1 Logan International Airport Right Sizing and Good Terminal Planning Two Case Studies: Terminal E Expansion Terminal C Checkpoint Presented by: Sam Sleiman, PE, CCM Director Of Capital Programs and Environmental Management Massachusetts Port Authority, East Boston, Massachusetts 17 March 2009 ACI-NA Operations and Technical Affairs Conference San Diego, CA

2 Agenda Case Study 1 / Terminal E Expansion Case Study 2 / Terminal C Consolidated Checkpoint Project Overview Goals and Objectives Program Development Key Issues and Opportunities Lessons Learned

3 Case Study 1 Right Sizing the Expansion of Terminal E A Large Project Downsizes.

4 Project Overview Terminal E E C A B Project Location

5 Project Overview E 2 A 2 B 1A 1B 1C 1D 1E C Project Location Terminal E

6 Goals and Objectives Case Study 1 / Terminal E Expansion Move NWA Domestic Operations Out of E Make Room for New International Carriers at E Move NWA into 3 Gates Formerly Used by AirTran Meet Tight Schedule Requirements / Risk Meet Tight Budget Constraints Enhance Passenger Convenience Improve Passenger Flow and Expand Security Checkpoint

7 Existing Departures Level Plan Key Issues: Checkpoint Throughput Poor Circulation - Circuitous Poor Sight-Lines Gatehold Sizing Issues with Concessions Location of Major Mechanical

8 Project Overview View at Roof

9 Scheme A Initial Approach Key Improvements: Expanded Checkpoint Reconfigured Circulation Improved Sightlines Reconfigured Gateholds Concessions Relocated HVAC Relocated Remaining Challenges: Pinch-Point at Checkpoint Phasing of Key Elements Escalating Costs (Market Driven) Schedule Challenges

10 Scheme B Revised Approach Key Improvements: Relocated Checkpoint Improved Circulation Less Intervention Reconfigured Gateholds Centralized Concessions Remaining Challenges: Phasing of Key Elements Escalating Costs (Market Driven) Schedule Driven Challenges Project Budget $25 Million +

11 Nothing is Certain but Change... NWA Merged with Delta Move to Terminal A NWA Would not Sign Lease - No Club Deal Steel Market Conditions at High Point / Excessive Cost CM@R Format Gained Schedule, but Cost was Excessive The Economy Worsened Project Placed on Hold

12 Opportunities NWA Moved to Terminal A / Schedule Relaxed Adjacent, Conflicting Projects were Completed The Economy Afforded Lower Bids / Project Cost The Project was Right-Sized Redesign as Shell and Core Anticipated New Airline Tenant Significant Cost Savings due to Economy and Relaxed Schedule

13 Right-Sized Approach / Shell and Core Only Key Improvements: Infill at Notch Ready for Expanded Checkpoint Implementation of Expansion Shell and Core HVAC Relocated to Existing Vacant Space Temporary Connector to Gates 1C, 1D and 1E Major Demo Accomplished Major Fit-Up Deferred

14 Lessons Learned Case Study 1 / Terminal E Expansion Carefully Plan and Think Through Your Options Make the Right Decisions for the Airport Remain Flexible and Fluid at All Times Get Your Timing Right Avoid Constructing Around Tenants Minimize Disruption Always Make Design Flexible to Meet Changing Needs

15 Case Study 2 Right Sizing the Expansion of Terminal C A Small Project Grows Economically, with Improved Efficiency.

16 Project Overview Terminal C E C A B Project Location

17 Project Overview Project Location Terminal C

18 Project Overview Interior View- United Checkpoint, Pier B

19 Project Overview Interior View- jetblue Checkpoint, Pier C

20 The Challenge Pier B 11 Gates United Airlines Pier C 11 Gates jetblue 2 Lanes at 9/11 2 Lanes at 9/11 Redesigned to 5 Lanes Redesigned to 5 Lanes (Same Footprint) TSA Regulations Evolved TSA Regulations Evolved Checkpoint Doesn't Meet TSA Standard United Using Approx. 7 out of 11 Gates Checkpoint No Longer Meets TSA Standard jetblue Using all 11 Gates and Need Expansion Capability 11 Gates Require 6 Lanes

21 Right Sizing Terminal C Existing Floor Plan

22 The Challenge Case Study 2 / Terminal C Checkpoint Accommodate Evolving TSA Equipment Requirements Meet Increased Demand Due to Airline Growth UAL 5 Lanes goes to 4 w/ New Equipment Maximize Flexibility Minimize Disruption / Phasing

23 The Challenge Pier B 11 Gates United Airlines Pre 9/11/01 Post 9/11/01 Existing

24 The Challenge Pier C 11 Gates jetblue Existing

25 Right Sizing Terminal C Option 1 jetblue, Pier C

26 Right Sizing Terminal C Option 2

27 Right Sizing Terminal C Option 3

28 Right Sizing Terminal C Option 4

29 Lessons Learned Case Study 2 / Terminal C Checkpoint Carefully Plan and Think Through Your Options Make the Right Decisions for the Airport Plans Should Conform to Your Master Planning Efforts Avoid Constructing Around Tenants Minimize Disruption Consider Rates and Charges Allocation in Your Decision Making Process

30 Logan International Airport Right Sizing and Good Terminal Planning Questions. Presented by: Sam Sleiman, PE, CCM Director Of Capital Programs and Environmental Management Massachusetts Port Authority, East Boston, Massachusetts 17 March 2009 ACI-NA Operations and Technical Affairs Conference San Diego, CA

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

TRACK: B TERMINAL/LANDSIDE

TRACK: B TERMINAL/LANDSIDE Salt Palace Convention Center TRACK: B TERMINAL/LANDSIDE WORKSHOP: 3 Title: Airlines and Airports Consolidation and Changing Faces Who is building the Terminals, Technology, and Flexibility? Moderator:

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit

More information

2011 AIRPORT UPDATE. March 25, 2011

2011 AIRPORT UPDATE. March 25, 2011 2011 AIRPORT UPDATE March 25, 2011 1 Airports are important economic engines for the regions they serve; creating jobs, facilitating commerce and providing access to the global marketplace 2 AIRPORT HIGHLIGHTS

More information

Fort Lauderdale Hollywood International Airport

Fort Lauderdale Hollywood International Airport ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Fort Lauderdale Hollywood International Airport Master Plan to Master Plan Implementation Jamie McCluskie Director of Aviation Planning & Environmental Broward County

More information

July 21, Mayor & City Council Business Session KCI Development Program Process Update

July 21, Mayor & City Council Business Session KCI Development Program Process Update July 21, 2015 Mayor & City Council Business Session KCI Development Program Process Update History of KCI 2 Airport Funding KCI Improvements are Funded by Airlines & Travelers City tax revenues do not,

More information

Brief Recap of Project to Date

Brief Recap of Project to Date CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Brief Recap of Project to Date Schematic Design: Design Development Meetings June 26 & 27, 2018 Project Description

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

LOVE FIELD MODERNIZATION PROGRAM (LFMP)

LOVE FIELD MODERNIZATION PROGRAM (LFMP) LOVE FIELD MODERNIZATION PROGRAM (LFMP) April 29, 2015 DALLAS AIRPORT SYSTEM Three Facilities Dallas Love Field Dallas Executive Airport Downtown Vertiport $90 million City of Dallas Department Operated

More information

Major Achievements Hawaii DOT, Airports Division May 11, 2017

Major Achievements Hawaii DOT, Airports Division May 11, 2017 Major Achievements Hawaii DOT, Airports Division May 11, 2017 The HDOT Airports Division has achieved major success in all aspects of airport operations in the past three years. Below is a list of some

More information

RAPID CITY REGIONAL AIRPORT

RAPID CITY REGIONAL AIRPORT RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

Birmingham Airport 2033

Birmingham Airport 2033 Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted

More information

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South

More information

Hartsfield Jackson Update prepared for:

Hartsfield Jackson Update prepared for: Hartsfield Jackson Update prepared for: September 6, 2013 Presented by: Shelley Lamar, Planning Manager Agenda ATL Overview Economic Impact Preparing for the Future Your Questions Airport overview Airport

More information

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam ABOUT THE GUAM AIRPORT Autonomous instrumentality of the Government of Guam; created in 1975 by P.L. 13-57; only commercial

More information

Implications of Construction Cost Escalation

Implications of Construction Cost Escalation Implications of Construction Cost Escalation 2007 ACI-NA Economics and Finance Conference James Gill, CPA Deputy Airport Director Finance, Business & Administration Raleigh-Durham Airport Authority Presentation

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Kansas City Aviation Department. Airport Committee July 19, 2018

Kansas City Aviation Department. Airport Committee July 19, 2018 Kansas City Aviation Department Airport Committee July 19, 2018 AGENDA Labor Update Design Process General Updates Community Outreach LABOR UPDATE Overarching Goals: Labor Harmony on the project Ensure

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016 DATE: TO: FROM: Michael Ehl, Director, Airport Operations Wayne Grotheer, Director, Aviation Project

More information

Chapter 4 Terminal Facility Requirements and Alternatives

Chapter 4 Terminal Facility Requirements and Alternatives Chapter 4 Terminal Facility Requirements and Alternatives I. Terminal Facility Requirements Introduction This chapter of the master plan converts the forecasted passenger demand levels that were identified

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Northside Redevelopment Strategy

Northside Redevelopment Strategy Northside Redevelopment Strategy April 2, 2014 Isaac Barrow Real Estate Manager 1 Presentation Overview Study Overview Review Recommended Development Alternative Current Efforts and anticipated next steps

More information

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary. TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...

More information

Master Plan Phase 2 Workshop

Master Plan Phase 2 Workshop Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of

More information

SAN JOSÉ INTERNATIONAL AIRPORT

SAN JOSÉ INTERNATIONAL AIRPORT SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft

More information

Love Field Modernization Program Update: Master Planning Recommendations

Love Field Modernization Program Update: Master Planning Recommendations Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and

More information

Kansas City Aviation Department. August 25, 2015

Kansas City Aviation Department. August 25, 2015 Kansas City Aviation Department August 25, 2015 KCI History Prior to the 1972 Charles B Wheeler Downtown Airport (MKC) was Kansas City s commercial airport Trans World Airlines (TWA) influenced the planning

More information

Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations

Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations Boston-Logan International Airport: Proposed Consolidation of Rental Car Operations ACI Legal Conference April 17, 2008 Prepared by: Trudy P. Reilly, Senior Legal Counsel, Massport Presentation Outline

More information

Port Everglades Master/Vision Plan Update

Port Everglades Master/Vision Plan Update 1 Port Everglades Master/Vision Plan Update 3 rd Tenant & Stakeholder Meeting November 21, 2013 2 Agenda Project Process Overview Summary of the Market Assessments October 30 th Charrette Summary Industry

More information

REAL ESTATE TRANSACTION ADVISORY SERVICES

REAL ESTATE TRANSACTION ADVISORY SERVICES REAL ESTATE TRANSACTION ADVISORY SERVICES Improving Performance and Value of Amtrak-owned Assets AMTRAK STATION DEVELOPMENT 1 New York Penn Station Moynihan Train Hall Philadelphia 30 th Street Station

More information

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

Kansas City Aviation Department. Update to Airport Committee Customer Service

Kansas City Aviation Department. Update to Airport Committee Customer Service Kansas City Aviation Department Update to Airport Committee Customer Service 1 Perspective An estimated 800,000 people participated in the Royals Word Series Parade On average 883,000 airline passengers

More information

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer

Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State. Kurt Beckett Deputy Chief Executive Officer Port of Seattle Sea-Tac Airport Master Plan An Economic Engine for Washington State Kurt Beckett Deputy Chief Executive Officer WA Ports A Unique Public Agency Mission: Create Jobs through Travel, Trade

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS

BOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS 1 [1 11 BOARD ITO Aide 001:4 Los Angeles World Airports REPORT TO THE Approved by: Justin rbacci - hief Innovation and Commercial St tegy Officer (--(AtSotA_ /1//r/'(10 PV Reviewed by: Samson Mengistu

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,

More information

L1555-D1 Electric Vehicle and Ground Service Equipment Charging Initiative

L1555-D1 Electric Vehicle and Ground Service Equipment Charging Initiative Consultant Briefing Electric Vehicle and Ground Service Massport Facilities in Greater Boston, Massachusetts Massport Contract No. L1555-D1 April 5, 2018 Massport has established an initiative to install

More information

Los Angeles Business Travel Association

Los Angeles Business Travel Association Los Angeles Business Travel Association Jenny Wedge Manager, Public Relations Public Information Officer June 3, 2010 John Wayne Airport Owned and operated by the County of Orange 503 acres surrounded

More information

AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN. South Bend International Airport (SBN) St. Joseph County Airport Authority

AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN. South Bend International Airport (SBN) St. Joseph County Airport Authority AIRPORT IRREGULAR OPERATIONS (IROPS) PLAN (SBN) St. Joseph County Airport Authority TABLE OF CONTENTS TABLE OF CONTENTS... 2 INTRODUCTION... 3 AIRPORT INFORMATION... 3 CONTACT INFORMATION... 4 PASSENGER

More information

Regular Board Meeting August 4, 2015

Regular Board Meeting August 4, 2015 Regular Board Meeting August 4, 2015 1616 Airport Circle Hailey, ID 83333 208.788.4956 PUBLIC COMMENT FY 16 Rates & Charges FY 16 Budget Approval Rates & Charges will provide the Board the ability to operate

More information

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM FREQUENTLY ASKED QUESTIONS September 2017 Master Plan Update: 1. What is a Master Plan Update? The objective of a Master Plan Update (MPU)

More information

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

State of the Airport Robert S. Bowen, Executive Director October 18, 2018 Robert S. Bowen, Executive Director October 18, 2018 A Year of Change The last year will be remembered as a period when the airlines, bolstered by a growing national economy, moderate fuel prices and changing

More information

Overview of Congestion Management Issues and Alternatives

Overview of Congestion Management Issues and Alternatives Overview of Congestion Management Issues and Alternatives by Michael Ball Robert H Smith School of Business & Institute for Systems Research University of Maryland and Institute of Transportation Studies

More information

? 0-? WA", ilp. Y ON 1Z Cond 1 0 AIRPORT COMMISSIONERS BOARD REPORT TO THE Los Angeles World Airports 0*1-

? 0-? WA, ilp. Y ON 1Z Cond 1 0 AIRPORT COMMISSIONERS BOARD REPORT TO THE Los Angeles World Airports 0*1- I 1 RW MT BOARD 0*1-.04 11 Los Angeles World Airports REPORT TO THE 0 AIRPORT COMMISSIONERS Meeting Date: Approved /by: Dave Jone - Airline Prop nd Concession Services ) 7/13/2017 Reviewed by:.',...ek

More information

The Start. Ed White, Vice President Corporate Real Estate, Alaska Airlines ACI-NA Economic and Finance Conference, April 7, 2009

The Start. Ed White, Vice President Corporate Real Estate, Alaska Airlines ACI-NA Economic and Finance Conference, April 7, 2009 1 The Start Ed White, Vice President Corporate Real Estate, Alaska Airlines ACI-NA Economic and Finance Conference, April 7, 2009 2 The Issues Airports... Desire high ratings to reduce borrowing costs

More information

ACI Annual Assembly Conference & Exhibition

ACI Annual Assembly Conference & Exhibition ACI Annual Assembly Conference & Exhibition Benefits and efficiencies of managing a group of airports versus just one Revenue side: More Competiveness Promoting intra-company routes GAP gets the advantage

More information

Funding Package TOTAL $15,172,000

Funding Package TOTAL $15,172,000 Funding Package ACT 13 $3,000,000 Transportation Capital Budget $5,000,000 Redevelopment Capital Program(RACP) $3,000,000 Passenger Facility Charge (PFC) $1,500,000 Multimodal Transportation (DCED) $1,500,000

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the

More information

City of Kansas City AIRPORT COMMITTEE BRIEFING. Major Renovation Evaluation for Kansas City International Airport.

City of Kansas City AIRPORT COMMITTEE BRIEFING. Major Renovation Evaluation for Kansas City International Airport. City of Kansas City AIRPORT COMMITTEE BRIEFING Major Renovation Evaluation for Kansas City International Airport February 2, 2016 1 Agenda Briefly review Exhibit K Process to establish Program Requirements

More information

United States House of Representatives Congressional STAFF REPORT U.S. AIRPORTS IN CRISIS

United States House of Representatives Congressional STAFF REPORT U.S. AIRPORTS IN CRISIS United States House of Representatives Congressional STAFF REPORT U.S. AIRPORTS IN CRISIS Prepared for U.S. Representative John L. Mica Former Chairman of the House Aviation Subcommittee Former Chairman

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Broward County Aviation Department Recommended Budget Fiscal Year 2019

Broward County Aviation Department Recommended Budget Fiscal Year 2019 Broward County Aviation Department Recommended Budget Fiscal Year 2019 Overview FY 2019 Key Operating Budget Highlights Industry and Airline Activity FLL Activity Comparison of Passenger Growth Rates Enplanement

More information

PASSUR Aerospace Annual Shareholder Meeting, April 5, 2017

PASSUR Aerospace Annual Shareholder Meeting, April 5, 2017 PASSUR Aerospace Annual Shareholder Meeting, April 5, 2017 1 Revenue Core-Non-Core, 2001-2016 2 3 Our Core and our Plan 1 PREDICT every aircraft trajectory and constraint.» We constantly probe the future,

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

ANA HOLDINGS Financial Results for FY2014

ANA HOLDINGS Financial Results for FY2014 ANA HOLDINGS NEWS ANA HOLDINGS Financial Results for FY2014 TOKYO, April 30, 2015 ANA HOLDINGS (hereafter ANA HD ) today reports its consolidated financial results for fiscal year 2014 (April-March). Highlights

More information

September 1, Re: September 1 st, 2015, Logan Airport Parking Space Inventory. Dear Ms. Kirby:

September 1, Re: September 1 st, 2015, Logan Airport Parking Space Inventory. Dear Ms. Kirby: Massachusetts Port Authority One Harborside Drive, Suite 200-S East Boston, MA 02128-2909 Telephone: 617-568-5000 www.massport.com September 1, 2015 Christine Kirby, Director, Air & Climate Division Massachusetts

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

Evaluating the Impact of Airline Mergers on Communities

Evaluating the Impact of Airline Mergers on Communities June 2008 Evaluating the Impact of Airline Mergers on Communities ACI-NA Marketing and Communications Conference Presented by: Robert A. Hazel www.oliverwyman.com Outline Fuel Crisis Impacts on Air Service

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 Agenda Overview of PFC Program at Spokane Airport (GEG) Proposed New PFC 11 Application Project

More information

Kansas City Aviation Department. Community Listening Session

Kansas City Aviation Department. Community Listening Session Kansas City Aviation Department Community Listening Session Listening Session Purpose The Kansas City Aviation Department is moderating these community listening sessions in order to gather feedback from

More information

Stakeholders Meeting

Stakeholders Meeting Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements

More information

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012

Meeting Presentation. Sacramento International Airport Master Plan Update October 30, 2012 Meeting Presentation Master Plan Update October 30, 2012 Agenda We encourage open discussion during today s meeting Team Goals Background (Airport Master Plans) Areas of Emphasis Schedule Special Concerns

More information

KCI New Terminal Update. Airport Committee Thursday, August 16, 2018

KCI New Terminal Update. Airport Committee Thursday, August 16, 2018 KCI New Terminal Update Airport Committee Thursday, August 16, 2018 AGENDA Design Progress Community Outreach General Updates Construction Phasing PROJECT TIMELINE Click to edit Master title style We are

More information

Press Release Mérignac, Tuesday June 28 th 2016

Press Release Mérignac, Tuesday June 28 th 2016 Press Release Mérignac, Tuesday June 28 th 2016 Bordeaux Airport: An ambitious modernisation plan for Halls A & B and new access points planned for 2019/2020 Bordeaux Airport Monitoring Committee adopted

More information

Tulsa Airports Improvement Trust Strategic Plan Update

Tulsa Airports Improvement Trust Strategic Plan Update Tulsa Airports Improvement Trust Strategic Plan Update 2016-2026 TABLE OF CONTENTS I. Background II. III. IV. Existing Conditions and Future Requirements Mission, Vision, & Goals Strengths, Weakness, Opportunities

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

Aviation Department Board Workshop. December 7, 2010

Aviation Department Board Workshop. December 7, 2010 Aviation Department Board Workshop December 7, 2010 1 Agenda North Perry Airport (HWO) FLL Economic Impact & Traffic Update Terminal Area Forecast FLL Airport Layout Plan & Master Plan Update Runway 9R/27L

More information

The CLE Master Plan Includes:

The CLE Master Plan Includes: The CLE Master Plan Includes: An inventory of existing conditions Forecasting future demand and analyzing future needs Evaluating alternative development scenarios Preparing the Airport Layout Plan Preparing

More information

The challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal

The challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal The challenges of growth, the growth of challenges Airports Canada 2013 April 11, 2013 JAMES C. CHERRY CEO Aéroports de Montréal AGENDA THE CHALLENGES OF GROWTH, THE GROWTH OF CHALLENGES Trafic growth

More information

Annual General Meeting. April 15, 2010

Annual General Meeting. April 15, 2010 Annual General Meeting April 15, 2010 AGENDA 2009 In Review Activity Levels Financial Overview Performance Measures Key Activities Moving Forward Activity Levels Passenger Activity (2009) Total Passengers

More information

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009 Massachusetts Port Authority Sustainable Design Standards and Guidelines AAPA Annual Convention Galveston, TX Overview of Massachusetts Port Authority Independent State Authority Governor appoints Board

More information

Aviation OTHER FUNDS. Positions. Percent. Change

Aviation OTHER FUNDS. Positions. Percent. Change Aviation Department Aviation OTHER FUNDS Percent Positions Change 2007-08 FY 07 Budget FY 08 Budget Aviation Operating $108,920,460 $170,490,280 $169,658,090 0% 424 484 Subtotal $108,920,460 $170,490,280

More information

LOVE FIELD MODERNIZATION EVOLUTION

LOVE FIELD MODERNIZATION EVOLUTION LOVE FIELD MODERNIZATION EVOLUTION June 8, 2016 WRIGHT AMENDMENT MCI STL ELP ABQ LBB AM A MAF OKC DAL TUL LIT JAN BHM SAT AUS HOUIIAH MSY Passed in 1979 to protect DFW Airport Could only fly within Texas

More information

Session 5: Complex and Creative Financial Transactions

Session 5: Complex and Creative Financial Transactions Session 5: Complex and Creative Financial Transactions Eric T. Smith Kaplan Kirsch & Rockwell LLP Nora Richardson LeighFisher Traditional Financial Tools Use of airport revenue Utilization of Long Term

More information

Filling in the Customer Service Gap

Filling in the Customer Service Gap Filling in the Customer Service Gap Brad Martin Deputy Director, Aviation Customer Service Boston Logan at a Glance 5 Passenger Terminals 98 Gates 6 Runways 11 TSA Checkpoints 26 Million Passengers in

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

Airline Network Structures Dr. Peter Belobaba

Airline Network Structures Dr. Peter Belobaba Airline Network Structures Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 8: 11 March 2014 Lecture Outline

More information

Elevating the Upstate

Elevating the Upstate Greenville-Spartanburg Int l Airport Elevating the Upstate SC Economic Developers Association October 12, 2012 Introduction/Presentation Outline Introductions Airport Overview Air Service Terminal Improvement

More information

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018

Report to the Strategic Development Committee. Ronald Reagan Washington National Airport Project Journey. June 2018 Report to the Strategic Development Committee Ronald Reagan Washington National Airport Project Journey June 2018 Secure National Hall Secure National Hall Project Cost Summary Prior Month Expenditures

More information

FY16 18 CONSTRUCTION ESCORT SUPPORT

FY16 18 CONSTRUCTION ESCORT SUPPORT MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS AND ENVIRONMENTAL AFFAIRS DEPARTMENT SUITE 209S LOGAN OFFICE CENTER SUITE 209S ONE HARBORSIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS MPA

More information

CVG Overview Connect with CVG March 29, 2017

CVG Overview Connect with CVG March 29, 2017 CVG Overview Connect with CVG March 29, 2017 Launching Point Strategic Plan CVG Launching Point Strategies for 2016 and Beyond Vision: Make travel through CVG and unforgettably positive experience Mission:

More information

Congestion Management Alternatives: a Toolbox Approach

Congestion Management Alternatives: a Toolbox Approach Congestion Management Alternatives: a Toolbox Approach by Michael O. Ball University of Maryland & NEXTOR based on NEXTOR Congestion Management Project (coinvestigators: L. Ausubel, F. Berardino, P. Cramton,

More information

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/25/15

OPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/25/15 Page: 1 of 10 PURPOSE: To maintain the aesthetics of the airport by establishing standards and procedures to be followed by tenants concerning approval of and placement of tenant related displays, signs,

More information

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018

Greater Orlando Aviation Authority Board Meeting. Wednesday, January 17, 2018 Greater Orlando Aviation Authority Board Meeting Wednesday, Award Recognition South Terminal Complex Phase 1 and Phase 2 Planning Overview Greater Orlando Aviation Authority AGENDA PASSENGER TRAFFIC

More information

Gerry Laderman SVP Finance, Procurement and Treasurer

Gerry Laderman SVP Finance, Procurement and Treasurer Gerry Laderman SVP Finance, Procurement and Treasurer Safe Harbor Statement Certain statements included in this release are forward-looking and thus reflect our current expectations and beliefs with respect

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN

IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN.doc TABLE OF CONTENTS SAN Appendix 1 - DOT Required Contingency Plan Appendix 2 CBP Sterile Area Procedures.doc 1.0 Purpose 1.1. The purpose of the is to provide

More information

CANADIAN ROCKIES INTERNATIONAL AIRPORT

CANADIAN ROCKIES INTERNATIONAL AIRPORT CANADIAN ROCKIES INTERNATIONAL AIRPORT 2018 2022 FIVE YEAR BUDGET PROPOSAL AND 2018 WORK PLAN AIRPORT OVERVIEW Mission: To serve the region by becoming the airport of choice and to provide the City of

More information

Presentation to El Centro, CA

Presentation to El Centro, CA Presentation to El Centro, CA September 4, 2012 Agenda SeaPort Airlines Snap Shot Review EAS Proposal & DOT Selection Reason for Delay in Service Proposed Alternative Service Plan Response to Misconceptions

More information

Savannah / Hilton Head International Airport Master Plan Update

Savannah / Hilton Head International Airport Master Plan Update EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,

More information

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 INTRODUCTION The purpose of this report is to analysis the current schedule of operations and assumptions within the 2010

More information