National Passenger Survey TOC Report for Chiltern Railways Autumn 2011

Size: px
Start display at page:

Download "National Passenger Survey TOC Report for Chiltern Railways Autumn 2011"

Transcription

1 National Passenger Survey TOC Report for Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne House 9-31 High Holborn London, WC1V 7DA Tel: dave.chilvers@bdrc-continental.com

2 Contents 4 Managed versus non-managed stations 4.1 Station factor results for 6 4. Network Rail categorisation for 7 1 Introduction Peak/off-peak satisfaction 1.1 Methodology.1 Peak/off peak satisfaction for 8 1. Issues affecting fieldwork 3. Peak/off peak satisfaction for Key results 6 Sample profile.1 Overall satisfaction and station factor results for Chiltern Railways 6.1 Weighted sample profile for 3. Train factor results for 6 6. Weighted sample profile for 33.3 Overall satisfaction and station factor results for London and South East Station sample sizes for 34.4 Train factor results for Weighted sample composition for all TOCs 3. performance versus London and South East Unweighted sample composition for all TOCs 36.6 Building block/route data for 13 3 Passenger satisfaction trend charts 7 Technical appendix 3.1 Trend charts of all passenger satisfaction results for Standard reports produced for NPS Rail sectors 38 1

3 1 1.1 Methodology Questionnaires are normally handed out at stations to customers about to board a train. A reply paid envelope is provided for returning questionnaires. Each Train Operating Company (TOC) is sampled separately. Interviewers are given a number of questionnaires to hand out at a station. At Gatwick and Heathrow Airports and for some shifts at certain London termini, questionnaires are handed out to passengers of a specific TOC. From 3 onwards, at all other stations, questionnaires are handed out to passengers of any TOC (in the past, these were also targeted). The number of questionnaires handed out will depend on: - the size of station - time of day - length of shift TOC data is compiled to provide a national sample. Fieldwork is carried out each (February/March) and (September/October). Up to 3, fieldwork took place over 3 weeks. In 3, the fieldwork was extended to an 11 week period, from 6 August to 9 November, to provide a better representation of journeys. Quotas for returned questionnaires are set overall and by weekday/weekend, journey purpose and station size. All data for a TOC in this Report is weighted up to the number of passenger journeys annually on the TOC and the profile of those journeys by: - weekday/weekend - journey purpose (Commuter, Business, Leisure) - station size (this profile is applied for each TOC building block) The data for number of journeys and profiles by these variables was generated from ORR data (). The stations for each TOC were stratified by number of passengers and a number of stations in each size stratum is sampled. This sample design and weighting ensures that data is representative of all passenger journeys made on each TOC. National results are constructed by combining data for all TOCs together, weighting by number of journeys. From standard region definitions have been used replacing older rail regions. Analysis for the old regions is available on request. For more details of NPS methodology, visit Methodology

4 1 1. Issues affecting fieldwork (Wave ) Wave fieldwork (Main and Boost) was undertaken between 1st September and 18th November. Top up shifts were run within the last 3 weeks of the fieldwork period. Delayed fieldwork on a separate rail industry project led to a smaller number of NPS shifts than normal at London Euston during the first couple of weeks of fieldwork, with others planned being moved to later in the fieldwork period. As with previous waves, planned engineering works meant that some shifts were rescheduled. As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. (Wave 4) Wave 4 fieldwork (Main and Boost) was undertaken between 31st January and 1th April. Top up interviews were run within the last 3 weeks of the fieldwork period. Closure of the Wrexham and Shropshire Franchise prior to the start of fieldwork meant that no shifts were conducted on train or at station for this TOC. Due to strike action with Arriva Trains Wales a small number of weekend shifts had to be rescheduled for later on in the fieldwork period. Other than this strike action, and clashes with Virgin Trains own fieldwork and a small amount of engineering work mainly affecting London Overground shifts there was little disruption to the field schedule. Whenever possible the shifts went ahead as planned if there were still train services The results achieved by London Midland are likely to have been affected by an industrial dispute which resulted in the cancellation of a significant number of trains through the full survey period. One fieldworker was commended on his behaviour by First TransPennine Express after saving the life of a young female passenger by preventing her from falling onto the track. 1. Issues affecting fieldwork 3

5 1 1. Issues affecting fieldwork (cont'd) (Wave 3) Fieldwork (Main and Boost) was undertaken between nd September and 1th November. Top up shifts were run between 14th October and the 6th November. Planned engineering works meant that some shifts were rescheduled. As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. Engineering works particularly affected shifts scheduled to be conducted on weekends both on train and at stations run by London Overground and Wrexham and Shropshire respectively. All shifts were rescheduled and conducted on the weekends where possible. Due to shortfall on returns on certain TOCs the fieldwork period was extended from the 1th of November to the 6th November. Other than the Papal visit, and the Conservative Party conference there were no other events that caused major disruptions to the fieldwork schedule. (Wave ) Fieldwork was undertaken between 31 January and 7 March. Top up shifts were run between 8 March and 9 April. The main fieldwork period was similar to previous years, but the top-up period was slightly extended because of problems encountered earlier in the fieldwork period. Extreme weather - in particular, heavy snow during the 1st week of February - caused a lot of disruption to the fieldwork schedule. Over % of all shifts originally scheduled for -6 February had to be postponed until later in the fieldwork period. As always, planned engineering works meant that some shifts were rescheduled. As usual, shifts were only rescheduled if the engineering work caused a station or line closure. Whenever possible the shifts went ahead as planned if there were still train services running. Over-running engineering work meant that further shifts had to be rescheduled during the course of the fieldwork, but this was not a great problem. A few shifts were rescheduled to avoid clashing with Six Nations rugby matches, but sporting events did not cause much disruption to the original schedule. 1. Issues affecting fieldwork (cont'd) 4

6 .1 Overall satisfaction and station factors Satisfaction results for Overall satisfaction (1116) At 9% confidence level: + denotes significant increase - denotes significant decrease % satisfied/good 88 Overall satisfaction with the station 1 (1118) Ticket buying facilities (67) Provision of information about train times/platforms 3 (97) The upkeep/repair of the station buildings/platforms 4 (8) Cleanliness (93) The facilities and services (967) The attitudes and helpfulness of the staff 7 (88) Connections with other forms of public transport 8 (817) Facilities for car parking (1) The overall station environment (14) Your personal security whilst using (999) The availability of staff (938) 1 4 How request to station staff was handled (186) Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied.1. Overall satisfaction and station factors

7 . Train factors At 9% confidence level: + denotes significant increase - denotes significant decrease Satisfaction results for % satisfied/good The frequency of the trains on that route 1 (19) Punctuality/reliability (i.e. train arriving/departing on time) (1117) The length of time the journey was scheduled to take (speed) 3 (16) Connections with other train services 4 () The value for money for the price of your ticket (8) Cleanliness of the train (114) The upkeep and repair of the train (1114) The provision of information during the journey (973) The helpfulness and attitude of staff on train (478) The space for luggage (84) Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied. Train factors 6

8 . Train factors (cont'd) At 9% confidence level: + denotes significant increase - denotes significant decrease Satisfaction results for % satisfied/good Toilet facilities (413) Sufficient room for all the passengers to sit/stand (83) Comfort of the seating area (9) The ease of being able to get on and off (13) Your personal security whilst on board (3) The cleanliness of the inside (1114) The cleanliness of the outside (94) The availability of staff (637) How well train company dealt with delays () Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied. Train factors (cont'd) 7

9 .3 Overall satisfaction and station factors Satisfaction results for Overall satisfaction (17116) At 9% confidence level: + denotes significant increase - denotes significant decrease % satisfied/good Overall satisfaction with the station 1 (1749) Ticket buying facilities (9644) Provision of information about train times/platforms 3 (1636) The upkeep/repair of the station buildings/platforms 4 (1638) Cleanliness (16441) The facilities and services (134) The attitudes and helpfulness of the staff 7 (1491) Connections with other forms of public transport 8 (16) Facilities for car parking (6661) The overall station environment (16684) Your personal security whilst using (14988) The availability of staff (1441) 1 How request to station staff was handled (71) Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied.3 Overall satisfaction and station factors 8

10 .4 Train factors At 9% confidence level: + denotes significant increase - denotes significant decrease Satisfaction results for % satisfied/good The frequency of the trains on that route 1 (168) Punctuality/reliability (i.e. train arriving/departing on time) (1693) The length of time the journey was scheduled to take (speed) 3 (168) Connections with other train services 4 (187) The value for money for the price of your ticket (164) Cleanliness of the train (1711) The upkeep and repair of the train (16) The provision of information during the journey (197) The helpfulness and attitude of staff on train (8739) The space for luggage (141) Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied.4 Train factors 9

11 .4 Train factors (cont'd) At 9% confidence level: + denotes significant increase - denotes significant decrease Satisfaction results for % satisfied/good Toilet facilities (68) Sufficient room for all the passengers to sit/stand (161) Comfort of the seating area (169) The ease of being able to get on and off (16834) Your personal security whilst on board (1818) The cleanliness of the inside (16998) The cleanliness of the outside (14769) The availability of staff (1163) How well train company dealt with delays (818) Very dissatisfied Fairly dissatisfied Neither Fairly satisfied Very satisfied.4 Train factors (cont'd)

12 . Overall satisfaction and station factors performance versus TOC Sector TOC Index Overall satisfaction % Overall satisfaction with the station % Ticket buying facilities % Provision of information about train times/platforms % The upkeep/repair of the station buildings/platforms % Cleanliness % The facilities and services % The attitudes and helpfulness of the staff % Connections with other forms of public transport % Facilities for car parking % Overall environment % Your personal security whilst using % The availability of staff % How request to station staff was handled %. Overall satisfaction and station factors 11

13 . Train factors performance versus TOC Sector TOC Index The frequency of the trains on that route % Punctuality/reliability (i.e. the train arriving/departing on time) 8 8 % The length of time the journey was scheduled to take (speed) % Connections with other train services 76 7 % The value for money for the price of your ticket 1 4 1% Cleanliness of the train % Upkeep and repair of the train % The provision of information during the journey % The helpfulness and attitude of staff on train 6 7 8% The space for luggage 6 11% The toilet facilities % Sufficient room for all passengers to sit/stand % The comfort of the seating area % The ease of being able to get on and off % Your personal security on board % The cleanliness of the inside % The cleanliness of the outside % The availability of staff % How well train company deals with delays %. Train factors 1

14 .6 Overall satisfaction and station factors Building block/route data for North South Overall satisfaction Overall satisfaction with the station Ticket buying facilities Provision of information about train times/platforms 8 84 The upkeep/repair of the station buildings/platforms 8 8 Cleanliness The facilities and services 6 7 The attitudes and helpfulness of the staff Connections with other forms of public transport 69 7 Facilities for car parking 6 73 Overall environment 8 86 Your personal security whilst using The availability of staff 6 67 How request to station staff was handled Overall satisfaction and station factors 13

15 .6 Train factors Building block/route data for North South The frequency of the trains on that route 8 79 Punctuality/reliability (i.e. the train arriving/departing on time) 81 8 The length of time the journey was scheduled to take (speed) Connections with other train services 76 7 The value for money for the price of your ticket 6 47 Cleanliness of the train Upkeep and repair of the train 89 The provision of information during the journey 83 7 The helpfulness and attitude of staff on train 78 4 The space for luggage 63 9 The toilet facilities 1 Sufficient room for all passengers to sit/stand 8 74 The comfort of the seating area 88 8 The ease of being able to get on and off Your personal security on board 87 8 The cleanliness of the inside The cleanliness of the outside The availability of staff 6 How well train company deals with delays Train factors 14

16 3 3.1 Passenger satisfaction trend charts Overall satisfaction (1116) Percentage of passengers satisfied to Overall station satisfaction (1118) Percentage of passengers satisfied to Ticket buying facilities (67) Percentage of passengers satisfied to Benchmark Benchmark Target Target 78 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 1

17 3 3.1 Passenger satisfaction trend charts Provision of information about train times/platforms (97) Percentage of passengers satisfied to The upkeep/repair of the station building/platforms (8) Percentage of passengers satisfied to Cleanliness of the station (93) Percentage of passengers satisfied to Benchmark Benchmark Target 8 Target 8 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 16

18 3 3.1 Passenger satisfaction trend charts The facilities and services at the station (967) Percentage of passengers satisfied to The attitudes and helpfulness of the staff at the station (88) Percentage of passengers satisfied to Connections with other forms of public transport from the station (817) Percentage of passengers satisfied to Benchmark Target 79 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 17

19 3 3.1 Passenger satisfaction trend charts Facilities for car parking at the station (1) Percentage of passengers satisfied to Overall station environment (14) Percentage of passengers satisfied to Your personal security whilst using the station (999) Percentage of passengers satisfied to Benchmark Target 8 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 18

20 3 3.1 Passenger satisfaction trend charts The availability of staff at the station (938) Percentage of passengers satisfied to How request to station staff was handled (186) Percentage of passengers satisfied to The frequency of trains on that route (19) Percentage of passengers satisfied to N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 19

21 3 3.1 Passenger satisfaction trend charts Punctuality/reliability (i.e. train arriving/departing on time) (1117) Percentage of passengers satisfied to The length of time the journey was scheduled to take (speed) (16) Percentage of passengers satisfied to Connections with other train services () Percentage of passengers satisfied to N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts

22 3 3.1 Passenger satisfaction trend charts The value for money for the price of your ticket (8) Percentage of passengers satisfied to Cleanliness of the train (114) Percentage of passengers satisfied to Upkeep and repair of the train (1114) Percentage of passengers satisfied to Benchmark Benchmark Target 8 Target 79 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 1

23 3 3.1 Passenger satisfaction trend charts The provision of information during the journey (973) Percentage of passengers satisfied to Benchmark The helpfulness and attitude of staff on train (478) Percentage of passengers satisfied to Benchmark The space for luggage (84) Percentage of passengers satisfied to Benchmark Target 6 Target 71 Target 6 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts

24 3 3.1 Passenger satisfaction trend charts Toilet facilities on train (413) Percentage of passengers satisfied to Sufficient room for all the passengers to sit/stand (83) Percentage of passengers satisfied to The comfort of the seating area (9) Percentage of passengers satisfied to Benchmark Benchmark Target 4 Target 71 N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 3

25 3 3.1 Passenger satisfaction trend charts The ease of being able to get on and off the train (13) Percentage of passengers satisfied to Your personal security whilst on board (3) Percentage of passengers satisfied to The cleanliness of the inside of the train (1114) Percentage of passengers satisfied to N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts 4

26 3 3.1 Passenger satisfaction trend charts The cleanliness of the outside of the train (94) Percentage of passengers satisfied to The availability of staff on the train (637) Percentage of passengers satisfied to How well train company dealt with delay () Percentage of passengers satisfied to N.B. Benchmarks and targets are only shown for applicable factors 3.1 Passenger satisfaction trend charts

27 4 4.1 Station factor results At 9% confidence level: + denotes significant increase - denotes significant decrease Managed versus non-managed stations for Stations managed by TOC significant difference Stations not managed by TOC Overall satisfaction with the station 8 Ticket buying facilities Provision of information about train times/platforms The upkeep/repair of the station buildings/platforms Cleanliness The facilities and services The attitudes and helpfulness of the staff 76 8 Connections with other forms of public transport Facilities for car parking Overall environment Your personal security whilst using The availability of staff How request to station staff was handled Station factor results 6

28 4 4. Network Rail categorisation Managed versus non-managed stations for (% Passengers Journeys originating from each type of station) Overall Total Stations managed by TOC Stations not managed by TOC 1% 1% 3% 13% % 37% 41% 36% 4% 4% % % 14% 9% 14% % 9% 11% A = National hub C = Important feeder E = Small staffed Not categorised B = Regional hub D = Medium staffed F = Small unstaffed 4. Network Rail categorisation 7

29 .1 Overall satisfaction and station factors Peak/off-peak satisfaction scores for At 9% confidence level: + denotes significant increase - denotes significant decrease Peak significant change TOC Sector Off-Peak significant change TOC Index Overall satisfaction Overall satisfaction with the station Ticket buying facilities Provision of information about train times/platforms The upkeep/repair of the station buildings/platforms Cleanliness The facilities and services The attitudes and helpfulness of the staff Connections with other forms of public transport Facilities for car parking Overall environment Your personal security whilst using The availability of staff How request to station staff was handled * Peak is defined as weekday journeys that arrive at London terminals between 7: and 9:9, and those departing between 16: and 18:9.1 Overall satisfaction and station factors 8

30 .1 Train factors Peak/off-peak satisfaction scores for At 9% confidence level: + denotes significant increase - denotes significant decrease Peak significant change TOC Off-Peak Sector significant change TOC Index The frequency of the trains on that route Punctuality/reliability (i.e. the train arriving/departing on time) The length of time the journey was scheduled to take (speed) Connections with other train services The value for money for the price of your ticket Cleanliness of the train Upkeep and repair of the train The provision of information during the journey The helpfulness and attitude of staff on train The space for luggage The toilet facilities Sufficient room for all passengers to sit/stand The comfort of the seating area The ease of being able to get on and off Your personal security on board The cleanliness of the inside The cleanliness of the outside The availability of staff How well train company deals with delays * Peak is defined as weekday journeys that arrive at London terminals between 7: and 9:9, and those departing between 16: and 18:9.1 Train factors 9

31 . Overall satisfaction and station factors At 9% confidence level: + denotes significant increase - denotes significant decrease Peak/off-peak satisfaction scores for Peak significant change TOC Sector Off-Peak significant change TOC Index Overall satisfaction Overall satisfaction with the station Ticket buying facilities Provision of information about train times/platforms The upkeep/repair of the station buildings/platforms Cleanliness The facilities and services The attitudes and helpfulness of the staff Connections with other forms of public transport Facilities for car parking Overall environment Your personal security whilst using The availability of staff How request to station staff was handled * Peak is defined as weekday journeys that arrive at London terminals between 7: and 9:9, and those departing between 16: and 18:9. Overall satisfaction and station factors

32 . Train factors At 9% confidence level: + denotes significant increase - denotes significant decrease Peak/off-peak satisfaction scores for Peak significant change TOC Off-Peak Sector significant change TOC Index The frequency of the trains on that route Punctuality/reliability (i.e. the train arriving/departing on time) The length of time the journey was scheduled to take (speed) Connections with other train services The value for money for the price of your ticket Cleanliness of the train Upkeep and repair of the train The provision of information during the journey The helpfulness and attitude of staff on train The space for luggage The toilet facilities Sufficient room for all passengers to sit/stand The comfort of the seating area The ease of being able to get on and off Your personal security on board The cleanliness of the inside The cleanliness of the outside The availability of staff How well train company deals with delays * Peak is defined as weekday journeys that arrive at London terminals between 7: and 9:9, and those departing between 16: and 18:9. Train factors 31

33 6 6.1 Weighted sample profile Weighted sample profile for % % % % SEX DELAYS Male None Female Minor Not stated 3 3 Major 1 Not stated 3 AGE REGULAR TRAVELLER Yes No TIME OF TRAVEL Peak Off-peak 76 8 Not stated 3 ASKED FOR HELP OR INFORMATION Yes asked for help 8 JOURNEY PURPOSE Yes asked for information 11 9 Commuter 3 3 Could not find anyone to ask 3 Business 1 1 No Leisure Not stated 6.1 Weighted sample profile 3

34 6 6. Weighted sample profile Weighted sample profile for % % % % SEX DELAYS Male None 8 8 Female 3 Minor Not stated 3 3 Major 3 Not stated AGE REGULAR TRAVELLER Yes No TIME OF TRAVEL Peak Off-peak 8 81 Not stated 3 ASKED FOR HELP OR INFORMATION Yes asked for help 8 8 JOURNEY PURPOSE Yes asked for information 8 8 Commuter 3 Could not find anyone to ask 3 3 Business 1 1 No 81 8 Leisure Not stated 6. Weighted sample profile 33

35 6 6.3 Station sample sizes Station sample sizes for Station Unweighted London Marylebone Banbury High Wycombe Amersham Gerrards Cross Leamington Spa Bicester North Haddenham And Thame Parkway Beaconsfield Warwick Parkway Great Missenden Aylesbury Wendover Warwick Princes Risborough Stoke Mandeville Birmingham Moor Street Birmingham Snow Hill Wembley Stadium Northolt Park Dorridge Solihull Oxford West Ruislip Stratford-Upon-Avon Jewellery Quarter Station sample sizes 34

36 6 6.4 Weighted sample composition Weighted sample composition for all train companies Annual journeys ('s) Journey Purpose Commute Business Leisure Day Of Week Weekday Weekend Very Large Station Size Large Medium Small Sample size* Arriva Trains Wales cc CrossCountry East Coast East Midlands Trains First Capital Connect First Great Western First TransPennine Express London Midland London Overground Merseyrail National Express East Anglia Northern Rail ScotRail South West Trains Southeastern Southern Virgin Trains * Sample size excludes non-franchised Train Operating Companies. 6.4 Weighted sample composition 3

37 6 6. Unweighted sample composition Unweighted sample composition for all train companies Sample size Journey Purpose Commute Business Leisure Day Of Week Weekday Weekend Very Large Station Size Large Medium Small Sample size* Arriva Trains Wales cc CrossCountry East Coast East Midlands Trains First Capital Connect First Great Western First TransPennine Express London Midland London Overground Merseyrail National Express East Anglia Northern Rail ScotRail South West Trains Southeastern Southern Virgin Trains * Sample size excludes non-franchised Train Operating Companies. 6. Unweighted sample composition 36

38 7 7.1 Standard reports produced for NPS The following reports are produced each wave: Summary report TOC reports Stations report Consultees report Best in class report Multivariate report Personal security at stations report Rankings report Virtual TOC reports Building block report PTE reports Demographic reports Tables report Summary tables for all TOCs (including comparison with one year previously), trend tables for last waves by TOC, trend charts for the main NPS factors, peak vs off-peak analysis for LSE TOCs. Tables and graphs showing results for TOC (including comparisons with one year previously and with relevant sector), trend charts for all factors (including sector and benchmark (if relevant) comparisons), summary profile of passengers surveyed, station sample sizes for TOC and sample composition & weighting. Percentage of passengers satisfied by each main factor for last waves for all stations covered by NPS during that time period. Summary national trend charts for all main factors, trend charts by age/journey purpose & gender, summary results for leisure/business passengers & commuters, one page for each factor showing national trend and results for all TOCs, Government Office Region charts for each factor and simple tables for some questions that are not included in the main NPS report. Trend tables showing results for all main factors for all TOCs and building blocks for the last waves. Multivariate analysis showing drivers of satisfaction and dissatisfaction nationally, by sector and by TOC for latest two NPS waves combined. Percentage of passengers satisfied and dissatisfied with personal security at all stations that were included in the NPS for the last survey waves. Results since wave showing satisfaction score for each TOC by factor, significant changes since one year earlier, national rank and rank in TOC type. NPS reports for TOCs that used to exist or that are planned to exist in the future (exactly the same format as TOC reports). Summary results showing satisfaction for all building blocks for all main NPS factors. NPS reports for all PTEs (exactly the same format as TOC reports). Simple reports for all TOCs showing demographic profile (and answers to other questions). Quite detailed tables for all TOCs showing results for the majority of NPS questions by gender, age, journey purpose, time of week and whether they were a frequent traveller or not. 7.1 Standard reports produced for NPS 37

39 7 7. Rail sectors Sector definitions The sector results used in this report contain the following TOCs (non-franchised operators are excluded): Operators Long Distance Operators Regional Operators cc CrossCountry Arriva Trains Wales East Coast Merseyrail First Capital Connect East Midlands Trains Northern Rail First Great Western First TransPennine Express ScotRail London Midland Virgin Trains London Overground National Express East Anglia Southeastern Southern South West Trains 7. Rail sectors 38

40 Contacts: David Chilvers BDRC Continental Kingsbourne House 9-31 High Holborn London, WC1V 7DA Tel: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: david.greeno@passengerfocus.org.uk

National Passenger Survey TOC Report for East Midlands Trains Spring 2011

National Passenger Survey TOC Report for East Midlands Trains Spring 2011 National Passenger Survey TOC Report for 11 Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V QY Tel: 13 83 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne

More information

National Passenger Survey PTE Report for West Midlands Autumn 2011

National Passenger Survey PTE Report for West Midlands Autumn 2011 National Passenger Survey PTE Report for Contacts: David Greeno Passenger Focus 1 Drummond Gate London, SW1V 2QY Tel: 123 837 Email: david.greeno@passengerfocus.org.uk David Chilvers BDRC Continental Kingsbourne

More information

National Rail Passenger Survey Autumn 2013 Main Report

National Rail Passenger Survey Autumn 2013 Main Report National Rail Passenger Survey Autumn 2013 Main Report What is Passenger Focus? Passenger Focus is the independent consumer watchdog for Britain s rail passengers and England s bus, coach and tram passengers

More information

National Rail Passenger Survey Autumn 2015 Main Report

National Rail Passenger Survey Autumn 2015 Main Report National Rail Passenger Survey Autumn 2015 Main Report Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey Spring 2006 putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for

More information

National Passenger Survey Spring putting rail passengers first

National Passenger Survey Spring putting rail passengers first National Passenger Survey putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain s rail

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn 2005 putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for

More information

National Rail Passenger Survey Main Report Spring 2018

National Rail Passenger Survey Main Report Spring 2018 National Rail Passenger Survey Main Report Spring 2018 Transport Focus is the independent transport user watchdog Our mission is to get the best deal for passengers and road users. With a strong emphasis

More information

National Passenger Survey Autumn putting rail passengers first

National Passenger Survey Autumn putting rail passengers first National Passenger Survey Autumn putting rail passengers first What is Passenger Focus? Passenger Focus is the independent national rail consumer watchdog. Our mission is to get the best deal for Britain

More information

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX National Rail Passenger Survey TOC Report 16 (Wave 34) Due to a technical query sector scores may need to be revised slightly at a future date - as such current scores should be treated as provisional

More information

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX

Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX National Rail Passenger Survey TOC Report 16 (Wave 4) scores are the subject of technical query and may need to be revised at a future date - as such the current scores should be treated as provisional.

More information

National Rail Passenger Survey Southeastern TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Southeastern TOC Report Autumn 2017 (Wave 37) National Rail Passenger Survey TOC Report (Wave 37) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Pam

More information

National Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34)

National Rail Passenger Survey East Midlands Trains TOC Report Spring 2016 (Wave 34) National Rail Passenger Survey TOC Report 16 (Wave 34) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

Railway performance and subsidy statistics

Railway performance and subsidy statistics Railway performance and subsidy statistics Standard Note: SN/SG/2199 Last updated: 2 October 2013 Author: Matthew Keep Social and General Statistics Section This Note provides data and commentary relating

More information

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36)

National Rail Passenger Survey Heathrow Connect TOC Report Spring 2017 (Wave 36) National Rail Passenger Survey TOC Report 17 (Wave 36) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38)

National Rail Passenger Survey Virgin Trains East Coast TOC Report Spring 2018 (Wave 38) National Rail Passenger Survey TOC Report 18 (Wave 38) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Heathrow Connect TOC Report Autumn 2017 (Wave 37) National Rail Passenger Survey TOC Report (Wave 37) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Pam

More information

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29)

National Rail Passenger Survey: User Guidance Report. Autumn 2013 (wave 29) National Rail Passenger Survey: User Guidance Report Autumn 2013 (wave 29) Rebecca Joyner Research Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2.

More information

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30)

National Rail Passenger Survey: User Guidance Report. Spring 2014 (wave 30) National Rail Passenger Survey: User Guidance Report Spring 2014 (wave 30) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Spring 2015 (Wave 32) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc continental.com Contents Page No. 1. Background... 1 2. Summary

More information

National Rail Passenger Survey: User Guidance Report

National Rail Passenger Survey: User Guidance Report National Rail Passenger Survey: User Guidance Report Autumn 2015 (Wave 33) Rebecca Joyner Director Tel: 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Summary

More information

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR GREATER MANCHESTER PTE

NATIONAL PASSENGER SURVEY - WAVE 23 Autumn 2010 REPORT FOR GREATER MANCHESTER PTE NATIONAL PASSENGER SURVEY - WAVE 23 REPORT FOR Contacts David Greeno Passenger Focus 1 Drummond Gate London, SW1V 2QQ Tel: 00 123 0837 Email: david.greeno@passengerfocus.org.uk David Chilvers Continental

More information

National Rail Passenger Survey Arriva Trains Wales TOC Report Spring 2016 (Wave 34)

National Rail Passenger Survey Arriva Trains Wales TOC Report Spring 2016 (Wave 34) National Rail Passenger Survey TOC Report 16 (Wave 4) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 12 87 Email: david.greeno@transportfocus.org.uk Rebecca

More information

National Rail Passenger Survey Arriva Trains Wales TOC Report Autumn 2017 (Wave 37)

National Rail Passenger Survey Arriva Trains Wales TOC Report Autumn 2017 (Wave 37) National Rail Passenger Survey TOC Report (Wave 37) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk Pam

More information

West Midlands and Chiltern. Route Utilisation Strategy. Research Findings

West Midlands and Chiltern. Route Utilisation Strategy. Research Findings West Midlands and Chiltern Route Utilisation Strategy Research Findings September 2011 West Midlands and Chiltern Route Utilisation Strategy Research Findings In September 2010, Passenger Focus surveyed

More information

National Rail Passenger Survey Arriva Trains Wales TOC Report Spring 2017 (Wave 36)

National Rail Passenger Survey Arriva Trains Wales TOC Report Spring 2017 (Wave 36) National Rail Passenger Survey TOC Report 17 (Wave 36) Contacts: David Greeno Transport Focus Fleetbank House 2-6 Salisbury Square London, EC4Y 8JX Tel: 123 837 Email: david.greeno@transportfocus.org.uk

More information

National Rail Passenger Survey

National Rail Passenger Survey National Rail Passenger Survey Technical Guide Spring 2015 (Wave 32) Rebecca Joyner Director 020 7490 9148 rebecca.joyner@bdrc-continental.com Contents Page No. 1. Background... 1 2. Sample design... 2

More information

Rail passengers priorities for improvement November 2017

Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Rail passengers priorities for improvement November 2017 Foreword We asked more than 12,800 passengers across the country to rank 31 possible improvements

More information

Tram Passenger Survey

Tram Passenger Survey Key findings Autumn 2015 Foreword Jeff Halliwell Now in its third year, our Tram Passenger Survey has covered passengers views of their journey in six network areas in Britain. For the second time this

More information

National Rail Performance Report - Quarter /16 (January-March 2016)

National Rail Performance Report - Quarter /16 (January-March 2016) National Rail Performance Report - Quarter 4 2015/16 (January-March 2016) May 2016 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling public. Our role

More information

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive

Transport Focus Train punctuality the passenger perspective. 2 March 2017 Anthony Smith, Chief Executive Transport Focus Train punctuality the passenger perspective 2 March 2017 Anthony Smith, Chief Executive Transport Focus Independent transport user watchdog Rail passengers in Great Britain Bus, coach &

More information

National Rail Performance Report - Quarter /14

National Rail Performance Report - Quarter /14 A London TravelWatch report The voice of transport users National Rail Performance Report - July 2014 London TravelWatch is the official body set up by Parliament to provide a voice for London s travelling

More information

A passenger perspective on the TransPennine. Sharon Hedges May 2014

A passenger perspective on the TransPennine. Sharon Hedges May 2014 A passenger perspective on the TransPennine Express franchise Sharon Hedges May 2014 Passenger Focus Independent watchdog for Britain s rail passengers* Extensive research to inform evidencebased campaigning

More information

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015)

Policy committee Item: 11 Ref: PC086. National Rail Performance Report - Quarter (Oct-Dec 2015) Policy committee 23.02.16 Item: 11 Ref: PC086 National Rail Performance Report - Quarter 3 2015-16 (Oct-Dec 2015) February 2016 London TravelWatch is the official body set up by Parliament to provide a

More information

Timetable Change Research. Re-contact survey key findings

Timetable Change Research. Re-contact survey key findings Timetable Change Research Re-contact survey key findings Key project objectives Measure the impact of the timetable changes on customers, what actions have they taken as a result Gauge how have the timetable

More information

Tram Passenger Survey (TPS) All networks

Tram Passenger Survey (TPS) All networks Tram Passenger Survey (TPS) All networks Rosie Giles Tel: Email: Rosie.Giles@transportfocus.org.uk results March Insight Team, Transport Focus, Fleetbank House, - Salisbury Square, London, ECY JX Contents

More information

Bus Passenger Survey spring 2015 results Centro - West Midlands PTE area

Bus Passenger Survey spring 2015 results Centro - West Midlands PTE area Bus Passenger Survey spring 2015 results Centro - West Midlands PTE area Contact: Murray Leader, Insight Team, Transport Focus Fleetbank House, 2-6 Salisbury Square, London, EC4Y 8JX Tel: 0300 123 0843

More information

Network Rail 2014 Customer Survey Report

Network Rail 2014 Customer Survey Report GfK 2014 GfK Business Network Rail Customer Report 2014 Network Rail 2014 Customer Survey Report Route Report: Anglia Prepared by: January 2015 14-Jan-15 / 1 GfK 2014 GfK Business Network Rail Customer

More information

What passengers want from the InterCity West Coast rail franchise: A submission from Passenger Focus

What passengers want from the InterCity West Coast rail franchise: A submission from Passenger Focus Roger Jones Divisional Manager, Rail Specification National Networks Group Department for Transport 5th Floor, Great Minster House 76 Marsham Street London SW1P 4DR Phone 020 7944 5377 Mobile 07 771 612

More information

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT 2010-2011 Ian Rivett Chairman Reg Whittome Vice Chairman Chairman s Message: This is the ninth Annual Report of the Chiltern Railways Passenger Board and

More information

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings

Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings Community Rail Partnership Action Plan The Bishop Line Survey of Rail Users and Non-Users August 2011 Report of Findings Analysis and report NWA Social Research 1 Contents Page No. A. Summary of Main Findings...

More information

National Station Improvement Programme. Halifax Station - Final report

National Station Improvement Programme. Halifax Station - Final report National Station Improvement Programme Halifax Station - Final report January 2010 National Station Improvement Plan Halifax Station Summary Report Passenger Focus April 2009 Prepared by:... Approved by:...

More information

The Chiltern Railways Company Limited Penalty Fares Scheme

The Chiltern Railways Company Limited Penalty Fares Scheme The Chiltern Railways Company Limited Penalty Fares Scheme December 2015 1. Penalty Fares Trains 1.1. For the purposes of this scheme, all the trains operated by the company (Chiltern Railway Company Limited)

More information

Passenger Focus Relationship between Customer Satisfaction and Performance CrossCountry. Date: 20 July 2010

Passenger Focus Relationship between Customer Satisfaction and Performance CrossCountry. Date: 20 July 2010 Passenger Focus Relationship between Customer Satisfaction and Performance CrossCountry Date: July Spirella House, - Regent Street, London WB AH Tel: Fax: email: cdl@cdlgroup.co.uk www.cdlgroup.co.uk Document

More information

Report. Passengers' Priorities for Improvements in Rail Services. Report for Passenger Focus. June 2007

Report. Passengers' Priorities for Improvements in Rail Services. Report for Passenger Focus. June 2007 Report Passengers' Priorities for Improvements in Rail Services Report for Passenger Focus June 2007 Document Control Project Title: MVA Project Number: Document Type: Directory & File Name: Passengers'

More information

National Station Improvement Programme. Uckfield Station Final report

National Station Improvement Programme. Uckfield Station Final report National Station Improvement Programme Uckfield Station Final report January 2010 National Station Improvement Plan Uckfield Station Summary Report Passenger Focus April 2009 Prepared by:... Approved by:...

More information

Bringing clarity, delivering breakthroughs. Transport Focus Surface Access to Airports - Research Report August 2018

Bringing clarity, delivering breakthroughs. Transport Focus Surface Access to Airports - Research Report August 2018 Bringing clarity, delivering breakthroughs Transport Focus Surface Access to Airports - Research Report August 2018 Introduction and methodology Most recent flight Booking transport to the airport Travelling

More information

98 Manor Way, Beckenham, Kent BR3 3LR

98 Manor Way, Beckenham, Kent BR3 3LR 98 Manor Way, Beckenham, Kent BR3 3LR 020 8650 0667 www.westlondonlinegroup.org.uk RECOMMENDATIONS FOR HS2, CROSSRAIL AND OLD OAK COMMON INTERCHANGE DECEMBER 2013 1 1. High Speed London Birmingham BIRMINGHAM

More information

East Midlands rail franchise: Consultation response. October 2017

East Midlands rail franchise: Consultation response. October 2017 East Midlands rail franchise: Consultation response October 2017 1 Contents 1. Transport Focus... 5 2. Introduction... 5 2.1 Franchise consultation response... 7 3. East Midlands rail franchise passenger

More information

The Pennine Class 185 experience

The Pennine Class 185 experience The Pennine Class 185 experience What do passengers think? May 2007 Passenger Focus is the independent national rail consumer watchdog. It is an executive non-departmental public body sponsored by the

More information

Caledonian Sleeper Passenger satisfaction report. Quarter Rail Period 12, 13 and 14

Caledonian Sleeper Passenger satisfaction report. Quarter Rail Period 12, 13 and 14 Caledonian Sleeper Passenger satisfaction report Quarter 4 016-17 Rail 1, 13 and 14 Contents Page Summary: Caledonian Sleeper results, Quarter 4 016/17 3 Overall opinions of the Caledonian Sleeper 4 Customer

More information

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc.

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Presented to: British Columbia Ferry Services Inc. Victoria, British Columbia 0 0 West Second Avenue Vancouver BC VH Y

More information

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc.

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Customer Satisfaction Tracking Annual Report 2003 British Columbia Ferry Services Inc. Presented to: British Columbia Ferry Services Inc. Victoria, British Columbia 402 1505 West Second Avenue Vancouver

More information

Mystery shop of rail ticket retailing research summary

Mystery shop of rail ticket retailing research summary Mystery shop of rail ticket retailing research summary March 2007 Mystery shop of rail ticket retailing research summary Introduction The latest results of the Passenger Focus National Passenger Survey

More information

The Evergreen 3 Project

The Evergreen 3 Project The Evergreen 3 Project Railway Civil Engineers Association 26 th January 2012 Allan Dare Strategic Development Manager Chiltern Railways Chiltern Railways Birmingham Solihull Warwick Parkway Virgin West

More information

Heritage Line Community Rail Partnership Darlington to Bishop Auckland Railway Line Survey of Users and Non-Users January to March 2010

Heritage Line Community Rail Partnership Darlington to Bishop Auckland Railway Line Survey of Users and Non-Users January to March 2010 Heritage Line Community Rail Partnership Darlington to Bishop Auckland Railway Line Survey of Users and Non-Users January to March 2010 Analysis and report NWA Social Research 1 Contents Page No. A. Summary

More information

Improving stations: improving passenger satisfaction. October 2016

Improving stations: improving passenger satisfaction. October 2016 Improving stations: improving passenger satisfaction October 2016 1 Contents Introduction... 3 Summary of overall satisfaction... 5 Trends over time... 7 Station-specific examples... 9 Reading station...

More information

Bus Passenger Survey

Bus Passenger Survey March 2012 Contents 1 Foreword 3 2 Key findings 4 3 Results by area Merseyside PTE (Merseytravel) South Yorkshire PTE Transport for Greater Manchester (TfGM) West Yorkshire PTE (Metro) Tyne & Wear PTE

More information

Letting Rail Franchises

Letting Rail Franchises The Department for Transport LONDON: The Stationery Office 14.35 Ordered by the House of Commons to be printed on 13 October 2008 REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1047 Session 2007-2008

More information

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc.

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Customer Satisfaction Tracking Annual Report 0 British Columbia Ferry Services Inc. Presented to: British Columbia Ferry Services Inc. Victoria, British Columbia 0 05 West Second Avenue Vancouver BC V6H

More information

Glasgow Queen Street Station Redevelopment research

Glasgow Queen Street Station Redevelopment research Glasgow Queen Street Station Redevelopment research May 2015 Contact: Sultana Idris, Insight Team, Transport Focus Fleetbank House, 2-6 Salisbury Square, London, EC4Y 8JX Tel: 0300 123 0860 Email: Sultana.Idris@transportfocus.org.uk

More information

2013 Business & Legislative Session Visitor Satisfaction Survey Results

2013 Business & Legislative Session Visitor Satisfaction Survey Results 2013 Business & Legislative Session Visitor Satisfaction Survey Results Completed by Juneau Economic Development Council in partnership with The Alaska Committee August 2013 JEDC research efforts are supported

More information

2013 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2013

2013 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2013 213 Travel Survey for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 213 May 21st 213 Table of Contents Page No. Summary of Results 1 Survey Results 2 Breakdown of departing

More information

REPORT. VisitEngland Business Confidence Monitor Wave 5 Autumn

REPORT. VisitEngland Business Confidence Monitor Wave 5 Autumn REPORT VisitEngland Business Confidence Monitor 2011 5-7 Museum Place Cardiff, Wales CF10 3BD Tel: ++44 (0)29 2030 3100 Fax: ++44 (0)29 2023 6556 www.strategic-marketing.co.uk Page 2 of 31 Contents Page

More information

Civil Aviation Authority:

Civil Aviation Authority: Civil Aviation Authority: UK Aviation Consumer Survey August 2018 CONTENTS Background and method Headline measures Flying behaviour Recent experience Travel disruption Disability Key driver analysis Public

More information

Tourism Business Monitor Accommodation Report. Wave 2 Post-Easter holidays

Tourism Business Monitor Accommodation Report. Wave 2 Post-Easter holidays Tourism Business Monitor 2017 Accommodation Report Wave 2 Post-Easter holidays Contents Background Key Findings Business Dashboards Visitor Profile Business Performance Workforce Business Confidence 2

More information

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc.

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Customer Satisfaction Tracking Annual Report 2007 British Columbia Ferry Services Inc. Presented to: British Columbia Ferry Services Inc. Victoria, British Columbia 02 10 West Second Avenue Vancouver BC

More information

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April

Transport Focus Informed Traveller monitoring initial findings, 9 March April- 13 April Appendix A Transport Focus Informed Traveller monitoring initial findings, 9 March 2018 1. Is the timetable correct six weeks ahead? In the first two weeks of our monitoring at T-6 Transport Focus has

More information

2015 Metro User Christchurch

2015 Metro User Christchurch 2015 Metro User Christchurch Research Report June 2015 www.researchfirst.co.nz Contents 2015 Metro User Christchurch 1 Research Context and Design 03 1.1 Introduction 03 1.2 Research Objectives 03 1.3

More information

Tourism Industry Council Tasmania Community Survey 2018 Research Report. May 2018

Tourism Industry Council Tasmania Community Survey 2018 Research Report. May 2018 Tourism Industry Council Tasmania Community Survey 2018 Research Report May 2018 This report has been prepared by Enterprise Marketing and Research Services 60 Main Road, Moonah TAS 7009 All enquiries

More information

2015 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2015

2015 Travel Survey. for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 2015 215 Travel Survey for the States of Guernsey Commerce & Employment Department RESEARCH REPORT ON Q1 215 April 28 th 215 Table of Contents Page No. Summary of Results 1 Survey Results 2 Breakdown of departing

More information

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results

Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI Results Survey of Britain s Transport Journalists A Key Influencer Tracking Study Conducted by Ipsos MORI 2014 Results Methodology This report presents the findings of the 2014 study of Transport Journalists,

More information

Byron Shire Visitor Profile and Satisfaction Report: Summary and Discussion of Results

Byron Shire Visitor Profile and Satisfaction Report: Summary and Discussion of Results Byron Shire Visitor Profile and Satisfaction Report: Summary and Discussion of Results Introduction The Byron Shire Visitor Profile and Satisfaction (VPS) project was completed as part of the Destination

More information

Ticket Office Mystery Shopping Report

Ticket Office Mystery Shopping Report Ticket Office Mystery Shopping Report Prepared by: Continental Research 132-140 Goswell Road London EC1V 7DY t: 020 7490 5944 f: 020 7490 1174 Agency Contact: Dave Chilvers Colin Shaddick Ticket Office

More information

Tourism Business Monitor Accommodation Report. Wave 5 Mid-September until the end of October

Tourism Business Monitor Accommodation Report. Wave 5 Mid-September until the end of October Tourism Business Monitor Accommodation Report Wave 5 Mid-ember until the end of October Background, objectives and research method Tourism Business Monitor designed to measure, monitor and understand tourism

More information

Tourism Business Monitor Wave 2 Post-Easter holidays

Tourism Business Monitor Wave 2 Post-Easter holidays Tourism Business Monitor 2017 Wave 2 Post-Easter holidays Contents Background Key Findings Business Dashboards Visitor Profile Business Performance Workforce - Accommodation Workforce Attractions Business

More information

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc.

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Customer Satisfaction Tracking Annual Report 2006 British Columbia Ferry Services Inc. Presented to: British Columbia Ferry Services Inc. Victoria, British Columbia 02 1505 West Second Avenue Vancouver

More information

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT

CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT CHILTERN RAILWAYS PASSENGER BOARD ANNUAL REPORT 2011-2012 Ian Rivett Chairman Reg Whittome Vice Chairman Chairman s Introduction: This is the tenth Annual Report of the Chiltern Railways Passenger Board

More information

2013/14 PUBLIC TRANSPORT PASSENGER SATISFACTION SURVEY

2013/14 PUBLIC TRANSPORT PASSENGER SATISFACTION SURVEY (TN/10/19) 2013/14 PUBLIC TRANSPORT PASSENGER SATISFACTION SURVEY Research Report Prepared for Greater Wellington Presented Regional B Council Final Version 19 th September 2014 26 th February 2010 Gravitas

More information

Passengers priorities for new franchises

Passengers priorities for new franchises Passengers priorities for new franchises Anthony Smith Chief Executive Passengers top 10 priorities performance still number one! 1 punctuality/reliability 2 value for money 3 frequency of trains 4 provision

More information

Guernsey Travel Survey

Guernsey Travel Survey Guernsey Travel Survey Quarter 2 2017 Issue date July 2017 The Guernsey Travel Survey shows the number of air and sea passengers, broken down by type, purpose and origin, based upon exit surveys undertaken

More information

Quarterly Progress Report

Quarterly Progress Report Quarterly Progress Report Team: Passenger Link Quarter: 3 Agenda Item: 6.2.4 Sponsor Ashwin Kumar Author(s): Lee Paddock 1. Highlights The paper attached provides an update on passenger facing work during

More information

Still waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword

Still waiting for a ticket? Ticket queuing times at large regional rail stations. Foreword Ticket queuing times at large regional rail stations Report of Findings July 2010 Foreword Train companies are investing heavily in installing ticket machines at stations, many tickets can now be bought

More information

Guernsey Travel Survey

Guernsey Travel Survey Guernsey Travel Survey Quarter 2 218 Issue date July 218 The Guernsey Travel Survey shows the number of air and sea passengers, broken down by type, purpose and origin, based upon exit surveys undertaken

More information

SHIPSTON-ON-STOUR VISITOR SURVEY 2012 FINAL REPORT

SHIPSTON-ON-STOUR VISITOR SURVEY 2012 FINAL REPORT SHIPSTON-ON-STOUR VISITOR SURVEY FINAL REPORT Produced by: Stratford-on-Avon District Council Consultation Unit December CONTENTS Page 1. Introduction 1.1 Background 1 1.2 Sample/Methodology 1 1.3 Statistical

More information

CEREDIGION VISITOR SURVEY 2011 TOTAL SAMPLE. November 2011

CEREDIGION VISITOR SURVEY 2011 TOTAL SAMPLE. November 2011 CEREDIGION VISITOR SURVEY 2011 TOTAL SAMPLE November 2011 TERMS OF CONTRACT Unless otherwise agreed, the findings of this study remain the copyright of Beaufort Research Ltd and may not be quoted, published

More information

Objective is to refresh the Canal & River Trust s understanding of the experiences, opinion, behaviours and preferences of licenced boaters

Objective is to refresh the Canal & River Trust s understanding of the experiences, opinion, behaviours and preferences of licenced boaters Background Objective is to refresh the Canal & River Trust s understanding of the experiences, opinion, behaviours and preferences of licenced boaters Methodology Online survey conducted in March 2016-1,024

More information

Policy Committee

Policy Committee Policy Committee 25.10.16 Secretariat memorandum Author: Susan James Agenda item: 9 PC103 Date: 19.10.16 Casework report for the periods quarter one and two April to September 1. Purpose of report To record

More information

Cedar Rapids Area Convention and Visitors Bureau Visitor Study

Cedar Rapids Area Convention and Visitors Bureau Visitor Study Cedar Rapids Area Convention and Visitors Bureau Visitor Study 2003-2004 University of Northern Iowa Sustainable Tourism & The Environment Program www.uni.edu/step Project Directors: Sam Lankford, Ph.D.

More information

On-Train Provision of Tickets Mystery Shopping Report

On-Train Provision of Tickets Mystery Shopping Report On-Train Provision of Tickets Mystery Shopping Report Prepared by: Continental Research 132-140 Goswell Road London EC1V 7DY t: 020 7490 5944 f: 020 7490 1174 Agency Contact: Dave Chilvers Colin Shaddick

More information

Rail delays and compensation

Rail delays and compensation Rail delays and compensation what passengers want November 2016 Rail delays and compensation what passengers want Introduction Passengers want their trains to be on time having a punctual service they

More information

Connecting People, Connecting Business

Connecting People, Connecting Business Connecting People, Connecting Business Connecting People, Connecting Business 1 East West Rail is a scheme to re-establish a rail link between Cambridge and Oxford to improve rail services between East

More information

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017

Liverpool Lime Street station engineering work. Experience during October 2017 improvement work November 2017 Liverpool Lime Street station engineering work Experience during October 2017 improvement work November 2017 Overview during the engineering work Between 30 September and 22 October engineering work at

More information

CUSTOMER SATISFACTION INDEX OF SINGAPORE 2017 Q2 RESULTS OVERVIEW AIR TRANSPORT AND LAND TRANSPORT

CUSTOMER SATISFACTION INDEX OF SINGAPORE 2017 Q2 RESULTS OVERVIEW AIR TRANSPORT AND LAND TRANSPORT CUSTOMER SATISFACTION INDEX OF SINGAPORE 2017 Q2 RESULTS OVERVIEW AIR TRANSPORT AND LAND TRANSPORT 2017 Q2 SCORES AIR TRANSPORT AND LAND TRANSPORT 74.4 Air Transport 77.1 Airport* 77.1 Changi Airport 74.2

More information

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co.

Easter Improvement Works. London Euston Closed Friday 19 until Monday 22 April virgintrains.com/spanner nationalrail.co. Easter Improvement Works London Euston Closed Friday 19 until Monday 22 April 2019 virgintrains.com/spanner nationalrail.co.uk/westcoast @virgintrains virgintrains What's happening? We recommend that

More information

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc.

Customer Satisfaction Tracking Annual Report British Columbia Ferry Services Inc. Customer Satisfaction Tracking Annual Report 2008 British Columbia Ferry Services Inc. Presented to: British Columbia Ferry Services Inc. Victoria, British Columbia 02 10 West Second Avenue Vancouver BC

More information

MOURNE & SLIEVE CROOB AONB. VISITORS SURVEY Summary Report

MOURNE & SLIEVE CROOB AONB. VISITORS SURVEY Summary Report MOURNE & SLIEVE CROOB AONB VISITORS SURVEY Summary Report November 2004 This project was funded by 1 EXECUTIVE SUMMARY INTRODUCTION In 2004 Mourne Heritage Trust secured funding for the implementation

More information

SURVEY OF U3A MEMBERS (PART 1)

SURVEY OF U3A MEMBERS (PART 1) SURVEY OF U3A MEMBERS (PART 1) Introduction To provide a satisfactory service to its member U3As, The Third Age Trust recognised that it needs to be aware of the diversity of individual U3A members and

More information

Tourism Business Monitor Visitor Attractions Report. Wave 2 Post-Easter holidays

Tourism Business Monitor Visitor Attractions Report. Wave 2 Post-Easter holidays Tourism Business Monitor 20 Visitor Attractions Report Wave 2 Post-Easter holidays Background, objectives and research method Tourism Business Monitor designed to measure, monitor and understand tourism

More information

CORNWALL VISITOR SURVEY 06/07. Final report. Produced by South West Tourism Research Department For and on behalf of Visit Cornwall.

CORNWALL VISITOR SURVEY 06/07. Final report. Produced by South West Tourism Research Department For and on behalf of Visit Cornwall. CORNWALL VISITOR SURVEY 06/07 Final report Produced by South West Tourism Research Department For and on behalf of Visit Cornwall September 2007 Contents Slide Executive summary 3 Chapter 1: Introduction

More information