1 What's your fleet mix for design? (Hint: it's not the Airport Master Plan s fleet mix) Presented to: By: 4 States Airport Conference Brian M. Tompkins, P.E., C.M. State Airport Engineer Iowa Dan E. Wilson, P.E., M.S. Regional Paving Engineer Date: August 30, 2016
2 Introduction Developing fleet mix for design Verifiable from actual data Reasonable for airport Appropriate for project Airfield Pavement Design What FAA needs for review Specifications, design alternatives, LCCA Q&A 2
3 Planning vs. Design 3
4 Planning vs. Design Planning (Forecast of Aviation Demand) Estimates when development needed (5-10 years out) Found in Master Plan, NEPA, Part 150 Noise Studies Establishes airport dimensional standards, AIP eligibility Design (Justification) Justifies that development which is needed now Identifies critical design aircraft Validates design details (fillet design, TDG, pavement section); details that are NOT determined during planning 4
5 Data Sources for Fleet Mix Planning, third party sources (see handout) FAA s TFMSC Database Traffic Flow Management System Counts Free, public access IFR traffic going back to 2001 Includes blocked flights not in 3 rd party data Access at 5
6 6
7 7
8 8
9 FAA s TFMSC Database Output Report formats of HTML, Word, Spreadsheet (see 11x17 handout) Each aircraft record includes Date aircraft operated User, weight, and physical classes Aircraft name (includes ICAO ident) Business jet, Regional jet, and business use Number of departures, arrivals, operations Number of seats 9
10 Fleet Mix Table Recommended Table (see 11x17 handout) Manufacturer, model User class, engine type Design standards (AAC, ADG, and TDG) Annual Operations, growth rate Weight, main gear type Runway length Identify critical design aircraft/family 10
11 Critical Design Aircraft Justifies airport design standards proposed for the project. Conducts, or is expected to conduct, at least 500 operations annually at the airport. Can be a specific aircraft, a family of aircraft, or a composite of several aircraft. AC 150/ A, 102.ff and 105.b/c and Order C,
12 Paving Engineer s Report Why do we see what we see in FAARFIELD and (If its out of the ordinary we expect to see an explanation) If deviating from Geotech report please state why, this should only be in rare occasions. If deviating from AC please state why, in most cases this will require a MOS. 12
13 Paving State Standards Use AC 150/ B This uses a different approach than 150/5320-6E Usually results in thicker sections <12,500 lbs. for all aircraft using that portion of pavement. Expect to see D-Cracking and ASR testing in state standards. State Standard is not Highway Specification. 13
14 Paving Form Project Description Need more than Taxiway D. Need locations of work performed. Define the limits either by Lat and Long along centerline which is preferred over station numbers. Think in long term forensic data gathering, station numbers will change but Lat and Long should stay the same. Typical Sections Cut and paste the cross section from the plans. Soil Analysis If using the Geotechnical Report then attach it to the form as it says. 14
15 Paving FAARFIELD Its not a black box! If an airplane is in library please use it, do not combine lighter aircraft unless this is a heavy airport. Once 6F, FAARFIELD 1.41 will be released and this has vehicle library and it will be expected to be used if vehicles control thickness. MTOW, should not use what is given in FAARFIELD. FAARFIELD always shows MTOW for aircraft. Look at performance charts for that aircraft and maximum RW length at that airport. Design life is set a 20 years, as of now cannot use anything else. 15
16 Paving Life Cycle Cost Analysis Follow example in AC 150/5320-6E, Appendix 1 Should not be done on initial design report. Only should be done when repair method has been agreed upon with FAA Project Manager (Rehab [minor, major], Reconstruction. Should be done with recent numbers, its just a phone call away. 16
Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationCEE 5614 and CEE Aircraft Classifications. Spring 2013
CEE 5614 and CEE 4674 Aircraft Classifications Dr. Antonio A. Trani Professor Civil and Environmental Engineering Spring 2013 1 Material Presented The aircraft and the airport Aircraft classifications
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationAccording to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationRunway Length Analysis Prescott Municipal Airport
APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section
More informationPROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS
PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a
More informationCHAPTER 3 ALTERNATIVES CONSIDERED
CHAPTER 3 ALTERNATIVES CONSIDERED 3.0 ALTERNATIVES The 2010 Stevensville Airport Master Plan contained five (5) airside development options designed to meet projected demands. Each of the options from
More informationFACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW
FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW This summary is intended to provide a brief overview of the key issues associated with conformance to FAA standards at Methow Valley State Airport.
More informationDr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. Spring 2015 Blacksburg, Virginia
CEE 4674 Airport Planning and Design Runway Length Calculations Addendum 1 Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University Spring 2015 Blacksburg,
More informationDr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia
Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University January 27, 2009 Blacksburg, Virginia 1 Runway Design Assumptions (FAA 150/5325-4b) Applicable to
More informationARP Forecast Review Critical Aircraft Data Sources
ARP Forecast Review Critical Aircraft Data Sources Kent Duffy FAA Office of Airports National Planning & Environmental Division, APP-400 December 14, 2015 Aviation Forecasts Airport sponsors
More informationChapter 4 Facility Requirements
Chapter 4 Facility Requirements Introduction This chapter evaluates the existing airport facilities and identifies improvements needed to effectively meet the forecasted demand levels discussed in the
More informationBOARD OF AIRPORT COMMISSIONERS
1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports
More informationAirfield Geometric Design Prof. Amedeo Odoni
Airfield Geometric Design Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 5 May 25, 2015 Objective and
More informationTrick or Treat Process M
AIP Design Lessons Trick or Treat Halloween Sharing October 25, 2017 By: FAA DMA ADO staff Dave P. Anderson Brian P. Schuck Mark J. Holzer 1 Trick or Treat Process M FAA staff of Dave, Brian and Mark shall
More informationThe offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10
The 747 8 offers operators increased capacity while taking advantage of existing airport infrastructure. 14 aero quarterly qtr_03 10 Operating the 747 8 at Existing Airports Today s major airports are
More informationAPPENDIX X: RUNWAY LENGTH ANALYSIS
APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationAirfield Geometric Design Prof. Amedeo Odoni
Airfield Geometric Design Prof. Amedeo Odoni Istanbul Technical University Air Transporta5on Management M.Sc. Program Air Transporta5on Systems and Infrastructure Module 4 28 April 2014 Objective and Outline!
More informationAIRPORT MASTER PLAN. Newport State Airport. Draft. (Colonel Robert F. Wood Airpark) THE Louis Berger Group, INC. Prepared for: Prepared by:
Draft AIRPORT MASTER PLAN Newport State Airport () Prepared for: 2000 Post Road Warwick, Rhode Island 02886-1533 THE Louis Berger Group, INC. 20 Corporate Woods Boulevard Albany, New York 12211-2370 Prepared
More informationAnalysis Item 71: Department of Aviation Aurora State Airport Runway Extension
Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analyst: Gregory Jolivette Request: Approve, retroactively, the submission of a federal grant application to the Federal Aviation
More information4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS
4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS A key step in the Airport Master Plan (AMP) process is determining future requirements for airport facilities that will allow for airside and landside development
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationDRAFT FINAL REPORT AIRPORT MASTER PLAN. Rifle Garfield County Airport Revised May 15, 2014
DRAFT FINAL REPORT AIRPORT MASTER PLAN Rifle Garfield County Airport Revised May 15, 2014 As required by Paragraph 425.B(4) of FAA Order 5100.38C, Airport Improvement Program (AIP) Handbook: The preparation
More informationOctober 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION
October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.
More informationTechnical Advisory Committee Meeting February 29, 2016
Technical Advisory Committee Meeting February 29, 2016 Meeting Agenda Introduction Recap of Planning Process Project Status Goals and Objectives Forecasts of Aviation Demand Overview of Facility Requirements
More informationAPPENDIX D MSP Airfield Simulation Analysis
APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/
More informationAircraft Classifications. Dr. Antonio Trani and Julio Roa Department of Civil and Environmental Engineering.
Aircraft Classifications Dr. Antonio Trani and Julio Roa Department of Civil and Environmental Engineering. January 2018 1 Material Presented The aircraft and the airport Aircraft classifications Aircraft
More informationDemand Patterns; Geometric Design of Airfield Prof. Amedeo Odoni
Demand Patterns; Geometric Design of Airfield Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Airport Planning and Management Module 4 January 2016 Demand Patterns;
More informationCity of Monett, Missouri. Pride and Progress. Airport Master Plan Update. for the Monett Municipal Airport
City of Monett, Missouri Airport Master Plan Update for the Monett Municipal Airport Pride and Progress Airport Inventory Monett Municipal Airport (HFJ) Master Plan Update MoDOT Project Number: 08-098B-1
More informationCEE Quick Overview of Aircraft Classifications. January 2018
CEE 5614 Quick Overview of Aircraft Classifications Dr. Antonio A. Trani Professor Civil and Environmental Engineering January 2018 1 Material Presented The aircraft and its impact operations in the NAS
More informationAirport Master Plan Open House Front Range Airport February 23, 2017
Airport Master Plan Open House Front Range Airport February 23, 2017 MASTER PLAN PROCESS AND OVERVIEW MASTER PLAN ELEMENTS The Master Plan is a 20-year plan to understand the needs of current and future
More informationMaster Plan Update Technical Advisory Committee Meeting
Nashville International Airport Master Plan Update Technical Advisory Committee Meeting February 14, 2019 Agenda Welcome and Introductions Aviation Activity Forecast Facility Requirements Alternatives
More informationVista Field Airport. Master Plan Update. February, Prepared for: Port of Kennewick One Clover Island Kennewick, Washington
Vista Field Airport February, 2006 Prepared for: Port of Kennewick One Clover Island Kennewick, Washington 99336 Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 30-
More informationFacility Requirements
4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA X Seminar, Mexico City, Mexico September 3-
More informationAIRPORT WITH NO RUNWAYS IS A MALL
RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More information3.1 Facility Requirements Overview Airfield Facility Requirements... 1
Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...
More informationAirport Master Plan 1
1 Aviation Demand AIRPORT PLANNING PROCESS FAA Design Standards Financial Resources Community Goals Environmental Requirements Serve Business Community This Advisory Circular (AC) provides guidance for
More informationThursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES
SOUTH ST. PAUL MUNICIPAL AIRPORT FLEMING FIELD MASTER PLAN ADVISORY GROUP MEETING #2 Thursday, May 2 nd, 2013 South St. Paul Municipal Airport Meeting Room 4:00 p.m. 5:30 p.m. MEETING NOTES The purpose
More informationSASP Advisory Committee Meeting #3
SASP Advisory Committee Meeting #3 MnDOT Office of Aeronautics #FlyMN www.minnesotago.org 1 Agenda Public Involvement Plan Update Defining the System Classification Review Minimum System Objectives Performance
More informationBuchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan
Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business Plan Steering Committee December 14, 2006 Airport Planning Program Master Plan FAR Part 150 Noise Study Strategic Business
More informationBoeing Aircraft and the Impact on Airports
International Civil Aviation Organization on Pavement Management Systems Lima, Peru November 19-22, 2003 Boeing Aircraft and the Impact on Airports Orest Shepson Principal Engineer - Airport Technology
More informationMeeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, Shannon Eibert, C&S Companies
Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #3 August 15, 2017 Prepared by: File: Attendees: Shannon Eibert, C&S Companies N93.012.001 See Sign-In List A third meeting was held
More informationDallas Executive Airport Town Hall Meeting April 3, 2014
Dallas Executive Airport Town Hall Meeting April 3, 2014 Background 1,040 acre general aviation facility owned and operated by the City of Dallas 150 based aircraft including business jets and helicopters,
More informationCorrection to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:
1410 Memorandum 9 DATE October 20, 2014 CITY OF DALLAS TO Rosa Rios City Secretary SUBJECT Correction to Council Resolution No. 14-1030, dated Please add the following correction as part of the permanent
More informationSummary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.
Committee Report Business Item No. 2017-191 Transportation Committee For the Metropolitan Council meeting of September 13, 2017 Subject: Final Crystal Airport 2035 Long Term Comprehensive Plan (LTCP) Proposed
More informationPassenger Facility Charge Application #1
Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures
More informationD.1 Introduction. Ronald Reagan Washington National Airport
Appendix D. Alternatives D.1 Introduction Federal Aviation Administration (FAA) Orders 1050.1E, Environmental Impacts: Policies and Procedures, and 5050.4B, National Environmental Policy Act (NEPA) Implementing
More informationJACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007
JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1
More informationAssignment 3: Runway Length and EMAS Design. Aircraft Engine Remarks. CFM56-7B20/-7B22/-7B24 developing 20,000 lb of thrust at sea level
CEE 4674: Airport Planning and Design Spring 2014 Solution! Assignment 3: Runway Length and EMAS Design Instructor: Trani Problem 1 A new airport to be constructed near Mexico City airport would like to
More informationBoeing Airplane Overview
Boeing Airplane Overview Yonglian Ding, PE Boeing Airport Compatibility Engineering Nov 29, 2016 BOEING is a trademark of Boeing Management Company. Copyright 2016 Boeing. All rights reserved. Agenda Aircraft
More informationTXDOT AVIATION DIVISION
TXDOT AVIATION DIVISION Airport Project Development & Selection Process Today s Topics Project Development Process Working with TxDOT Aviation Division Funding Sources National Plan of Integrated Airports
More informationDocument prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN
LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support
More informationFacility Requirements
C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over
More informationAIRSIDE CAPACITY AND FACILITY REQUIREMENTS
AIRSIDE CAPACITY AND FACILITY REQUIREMENTS This Section investigates the capacity of the airport, its ability to meet current demand, and the facilities required to meet forecasted needs as established
More informationBearing Strength Assessment PLR & PCN
1 LEISMER AIRPORT (Airport code CET2, Canada) Bearing Strength Assessment PLR & PCN Report APMS-111021 October 21, 2011 APMS Stationsweg 51, Velsen-Zuid 1981 BA, the Netherlands Phone: + 31 (0) 255 524
More informationTABLE OF CONTENTS. Washington Aviation System Plan Update July 2017 i
TABLE OF CONTENTS Chapter 1 Overview... 1-1 1.1 Background... 1-1 1.2 Overview of 2015 WASP... 1-1 1.2.1 Aviation System Performance... 1-2 1.3 Prior WSDOT Aviation Planning Studies... 1-3 1.3.1 2009 Long-Term
More informationRunway Roughness Evaluation- Boeing Bump Methodology
FLIGHT SERVICES Runway Roughness Evaluation- Boeing Bump Methodology Michael Roginski, PE, Principal Engineer Boeing Airport Compatibility Engineering ALACPA XI Seminar, Santiago, Chile September 1-5,
More informationAVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE STATEWIDE. Airfield. Pavement Management
F L O R I D A D E PA R T M E N T O F T R A N S P O R T A T I O N AVIATION AND SPACEPORT OFFICE DISTRICT 6 REPORT JU NE 2 0 1 5 STATEWIDE Airfield Pavement Management P R O G R A M Pavement Evaluation
More informationFEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 CHECKLIST
Form 291111wd (09-15) Storm Lake Municipal Airport Airport FEDERAL AIRPORT IMPROVEMENT PROGRAM (AIP) PRE-APPLICATION FFY 2017 SLB FAA Identifier CHECKLIST Please attach the following documents with your
More informationAppendix B PAVEMENT CONDITION AND HISTORY
Appendix B PAVEMENT CONDITION AND HISTORY The Sunport maintains a pavement management program (PMP) in order monitor the condition of pavements and to plan for repair/replacement in a timely manner. The
More informationCapacity Analysis & Facility Requirements
CHAPTER C Capacity Analysis & Facility Requirements 1. Introduction This chapter considers the ability of facilities at Friedman Memorial Airport (SUN) to accommodate existing and projected activity. Current
More informationType Acceptance Report
TAR 98/08 Revision 1 CESSNA 150/152 Aircraft Certification Unit TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1. INTRODUCTION 1 2. ICAO TYPE CERTIFICATE DETAILS 1 3. TYPE ACCEPTANCE DETAILS 1 4. NZCAR 21.43 DATA
More informationAIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION
30 th Annual AAAE Basics of Airport Law Workshop and 2014 Legal Update October 19-21, 2014 AIRPORT PLANNING, DEVELOPMENT AND LAND ACQUISITION Desk Reference Chapters 4, 13, 14 & 25 Catherine M. van Heuven,
More informationProgram Update Dan Cohen-Nir - Airbus Americas
ACI-NA Airports@Work New Orleans March 15, 2018 Program Update Dan Cohen-Nir - Airbus Americas An Airbus takes off or lands every 1.4 seconds 18,234 Orders 10,991 Deliveries 7,333 Backlog End December
More informationLopez Island Airport Master Plan Update. Public Meeting June 15, 2017
Lopez Island Airport Master Plan Update Public Meeting June 15, 2017 Master Plan Update Team Reid Middleton/Everett, WA Shannon Kinsella, Project Manager Melania Haagsma, Project Engineer Mead & Hunt/Tulsa,
More informationForecast Data specific to SDM... 6 Aviation Industry Trends Collection of Other Data... 12
Working Paper 2 Forecasts of Aviation Demand Table of Contents 2.1 Forecast Overview... 1 2.2 Identification of Aviation Demand Elements... 2 2.3 Data Sources... 3 2.4 Historical and Existing Aviation
More informationTable of Contents. Overview Objectives Key Issues Process...1-3
Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5
More informationAirport Compatibility
Presented by Dan COHEN-NIR Programs Director Airbus Americas Holdings Inc. www.airbusamericas.com Airport Compatibility Opportunities and Challenges Airport Challenges & Aircraft Design Challenge: Prepare
More informationRSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY
RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT
More informationMilton. PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton.
Milton GeneralAviationAirport PeterPrinceAirportislocatedinSantaRosaCounty, approximatelythreemileseastofmilton. Existing Facilities Peter Prince Airport is served by one runway, Runway 18/36, 3,700 feet
More informationAERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES
AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES Current as of November 2012 ALASKA AVIATION SYSTEM PLAN UPDATE Prepared for: State of Alaska Department of Transportation & Public Facilities Division
More informationBeginning balance available for Priority I Projects: $1,737,029
2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)
More informationAirport Design-3 Geometric Design
Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and
More informationTable of Contents Facility Requirements Overview Airport Capacity and Delay Analysis... 1
Table of Contents Table of Contents... 2 3.1 Overview... 1 3.2 Airport Capacity and Delay Analysis... 1 Airspace Capacity... 1 Aircraft Mix Index... 3 Arrivals Percentage... 3 Touch-and-Go Percentage...
More informationPublic Information Meeting. September 2015
W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationRecommended Performance Measures
Recommended Performance Measures January 2009 1 RECOMMENDED PERFORMANCE MEASURES Performance measures are utilized by the North Central Texas Council of Governments (NCTCOG) to monitor the performance
More informationCHAPTER 1: INTRODUCTION
CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the
More informationDemonstration and. 4. Contact List. Federal Aviation Administration. Administration
Demonstration and Hands-On Training Presented to: VII ALACPA Airport Pavement Seminar & V FAA Airport Pavement Workshop By: David R. Brill, P.E., Ph.D. Date: Information on Disk 1. FAA Computer Programs
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More information3.0 Facility Requirements
3.0 Facility Requirements The facility requirements chapter includes an assessment of the aviation and non-aviation components of Rickenbacker International Airport (LCK) including the runway and taxiway
More informationPierre Regional Airport Airport Master Plan. Kickoff Meeting April 7, 2017
Pierre Regional Airport Airport Master Plan Kickoff Meeting April 7, 2017 Agenda Introductions Airport Master Planning Planning Considerations Master Plan Elements Schedule Public Involvement Basics about
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationFAA Technical Documentation Requirements
FAA Technical Documentation Requirements 1. A COMPLETED FAA Form 8130-6 or FAA Form 8130-1. The 8130-6 form is used to apply for a standard and special airworthiness certification, and the 8130-1 form
More informationPFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018
PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application
More informationagis a brief overview
agis a brief overview Steve Welebny Photogrammetrist Keystone Aerial Surveys Villanova University 1 Villanova University 2 Nav Aid Cost VOR Install = $250,000 20 year life cycle cost = $1,100,000 ILS Install
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input
More informationChapter 4: Facility Requirements
Chapter 4: Facility Requirements 1 Rapid City Regional Airport Master Plan Update Chapter 4 Facility Requirements Introduction This chapter of the Airport Master Plan analyzes the existing and anticipated
More informationMaster Planning AirTAP Fall Forum. Mike Louis, Dan Millenacker
Master Planning 2007 AirTAP Fall Forum Mike Louis, Dan Millenacker 1 Measures in the State Aviation System Plan (SASP) 2 Goals for the Airport System Are consistent with the prior System Plan and the Statewide
More informationPavement Strength Analysis Prepared by Molzen Corbin September 2016
Pavement Strength Analysis Prepared by Molzen Corbin September 2016 The Santa Fe Municipal Airport was originally constructed in 1941. It was constructed by the military as a B-24 bomber training base.
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationMorristown Municipal Airport Runway 5-23 Rehabilitation Environmental Assessment
2.0 PURPOSE AND NEED The Purpose and Need Statement in a NEPA document is a formal declaration of the overall goals and objectives of a proposed project. This statement documents the justification for
More information4.0 FACILITY REQUIREMENTS
4.0 FACILITY REQUIREMENTS The facility requirements assesses both the aviation and non-aviation components of the New Smyrna Beach Municipal Airport (EVB) including the runways and taxiways, aircraft storage
More information