PBN Navigation Specification
|
|
- Gillian Wilkinson
- 6 years ago
- Views:
Transcription
1 PBN Navigation Specification & TM esign Victor Hernandez RO TM/SR November 2013 Page 1
2 Navigation Specification, Flight Phase The En route Terminal pproaches: latest rrivals: epartures: continental: edition PCH RNV of the RNV (LNV), 5, PBN RNV 2, 5, Manual, RNV RNP 2, RNV 1, 2, ICO dvanced RNV 1, (LNV/VNV), oc dvanced 1, 9613 RNP, 2, contains RNP, dvanced RNP 1 RNP and PCH 1, RNP and (LPV) and 0.3 RNP (for and RNP 0.3 Enroute Oceanic/Remote: RNV 10, RNP 4, RNP 2 and dvanced RNP specifications (for helicopters RNP beyond the dvanced Only There RNV RNP initial applies 5 once en route 50m navigation (40m Cat H) specification obstacle clearance which may has been used achieved the (for after initial R 0.3 are 30 helicopters PCH part only) 1 is and start NM RNP two applicable intermediate from also sections permits the to that of only) a cover: of only) STR climb. outside is to airport RNP limited the a segments range PCH RNP reference 30 NM to of PCH Part use scalable of and on instrument specification; point. above STRs, ifferent (RP), MS. SIs, lateral approach angular the Part navigation accuracy performance is procedures enabled value accuracies by for and The Optional RNP 0.3 requires specification higher is continuity. primarily intended for helicopter operations. the alerting GNSS requirements see missed the and becomes PBN approach Baro Manual, are VNV, 2 applicable NM. after Vol. Part the II., B to Part is initial enabled RNP C, climb Chapter PCH by phase; Part SBS. 4, paragraph B only Navigation Specification En route oceanic/remote En route Continental Flight phase rrival pproach eparture Initial Intermediate Final Missed 1 RNV RNV RNV RNV RNP 4 4 RNP RNP dvanced RNP or RNP PCH RNP R PCH RNP November 2013 Page 2
3 PBN irspace Concept RNV 5/2 (Continental) Continuous escent Operations (CO s) RNP 10-4 (Oceanic) RNP 2 RNV 1/2 RNP 1/2 November 2013 Page 3
4 Overview OBJECTIVE Methodology STEPS This module will provide an good understanding of irspace volumes and Sectorisation in support of ir traffic Management November 2013 Page 4
5 Three GOLEN RULES Methodology STEPS irspace Volumes protect the IFR Flight paths. They are esigned FTER the routes have been designed. Routes should not be designed so as to fit into pre-existing irspace Volumes. Only delineate as much airspace volume as needed. November 2013 Page 5
6 oc 4444 TM Terminal control area control area normally established at the confluence of TS routes in the vicinity of one or more major aerodromes. En-route TM CTR November 2013 Page 6
7 TM TM - Terminal area surrounds an airport, and it is an airspace within which air traffic control service is provided. Such airspace predominantly contains traffic operating along Terminal Routes. The above description is aimed at including TM, CT, CTR, TZ airspace classification or any other nomenclature used to describe the airspace around an airport. En-Route T CTR November 2013 Page 7
8 Competing Interests STRUCTURES & SECTORS: Objectives TC REQUIREMENTS SFETY, CPCITY & EFFICIENCY SUFFICIENT IRSPCE TO CCOMMOTE - ROUTES (TCTICL N PUBLISHE) HOLING PTTERNS TRFFIC SEQUENCING TECHNIQUES USER REQUIREMENTS Unhindered airspace access ENVIRONMENTL REQUIREMENTS irspace STRUCTURES & SECTORS: Objectives TC REQUIREMENTS SFETY, CPCITY & EFFICIENCY SUFFICIENT IRSPCE TO CCOMMOTE - ROUTES (TCTICL N PUBLISHE) HOLING PTTERNS TRFFIC SEQUENCING TECHNIQUES USER REQUIREMENTS Unhindered airspace access ENVIRONMENTL REQUIREMENTS irspace Prohibitions over cities, natural parks, residential areas November 2013 Page 8
9 irspace Volumes W E RRIVLS EPRTURES RWY EP 3% EP 7% E P 10% RR MX RR 3 0 Controlled irspace W E November 2013 Page 9
10 irspace Volumes Protect IFR Flight Paths Uncontrolled irspace St1 Uncontrolled irspace St1 St2 St2 Uncontrolled irspace Uncontrolled irspace St1 St2 November 2013 Page 10
11 irspace Volumes o not take more airspace than needed. November 2013 Page 11
12 Terminal irspace X X X VFR irport CITY Y CITY Y CITY 4 1 Terminal irspace (s per Chapter 6) X X 5 S4 2 Terminal irspaces N Sectorised New northern Holds More IFR Traffic ENTRY GTE S5 S b S a S6 F 2 Terminal irspaces Parallel RWY added at N New southern Hold More Traffic to Y S f ENTRY GTE S7 Y CITY S3 ENTRY GTE S c S d F S e CITY 2 larger Terminal irspaces Two-Phase holding system More Traffic S2 S1 1 Terminal irspace system with Entry Gates; Revised Sectorisation November 2013 Page 12
13 TM TM May combine two or more sector volume, aimed at improving the design and management of terminal routes and TC sectorisation, servicing several airports in close proximity. November 2013 Page 13
14 Evolution of functions November 2013 Page 14
15 TC Sectorisation Upper CC Sectors Upper CC Sectors CC S1 CC S2 CC S3 CC Lower pproach W pproach E GEOGRPHIC FUNCTIONL November 2013 Page 15
16 GEOGRPHICL SECTORISTION dvantages Controller can fully exploit the space available in sector to manipulate best levels for inbounds/outbounds and expedite climb and descent without need for co-ordination. Easier to balance workload between sectors. Can be less demanding in terms of the Radar isplay and TC system Relatively easily to describe operational instructions for TC areas of responsibility. isadvantages Controller handles mixed traffic i.e. arrival, departure and transit traffic. In instances where the sector division runs along the runway centre-line, departing aircraft departing in different directions may be controlled by different controllers after take-off. (Effective mitigation can be provided by putting appropriate procedures in place). In cases where an aircraft is required to transit more than one geographic sector in the Terminal irspace, this can add to complexity by requiring additional co-ordination. November 2013 Page 16
17 FUNCTIONL SECTORISTION dvantages Controller handles one traffic type i.e. either departures or arrivals because sector defined as a function of task. Usually, all eparting aircraft are on the same frequency after take-off. In some configurations, can prove more flexible to operate. isadvantages Vertical/Lateral limits of sector can prove overly restrictive as one (vertical) band is unlikely to cater for all aircraft performance types. ifficult to balance workload between sectors especially where departure and arrival peaks do not coincide. Can be demanding in terms of the Radar isplay and TC System Operating instructions for TC can be difficult to formulate with respect to areas of responsibility; November 2013 Page 17
18 SECTORISTION void Sector designs that cause stepped climbs or descents November 2013 Page 18
19 Sectorisation TC Sectorisation Maintain holding area in same sector void crossing too close to sector boundary S C S C S C S C S S S S S B S B S B S B Se2 S Se2 S Se4.1 S Se4.1 S S C S C S C S C S S S S S B S B S B S B Se3 S Se3 Sector boundaries should not coincide with route centre lines S November 2013 Page 19 Se7 S Se7 Preferably, keep sectors the same when runway changes S
20 Sectorisation November 2013 Page 20
21 Thank You November 2013 Page 21
Airspace Volumes & Sectorisation Module 13 Activity 9
irspace Volumes & Sectorisation Module 13 ctivity 9 European irspace Concept Workshops for PBN Implementation Overview OBJECTIVE This module will provide an good understanding of irspace volumes and Sectorisation
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationCONTROLLED AIRSPACE CONTAINMENT POLICY
Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon
More informationHoneywell.com PBN Concepts Krakow, Poland
PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationTítulo ponencia: Introduction to the PBN concept
Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based
More informationJeppView for Windows. jep=jeppesen. Airport Information For EDLP Printed on 06 Dec 2017 Page 1. General Information. Runway Information
irport Information For ELP Printed on 06 ec 207 Page (c) SNERSON, IN., 207, LL RIGHTS RESERVE jep= JeppView for Windows General Information Location: PERORN/LIPPSTT EU IO/IT: ELP / P Lat/Long: N5 36.85',
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationTANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES
Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen
Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4
More informationPBN Operational Approval Continental En Route Navigation Specifications
PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationPBN Operational Approval Oceanic and Remote En Route Navigation Specifications
PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationTWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.
International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationAERONAUTICAL INFORMATION CIRCULAR 18/18
NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationJeppView for Windows. List of pages in this Trip Kit. jep=jeppesen. Trip Kit Index
Trip Kit Index Printed on 28 Jun 2015 Page 1 (c) SNERSON, IN., 2015, LL RIGHTS RESERVE jep= JeppView for Windows List of pages in this Trip Kit Trip Kit Index irport Information For TGPY Terminal harts
More informationIRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority
IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance
More informationGestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)
Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationAIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.
AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationDesign Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation
Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which
More informationPLUME RISE ASSESSMENTS
Advisory Circular AC 139-5(1) NOVEMBER 2012 PLUME RISE ASSESSMENTS CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory circular 2 4. Acronyms 2 5. Definitions 3 6. Background 3 7. Key
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationController Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA
Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole
More informationIVAO Flight Operations Department Indonesia (ID) Division Procedures
IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In
More informationConsiderations for Facility Consolidation
Considerations for Facility Consolidation ATC Guild, New Delhi, India October 21, 2010 Mimi Dobbs Overview Why consider consolidation? Co location vs Consolidation Consolidating Methodologies Areas to
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More informationEuropean Aviation Safety Agency
Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation
More informationAPPENDIX F AIRSPACE INFORMATION
APPENDIX F AIRSPACE INFORMATION Airspace Use DEFINITION OF AIRSPACE Airspace, or that space which lies above a nation and comes under its jurisdiction, is generally viewed as being unlimited. However,
More informationIFR SEPARATION WITHOUT RADAR
1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s
More informationPBN and RNAV concepts
PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)
More informationJEPPESEN RNP-1 approval required. If not RNP-1 approved, report to ATC upon first contact. Expect routings according to chart 10-2C.
Printed from JeppView for Windows 5.3.0.0 on 29 Nov 206; Terminal chart data cycle 24-206; Notice: fter 0 ec 206, 0000Z, this chart may no longer be valid LUBLINEK 2 JUN 5 0-2.Eff.25.Jun..RNV.STR. RNP-
More informationOverview ICAO Standards and Recommended Practices for Aerodrome Safeguarding
Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July
More informationRNP AR and Air Traffic Management
RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,
More informationRNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationAppendix K: MSP Class B Airspace
Appendix K: MSP Class B Airspace K All of the open sky covering the United States, from less than an inch off the ground all the way to outer space, is part of America s airspace. This airspace resource
More informationAD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:
More informationSAFETY BULLETIN. One Level of Safety Worldwide Safety Bulletin No. 05SAB004 5 July 2004
IFLP SFETY BULLETIN THE GLOBL VOICE OF PILOTS One Level of Safety Worldwide Safety Bulletin No. 05SB004 5 July 2004 CS II - TCS II and VFR traffic This Document was produced in co-operation with EUROCTROL
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationJeppView for Windows. List of pages in this Trip Kit. jep=jeppesen. Trip Kit Index
Trip Kit Index Printed on 28 Jun 2015 Page 1 (c) JEPPESEN SNERSON, IN., 2015, LL RIGHTS RESERVE jep=jeppesen JeppView for Windows List of pages in this Trip Kit Trip Kit Index irport Information For TLPL
More informationREGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application
Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation
More informationTHE AREA CONTROL CENTRE (CTR) POSITION
THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)
More information1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;
Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS
More informationATM 4 Airspace & Procedure Design
ATM 4 Airspace & Procedure Design 1. Introduction 1.1. The proper planning and design of routes, holding patterns, airspace structure and ATC sectorisation in both terminal and en-route airspace can be
More informationNavigation at the. Federal Aviation Administration Crossroads
Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationNOISE ABATEMENT PROCEDURES
1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions
More informationUK Performance-based Navigation (PBN) Implementation Status
UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current
More informationthe Applicant A P P L I C A N T ' S L I C E N C E N U M B E R : Title First Name Last Name Street Place Postal Country Telephone Fax
Please fill in the framed fields of the form, sign it and send it together with attachments to: USTRO CONTROL GmbH, viation gency, Department LS/PEL/Licencing, Wagramer Straße 19, 1220 Vienna, ustria 1
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationJeppView for Windows. jep=jeppesen. Airport Information For HESH Printed on 06 Dec 2017 Page 1. General Information. Runway Information
irport Information For HESH Printed on 06 ec 207 Page (c) SNERSON, IN., 207, LL RIGHTS RESERVE jep= JeppView for Windows General Information Location: SHRM EL SHEIKH EGY IO/IT: HESH / SSH Lat/Long: N27
More informationJeppView for Windows. jep=jeppesen. Trip Kit Index. Printed on 24 Jan 2013 Page 1. List of pages in this Trip Kit. Trip Kit Index
Trip Kit Index Printed on 24 Jan 203 Page (c) SNERSON, INC., 203, LL RIGHTS RESERVE jep= JeppView for Windows List of pages in this Trip Kit Trip Kit Index irport Information For PK Terminal Charts For
More informationFinal Approach Operations Symposium
Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationEXPLANATION OF TPP TERMS AND SYMBOLS
U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures
More informationApplication for amendment to Tauranga control zone and control areas Consultation
Application for amendment to Tauranga control zone and control areas Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Background... 1 3. Proposal... 1 3. Effect on users... 2 a. VFR traffic...
More informationCE 563 Airport Design
CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA
More informationPBN and Procedure Design training
PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More informationEastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)
PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to
More informationICAO framework for LPV
ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic
More informationFLIGHT OPERATIONS PANEL
International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme
More informationSECTION 4 - APPROACH CONTROL PROCEDURES
SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES
More informationAdvisory Circular. Regulations for Terrain Awareness Warning System
Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective
More informationNextGen Priorities: Multiple Runway Operations & RECAT
NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the
More informationIVAO Switzerland Division
IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating
More informationPBN Implementation inside Italian Airspace Status update Summer 2013
PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions
More informationManual of Radiotelephony
Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments
More informationSAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE
SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this
More informationEFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK
KOUN WESTHEIMER AIRPORT NORMAN, OK 17 09/08 09/09 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon CDT until 7:30 PM CDT Thursday, September 7, 2017 7:00 AM CDT until 7:30 PM CDT Friday, September
More informationPBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain
PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain the example of Innsbruck/Austria Dr.-Ing. Philipp Daniel Schaad Head of Instrument Flight Procedures Austro Control
More informationEFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT
KGON GROTON-NEW LONDON AIRPORT GROTON, CT 17 10/06 10/07 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon EDT until 6:00 PM EDT Thursday, October 5, 2017 7:00 AM EDT until 6:00 PM EDT Friday, October
More informationEASA RNP (AR) Workshop The Landscape Working Together
EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationIFR SEPARATION USING RADAR
IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,
More informationJeppView for Windows. jep=jeppesen. Airport Information For EPLL Printed on 06 Dec 2017 Page 1. General Information. Runway Information
irport Information For EPLL Printed on 06 ec 207 Page (c) SNERSON, IN., 207, LL RIGHTS RESERVE jep= JeppView for Windows General Information Location: LOZ POL IO/IT: EPLL / LJ Lat/Long: N5 43.32', E09
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationContents. Subpart A General 91.1 Purpose... 7
Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91
More informationFlight Operations Inspector Manual
1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and
More informationStandard Operational Procedures
Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and
More informationIntroduction. Appendix D: Airspace Protection
Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection
More informationKenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi
Kenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi 1 Flora K. Wakolo ATM /OPS Objective Share with audience information
More informationA Pilot s perspective
The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes
More informationCivil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace
Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information
More informationMinor engine repairs are available.
irport Information etails for /OSNRUK ity /OSNRUK State/Province ountry EU Latitude N 52 08' 04.7" Longitude E 7 4' 05.39" Elevation 59 Longest Runway 700 Magnetic Variance E.0 Fuel Type 00 Low Lead (LL)
More informationOverview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1
Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications
More informationSULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11
KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.
More informationFederal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017
Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment
More information