A World In Motion. NAV CANADA Overview for CASI December 2013

Size: px
Start display at page:

Download "A World In Motion. NAV CANADA Overview for CASI December 2013"

Transcription

1 A World In Motion NAV CANADA Overview for CASI December 2013

2 Who We Are About NAV CANADA Private, non-share capital company 2nd largest ANSP in the world 12 million aircraft movements annually 18 million square km of airspace Regulated by Federal Government on Safety Performance

3 Our People 4,650 employees across the country Air Traffic Controllers Flight Service Specialists Engineering and IM Corporate Functions Electronics Technologists

4 Our Services Air Traffic Control Flight Information Weather Briefings Aeronautical Information Airport Advisory Services Electronic Navigation Aids

5 Our Mission Statement NAV CANADA facilitates the safe movement of aircraft, efficiently and cost effectively, through the provision of air navigation services on a long-term, sustainable basis.

6 Overarching Objectives Safety record: top decile ANS customer service charges: bottom quartile, and decline over long term Modern, cost-efficient technology: top quartile Providing value to our customers: improving operational efficiency in technology and services Create productive/fulfilling workplace Environment: Contribute where feasible to reduced aviation footprint

7 The ANS Transfer Private company: Canada Not-for-profit Corporations Act Purchased from Federal Government: $1.5 B in 1996 No equity ; no government subsidies Supported through service charges Financed through public bond markets $2.0 billion in various debt maturities, AA credit ratings

8 5 Members Unions Federal Government Commercial Carriers General Aviation Director member

9 Governance Structure: Board of Directors Members elect directors: Commercial Carriers: 4 General Aviation: 1 Federal Government: 3 Unions: 2 4 unrelated directors elected by the Board as a whole through the Director member President and CEO

10 Our Customers (± 40,000) Airlines Air Cargo Operators Air Taxi, Air Charter Operators, Helicopter Operators General and Business Aviation (30,000)

11 Canadian Airspace Characteristics Vast distances Climate varies from polar to temperate Crossroads of global air traffic flows Busiest oceanic airspace in the world Unique northern airspace operations Stimulus for innovation

12 7 Area Control Centres

13 41 Air Traffic Control Towers

14 56 Flight Service Stations

15 8 Flight Information Centres

16 51 Community Aerodrome Radio Stations

17 33 Maintenance Centres

18

19 Safety Rate of IFR/IFR losses of separation per 100,000 aircraft movements (5 year moving average)

20 Service Charges Introduced in Air Transportation Tax (ATT) abolished Terminal, enroute, oceanic Can only be set at the level required to meet our financial requirements of providing ANS services Must adhere to other charging principles covering safety, nondiscriminatory pricing, Northern Services etc. Charges can be appealed

21 INDEX TO 1999 Service Charges HISTORY OF NAV CANADA RATE CHANGES (1) VERSUS CONSUMER PRICE INDEX (2) (1) Average changes since charges were fully implemented on March 1, 1999 (2) Consumer Price Index growth assumed to be 1.8 per cent for 2012

22 Technology Progress Investment over $1.9 billion in new systems, technology and facilities since 1996

23 CIFER Collaborative Initiatives for Emissions Reductions Canadian ANS initiatives that support improved efficiency and reduction in GHG emissions Annual status report forecasts GHG reductions and fuel savings to 2020 Summarizes our most recent OPPORTUNITIES

24 $2.6B customer fuel savings M $7.4B projected total fuel savings metric tons of greenhouse gas emissions avoided M metric tons of greenhouse gas emissions reductions forecasted

25 Northern Airspace Surveillance 7 new Northern radar sites Improvements: safety, efficiency Coverage: 1M sq km of airspace Complete 2004

26 Automatic Dependent Surveillance - Broadcast Supports radar-like separation 1/10th installed cost Preferred routes, reductions in fuel consumption & GHG emissions Hudson Bay implemented January 2009 North East Coast-Greenland:

27 North Warning System: ADS-B Integration Eastern portion of Canadian North Labrador coast and southern Baffin Island Implemented October 2010 Immediate benefits in Gander Domestic and Oceanic airspace

28 Surveillance 1996

29 Northern Radar Program 2004

30 Hudson Bay ADS-B 2009

31 East Coast/Oceanic ADS-B

32 Northern Warning Radar

33 Extended Coverage A flight through ADS-B coverage (Greenland, East Coast, Hudson s Bay) could traverse approximately 3,300 kms of ADS-B surveillance

34 Number of Flights Polar Routes Growth Traffic on polar routes increased more than 10X between 2003 and 2011 Year

35 Aireon LLC is a joint venture between Iridium Communications Inc. and NAV CANADA. Harris Corporation and ITT Exelis are supporting this transformative venture with strategy and technical expertise.

36 Transforming Skyways Iridium NEXT, a constellation of 66 cross-linked Low Earth Orbit (LEO) satellites, extends ADS-B coverage to every flight path across the planet Will enable all air traffic management agencies around the globe to improve: operational efficiencies, fuel savings and use of air space Designed as a platform for innovation and growth and Will generate business opportunities for partners and customers around the world

37 Network: LEO Satellites

38 Estimation based on Iridium commissioned independent studies A Transformative Solution

39 Benefits First ever complete pole-to-pole coverage Estimated annual fuel savings of $125 million for North Atlantic Enhanced safety and decreased congestion Increased air operations capacity and efficiency Reduced emissions and environmental impact

40 Multilateration (MLAT) Wide Area Multilateration (WAM): Fort St. John, Kelowna, Vancouver Harbour Expansion underway Vancouver Mainland and Fredericton Surface MLAT: Montreal Trudeau, Calgary, Toronto Pearson International Airports

41 Video Surveillance Acquired controlling interest in Searidge Technologies Provides ATC-grade video surveillance solutions Exclusively focused on the Air Navigation Services (ANS) industry (ANSPs, Airports)

42 Customers include: Abu Dhabi International Airport Cologne Bonn Airport DFS Deutsche Flugsicherung Federal Aviation Administration (FAA) /Teterboro Airport Malta Air Traffic Services Munich Airport NAV CANADA/Ottawa International Airport (testing enhanced surveillance) Porter Airlines/Billy Bishop Toronto City Airport Future Canadian deployments: Montreal, London

43 Canadian Automated Air Traffic System World leading automated flight data processing system

44 CAATS Now operational at all Area Control Centres across the country 44

45 More Modernization CAATS Safety Net Features Conflict Alert Medium Term Conflict Detection Airspace Warning Feature (AWF) Minimum Safe Altitude Warning (MSAW)

46 Controller Pilot Datalink Communications Full domestic deployment nearing completion

47 Gander Automated Air Traffic System (GAATS) + Advanced oceanic ATC system (SAATS in UK) Automates flight data processing, integrates ADS position reports and CPDLC communications Faster response to customer requests Supports reduced oceanic separation Now integrated with Oceanic ADS-B

48

49 Integrated Tower Automation Products Innovative air traffic management systems designed by operational ATC professionals.

50 Canadian Deployment 1st Generation: Electronic Flight Strips in Toronto Now at all 41 Towers Expanding to Flight Service Stations 50

51 World Technology Sales

52 World Technology Sales : UK Towers Stansted, Gatwick, Luton, Heathrow, London City, Edinburgh, Aberdeen, Glasgow, Manchester 2005: Naviair Copenhagen 2009: Air Services Australia (Sensis) Adelaide, Melbourne, Rockhampton, ATC Centre and Learning Academy 2011: Dubai International Dubai World Netherlands Antilles Hong Kong

53 More Modernization New Flight Inspection Aircraft and System Upgraded/expansion weather cameras and automated weather observation system

54 Total Proposed Weather Sites (Wx): 88 AWOS Sites 217 Wx Cam Sites (Phase 1 & 2) 196 Human Wx Sites Current Installation Status 79 AWOS Sites Installed 148 Wx Cam Sites Installed 113 HWOS Sites Installed

55 More Modernization Electronic NAVAIDS Fielded systems: 115 Distance Measuring Equipment units (DME) 118 Instrument Landing Systems (ILS)

56 New Tower - Edmonton

57 New Tower - Calgary New Tower - Calgary

58 Expanding Performance-Based Navigation (PBN)

59 Area Navigation (RNAV) Uses GNSS and space-based systems Improves airport accessibility and enroute efficiency Total Benefits to ,768,000 mt CO 2 e CAD $448 M in avoided fuel costs

60 Required Navigation Performance (RNP) Short turn approaches feature constant descent Total Benefits to ,000 mt CO 2 e CAD $83 M in avoided fuel costs

61 RNP Short Approach Standard Flight Path Radius to fix (short) transition Short Approach RNP Aircraft RF Leg to Final saves 10 miles 100 RNP Procedures & 22 Short Approaches published to date 61

62 Windsor Toronto Montreal Airspace Design Improved safety Improved efficiency GPS-based routings and procedures Airport arrival and departure procedures Reduced cumulative flight time by over 10 hours daily over all three cities and in enroute airspace

63 WTM Design Benefits The effects of tactical ATC interventions to reduce route congestion, route length and climb/descent interferences results in a combined savings of : 10 hours of flying time per day 5.4 millions litres of fuel per year metric tons of CO 2 per year

64 Best Air Navigation Service Provider International Air Transport Association (IATA) Eagle Award Program

65

IMPLEMENTATION OF ADS-B BY NAV CANADA

IMPLEMENTATION OF ADS-B BY NAV CANADA IMPLEMENTATION OF ADS-B BY NAV CANADA Carole Stewart-Green Manager, ATS Regulatory Coordination ABOUT NAV CANADA Private, non-share capital company Second largest ANSP in the world 12 million aircraft

More information

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009

ACI-NA Conference NextGen at NAV CANADA. John Crichton President and Chief Executive Officer October 11, 2009 ACI-NA Conference NextGen at NAV CANADA John Crichton President and Chief Executive Officer October 11, 2009 IATA Roadmap Functions Current Planned Not Planned Automated ATC Coordination CAATS Early Issue

More information

ADS-B via Low Earth Orbiting Satellites Benefits Assessment

ADS-B via Low Earth Orbiting Satellites Benefits Assessment ADS-B via Low Earth Orbiting Satellites Benefits Assessment Jeff Dawson Director, Operational Support NAM/CAR ANI/WG/1 July 2013 Aireon LLC is a joint venture between NAV CANADA and Iridium to finance,

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

TECHWATCH WINTER 2015 EDITION

TECHWATCH WINTER 2015 EDITION TECHWATCH WINTER 2015 EDITION TECHWATCH is published twice a year to provide customers and stakeholders with updated information regarding the technology and systems developed and used by NAV CANADA. Table

More information

ADS-B Implementation Update 2011 CNS/ATM Conference

ADS-B Implementation Update 2011 CNS/ATM Conference ADS-B Implementation Update 2011 CNS/ATM Conference Prepared by Jeff Cochrane Manager, CNS Service Design June 2011 Briefing Overview Canadian ADS-B Implementation Review of Requirements for ADS-B surveillance

More information

Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018

Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018 Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018 Alan Khalili, CFO - Aireon Aircraft Builders Conference September 22, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED.

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

NATA 2018 AGM & CONFERENCE

NATA 2018 AGM & CONFERENCE NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization

More information

Technology driving opportunities for customers over the North Atlantic

Technology driving opportunities for customers over the North Atlantic Technology driving opportunities for customers over the North Atlantic NAV CANADA has extended its surveillance to cover a 1.3 million square kilometre portion of airspace over the North Atlantic (coverage

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration

Federal Aviation. Administration. FAA Overview. Federal Aviation. Administration Presented to: AFCEA International Los Angeles By: William C. Withycombe Regional Administrator, Western-Pacific Region Date: Overview! Major Safety Initiatives! Organizational Structure! Destination 2025!

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015 Space Based ADS-B Transforming the Way you See the Sky September 23, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED. 2014 AIREON LLC. ALL RIGHTS RESERVED. 1 For optimal operational ATM Performance

More information

Introduction of Aireon: Value extraction from technical opportunity

Introduction of Aireon: Value extraction from technical opportunity Space based ADS B ADS B Seminar Hong Kong 22 April 2014 Introduction of Aireon: Value extraction from technical opportunity 1 Aireon LLC is a joint venture between NAV CANADA, IAA, ENAV, NAVIAR and Iridium

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

New York Aviation Management Association Conference

New York Aviation Management Association Conference New York Aviation Management Association Conference Presented by: Carmine W. Gallo Federal Aviation Administration Eastern Region Regional Administrator September 14, 2016 1 The What is and Benefits of

More information

(Presented by the United States)

(Presented by the United States) International Civil Aviation Organization 31/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Edmonton International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 January 2018 The information

More information

ENRI International Workshop on ATM/CNS

ENRI International Workshop on ATM/CNS NextGen Next Generation Air Transportation System ENRI International Workshop on ATM/CNS Presented by: Jay Merkle Manager, System Engineering Integration, NextGen and Operations Planning Date: 12 November

More information

Thank you, Director Heijl and Bon Jour. It s good to be back in Montreal for this important symposium.

Thank you, Director Heijl and Bon Jour. It s good to be back in Montreal for this important symposium. Keynote Speech by Ms. Victoria Cox, Vice President, Operations Planning United States Federal Aviation Administration Air Traffic Organization Worldwide Symposium on Performance of the Air Navigation System

More information

Benefits of CNS/ATM Implementation for the Region

Benefits of CNS/ATM Implementation for the Region Benefits of CNS/ATM Implementation for the Region IATA today www.iata.org 227 Airline Members from 143 countries accounting for 94% of total international traffic 200 partners Representation in 90 countries

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

Space Based ADS-B. Transforming the Way you See the Sky February, 2015 Space Based ADS-B Transforming the Way you See the Sky February, 2015 The current ATM reality 2 Significant challenges for airlines High physical infrastructure costs Duplication of signals / contingency

More information

Introduction of New CANSO Member Simon Li Director General CAD Hong Cong

Introduction of New CANSO Member Simon Li Director General CAD Hong Cong Introduction of New CANSO Member Simon Li Director General CAD Hong Cong Mr. Simon Li Director-General of Civil Aviation Hong Kong, China 2 Introduction to Civil Aviation Department Embracing New Challenges

More information

CMATS The Civil Military ATM System

CMATS The Civil Military ATM System CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Halifax Stanfield International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November 2017 The information

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

THE EXECUTIVE REFERENCE GUIDE TO SPACE-BASED ADS-B

THE EXECUTIVE REFERENCE GUIDE TO SPACE-BASED ADS-B THE EXECUTIVE REFERENCE GUIDE TO SPACE-BASED ADS-B Delivering Global Air Traffic Surveillance To All Aviation Stakeholders Air Traffic Surveillance: An Introduction Determining an Aircraft Position A

More information

ENVIRONMENT ACTION PLAN

ENVIRONMENT ACTION PLAN ENVIRONMENT ACTION PLAN 2015 16 Airservices Australia 2015 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process without prior written

More information

Aireon project to extend ADS-B surveillance throughout globe

Aireon project to extend ADS-B surveillance throughout globe Aireon project to extend ADS-B surveillance throughout globe A new joint venture to install Automatic Dependent Surveillance Broadcast (ADS-B) receivers on a constellation of Low Earth Orbit (LEO) satellites

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Concept of Ops: A Strawman

Concept of Ops: A Strawman Concept of Ops: A Strawman Presentation Outline Introduction to Concept of Operations Examples for Different Domains Major Drivers for Change Regional Harmonisation of Block changes Development of Block

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

HungaroControl. More than an Air Navigation Service Provider

HungaroControl. More than an Air Navigation Service Provider HungaroControl More than an Air Navigation Service Provider Ministry of National Development Controlling Institution Industry Stakeholders DGCA National Supervisory Authority Transportation Safety Bureau

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air

More information

ALERT: Aireon announces new global emergency response tracking service

ALERT: Aireon announces new global emergency response tracking service NAV CANADA DIRECT ROUTE ALERT: Aireon announces new global emergency response tracking service In late September, Aireon announced its intention to provide a free global aircraft tracking service to the

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

SUMMARY. of the North. Reference: A B

SUMMARY. of the North. Reference: A B International Civil Aviation Organization South American Regional Office 10/ /10/17 Twentieth Workshop/Meeting of the SAM Implementation Group (SAM/IG/20) - Regional Project RLA/06/901 (Lima, Peru, 16

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

NextGen Equipage Impact on Airlines and MROs April 16, 2013

NextGen Equipage Impact on Airlines and MROs April 16, 2013 NextGen Equipage Impact on Airlines and MROs April 16, 2013 www.nexacapital.com Without NextGen equipage by operators, there will be no NextGen Marion C. Blakey President, Aerospace Industries Association

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY

3.3 Specific Developments in Air Navigation CNS AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) (Presented by the United States of America) SUMMARY International Civil Aviation Organization 23/02/12 North American, Central American and Caribbean Office (NACC) Seventh Central American Air Navigation Experts Working Group Meeting (CA/ANE/WG/7) Ninth

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

NextGen. Accomplishments. Federal Aviation Administration

NextGen. Accomplishments. Federal Aviation Administration NextGen Accomplishments Presented to: Illuminating Engineering Society Aviation Lighting Committee Government Contacts Subcommittee By: Pamela Whitley, Acting Director for NextGen Integration & Implementation

More information

Air Traffic Management

Air Traffic Management Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of

More information

NextGen and ASPIRE Environmental Initiatives

NextGen and ASPIRE Environmental Initiatives ICAO Colloquium on ICAO Colloquium on Aviation Aviation Climate Change andand Climate Change NextGen and ASPIRE Environmental Initiatives Presented to: By: Date: ICAO Colloquium Maria A. DiPasquantonio

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013

AIM and PBN Airport Community Benefits. IAAE Saskatoon, May 2013 AIM and PBN Airport Community Benefits IAAE Saskatoon, May 2013 1 AIM Fit for Purpose Information Chain Business Plan PBN Overview Implementation 2 AIM to IM FIT FOR PURPOSE Aeronautical Terrain and Obstacles

More information

DFS Aviation Services GmbH. A brand of experience. Aviation Services

DFS Aviation Services GmbH. A brand of experience. Aviation Services DFS Aviation Services GmbH A brand of experience Aviation Services Who we are Company profile DFS Aviation Services GmbH offers a wide range of products and services related to air navigation services

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)

More information

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. BOBASIO 3-WP/09 22-24/10/2013 The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013. Agenda Item 7: Green Initiatives

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services NextGen's ADS-B - the FAA's Plan to Modernize our National Air Transportation System, and What It Means to You To: Texas General Aviation Summit By: Tim Schroeder, SBS

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

Draft PBN Implementation Plan Papua New Guinea

Draft PBN Implementation Plan Papua New Guinea Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN

More information

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY 20 th E/CAR DCA-IP/12 International Civil Aviation Organization 21/11/06 NORTH AMERICAN, CENTRAL AMERICAN AND CARIBBEAN OFFICE Twentieth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

ATC automation: facts and steps ahead

ATC automation: facts and steps ahead ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC

More information

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015

2.6% /14 Forward Plan. 4.1 Traffic Outlook. Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4 2013/14 Forward Plan 2.6% Eurocontrol STATFOR s 2013 Medium-Term Forecast for 2015 4.1 Traffic Outlook Traffic levels continue to be affected by a combination of the fragile economic situation in the

More information

Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101. A Plain Speak White Paper. on the. Current and Near-Term Future. As Air Navigation Transitions

Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101. A Plain Speak White Paper. on the. Current and Near-Term Future. As Air Navigation Transitions Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101 A Plain Speak White Paper on the Current and Near-Term Future As Air Navigation Transitions from Ground Based Radar to Satellite Based ATC Assistance

More information

Surveillance and. Program Status. Federal Aviation Administration Broadcast Services. To: By:

Surveillance and. Program Status. Federal Aviation Administration Broadcast Services. To: By: Surveillance and Broadcast Services Program Status To: By: Date: International Helicopter Safety Team Jim Linney, Central Service Area Program Manager September 30, 2009 Background: Automatic Dependent

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

South Dakota Airports Conference

South Dakota Airports Conference South Dakota Airports Conference Federal Aviation Presented to: By: Date: Conference Attendees Barry D. Cooper March 18, 2015 Legislation: FAA Reauthorization Annual Appropriation Sequester Federal Aviation

More information

Captain Jeff Martin Senior Director Flight Operations Southwest Airlines

Captain Jeff Martin Senior Director Flight Operations Southwest Airlines Captain Jeff Martin Senior Director Flight Operations Southwest Airlines Southwest s Fleet Southwest achieves one of its primary competitive strengths low operating costs by operating only one aircraft

More information

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS

FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS FIJI s STATE ACTION PLAN FOR THE REDUCTION OF AVIATION GREENHOUSE GAS EMISSIONS FOREWORD To meet ICAO Assembly Resolution A38-18, Fiji has put together this State Action Plan detailing its actions to reduce

More information

Doing things differently

Doing things differently Doing things differently To navigate this document; click on the page names below or use the arrows in the top left corner. Doing things differently The leading ANSP Alliance that enables its members to

More information

ICAO UPDATE. (Presented by the Secretariat)

ICAO UPDATE. (Presented by the Secretariat) International Civil Aviation Organization 29/05/15 CAR/SAM Planning and Implementation Regional Group (GREPECAS) Third Meeting of the Programmes and Projects Review Committee (PPRC/3) (Mexico City, Mexico,

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

FAA Update Society of American Military Engineers

FAA Update Society of American Military Engineers FAA Update Society of American Military Engineers May 8, 2013 Presented by Joseph Miniace Regional Administrator FAA Central Region Current FAA FAA Mission is to provide the safest, most efficient aerospace

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

AERONAUTICAL INFORMATION CIRCULAR 33/17

AERONAUTICAL INFORMATION CIRCULAR 33/17 NAV CANADA 07 DEC 17 AERONAUTICAL INFORMATION CIRCULAR 33/17 Introduction NOTICE OF PLANNED EXPANSION OF THE TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE INTERNATIONAL CIVIL

More information

The challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal

The challenges of growth, the growth of challenges Airports Canada 2013 April 11, JAMES C. CHERRY CEO Aéroports de Montréal The challenges of growth, the growth of challenges Airports Canada 2013 April 11, 2013 JAMES C. CHERRY CEO Aéroports de Montréal AGENDA THE CHALLENGES OF GROWTH, THE GROWTH OF CHALLENGES Trafic growth

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

Harris Experience in the U.S. Surveillance Broadcast Systems (SBS)

Harris Experience in the U.S. Surveillance Broadcast Systems (SBS) Harris Experience in the U.S. Surveillance Broadcast Systems (SBS) Copyright 2015 Harris Corporation. This document is classified as EAR99 according to the EAR under Commerce Department jurisdiction. There

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions

International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics. Paul Willis Managing Director, Aviation Solutions International Conference Air Transport, Airports, Air Navigation & Globalisation of the Economics Paul Willis Managing Director, Aviation Solutions Overview Some of the Challenges Future Technology Capacity

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004

Federal Aviation Administration Flight Plan Presented at the Canadian Aviation Safety Seminar April 20, 2004 Federal Aviation Administration Flight Plan 2004-2008 Presented at the Canadian Aviation Safety Seminar April 20, 2004 Challenges Reducing an Already Low Commercial Accident Rate Building an Air Traffic

More information

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren

NATS TMA Programmes. #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA. Mark McLaren NATS TMA Programmes #120_AF1 LAMP Phase 1A and #119_AF1 Manchester TMA Mark McLaren Pilot Common Projects (PCP) IR 716/ 2014 PCP identifies two UK TMAs and includes four airports Heathrow Gatwick Stansted

More information

DFS Aviation Services GmbH. A brand of experience

DFS Aviation Services GmbH. A brand of experience EN DFS Aviation Services GmbH A brand of experience Published by DFS Aviation Services GmbH Heinrich-Hertz-Straße 26 63225 Langen Germany www.dfs-as.aero Photo credits DFS Deutsche Flugsicherung GmbH,

More information