AIR NAVIGATION SERVICES DEPARTMENT ДАРГА П.ГАНБОЛД

Size: px
Start display at page:

Download "AIR NAVIGATION SERVICES DEPARTMENT ДАРГА П.ГАНБОЛД"

Transcription

1 AIR NAVIGATION SERVICES DEPARTMENT ДАРГА П.ГАНБОЛД

2 AGENDA

3 COMMUNICATION NAVIGATON SURVEILLANCE SERVICE FLIGHT INSPECTION AND PROCEDURE DESIGN SERVICE AIR NAVIGATION SERVICE AVIATION WEATHER INFORMATION SERVICE AIR TRAFFIC SERVICE AERONAUTICAL INFORMATION SERVICE

4 MONGOLIAN STATUS OF ICAO GLOBAL PLAN INITIATIVES GPI-1 Flexible use of airspace GPI-2 Reduced vertical separation minima GPI-3 Harmonization of level systems GPI-4 Alignment of upper airspace classifications GPI-5 RNAV and RNP (Performance based navigation) GPI-6 Air traffic flow management GPI-7 Dynamic and flexible ATS route management GPI-8 Collaborative airspace design and management GPI-9 Situational awareness GPI-10 Terminal area design and management GPI-11 RNP and RNAV SIDs and STARs GPI-12 Functional integration of ground systems with airborne systems GPI-13 Aerodrome design and management GPI-14 Runway operations GPI-15 Match IMC and VMC operating capacity GPI-16 Decision support systems and alerting systems GPI-17 Data link applications GPI-18 Aeronautical information GPI-19 Meteorological systems GPI-20 WGS-84 The implementation of WGS-84 by all States. GPI-21 Navigation Systems GPI-22 Communication infrastructure GPI-23 Aeronautical radio spectrum

5 AIRSPACE MANAGEMENT 1 FLGHT INFORMATION REGION (UB FIR) ENTRY AND EXIT POINT ENTRY & EXIT POINT WITH RUSSIA ENTRY & EXIT POINT WITH CHINA AIR ROUTES AREA CONTROL CENTER SECTORS AERODROME / APPROACH CONTROL SECTORS AERODROME FLIGHT INFORMATION SERVICE

6

7 AIR TRAFFIC SERVICES AIR TRAFFIC CONTROLLER HOUR SHIFT OVER FLIGHT DEPARTURE AND ARRIVAL

8 AIR TRAFFIC FLOW Олон улсын өнгөрөлт Олон улсын хөөрөлт,буулт Орон нутгийн хөөрөлт,буулт 0 I/01 - IX/01 I/01 - IX/01 I/01 - IX/01 I/01 - IX/01 I/01 - IX/ он 2010 он 2011 он 2012 он 2013 он

9 AIRNAVIGATION AIDS IMPLEMENTATION PLAN 2013

10 FACILITY RCAG voice communication VHF Data-link communication (VDL mode-2) HF Voice communication VSAT voice/data communication Fiber Optic network AFTN and AWOS network

11 AERONAUTICAL SATELLITE COMMUNICATION. VSAT SINCE WILL BE REPLACED CURRENTLY 22 TerrsaSat 400 STATIONS NEW INSTALLED 16 STATIONS WILL BE REPLACED 9 STATIONS Хатгал Улаангом Их түнэл Мөрөн Баян-Өлгий Ховд Булган (Ховд) Ургамал Тосонцэнгэл Доной Булган Улаанбаатар Алтанбулаг Өндөрхаан Чойбалсан Алтай Баянхонгор Арвайхээр Хар хорин Бор Өндөр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад New MASCOM VSAT network is being installed for swapping existing system.

12 Ground-to-Ground communication VSAT VOICE/DATA COMMUNICATION Irkutsk (Russia) Ulaanbaatar (Mongolia) Beijing (China) Bangkok (Thailand) Neighbors have been connected by VSAT and ground fiber optic links for exchanging information faster

13 FIBER OPTIC LINK NETWORK Terminals: AFTN, RCAG, AWOS Telephone SINCE LOCATIONS ARE CONNECTED 6 LOCATIONS WILL BE CONNECTED

14 AIR-GROUND COMMUNICATION RCAG Voice Communication Баян-Өлгий Улаангом Хэнгэрэгтэй Мөрөн Ховд Ургамал Тосонцэнгэл Доной Цэцэрлэг Булган Улаанбаатар Өндөрхаан Чойбалсан Булган (Ховд) Алтай Баянхонгор Арвайхээр Бор-Өндөр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад Ханбумбат DUAL CHANNEL 23 RCAG VHF RADIO STATIONS 20 LOCATIONS

15 Air-to-Ground communication HF VOICE COMMUNICATION 22 AIRPORTS R&S XK-2900 HF radios

16 SURVEILLANCE SYSTEM / PHASES IMPLEMETATION SSR SYSTEM SINCE SSR IMPLEMENTED SSR INSTALLED WILL BE INSTALLED Баян-Өлгий Улаангом Ургамал Ховд Булган (Ховд) Алтай Тосонцэнгэл Доной Мөрөн Цэцэрлэг Булган Баянхонгор Арвайхээр Далан Улаанбаатар Мандалговь Дадал Өндөрхаан Чойбалсан БаруунУрт Сайншанд Даланзадгад

17 STAGE OF ADS-B IMPLEMENTATION Баян-Өлгий Улаангом Мөрөн Ховд Булган (Ховд) Ургамал Тосонцэнгэл Доной Цэцэрлэг Булган Улаанбаатар Дадал Өндөрхаан Чойбалсан Алтай Баянхонгор Арвайхээр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад

18 PBN IMPLEMENTATION DME INSTALLATION PLAN NOPUS Ulgii (ZMUL) TEBUS Ulaangom (ZMUG) Khovd (ZMKD) NIGOR Улаангом ZMUM Bulgan Sum (ZMBS) NOTE: COVERAGE OF DME & UPDATE AREA FL=9,000m (20 stations) DME COVERAGE (200 NM) 0 km SCALE Ховд N E Ургамал URGAM Baruunturuun (ZMBT) ZMTD SILUS Алтай Altai (ZMAT) N E TEKOR DARNO TOMES Доной Donoi (ZMDN) Тосонцэнгэл Tosontsenge (ZMTL) Tudevtai (ZMTD) ZMHG Muren (ZMMN) Мөрөн ZMHU ZMHH ZMTG Цэцэрлэг KENTA LETBI Bulgan (ZMBN) BayanKhongor Arvaikheer Арвайхээр Баянхонгор (ZMBH) (ZMAH) Далан DALAN Булган Дархан Даланзадгад Dalanzadgad (ZMDZ) SERNA Ulaanbaatar (ZMUB) Baruun-Urt Улаанбаатар Underkhaan (ZMBU) Morin- UNDUR ZMTM (ZMUH) Uui Өндөрхаан ARGAT MODUN MENOR Баруун-Урт Мандалговь ZMMG ZMOT BAGAT ANIKU ZMDL Дадал DEGIR Сайншанд Sainshand (ZMSH) DORUTL Choibalsan (ZMCD) Дорнод 01 ZMAH 11 ZMMG 02 ZMAT 12 ZMMN MORIT 03 ZMBN 13 ZMSH LEGEND DME/DME More than two 04 ZMBH 14 ZMTG UPDATE AREA DME/DME INTERNATIONAL 05 ZMBU 15 ZMTL UPDATE AREA EN-ROUTE 06 ZMCD 16 ZMUG AIRPORT OR RCAG SITE 07 ZMDL 17 HMUH 350 km 700 km REPORTING POINT 08 ZMDN 18 DALAN 08 ZMDZ 19 Morin-Uui 09 ZMKD 20 URGAM INTIK POLHO SULOK ZMSM LOCATION OF DME STATION PLAN TO INSTALL CURRENT Далан, Дорнод

19 NON DIRECTION BEACONS (NDB) LOCATIONS Ulaangom Ulgii NDB Baruunturuun NDB Murun Teshig Hovd NDB Tosontsengel NDB Bulgan ULAANBAATAR Dadal Choibalsan NDB Bulgan Altai Uliastai NDB Bayankhongor NDB Tstetserleg Arvaiheer NDB Mandalgobi NDB NDB Undurkhaan Baruun-Urt Sainshand NDB Dalanzadgad NDB NDB: ARM-150MA 12 stations, PAR-10C 5 stations MARKERS : MRM stations, MRM-70

20 Ground-to-Ground communication AFTN AND AWOS NETWORK based on fiber optic network Ulaangom Ulgii Baruunturuun Murun Teshig Hovd Bulgan Altai Tosontsengel Uliastai Tstetserleg Bulgan Arvaiheer Bayankhongor ULAANBAATAR Mandalgobi Dadal Undurkhaan Baruun-Urt Sainshand Choibalsan Dalanzadgad - AFTN Aeronautical Message exchange network - 18 Domestic airport Weather data collecting system - Data automatically passed through AFTN X.25 Network every 30 minutes

21 RUNWAY LIGHTING SYSTEM Баян-Өлгий Улаангом Мөрөн Ховд Булган (Ховд) Ургамал Тосонцэнгэл Доной Цэцэрлэг Булган Улаанбаатар Дадал Өндөрхаан Чойбалсан Алтай Баянхонгор Арвайхээр БаруунУрт Мандалговь Далан Сайншанд Даланзадгад NEW EXISTING

22 SOLAR POWER STATION WITH 443KWATTS Solar Panels Junction Box Power Conditioner Power Distributor Solar light measurement Power Supply Company Display Weather sensor Load System Controller

23 Asphalt-Concrete RW4D category Asphalt-Concrete RW3C category Concrete RW3C category Concrete RW4C category Grass RW3C category

24 REDUCTION OF SEPARATION MINIMA 2012 оноос өмнө 150 км Агаарын хөлгүүдийн зайчлалын зураг

25 2012 онд 90 км 2012 оноос өмнө 150 км 2014 онд 40 км Агаарын хөлгүүдийн зайчлалыг ирээдүйд 10км болгон

26 АНХААРАЛ ТАВЬСАНД БАЯРЛАЛАА

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

ROAD SECTOR. Ulaanbaatar MINISTRY OF ROADS AND TRANSPORTATION GOVERNMENT POLICY FOR DEVELOPING ROAD SECTOR OF MONGOLIA

ROAD SECTOR. Ulaanbaatar MINISTRY OF ROADS AND TRANSPORTATION GOVERNMENT POLICY FOR DEVELOPING ROAD SECTOR OF MONGOLIA MINISTRY OF ROADS AND TRANSPORTATION ROAD SECTOR GOVERNMENT POLICY FOR DEVELOPING ROAD SECTOR OF MONGOLIA Kh.Ganbold Head of Road Construction and Production Division Ulaanbaatar www.mrt.gov.mn March 2013

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

NEW CALEDONIA PBN PLAN

NEW CALEDONIA PBN PLAN NEW CALEDONIA PBN PLAN SUMMARY This document presents the performance-based navigation (PBN) deployment program in the New Caledonia airspace sector of NANDI Flight Information Region (FIR NFFF) as well

More information

Flight Inspection Services

Flight Inspection Services Flight Inspection Services Overview Copyright 2013 Serbia and Montenegro Air Traffic Services (SMATSA), LLC About us SMATSA is the provider of air navigation services in the airspace of the Republic of

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE NPF/SIP/2010-WP/22 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10

More information

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each) Gestão de Tráfego Aéreo 2015/2016 Exam 2016.01.04 Name Student ID Number I (5.5/20, 0.5 each) What is each contracting state of ICAO required to provide? [ ] Modern radio navigation facilities for aeroplanes

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

Título ponencia: Introduction to the PBN concept

Título ponencia: Introduction to the PBN concept Título ponencia: Introduction to the PBN concept Organizado por: Index Introduction Background PBN Concept PBN Operations Conclusions Introduction Subject This presentation addresses the Performance-Based

More information

WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER 2010) ZAMBIA

WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER 2010) ZAMBIA WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10 DECEMBER 2010) ZAMBIA About Zambia 1. Zambia is a landlocked country covering land mass of about

More information

ICAO Air Navigation Panels/Study Groups Work Programme

ICAO Air Navigation Panels/Study Groups Work Programme NPF/SIP/2010-WP/24 ICAO Air Navigation Panels/Study Groups Work Programme SAULO DA SILVA International Civil Aviation Organization Workshop on the development of National Performance Framework for Air

More information

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation V. Korchagin PBN implementation plan for the Russian airspace and its first results PBN TF/8 meeting, Paris

More information

ICAO UPDATE. (Presented by the Secretariat)

ICAO UPDATE. (Presented by the Secretariat) International Civil Aviation Organization 29/05/15 CAR/SAM Planning and Implementation Regional Group (GREPECAS) Third Meeting of the Programmes and Projects Review Committee (PPRC/3) (Mexico City, Mexico,

More information

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop Víctor Hernández ndez Regional Officer ATM/SAR ICAO NACC Office 1 CONTENTS ICAO REGIONAL OFFICES - OBJECTIVE REGIONAL AIR NAVIGATION

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014.

The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, September, 2014. The Fourth ATS Coordination meeting of Bay of Bengal, Arabian Sea and Indian Ocean Region (BOBASIO/4) Kolkata, India, 22-24 September, 2014. Agenda Item 4: Strategic ATM Plans of Participating States Upper

More information

Flight Procedure Design and Cartography

Flight Procedure Design and Cartography Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018 IATA User Requirements for Air Traffic Services (URATS) NAVIGATION MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, 11 13 February 2018 IATA at 30,000 ft Mission to represent, lead and serve the airline industry

More information

IFR SEPARATION WITHOUT RADAR

IFR SEPARATION WITHOUT RADAR 1. Introduction IFR SEPARATION WITHOUT RADAR When flying IFR inside controlled airspace, air traffic controllers either providing a service to an aircraft under their control or to another controller s

More information

Packaging Tomorrow s Aviation System

Packaging Tomorrow s Aviation System International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq

More information

(RN R A N V A V & & RN R P N

(RN R A N V A V & & RN R P N PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR

USE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference

More information

Learning Objectives 090 Communications

Learning Objectives 090 Communications Learning Objectives 090 Communications Syllabus 090 00 00 00 COMMUNICATIONS 091 00 00 00 VFR COMMUNICATIONS (understood as basic information for IFR-procedures) 091 01 00 00 DEFINITIONS 091 01 01 00 Meanings

More information

Bits to Blocks Aviation System Block Upgrades (ASBU)

Bits to Blocks Aviation System Block Upgrades (ASBU) Bits to Blocks Aviation System Block Upgrades (ASBU) A.K. Dutta General Manager (ATM) Airports Authority of India 21 st October, 2011 We are here... Bits Russia Canada Australia India China 2 We Can make

More information

Ministry of transport and communications of the Kyrgyz Republic. Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia

Ministry of transport and communications of the Kyrgyz Republic. Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia Ministry of transport and communications of the Kyrgyz Republic Modernization of aero navigation facilities of SE Kyrgyzaeronavigatsia Project Purpose: Modernization and re-equipment of air traffic system

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

Syllabus details and associated Learning Objectives ATPL CPL ATPL/ IR COMMUNICATIONS

Syllabus details and associated Learning Objectives ATPL CPL ATPL/ IR COMMUNICATIONS P. SUBJECT 092 IFR COMMUNICATIONS Syllabus ATPL CPL 090 00 00 00 COMMUNICATIONS 092 00 00 00 IFR COMMUNICATIONS 092 01 00 00 DEFINITIONS 092 01 01 00 Meanings and significance of associated terms LO Stations.

More information

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/21 Business case Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of Business

More information

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures

JAA Administrative & Guidance Material Section Five: Licensing, Part Two: Procedures 090 00 00 00 COMMUNICATIONS 091 00 00 00 VFR COMMUNICATIONS 091 01 00 00 DEFINITIONS 091 01 01 00 Meanings and significance of associated terms x x x x x LO Stations LO Communication methods 091 01 02

More information

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING

PBN Airspace Design Workshop. Area Navigation. Asia and Pacific Regional Sub-Office Beijing, China. 5 May 2016 Page 1 APAC RSO BEIJING PBN Airspace Design Workshop Area Navigation Asia and Pacific Regional Sub-Office Beijing, China 5 May 2016 Page 1 APAC RSO BEIJING Learning Objectives By the end of this presentation, you will be: Aware

More information

User Requirements for Air Traffic Services (URATS) Communications, Navigation, and Surveillance (CNS) Technologies

User Requirements for Air Traffic Services (URATS) Communications, Navigation, and Surveillance (CNS) Technologies User Requirements for Air Traffic Services (URATS) Communications, Navigation, and Surveillance (CNS) Technologies Edition 3.0 - JULY 2017 DISCLAIMER The information contained in this document is subject

More information

Appendix A REQUEST FOR AUTHORIZATION FORM

Appendix A REQUEST FOR AUTHORIZATION FORM Appendix A REQUEST FOR AUTHORIZATION FORM Note. For details on completing this form, and for definitions of acronyms and abbreviations, see section on Information Required for the Assessment of Authorization

More information

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report 29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

Air Traffic Services Standards and Procedures Contents

Air Traffic Services Standards and Procedures Contents Air Traffic Services Standards and Procedures Contents Effective Date Preface 18 May 2007 Contents 31 July 2013 Section 1 Glossary 22 July 2009 Chapter 1 Definitions 8 February 2013 Chapter 2 Abbreviations

More information

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen Page 1 of 6 1 INTRODUCTION Each route shall be assigned a designator that is unique for that aerodrome. The designator shall be defined in accordance with Annex 11, Appendix 3. In addition, the first 4

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region

MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec Status of implementation of CNS/ATM Systems in the MID Region MID Region Global ATM Operational Concept Training Seminar Cairo, 28 Nov. 1 Dec. 2005 Status of implementation of CNS/ATM Systems in the MID Region Mohamed Smaoui RO/AIS/MAP, ICAO MID Office, Cairo Contents

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

Project RLA/06/901 Lima, Peru, 22 September to 3 October Final Version

Project RLA/06/901 Lima, Peru, 22 September to 3 October Final Version GUIDELINE FOR THE IMPROVEMENT OF COMMUNICATIONS, NAVIGATION AND SURVEILLANCE SYSTEMS FOR SATISFYING OPERATIONAL REQUIREMENT IN THE SHORT- AND MEDIUM-TERM FOR EN-ROUTE AND TERMINAL AREA OPERATIONS Project

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

Air Traffic Services Standards and Procedures Contents

Air Traffic Services Standards and Procedures Contents Air Traffic Services Standards and Procedures Contents Effective Date Preface 18 May 2007 Contents 22 July 2009 Section 1 Glossary 22 July 2009 Chapter 1 Chapter 3 Chapter 4 Definitions Abbreviations Conversion

More information

What is B-RNAV? 1. 1 Adaptado de [ ]

What is B-RNAV? 1. 1 Adaptado de  [ ] What is B-RNAV? 1 RNAV is a method of navigation which permits a/c operations on any desired flight path within the coverage of station referenced navigation aids or the limits of the capability of self-contained

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood. RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks

More information

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN

TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN TRINIDAD AND TOBAGO PIARCO FIR/NATIONAL ASBU PLAN 1 ICAO ASBU WORKSHOP ANR ROBINSON INTERNATIONAL AIRPORT RUNWAY 11 PRESENTED BY RIAAZ MOHAMMED AND ROHAN GARIB ICAO Regional NAM/CAR Workshop on the Aviation

More information

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand) INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status

More information

NATA 2018 AGM & CONFERENCE

NATA 2018 AGM & CONFERENCE NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization

More information

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Aviation System Block Upgrades (ASBU), Blocks 0 and 1 ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana) International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities:

DRAFT. AND/OR one or more of the following to indicate the serviceable COM/NAV/approach aid equipment and capabilities: AIP ENR 1.10 Amendment ITEM 10: EQUIPMENT AND CAPABILITIES Radio Communication, Navigation and Approach Aid Equipment and Capabilities INSERT one letter as follows: N if no COM/NAV/approach aid equipment

More information

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO

ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/118 1 1/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation Safety and Air Navigation Implementation Support IMPACT TO

More information

APV IMPLEMENTATION PLAN

APV IMPLEMENTATION PLAN APV IMPLEMENTATION PLAN PRESENTATION PLAN Introduction PBN concept benefits implementation process Infrastructures assessment Operational constraints Medusa ALG civil aviation following actions conclusion

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,

More information

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017

AIRAC AIP SUPPLEMENT A 16/17 08 June 2017 Phone: 66 02 568 8831 Fax: 66 02 576 1903 AFTN: VTBAYOYX E-mail: aisthai@caat.or.th ais@caat.or.th THE CIVIL AVIATION AUTHORITY OF THAILAND Aeronautical Information Service Department 333/105 Lak Si Plaza,

More information

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific

Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Asia Pacific Seamless ATM Plan and Implementation of ATFM in Asia Pacific Yoshiki Imawaka Deputy Director - ICAO Asia and Pacific Office Global Ministerial Conference Riyadh, Saudi Arabia, 29 31 August

More information

Nepal PBN Implementation Plan. Civil Aviation Authority of Nepal Babarmahal, Kathmandu

Nepal PBN Implementation Plan. Civil Aviation Authority of Nepal Babarmahal, Kathmandu Nepal PBN Implementation Plan Civil Aviation Authority of Nepal Babarmahal, Kathmandu April 2011 Nepal PBN Implementation Plan Civil Aviation Authority of Nepal Babarmahal, Kathmandu April 2011 Amendments

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based

More information

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

European Aviation Safety Agency

European Aviation Safety Agency Annexes I and II to ED Decision 2018/013/R European Aviation Safety Agency Acceptable Means of Compliance and Guidance Material to Commission Regulation (EU) No 1332/2011 and Commission Implementing Regulation

More information

AERODROME OPERATING MINIMA

AERODROME OPERATING MINIMA Title: Determination of Aerodrome Operating Minima Page 1 of 8 AERODROME OPERATING MINIMA 1. PURPOSE 1.1 The purpose of this Advisory Circular is to provide methods to be adopted by operators in determining

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

Navigation at the. Federal Aviation Administration Crossroads

Navigation at the. Federal Aviation Administration Crossroads Navigation at the Crossroads To: Stanford 2010 PNT Symposium By: Leo Eldredge GNSS Program Manager Date: Peak Aircraft Traffic Over The US 5000 aircraft 689 M passengers 36 B pounds cargo 2 If We Do Nothing

More information

AIRLINE TRANSPORT PILOTS LICENSE ( COMMUNICATIONS)

AIRLINE TRANSPORT PILOTS LICENSE ( COMMUNICATIONS) VFR COMMUNICATIONS 090 01 00 00 DEFINITIONS 090 01 01 00 Explain the meanings and significance of associated terms: Stations Communication methods 090 01 02 00 Air traffic control abbreviations Define

More information

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line. International Civil Aviation Organization WORKING PAPER 31/10/12 English only TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

Aeronautical Radio Licensing Policy Manual

Aeronautical Radio Licensing Policy Manual Radio Licensing Policy Manual GUIDANCE: Publication Date: 2 nd November 2018 About this document 1.1 The Radio Licensing Policy manual gives general guidance on the licensing of radio in Aircraft and Ground

More information

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION

AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION INTERNATIONAL CIVIL AVIATION ORGANIZATION AIR NAVIGATION SYSTEM IMPLEMENTATION PLAN FOR THE AFI REGION Communications, Navigation and Surveillance Version 1.0 September 2013 - 2 - TABLE OF CONTENTS Chapter

More information

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8)

International Civil Aviation Organization. The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) PBN/TF/8 IP/03 12-13/5/2011 International Civil Aviation Organization The Eighth Meeting of the Performance Based Navigation Task Force (PBN TF/8) New Delhi, India 12 13 May 2011 Agenda Item 5: State/Industry

More information

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123

Chapter 6. Brize Radar, Speedbird 213 Heavy, request radar advisory. Speedbird 123 change call sign to BA 123 INTRODUCTION The procedures for and VFR are mostly identical but some words and procedures are generally only used by large commercial aircraft; hence they appear in this section. In this chapter we will

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

Air Traffic Control & Management

Air Traffic Control & Management Air Traffic Control & Management To fully understand the varying performance characteristics of aircraft, it is necessary to understand certain elements of the environment in which they operate. The performance

More information

Subject: Application of Data Link services within Kolkata FIR

Subject: Application of Data Link services within Kolkata FIR AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2233/2245 AFS: VIDDYXAX FAX: 91-11-24611078 INDIA AERONAUTICAL INFORMATION SERVICE Sl. No.06/2006 AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG AIRPORT

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule NACC/WG/2- WP/01 Rev. International Civil Aviation Organization 23/04/08 North American, Central American and Caribbean Office Second North American, Central American and Caribbean Working Group Meeting

More information