SHOW RESTRICTED AREA (TEMPORARY)

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

ATC Training Department / South East RTS. UK Flight Information Services (FIS) REVISION 3. (Monday, 16 February 2015 at 14:15)

ATC Training Department / South East RTS. UK Flight Information Services (FIS) REVISION 3. (Monday, 16 February 2015 at 14:15) I ATC Training Department / South East RTS UK Flight Information Services (FIS) (Formerly: Air Traffic Services Outside Controlled Airspace) REVISION 3 (Monday, 16 February 2015 at 14:15) PUBLISHED Monday,

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

In our previous example for the circuit flight we have already learned how to ask for proper clearance so let's go.

In our previous example for the circuit flight we have already learned how to ask for proper clearance so let's go. Learning Goals VFR R/T TRAINING VFR COMMUNICATION, HOW TO DO THIS (part 2) Since we have practised now a circuit flight, let's go over an example where we will do a flight from Borg El Arab (HEBA) to Alexandria

More information

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations

Anchorage ARTCC Phraseology Guide. Clearance Delivery Operations Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:

More information

AERONAUTICAL INFORMATION CIRCULAR

AERONAUTICAL INFORMATION CIRCULAR REPUBLICA BOLIVARIANA DE VENEZUELA INSTITUTO NACIONAL DE AERONAUTICA CIVIL SERVICIO DE INFORMACION AERONAUTICA TEL: (58)212 3551920. FAX: (58) 3551518. AFTN: SVMIYOYX. E-mail: ais@inac.gov.ve AIC A10/04

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

- Updated formatting - Re-drawn airspace delegation diagram

- Updated formatting - Re-drawn airspace delegation diagram Z D C A R T C C - Updated formatting - Re-drawn airspace delegation diagram Change Log... 2 Table of Contents... 3 Chapter 1. Positions... 4 Chapter 2. Clearance Delivery... 5 Chapter 3. Ground Control...

More information

TRANSPONDER WITH IVAC

TRANSPONDER WITH IVAC TRANSPONDER WITH IVAC 1. Introduction In his area of control, an active controller is responsible to assign a transponder code to all aircraft. It is the responsibility of the pilot in command to tune

More information

OPERATIONS MANUAL PART A

OPERATIONS MANUAL PART A PAGE: 1 Table of Content A.GENERAL /CHAPTER 7 -....3 7.... 3 7.1 Minimum Flight Altitudes /Flight Levels VFR Flight... 3 7.2 Minimum Flight Altitudes /Flight Levels IFR Flight... 4 7.2.1 IFR flights non

More information

CHAPTER 6 FLIGHT FOLLOWING

CHAPTER 6 FLIGHT FOLLOWING CHAPTER 6 FLIGHT FOLLOWING The procedures in this chapter for flight following and airspace management are for use in and around cantonment areas, training areas, and ranges. However, this does not preclude

More information

RAF BRIZE NORTON CONTROL ZONE

RAF BRIZE NORTON CONTROL ZONE RAF BRIZE NORTON CONTROL ZONE A guide to transiting through and around Controlled Airspace This is an Information Guide produced by RAF Brize Norton Air Traffic Control Squadron and should not be used

More information

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB

AIRPROX REPORT No PART A: SUMMARY OF INFORMATION REPORTED TO UKAB AIRPROX REPORT No 2017272 Date: 01 Dec 2017 Time: 1058Z Position: 5348N 00150E Location: Below EGD323D PART A: SUMMARY OF INFORMATION REPORTED TO UKAB Recorded Aircraft 1 Aircraft 2 Aircraft AW189 F15

More information

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME

INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016 BY: MATHIEU LAFLAMME INTERNATIONAL VIRTUAL AVIATION ORGANISATION CANADIAN AIR TRAFFIC CONTROL PHRASEOLOGY ATC OPERATIONS DECEMBER 2016!1 GENERAL Proper use of phraseology is one of the most important thing in aviation and

More information

Piedmont Triad International Airport

Piedmont Triad International Airport ZTL ARTCC Piedmont Triad International Airport Airport Traffic Control Tower Standard Operating Procedures GSO 7110.65B Effective: May 1, 2011 1 CHAPTER 1. GENERAL CONTROL SECTION 1. EQUIPMENT 1-1-1. Callsign

More information

Pilot ATC RT Phraseology

Pilot ATC RT Phraseology Pilot ATC RT Phraseology An Introduction to ATC Pilot Communications 6/1/2016 Pakistan vacc Introduction: This document will give you a brief introduction to the calls/conversation taking place on the

More information

This advisory circular provides the syllabus for training and assessment for applicants for an approach control procedural rating.

This advisory circular provides the syllabus for training and assessment for applicants for an approach control procedural rating. Advisory Circular AC65-7.2 Air Traffic Service Personnel Licences and Ratings Air Traffic Controller Ratings Approach Control Procedural Rating Revision 3 11 November 2015 General Civil Aviation Authority

More information

Airspace. Chapter 14. Gold Seal Online Ground School. Introduction

Airspace. Chapter 14. Gold Seal Online Ground School.   Introduction Gold Seal Online Ground School www.onlinegroundschool.com Chapter 14 Airspace Introduction The two categories of airspace are: regulatory and nonregulatory. Within these two categories there are four types:

More information

Farnborough International Airshow 2018 HELICOPTER OPERATORS GUIDE

Farnborough International Airshow 2018 HELICOPTER OPERATORS GUIDE Farnborough International Airshow 2018 HELICOPTER OPERATORS GUIDE CONTENTS PAGE Section 1 INTRODUCTION 1-2 1.1 Farnborough International Airshow 2018 1.2 Reference Documents 1.3 Permission 1.4 Contacts

More information

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW)

Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) Virtual Air Traffic Simulation Network (VATSIM) United States Division Fort Worth vartcc (ZFW) KDAL Dallas Love International Airport ATCT Standard Operating Procedures Rev. December 17, 2014 Approved:

More information

c) Advisory service to IFR flights operating within advisory airspace.

c) Advisory service to IFR flights operating within advisory airspace. Section 5 Chapter 1 Area Services Area Control Service Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7(ATS Surveillance

More information

CAT E Subject to NOTAM: No

CAT E Subject to NOTAM: No AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2015-09-0091 V1.0 10 June 2016 10 June 2016 TALLA DVOR/DME CALIBRATION CAT E Subject to

More information

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB

UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM GLIDING CLUB AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-04-0110 V2.0 05 May 2016 22 April 2016 UK MOUNTAIN WAVE FESTIVAL - TRA (G) CAIRNGORM

More information

SAFETY AND AIRSPACE REGULATION GROUP

SAFETY AND AIRSPACE REGULATION GROUP SAFETY AND AIRSPACE REGULATION GROUP ACTIVITY No 2014-00-0105 13 January 2014 See Distribution INTRODUCTION AIRSPACE CO-ORDINATION NOTICE LONDON CITY ILS RWYs 09 AND 27 FLIGHT CHECKS 1. SARG has agreed

More information

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures

VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating

More information

This advisory circular provides the syllabus for training and assessment for applicants for an approach control surveillance rating.

This advisory circular provides the syllabus for training and assessment for applicants for an approach control surveillance rating. Advisory Circular AC65-7.3 Air Traffic Service Personnel Licences and Ratings Air Traffic Controller Ratings Approach Control Surveillance Rating Revision 3 11 November 2015 General Civil Aviation Authority

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

AERIAL SURVEY SWISS FLIGHT SERVICES CAT Z

AERIAL SURVEY SWISS FLIGHT SERVICES CAT Z AIRSPACE CO-ORDINATION NOTICE Safety and Airspace Regulation Group ACN Reference: Version: Date: Date of Original 2016-05-0225 Draft 01 June 2016 Subject to NOTAM: No Date(s) of activity/validity: WIE

More information

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office:

Any queries about the content of the attached document should be addressed to: ICAO EUR/NAT Office: Serial Number: 2018_005 Subject: Special Procedures For In-Flight Contingencies in Oceanic Airspace Originator: NAT SPG Issued: 17 DEC 2018 Effective:28 MAR 2019 The purpose of this North Atlantic Operations

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN PILOT BRIEFING ROVANIEMI X-MAS FLY-IN GENERAL ICAO: EFRO IATA: RVN Runways: 03/21 AIP SUPPLEMENT An AIP Supplement will be in effect on the day of the event. This supplement details vital procedures for

More information

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123 INTRODUCTION The procedures for and VFR are mostly identical but some words and procedures are generally only used by large commercial aircraft; hence they appear in this section. In this chapter we will

More information

AERONAUTICAL INFORMATION CIRCULAR Y 024/2015

AERONAUTICAL INFORMATION CIRCULAR Y 024/2015 AERONAUTICAL INFORMATION CIRCULAR Y 024/2015 UNITED KINGDOM NATS Services UK Aeronautical Information Services Heathrow House Bath Road, Cranford Middlesex, TW5 9AT http://www.ais.org.uk 01223-497987 (Content

More information

CPA 1711:56 R44 A15 EC135 A14 100ft V 0.2nm H. Wolverhampton Halfpenny Green

CPA 1711:56 R44 A15 EC135 A14 100ft V 0.2nm H. Wolverhampton Halfpenny Green AIRPROX REPORT No 2013136 Date/Time: 21 Sep 2013 1712Z (Saturday) Position: 5234N 00206W (7nm NE of Wolverhampton Halfpenny Green) Airspace: London FIR (Class: G) Reporting Ac Reported Ac Type: EC135P2+

More information