CONSENT DECREE & 3,500 RUNWAY
|
|
- Belinda Neal
- 6 years ago
- Views:
Transcription
1 CONSENT DECREE & 3,500 RUNWAY FAA Airfield Design Standards FAA AC 150/ A Change 1 (2/26/2014) Joseph Schmitz, PhD Airport Commission Member Graphics: Andrew Wilder
2 Resolves Ongoing FAA v. City of Santa Monica Lawsuits and Related Part 16 Complaints Dismisses only FAA lawsuits FAA advises Part 16 Complainants that City now complies re Decree legal issues FAA requests private party Part 16 Complaint withdrawal Does not address lawsuits & Part 16 Complaints outside Decree parameters
3 Removes IOT perpetuity clause & Permits SMO Closure at City Discretion SMO closure delayed until January 2029 Permits 3,500 SMO runway through 2028 Limits numbers & size of jets at SMO Safe operations based on agreed-upon length FAA safety buffers constrain commercial passenger flights (including charters) Stringent commercial passenger safety rules increase aircraft runway length requirements
4 SMO Shall Have a 3,500 Runway Runway and Runway Safety Areas (RSA) will extend into the Western Parcel FAA approval required for RSA/Airfield changes before runway can be shortened City pays Environmental Assessment & construction costs 3,500 runway reduces SMO runway classification Minimum RSA length: At least 300, perhaps 1,000 FAA Regulations and RSA safety requires Cleared and unobstructed surfaces Restricted access
5 FAA Will Approve Non-aeronautical Uses for SMO Airfield FAA approval for non-aeronautical uses prior to Airport closure, but After shortened and reconfigured Airfield Property not needed for shortened runway & RSA may be used by City If FAA approved Consistent with safe aeronautical Airfield uses
6 City Has Proprietary Exclusive FBO Rights After runway shortening completed City has exclusive rights to provide all SMO services Including sale and into-plane fuel delivery Must offer leaded avgas & jet fuel Private FBO may offer customary GA service if the City won t fully provide that type of service 3-year aviation leases required
7 Stringent FAA Airfield Safety Protection Runway Safety Areas (RSA) Runway Obstacle Free Areas (ROFA) Runway Protection Zones (RPZ) Runway Strips at each end of the runway
8 FAA Airfield Safety Measures Runway Strips: 100 blast resistant surface graded, compacted, and leveled soil or asphalt SMO: Too short RSA: 300 to 1000 long & 150 to 600 wide (Determined by FAA Runway Design Code) SMO: Missing ROFA: Extends 300 to 1000 long & 500 to 800 wide (Design Code) SMO: 500 wide, but no extensions past runway ends RPZ: 1,700 long & 500 to 1,500 wide (Design Code) SMO: Non-existent & not possible with 4,973 runway
9 Present West End Deficient
10 Present East End Deficient
11 FAA Airfield Design Standards Santa Monica Airfield Runway Design Code(s) Dictated by three FAA Design Code criteria Aircraft Approach Speed Cat B = Knots Cat C = Knots Aircraft physical dimensions Lowest instrument visibility determines RPZ size Lower visibilities require larger RPZs Aircraft dimensions & Lowest Airfield (SMO) Instrument visibility B II: Prop, Turboprop, and a few small jets (CJ2+) C II: Small jets limited by short 3,500 runway
12 Present FAA Airfield Guidance AC 150/ A d) RSA standards cannot be modified p. 61 A continuous evaluation of all practicable alternatives for improving each sub-standard RSA is required until it meets all standards for grade, compaction, and object frangibility.
13 FAA Compliant C II 3,500 Foot SMO Runway
14 SMO C II West Runway End
15 SMO C II East Runway End
16 Why Compacted Earth? FAA states: compacted earth - slows overrun aircraft Consent Decree expressly (shall) specifies 3,500 runway A 5,000 concrete airstrip is not a 3,500 runway Cost: -- Just under $2 million (LAX 2012 data) FAA changes agreements with Santa Monica after the fact Measure LC City Charter Amendment: Mandate City still owns Western Parcel under the Consent Decree City Council 2016 resolution commits City Council to local control of City land
17 Questions? References for all claims and information provided on request. Contact FAA City of Santa Monica Consent Decree on/consent%20decree%20(faa%20-%20santa%20monica).pdf Authority: FAA AC 150/ A Change A-chg1-interactive pdf
3,500 SMO RUNWAY. Issues and Questions. May 2, Airport Commission Member
3,500 SMO RUNWAY Issues and Questions May 2, 2017 Joe Schmitz Airport Commission Member Joe.schmitz@smgov.net Graphics: Andrew Wilder 1 COMMISSIONER SCHMITZ: FOUR QUESTION AREAS 1. What primary FAA airport
More informationSANTA MONICA AIRPORT COMMISSION JANUARY 27, 2014 MEETING AIRPORT TENANT REQUIREMENT EVALUATION
SANTA MONICA AIRPORT COMMISSION JANUARY 27, 2014 MEETING General Aviation Parcel 1948 Instrument of Transfer Marsha Parcel Acquired by City in 1949 Non-Aviation Parcel Released in 1984 AIRPORT TENANT REQUIREMENT
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationAirport Compliance. Common Issues
Airport Compliance Common Issues Airports must submit any proposed changes on airport property to TxDOT Aviation to update ALP and for approval. Anything required by FAA to be on the ALP shall be subject
More informationCity Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering
City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering City Council Meeting: February 28, 2017 Agenda Item: 3.H Subject: Award of Feasibility/Design-Build
More informationChapter 4 Airport Facility Requirements
Chapter 4 Airport Facility Requirements Introduction CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-1 Organization of Materials CHAPTER 4 AIRPORT FACILITY REQUIREMENTS MAY 2013-2 RPZ - ROAD RPZ - NON-AIRPORT
More informationCity Council Report. Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering Subject: Airport Runway Shortening Options
City Council Report To: From: Mayor and City Council Susan Cline, Director, Public Works, Civil Engineering Subject: Airport Runway Shortening Options City Council Meeting: May 24, 2017 Agenda Item: 8.A
More informationUsing Airport Design Standards To Justify Shrinking An Airport: Is It For Safety Or Noise?
Using Airport Design Standards To Justify Shrinking An Airport: Is It For Safety Or Noise? PRESENTED TO THE 2009 FAC ENVIRONMENTAL AND NOISE CONFERENCE JANUARY 16, 2009 Daniel S. Reimer Kaplan Kirsch and
More informationCase 2:13-cv JFW-VBK Document 21-4 Filed 01/17/14 Page 2 of 10 Page ID #:435
Case 2:13-cv-08046-JFW-VBK Document 21-4 Filed 01/17/14 Page 2 of 10 Page ID #:435 UNITED STATES DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINGTON, DC ) IN THE MATTER OF COMPLIANCE
More informationREPORT TO THE BOARD OF DIRECTORS
REPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO PURCHASE ENGINEERED MATERIAL ARRESTING SYSTEMS FROM ENGINEERED ARRESTING SYSTEMS CORPORATION AT RONALD REAGAN WASHINGTON NATIONAL AIRPORT MARCH 2013 ACTION
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationThe Santa Monica Airport Association. The SMAA: Preserving the Santa Monica Airport for future genera7ons
The Santa Monica Airport Association The SMAA: Preserving the Santa Monica Airport for future genera7ons Presentation to Surrounding Communities affected by Santa Monica Airport (SMO) Potential 2017 runway
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationSafety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013
New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts
More informationMartin Pastucha, Director of Public Works/Airport Director
Information Item Date: September 3, 2015 To: From: Subject: Mayor and City Council Martin Pastucha, Director of Public Works/Airport Director City s Response and Airport Commission s Recommendations to
More informationAppendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION RUNWAY 17-35
Appendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION Master Plan Update RUNWAY 17-35 Hector International Airport SUFFICIENCY ANALYSIS Near the completion of the Master Plan Update
More informationWhy are the underground fuel tanks being removed and replaced with above ground tanks?
AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationChapter 5 Airport Development Alternatives
Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2
More informationNew Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together
Bringing g the PUBLIC WORKSHOP Venice Municipal Airport New Opportunities Presented for Venice City Council & Citizens of Venice September 25, 2009 Slide 1 Bringing g the Welcome & Introductions May 12th
More informationCLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257
Form PDES 8 THE CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257 Summary of Duties: A Senior Airport Engineer performs the more difficult and
More informationSource: Chippewa Valley Regional Airport ASOS, Period of Record
Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size
More informationPreliminary Findings of Proposed Alternative
Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be
More informationGENERAL AVIATION AIRPORT AGREEMENTS
33 rd Annual Basics of Airport Law Workshop and 2017 Legal Update Session #17 GENERAL AVIATION AIRPORT AGREEMENTS W. Eric Pilsk Kaplan Kirsch & Rockwell Corinne C. Nystrom, A.A.E., Airport Director Mesa-Falcon
More information5) Old Business (Public discussion permitted) a) Update and Discussion on the Runway Shortening Project Phase 2
Commissioner Peter Donald, Chair Commissioner Andrew Wilder, Vice Chair Commissioner Lael R. Rubin Commissioner Joe Schmitz Commissioner Chris Waller Special Meeting of SANTA MONICA AIRPORT COMMISSION
More informationAMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION
AMENDMENT No. 8 TO THE INTERNATIONAL STANDARDS AERODROMES ANNEX 14 TO THE CONVENTION ON INTERNATIONAL CIVIL AVIATION VOLUME I AERODROME DESIGN AND OPERATIONS The amendment to Annex 14, Volume I contained
More informationSECTION 32. Airfield and Aircraft Operations
SECTION 32 Airfield and Aircraft Operations 32.A Airfields General. 32.A.01 The following safety requirements shall be in addition to the airfield's safety requirements. When an airfield has safety requirements
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationDRAFT MASTER PLAN UPDATE
DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS
More informationFriedman Memorial Airport Authority. Regular Meeting September 4, 2012
Friedman Memorial Airport Authority Regular Meeting September 4, 2012 UNFINISHED BUSINESS Airport Solutions Blaine County Report Airport Solutions City of Hailey Report Airport Solutions Airport Manager
More informationSection 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft
Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations Section: Page 32.A General... 32-1 32.B Aircraft... 32-4 32-i THIS PAGE INTENTIONALLY LEFT BLANK 32-i SECTION 32 Airfield and Aircraft Operations
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More information2015 PURDUE ROAD SCHOOL March 11, 2015
2015 PURDUE ROAD SCHOOL March 11, 2015 Runway Protection Zone (RPZ) Definition It is a trapezoidal shape formed off the end of a runway and its geometry it a function of the airport s aircraft approach
More informationAIRPORT MINIMUM STANDARDS
AIRPORT MINIMUM STANDARDS South Carolina Aviation Association Annual Conference Presented by: Bill Dunn, President What s the real name for these documents and guidance? Minimum Standards for COMMERCIAL
More informationCHAPTER 2.0 ALTERNATIVES
CHAPTER 2.0 ALTERNATIVES 2.1 INTRODUCTION 2.1.1 SCOPE OF THE ALTERNATIVES ANALYSIS This chapter summarizes the screening analysis conducted to identify the range of reasonable and practicable alternatives
More informationChapter 4.0 Facility Requirements
Chapter 4.0 Facility Requirements Having inventoried the existing infrastructure and forecasted demand, determining airport facility requirements is the next essential step in the airport master planning
More informationFacility Requirements
C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over
More informationYolo County Airport. ALP Narrative Report. April Prepared by Mead & Hunt, Inc. for the County of Yolo, California
Yolo County Airport ALP Narrative Report April 2016 Prepared by Mead & Hunt, Inc. for the County of Yolo, California Yolo County Airport ALP Narrative Report Prepared for the County of Yolo Mindi Nunes,
More informationFACILITY REQUIREMENTS
FACILITY REQUIREMENTS In order to ensure that Bradley International Airport (BDL) is capable of supporting the expected increase in passenger traffic, care must be taken to ensure that the recommendations
More informationFRENCH VALLEY AIRPORT (F70) Sky Canyon Dr. Murrieta, CA. Phone: Riverside FAA FSDO Complaint Line: (951)
FRENCH VALLEY AIRPORT (F70) 37600 Sky Canyon Dr. Murrieta, CA Phone: 951-600-7297 Riverside FAA FSDO Complaint Line: (951) 276-6701 Visit the F70 website for additional information regarding the airport
More informationAirfield Design OVERVIEW BASIC DESIGN FACTORS. Airport Role
3 Airfield Design OVERVIEW Due to the presence of significant physical constraints, little change to the existing airfield is anticipated. The emphasis in this plan is on identifying airfield improvements
More informationMorristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment
2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for
More informationComparison Between Old and New ALUC Plans
A P P E N I X H Comparison Between Old and New ALUC Plans OVERVIEW This Placer County Airport Land Use Compatibility Plan (ALUCP) sets forth land use compatibility criteria for the environs of Auburn Municipal,
More informationCOUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018
COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development Per Individual
More informationDraft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005
Draft Palo Alto Airport Master Plan Report County of Santa Clara, California October 2005 County of Santa Clara Board of Supervisors Donald F. Gage Blanca Alvarado Peter A. McHugh James T. Beall, Jr. Liz
More informationCOUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019
COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development
More informationAppendix C AIRPORT LAYOUT PLANS
Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development
More informationBilly Bishop Toronto City Airport; Porter Airlines Proposal Review; Interim Results/Findings, Airbiz, 26 June 2013
Billy Bishop Toronto City Airport - Outstanding Questions for Transport Canada EXECUTIVE SUMMARY Transport Action has reviewed the reports published by Airbiz and LPS Avia Consulting and found that they
More informationFlying Cloud Airport Joint Airport Zoning Board. 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance
Flying Cloud Airport Joint Airport Zoning Board 27 February 2018 Public Hearing #1 Overview of Proposed Airport Zoning Ordinance Presentation Agenda Purpose & Goals Review of FCM Zoning Historical Timeline
More informationFACILITY REQUIREMENTS 5.1 Introduction
Chapter 5 FACILITY REQUIREMENTS 5.1 Introduction The facility requirements section of this study defines the physical facilities needed to safely and efficiently accommodate the current and future aviation
More informationReliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM)
Reliever Airports: NOISE ABATEMENT PLAN Flying Cloud Airport (FCM) INTRODUCTION The Noise Abatement Plan (FCM Plan) for the Flying Cloud Airport has been prepared in recognition of the need to make the
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationCHAPTER 3 AIRPORT FACILITY REQUIREMENTS
CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2017 Pursuant to the California Department of Transportation
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationMEETING MINUTES Page 1 of 5
Page 1 of 5 50178.000 May 26, 2009 PROJECT PROJECT NO. MEETING DATE ISSUE DATE Citizens Advisory Committee Meeting MEETING LOCATION MEETING PURPOSE Amy Eckland ISSUED BY SIGNATURE PARTICIPANT See attached
More information~ s: Memorandum
Memorandum CITY OF DALLAS DATe November 13, 2015 ro sva..rc~ Members of the Economic Development Committee: Rickey D. Callahan (Chair), Casey Thomas, II (Vice Chair), Lee M. Kleinman, Adam Medrano, Carolyn
More informationThe purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationTechnical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand
Technical Arrangement on Aircraft Maintenance between the Transport Canada Civil Aviation Directorate and the Civil Aviation Authority of New Zealand Preamble 1. Transport Canada, Civil Aviation Directorate
More information4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS
4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development
More informationPLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018
PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #4 March 19, 2018 Meeting Agenda 1. Master Plan Status [5 Minutes] 2. Preferred Forecasts [15 Minutes] 3. Runway Length Options [45
More informationOverview ICAO Standards and Recommended Practices for Aerodrome Safeguarding
Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July
More information3.1 Facility Requirements Overview Airfield Facility Requirements... 1
Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY SECOND QUARTER 2015 Pursuant to the California Department of Transportation
More informationTECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan
TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County
More informationAIRSIDE CAPACITY AND FACILITY REQUIREMENTS
AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established
More informationMinimum Standards. For. Commercial Aeronautical Services SANTA MONICA MUNICIPAL AIRPORT
Minimum Standards For Commercial Aeronautical Services At SANTA MONICA MUNICIPAL AIRPORT Minimum Standards Santa Monica Airport i Table of Contents SECTION 1 GENERAL INFORMATION... 1 SECTION 2 APPLICATION
More informationVista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington
Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington
More informationGCAA ADVISORY CIRCULAR
GUYANA CIVIL AVIATION AUTHORITY 73 High Street Kingston Georgetown GUYANA TEL. NOs: (592) 225 6822, 225 0778, 227 8111 FAX: (592) 225 6800 E-mail: director-general@gcaa-gy.org GCAA ADVISORY CIRCULAR AERODROME
More informationSafety Enhancement SE RE Airports Policies and Procedures to Mitigate Runway Excursion Consequences & Severity
Safety Enhancement SE 221.1 RE Airports Policies and Procedures to Mitigate Runway Excursion Consequences & Severity Safety Enhancement Action: Implementers: Statement of Work: Airport operators and the
More informationTHE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015
THE BURBANK-GLENDALE-PASADENA AIRPORT AUTHORITY S UPDATE REGARDING ITS NOISE IMPACT AREA REDUCTION PLAN AND ITS PART 161 STUDY FIRST QUARTER 2015 Pursuant to the California Department of Transportation
More informationAirport 20 to 1 Approach Surface
Airport 20 to 1 Approach Surface 2014 South Carolina Aviation Association Annual Conference Jon Walker Eastern Flight Procedures Team Feb 13, 2014 20 to 1 Surface Area Criteria 14 CFR Part 77; AC 150/5300-13A;
More informationCOUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION
COUNTY OF MILWAUKEE ADDENDUM NO. 1 DEPARTMENT OF TRANSPORTATION September 9, 2013 AIRPORT DIVISION INVITATION TO SUBMIT PROPOSAL FOR THE OPERATION OF A FIXED BASE OPERATOR FACILITY AT GENERAL MITCHELL
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationat: Accessed May 4, 2011.
3.11 SAFETY 3.11.1 Background and Methodology As with other forms of transportation, there is risk associated with aviation activities. This section focuses on risk to those on the ground near airports.
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationWhat is a Through the Fence Operation?
Airport Through the Fence operations and Residential Airparks at Publicly Funded Airports Researched and Authored by Bill Dunn Vice President Local Airport Advocacy AOPA Over the past several years, members
More informationTCAA-AC-AWS007C. March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE
Advisory Circular TCAA-AC-AWS007C March 2013 CERTIFICATION OF A FOREIGN APPPOVED MAINTENANCE ORGANISATION (AMO) 1.0 PURPOSE This Advisory Circular (AC) is issued to provide information and guidance to
More informationAERODROME LICENCE APPLICATION PROCESS
0000180111 Page 2 Why is a Licence Required? An aerodrome licence is required for a site if it is intended to facilitate operations by commercial transport aircraft, other aerial work other than rotorcraft,
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements Chapter 5 Facility Requirements INTRODUCTION Chapter 4 produced a forecast of traffic volumes estimated to be generated at the airport during the 20- year forecast period.
More informationChapter 5 Airport Facility Requirements
Chapter 5 Airport Facility Requirements Introduction The evaluation of airport facility requirements uses the results of the inventory and forecasts contained in Chapters Two and Three, as well as established
More informationSANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013
SANTA MONICA AIRPORT VISIONING PROCESS: PHASE III FINDINGS AND NEXT STEP RECOMMENDATIONS APRIL 30, 2013 Visioning Process: Overview SMO in 1917 (Cloverfield) Grass Landing Strip WWI Pilot Training Visioning
More informationTechnical Advisory Committee Meeting February 29, 2016
Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements
More informationCity of Redding Airports
City of Redding Airports Benton Airpark Redding Municipal Airport DEVELOPMENT AND USE GUIDELINES FOR GENERAL AVIATION HANGARS April 7, 2009 PREFACE The City of Redding, as owner of federally obligated
More informationMASTER PLAN CONCEPT 1 DRAFT
The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development
More information15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long
The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance
More informationB GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:
2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus
More informationIntroduction to the FAA s Airport Law Presented to: ACI-NA Fall Legal Conference
Introduction to the FAA s Airport Law Branch Presented to: ACI-NA Fall Legal Conference By: Jonathan Cross, FAA Counsel s Office Date: First, an airport quiz 2 That was too easy how about this one? 3 Here?
More informationLopez Island Airport Master Plan Update. Public Meeting June 15, 2017
Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,
More informationJOHNSTON COUNTY AIRPORT AUTHORITY
JOHNSTON COUNTY AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS FOR AIRPORT PLANNING SERVICES For JOHNSTON REGIONAL AIRPORT (JNX) 3149 Swift Creek Rd. Smithfield, NC 27577 PHIL LANIER AIRPORT DIRECTOR (919)
More informationAddendum - Airport Development Alternatives (Chapter 6)
Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary
More informationChapter 5. Facility Requirements
Chapter 5 Facility Requirements Chapter 5 Facility Requirements INTRODUCTION The Baseline Forecast was used to determine facility requirements. Chapter 4 produced a forecast of traffic volumes expected
More informationChapter 4 Facility Requirements
Chapter 4 Facility Requirements Introduction This chapter evaluates the existing airport facilities and identifies improvements needed to effectively meet the forecasted demand levels discussed in the
More informationWindmills & Airspace Can We Work Together?
May 29, 2008 Windmills & Airspace Can We Work Together? J. Randolph Babbitt C O N F I D E N T I A L www.oliverwyman.com Windmills & Airspace Overview of Airspace Issues For Wind Turbine Sites The FAA s
More informationCity of Lafayette. Request for Proposals Municipal Airport Fixed Based Operator
City of Lafayette Request for Proposals Municipal Airport Fixed Based Operator NOTICE PROPOSERS The City of Lafayette is seeking an experienced, reliable professional to establish and operate a fullservice
More informationII. Purpose and Need. 2.1 Background
II. 2.1 Background The Metropolitan Washington Airports Authority is preparing an Environmental Assessment of potential environmental impacts associated with proposed enhancements to the Runway 4-22 and
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationJANUARY 2013 Friedman Memorial Airport Pomeroy, Chris
JANUARY 2013 Friedman Memorial Airport Pomeroy, Chris Friedman Memorial Airport / T-O Engineers Airport Alternatives Technical Analysis Table of Contents 1.0 Background and Purpose of Analysis... 1 1.1
More informationBUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA
BUSINESS OF THE CITY COUNCIL CITY OF MERCER ISLAND, WA AB 4564 September 7, 2010 Regular Business RENTON AIRPORT STATUS UPDATE Proposed Council Action: Receive update. No action required. DEPARTMENT OF
More information