ADVISORY CIRCULAR AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS

Size: px
Start display at page:

Download "ADVISORY CIRCULAR AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS"

Transcription

1 AC SRVSOP ADVISORY CIRCULAR AC : DATE : 12/10/09 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 5 OPERATIONS 1. PURPOSE This advisory circular (AC) provides acceptable means of compliance (AMC) concerning aircraft and operators approval for RNAV 5 operations. An operator may use alternative means of compliance, as far as those means are acceptable for their respective Civil Aviation Authority (CAA). The use of the verb in future or the word must, is applied to an applicant or operator choosing to fulfill the criteria described in this AC. This AC also provides guidelines to operators when the stand-alone global positioning system (GPS) is used as the means of navigation in RNAV 5 operations (where the stand-alone GPS equipment provides the only RNAV capability installed on board the aircraft). 2. LATIN AMERICAN AERONAUTICAL REGULATIONS (LAR) RELATED SECTIONS OR EQUIVALENT REGULATIONS LAR 91: LAR 121: LAR 135: Sections and or equivalents Section (b) or equivalent Section (c) or equivalent 3. RELATED DOCUMENTS ICAO Doc 9613 Performance-based navigation (PBN) manual and its related documentation EASA AMC 20-4 Airworthiness approval and operational criteria for the use of navigation systems in European airspace designated for Basic RNAV operations and its related documentation FAA AC 90-96A Approval of U.S. operators and aircraft to operate under instrument flight rules (IFR) in European airspace designated for basic area navigation (B-RNAV) and precision area navigation (P-RNAV) and its related documentation Spain DGAC CO 1/98 Resolution for operational approval and criteria for the use of navigation systems in European airspace designated for Basic RNAV operations 4. DEFINITIONS AND ABREVIATIONS 4.1 Definitions a) Area navigation (RNAV).- A method of navigation which permits aircraft operation on any desired flight path within the coverage of ground or space-based navigation aids or within the 1

2 SRVSOP AC limits of the capability of self-contained aids, or a combination of these. Note.- Area navigation includes performance-based navigation as well as other operations that do not meet the definition of performance-based navigation. b) Area navigation route.- An Air traffic services (ATS) route established for the use of aircraft capable of employing area navigation. c) Global positioning system (GPS).- The United States Global navigation Satellite System (GNSS) is a satellite-based radio navigation system which utilizes precise range measurements to determine position, velocity and time in anywhere in the world. The GPS is composed by three elements: space, control, and user. The space element is formed of at least 24 satellites in 6 orbital planes. The control element consists of 5 monitor stations, 3 ground antennas, and a master control station. The user element consists of antennas and receivers that provide positioning, velocity and precise timing to the user. d) Navigation specifications.- A set of aircraft and air crew requirements, needed to support performance based navigation operations within a defined airspace. There are two kinds of navigation specifications: RNAV and RNP. A RNAV specification does not include requirements for on-board performance monitoring and alerting. A RNP specification includes requirements for on-board performance monitoring and alerting. e) Performance based navigation (PBN).- Area navigation based on performance requirements for aircraft operating along an ATS route, on an instrument approach procedure or in a designated airspace. Note.- Performance requirements are expressed in navigation specifications (RNAV specification, RNP specification) in terms of accuracy, integrity, continuity, availability and functionality needed for the proposed operation in the context of a particular airspace concept. f) Receiver autonomous integrity monitoring (RAIM).- A technique used within a GPS receiver/processor to determine the integrity of its navigation signals using only GPS signals, or GPS signals augmented with barometrical altitude data. This determination is achieved by a consistency check among redundant pseudo-orange measurements. At least one additional satellite needs to be available in respect to the number of satellites that are needed to obtain the navigation solution. g) RNAV operations.- Aircraft operations using area navigation for RNAV applications. RNAV operations include the use of area navigation for operations which are not developed in accordance with the PBN manual. h) RNAV system.- Area navigation system, which permits aircraft operation on any desired flight path within the coverage of ground or space-based navigation aids, or within the limits of the capability of self-contained aids, or a combination of both. A RNAV system may be included as part of the Flight Management System (FMS) 4.2 Abreviaturas a) AC Advisory circular (FAA) b) ADF Automatic direction finder c) AFM Aircraft flight manual d) AIP Aeronautical information publication e) AIRAC Aeronautical information regulation and control f) AMC Aceptable means of compliance g) ANSP Air navigation services provider h) ATC Air traffic control 2

3 AC SRVSOP i) ATS Air traffic services j) B-RNAV Basic area navigation k) CA Advisory circular (in spanish - SRVSOP) l) CAA Civil Aviation Authority m) CDI Course deviation indicator n) CDU Control display unit o) CO Operational Circular (Spain) p) DME Distance measuring equiment q) DOP Dilution of precision r) EASA European Aviation Safety Agency s) ETSO EASA Technical standard order t) EUROCAE European organization for civil aviation equipment u) FAA Federal Aviation Administration (United States) v) FDE Fault detection and exclusion w) FMS Flight management system x) FTE Flight technical error y) GNSS Global navigation satellite system z) GPS Global positioning system aa) HSI Horizontal situation indicator bb) IFR Instrument flight rules cc) INS Inertial navigation system dd) IRS Inertial referente system ee) IRU Inertial referente unit ff) LAR Latin American Aeronautical Regulations gg) LOA Letter of authorization/letter of acceptance hh) MEL Minimum equipment list ii) NAVAIDS Navigation aids jj) NDB Non-directional beacon kk) ND Navigation display ll) NOTAM Notice to airmen mm) ICAO Internacional Civil Aviation Orgatization nn) OM Operations manual oo) PBN Performance based navigation pp) PF Pilot flying qq) PNF Pilot not flying rr) POH Pilot operating handboock ss) RAIM Receiver autonomous integrity monitoring 3

4 SRVSOP AC tt) P-RNAV Precision area navigation uu) RAIM Receiver autonomous integrity monitoring vv) RNAV Area navigation ww) RTCA Radio technical commission for aeronautics xx) SA Selective availability yy) SB Service bulletin zz) STC Supplemental type certificate aaa) TCDS Type certificate data sheet bbb) TLS Target level of safety ccc) TSO Technical standard order ddd) VOR Very hight frecuency (VHF) omni-directional radio range eee) WGS World geodetic system fff) WPT Waypoint 5. INTRODUCTION 5.1 In January 1998, the European Air Safety Agency (EASA) published the document related to the acceptable means of compliance (AMC 20-4) which replaced the Temporary guidance Leaflet No. 2 (TGL No. 2) issued by former JAA. This AMC contains acceptable means of compliance related to airworthiness approval and operational criteria for the use of navigation systems in European air space designated for basic area navigation operations (Basic RNAV or B- RNAV). 5.2 In the same manner, the Federal Aviation Administration (FAA) of the United States (U.S.) replaced the AC of March 1998 by AC 90-96A issued in January This new circular provides guidance material in regards to the airworthiness and operational approval for operators of U.S. registered civil aircraft operating in European air space designated for Basic area navigation (B-RNAV) and Precision area navigation (P-RNAV). 5.3 Both current documents, AMC 20-4 and AC 90-96A, require similar operational and functional requirements. 5.4 In the context of the terminology adopted in the Performance based navigation manual (PBN manual) of the International Civil Aviation Organization (ICAO), B-RNAV requirements are termed RNAV The basis of specifications developed by EASA and FAA are supported on the capacity of RNAV equipments incorporated in the early 70s. 5.6 While RNAV operation requirements are addressed primarily in an ATS surveillance environment, RNAV 5 implementation has occurred in areas where there is no surveillance. This has required an increase in route spacing to ensure compliance with the desired level of safety (TLS). 5.7 RNAV 5 specification does not require an alert to the pilot in the event of excessive navigation errors, neither requires two RNAV Systems, thus, the potential for loss of RNAV capability requires the aircraft to be provided of an alternative navigation source. 5.8 The performance level selected for RNAV operations allows a wide range of RNAV systems to be approved for these operations, including INS with a two hour limit after its last alignment/position update performed on the ground, when they do not have a function for automatic radio updating of aircraft position. 5.9 Although RNAV 5 specification does not include requirements for on-board performance 4

5 AC SRVSOP monitoring and alerting, it does require that the on-board equipment keeps a lateral and longitudinal navigation accuracy on route of + 5 NM or better during 95% of the total flight time. 6. GENERAL CONSIDERATIONS 6.1 Navaid infrastructure a) The CAA may prescribe RNAV 5 navigation specification for specific routes or for specific areas or flight levels of an airspace. b) RNAV 5 systems permit aircraft navigation along any desired flight path within the coverage of ground or space-base navigation aids (NAVAIDS) or within the limits of the capability of self-contained aids or a combination of both methods. c) RNAV 5 operations are based on the use of RNAV equipment which automatically determines the aircraft position in the horizontal plane using input from one sensor or a combination of the following types of position sensors, together with the means to establish and follow a desired path: 1) VOR/DME; 2) ME/DME; 3) INS or IRS; and 4) GNSS. Note.- the application of the sensors is subject to the limitations contained in this AC. d) The Air navigation services providers (ANSP) must assess the NAVAID infrastructure in order to ensure that it is sufficient for the proposed operations, including reversionary modes. e) It is acceptable for gaps in NAVAIDS coverage to be present; when this occurs, route spacing and obstacle clearance surfaces must be consider due to the expected increase in lateral trackkeeping errors during the dead reckoning phase of flight. 6.2 Communication and air traffic services (ATS) surveillance a) Direct pilot to ATC voice communication is required. b) When reliance is placed on the use of ATS surveillance to assist contingency procedures, its performance should be adequate for that purpose. c) Radar monitoring by the ATS may be used to mitigate the risk of gross navigation errors, provided the route lies within the ATS surveillance and communications service volumes and the ATS resources are sufficient for the task. 6.3 Obstacle clearance and route spacing a) Detailed guidance on obstacle clearance is provided in PANS-OPS (Doc 8168), Volume II; the general criteria in Parts I and III apply. b) The ANSP is responsible for route spacing and should have ATS surveillance and monitoring tools to support detection and correction of navigation errors. c) In an ATC surveillance environment, the route spacing will depend on acceptable ATC workload and availability of controller tools. d) The route design should account for the navigation performance achievable using the available NAVAID infrastructure, as well as the functional capabilities required by this document. Two aspects are of particular importance: 1) Spacing between routes in turns (a) Automatic leg sequencing and associated turn anticipation is only a 5

6 SRVSOP AC recommended function for RNAV 5. The track followed in executing turns depends upon the true airspeed, applied bank angle limits and wind. These factors, together with the different turn initiation criteria used by manufacturers, result in a large spread of turn performance. Studies have shown that for a track change of as little as 20 degrees, the actual path flown can vary by as much as 2 NM. This variability of turn performance must be considered in the design of the route structure where closely spaced routes are proposed. 2) Along track distance between leg changes (a) A turn can start as early as 20 NM before the waypoint in the case of a large track angle change. Manually initiated turns may overshoot the following track. (b) The track structure design has to ensure leg changes do not occur too closely together. The required track length between turns shall depend upon the required turn angle. 6.4 Publication a) The AIP shall clearly indicate the navigation application is RNAV 5. The requirement for the carriage of RNAV 5 equipment in specific airspace or on identified routes should be published in the AIP. b) The route must rely on normal descent profiles and identify minimum segment altitude requirements. c) The navigation data published in the AIP for the routes and supporting navigation aids must meet the requirements of Chicago Convention Annex 15 - Aeronautical Information Services. d) All routes must be based upon WGS-84 coordinates. e) The available NAVAID infrastructure must be clearly designated on all appropriate charts (e.g. GNSS, DME/DME, VOR/DME). Any navigation facilities that are critical to RNAV 5 operations shall be identified in the relevant publications. f) A navigation database does not form part of the required functionality of RNAV 5. The absence of such a database necessitates manual waypoint entry, which significantly increases the potential for waypoint errors. En-route charts should support gross error checking by the flight crew by publishing fix data for selected waypoints on RNAV 5 routes. 6.5 Additional considerations a) Many aircraft have the capability to fly a path parallel to, but offset left or right from, the original active route. The purpose of this function is to enable offsets for tactical operations authorized by ATC. b) In the same way, many aircraft have the capability to execute a holding pattern manoeuvre using their RNAV system; this capability can provide flexibility to ATC in designing RNAV 5 operations. 7. AIRWORTHINESS AND OPERATIONAL APPROVAL 7.1 In order to the operator receives an RNAV 5 authorization, this must comply with two types of approval: a) Airworthiness approval in charge of the State of registry; (See Art. 31, Chicago Convention, Paragraph and of Annex 6, Part I; and b) Operational approval required by the State of the operator (See Paragraph and Attachment F of Annex 6 Part I). 7.2 For general aviation operators, the State of registration (See Paragraph of Annex 6 Part II) will submit a Letter of Appointment (LOA) once determined that the aircraft accomplishes all applicable requirements of this document for RNAV 5 operations. 6

7 AC SRVSOP 7.3 Compliance with airworthiness requirements by themselves does not constitute the operational approval. 8. AIRWORTHINESS APPROVAL 8.1 Aircraft equipment a) An aircraft may be considered eligible for an RNAV 5 approval if it is equipped with one or more navigation systems approved and installed in accordance with the guide included in this document. b) An aircraft capacity to perform RNAV 5 operations can be demonstrated or reached in the following cases 1) First case: Demonstrated capacity in the manufacturing process and declared in the Aircraft flight manual (AFM) or in the AFM supplement or in the Type certificate data sheet (TCDS) or in the Pilot operating handbook (POH). 2) Second case: Capacity reached in-service: (a) By applying the service bulletin or supplemental type certificate or service letter or equivalent document and inclusion of the supplement in the AFM; or (b) through aircraft navigation system approval. 8.2 Eligibility based on AFM or AFM supplement or TCDS or POH. To determine eligibility of the aircraft in function of AFM or AFM supplement, TCDS or POH, aircraft RNAV 5 capacity must have been demonstrated in production (aircraft in manufacturing process or new construction). a) Aircraft RNAV 5 systems eligibility. 1) An aircraft may be considered eligible for RNAV 5 operations, if AFM or AFM supplement or TCDS or POH shows the appropriate instruments flight rules (IFR) navigation system installation has received airworthiness approval in accordance with this AC or AMC 20-4 or with one of the following FAA documents: (a) AC 90-96, AC 90-45A, AC A, AC , AC o AC ) Airworthiness approval guidance included in this AC provides aircraft navigation performance equivalent to EASA AMC 20-4 and FAA AC 90-96A. 3) Once aircraft eligibility has been established, operator approval will proceed, according to paragraph 9 of this AC. b) LAR 91 aircraft approval 1) LAR 91 operators should revise the AFM or AFM supplement or TCDS or POH to assure that the aircraft navigation system is eligible to perform RNAV 5 operations, according to describe on paragraph 8.2 a) 1) of this AC. 2) After having determined eligibility of the navigation system, LAR 91 operators will present respective documents to the AAC. 3) In case LAR 91 operators are not able to determine, based on the AFM or AFM supplement or TCDS or POH, whether the Aircraft system has been installed and approved according with an appropriate CA or AC or AMC, they will proceed according to paragraph 8.3. of this document. c) LAR 121 and/or 135 aircraft approval 1) LAR 121 and/or 135 operators will present the following documents to AAC: (a) Sections of the AFM or AFM supplement or TCDS that document airworthiness 7

8 SRVSOP AC approval in accordance with this AC or with guidance materials mentioned in Paragraph 8.2 a) 1) of the this document. 2) These operators will ensure that the aircraft navigation system will meet the functions required in paragraph 8.6 of this CA. 3) In case a LAR 121 and/ or 135 operator is not able to determine, based on the AFM or AFM supplement or TCDS, whether the system has been installed and approved according to an appropriate CA or AC or AMC, it will proceed in accordance with to the steps established in the following paragraph. 8.3 Eligibility not based on AFM or TCDS or AFM Supplement or POH RNAV 5 capacity reached during service. a) Determination of the aircraft eligibility through evaluation of its navigation equipment. 1) The operator makes a request for assessment of aircraft RNAV equipment for eligibility to the airworthiness inspection Direction or equivalent CAA entity. The operator, together with the request, will provide the following: (a) RNAV system make, model and part number; (b) evidence that the equipment meets lateral and longitudinal navigation accuracy on route of + 5 NM or better during 95% of the total flight time. This can be determined through the evaluation of system design. Evidence of meeting the requirements of another AC can be used for this purpose. (c) proof that the system meets the required functions for RNAV 5 operations described in this CA on paragraph 8.6. (d) crew operating procedures and bulletins; and (e) any other pertinent information required by the CAA. 2) in case the airworthiness inspection Direction or CAA equivalent entity is not able to determine RNAV equipment eligibility, evaluation request together with supporting documents will be forward to the aircraft certification Direction or equivalent entity from the State of registry. In any case, aircraft certification Division or equivalent will inform to airworthiness inspection Direction or CAA equivalent entity about the eligibility of the proposed equipment to perform RNAV 5 operations. 3) LAR 91 Operators.- Once the CAA has determined the aircraft equipment is eligible for RNAV 5 operations, the airworthiness inspection Direction or CAA equivalent entity will issue a letter of finding documenting that the aircraft RNAV equipment is eligible to perform those operations. 4) LAR 121 or 135 operators.- The CAA will verify aircraft RNAV system eligibility including the required functions on paragraph 8.6 of this AC. 8.4 Limitations on the design and/or use of navigation systems.- Although the following navigation systems offer RNAV capability, these present limitations for their use in RNAV 5 operations. a) Inertial navigation systems/inertial reference systems (INS/IRS) 1) Inertial systems may be used either as a stand alone inertial navigation system (INS) or as an inertial reference (IRS) acting as part of a multi-sensor RNAV system where inertial sensors provides augmentation to the basic position sensors as well as a reversionary position data source when out of cover of radio navigation sources. 2) INS without a function for automatic radio updating of aircraft position and approved in accordance with FAA AC 25-4, when complying with the functional criteria of paragraph 8.6 of this AC, may be used only for a maximum of two (2) hours from the last alignment/position update performed on ground. Consideration may be given to specific 8

9 AC SRVSOP INS configurations (e.g. triple mix) where either equipment or aircraft manufacturer s data justifies extended use from the last position update. 3) INS without automatic radio updating of aircraft position, including those systems where manual selection of radio channels is performed in accordance with flight crew procedures, must be approved n accordance with FAA AC 90-45A or AC A or any other equivalent document. b) VHF omni-directional radio range (VOR) 1) VOR accuracy can typically meet accuracy requirements for RNAV 5 up to 60 NM from the navigation aid and Doppler VOR up to 75 NM. Specific regions within the VOR coverage may experience larger due to propagation effect (e.g. multipath). Where such errors exist this can be accommodated by prescribing areas where the affected VOR may not be used. c) Distance measuring equiment (DME) 1) DME signals are considered sufficient to meet requirements of RNAV 5 wherever the signals are received and there is no closer DME on the same channel, regardless of the published coverage volume. Where the RNAV 5 system does not take account of published Designated operational coverage of the DME, the RNAV system must execute data integrity checks to confirm that the correct DME signal is being received. d) Global navigation satellite system (GNSS) 1) Global positioning system (GPS) (a) The use of GPS to perform RNAV 5 operations is limited to equipment approved in accordance with the TSO-C 129(), TSO-C-145() and TSO-C-146() from FAA or ETSO-129(), ETSO-145() and ETSO-146() from EASA or equivalent documents which include the minimum systems functions specified in the present CA on Paragraph 8.6. (b) The integrity of GPS system must be provided by the receiver autonomous integrity monitoring (RAIM) or an equivalent means within a multi-sensor navigation system. The equipment must be approved in accordance with the AMC 20-5 or equivalent document. In addition, stand-alone GPS equipment must include the following functions according to the TSO-C 129a or ETSO-129a criteria: Pseudorange step detection; and Health word checking (c) Compliance with these two requirements can be determined the following way: (1) a statement in the AFM or POH indicating the GPS equipment meets the criteria for primary means of navigation in oceanic and remote airspace; or (2) a placard on the GPS receiver certifying it meets TSO-C 129 (), TSO-C-145 () and TSO-C-146 () from FAA or ETSO-129 (), ESTO-145 () and ESTO- 146 () from EASA; or (3) a CAA letter of design approval for the applicable equipment. Operators should contact the avionic equipment s manufacturer to determine if the equipment complies with these requirements and ask if a letter of design approval is available. Manufacturers may obtain this letter by submitting appropriate documentation to the certifications offices of the States of aircraft design or manufacturer. Operators will keep the letter of design approval within the AFM or POH as evidence of the RNAV 5 eligibility. Any limitations included in the letter of design approval should be reflected in a letter of finding to LAR 91 operators or in the operations specifications 9

10 SRVSOP AC (OpSpecs) for LAR 121 and/or 135 operators. (d) Traditional navigation equipment (e.g., VOR, DME or automatic direction finder (ADF)) must be installed and operative, so as to provide an alternative navigation means of navigation. (e) Where approval for RNAV 5 requires the use of traditional navigation equipment as a back up in the event of loss of GPS, the required navigation aids as defined in the approval (e.g. VOR, DME or ADF) must be installed and serviceable. 2) Stand-alone GPS equipment (a) Stand-alone GPS equipment approved in accordance with guidance provided in this AC may be used in RNAV 5 operations, subject to the limitations included in this document. Such equipment must be operated in accordance with procedures acceptable to the CAA. The flight crew must receive appropriate training for use the stand-alone GPS equipment regarding normal and contingency procedures detailed in the Paragraph 10 of this AC. 8.5 RNAV-5 system requirements a) Accuracy 1) The navigation performance of aircraft approved for RNAV 5 requires a track keeping accuracy equal to or better than + 5 NM during the 95% of the flight time. This value includes signal source error, airborne receiver error, display system error and flight technical error (FTE). 2) This navigation performance assumes the necessary coverage provided by satellite or ground based navigation aids is available for the intended route to be flown. b) Availability and integrity The minimum level of availability and integrity required for RNAV 5 systems can be met by a single installed system comprising by: 1) one sensor or a combination of the following sensors: VOR/DME, DME/DME, INS or IRS and GNSS or GPS; 2) RNAV computer; 3) control display unit (CDU); and 4) navigation display(s) [(e.g. navigation display (ND), horizontal situation indicator (HSI) or course indicator deviation (CDI)]provided that the system is monitored by the flight crew and that in the event o a system failure the aircraft retains the capability to navigate relative to ground based navigation aids (e.g. VOR, DME or Non-directional beacon (NDB)). 8.6 Functional requirements a) Required Functions.- The following system functions are the minimum required to conduct RNAV 5 operations: 1) Continuous indication of the aircraft position relative to track to be displayed to the pilot flying (PF) on a navigation display situated in his primary field of view; 2) In addition, where the minimum flight crew is two pilots, indication of the aircraft position relative to track to be displayed to the pilot not flying (PNF) on a navigation display situated in his primary field of view. 3) Display of distance and bearing to the active (To) waypoint; 4) Display of ground speed or time to active (To) waypoint; 5) Storage of a minimum of 4 waypoints; and 10

11 AC SRVSOP 6) Appropriate failure indication of the RNAV system, including the sensors failure. b) RNAV 5 navigation displays 1) Navigation data must be available for display either on a display forming part of the RNAV equipment or on a lateral deviation display (e.g. CDI, (E)HSI, or a navigation map display). 2) These displays must be used as primary flight instruments for the navigation of the aircraft, for maneuver anticipation and for failure/status/integrity indication. They should meet the following requirements: (a) The displays must be visible to the pilot when looking forward along the flight path. (b) The lateral deviation display scaling should be compatible with any alerting and annunciation limits, where implemented. (c) The lateral deviation display must have a scaling and full-scale deflection suitable for the RNAV 5 operation. 8.7 Continued airworthiness a) The operators of aircraft approved to perform RNAV 5 operations, must ensure the continuity of the technical capacity of them, in order to meet technical requirements established in this AC. b) Each operator who applies for RNAV-5 operational approval shall submit to the CAA of State of registry, a maintenance and inspection program that includes all those requirements of maintenance necessary to ensure that navigation systems continue fulfilling the RNAV 5 approval criteria. c) The following maintenance documents must be revised, as appropriate, to incorporate RNAV 5 aspects: 1) Maintenance control manual (MCM); 2) Illustrated parts catalogs (IPC); and 3) Maintenance program. d) The approved maintenance program for the affected aircrafts should include maintenance practices listed in maintenance manuals of the aircraft manufacturer and its components, and must consider: 1) that equipment involved in the RNAV 5 operation should be maintained according to directions given by manufacturer's components; 2) that any amendment or change of navigation system affecting in any way RNAV 5 initial approval, must be forwarded and reviewed by the CAA for its acceptance or approval of such changes prior to its implementation; and 3) that any repair that is not included in the approved/accepted maintenance documentation, and that could affect the integrity of navigation performance, should be forwarded to the CAA for acceptance or approval thereof. e) Within the RNAV maintenance documentation should be presented the training program of maintenance personnel, which inter alia, should include: 1) PBN concept; 2) RNAV 5 application; 3) equipment involved in a RNAV 5 operation; and 4) MEL use. 9. OPERATIONAL APPROVAL 11

12 SRVSOP AC Requirements to obtain the operational approval.- To obtain the operational approval, the operator will comply with the following steps considering the operational procedures established in Paragraph 10 of this AC. a) Airworthiness approval.- The Aircraft must have the corresponding airworthiness approvals as mentioned in Paragraph 8 of this CA. b) Documentation.- The operator will present to the AAC the following documents: 1) The application to obtain RNAV 5 authorization; 2) Amendments to the operations manual (OM) which must include operations procedures according to what is described in Paragraph 10 of this CA, for crews and dispatchers, if applicable; 3) Amendments, when applicable, of maintenance manuals and programs which must have the maintenance procedures for the new equipment, as well as the training of the maintenance associated personnel, in accordance with Paragraph 8.7 e); 4) A copy of the AFM parts, or AFM supplement or TCDS or POH, to verify the airworthiness approval for RNAV 5 for each affected aircraft; 5) The amendments to the Minimum Equipment List (MEL), which must identify the minimum necessary equipment to comply with RNAV 5; and 6) Training programs or amendments to the operator s training program for crews and flight dispatchers, if applicable, according to what is described in Paragraph 11 of this document; c) Training.- Once the amendments to manuals, programs and documents have been accepted or approved, the operator will provide required training to its personnel. d) Validation flights.- The AAC may perform a validation flight, if determines it is necessary in the interest of safety. 9.2 Authorization issuance to perform RNAV 5 operations.- Once the operator has successfully completed the operational approval process, the AAC will issue the operator, when applicable, the corresponding authorization to perform RNAV 5 operations. a) LAR 91 operators.- For LAR 91 operators, the AAC does will issue a letter of authorization (LOA). b) LAR 121 and/or 135 operators.- For LAR 121 and/or LAR 135 operators, the AAC will issue the corresponding OpSpecs, which will show RNAV 5 authorization. 10. OPERATION PROCEDURES 10.1 Flight planning. a) Before operating on a RNAV 5 route, the operator will ensure that: 1) The aircraft counts on a RNAV 5 approval; 2) Routes correspond to the authorization; 3) The necessary equipment to operate RNAV 5 work correctly and are not degraded; 4) Navigation aids based on space or ground are available; 5) The crews check the contingency procedures. b) Stand-alone GPS equipment. During the planning phase the following procedures must be accomplish in regards to the stand-alone GPS equipment: 1) An aircraft can depart without further action in the following cases, when: (a) all satellites are scheduled to be in service; or 12

13 AC SRVSOP (b) one satellite is scheduled to be out of service in case of GPS equipment that includes barometrical altitude. 2) The availability of GPS integrity RAIM shall be confirmed for the intended flight (route and time) through the use of a prediction program either ground-based or incorporated in the on-board system, following the criteria established in Appendix 1 of the CAA, when: (a) any satellite is scheduled to be out of service; or (b) more than one satellite is scheduled to be out of service in case of GPS equipment that includes barometric altitude. 3) This prediction is required for any route and route segment RNAV 5 based upon the use of GPS. 4) The specified route of flight, including trajectory to any alternative aerodrome will be defined by a series of waypoints and by the estimated time of pass over them for a speed or series of speed, which at the same time will be in function of the intensity and previous wind direction. 5) Taking in consideration that during flight may occur deviations in regards to the specified ground speedy, prediction must be done using different speeds within the predictable margin for them. 6) Prediction program must be executed with a maximum anticipation of two hours preview to the flight departure. The operator will confirm that data about the state of the constellation and GPS ephemerides, have been updated with the latest information distributed by notice to airmen (NOTAM). 7) In order to get exact prediction, the program will allow manual de-selection of satellites considered non operative, as well as selection of those back to service condition during the flight time. 8) The operator will not dispatch or release a flight in case of continuous prediction loss of RAM higher than 5 minutes to any part of the previewed route. In this event, flight can be delayed, cancelled or re-routed in which RAM requirements may be accomplished. c) ATS ICAO flight plan.- At the time to file the ATS flight plan, authorized aircraft operators on RNAV 5 route, will insert corresponding code on flight plan form s box 10 (equipment), as defined within ICAO Doc 7030 for these operations Preview flight procedures at the aircraft.- The crew will perform on the aircraft the following procedures preview to the flight: a) check registrations and forms to be sure that maintenance actions have been taken in order to correct defects in the equipment; and b) check data base validation (current AIRAC cycle), if it is installed En route operations. a) The crew will assure the aircraft correct functioning of its navigation system during its operation in a RNAV 5 route, confirming that: 1) necessary RNAV 5 equipment have not degraded during flight; 2) route corresponds to the authorization; 3) aircraft navigation accuracy is pertinent for RNAV 5, assuring this through pertinent cross check; and 4) others navigation aids (for example VOR, DME y ADF) must be selected in a way to permit a cross check or immediate reversion in the event of a RNAV capacity loss Contingency procedures. 13

14 SRVSOP AC a) Flight crews must familiarize with the following general provisions: 1) An aircraft must not enter or continue the operations in airspace designated as RNAV 5, according to the present ATC authorization, if because of a failure or degradation the navigation systems falls under RNAV 5 requirements, the pilot will obtain as soon as possible an amended authorization; 2) According to ATC instructions, operations will continue in regards to the present ATC authorization, or when not possible, will be requested a revised authorization to return to the VOR/DME conventional navigation; 3) in the event of communications failure, the flight crew must continue with the flight plan, in accordance with the published lost communication procedures; and 4) in any case, the crew must follow contingency procedures established for every operation region, and obtain an ATC authorization as soon as possible. b) Stand-alone GPS equipment. 1) The operating procedures must identify the flight crew actions required in the event of RAIM function loss or exceedance of integrity alarm limit (erroneous position). This procedures must include: (a) In case of loss of the RAIM detection function.- The flight crew may continue navigating with the GPS equipment. The flight crew should attempt to crosscheck the aircraft position with the information provided for the ICAO conventional navaids: VOR, DME and ADF, in order to confirm the existence of a required level of precision. In other case, the crew must revert to an alternative navigation means; (b) In the event of an observed failure (including the failure of a satellite impacting the performance of the navigation systems based on GPS), the flight crew must revert to an alternative means of navigation. (c) In case of exceedance of the alarm limit.- The flight crew must revert to an alternative means of navigation. 2) On-board equipment availability VOR, DME or ADF.- The operator must have installed on the aircraft the VOR, DME or ADF on-board equipment capacity according to the applied rules of operation LAR 91, 121 and 135. This capacity must be available along the intended route of flight to assure the availability of navigation alternative means in case of a GPS/RNAV system failure. c) Any incidence registered in flight must be notified to the AAC in a maximum time of seventy two hours, unless justified cause. 11. NAVIGATION ERROR REPORTS FOLLOW UP PROCESS a) The operator will establish a process to receive, analyze and do a follow up of the navigation error reports which allow determine the appropriate corrective action. b) Repetitive navigation error occurrences, attributed to a specific part of the navigation equipment must be analyzed in order to correct its cause. c) The nature and severity of the error may result in temporary withdrawn of the authorization to use the navigation equipment until the cause of the problem has been identified and rectified. 12. TRAINING PROGRAM a) The training programs for flight crews and flight dispatchers, if correspond, must be reviewed and approved by the AAC. The operator will included at least the following modules: 14

15 AC SRVSOP 1) Required equipments, capacities, limitations and operation of these equipments in RNAV 5 airspace. 2) The routes and airspace for which the RNAV system is approved to operate. 3) The NAVAID limitations in respect of the operation of the RNAV system to be used for the RNAV 5 operation. 4) Contingency procedures for RNAV failures. 5) The Radio/Telephony Phraseology for the airspace in accordance to Doc 4444 and Doc 7030 as appropriate. 6) The flight planning requirements for the RNAV operation. 7) RNAV requirements as determined from chart depiction and textual description. 8) RNAV 5 en route procedures; 9) Methods to reduce navigation errors through dead-reckoning techniques. 10) RNAV system-specific information, including: (a) Levels of automation, mode annunciations, changes, alerts, interactions, reversions, and degradation. (b) Functional integration with other aircraft systems. (c) Monitoring procedures for each phase of flight (for example, monitor PROG or LEGS page). (d) Types of navigation sensors (for example, DME, IRU, GNSS) utilized by the RNAV system and associated system prioritization/weighting/logic. (e) Turn anticipation with consideration to speed and altitude effects. (f) Interpretation of electronic displays and symbols. 11) RNAV equipment operating procedures, as applicable, including how to perform the following actions: (a) Verify currency of aircraft navigation data. (b) Verify successful completion of RNAV system self-tests. (c) Initialize RNAV system position. (d) Fly direct to a waypoint. (e) Intercept a course/track. (f) Be vectored off and rejoin a procedure. (g) Determine cross-track error/deviation. (h) Remove and reselect navigation sensor input. (i) When required, confirm exclusion of a specific navigation aid or navigation aid type. (j) Perform gross navigation error check using conventional navigation aids. b) Training program on the GPS as a primary means of navigation. 1) Besides the training modules describe on the previous paragraphs, operators training programs which use RNAV systems based on GPS as a primary navigation means will include modules described in Appendix 2. 15

16 SRVSOP AC PAGE INTENTIONALLY LEFT BLANK 16

17 AC SRVSOP Appendix 1 GPS integrity monitoring (RAIM) prediction program Where a GPS integrity monitoring (RAIM) prediction program is used as a means of compliance with paragraph 5.2 (a) of this document, it should meet the following criteria: a) The program should provide prediction of availability of the integrity monitoring (RAIM) function of the GPS equipment, suitable for conducting RNAV 5 operations in designated European airspace. b) The prediction program software should be developed in accordance with at least RTCA DO 178B/EUROCAE 12B, Level D guidelines. c) The program should use either a RAM algorithm identical to that used in the airborne equipment or an algorithm based on assumptions for RAIM prediction that give a ore conservative result. d) The program should calculate AIM availability based on a satellite mask angle of no less than 5 degrees, except where use of lower mask angle has been demonstrated to be acceptable to the authority. e) The program should have the capability to manually designate GPS satellites which have been notified as being out of service for the intended flight. f) The program should allow the user to select: 1) the intended route and declared alternates; and 2) the time and duration of the intended flight. 17

18 SRVSOP AC PAGE INTENTIONALLY LEFT BLANK 18

19 AC SRVSOP Appendix 2 Training program on the GPS as a primary means of navigation The training programs for flight crews that use RNAV 5 systems based on the GPS as a primary means of navigation will include a segment with the following training modules: a) GPS system components and operating principles.- Understanding of the GPS system and its operating principles: 1) GPS system components: control segment, user segment, and space segment; 2) on-board equipment requirements; 3) GPS satellite signals and pseudo-random code; 4) positioning principle; 5) receiver clock error; 6) masking function; 7) performance limitations of the different types of equipment; 8) WGS84 coordinate system; b) Navigation system performance requirements.- Define the following terms in relation to the navigation system and evaluate the degree of compliance by the GPS system of the requirements associated with the following terms: 1) precision; 2) integrity; (a) means to improve GPS integrity: RAIM and fault detection and exclusion (FDE) 3) availability; 4) service continuity c) Authorizations and documentation.- Requirements applicable to pilots and navigation equipment for GPS operation: 1) pilot training requirements; 2) aircraft equipment requirements; 3) AFM system certification criteria and limitations; 4) GPS-related NOTAMs. d) GPS system errors and limitations.- Cause and magnitude of typical GPS errors: 1) ephemerides; 2) clock; 3) receiver; 4) atmospheric/ionospheric; 5) multi-reflection; 6) selective availability (SA); 7) total typical error associated to the C/A code; 8) effect of the dilution of precision (DOP) on the position; 9) susceptibility to interference; 19

20 SRVSOP AC ) comparison of vertical and horizontal errors; and 11) path-tracking precision. Collision avoidance. e) Human factors and GPS.- Limitations on the use of GPS equipment due to human factors. Operating procedures that offer protection against navigation errors and loss of awareness of the real situation due to the following causes: 1) mode errors; 2) data entry errors; 3) data checks and validation, including independent cross-checking procedures; 4) automation-induced relaxation; 5) lack of standardization of GPS equipment; 6) information processing by humans and situational awareness. f) GPS equipment Specific navigation procedures.- Knowledge of the appropriate operating procedures for GPS in the typical navigation tasks for each specific type of equipment in each type of aircraft that includes: 1) selection of the appropriate operating mode; 2) review of the different types of information contained in the navigation database; 3) forecast of the availability of the RAIM function; 4) procedure for entering and checking the waypoints defined by the user; 5) procedure for entering, retrieving and checking flight plan data; 6) interpretation of the typical information shown on the GPS navigation display: LAT/LONG, distance and heading to the waypoint, CDI; 7) interception and maintenance of the GPS-defined routes; 8) in-flight determination of ground speed (GS), estimated time of arrival (ETA), time and distance to the waypoint; 9) indication of waypoints over flight; 10) use of the DIRECT TO function; 11) use of the NEAREST AIRPORT function; 12) use of the GPS in GPS or DME/GPS arrival procedures. g) Verification of GPS equipment.- For each type of equipment in each aircraft, the following operational and start-up checks must be conducted at the appropriate time: 1) constellation status; 2) RAIM and FDE functional status; 3) dilution of precision (DOP) status; 4) currency of the instrument flight rules (IFR) database; 5) receiver operating condition; 6) CDI sensitivity; 7) position indication. h) GPS messages and warnings.- For each type of equipment in each aircraft, timely action must be recognized and taken in face of GPS messages and warnings, including the following: 1) loss of RAIM function; 20

21 AC SRVSOP 2) 2D/3D navigation; 3) dead-reckoning navigation mode; 4) database not updated; 5) loss of the database; 6) GPS equipment failure; 7) barometric data entry failure; 8) power failure; 9) prolonged parallel displacement; and 10) satellite failure. 21

22 SRVSOP AC PAGE INTENTIONALLY LEFT BLANK 22

23 AC SRVSOP Appendix 3 RNAV 5 approval process a) The RNAV 5 approval process is comprised of two types of approvals: the airworthiness approval and the operational approval, even though, they have different requirements, both must be considered under one process only. b) This process constitutes a well-arrange method, which is used by the CAA to ensure the applicants comply with the established requirements. c) The approval process is conformed by the following phases: 1) Phase one: Pre-application 2) Phase two: Formal application 3) Phase three: Analysis of the documentation 4) Phase four: Demonstration and inspection 5) Phase five: Approval d) In Phase One - Pre-aplication, the CAA holds a meeting with the operator (the pre-aplication meeting), in which the operator will be informed about all the requirements that he needs to comply during the approval process. e) In Phase Two - Formal application, the operator submits the formal application with all applicable documents. f) In Phase Three - Analysis of the documentation, the CAA reviews the submission and evaluates the navigation equipment in order to determine the method of approval (aircraft equipment eligibility). As a result of this evaluation the CAA may accept or return the Formal Application with the documentation. g) In Phase Four - Demonstration and inspection, the operator will accomplish the training program and the validation flight if this is required by the CAA, otherwise the process will advance to the next phase. h) In phase Five - Approval, the CAA issues the RNAV 5 authorization, once the operator has completed the airworthiness and operations requirements. For LAR 121 and/or 135 operators, the AAC will issue the OpSpecs and for LAR 91 operators will issue a LOA. 23

24 SRVSOP AC PAGE INTENTIONALLY LEFT BLANK 24

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS

RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS RNP 2 Job Aid SRVSOP RNP 2 JOB AID REQUEST TO CONDUCT RNP 2 OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation System (SRVSOP) to provide

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000,

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG. Integrated Avionics System Garmin G1000, DA 40 NG AFM Garmin G1000, P-RNAV Operation SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 40 NG Integrated Avionics System Garmin G1000, Doc. No. : 6.01.15-E Date of Issue : Design Change Advisory :

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations. GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 6 OF 2014 Date: 4 TH SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators Approval For RNAV 10(RNP10) Operations.

More information

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS

RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS RNP AR APCH Job Aid SRVSOP RNP AR APCH JOB AID OPERATOR APPLICATION TO CONDUCT RNP AR APCH OPERATIONS 1. Introduction This Job Aid was developed by the Latin American Regional Safety Oversight Cooperation

More information

Aircraft and Operators approval for RNP 2 operations

Aircraft and Operators approval for RNP 2 operations GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 14 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP 2 operations 1. PURPOSE This

More information

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation

SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62. Integrated Avionics System Garmin G1000 and. G1000 NXi, SBAS and P-RNAV Operation DA 62 AFM Garmin G1000 and SUPPLEMENT A33 TO THE AIRPLANE FLIGHT MANUAL DA 62 Integrated Avionics System Garmin G1000 and G1000 NXi, SBAS and Doc. No. : 7.01.25-E Date of Issue : 01-Apr-2015 Design Change

More information

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S.

NOTE: This guidance does not apply to RNP-1 routes and procedures planned in the U.S. Subject: APPROVAL OF U.S. OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION (B-RNAV) AND PRECISION AREA NAVIGATION (P-RNAV)

More information

Guidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10)

Guidance material AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10) Guidance material DATE : 01/11/13 REVISION : 1 ISSUED BY : EUR PBN TF SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1O OPERATIONS (DESIGNATED AND AUTHORIZED AS RNP 10) 1. PURPOSE This guidance material

More information

CASAS ADVISORY PAMPHLET

CASAS ADVISORY PAMPHLET No. 18 CASAS ADVISORY PAMPHLET Subject: GUIDENCE ON THE APPROVAL OF SURINAMESE OPERATORS AND AIRCRAFT TO OPERATE UNDER INSTRUMENT FLIGHT RULES (IFR) IN EUROPEAN AIRSPACE DESIGNATED FOR BASIC AREA NAVIGATION

More information

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY 216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 11 OF 2014 Date: OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Approach (RNP APCH) Operations

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION

OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'O',

More information

Advisory Circular. Radius to Fix (RF) Path Terminator

Advisory Circular. Radius to Fix (RF) Path Terminator Advisory Circular Subject: Radius to Fix (RF) Path Terminator Issuing Office: Standards Document No.: AC 700-027 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7617945 V12 Effective Date:

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Date: 1/7/05. NOTE 1: This AC does not apply to RNAV routes in the Gulf of Mexico ( Q ) or Alaska VOR/DME RNAV routes ( JxxxR ).

Date: 1/7/05. NOTE 1: This AC does not apply to RNAV routes in the Gulf of Mexico ( Q ) or Alaska VOR/DME RNAV routes ( JxxxR ). - Advisory Circular Subject: U.S. TERMINAL AND EN ROUTE AREA NAVIGATION (RNAV) OPERATIONS Date: 1/7/05 Initiated by: AFS-400 AC No: 90-100 Change: 1. PURPOSE. a. This advisory circular (AC) provides operational

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300

AMC ICAO DOC 9613 AMC 20-4 ICAO DOC 9613 TGL-10 ICAO DOC 9613 AMC AMC AMC ICAO DOC 70300 Application for PBN operations approval Completion of form: Application: Each relevant box should be completed with a tick ( ) or a (X). Items marked with an asterisk (*) to be completed only for first

More information

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation

VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE. Section 4 Class II Navigation VOLUME 4 AIRCRAFT EQUIPMENT AND OPERATIONAL AUTHORIZATION CHAPTER 1 AIR NAVIGATION, COMMUNICATIONS, AND SURVEILLANCE 4-76 GENERAL. Section 4 Class II Navigation A. Concepts, Direction, and Guidance. This

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

Navigation 101 Chapter 3 RNP-10

Navigation 101 Chapter 3 RNP-10 853d Electronic Systems Group Navigation 101 Chapter 3 RNP-10 853 ELSG/NT Electronic Systems Center Hanscom AFB, MA 20 Mar 07 ESC 07-0399 Briefing Overview RNP-10 Fundamentals Avionics Systems Qualifications

More information

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent

More information

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION

GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION ANSS AC NO. 1 of 2017 31.07. 2017 Air Space and Air Navigation Services Standard ADVISORY CIRCULAR Subject: Procedures to follow in case

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item

More information

Annex to Decision 2016/015/R

Annex to Decision 2016/015/R Annex to Decision 2016/015/R AMC and GM to Part-CAT Issue 2, Amendment 6 The Annex to Decision 2014/015/R is hereby amended as follows: The text of the amendment is arranged to show deleted, new or amended

More information

Intentionally left blank

Intentionally left blank Supplement D42L AFM Intentionally left blank Page 9-S4-2 Supplement D42L AFM Intentionally left blank Page 9-S4-4 D42L AFM Supplement LIST OF EFFECTIVE PAGES Chapter Page Date 0 DOT-approved 9-S4-1 24-May-11

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010)

FAA RNP 10 JOB AID With FAA Order B References (20 May 2010) OPERATOR APPLICATION TO CONDUCT RNP 10 OPERATIONS IN DESIGNATED OCEANIC CONTROL AREAS (CTAs) Introduction. This RNP 10 Job Aid was developed by the FAA Hq Flight Technologies & Procedures Division (AFS-400)

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV MINIMA

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV MINIMA AC 91-008 SRVSOP ADVISORY CIRCULAR AC : 91-008 DATE : 18/05/12 REVISION : 2 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS DOWN TO LNAV AND LNAV/VNAV

More information

GENERAL INFO NOTICE 1. BACKGROUND

GENERAL INFO NOTICE 1. BACKGROUND GENERAL INFO NOTICE 1. BACKGROUND Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European Airspace in April 1998 for en-route operations. Initial

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJUNG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 8 AIRCRAFT OPERATIONS SERIES 'S', PART III ISSUE

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

Required Navigation Performance (RNP 10) Revision 1 18 March Related Rules This AC relates specifically to , , and

Required Navigation Performance (RNP 10) Revision 1 18 March Related Rules This AC relates specifically to , , and Advisory Circular AC91-7 Required Navigation Performance (RNP 10) Revision 1 General Civil Aviation Authority Advisory Circulars contain information about standards, practices, and procedures that the

More information

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS AC 91-008 SRVSOP ADVISORY CIRCULAR AC : 91-008 DATE : 12/10/09 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNP APPROACH (RNP APCH) OPERATIONS 1. PURPOSE This advisory circular

More information

PBN Operational Approval The Process. ICAO PBN Operational Approval Course

PBN Operational Approval The Process. ICAO PBN Operational Approval Course PBN Operational Approval The Process What is a PBN Operations Approval? Does it include approval of routes? How do I approve PBN Ops? 2 Why Operational Approval? Early Area Navigation operations based

More information

Advisory Circular. Automatic Dependent Surveillance - Broadcast

Advisory Circular. Automatic Dependent Surveillance - Broadcast Advisory Circular Subject: Automatic Dependent Surveillance - Broadcast Issuing Office: Standards PAA Sub Activity Area: Aviation Safety Regulatory Framework Document No.: AC 700-009 File Classification

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

What is B-RNAV? 1. 1 Adaptado de [ ]

What is B-RNAV? 1. 1 Adaptado de  [ ] What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained

More information

General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08

General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications. Version 1.0 8/8/08 General Guidelines for Obtaining Airworthiness and Operational Approvals for PBN Navigation Specifications Version 1.0 8/8/08 Glossary of Terms Advisory Circular (AC) AC 90 series provide operational

More information

An advisory circular may also include technical information that is relevant to the standards or requirements.

An advisory circular may also include technical information that is relevant to the standards or requirements. Advisory Circular AC91-21 RNAV 1, RNAV 2, RNP 1, RNP 2, RNP APCH and BARO VNAV Operational Approvals Revision 0.3 5 September 2016 General Civil Aviation Authority advisory circulars contain guidance and

More information

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 2 OPERATIONS

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 2 OPERATIONS AC 91-005 SRVSOP ADVISORY CIRCULAR CA : 91-005 DATE : 16/09/13 REVISION : Original ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 2 OPERATIONS 1. PURPOSE This advisory circular (AC)

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS AC 91-006 SRVSOP ADVISORY CIRCULAR CA : 91-006 DATE : 09/09/13 REVISION : 1 ISSUED BY : SRVSOP SUBJECT: AIRCRAFT AND OPERATOR APPROVAL FOR RNP 1 OPERATIONS 1. PURPOSE This advisory circular (AC) establishes

More information

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1 AND RNAV 2 OPERATIONS

ADVISORY CIRCULAR SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1 AND RNAV 2 OPERATIONS ADVISORY CIRCULAR AC : RNAV1/2 DATE : 01/01/13 REVISION : 1 ISSUED BY : PBN TF SUBJECT: AIRCRAFT AND OPERATORS APPROVAL FOR RNAV 1 AND RNAV 2 OPERATIONS 1. PURPOSE This advisory circular (AC) establishes

More information

Subject: Aircraft and Operators approval for RNP Authorisation Required Approach (RNP AR APCH) Operations

Subject: Aircraft and Operators approval for RNP Authorisation Required Approach (RNP AR APCH) Operations GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 13 OF 2014 Date: 04 th SEPT. 2014 OPERATIONS CIRCULAR Subject: Aircraft and Operators approval for RNP Authorisation

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

AMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations

AMC Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations AMC 20 26 Effective: 23/12/2009 Annex II to ED Decision 2009/019/R of 16/12/2009 AMC 20 26 Airworthiness Approval and Operational Criteria for RNP Authorisation Required (RNP AR) Operations This AMC provides

More information

PROCEDURES SPECIAL OPERATIONS

PROCEDURES SPECIAL OPERATIONS Intentionally left blank A318/A319/A320/A321 PRELIMINARY PAGES - TABLE OF CONTENTS PRO-SPO-51 Required Navigation Performance (RNP) General...A RNAV 10 / RNP 10... B RNAV 5 / BRNAV...C RNAV 1 RNAV 2 /

More information

Technical Standard Order

Technical Standard Order Department of Transportation Federal Aviation Administration Aircraft Certification Service Washington, DC TSO-C145a Effective Date: 09/19/02 Technical Standard Order Subject: AIRBORNE NAVIGATION SENSORS

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator:

Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM Operator: Application Form and Compliance Checklist - OPS for NAT HLA (MNPS) Approval FORM.965.037 Operator: Adress: E-mail: AOC No: Phone no: The relevant elements defined in the mandatory part of the Operational

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180

Advisory Circular. Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180 Advisory Circular Subject: Special Authorization (SA) for Required Communications Performance (RCP) 240 and Required Surveillance Performance (RSP) 180 Issuing Office: Civil Aviation, Standards Document

More information

Flight Safety Division Case Nr. Page 1 of 11

Flight Safety Division Case Nr. Page 1 of 11 FRD-035 Date: 08.03.2014 Version 1.2 ICELANDIC TRANSPORT AUTHORITY Application received, Date. Flight Safety Division Case Nr. Page 1 of 11 APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

More information

SUPPLEMENT S06. Transport Canada Approved Flight Manual Supplement For GARMIN 400W/500W SERIES GPS WASS NAVIGATION SYSTEM

SUPPLEMENT S06. Transport Canada Approved Flight Manual Supplement For GARMIN 400W/500W SERIES GPS WASS NAVIGATION SYSTEM Transport Canada Approved Flight Manual Supplement For This supplemental manual is applicable to Garmin 400W/500W Series GPS WASS Navigation System equipped airplanes. This Supplement must be attached

More information

P-RNAV GENERAL INFO NOTICE. 1. Background

P-RNAV GENERAL INFO NOTICE. 1. Background GENERAL INFO NOTICE 1. Background Precision-RNAV (P-RNAV) is the natural progression from Basic RNAV (B-RNAV) which became mandatory in European airspace in April of 1998 for enroute operations. Initial

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO) EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85 ( ), Authorization of Aircraft and Operators for Flight in

More information

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0

CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 CIVIL AVIATION REGULATIONS SURINAME PART 17 - AERONAUTICAL TELECOMMUNICATIONS VERSION 5.0 January 2018 AMENDMENTS Location Date Amended by Description CONTENTS 17.1 GENERAL... 4 17.1.1 Applicability...

More information

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance

NATA Aircraft Maintenance & System Technology Committee Best Practices. RVSM Maintenance NATA Aircraft Maintenance & System Technology Committee Best Practices Reduced Vertical Separation Minimum (RVSM) Airspace reduces the vertical separation above flight level (FL) 290 from 2000-ft minimum

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

Manual on Required Navigation Performance (RNP) (Doc 9613-AN/937)

Manual on Required Navigation Performance (RNP) (Doc 9613-AN/937) Manual on Required Navigation Performance (RNP) (Doc 9613-AN/937) SECOND EDITION 1999 AMENDMENTS The issue of amendments is announced regularly in the ICAO Journal and in the monthly Supplement to the

More information

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL

APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL APPLICATION FOR RNP APPROACH OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'RNP Approach Notes for Completion' before completing the form. Please complete the form in BLOCK

More information

PBN and RNAV concepts

PBN and RNAV concepts PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports.

Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. Single Engine Instrument Training Record I PREFLIGHT PREPARATION WEATHER INFORMATION weather reports and forecasts. pilot and radar reports. surface analysis charts. radar summary charts. significant weather

More information

SUBPART C Operator certification and supervision

SUBPART C Operator certification and supervision An AOC specifies the: SUBPART C Operator certification and supervision Appendix 1 to OPS 1.175 Contents and conditions of the Air Operator Certificate (a) Name and location (principal place of business)

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

Advisory Circular. Required Navigation Performance Approach (RNP APCH)

Advisory Circular. Required Navigation Performance Approach (RNP APCH) Advisory Circular Subject: Required Navigation Performance Approach (RNP APCH) Issuing Office: Standards Document No.: AC 700-023 File Classification No.: Z 5000-34 Issue No.: 01 RDIMS No.: 7550326-V23

More information

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization

COVER SHEET. Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization COVER SHEET Reduced Vertical Separation Minimum (RVSM) Information Sheet Part 91 RVSM Letter of Authorization NOTE: FAA Advisory Circular 91-85, Authorization of Aircraft and Operators for Flight in Reduced

More information

Advisory Circular. Regulations for Terrain Awareness Warning System

Advisory Circular. Regulations for Terrain Awareness Warning System Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective

More information

AIR LAW AND ATC PROCEDURES

AIR LAW AND ATC PROCEDURES 1 The International Civil Aviation Organisation (ICAO) establishes: A standards and recommended international practices for contracting member states. B aeronautical standards adopted by all states. C

More information

Safety and Airspace Regulation Group

Safety and Airspace Regulation Group Safety and Airspace Regulation Group 24 August 2015 Policy Statement POLICY FOR POINT MERGE AND TROMBONE TRANSITION PROCEDURES 1 Introduction 1.1 The Point Merge transition procedure is an Area Navigation

More information

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT ICAO Universal Safety Oversight Audit Programme SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT (Kuwait, 17 to 20 September 2003) International

More information

RNAV - RNP. July 2010

RNAV - RNP. July 2010 RNAV - RNP July 2010 July 2010 Issue 1 Page 1 of 6 1 Who Issues approval to fly in P-RNAV Airspace? a) National Authority b) Euro Control c) JAA d) ICAO 2 A Fixed Published Route is? a) Alternative / Reserve

More information

Excerpts from ICAO PBCS Manual

Excerpts from ICAO PBCS Manual IBAC Bulletin - 8 Dec. 2017 Attachment A Excerpts from ICAO PBCS Manual Chapter 4. Complying with and RCP/RSP specification 4-8 4.3.1.7 The ANSP should establish the following, subject to a bilateral,

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval

Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval Policy Letter (PL) Global Positioning System (GPS) Equipment and Installation Approval File No. 5009-32-0 PL No. 551-003 RDIMS No. 1019349-V5 Issue No. 01 Issuing Branch Aircraft Certification Effective

More information

Instrument Proficiency Check Flight Record

Instrument Proficiency Check Flight Record Instrument Proficiency Check Flight Record Date: Flight Time: Sim. Inst. Time: Pilot Name: Aircraft Type: Aircraft Tail Number: Act. Inst. Time: Instructor Name: Holding Procedures Task Notes N/A Satisfactory

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

MetroAir Virtual Airlines

MetroAir Virtual Airlines MetroAir Virtual Airlines NAVIGATION BASICS V 1.0 NOT FOR REAL WORLD AVIATION GETTING STARTED 2 P a g e Having a good understanding of navigation is critical when you fly online the VATSIM network. ATC

More information

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL

APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL SEYCHELLES CIVIL AVIATION AUTHORITY APPLICATION FOR P-RNAV/RNAV 1 OPERATIONAL APPROVAL OR RENEWAL Applicants are strongly advised to read the 'P-RNAV Notes for Completion' before completing the form. Please

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 171 AERONAUTICAL TELECOMMUNICATION SERVICES Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 First

More information

Initiated By: AFS-400

Initiated By: AFS-400 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Development and Submission of Special Date: 04/14/2015 AC No: 90-112A Instrument Procedures to the FAA Initiated

More information

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders Statement of compliance with: COMMISSION REGULATION (EU) No 965/2012 (of 5 October 2012 laying down technical requirements and administrative procedures related to air operations pursuant to Regulation

More information

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No.

Advisory Circular. En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Aviation Safety Regulatory Framework Document No. Advisory Circular Subject: En Route Area Navigation Operations RNAV 5 (Formerly B-RNAV) Issuing Office: PAA Sub Activity Area: File Classification No.: Civil Aviation Aviation Safety Regulatory Framework

More information