PBN Navigation Specification

Size: px
Start display at page:

Download "PBN Navigation Specification"

Transcription

1 PBN Navigation Specification & TM esign Victor Hernandez RO TM/SR November 2013 Page 1

2 Navigation Specification, Flight Phase The En route Terminal pproaches: latest rrivals: epartures: continental: edition PCH RNV of the RNV (LNV), 5, PBN RNV 2, 5, Manual, RNV RNP 2, RNV 1, 2, ICO dvanced RNV 1, (LNV/VNV), oc dvanced 1, 9613 RNP, 2, contains RNP, dvanced RNP 1 RNP and PCH 1, RNP and (LPV) and 0.3 RNP (for and RNP 0.3 Enroute Oceanic/Remote: RNV 10, RNP 4, RNP 2 and dvanced RNP specifications (for helicopters RNP beyond the dvanced Only There RNV RNP initial applies 5 once en route 50m navigation (40m Cat H) specification obstacle clearance which may has been used achieved the (for after initial R 0.3 are 30 helicopters PCH part only) 1 is and start NM RNP two applicable intermediate from also sections permits the to that of only) a cover: of only) STR climb. outside is to airport RNP limited the a segments range PCH RNP reference 30 NM to of PCH Part use scalable of and on instrument specification; point. above STRs, ifferent (RP), MS. SIs, lateral approach angular the Part navigation accuracy performance is procedures enabled value accuracies by for and The Optional RNP 0.3 requires specification higher is continuity. primarily intended for helicopter operations. the alerting GNSS requirements see missed the and becomes PBN approach Baro Manual, are VNV, 2 applicable NM. after Vol. Part the II., B to Part is initial enabled RNP C, climb Chapter PCH by phase; Part SBS. 4, paragraph B only Navigation Specification En route oceanic/remote En route Continental Flight phase rrival pproach eparture Initial Intermediate Final Missed 1 RNV RNV RNV RNV RNP 4 4 RNP RNP dvanced RNP or RNP PCH RNP R PCH RNP November 2013 Page 2

3 PBN irspace Concept RNV 5/2 (Continental) Continuous escent Operations (CO s) RNP 10-4 (Oceanic) RNP 2 RNV 1/2 RNP 1/2 November 2013 Page 3

4 Overview OBJECTIVE Methodology STEPS This module will provide an good understanding of irspace volumes and Sectorisation in support of ir traffic Management November 2013 Page 4

5 Three GOLEN RULES Methodology STEPS irspace Volumes protect the IFR Flight paths. They are esigned FTER the routes have been designed. Routes should not be designed so as to fit into pre-existing irspace Volumes. Only delineate as much airspace volume as needed. November 2013 Page 5

6 oc 4444 TM Terminal control area control area normally established at the confluence of TS routes in the vicinity of one or more major aerodromes. En-route TM CTR November 2013 Page 6

7 TM TM - Terminal area surrounds an airport, and it is an airspace within which air traffic control service is provided. Such airspace predominantly contains traffic operating along Terminal Routes. The above description is aimed at including TM, CT, CTR, TZ airspace classification or any other nomenclature used to describe the airspace around an airport. En-Route T CTR November 2013 Page 7

8 Competing Interests STRUCTURES & SECTORS: Objectives TC REQUIREMENTS SFETY, CPCITY & EFFICIENCY SUFFICIENT IRSPCE TO CCOMMOTE - ROUTES (TCTICL N PUBLISHE) HOLING PTTERNS TRFFIC SEQUENCING TECHNIQUES USER REQUIREMENTS Unhindered airspace access ENVIRONMENTL REQUIREMENTS irspace STRUCTURES & SECTORS: Objectives TC REQUIREMENTS SFETY, CPCITY & EFFICIENCY SUFFICIENT IRSPCE TO CCOMMOTE - ROUTES (TCTICL N PUBLISHE) HOLING PTTERNS TRFFIC SEQUENCING TECHNIQUES USER REQUIREMENTS Unhindered airspace access ENVIRONMENTL REQUIREMENTS irspace Prohibitions over cities, natural parks, residential areas November 2013 Page 8

9 irspace Volumes W E RRIVLS EPRTURES RWY EP 3% EP 7% E P 10% RR MX RR 3 0 Controlled irspace W E November 2013 Page 9

10 irspace Volumes Protect IFR Flight Paths Uncontrolled irspace St1 Uncontrolled irspace St1 St2 St2 Uncontrolled irspace Uncontrolled irspace St1 St2 November 2013 Page 10

11 irspace Volumes o not take more airspace than needed. November 2013 Page 11

12 Terminal irspace X X X VFR irport CITY Y CITY Y CITY 4 1 Terminal irspace (s per Chapter 6) X X 5 S4 2 Terminal irspaces N Sectorised New northern Holds More IFR Traffic ENTRY GTE S5 S b S a S6 F 2 Terminal irspaces Parallel RWY added at N New southern Hold More Traffic to Y S f ENTRY GTE S7 Y CITY S3 ENTRY GTE S c S d F S e CITY 2 larger Terminal irspaces Two-Phase holding system More Traffic S2 S1 1 Terminal irspace system with Entry Gates; Revised Sectorisation November 2013 Page 12

13 TM TM May combine two or more sector volume, aimed at improving the design and management of terminal routes and TC sectorisation, servicing several airports in close proximity. November 2013 Page 13

14 Evolution of functions November 2013 Page 14

15 TC Sectorisation Upper CC Sectors Upper CC Sectors CC S1 CC S2 CC S3 CC Lower pproach W pproach E GEOGRPHIC FUNCTIONL November 2013 Page 15

16 GEOGRPHICL SECTORISTION dvantages Controller can fully exploit the space available in sector to manipulate best levels for inbounds/outbounds and expedite climb and descent without need for co-ordination. Easier to balance workload between sectors. Can be less demanding in terms of the Radar isplay and TC system Relatively easily to describe operational instructions for TC areas of responsibility. isadvantages Controller handles mixed traffic i.e. arrival, departure and transit traffic. In instances where the sector division runs along the runway centre-line, departing aircraft departing in different directions may be controlled by different controllers after take-off. (Effective mitigation can be provided by putting appropriate procedures in place). In cases where an aircraft is required to transit more than one geographic sector in the Terminal irspace, this can add to complexity by requiring additional co-ordination. November 2013 Page 16

17 FUNCTIONL SECTORISTION dvantages Controller handles one traffic type i.e. either departures or arrivals because sector defined as a function of task. Usually, all eparting aircraft are on the same frequency after take-off. In some configurations, can prove more flexible to operate. isadvantages Vertical/Lateral limits of sector can prove overly restrictive as one (vertical) band is unlikely to cater for all aircraft performance types. ifficult to balance workload between sectors especially where departure and arrival peaks do not coincide. Can be demanding in terms of the Radar isplay and TC System Operating instructions for TC can be difficult to formulate with respect to areas of responsibility; November 2013 Page 17

18 SECTORISTION void Sector designs that cause stepped climbs or descents November 2013 Page 18

19 Sectorisation TC Sectorisation Maintain holding area in same sector void crossing too close to sector boundary S C S C S C S C S S S S S B S B S B S B Se2 S Se2 S Se4.1 S Se4.1 S S C S C S C S C S S S S S B S B S B S B Se3 S Se3 Sector boundaries should not coincide with route centre lines S November 2013 Page 19 Se7 S Se7 Preferably, keep sectors the same when runway changes S

20 Sectorisation November 2013 Page 20

21 Thank You November 2013 Page 21

Airspace Volumes & Sectorisation Module 13 Activity 9

Airspace Volumes & Sectorisation Module 13 Activity 9 irspace Volumes & Sectorisation Module 13 ctivity 9 European irspace Concept Workshops for PBN Implementation Overview OBJECTIVE This module will provide an good understanding of irspace volumes and Sectorisation

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

CONTROLLED AIRSPACE CONTAINMENT POLICY

CONTROLLED AIRSPACE CONTAINMENT POLICY Safety and Airspace Regulation Group (SARG) 17 January 2014 Policy Statement 1 Overview CONTROLLED AIRSPACE CONTAINMENT POLICY 1.1 UK airspace design policy for ATS Routes, SIDs and STARs is based upon

More information

Honeywell.com PBN Concepts Krakow, Poland

Honeywell.com PBN Concepts Krakow, Poland PBN Concepts Krakow, Poland EPKK (KRK) Current Operational Environment Current Operational Environment : Runways: 07/25 8,366 ft (2550m) Approaches: ILS or LOC 25 RNAV (GNSS) 07, 25 VOR 07, 25 NDB 25 Departure

More information

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

JeppView for Windows. jep=jeppesen. Airport Information For EDLP Printed on 06 Dec 2017 Page 1. General Information. Runway Information

JeppView for Windows. jep=jeppesen. Airport Information For EDLP Printed on 06 Dec 2017 Page 1. General Information. Runway Information irport Information For ELP Printed on 06 ec 207 Page (c) SNERSON, IN., 207, LL RIGHTS RESERVE jep= JeppView for Windows General Information Location: PERORN/LIPPSTT EU IO/IT: ELP / P Lat/Long: N5 36.85',

More information

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613) PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

PBN Operational Approval Continental En Route Navigation Specifications

PBN Operational Approval Continental En Route Navigation Specifications PBN Operational Approval Continental En Route Navigation Specifications Navigation Specifications Applicable to Continental En-route operations RNAV 5 RNAV 2 RNP 2 A-RNP RNP 0.3 2 RNAV 5 Flight Phase Navigation

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications PBN Operational Approval Oceanic and Remote En Route Navigation Specifications Navigation Specifications Applicable to Oceanic/Remote RNAV 10 (RNP 10) RNP 4 RNP 2 A-RNP 2 Prior Guidance Material RNP 10

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

JeppView for Windows. List of pages in this Trip Kit. jep=jeppesen. Trip Kit Index

JeppView for Windows. List of pages in this Trip Kit. jep=jeppesen. Trip Kit Index Trip Kit Index Printed on 28 Jun 2015 Page 1 (c) SNERSON, IN., 2015, LL RIGHTS RESERVE jep= JeppView for Windows List of pages in this Trip Kit Trip Kit Index irport Information For TGPY Terminal harts

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each) Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory. AIRSPACE STRUCTURE 1. Introduction In aeronautics, s are the portion of the atmosphere controlled by a country above its territory. There are two kinds of : Controlled is of defined dimensions within which

More information

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931 International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic

More information

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7 European Airspace Concept Workshops for PBN Implementation Design in Context TFC Where does the traffic come from? And when? RWY Which

More information

PLUME RISE ASSESSMENTS

PLUME RISE ASSESSMENTS Advisory Circular AC 139-5(1) NOVEMBER 2012 PLUME RISE ASSESSMENTS CONTENTS Page 1. References 1 2. Purpose 2 3. Status of this advisory circular 2 4. Acronyms 2 5. Definitions 3 6. Background 3 7. Key

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA Disclaimer This presentation is for information purposes only. It should not be relied on as the sole

More information

IVAO Flight Operations Department Indonesia (ID) Division Procedures

IVAO Flight Operations Department Indonesia (ID) Division Procedures IVAO Flight Operations Department Indonesia (ID) Division Procedures Revised April 12 rd, 2010 Please consult also the local application of common procedures on http://www.ivao.web.id 1. General 1.1 In

More information

Considerations for Facility Consolidation

Considerations for Facility Consolidation Considerations for Facility Consolidation ATC Guild, New Delhi, India October 21, 2010 Mimi Dobbs Overview Why consider consolidation? Co location vs Consolidation Consolidating Methodologies Areas to

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

APPENDIX F AIRSPACE INFORMATION

APPENDIX F AIRSPACE INFORMATION APPENDIX F AIRSPACE INFORMATION Airspace Use DEFINITION OF AIRSPACE Airspace, or that space which lies above a nation and comes under its jurisdiction, is generally viewed as being unlimited. However,

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

PBN and RNAV concepts

PBN and RNAV concepts PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)

More information

JEPPESEN RNP-1 approval required. If not RNP-1 approved, report to ATC upon first contact. Expect routings according to chart 10-2C.

JEPPESEN RNP-1 approval required. If not RNP-1 approved, report to ATC upon first contact. Expect routings according to chart 10-2C. Printed from JeppView for Windows 5.3.0.0 on 29 Nov 206; Terminal chart data cycle 24-206; Notice: fter 0 ec 206, 0000Z, this chart may no longer be valid LUBLINEK 2 JUN 5 0-2.Eff.25.Jun..RNV.STR. RNP-

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding References The Convention on International Civil Aviation (Chicago Convention) ICAO SARPS Annex 14 Vol. I, 7 th Edition, July

More information

RNP AR and Air Traffic Management

RNP AR and Air Traffic Management RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Appendix K: MSP Class B Airspace

Appendix K: MSP Class B Airspace Appendix K: MSP Class B Airspace K All of the open sky covering the United States, from less than an inch off the ground all the way to outer space, is part of America s airspace. This airspace resource

More information

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

AD 2. AERODROMES. For the ICAO location indicators used for Canadian aerodromes, refer to the following publications: AIP CANADA (ICAO) PART 3 AERODROMES (AD) AD 2. AERODROMES AD 2.1 Aerodrome Location Indicator and Name For the ICAO location indicators used for Canadian aerodromes, refer to the following publications:

More information

SAFETY BULLETIN. One Level of Safety Worldwide Safety Bulletin No. 05SAB004 5 July 2004

SAFETY BULLETIN. One Level of Safety Worldwide Safety Bulletin No. 05SAB004 5 July 2004 IFLP SFETY BULLETIN THE GLOBL VOICE OF PILOTS One Level of Safety Worldwide Safety Bulletin No. 05SB004 5 July 2004 CS II - TCS II and VFR traffic This Document was produced in co-operation with EUROCTROL

More information

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different

More information

JeppView for Windows. List of pages in this Trip Kit. jep=jeppesen. Trip Kit Index

JeppView for Windows. List of pages in this Trip Kit. jep=jeppesen. Trip Kit Index Trip Kit Index Printed on 28 Jun 2015 Page 1 (c) JEPPESEN SNERSON, IN., 2015, LL RIGHTS RESERVE jep=jeppesen JeppView for Windows List of pages in this Trip Kit Trip Kit Index irport Information For TLPL

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

THE AREA CONTROL CENTRE (CTR) POSITION

THE AREA CONTROL CENTRE (CTR) POSITION THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)

More information

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions; Section 4 Chapter 1 Approach Control Services Approach Control Note: This section should be read in conjunction with Section 2 (General ATS), Section 6 (Separation Methods and Minima) and Section 7 (ATS

More information

ATM 4 Airspace & Procedure Design

ATM 4 Airspace & Procedure Design ATM 4 Airspace & Procedure Design 1. Introduction 1.1. The proper planning and design of routes, holding patterns, airspace structure and ATC sectorisation in both terminal and en-route airspace can be

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

NOISE ABATEMENT PROCEDURES

NOISE ABATEMENT PROCEDURES 1. Introduction NOISE ABATEMENT PROCEDURES Many airports today impose restrictions on aircraft movements. These include: Curfew time Maximum permitted noise levels Noise surcharges Engine run up restrictions

More information

UK Performance-based Navigation (PBN) Implementation Status

UK Performance-based Navigation (PBN) Implementation Status UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 1 Current Implementation of PBN in UK Airspace 2 Current

More information

the Applicant A P P L I C A N T ' S L I C E N C E N U M B E R : Title First Name Last Name Street Place Postal Country Telephone Fax

the Applicant A P P L I C A N T ' S L I C E N C E N U M B E R : Title First Name Last Name Street Place Postal Country Telephone Fax Please fill in the framed fields of the form, sign it and send it together with attachments to: USTRO CONTROL GmbH, viation gency, Department LS/PEL/Licencing, Wagramer Straße 19, 1220 Vienna, ustria 1

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

JeppView for Windows. jep=jeppesen. Airport Information For HESH Printed on 06 Dec 2017 Page 1. General Information. Runway Information

JeppView for Windows. jep=jeppesen. Airport Information For HESH Printed on 06 Dec 2017 Page 1. General Information. Runway Information irport Information For HESH Printed on 06 ec 207 Page (c) SNERSON, IN., 207, LL RIGHTS RESERVE jep= JeppView for Windows General Information Location: SHRM EL SHEIKH EGY IO/IT: HESH / SSH Lat/Long: N27

More information

JeppView for Windows. jep=jeppesen. Trip Kit Index. Printed on 24 Jan 2013 Page 1. List of pages in this Trip Kit. Trip Kit Index

JeppView for Windows. jep=jeppesen. Trip Kit Index. Printed on 24 Jan 2013 Page 1. List of pages in this Trip Kit. Trip Kit Index Trip Kit Index Printed on 24 Jan 203 Page (c) SNERSON, INC., 203, LL RIGHTS RESERVE jep= JeppView for Windows List of pages in this Trip Kit Trip Kit Index irport Information For PK Terminal Charts For

More information

Final Approach Operations Symposium

Final Approach Operations Symposium Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017 Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

EXPLANATION OF TPP TERMS AND SYMBOLS

EXPLANATION OF TPP TERMS AND SYMBOLS U.S. TERMINAL PROCEDURES PUBLICATION 52 EXPLANATION OF TPP TERMS AND SYMBOLS The discussions and examples in this section will be based primarily on the IFR (Instrument Flight Rule) Terminal Procedures

More information

Application for amendment to Tauranga control zone and control areas Consultation

Application for amendment to Tauranga control zone and control areas Consultation Application for amendment to Tauranga control zone and control areas Civil Aviation Authority Table of Contents 1. Introduction... 1 2. Background... 1 3. Proposal... 1 3. Effect on users... 2 a. VFR traffic...

More information

CE 563 Airport Design

CE 563 Airport Design CE 563 Airport Design Prevent aircraft collisions Prevent aircraft collisions with obstructions Expedite and maintain an orderly flow of air traffic Air traffic control system command center Herndon, VA

More information

PBN and Procedure Design training

PBN and Procedure Design training PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training

More information

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels

More information

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR)

Eastern Caribbean PIARCO Virtual FIR. PIARCO Control Zone (CTR) PIARCO Control Zone (CTR) Eastern Caribbean PIARCO Virtual FIR NOT TO BE USED FOR REAL WORLD AVIATION, STRICTLY FOR USE ON THE VATSIM VIRTUAL ATC NETWORK. 1. Introduction 1.1 Objective of this SOP is to

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/18 10/04/15 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP MEETING SECOND MEETING Rome Italy, 4 to 8 May 2015 Agenda Item 5 : New Work Programme

More information

SECTION 4 - APPROACH CONTROL PROCEDURES

SECTION 4 - APPROACH CONTROL PROCEDURES SECTION 4 - APPROACH CONTROL PROCEDURES CHAPTER 1 - PROVISION OF SERVICES 1.1 An approach control unit shall provide:- a) Approach control service. b) Flight Information service. c) Alerting service. RESPONSIBILITIES

More information

Advisory Circular. Regulations for Terrain Awareness Warning System

Advisory Circular. Regulations for Terrain Awareness Warning System Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

PBN Implementation inside Italian Airspace Status update Summer 2013

PBN Implementation inside Italian Airspace Status update Summer 2013 PBN Implementation inside Italian Airspace Status update Summer 2013 Paris, 11-13 September 2013 enav.it Contents Tasks achieved PBN implementation schedules On going activities Further aspects Conclusions

More information

Manual of Radiotelephony

Manual of Radiotelephony Doc 9432 AN/925 Manual of Radiotelephony Approved by the Secretary General and published under his authority Fourth Edition - 2007 International Civil Aviation Organization AMENDMENTS The issue of amendments

More information

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE

SAFETYSENSE LEAFLET AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE SAFETYSENSE LEAFLET 8e AIR TRAFFIC SERVICES OUTSIDE CONTROLLED AIRSPACE 1 INTRODUCTION 2 NON-RADAR SERVICES 3 RADAR SERVICES 4 HOW TO OBTAIN A SERVICE 5 RADAR SERVICE LIMITATIONS 1 INTRODUCTION a) In this

More information

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK

EFFECTIVE NOTAM KOUN SPECIAL FLIGHT PROCEDURES 09/08 NORMAN, OK KOUN WESTHEIMER AIRPORT NORMAN, OK 17 09/08 09/09 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon CDT until 7:30 PM CDT Thursday, September 7, 2017 7:00 AM CDT until 7:30 PM CDT Friday, September

More information

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain

PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain the example of Innsbruck/Austria Dr.-Ing. Philipp Daniel Schaad Head of Instrument Flight Procedures Austro Control

More information

EFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT

EFFECTIVE NOTAM KGON 10/06 SPECIAL FLIGHT PROCEDURES GROTON, CT KGON GROTON-NEW LONDON AIRPORT GROTON, CT 17 10/06 10/07 NOTAM SPECIAL FLIGHT PROCEDURES EFFECTIVE 12:00 Noon EDT until 6:00 PM EDT Thursday, October 5, 2017 7:00 AM EDT until 6:00 PM EDT Friday, October

More information

EASA RNP (AR) Workshop The Landscape Working Together

EASA RNP (AR) Workshop The Landscape Working Together EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

IFR SEPARATION USING RADAR

IFR SEPARATION USING RADAR IFR SEPARATION USING RADAR 1. Introduction When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s traffic,

More information

JeppView for Windows. jep=jeppesen. Airport Information For EPLL Printed on 06 Dec 2017 Page 1. General Information. Runway Information

JeppView for Windows. jep=jeppesen. Airport Information For EPLL Printed on 06 Dec 2017 Page 1. General Information. Runway Information irport Information For EPLL Printed on 06 ec 207 Page (c) SNERSON, IN., 207, LL RIGHTS RESERVE jep= JeppView for Windows General Information Location: LOZ POL IO/IT: EPLL / LJ Lat/Long: N5 43.32', E09

More information

SESAR Solutions. Display Options

SESAR Solutions. Display Options SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,

More information

Contents. Subpart A General 91.1 Purpose... 7

Contents. Subpart A General 91.1 Purpose... 7 Contents Rule objective... 3 Extent of consultation... 3 Summary of comments... 4 Examination of comments... 6 Insertion of Amendments... 6 Effective date of rule... 6 Availability of rules... 6 Part 91

More information

Flight Operations Inspector Manual

Flight Operations Inspector Manual 1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and

More information

Introduction. Appendix D: Airspace Protection

Introduction. Appendix D: Airspace Protection Preliminary PreliminaryDraft DraftMaster MasterPlan Plan Bankstown Airport Introduction : Airspace Protection D Preliminary Master Plan Draft Master Plan Airspace protection D1 OVERVIEW The protection

More information

Kenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi

Kenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi Kenya Civil Aviation Authority Air Navigation Services ICAO Seminar/Workshop on Air Traffic Services System Capacity 8-10 June 2016 Nairobi 1 Flora K. Wakolo ATM /OPS Objective Share with audience information

More information

A Pilot s perspective

A Pilot s perspective The Challenges of Modern Approaches, from NPA/PA to 2D/3D operations airborne perspective A Pilot s perspective Stefan Fiedler IFALPA, VC German Cockpit IFALPA Position on PBN (December 2014) IFALPA welcomes

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Minor engine repairs are available.

Minor engine repairs are available. irport Information etails for /OSNRUK ity /OSNRUK State/Province ountry EU Latitude N 52 08' 04.7" Longitude E 7 4' 05.39" Elevation 59 Longest Runway 700 Magnetic Variance E.0 Fuel Type 00 Low Lead (LL)

More information

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1

Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 Overview of Continental En-route Navigation Specifications RNAV 5, RNAV 2 and RNAV 1 1 Learning Objectives RNAV applications in a continental en-route context Characteristics of available navigation specifications

More information

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 KURDISTAN REGIONAL GOVERNMENT SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11 SEPARATION STANDARDS & APPLICATIONS International and Local Procedures ( First Edition ) April 2012 Ff Prepared By Fakhir.F.

More information

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017 Presented to: UC Davis Aviation Symposium By: Michael Valencia & Dianna Johnston Date: Overview Part 1 Air Traffic Controllers History Safety and Navigation Terminology Air Traffic Facility Types Equipment

More information