Airfield Geometric Design Prof. Amedeo Odoni
|
|
- Theodore Collins
- 5 years ago
- Views:
Transcription
1 Airfield Geometric Design Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 5 May 25, 2015
2 Objective and Outline Review briefly the rationale underlying the geometric design specifications for airfields Outline: - ICAO and FAA Reference Codes - Practical observations - Principal documents - Examples of specifications and rationale Reference: Chapter 9 of de Neufville and Odoni Page 2
3 Airfield Design Specifications The two most-commonly used sources of geometric specifications for airfield design are: 1. ICAO Annex 14 ( Aerodromes ) [latest 2013, 6 th Edition] and many associated documents, esp. Aerodrome Design Manual, Parts FAA Advisory Circular 150/ ( Airport Design ) [latest: Sept. 2012] FAA updates of specifications are usually developed earlier than updates to ICAO Annex 14 (e.g., Group VI standards) Runway length requirements: AC 150/5325-4B Reference: de Neufville and Odoni, Ch. 9, Secs. 2- Page 3 3, 5-9
4 ICAO Aerodrome Reference Code Page 4
5 FAA Runway Design Code (RDC) Aircraft Approach Category (AAC) Approach Speed (AS) A: < 91 knots B: 91 <121 knots C: 121 <141 knots D: 141 <166 knots E: 166+ knots Airplane Design Group (ADG) Wingspan (WS) Tail Height (TH) I: < 49 ft <20 ft <15 m <6 m II: 49 <79 ft 20 <30 ft 15 <24 m 6 <9 m III: 79 <118 ft 30 <45 ft 24 <36 m 9 <13.5 m IV: 118 <171 ft 45 <60 ft 36 <52 m 13.5 <18.5 m V: 171 <214 ft 60 <66 ft 52 <65 m 18.5 <20 m VI: 214 <262 ft 66 <80 ft 65 <80 m 20 <24.5 m Page 5
6 A380 vs. B (79.8 m) (72.2 m) (24.1 m) (64.4 m) (70.6 m) (19.4 m) (560 tons) (396 tons) Page 6
7 A380 vs ER Note: Boeing ER Is longer than the A380 7 Page 7
8 Airport Reference Code (ARC) Determined by the most demanding aircraft (or design aircraft, or critical aeroplane ) that the airport is designed to serve The design aircraft need NOT be An aircraft which is currently using the airport An existing aircraft (can be a hypothetical future aircraft) Different runways may have different Runway Design Codes (RDC): ARC of entire airport will then be determined by the highest RDC available E.g., if RDC of Runway 1 is 4-E and of Runway 2 4-C, then ARC is 4-E Page 8
9 Remarks: ICAO and FAA Airport Reference Codes Practically all major commercial airports belong to the ICAO Code #4 class In practice, Outer Main Gear Wheel Span (ICAO) is dominated by Wing Span Similarly, Tail Height (FAA) is dominated by Wing Span ICAO Code Letters A-F Wing Spans correspond exactly to FAA Airplane Design Groups I-VI wingspans Most geometric specifications for airports are determined by the Wing Span of the most demanding aircraft Page 9
10 787-8 A A Page 10
11 Reference Codes of Wide-Body Aircraft Page 11
12 Wide-Body Aircraft: Range vs. Seating Capacity Page 12
13 Examples of Geometric Specifications (ICAO Annex 14) C D E F Runway width Taxiway width Runway centerline to taxiway centerline Runway centerline to holdline Taxiway centerline to taxiway centerline Taxiway centerline to object Taxilane centerline to object Code #4 aircraft; distances are in meters; assumes instrument runway at sea level Page 13
14 LAX Diagram (October 23, 2008) Page 14
15 LAX: Handling ADG VI Aircraft Today Page 15
16 Rationale for Dimensional Specifications The rationale for many of the dimensional specifications in the ICAO Annex 14 is provided in the Aerodrome Design Manual, Doc 9157 (Part 1: Runways, Part 2: Taxiways) The Aerodrome Design Manual can also be used to estimate dimensional specifications for accommodating future aircraft development (e.g., Code Letter G) The rationale for some of the FAA s dimensional specifications can be found in Appendices 8 (Runways) and 9 (Taxiways) of older versions (e.g., 1989) of the FAA s Airport Design advisory circular (AC 150/ ) Page 16
17 ICAO: Taxiway Centerline to Taxiway Centerline S = WS + C + Z For Code F, WS=80 m, C=4.5 m, Z=13 m; therefore S=97.5 m Page 17
18 Single lane vs. dual lane access to stands Source: FAA AC 150/ (1989 edition) Note as well: Taxiway centerline to taxiway centerline: 1.2x(wingspan of most demanding a/c) + 10 ft (3m) Taxiway centerline to object: 0.7x(wingspan of most demanding a/c) + 10 ft (3m) Page 18
19 Wind Coverage (ICAO) For operations on any given runway, crosswinds should not exceed [FAA rules roughly the same]: 37 km/h (20 knots) for aircraft whose reference field length is 1500 m or more, except with poor braking action, when the limit is 24 km/h (13 knots) 24 km/h (13 knots) for reference field length between 1200 m and 1,499 m 19 km/h (10.5 knots) for reference field length of less than 1,200 m Crosswind coverage (or airport usability factor ) should be at least 95% [same with FAA] Page 19
20 Wind Rose and Wind Coverage Page 20
21 ICAO: Obstacle Limitation Surfaces Source: ICAO Annex 14 Page 21
22 Questions? Comments? Page 22
Airfield Geometric Design Prof. Amedeo Odoni
Airfield Geometric Design Prof. Amedeo Odoni Istanbul Technical University Air Transporta5on Management M.Sc. Program Air Transporta5on Systems and Infrastructure Module 4 28 April 2014 Objective and Outline!
More informationDemand Patterns; Geometric Design of Airfield Prof. Amedeo Odoni
Demand Patterns; Geometric Design of Airfield Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Airport Planning and Management Module 4 January 2016 Demand Patterns;
More informationAirport Characteristics. Airport Characteristics
Airport Characteristics Amedeo R. Odoni September 5, 2002 Airport Characteristics Objective To provide background and an overview on the diversity of airport characteristics Topics Discussion of geometric
More informationThe offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10
The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are
More informationBoeing Airplane Overview
Boeing Airplane Overview Yonglian Ding, PE Boeing Airport Compatibility Engineering Nov 29, 2016 BOEING is a trademark of Boeing Management Company. Copyright 2016 Boeing. All rights reserved. Agenda Aircraft
More informationAdvisory Circular (AC)
Advisory Circular (AC) Certification of Transport Category Aeroplanes On Narrow Runways File No. 5009-6-525 AC No. 525-014 RDIMS No. 528471-V3 Issue No. 01 Issuing Branch Aircraft Certification Effective
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationCEE Quick Overview of Aircraft Classifications. January 2018
CEE 5614 Quick Overview of Aircraft Classifications Dr. Antonio A. Trani Professor Civil and Environmental Engineering January 2018 1 Material Presented The aircraft and its impact operations in the NAS
More informationCEE 5614 and CEE Aircraft Classifications. Spring 2013
CEE 5614 and CEE 4674 Aircraft Classifications Dr. Antonio A. Trani Professor Civil and Environmental Engineering Spring 2013 1 Material Presented The aircraft and the airport Aircraft classifications
More informationAirfield Capacity Prof. Amedeo Odoni
Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:
More informationAssignment 7: Airport Geometric Design Standards
CEE 4674: Airport Planning and Design Spring 2018 Date Due: March 23, 2018 Instructor: Trani Problem 1 Assignment 7: Airport Geometric Design Standards An airport is designing a new pier terminal to accommodate
More informationRecent amendment to Annex 14, Volume I and an update on PANS-Aerodromes
Recent amendment to Annex 14, Volume I and an update on PANS-Aerodromes Yong Wang Chief, Airport Operations and Infrastructure, ICAO Overview Adoption of Amendment 14 to Annex 14, Volume I Update on PANS-Aerodromes
More informationAircraft Classifications. Dr. Antonio Trani and Julio Roa Department of Civil and Environmental Engineering.
Aircraft Classifications Dr. Antonio Trani and Julio Roa Department of Civil and Environmental Engineering. January 2018 1 Material Presented The aircraft and the airport Aircraft classifications Aircraft
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationRunway Length Analysis Prescott Municipal Airport
APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section
More informationAirport Compatibility
Presented by Dan COHEN-NIR Programs Director Airbus Americas Holdings Inc. www.airbusamericas.com Airport Compatibility Opportunities and Challenges Airport Challenges & Aircraft Design Challenge: Prepare
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationFOR. Boeing Commercial Airplanes
Aircraft Classification & Airport Pavement Design Curves Prof. Dr. Shafik Jendia 2009/2010 1 A-1 BOEING 747-200 AIRPLANE CHARACTERSTICS FOR AIRPORT PLANNING & DESIGN BOEING Boeing Commercial Airplanes
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationAssignment 3: Runway Length and EMAS Design. Aircraft Engine Remarks. CFM56-7B20/-7B22/-7B24 developing 20,000 lb of thrust at sea level
CEE 4674: Airport Planning and Design Spring 2014 Solution! Assignment 3: Runway Length and EMAS Design Instructor: Trani Problem 1 A new airport to be constructed near Mexico City airport would like to
More informationCHAPTER 3 FACILITY REQUIREMENTS
CHAPTER 3 FACILITY REQUIREMENTS 3.1 INTRODUCTION To properly plan for the future requirements of Newport News/Williamsburg International Airport, it is necessary to translate the forecasts of aviation
More informationIntroduction to Airports and Their Characteristics Prof. Amedeo Odoni
Introduction to Airports and Their Characteristics Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 3 May
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationFacility Requirements
4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 50 INTRODUCTION This chapter describes the airside and landside facility requirements necessary to accommodate existing and forecasted demand in accordance with Federal
More informationChapter 4 Facility Requirements
Chapter 4 Facility Requirements Introduction This chapter evaluates the existing airport facilities and identifies improvements needed to effectively meet the forecasted demand levels discussed in the
More informationConsideration will be given to other methods of compliance which may be presented to the Authority.
Advisory Circular AC 139-11 Revision 2 Use of day-vfr aerodromes 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that
More informationFacility Requirements
C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over
More informationChapter 4 Airport Capacity Assessment and Identification of Facility Needs
Chapter 4 Airport Capacity Assessment and Identification of Facility Needs 4.1 Introduction The purpose of the airport capacity assessment and identification of facility needs is to evaluate the single
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)
CAR DCA/1 20/09/02 INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1) (Grand Cayman, Cayman Islands, 8-11 October 2002) Agenda Item
More informationAIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA
AIRPORT MASTER PLAN ADVISORY COMMITTEE MEETING #2 AGENDA MEETING DATE: Wednesday, June 1, 2011 TIME: 2:30 PM (1½ Hours) LOCATION: Duluth Airport Terminal Building, Skyline Room (2 nd Floor) This meeting
More informationFACILITY REQUIREMENTS CHAPTER
FACILITY REQUIREMENTS CHAPTER Introduction This chapter presents requirements for airside, landside, terminal, and support facilities to meet aviation demand at RNO over the next 20 years. Facilities are
More informationAN INTRODUCTION TO PANS-AERODROMES (Doc 9981)
AN INTRODUCTION TO PANS-AERODROMES (Doc 9981) ADCI TF/1-PPT/5 Joseph CHEONG, Technical Officer, Aerodromes Section, ICAO Montreal REFERENCES: PANS - AERODROMES ANWP-8322 ANWP-8379 ANWP-8669 (not available)
More informationTechnical Advisory Committee Meeting February 29, 2016
Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements
More informationBoeing Aircraft and the Impact on Airports
International Civil Aviation Organization on Pavement Management Systems Lima, Peru November 19-22, 2003 Boeing Aircraft and the Impact on Airports Orest Shepson Principal Engineer - Airport Technology
More informationSession. Arrester Systems, Declared Distances and Runway Excursion Prevention
Session Arrester Systems, Declared Distances and Runway Excursion Prevention 1 Runway Excursion Toronto, Canada August 2, 2005 200 meters from end of runway 2 American Airlines Flight 331, Norman Manley
More informationCHAPTER 3. Airside Facilities
CHAPTER 3 Airside Facilities 3.0 AIRSIDE OVERVIEW This chapter focuses on airside facilities at Spokane International Airport (GEG or the Airport ). Airside facilities include runways, taxiways, support
More informationAIRSIDE CAPACITY AND FACILITY REQUIREMENTS
AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established
More information4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS
4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development
More informationPROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS
PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a
More informationChippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan
1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationADVISORY CIRCULAR AC-AD-005
GHANA CIVIL AVIATION AUTHORITY ADVISORY CIRCULAR AC-AD-005 AERODROME QUALITY DATA SYSTEM GENERAL Ghana Civil Aviation Authority (GCAA) Advisory Circulars from Aerodrome Safety and Standards (ASAS) contain
More informationAirport Geometric Design Standards
Airport Geometric Design Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Organization of this Presentation Review of geometric design standards Runway-runway
More informationBoeing Product Update
Boeing Product Update Agenda Market Outlook Boeing Product Impact to Airports 777X Folding Wingtip Boeing Airport Compatibility Group 2 Regulatory Effort Market Outlook (Latin America) Boeing Product
More informationCHAPTER 1 BACKGROUND AND PROPOSED ACTION
CHAPTER 1 BACKGROUND AND PROPOSED ACTION 1.0 INTRODUCTION An Environmental Assessment (EA) evaluates the effects of a proposed Federal action on the surrounding environment and is prepared in compliance
More informationAppendix A - Glossary
Appendix A - Glossary The terms and definitions here are relevant to airport design standards and retrieved from AC 150/5300-13A, Airport Design. A Accelerate-Stop Distance Available (ASDA). See Declared
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More information3.1 Facility Requirements Overview Airfield Facility Requirements... 1
Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...
More information3.0 Facility Requirements
3.0 Facility Requirements The facility requirements chapter includes an assessment of the aviation and non-aviation components of Rickenbacker International Airport (LCK) including the runway and taxiway
More informationTable of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1
Table of Contents Table of Contents... 2 3.1 Overview... 1 3.2 Airport Capacity and Delay Analysis... 1 Airspace Capacity... 1 Aircraft Mix Index... 3 Arrivals Percentage... 3 Touch-and-Go Percentage...
More information1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;
1.0 PURPOSE Page 1 of 5 The purpose of this Advisory Circular (AC) is to provide guidance to the aerodrome operators in adopting operational procedures and principles for apron management. The aerodrome
More informationMeeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held
More informationWhat's your fleet mix for design?
What's your fleet mix for design? (Hint: it's not the Airport Master Plan s fleet mix) Presented to: By: 4 States Airport Conference Brian M. Tompkins, P.E., C.M. State Airport Engineer Iowa Dan E. Wilson,
More informationAirport Runway Location and Orientation. CEE 4674 Airport Planning and Design
Airport Runway Location and Orientation CEE 4674 Airport Planning and Design Dr. Antonio A. Trani Professor of Civil Engineering Virginia Tech Virginia Tech 1 of 24 Runway Location Considerations The following
More informationAPPENDIX X: RUNWAY LENGTH ANALYSIS
APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for
More informationMASTER PLAN UPDATE WORKING PAPER NO. 3. Demand/Capacity Analysis and Facility Requirements. March 18, 2013
MASTER PLAN UPDATE WORKING PAPER NO. 3 Demand/Capacity Analysis and Facility Requirements March 18, 2013 Contents 4 Demand/Capacity Analysis and Facility Requirements... 4 1 4.1 Summary of Aviation Demand
More informationGrowing Size and Complexity Prof. Amedeo Odoni
Growing Size and Complexity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Airport Planning and Management Module 3 January 2016 Growing Size and Complexity
More information4. Demand/Capacity Assessment and Facility Requirements
4. This chapter presents an evaluation of the existing airfield facilities, buildings, and other facilities at the Airport and an assessment of their potential use under the demand scenarios defined for
More informationGround Movement Handling of Large Passenger and Cargo Carrying Aircraft
Airside Operational Instruction TBA Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft Airside Operation Instruction
More informationADVISORY CIRCULAR ON CALCULATION OF DECLARED DISTANCES
Page 1 of 6 1. PURPOSE This Advisory circular (AC) provides guidance to operators to calculated declared distances at aerodrome for safe use of runway and promulgation of aeronautical data to the aeronautical
More informationAerodrome Design Manual
Doc 9157 AN/901 Aerodrome Design Manual Part 1 Runways Approved by the Secretary General and published under his authority Third Edition 2006 International Civil Aviation Organization Doc 9157 AN/901
More informationAIRPORT FACILITY REQUIREMENTS
4.1 INTRODUCTION Chapter 4 AIRPORT FACILITY REQUIREMENTS The major elements of the Airport, which were described in Chapter 3, Existing Airport Facilities must be analyzed individually and balanced in
More informationAirport Obstruction Standards
Airport Obstruction Standards Dr. Antonio Trani Department of Civil and Environmental Engineering Virginia Tech Outline of this Presentation Obstructions to navigation around airports Discussion of Federal
More informationPORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS
PORT OF PORTLAND Chapter Four AVIATION FACILITY REQUIREMENTS CHAPTER FOUR PORT OF PORTLAND AVIATION FACILITY REQUIREMENTS In this chapter, existing components of the airport are evaluated to identify the
More informationLopez Island Airport Master Plan Update. Public Meeting June 15, 2017
Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,
More informationTerms of Reference for rulemaking task RMT.0704
Terms of Reference for rulemaking task Runway Surface Condition Assessment and Reporting ISSUE 1 Issue/rationale The International Civil Aviation Organization (ICAO), through State Letters AN 4/1.2.26-16/19
More informationCapacity Analysis & Facility Requirements
CHAPTER C Capacity Analysis & Facility Requirements 1. Introduction This chapter considers the ability of facilities at Friedman Memorial Airport (SUN) to accommodate existing and projected activity. Current
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationUSAF Aero Club Local Procedures Exam Updated February 2017
USAF Aero Club Local Procedures Exam Updated February 2017 Instructions This exam is part of the Annual Standardization Test. Continue with the following exam using a separate answer sheet and check (
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More information7.1 General Information. 7.2 Landing Gear Footprint. 7.3 Maximum Pavement Loads. 7.4 Landing Gear Loading on Pavement
7.0 PAVEMENT DATA 7.1 General Information 7.2 Landing Gear Footprint 7.3 Maximum Pavement Loads 7.4 Landing Gear Loading on Pavement 7.5 Flexible Pavement Requirements - U.S. Army Corps of Engineers Method
More informationFACILITY REQUIREMENTS 5.1 Introduction
Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation
More informationInventory of Existing Conditions
CHAPTER A. Inventory of Existing Conditions INTRODUCTION. The layout/configuration of the Snohomish County Airport (Paine Field) runway and taxiway system has evolved over many years. In the early 1940
More informationChapter 3 FACILITY REQUIREMENTS
Chapter 3 FACILITY REQUIREMENTS Chapter Three Facility Requirements To properly plan for the future of Ryan Airfield, it is necessary to translate forecast aviation demand into the specific types and quantities
More informationBearing Strength Assessment PLR & PCN
1 LEISMER AIRPORT (Airport code CET2, Canada) Bearing Strength Assessment PLR & PCN Report APMS-111021 October 21, 2011 APMS Stationsweg 51, Velsen-Zuid 1981 BA, the Netherlands Phone: + 31 (0) 255 524
More informationRef.: AN 4/ /44 19 April 2017
International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 514-954-8219
More informationFACILITY REQUIREMENTS
FACILITY REQUIREMENTS In order to ensure that Bradley International Airport (BDL) is capable of supporting the expected increase in passenger traffic, care must be taken to ensure that the recommendations
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationAirport Design-3 Geometric Design
Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More informationProgram Update Dan Cohen-Nir - Airbus Americas
ACI-NA Airports@Work New Orleans March 15, 2018 Program Update Dan Cohen-Nir - Airbus Americas An Airbus takes off or lands every 1.4 seconds 18,234 Orders 10,991 Deliveries 7,333 Backlog End December
More informationCHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION
CHAPTER D Capacity Analysis and Facility Requirements INTRODUCTION The capacity of an airfield is primarily a function of the major aircraft operating surfaces that compose the facility and the configuration
More informationUpset Prevention & Recovery Training (UPRT) Guidance from CAAS. Gerard Peacock 18 Mar 2016
Upset Prevention & Recovery Training (UPRT) Guidance from CAAS Gerard Peacock 18 Mar 2016 - AC References: ICAO Doc 10011- Manual on Aeroplane UPRT. ICAO Doc 9868 Pans Training - Chapter 7. ICAO Annex
More information1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities
To properly plan for improvements at Dallas Executive Airport, it is necessary to translate forecast aviation demand into the specific types and quantities of facilities that can adequately serve the demand.
More informationBudapest, Hungary 2015
Budapest, Hungary 2015 Runway Pavement Roughness Considering Pavement Surface Drainage and Boeing Bump Index Injun Song, Ph.D., P.E. SRA International, Inc. Acknowledgement Jeffrey Gagnon, P.E., FAA Airport
More information3 INTRODUCTION. Chapter Three Facility Requirements. Facility Requirements PEAKING CHARACTERISTICS
Chapter Three Facility Requirements 3 INTRODUCTION This chapter identifies the long-range airfield and terminal area facilities needed to satisfy the 20-year forecast of aviation demand at Monett Municipal
More informationINCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER
INCREASING AIRPORT OPERATION SAFETY BASED ON UPDATED OR ENHANCED AIRPORT PAVEMENT MARKINGS: A CASE STUDY PAPER 09-2020 By Chun-Hsing Ho, Dwight D. Eisenhower Fellow Department of Civil and Environmental
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements The evaluation of airport facility requirements uses the results of the inventory and forecasts contained in Chapters Two and Three, as well as established planning
More informationAERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES
AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division
More informationAirport Compatibility Brochure 737 MAX
Airport Compatibility Brochure 737 MAX Specific airport compatibility questions concerning Boeing commercial aircraft should be forwarded to: June 2017 BOEING is a trademark of Boeing Management Company.
More informationNoise Certification Workshop
Session 2: Aircraft Noise Certification Harmonisation James Skalecky U.S. FAA 1 Harmonisation / The Beginning In June 1990 at a meeting of the JAA Council and the FAA, the FAA Administrator committed the
More information4.0 FACILITY REQUIREMENTS
4.0 FACILITY REQUIREMENTS The purpose of this chapter of Master Plan is to identify the needs for additional facilities, or improvements to existing facilities over the planning period. By comparing current
More informationTECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan
TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING
More information