Air Traffic Complexity: An Input-Output Approach. Amy R Pritchett, Keumjin Lee and Eric JM Feron School of Aerospace Engineering Georgia Tech
|
|
- Emil Glenn
- 6 years ago
- Views:
Transcription
1 Air Traffic Complexity: An Input-Output Approach Amy R Pritchett, Keumjin Lee and Eric JM Feron School of Aerospace Engineering Georgia Tech
2 Motivation Efforts to balance air traffic demand and airspace capacity Traffic Flow Management (TFM) : Regulate traffic flows based on current and future traffic configuration Dynamic Airspace Configuration (DAC) : Reconfigure the airspace in accordance with the users demands and the traffic complexity Free Flight: While aircraft can go any where, may still need to prevent aircraft from entering any locally complex areas All these methods require ability to assess air traffic complexity in an operationally relevant manner 2
3 Previous Efforts Combination of factors Perceived levels of the complexity Air traffic complexity metric We build upon these methods by examining the control impact required within an airspace configuration 3
4 Input-Output Approach Environment : Weather Sector boundary closure Air route structure Reference Inputs Signal of interest : An additional aircraft Air Air traffic traffic inside inside sector: sector:? No uncertainty No uncertainty? Uncertainty Uncertainty Control activity Control Control architecture: architecture:?minimum control activity Minimum control activity 4
5 Input-Output Approach (2) Model airspace as a closed loop system Build a map of the system s response to all possible instances of the reference signal Describe air traffic complexity from the inputoutput response Extensibile Different airspace models External environmental factors
6 Input-Output Approach (3) Def1: Reference input is any hypothetical aircraft entering the sector of interest at any heading and location Def2: Air traffic complexity is a measure of the control activity required to accept a hypothetical aircraft entering into the sector. Absolute complexity is based on optimal (minimum) control activity Relative complexity specific to a sub-optimal controller denotes the additional complexity 6
7 Input-Output Approach (4) Nominal aircraft Entering aircraft position angle Entering aircraft Entering aircraft bearing angle Sector boundary Def 3: The entering aircraft position angle defines the entry position of the aircraft into the sector as an angle representing its position relative to the sector center Def 4: The entering aircraft bearing defines the relative track of an entering aircraft with respect to the line connecting the aircraft to the center of the sector 7
8 Details Of The System Detail of the plant used in our examples Safety regions around each aircraft Horizontal motion of aircraft Only one impulsive turn Constant velocity Control architecture Ref: Pallottino, L., Feron, E., and Bicchi, A., Conflict resolution problems for air traffic management systems solved with mixed integer programming, IEEE, Trans. Intelligent Transportation System, Vol.3, No.1, 2002 Does not preclude more extensive models 8
9 Conflict geometry Details Of The System (2) Relative velocity vector V 2/1 should point outside forbidden area V 2 /1 V 2 V 1 Safety region Forbidden Area 9
10 Comparing Two Traffic Situations Traffic Situation 1 intruder Traffic position Situation & heading No. 1 angle Traffic Situation 2 intruder Traffic position Situation & heading No. 2 angle y axis (nmi) 0 y axis (nmi) x axis (nmi) x axis (nmi) Both are conflict free airspace right now can measure complexity as result in an entering aircraft 10
11 Complexity Map of Traffic Situation #1 Contours of minimum control activity required to accept entering aircraft Intruder position angle (deg) Entering aircraft position angle (deg) Entering aircraft position angle (deg) 11 Intruder bearing angle (deg) Entering aircraft bearing (deg) (deg)
12 Complexity Map of Traffic Situation #1 (2) Entering aircraft bearing (deg) (deg) Intruder bearing angle (deg) C/0 0/CC 0/C CC/0 Particular entering aircraft (Position=120, Bearing=20 ) Heading change Entry position Uncertainty Special attention on some parts of the sector boundary Intruder position angle (deg) Entering aircraft position angle (deg) Entering aircraft position angle (deg) 12
13 Complexity Map of Traffic Situation #2 Entering Entering aircraft aircraft bearing bearing (deg) (deg) Intruder bearing angle (deg) Minimum heading changes required (deg) Contours of minimum control activity required to accept entering aircraft Intruder position angle (deg) Entering aircraft position angle angle (deg) (deg) 13
14 Scalar Measures of Air Traffic Complexity Many possible scalar measures Worst-case value Sensitivity to inputs Average value Overall input-output response The area enclosed on a complexity map How often aircraft need to be controlled Many other methods are possible 14
15 Comparing Two Complexity Maps Entering aircraft bearing (deg) Intruder bearing angle (deg) Entering aircraft bearing (deg) Entering aircraft bearing bearing (deg) (deg) Intruder bearing angle (deg) Minimum heading changes required (deg) Intruder position angle (deg) Intruder position angle (deg) Entering aircraft position angle (deg) Entering aircraft position angle (deg) Entering aircraft position angle angle (deg) (deg) Traffic situation 1: Larger maximum control activity Traffic situation 2: Larger range of entering aircraft position and bearing angles require control activity of at least 10 degrees
16 Partially Closed Sector Boundary Traffic situation y-axis (nmi) A closed part of the sector boundary x-axis (nmi) Partial closure of sector s boundary due to dynamic airspace management restrictions 16
17 2 2 Complexity Map: No Boundary Closure Required heading changes : nominal case J(sum of heading) vs intruder position & heading angle 80 Entering aircraft bearing (deg) Intruder Entering bearing angle (deg) intruder aircraft heading bearing angle (deg) (deg) intruder position angle (deg) Intruder position Entering angle aircraft (deg) position angle (deg) Entering aircraft position angle (deg) 17
18 Complexity Map: Partially Closed Boundary 80 Required heading changes : Sector closed J(sum of heading) vs intruder position & heading angle Intruder Entering intruder position angle (deg) position aircraft angle position (deg) angle (deg) Intruder Entering bearing angle (deg) intruder aircraft heading bearing angle (deg) (deg) % increase on the average value Entering aircraft bearing (deg) Entering aircraft position angle (deg)
19 Comparing Scalar Measures Across Situations 67% increase Traffic #1 Traffic #2 Traffic #3 (N) Traffic #3 (P) Average (deg) Worstcase(deg) N: Nominal sector with no boundary closure P: Sector with partially closed boundary 39% increase 19
20 Conclusion Proposed input-output approach Define air traffic complexity as the closed-loop response of the airspace against reference inputs Complexity map displays the effective complexity of the traffic situation in a manner suitable for minute-byminute decisions Scalar measures provide succinct measures of traffic situation Can evaluate a number of effects Impact of near-term decisions (e.g., aircraft acceptance) (on-going) Use to evaluate airway structures within airspace (on-going) Use in a predictive manner 20
21 Thank you very much for listening Any questions? 21
AIR TRAFFIC COMPLEXITY: AN INPUT-OUTPUT APPROACH
AIR TRAFFIC COMPLEXITY: AN INPUT-OUTPUT APPROACH Keumjin Lee, Eric Feron, Amy Pritchett School of Aerospace Engineering, Georgia Institute of Technology, Atlanta, GA Abstract This paper addresses a new
More informationANALYSIS OF THE CONTRIUBTION OF FLIGHTPLAN ROUTE SELECTION ON ENROUTE DELAYS USING RAMS
ANALYSIS OF THE CONTRIUBTION OF FLIGHTPLAN ROUTE SELECTION ON ENROUTE DELAYS USING RAMS Akshay Belle, Lance Sherry, Ph.D, Center for Air Transportation Systems Research, Fairfax, VA Abstract The absence
More informationIntegration of Reusable Launch Vehicles (RLV) into the Air Traffic Management System
Integration of Reusable Launch Vehicles (RLV) into the Air Traffic Management System J.K. Kuchar, K.A. Khan, J. Falkner Department of Aeronautics and Astronautics Massachusetts Institute of Technology
More informationAirspace Complexity Measurement: An Air Traffic Control Simulation Analysis
Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Parimal Kopardekar NASA Ames Research Center Albert Schwartz, Sherri Magyarits, and Jessica Rhodes FAA William J. Hughes Technical
More informationCross-sectional time-series analysis of airspace capacity in Europe
Cross-sectional time-series analysis of airspace capacity in Europe Dr. A. Majumdar Dr. W.Y. Ochieng Gerard McAuley (EUROCONTROL) Jean Michel Lenzi (EUROCONTROL) Catalin Lepadatu (EUROCONTROL) 1 Introduction
More informationA Study on Berth Maneuvering Using Ship Handling Simulator
Proceedings of the 29 IEEE International Conference on Systems, Man, and Cybernetics San Antonio, TX, USA - October 29 A Study on Berth Maneuvering Using Ship Handling Simulator Tadatsugi OKAZAKI Research
More informationSafety Analysis Tool for Automated Airspace Concepts (SafeATAC)
Safety Analysis Tool for Automated Airspace Concepts (SafeATAC) 31 st Digital Avionics Systems Conference Williamsburg, VA October 2012 1 Metron Aviation, Inc: NASA Ames Tech Monitors: David Thipphavong
More informationAnalysis of Aircraft Separations and Collision Risk Modeling
Analysis of Aircraft Separations and Collision Risk Modeling Module s 1 Module s 2 Dr. H. D. Sherali C. Smith Dept. of Industrial and Systems Engineering Virginia Polytechnic Institute and State University
More information= Coordination with Direct Communication
Particle Swarm Optimization Mohamed A. El-Sharkawi Computational Intelligence Applications (CIA) Lab. Department of EE, Box 352500 University of Washington Seattle, WA 98195-2500 elsharkawi@ee.washington.edu
More informationTime Benefits of Free-Flight for a Commercial Aircraft
Time Benefits of Free-Flight for a Commercial Aircraft James A. McDonald and Yiyuan Zhao University of Minnesota, Minneapolis, Minnesota 55455 Introduction The nationwide increase in air traffic has severely
More informationARRIVALS REVIEW GATWICK
ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving
More informationAirspace Encounter Models for Conventional and Unconventional Aircraft
Airspace Encounter Models for Conventional and Unconventional Aircraft Matthew W. Edwards, Mykel J. Kochenderfer, Leo P. Espindle, James K. Kuchar, and J. Daniel Griffith Eighth USA/Europe Air Traffic
More informationLAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014
LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics
More informationPrice-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study
Price-Setting Auctions for Airport Slot Allocation: a Multi-Airport Case Study An Agent-Based Computational Economics Approach to Strategic Slot Allocation SESAR Innovation Days Bologna, 2 nd December
More informationArash Yousefi George L. Donohue, Ph.D. Chun-Hung Chen, Ph.D.
Investigation of Airspace Metrics for Design and Evaluation of New ATM Concepts Arash Yousefi George L. Donohue, Ph.D. Chun-Hung Chen, Ph.D. Air Transportation Systems Lab George Mason University Presented
More informationLessons Learnt From The EUROCONTROL Wake Impact Severity Assessment Flight Simulator Campaign
Lessons Learnt From The EUROCONTROL Wake Impact Severity Assessment Flight Simulator Campaign Vincent Treve (EUROCONTROL) Cpt. Dirk De Winter (Contrator to EUROCONTROL) Content Objectives Experiment setup
More informationDefining and Managing capacities Brian Flynn, EUROCONTROL
Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All
More informationPreliminary Investigation of Sector Tools Descent Advisory Potential Benefits
97159-01 Preliminary Investigation of Sector Tools Descent Advisory Potential Benefits T. Golpar Davidson George Hunter Seagull Technology, Inc. Prepared for: National Aeronautics and Space Administration
More informationFuture Automation Scenarios
Future Automation Scenarios Francesca Lucchi University of Bologna Madrid, 05 th March 2018 AUTOPACE Project Close-Out Meeting. 27th of March, 2018, Brussels 1 Future Automation Scenarios: Introduction
More informationAn Analysis of Dynamic Actions on the Big Long River
Control # 17126 Page 1 of 19 An Analysis of Dynamic Actions on the Big Long River MCM Team Control # 17126 February 13, 2012 Control # 17126 Page 2 of 19 Contents 1. Introduction... 3 1.1 Problem Background...
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationMetrics for Evaluating the Impact of Weather on Jet Routes J. Krozel, M. Ganji, S. Yang, J.S.B., Mitchell, and V. Polishchuk 15 th Conf.
Metrics for Evaluating the Impact of Weather on Jet Routes J. Krozel, M. Ganji, S. Yang, J.S.B., Mitchell, and V. Polishchuk 15 th Conf. on Aviation, Range & Aerospace Meteorology Los Angeles, CA Aug.
More informationEvaluation of Alternative Aircraft Types Dr. Peter Belobaba
Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014
More informationSession III Issues for the Future of ATM
NEXTOR Annual Research Symposium November 14, 1997 Session III Issues for the Future of ATM Synthesis of a Future ATM Operational Concept Aslaug Haraldsdottir, Boeing ATM Concept Baseline Definition Aslaug
More informationFlight Testing the Wake Encounter Avoidance and Advisory system: First results
Flight Testing the Wake Encounter Avoidance and Advisory system: First results Dr. Fethi Abdelmoula, Tobias Bauer DLR Institute of Flight Systems Paris, May 15 th & 16 th, 2013 WakeNet-Europe Workshop
More informationIncluding Linear Holding in Air Traffic Flow Management for Flexible Delay Handling
Including Linear Holding in Air Traffic Flow Management for Flexible Delay Handling Yan Xu and Xavier Prats Technical University of Catalonia (UPC) Outline Motivation & Background Trajectory optimization
More informationTHIRTEENTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/13-WP/22 14/6/18 WORKING PAPER THIRTEENTH AIR NAVIGATION CONFERENCE Agenda Item 1: Air navigation global strategy 1.4: Air navigation business cases Montréal,
More informationCharacteristics of a Well Clear Definition and Alerting Criteria for Encounters between UAS and Manned Aircraft in Class E Airspace!
National Aeronautics and Space Administration Characteristics of a Well Clear Definition and Alerting Criteria for Encounters between UAS and Manned Aircraft in Class E Airspace! NASA Ames Research Center
More informationICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace
ICAO Big Data Project ADS-B Data as a source for analytical solutions for traffic behaviour in airspace ICAO/IATA/CANSO PBN/2 San Jose December 8, 2016 Big Data process Quantitative Quantitative / Qualitative
More informationReducing Departure Delays at LaGuardia Airport with Departure-Sensitive Arrival Spacing (DSAS) Operations
Reducing Departure Delays at LaGuardia Airport with Departure-Sensitive Arrival Spacing (DSAS) Operations Paul U. Lee, Nancy Smith NASA Ames Research Center Jeffrey Homola, Connie Brasil, Nathan Buckley,
More informationConsiderations for Facility Consolidation
Considerations for Facility Consolidation ATC Guild, New Delhi, India October 21, 2010 Mimi Dobbs Overview Why consider consolidation? Co location vs Consolidation Consolidating Methodologies Areas to
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationImpact of Equipage on Air Force Mission Effectiveness
Impact of Equipage on Air Force Mission Effectiveness Presentation at ICCRTS 28 September 2006 Slide 1 Background On 3 April 1996 a military version of the Boeing 737 crashed in Dubrovnik, Croatia Sec.
More informationSafety Analysis of the Winch Launch
Safety Analysis of the Winch Launch Trevor Hills British Gliding Association and Lasham Gliding Society ts.hills@talk21.com Presented at the XXVIII OSTIV Congress, Eskilstuna, Sweden, 8-15 June 26 Abstract
More informationATM Seminar 2015 OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY. Wednesday, June 24 nd 2015
OPTIMIZING INTEGRATED ARRIVAL, DEPARTURE AND SURFACE OPERATIONS UNDER UNCERTAINTY Christabelle Bosson PhD Candidate Purdue AAE Min Xue University Affiliated Research Center Shannon Zelinski NASA Ames Research
More informationSurface Congestion Management. Hamsa Balakrishnan Massachusetts Institute of Technology
Surface Congestion Management Hamsa Balakrishnan Massachusetts Institute of Technology TAM Symposium 2013 Motivation 2 Surface Congestion Management Objective: Improve efficiency of airport surface operations
More informationReal-time Simulations to Evaluate the RPAS Integration in Shared Airspace
Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace (WP-E project ERAINT) E. Pastor M. Pérez-Batlle P. Royo R. Cuadrado C. Barrado 4 th SESAR Innovation Days Universitat Politècnica
More informationAnalysis of ATM Performance during Equipment Outages
Analysis of ATM Performance during Equipment Outages Jasenka Rakas and Paul Schonfeld November 14, 2000 National Center of Excellence for Aviation Operations Research Table of Contents Introduction Objectives
More informationSPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2
- Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity
More informationIntegrated Optimization of Arrival, Departure, and Surface Operations
Integrated Optimization of Arrival, Departure, and Surface Operations Ji MA, Daniel DELAHAYE, Mohammed SBIHI ENAC École Nationale de l Aviation Civile, Toulouse, France Paolo SCALA Amsterdam University
More informationSystem Performance Characteristics of Centralized and Decentralized Air Traffic Separation Strategies
4 th USA/Europe Air Traffic Management R&D Seminar, Santa Fe, NM; U.S.A. 3 7 December 2001 System Performance Characteristics of Centralized and Decentralized Air Traffic Separation Strategies Jimmy Krozel
More informationLarge-Scale Network Slot Allocation with Dynamic Time Horizons
www.dlr.de page 1 > Large-Scale Network Slot Allocation with Dynamic Time Horizons (Lau, Berling et al.) Large-Scale Network Slot Allocation with Dynamic Time Horizons Alexander Lau 1, Jan Berling 1, Florian
More informationA Framework for the Development of ATM-Weather Integration
A Framework for the Development of ATM-Weather Integration Building on the Original ATM-Weather Integration Concept Diagram Matt Fronzak, Mark Huberdeau, Claudia McKnight, Ming Wang, Eugene Wilhelm January
More informationarxiv:cs/ v1 [cs.oh] 2 Feb 2007
A Dynamic I/O Model for TRACON Traffic Management arxiv:cs/7219v1 [cs.oh] 2 Feb 27 Maxime Gariel, John-Paul Clarke and Eric Feron Georgia Institute of Technology Atlanta, GA, 3332-1, USA October 17, 218
More informationA Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact
A Methodology for Integrated Conceptual Design of Aircraft Configuration and Operation to Reduce Environmental Impact ATIO/ANERS September 22, 2009 Andrew March Prof. Ian Waitz Prof. Karen Willcox Motivation
More information> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96
Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken
More informationOptimizing trajectories over the 4DWeatherCube
Optimizing trajectories over the 4DWeatherCube Detailed Proposal - SES Awards 2016 Airbus Defence and Space : dirk.schindler@airbus.com Luciad : robin.houtmeyers@luciad.com Eumetnet : kamel.rebai@meteo.fr
More informationWake Turbulence Research Modeling
Wake Turbulence Research Modeling John Shortle, Lance Sherry Jianfeng Wang, Yimin Zhang George Mason University C. Doug Swol and Antonio Trani Virginia Tech Introduction This presentation and a companion
More informationImpact of a new type of aircraft on ATM
Impact of a new type of aircraft on ATM Study of the low & slow concept Cyril Allignol ATM in smart and efficient air transport systems Workshop in Oslo, 31st May 2017 Introduction 1 / 25 Low & Slow concept
More informationFree Flight En Route Metrics. Mike Bennett The CNA Corporation
Free Flight En Route Metrics Mike Bennett The CNA Corporation The Free Flight Metrics Team FAA Dave Knorr, Ed Meyer, Antoine Charles, Esther Hernandez, Ed Jennings CNA Corporation Joe Post, Mike Bennett,
More informationAnalysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator
Analysis of Operational Impacts of Continuous Descent Arrivals (CDA) using runwaysimulator Camille Shiotsuki Dr. Gene C. Lin Ed Hahn December 5, 2007 Outline Background Objective and Scope Study Approach
More informationTrajectory Based Operations
Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation
More informationJasna Plavsic. WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN Zagreb, 6 March 2014
WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN Zagreb, 6 March 214 Water and Climate Adaptation Plan (WATCAP) for the Sava River Basin: Climate Change Predictions for the Sava River Basin Jasna Plavsic
More informationPRESENTATION OVERVIEW
ATFM PRE-TACTICAL PLANNING Nabil Belouardy PhD student Presentation for Innovative Research Workshop Thursday, December 8th, 2005 Supervised by Prof. Dr. Patrick Bellot ENST Prof. Dr. Vu Duong EEC European
More informationCongestion. Vikrant Vaze Prof. Cynthia Barnhart. Department of Civil and Environmental Engineering Massachusetts Institute of Technology
Frequency Competition and Congestion Vikrant Vaze Prof. Cynthia Barnhart Department of Civil and Environmental Engineering Massachusetts Institute of Technology Delays and Demand Capacity Imbalance Estimated
More informationInternational Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY
BBACG/16 WP/4 31/01/05 International Civil Aviation Organization The Special Coordination Meeting for the Bay of Bengal area (SCM/BOB) and The Sixteenth Meeting of the Bay of Bengal ATS Coordination Group
More informationCPA2 1256: ft V/2.8nm H
AIRPROX REPORT No 2013054 Date/Time: 23 Jun 2013 1255Z (Sunday) Position: 5642N 00433W (N FINDO) Airspace: UAR (Class: C) Reporting Ac Reported Ac Type: B747(1) B747(2) Operator: CAT CAT Alt/FL: FL340
More informationCharacteristics of a Well Clear Definition and Alerting Criteria for Encounters between UAS and Manned Aircraft in Class E Airspace!
National Aeronautics and Space Administration Characteristics of a Well Clear Definition and Alerting Criteria for Encounters between UAS and Manned Aircraft in Class E Airspace! NASA Ames Research Center
More informationChallenges in Complex Procedure Design Validation
Challenges in Complex Procedure Design Validation Frank Musmann, Aerodata AG ICAO Workshop Seminar Aug. 2016 Aerodata AG 1 Procedure Validation Any new or modified Instrument Flight Procedure is required
More informationECOsystem: MET-ATM integration to improve Aviation efficiency
ECOsystem: MET-ATM integration to improve Aviation efficiency Daniel MULLER ICAO APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Brussels, October
More informationAirspace Infringements: Impact on ATC
Airspace Infringements: Impact on ATC Airspace Infringement Workshop 24 January 2008 Eurocontrol HQ, Brussels Presented by: xavier.henriod@skyguide.ch Xavier Henriod, DSO, 24/01/2008 Objective To highlight
More informationUAS/NAS Forum: Technology Milestones Necessary for NAS Certification Autonomy: Relating UAS Automation to Certification
UAS/NAS Forum: Technology Milestones Necessary for NAS Certification Autonomy: Relating UAS Automation to Certification Eric N. Johnson Lockheed Martin Associate Professor of Avionics Integration Daniel
More informationStrategic airspace capacity planning in a network under demand uncertainty (COCTA project results)
Strategic airspace capacity planning in a network under demand uncertainty (COCTA project results) Prof. Dr. Frank Fichert Worms University of Applied Sciences Joint work with: University of Belgrade (Dr
More informationIII. EulI. 292 CONCEPTS FOR TERMINAL AREA CONFIGURATION MRNAOEIIENT(U) ini 7 AD-AI142. MP-SiI13i DTFROi-i-C-i81
7 AD-AI142 EulI 292 CONCEPTS FOR TERMINAL AREA CONFIGURATION MRNAOEIIENT(U) ini MITRE CORP MCLEAN VA METREK DIV R N SINHA SEP Bi I MP-SiI13i DTFROi-i-C-i81 UNCLASSIFIED F/G 1/5 NL III '-V P2.8 1.0. -N
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationThe Centre for Transport Studies Imperial College London: Developments in measuring airspace capacity in Europe
The Centre for Transport Studies : Developments in measuring airspace capacity in Europe Dr. A. Majumdar a.majumdar@imperial.ac.uk 1 Content The en-route capacity problem estimation difficulties Three
More informationProximity versus dynamicity: an initial analysis at four European airports
Proximity versus dynamicity: an initial analysis at four European airports Pierrick Pasutto, Eric Hoffman, Karim Zeghal EUROCONTROL Experimental Centre, Brétigny-sur-Orge, France This paper presents an
More informationAir Space Management - ASM Workshop March 2013 Rabat, Morocco. Advanced Flexible Use of Airspace. Presented by Petri Hartikainen, Integra A/S
Air Space Management - ASM Workshop 18 19 March 2013 Advanced Flexible Use of Airspace Presented by Petri Hartikainen, Integra A/S Presentation Contents On-going R&D related to advanced ASM Airspace design
More informationEfficiency and Automation
Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad
More informationWelcome to AVI AFRIQUE 2017
Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,
More informationContent. Study Results. Next Steps. Background
Content Background Study Results Next Steps 2 ICAO role and actions in previous crisis time Background October 1973 oil crisis: oil price increased by 400% and oil production decreased by 240% Early 1974:
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationCMATS The Civil Military ATM System
CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia
More informationNew issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system
New issues raised on collision avoidance by the introduction of remotely piloted aircraft (RPA) in the ATM system Jean-Marc Loscos DSNA expert on collision avoidance and airborne surveillance EIWAC 2013
More informationUniversity of Colorado, Colorado Springs Mechanical & Aerospace Engineering Department. MAE 4415/5415 Project #1 Glider Design. Due: March 11, 2008
University of Colorado, Colorado Springs Mechanical & Aerospace Engineering Department MAE 4415/5415 Project #1 Glider Design Due: March 11, 2008 MATERIALS Each student glider must be able to be made from
More informationMotion 2. 1 Purpose. 2 Theory
Motion 2 Equipment Capstone, motion sensor, meter stick, air track+ 2 gliders, 2 blocks, and index cards. Air Tracks In this experiment you will be using an air track. This is a long straight triangular
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationRemotely Piloted Operations Integration
ITALIAN AIR FORCE Remotely Piloted Operations Integration Colonel Claudio CASTELLANO Bruxelles, 25.10.2018 Analize RP operations Define RP operations due regard/accommodation solutions with effective interaction
More informationIntegrated SWIM. Federal Aviation Administration Presented to: Interregional APAC/EUR/MID Workshop>
Integrated SWIM Administration Services Presented to: Interregional APAC/EUR/MID Workshop> By: Jeri Groce; SWIM Program Manager Date: 4 October, 2017 Agenda Introduction Business Services SWIM Services
More informationA Survey of Time and Space Partitioning for Space Avionics
2018-05-25, 21:52:13 A Survey of Time and Space Partitioning for Space Avionics Presentation at DASIA 2018 31st May 2018 The Basic Idea of TSP Motivation Time and Space Partitioning (TSP) Why? several
More informationATC automation: facts and steps ahead
ATC automation: facts and steps ahead Objectives Context Stating the problem Current solution Steps ahead Implementation constraints ATC automation: facts and steps ahead Objectives Understand why ATC
More informationEvaluation of Strategic and Tactical Runway Balancing*
Evaluation of Strategic and Tactical Runway Balancing* Adan Vela, Lanie Sandberg & Tom Reynolds June 2015 11 th USA/Europe Air Traffic Management Research and Development Seminar (ATM2015) *This work was
More informationCDM Quick Reference Guide. Concepts I Need to Know for the Exam
CDM Quick Reference Guide Concepts I Need to Know for the Exam 1 What is the principle behind CDM? Sharing information between: ATC (al parts System Command & Control, Centers, TRACONS, Towers) Airlines
More informationEvaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations
Evaluation of Pushback Decision-Support Tool Concept for Charlotte Douglas International Airport Ramp Operations Miwa Hayashi, Ty Hoang, Yoon Jung NASA Ames Research Center Waqar Malik, Hanbong Lee Univ.
More informationTHE AREA CONTROL CENTRE (CTR) POSITION
THE AREA CONTROL CENTRE (CTR) POSITION 1. Introduction The Area Control Centre (ACC) also known as en-route controller and called CTR on IVAO, has the responsibility of ensuring Air Traffic Control (ATC)
More informationA Network Model to Simulate Airport Surface Operations
A Network Model to Simulate Airport Surface Operations Project Proposal February 11, 2014 Prepared by: Adel Elessawy Robert Eftekari Yuriy Zhylenko For: Dr. Kathryn Laskey Sponsored by: Dr. Lance Sherry
More informationLake Tahoe Airport Master Plan Public Meeting March 16, 2015
Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans
More informationUnmanned Aircraft System Loss of Link Procedure Evaluation Methodology
Unmanned Aircraft System Loss of Link Procedure Evaluation Methodology Sponsor: Andy Lacher (MITRE Corporation) May 11, 2011 UL2 Team Rob Dean Steve Lubkowski Rohit Paul Sahar Sadeghian Approved for Public
More informationCross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations
Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations 29 30 JUN 2015 Item 1: Cross-border expansion of FRA (1) Harmonised CONOPS PMP and management structure Important
More informationPASSUR Aerospace Annual Shareholder Meeting, April 5, 2017
PASSUR Aerospace Annual Shareholder Meeting, April 5, 2017 1 Revenue Core-Non-Core, 2001-2016 2 3 Our Core and our Plan 1 PREDICT every aircraft trajectory and constraint.» We constantly probe the future,
More informationConstruction of Conflict Free Routes for Aircraft in Case of Free Routing with Genetic Algorithms.
Construction of Conflict Free Routes for Aircraft in Case of Free Routing with Genetic Algorithms. Ingrid Gerdes, German Aerospace Research Establishment, Institute for Flight Guidance, Lilienthalplatz
More informationAIR NAVIGATION SERVICE PROVIDERS
AIR LAW, REGULATION AND COMPLIANCE MANAGEMENT COURSE DESIGNED FOR ISTANBUL TECHNICAL UNIVERSITY AND TURKISH AVIATION ACADEMY BY McGILL UNIVERSITY INSTITUTE OF AIR AND SPACE LAW AIR NAVIGATION SERVICE PROVIDERS
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationSunshine Coast Airport Master Plan September 2007
Sunshine Coast Airport Master Plan September 2007 Contents CONTENTS... I ACKNOWLEDGEMENT... II DISCLAIMER... III 1 EXECUTIVE SUMMARY...IV 1 INTRODUCTION... 1 2 AVIATION DEMAND FORECAST... 5 3 AIRCRAFT
More informationNoise Action Plan Summary
2013-2018 Noise Action Plan Summary Introduction The EU Noise Directive 2002/49/EU and Environmental Noise (Scotland) Regulations 2006 requires airports with over 50,000 movements a year to produce a noise
More informationRECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT
RECEDING HORIZON CONTROL FOR AIRPORT CAPACITY MANAGEMENT W.-H. Chen, X.B. Hu Dept. of Aeronautical & Automotive Engineering, Loughborough University, UK Keywords: Receding Horizon Control, Air Traffic
More informationPreliminary Results and Findings Limited Deployment Cooperative Airspace Project
Preliminary Results and Findings Limited Deployment Cooperative Airspace Project Paul J. Wehner Briefer Jonathan L. Schwartz Deihim Hashemi Todd M. Stock Presented at RTCA SC-203 Working Group 3 February
More informationKeynote speaker - Bill Davis
Space Traffic Management Conference 2016 Emerging Dynamics Nov 18th, 10:30 AM - 11:00 AM Keynote speaker - Bill Davis Bill Davis FAA ATO Follow this and additional works at: http://commons.erau.edu/stm
More informationFrom AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez
From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air
More informationATTEND Analytical Tools To Evaluate Negotiation Difficulty
ATTEND Analytical Tools To Evaluate Negotiation Difficulty Alejandro Bugacov Robert Neches University of Southern California Information Sciences Institute ANTs PI Meeting, November, 2000 Outline 1. Goals
More information