North Perry Airport Master Plan

Size: px
Start display at page:

Download "North Perry Airport Master Plan"

Transcription

1 North Perry Airport Master Plan North Perry Master Plan May 30, 2007

2 TAC Invitees County Representatives Bob Bielek, Interim Director of Aviation, BCAD Nina Demeo, Airport Manager, BCAD Darlene Duecker, Assistant to Airport Manager, BCAD Mike Nonnemacher, Director of Operations, BCAD Stephen Wilson, Project Manager, BCAD Doris Enriquez, Airport Properties Manager, BCAD Marc Gambrill, Assistant Director of Planning & Development, BCAD Christine Steiner, Assistant Airport Properties Manager, BCAD Yasmi Govin, Assistant County Attorney, BCAD Allan Siegel, Community Outreach Coordinator, BCAD Norm Taylor, Director, Broward Co. Economic Development Henry Sniezek, Executive Director, Broward Co. Planning Council Deanne Von Stetina, Senior Planner, Broward Co. Planning Council FAA/FDOT Representatives Rebecca Henry, Planing Program Manager, FAA Rene Alvarez, Team Operations, FAA/FSDO Mike Keane, FAA/FSDO Neil Morris, FAA/FSDO Ken Martin, Air Traffic Manager (HWO), FAA Rebecca Mainardi, Aviation & Rail Section Leader, FDOT (Dist. 4) Dan Afghani, CFASPP, FDOT (Dist. 4) Local Government Representatives Jaye Epstein, Director of Planning, City of Hollywood Lorie Mertens-Black, Director of Intergovernmental Affairs, City of Hollywood Donald Waldron, Director of Planning, City of Miramar Roberta J. Spicer, Planning, City of Miramar Joseph Yaciuk, Planning, City of Pembroke Pines Laurie Barnes-Zargo, Assistant Division Fire Chief, Pembroke Pines Fire Dept. Shawn Hallich, Assistant Division Fire Marshall, Pembroke Pines Fire Dept. Tenants/Neighbors Jan Shakespeare, Aviation Program Manager, Broward Community College Jorge Guerra, Dean, Aviation Institute, Broward Community College Jim McKeown, Assistant Manager, Air Superiority Hiam Molcho, President, Hollywood Aviation Lois Cotton, President, North Perry Aerospace Thomas McMenamin, Vice President, North Perry Aviation Brian Broderson, VP Business Operations, Van Wagner Aerial Media John Thompson, President, Boomerang Aviation Corp. Leo Holland, Florida Aero Club Terry Fensome, President, Pelican Airways Stuart Hanley, Aztec Airways Dave Reich, North Perry Airport Tenant Bob Cernuda, Crescent Helicopters 2

3 Meetings to Date Tenant Meeting #1, Wednesday, June 14, 2006 Meetings Pending Tenant Meeting #2, Wednesday, June 27, 2007: TAC Meeting #1, December 13, 2006 City of Miramar, Date Pending City of Hollywood, February 12, 2007 Public Workshop, August 2007 (tentative) City of Pembroke Pines, March 21, 2007 Commission Presentation, October 2007 (tentative) TAC Meeting #2, Wednesday, May 30,

4 Progress to Date 1 Inventory 2 Planning Guidelines 3 Forecasts 4 Demand/Capacity Analysis 5 Facility Requirements 7 Land Use Evaluation 8 Environmental Overview Tasks Pending 6 Alternatives Analysis 9 Develop ALP Set / Airport Property Map 10 Capital Improvement Program 11 Financial Feasibility 12 Airport Property Map 13 Economic Impact Analysis 14 Business Tools 15 Final Master Plan Report & ALP Set 4

5 Demand/Capacity Analysis Runway Use/Configuration One instrument approach Runway 9R (non-precision GPS) Departures Arrivals Capacity of the Airport : VFR = 195 operations/hour IFR = 24 operations/hour Weighted hourly capacity = 186 operations/hour Annual Service Volume (ASV) = 440,000 operations/year 5

6 Demand/Capacity Analysis Sources: Forecast Demand Terminal Area Forecast, March 2006 ASV estimate MCG based on FAA Advisory Circular 150/5060, Airport Capacity and Delay 6

7 Facility Requirements Runways Rehabilitate runway pavements Consider a precision instrument approach Increase the number of exit taxiways Consider adding runway pavement Use declared distances to maximize runway length Add additional run-up areas 7

8 Facility Requirements Pavement & BCAD Building Conditions Rehabilitate pavements Renovate BCAD buildings Construct Taxiway A Broward County Aviation Department Buildings 1 BCAD Administration Office 2 Vacant 3 FAA Air Traffic Control Tower 4 FAA ATCT UPS Building 5 Airfield Lighting 6 Vacant 7 Vacant (Formerly Mayday s Restaurant) 8 Vacant 9 Vacant 8

9 Facility Requirements Airfield Lighting, Signage, and Marking Remark all runways and taxiways as needed Add MITL and lighted signs to Taxiway A and connectors, when developed Rehabilitate the airfield lighting and signage as needed Install additional reflectors on unlit taxiways and taxilanes Rehabilitate the electrical vault as needed Light Runway 9L-27R and supporting taxiways 9

10 Facility Requirements Navigational and Visual Landing Aids Add lighted windsocks to Runways 18R, 18L, and 27R Light the windsocks near Runways 27L and 36L Consider installation of GPS-WAAS or GPS-LAAS for a precision instrument approach Upgrade REILs for 18R, 36L, and 27L through planning period Upgrade PAPI-2 s for Runways 18R, 36L, 18L, 36R, and 27L Upgrade PAPI-4 for Runway 9R Identify locations for relocated VOR 10

11 Facility Requirements Buildings Consider adding a full service FBO at airport Consider development of a GA terminal building Renovate or remove deteriorating buildings Upgrade ATCT and UPS building as needed through planning period 11

12 Facility Requirements Apron Space Rehabilitate the apron pavement Seal coat apron pavements Install high mast apron lighting on aprons Add additional apron space in long term to meet demand 12

13 Facility Requirements Access and Infrastructure Develop landscaping plan Develop facility signage plan Provide appropriate roadway lights on perimeter road Install speed limit signs on perimeter road Review emergency preparedness plans for utility providers for Airport Upgrade security fencing as appropriate throughout planning period Upgrade access control system throughout planning period Install video identification and tracking system for nighttime surveillance 13

14 Facility Requirements Other Consider highest/best use of banner towing area Purchase of avigation easements Encourage airport compatibility planning in land use and zoning ordinances Consider need for helipad(s) or operational agreement Upgrade ARFF vehicle and equipment Re-evaluate self fueling requirements for tenants in the minimum standards 14

15 Alternatives Analysis Airside Alternatives Runways Taxiways Navigational Aids Landside Alternatives Aprons Hangars New FBO/GA Terminal Customs Facility Helipad 15

16 Airside Alternatives 16

17 Runway Length Requirements for North Perry Airport SMALL AIRPLANES WITH LESS THAN 10 PASSENGER SEATS SMALL AIRPLANES WITH MORE THAN 10 PASSENGER SEATS LARGE AIRPLANES OF 60,000 POUNDS OR LESS % of these large airplanes at 60% useful load 2,450 feet 3,570 feet 4,170 feet 5,300 feet 5,500 feet % of these large airplanes at 90% useful load 7,000 feet 7,810 feet BUSINESS JET AIRCRAFT (FAA Southern Region) 6,500 feet VERY LIGHT JET (VLJ) AIRCRAFT 2,500 feet 3,400 feet RUNWAY LENGTH RANGE EXISTING RUNWAY LENGTH RANGE 3,500 6,500 feet 3,000 3,181 feet Sources: FAA Advisory Circular 150/5325-4B, Runway Length Requirements for Airport Design; FAA Southern Region, RGL 00-1, Standard Development for Business Jet Aircraft, Revised August 28,

18 Alternative 1 No Build Alternative 2 Apply Declared Distances With Existing Pavement Alternative 3 Construct Additional Pavement & Apply Declared Distances Alternative 4 Accommodate Larger Aircraft 18

19 1 No Build 19

20 4 No Build 20

21 1 No Build Advantages Least expensive alternative Disadvantages Limits operations to smaller aircraft No runway length improvements 21

22 2 Apply Declared Distances with Existing Pavement 22

23 2 Apply Declared Distances w/ Existing Pavement Displaced Threshold RPZ RPZ 200 TORA TODA ASDA LDA TORA TODA ASDA LDA RPZ LEGEND Take-off Run Available Take-off Distance Available Accelerate Stop Distance Available Landing Distance Available Runway Protection Zone 23

24 3 Apply Declared Distances with Existing Pavement 24

25 3 Apply Declared Distances with Existing Pavement 25

26 2 Apply Declared Distances w/ Existing Pavement Declared Distances For Existing Runways at North Perry Airport Runways 9R 27L 9L 27R 18R 36L 18L 36R Existing Length 3,000 3,045 3,060 3,181 3,000 3,000 3,150 3,075 TORA (in feet) TODA (in feet) ASDA (in feet) 3,025 3,000 3,182 3,060 3,000 3,000 3,075 3,150 3,255 3,255 3,242 3,242 3,350 3,350 3,260 3,260 3,255 3,255 3,242 3,242 3,350 3,000 3,260 3,260 LDA (in feet) 3,000 3,045 3,060 3,182 3,000 3,000 3,150 3,075 Source: FAA Advisory Circular 150/5300-Change 11, Airport Design, Appendix 14 26

27 2 Apply Declared Distances w/ Existing Pavement Advantages Inexpensive since no pavement or markings will be altered Maximizes usable runway for take-offs and landings Disadvantages Declared distances can be confusing to pilots Does not accommodate 100% of small airplanes requiring 3,570 feet of runway 27

28 3 Construct Additional Pavement & Apply Declared Distances 28

29 29

30 30

31 31

32 32

33 3 Construct Additional Pavement & Apply Declared Distances Take-off Run and Landing Distances For North Perry Airport Runways 9R 27L 9L 27R 18R 36L 18L 36R Existing Length Added Length (in feet) 3,000 3,045 3,060 3,181 3,000 3,000 3,150 3, TORA (in feet) 3,745 3,915 3,717 3,910 3,390 3,840 3,800 3,745 LDA (in feet) 3,915 3,745 3,910 3,717 3,840 3,390 3,745 3,800 Source: FAA Advisory Circular 150/5300-Change 11, Airport Design, Appendix 14 33

34 3 Construct Additional Pavement & Apply Declared Distances Advantages Maximizes runway lengths Accommodates 100% of small airplanes requiring 3,570 feet of runway Accommodates 95% of VLJ fleet Provides opportunities for further airport development Disadvantages Additional costs of new pavement for airfield Runway operations closer to residential area Declared distances can be confusing to pilots 34

35 4 Accommodate Larger Aircraft 35

36 36

37 37

38 4 Accommodate Larger Aircraft Advantages Facilitates HWO as General Aviation reliever to FLL Accommodates business jet aircraft Increases opportunities for FBO, corporate hangars & industrial parks Potential increase of airport revenues Disadvantages Major impacts to community Major impacts to residential and commercial Major capital cost Significant impacts to on-airport tenants due to relocation Requires preparation of Environmental Impact Statement Increases runway dimensional criteria This alternative is not recommended 38

39 Taxiway A & the Highest/Best Use of the Northwest Quadrant 39

40 Taxiways 40

41 Taxiway A & the Highest/Best Use of the Northwest Quadrant Advantages Enhances operational capacity of Runway 18R-36L Parallel taxiway provides development opportunities on west side of Runway 18R-36L Disadvantages Construction cost Impacts banner towing operations 41

42 Navigational Aids 42

43 Establish Precision Instrument Approach Navigational Aids Alternative 1 Runway 9R-27L Alternative 2 Runway 9L-27R Alternative 3 Runway 18R-36L Alternative 4 Runway 18L-36R Very High Frequency Omni-Directional Range (VOR) Alternative 1 Southwest Quadrant Alternative 2 Southeast Quadrant 43

44 Navigational Aids Establish Precision Instrument Approach 44

45 Navigational Aids Advantages Increases approach capability for airport Provides navigational training for student pilots Enhances business aircraft operations Satisfies criteria for on-demand charter services Disadvantages Major impacts to community Major capital costs: runway, taxiway & residential/commercial property acquisition (FAA recommends 4,200 feet of runway length for reliever airport designation) Obstructions must be removed from 50:1 approach Significant impact to airport tenants due to required relocation Requires preparation of Environmental Impact Statement 45

46 Navigational Aids Relocation of Very High Frequency Omni-Directional Range (VOR) 46

47 Navigational Aids Advantages Meets VOR siting criteria Provides VOR training for pilots Provides enhancement to navigational aids at HWO Disadvantages Alternative 1: ASOS, wind measuring equipment, relocate windsocks, VOR located in Runway Visibility Zone; potential site for helipad Alternative 2: Prohibits future airport development in this area 47

48 Landside Alternatives 48

49 Aprons 6 potential sites Hangars 8 potential sites New FBO/GA Terminal 8 potential sites Customs Facility Helipad 4 potential sites 49

50 Aprons 50

51 Aprons Site Advantages Existing Access to Runway/Taxiway Ability to Expand Beyond Planning Period Can Accommodate other GA Facilities Road Access via Perimeter Road Adjacent to Existing FBO & Corporate/Thangars

52 Aprons Site Disadvantages 1 Banner Towing operations impacted in this area Not adjacent to other existing GA facilities; requires construction of parallel Taxiway A 2 Access to primary runway and GA facilities is not as convenient 3 Not adjacent to other existing GA facilities; requires construction of parallel Taxiway A 4 Not adjacent to other existing GA facilities; requires construction of access/perimeter road 5 Not adjacent to other existing GA facilities 6 Can not be expanded beyond planning horizon 52

53 Hangars 53

54 Hangars Site Advantages Existing Access to Runway/Taxiway Ability to Expand Beyond Planning Period Can Accommodate other GA Facilities Road Access via Perimeter Road 1 Adjacent to Existing FBO & Corporate/Thangars

55 Hangars Site Disadvantages 1 Banner Towing operations impacted in this area Not adjacent to other existing GA facilities; requires construction of parallel Taxiway A 2 Access to primary runway and GA facilities not as convenient 3 Not adjacent to other existing GA facilities; requires construction of parallel Taxiway A 4 Not adjacent to other existing GA facilities; requires construction of access/perimeter road 5 Not adjacent to other existing GA facilities 6 Requires paved access/perimeter road; BCAD lighting bldg. & ATCT/equipment, portion part of Hollywood Aviation leasehold 7 Property contained in existing tenant leaseholds 8 Property contained in existing tenant leaseholds 55

56 New FBO/GA Terminal Minimum facility requirements for an FBO are outlined in BCAD s Minimum Standards for General Aviation at County Airports, March 28, HWO FBO must: Lease at least a six acre site Construct 2,000 ft 2 administration building Provide 15 aircraft tie-down positions Construct 5,000 ft 2 maintenance hangar and 10,000 ft 2 hangar and/or T-Hangars Construct 60,000 ft 2 apron Provide paved automobile parking Provide for 10,000 gal. fuel storage and one 250 gal. truck Provide electric security gate to restrict unauthorized access to ramp 56

57 New FBO/GA Terminal 57

58 New FBO/GA Terminal Site Advantages Provides Access from Perimeter Road Does Not Interfere with Banner Towing Adjacent to Taxiway/Runway/Cor porate/hangar Development Has 6 Acres of Developable Land

59 New FBO/GA Terminal Site Disadvantages 1 Not located near primary runway 2 Not located near primary runway; Banner Towing operations impacted in this area; requires construction of parallel Taxiway A 3 Banner Towing operations impacted in this area; requires construction of parallel Taxiway A 4 Requires construction of access road 5 Requires construction of parallel Taxiway A ; limited by building restriction line 6 BCAD (Aviation Lighting) and ATCT located in area; significant portion of area is part of Hollywood Aviation s leasehold 7 Does not provide required 6 acres for FBO 8 Does not provide required 6 acres for FBO 59

60 U.S. Customs Facility South Florida General Aviation airports currently with customs facilities: Opa-locka Executive Airport Fort Lauderdale Executive Airport Kendall-Tamiami Executive Airport St. Lucie County International Airport Need for a 5,000 square foot secure building Preferred location is adjacent to FBO 60

61 U.S. Customs Facility U.S. Customs and Border Protection User Fee Airport (UFA) applicant requirements: Volume or value of business at airport is insufficient to justify the availability of inspectional services on a non-reimbursable basis Governor supports designation in writing to the Commissioner of CBP County agrees to reimburse CBP for all costs associated with the services, including expenses of staffing at least one full-time inspector County completes an Agriculture Compliance Agreement with FBOs and refuse haulers for handling international refuse Basic steps required in considering an application for designation as a UFA include: Receipt of a letter from the Governor supporting the user fee airport designation Successful site visit in which CBP officials discuss workload and services and verify that facilities are adequate for inspectional services to be provided Completing a Memorandum of Agreement (MOA) with CBP, which states the responsibilities, fees and hours of service Completing an Agriculture Compliance Agreement with CBP for handling international refuse 61

62 U.S. Customs Facility An approved UFA receiving CBP services is responsible for payment of the following fees: Per Inspector: $140,000 + (1 st year) $124,000 + (succeeding years) Additional costs per inspector: $17,000 + (1 st year) $14,000 + (succeeding years) Other associated costs (i.e., overtime) 62

63 U.S. Customs Facility Advantages Possibility for increased operations from tourism to/from the Bahamas, U.S. Virgin Islands, Puerto Rico, and other islands Possibility for increased revenue from fuel sales Increased charter activities Good for airport businesses Disadvantages County would incur additional costs to build County would incur additional costs to operate County unlikely to recover costs through leasehold revenue 63

64 Helipad 64

65 Helipad Advantages Sites 1 and 2 provide adequate area for helipad; adjacent to Helicopters, Inc. Site 3 provides adequate area for a helipad; recommended area in 1996 Master Plan; near Crescent Helicopters; aligned with primary Runway 9R-27L Site 4 provides adequate area for a helipad and is near Crescent Helicopters; aligned with primary Runway 9R-27L Disadvantages Site 1 approach and departure path aligned to Runway 18R-36L; potential noise impacts; not convenient for helicopter operations on the south side of airfield Site 2 approach and departure path aligned to Runway 18R-36L; Banner Towing operations impacted in this area; not convenient for helicopter operations on the south side of airfield Site 3 located within the Runway Visibility Zone; area may be site for future VOR Site 4 area may be site for future VOR 65

66 Next Steps Evaluation of Alternatives Recommended Capital Improvement Plan Financial Analysis Update Airport Layout Plan (ALP) 66

67 Questions/Comments/Suggestions Please Contact Monty Gettys at 67

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS 6.1 INTRODUCTION In the previous chapter, facility needs for the 20-year planning horizon were identified. The next step in the planning process is to identify and evaluate the various ways certain facilities

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

MASTER PLAN CONCEPT 1 DRAFT

MASTER PLAN CONCEPT 1 DRAFT The Airport Master Plan Update for Dallas Executive Airport has included the development of aviation demand forecasts, an assessment of future facility needs, and the evaluation of airport development

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.

Milton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet

More information

CHAPTER FOUR AIRPORT ALTERNATIVES

CHAPTER FOUR AIRPORT ALTERNATIVES 4.0 INTRODUCTION CHAPTER FOUR The goal of the master planning process is to provide the City of New Smyrna Beach with an assessment of the adequacy and capabilities of the Airport as well as to identify

More information

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY 1 1 EXECUTIVE SUMMARY INTRODUCTION William R. Fairchild International Airport (CLM) is located approximately three miles west of the city of Port Angeles, Washington. The airport

More information

Addendum - Airport Development Alternatives (Chapter 6)

Addendum - Airport Development Alternatives (Chapter 6) Bowers Field Addendum - Airport Development Alternatives (Chapter 6) This addendum to the Airport Development Alternatives chapter includes the preferred airside development alternative and the preliminary

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

CHAPTER 3 ALTERNATIVES CONSIDERED

CHAPTER 3 ALTERNATIVES CONSIDERED CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from

More information

Stakeholders Meeting

Stakeholders Meeting Stakeholders Meeting for the Expansion of Runway 9R-27L, Terminal 4 Gate Relocation and Land Acquisition for Runway 9R-27L September 22, 2011 Stakeholders Meeting AGENDA Introduction FLL Airport Improvements

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

ACTION TRANSMITTAL

ACTION TRANSMITTAL Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL 2018-16 DATE: February 9, 2018 TO: Transportation Advisory Board FROM: Technical Advisory Committee PREPARED

More information

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014

DRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014 DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

SouthwestFloridaInternational Airport

SouthwestFloridaInternational Airport SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

General Aviation Master Plan Update

General Aviation Master Plan Update Peter O. Knight Airport Public Meeting #2 Peter O. Knight Airport Agenda Welcome and Introductions HCAA System of Airports Purpose of Public Meetings Master Plan Status Update Next Steps Q & A 2 Our System

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

Airport Master Plan Open House Front Range Airport February 23, 2017

Airport Master Plan Open House Front Range Airport February 23, 2017 Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future

More information

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35 Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

CHAPTER 5 - FACILITY REQUIREMENTS

CHAPTER 5 - FACILITY REQUIREMENTS CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the

More information

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update Table of Contents 7.1. Airport Layout Plan (Existing Conditions)... 2 7.2. Airport Layout Plan (Future Conditions)... 3 7.3. Technical Data Sheet... 5 7.4. Commercial Terminal Area Drawing... 5 7.5. East

More information

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1 Feb. 27, 2017 HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Welcome Curtis Robinhold, Port of Portland 1 HILLSBORO

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

Preliminary Findings of Proposed Alternative

Preliminary Findings of Proposed Alternative Preliminary Findings of Proposed Alternative The attached drawing provides a schematic layout of the proposed alternative that will be discussed on July 27, 2010. A full report will follow and should be

More information

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.

ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad. Arcadia GeneralAviationAirport ArcadiaMunicipalAirportislocatedonthesoutheast sideofarcadia,southofstateroute70,westofstate Route31,andisaccessiblefrom AirportRoad.Arcadia islocatedapproximately30milesnortheastoftheport

More information

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT chapter 5 Recommended Master Plan Concept airport master plan The planning process for Coolidge Municipal Airport has included several analytical efforts in the previous chapters intended to project potential

More information

Chapter 9 - AIRPORT SYSTEM DESIGN

Chapter 9 - AIRPORT SYSTEM DESIGN Chapter 9 - AIRPORT SYSTEM DESIGN 9.01 GENERAL This chapter discusses the development program for Dutchess County Airport to the year 2020. This airport system design is based upon the airport's existing

More information

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES Chapter Four Airport Development Alternatives Prior to formulating a development program for Ryan Airfield, it is important to consider development potential

More information

Grants Pass Airport Master Plan & Airport Layout Plan Update

Grants Pass Airport Master Plan & Airport Layout Plan Update Attendees: Grants Pass Airport Master Plan & Airport Layout Plan Update Meeting #3 January 26, 2010 Merlin Community Center 100 Acorn Street, Merlin 5:45 7:15 p.m. Josephine County Department of Airports:

More information

Norfolk International Airport

Norfolk International Airport Norfolk International Airport Master Plan Update Technical Advisory Committee Meeting #1 Community Advisory Committee Meeting #1 January 24, 2018 Agenda Project Background Introductions Overview of Airport

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES

SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES SECTION 5 ALTERNATIVE DEVELOPMENT CONCEPT ANALYSES 5.1 INTRODUCTION This section investigates Airfield Development Alternatives, generalized Land Use Alternatives, and more detailed General Aviation Alternatives.

More information

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan

Chippewa-Eau Claire Metropolitan Planning Area Long Range Transportation Plan 1.2.7 2010 Eau Claire County Comprehensive Plan According to Eau Claire County s most recent comprehensive plan, the County will limit land use development adjacent to EAU in order to preserve the ability

More information

DRAFT MASTER PLAN UPDATE

DRAFT MASTER PLAN UPDATE DRAFT MASTER PLAN UPDATE CHAPTER VI: AIRPORT LAYOUT PLAN NARRATIVE DRAFT REPORT APRIL 2017 PREPARED BY: Table of Contents WESTCHESTER COUNTY AIRPORT 6 AIRPORT LAYOUT PLAN NARRATIVE REPORT... 6-1 6.1 AGIS

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i

TABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term

More information

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item. Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Introduction DRAFT March 9, 2017

Introduction DRAFT March 9, 2017 Chapter Overview The City of Redmond (City) initiated an update to the Airport Master Plan ( Plan ) to assess the facility and service needs of the Redmond Municipal Airport ( the Airport ) throughout

More information

Source: Chippewa Valley Regional Airport ASOS, Period of Record

Source: Chippewa Valley Regional Airport ASOS, Period of Record Chapter 1 Inventory Runway wind coverage is the percentage of time a runway can be used without exceeding allowable crosswind velocities. Allowable crosswind velocities vary depending on aircraft size

More information

Chapter 5 Airport Development Alternatives

Chapter 5 Airport Development Alternatives Chapter 5 Airport Development Alternatives Introduction CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-1 Evaluation Process No-Action Alternative CHAPTER 5 AIRPORT DEVELOPMENT ALTERNATIVES JUNE 2013-2

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Why are the underground fuel tanks being removed and replaced with above ground tanks?

Why are the underground fuel tanks being removed and replaced with above ground tanks? AIRPORT/CITIZEN FAQ This list of Frequently Asked Questions (FAQs) with responses are provided to share information related to airport topics with the Citizens of Georgetown. The questions / responses

More information

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Airlake Airport 2035 Long Term Comprehensive Plan (LTCP) Public Informational Meetings August 9 & 10, 2017 Draft LTCP Overview Briefing Agenda Airport Role & Context Existing Conditions & Previous Plan

More information

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017 Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,

More information

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013 New York State Department of Transportation Safety, Infrastructure, and Tenant Improvement Project Public Hearing Informational Brochure February 26, 2013 This DEIS/Draft EA evaluates the potential impacts

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4 MASTER PLAN UPDATE Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT Meeting #4 December 14, 2017 Today s Agenda o Welcome o Introductions o Progress update o Alternatives analysis

More information

Aviation, Rail, & Trucking 6-1

Aviation, Rail, & Trucking 6-1 6-1 This chapter describes the services, facilities, and condition of air, rail, and trucking as components of the transportation system. These three intermodal areas have an impact on the factors to be

More information

Chapter 4 Development Alternatives

Chapter 4 Development Alternatives LAKE COUNTY AIRPORT MASTER PLAN UPDATE The preceding chapter identified deficiencies of the Lake County Airport (Airport) with respect to existing and anticipated aeronautical demand, which are consistent

More information

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application PUBLIC NOTICE ***************************** New Castle Airport Intention to File a Passenger Facility Charge (PFC) Application The Delaware River & Bay Authority (DRBA), the sponsor of the New Castle Airport

More information

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES Airport Layout Plan Report In this chapter, existing components of the Airport are evaluated so that the capacities of the overall system are identified.

More information

Existing Facilities. Current and Forecast Demand

Existing Facilities. Current and Forecast Demand Existing Facilities Albert Whitted Airport is owned and operated by the City of St. Petersburg ( City ). The airport property encompasses approximately 119 acres. The airport is served by two intersecting

More information

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan Technical Report #7 Palm Beach International Airport Layout Plan Palm Beach International Airport Prepared for Palm Beach County

More information

Chapter 4.0 Facility Requirements

Chapter 4.0 Facility Requirements Chapter 4.0 Facility Requirements Having inventoried the existing infrastructure and forecasted demand, determining airport facility requirements is the next essential step in the airport master planning

More information

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot

Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot Input Efforts Online survey of tenants and users Focus group meetings with Tenants and users Agencies and stakeholders General Aviation Pilot community Airport Advisory Board meetings Elected Officials

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long

15 Precision Approach Path Indicator 33 None RSA 150 feet wide by 300 feet long 150 feet wide by 300 feet long The first (AMP) was completed in 1984 and updated in 2000. The current FAA approved Airport Layout Plan (ALP) is dated November 9, 2001. The FAA suggests updating the AMP every five year in accordance

More information

Dallas Executive Airport Town Hall Meeting April 3, 2014

Dallas Executive Airport Town Hall Meeting April 3, 2014 Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

BELFAST MUNICIPAL AIRPORT OVERVIEW

BELFAST MUNICIPAL AIRPORT OVERVIEW BELFAST MUNICIPAL AIRPORT OVERVIEW LOCATION AND HISTORY Belfast Municipal Airport (Federal Aviation Administration (FAA) airport code BST, International Civil Aviation Organization airport code KBST, FAA

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update Chapter Six ALP Drawings Master Plan Update The master planning process for the (Airport) has evolved through efforts in the previous chapters to analyze future aviation demand, establish airside and landside

More information

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business

More information

Master Plan Update Technical Advisory Committee Meeting

Master Plan Update Technical Advisory Committee Meeting Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives

More information

What is an Airport Master Plan?

What is an Airport Master Plan? What is an Airport Master Plan? The goal of a master plan is to provide the framework needed to guide future airport development that will cost-effectively satisfy aviation demand, while considering potential

More information

Agenda: SASP SAC Meeting 3

Agenda: SASP SAC Meeting 3 Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification

More information

Technical Advisory Committee Briefing #3

Technical Advisory Committee Briefing #3 (PRELIMINARY DRAFT) WORK IN PROGRESS - FOR DISCUSSION PURPOSES ONLY Technical Advisory Committee Briefing #3 June 22, 2018 Master Plan Schedule Overview Coordination Review Recommended Remote 5-Gate Facility

More information

CHAPTER 6 ALTERNATIVES ANALYSIS

CHAPTER 6 ALTERNATIVES ANALYSIS CHAPTER 6 ALTERNATIVES ANALYSIS 6 6 ALTERNATIVES ANALYSIS INTRODUCTION The purpose of this chapter is to identify and evaluate alternative development strategies for long-range development planning at

More information

Crystal River Airport Master Plan Update

Crystal River Airport Master Plan Update Crystal River Airport Master Plan Update Final Report November 2017 Prepared for: Citrus County, FL Prepared by: URS Corporation and American Infrastructure Development, Inc. Crystal River Airport Master

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

Facility Requirements

Facility Requirements 4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal

More information

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project #

EXHIBIT A. LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # EXHIBIT A LOMPOC AIRPORT MASTER PLAN SCOPE OF WORK AIP Project # 3-06-0125-11 INTRODUCTION The following proposed work program for the Lompoc Airport Master Plan describes in detail the work which is to

More information

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, 2018 Airport Master Plan WELCOME & INTRODUCTIONS Kimberly Moss, Doug Hammon (The Ohio State University) 2 Member Introduction Name Organization 3 MEETING

More information

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS

CHAPTER 3 AIRPORT FACILITY REQUIREMENTS CHAPTER 3 AIRPORT FACILITY REQUIREMENTS 3.1 Introduction The existing runway and taxiway system at Skyhaven Airport provides more than adequate operational capacity to accommodate future peak hour and

More information

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016

PLU Airport Master Plan. Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 PLU Airport Master Plan Master Plan Advisory Committee (MPAC) Meeting #2 October 16, 2016 Meeting Agenda 1. Introductions and Contacts [10 Minutes] 2. Plan Overview and MPAC Role [20 Minutes] 3. MPAC Visioning

More information

Westover Metropolitan Airport Master Plan Update

Westover Metropolitan Airport Master Plan Update Westover Metropolitan Airport Master Plan Update June 2008 INTRODUCTION Westover Metropolitan Airport (CEF) comprises the civilian portion of a joint-use facility located in Chicopee, Massachusetts. The

More information

Request for Proposals. Aviation Service Providers At Tri-Cities Airport

Request for Proposals. Aviation Service Providers At Tri-Cities Airport Request for Proposals Aviation Service Providers At Tri-Cities Airport Proposals Due February 27, 2009 2:00 PM Village of Endicott 1009 E Main St. Endicott, New York 13760 Page 1 of 6 Introduction The

More information

Master Plan Update. Palm Beach County Park Airport. Master Plan Update. Ricondo & Associates, Inc.

Master Plan Update. Palm Beach County Park Airport. Master Plan Update. Ricondo & Associates, Inc. Master Plan Update Palm Beach County Park Airport Master Plan Update Prepared for Palm Beach County Department of Airports TB102006004WPB October 31, 2006 Prepared by In association Ricondo & Associates,

More information