etod: State of Affairs Global AIM Kampala - Session 5 24 th May 2017 Jan-Philipp LAUER, MSc

Size: px
Start display at page:

Download "etod: State of Affairs Global AIM Kampala - Session 5 24 th May 2017 Jan-Philipp LAUER, MSc"

Transcription

1 etod: State of Affairs Global AIM Kampala - Session 5 24 th May 2017 Jan-Philipp LAUER, MSc jan-philipp.lauer@dfs.de

2 Overview Content The need for etod Regulatory situation Technical situation Conclusions 2

3 The need for etod etod data are needed for a number of applications: procedure design (including Engine Out Standard Instrument Departure (EOSID) design) Terrain Avoidance and Warning Systems (TAWS), for Helicopters (HTAWS) takeoff performance analysis Vertical Situation Displays (VSD) Synthetic Vision Systems (SVS) en-route mapping finding landing zones, e.g. Helicopter Emergency Medical Services (HEMS) descent profile analyses, e.g. to determine emergency oxygen requirements radio wave propagation analyses (radar, VHF, etc.) 3

4 Regulatory situation: history ICAO decided to go digital with obstacle and terrain information at a Divisional Meeting in RTCA and EUROCAE developed User Requirements for Terrain and Obstacle Data (DO-276A and ED-98A) in In 2004, Amendment 33 to ICAO Annex 15 incorporated those etod requirements. Amendment 36 to Annex 15, released in 2010, foresaw major revisions to the etod requirements to reduce implementation costs. In 2013, Amendment 37 to Annex 15 contained minor etod changes and added AMDB (Aerodrome Mapping Database) requirements. The Final Report of the ICAO EANPG/58 (28 November to 01 December 2016), Appendix V Deficiencies related to etod Area 1 and Area 4 in the list of AN Deficiencies, listed the countries not providing electronic terrain and obstacle data for Area 1 and not providing obstacle data for Area 4 as having Air Navigation Deficiencies. 4

5 Technical situation: AIXM Eurocontrol and the FAA have jointly developed the Aeronautical Information Exchange Model (AIXM) to exchange etod obstacle data and other aeronautical information. AIXM version 1.1 was released in AIXM version 5.1 has been available since February It contained updates to inter alia facilitate the encoding of Digital NOTAMs. AIXM version was released in May Since 2012 a Change Control Board with international participation has governed the development of AIXM. 5

6 Technical situation: airborne applications Most airborne systems (e.g. Terrain Avoidance and Warning Systems (TAWS), Vertical Situation Displays (VSD), Synthetic Vision Systems (SVS), and en-route mapping) will not utilize AIXM to store and process etod obstacle data. To enable the use of etod data in airborne systems, ARINC is developing a new set of technical specifications: Terrain Database: ARINC Project Paper 813 will define encoding formats for terrain databases that can be loaded directly into airborne systems. Note: Today the primary terrain data sources for these systems are enriched SRTM (Shuttle Radar Topography Mission)datasets that were acquired by the Space Shuttle mission STS-99 in February Obstacle Database: ARINC Project Paper 815 XML Encoding and Compression: ARINC Specification 814 All these specifications are not mature and only available as drafts. First plans exist to use AIXM data in EFBs to optimize takeoff and landing performance. 6

7 Sferion Synthetic Vision & Obstacle Warning 7

8 Example: SVS based on WorldDEM for bad weather conditions Merge of database with sensor data for combined synthetic view SFERION Avionic with WorldDEM , Helicopter Days Bückeburg 8

9 Satellite DEM: Ivory Coast, Bouaké Region WorldDEM(0.4 12m) ASTER(1 30m) SRTM90(3 90m) arc second 30m

10 Close up Terrain comparison WorldDEM - level of detail SRTM90 SRTM30 Minnesota WorldDEM N47W097 10

11 Terrain comparison Oxford, United Kingdom WorldDEM12 WorldDEM24 WorldDEM90 SRTM90

12 WorldDEM ICAO Annex 15 Chapter 10 compliance with numerical requirements Using commercially available datasets to comply with some etod requirements is a possibility: 12

13 Helicopter operational improvements by database improvements Current terrain and obstacles numerical data requirements Proposed terrain and obstacles numerical data requirements Factor of Improvement / Consequence Post spacing Terrain horizontal acc. Terrain vertical acc. Obstacle horizontal acc. Obstacle vertical acc. DTED1 90m +/- 50m +/- 30m +/- 50m +/- 30m DTED2 30m +/- 5m +/- 3m +/- 16m +/- 7m Factor 6 Factor 100 Factor 10 Factor 9 Factor 4.3 Minimum off-airport landing area size to consider for landing safely an EC145-T2 H/C, HEMS operations from database information 135m x 135m 67m x 67m Factor 4 / Ease of landing area detection or selection NAVD page obstacle display, minimum range selected: 0.5NM Uncertainty area around obstacle position is a small circle Uncertainty area is reduced to a point, so already optimal Factor 9 / Accuracy in line with display capability DMAP page obstacle display, minimum range selected: 0.1NM Uncertainty area around obstacle position is a medium circle Uncertainty area around obstacle position is a small circle Factor 9 / Accuracy in line with display capability SVS case 1 (terrain at 5NM) SVS case 2 (terrain at 800m) SVS case 3 (terrain at 300m) Dx +/- 1 Dy +/- 0,35 Errors part 13% Dx +/- 2,54 Dy +/- 1,16 Errors part 55% Dx +/- 5,3 Dy +/- 2,36 Errors part 69% Dx +/- 0,89 Dy +/- 0,31 Errors part 1,5% Dx +/- 1,28 Dy +/- 0,64 Errors part 10% Dx +/- 2 Dy +/- 1 Errors part 19% Factor 1,1 Factor 10 Factor 2 Factor 5,5 Factor 2,6 Factor 3,5 HTAWS forward timing Warning timing reduced by 10% (1s) Warning timing reduced by 3% (300ms) Factor 3 / Less impact on Warning timing => safer HTAWS vertical buffer increased by accuracy (worst case) 248ft 173ft Factor 1.4 / False alerts nuisances reduction HTAWS vertical buffer reduced by accuracy (worst case) 5s of descent flight (52ft) 13s of descent flight (127ft) Factor 2.5 / Passing from unsafe to situation in line with regulations 13

14 Rationale: landing zones Helicopter emergency medical services (HEMS) operations Terrain and obstacles: etod Area 1 accuracy requirement: 50m Desired accuracy: 16m The landing area to be searched for, which also has to be free of obstacles, is reduced by factor 4. reduction of pilot workload increased situational awareness 14

15 Rationale: HTAWS (Helicopter Terrain Awareness and Warning System) accuracy HTAWS generates proximity alerts for terrain and obstacles. Due to its higher resolution and accuracy, WorldDEM allows more accurate collision warnings to be triggered. HTAWS based on SRTM90 versus WorldDEM12 Redundant system (with on-board sensors) 15

16 Rationale: HTAWS accuracy Scenario - Descent flight with 600ft/min - HTAWS vertical buffer: 150ft - Accuracy 100ft (>30m) actually 150ft real terrain 16

17 Rationale: HTAWS accuracy Scenario - Descent flight with 600ft/min - HTAWS vertical buffer: 150ft - Accuracy 100ft (>30m) actually - Case 1: distance to terrain 250ft false alarm 150ft 250ft 30 m displayed terrain real terrain 17

18 Rationale: HTAWS accuracy Scenario - Descent flight with 600ft/min - HTAWS vertical buffer: 150ft - Accuracy 100ft (>30m) actually - Case 1: distance to terrain 250ft false alarm - Case 2: distance to terrain 50ft no alert 50ft 150ft m real terrain displayed terrain

19 Rationale: HTAWS accuracy Scenario - Descent flight with 600ft/min - HTAWS vertical buffer: 150ft - 12ft (4m) with WorldDEM - Case 1: distance to terrain 162ft false alarm - Case 2: distance to terrain 138ft no alert 150ft 5m 5m displayed terrain real terrain 19

20 3D obstacle AIP data AIP Germany AIP Austria AIP Switzerland 20

21 Technical issues: procedure design / airline systems The sheer amount of etod obstacle data overwhelms current ANSP and airline procedure design systems (LTBA, Istanbul Atatürk Airport is shown here). Coding inconsistencies between different etod implementations exist. Business rules, coding guidelines, reference implementations, and verification tests are required. GmbH 21

22 Technical issues: AIXM I Despite its long development history (ongoing since 1998), a number of issues prevent the effective exchange of AIXM data: Mapping rules to convert AIXM to the ARINC obstacle data formats do not exist. Therefore, it is difficult to make AIXM data available for airborne applications. The AIXM standard is too permissive; there is practically no interoperability so that data exchanges are only possible after major bilateral coordination between the exchanging parties. The underlying business rules are neither finalized nor mandatory. Incremental updates of AIXM datasets are currently not supported, in particular due to the lack of harmonized UUIDs (Universally Unique Identifiers) throughout the data chain. Due to this shortcoming, additional effort to track changed information in new datasets is required. 22

23 Technical issues: AIXM II No reference implementations and certification tests for AIXM implementations by different vendors exist that would ensure the required level of interoperability across the industry. The development of coding guidelines has only begun. Additional resources are required. As the Digital NOTAM concept is not fully mature and harmonized UUIDs are a pre-requisite to its implementation, the use-case obstacle NOTAM cannot be implemented at this time. The Digital NOTAM Event Specification required for the implementation of Digital NOTAM is neither complete nor mature. Due to the verbosity of AIXM datasets, AIXM files are very large (about 500 MB for Frankfurt Airport). This paired with the current inability to provide incremental updates can lead to problems when uncompressed AIXM files have to be transmitted over narrow-band connections. 23

24 Technical issues: terrain data At present SRTM/ASTER terrain data are predominantly used in avionics SRTM/ASTER data: are available free of charge are often outdated have a low resolution and a high error potential Higher resolution data cannot yet be processed by most avionics systems Problems with State-provided terrain data: lack of harmonization between national datasets (lack of homogeneity) quilting of data at borders different data formats 24

25 The aeronautical data chain is outdated and broken GmbH 25

26 Conclusions etod is still immature and not all operational requirements are met by today s regulatory requirements. A major issue are the disparate, uncoordinated development efforts by different stakeholder groups. Another major issue is the inability to exchange data between stakeholders. This is caused by excessively permissive specifications and the lack of congruence and coherence between standardization activities. Other industries have solved these coordination, standardization, and data exchange issues a long time ago. The aviation industry needs to fix etod and to improve the underlying structures, i.e. harmonization, standardization, and certification. 26

27 Thank you for your attention! WEBALE NYO 27

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member

SWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member SWIM: An ANSP Perspective Jan-Philipp LAUER, MSc CANSO AIMWG SC Member ICAO Interregional APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Agenda

More information

Regional implementation of Electronic Terrain and Obstacle data (e-tod) (Presented by Jeppesen)

Regional implementation of Electronic Terrain and Obstacle data (e-tod) (Presented by Jeppesen) International Civil Aviation Organization SAM/IG/13-WP/39 South American Regional Office 5/04/14 Thirteenth Workshop/Meeting of the SAM Implementation Group English only (SAM/IG/13) - Regional Project

More information

AIXM Coding guidelines for the ICAO data sets

AIXM Coding guidelines for the ICAO data sets AIXM Coding guidelines for the ICAO data sets Eduard POROSNICU DECMA/STR/SWM July 2018 Context Restructured Annex 15 Digital data sets AIP Obstacles Terrain Airport Mapping Instrument Flight Procedures

More information

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well

More information

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL) ATIEC 2017 Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL) Content AIXM usage - current and future Interoperability Digital NOTAM AIXM intended use AIXM 2.1/3.3/4.5 - developed for the EAD (European

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36 DP-3 ICAO Electronic Terrain and Obstacle Data Amendments 33 & 36 1 Published Amendment 33 to ICAO Annex 15, Chapter 10 July 2004, ICAO Annex 15(Aeronautical Information Services) addeda new Chapter 10

More information

Terms of Reference for a rulemaking task

Terms of Reference for a rulemaking task Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1

More information

Lufthansa Systems AIM from a navigation data house perspective

Lufthansa Systems AIM from a navigation data house perspective AIM/SAM/10, August 2017 Lima Peru Lufthansa Systems AIM from a navigation data house perspective genda The Company & Products Electronic Terrain and Obstacle Data (etod) Transition from AIS to AIM Aeronautical

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE

More information

AMXM Airport Mapping picking-up SWIM

AMXM Airport Mapping picking-up SWIM Global Information Management AMXM Airport Mapping picking-up SWIM Presented By: Sam Van der Stricht Date: August 25, 2015 AMDB Applications EUROCAE / RTCA Applications: Moving Map Routing Runway Safety

More information

AIXM/WXXM CONFERENCE 2010

AIXM/WXXM CONFERENCE 2010 AIXM/WXXM CONFERENCE 2010 ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) Development of Standards and Recommended Practices (SARPS) Presented to: AIXM/WXXM

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)

More information

Wireless Avionics Intra- Communications (WAIC) SAE Aerospace Standards Summit Spring 2017, 25-26th April, 2017, Cologne, Germany

Wireless Avionics Intra- Communications (WAIC) SAE Aerospace Standards Summit Spring 2017, 25-26th April, 2017, Cologne, Germany Wireless Avionics Intra- Communications (WAIC) SAE Aerospace Standards Summit Spring 2017, 25-26th April, 2017, Cologne, Germany Uwe Schwark 19 April 2017 Content Introduction to WAIC What is WAIC? Examples

More information

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 International Civil Aviation Organization Amendment 37,38 to Annex 15 Amendment 57 to Annex 4 Roberta Luccioli TO/AIM Seminario de la OACI sobre la Transicion al AIM Fases1 3 Outline 1. Amendment 37 to

More information

Aeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM)

Aeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM) Aeronautical Information Services Update on Aeronautical Information Exchange Model (AIXM) Presented to: ATIEC 2016 By: D. Cowell (FAA), E. Porosnicu (EUROCONTROL) Date: 22 August 2016 Content AIXM versions

More information

Electronic Terrain and Obstacle Data

Electronic Terrain and Obstacle Data International Civil Aviation Organization Electronic Terrain and Obstacle Data David Lewtas Chief, Aeronautical Information Unit (MET/AIM) 24 November 2010 ICAO CAR AIM Seminar Kingston, Jamaica 22-24

More information

FLIGHT OPERATIONS PANEL

FLIGHT OPERATIONS PANEL International Civil Aviation Organization FLTOPSP/WG/2-WP/11 24/04/2015 WORKING PAPER FLIGHT OPERATIONS PANEL WORKING GROUP SECOND MEETING (FLTOPSP/WG2) Rome, Italy 4 to 8 May 2015 Agenda Item 6: Any Other

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,

More information

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT CHAP 7-1 CHAPTER 7 COMMUNICATION AND NAVIGATION EQUIPMENT 7.1 COMMUNICATION EQUIPMENT 7.1.1 An aeroplane shall be provided with radio communication equipment capable of: a) conducting two-way communication

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

NCLB AIM WORKSHOP, CAIRO - EGYPT 11 TH -13 TH SEPTEMBER, 2017 Kabir Y. Gusau IFAIMA Vice President

NCLB AIM WORKSHOP, CAIRO - EGYPT 11 TH -13 TH SEPTEMBER, 2017 Kabir Y. Gusau IFAIMA Vice President IFAIMA International Federation of Aeronautical Information Management Associations The Global voice of AIM as a non-partisan and non-profit-making Federation of AIM Associations Since 2008 Objectives

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011 DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen

More information

International Civil Aviation Organization

International Civil Aviation Organization International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and

More information

Global Information Management. Status Report: AIXM

Global Information Management. Status Report: AIXM Global Information Management Status Report: AIXM Presented By: Allen Proper, FAA Date: August 25, 2015 Content AIXM versions in use AIXM Change Control Board activity FAA perspective AIXM 4.5 Published:

More information

Got Mountains? Challenges of Modeling SRTM and Other Terrain Data to Suit Aviation Applications

Got Mountains? Challenges of Modeling SRTM and Other Terrain Data to Suit Aviation Applications Got Mountains? Challenges of Modeling SRTM and Other Terrain Data to Suit Aviation Applications M. Fox, B. Dorrell, L. Haskell, Jeppesen, 55 Inverness Drive East, Englewood, CO 80112 Abstract Jeppesen,

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

GENERAL INFORMATION Aircraft #1 Aircraft #2

GENERAL INFORMATION Aircraft #1 Aircraft #2 GENERAL INFORMATION Identification number: 2007075 Classification: Serious incident Date and time 1 of the 2 August 2007, 10.12 hours occurrence: Location of occurrence: Maastricht control zone Aircraft

More information

ICAO GANP Requirements and Evolution

ICAO GANP Requirements and Evolution ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

Breaking the Accident Chain

Breaking the Accident Chain Breaking the Accident Chain Helitech International 2013 Safety Workshops 26 September 2013 Agenda CFIT Truths and Myths Breaking the Accident Chain Overview FAA Case Scenario HTAWS Truths and Myths HTAWS

More information

Competency of Surveyors

Competency of Surveyors Competency of Surveyors Session 2.1: Obstacle Identification & Data Collection 5 December 2017 AERODROME SAFEGUARDING WORKSHOP (Cairo, Egypt, 4-6 December 2017) Presented by: Michelle Soliman, Aerodrome

More information

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2 Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)

More information

VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection

VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection The FANS Group 8703 Yates Drive, suite 125 Westminster, Colorado 80031 www.fans-group.aero 877.710.7932

More information

Advisory Circular. Regulations for Terrain Awareness Warning System

Advisory Circular. Regulations for Terrain Awareness Warning System Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective

More information

MIDAD Project IDS Vision

MIDAD Project IDS Vision MIDAD Project IDS Vision Cairo July, 2013 Ramy El-Jabi Outline MIDAD Scope Solution High Level Architecture IDS Air Navigation Suite Proposed Implementation Schedule 2 MIDAD Scope Drawbacks related to

More information

COLLISION AVOIDANCE FOR RPAS

COLLISION AVOIDANCE FOR RPAS COLLISION AVOIDANCE FOR RPAS Johan Pellebergs, Saab Aeronautics ICAS workshop, September 2017 This document and the information contained herein is the property of Saab AB and must not be used, disclosed

More information

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84 Data Origination, Management and WGS 84 1 Learning Objectives Overview Understand the implication of publishing incorrect navigational data in the State s AIP Identify why it is essential to use a common

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

Airport AIM as a Service Presented at World ATM Congress 2016

Airport AIM as a Service Presented at World ATM Congress 2016 Airport AIM as a Service Presented at World ATM Congress 2016 Ulrich Kaage Sales Manager AIM Outline Airport data is a considerable part of the AIM data chain The move from paper centric to data driven

More information

ADQ Regulators Working Group

ADQ Regulators Working Group ADQ Regulators Working Group Common Understanding 01/2013 Application of the provisions of Commission Regulation (EU) 73/2010 to NOTAM Edition: 1.4 Date: 20 October 2016 Reference: ARWG CU 01/2013 ARWG

More information

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015

10+ years of EAD: picking the low-hanging fruit. guido HAESEVOETS EAD Customer Management 29/01/2015 10+ years of EAD: picking the low-hanging fruit guido HAESEVOETS EAD Customer Management 29/01/2015 10+ years of EAD Principles EUROCONTROL operates and manages the EAD on behalf of its Member States,

More information

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems

TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems REQUESTOR: RTCA Paper No. 349-16/PMC-1568 TERMS OF REFERENCE (Revision 9) Special Committee (SC) 213 Enhanced Flight Vision Systems/Synthetic Vision Systems Organization Federal Aviation Administration,

More information

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures

Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the

More information

Aircraft Systems and 4D Trajectory Management

Aircraft Systems and 4D Trajectory Management Aircraft Systems and 4D Trajectory Management September 2012 David De Smedt EUROCONTROL 1 i4d concept (SESAR) Share and synchronise airborne and ground trajectory Flying to time constraints to optimize

More information

Sharing UAE experience in. AIM implementation

Sharing UAE experience in. AIM implementation Sharing UAE experience in AIM implementation NCLB AIM WORKSHOP Cairo, Egypt, 11 13 September 2017 MID Region NCLB Strategy No Country Left Behind campaign help ensure all States of effective implementation

More information

Introduction to Amendment 40 to Annex 15

Introduction to Amendment 40 to Annex 15 Introduction to Amendment 40 to Annex 15 Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline From Aeronautical information services (AIS)

More information

CASCADE OPERATIONAL FOCUS GROUP (OFG)

CASCADE OPERATIONAL FOCUS GROUP (OFG) CASCADE OPERATIONAL FOCUS GROUP (OFG) Use of ADS-B for Enhanced Traffic Situational Awareness by Flight Crew During Flight Operations Airborne Surveillance (ATSA-AIRB) 1. INTRODUCTION TO ATSA-AIRB In today

More information

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach

More information

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that

More information

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework

More information

Module N B0-102: Baseline Ground-based Safety Nets

Module N B0-102: Baseline Ground-based Safety Nets Module B0-102 V1 1 2 3 Module N B0-102: Baseline Ground-based Safety Nets 4 5 Summary Main Performance Impact Operating Environment/Phases Flight Applicability Considerations Global Concept Component(s)

More information

khz CHANNEL SPACING

khz CHANNEL SPACING 1. Introduction This instruction updates section 47: 8.33 khz CHANNEL of the IFPS Users Manual 21.1. Next edition of the manual (22.0 due in the spring 2018) will incorporate the present update. 2. Update

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011) IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

ORGANISER HOST LEAD SPONSOR

ORGANISER HOST LEAD SPONSOR ORGANISER HOST LEAD SPONSOR Data Sharing and ATFM Moderator Francois Delille Director of Business and Product Strategy, ATM, Thales CANSO LATIN AMERICA AND CARIBBEAN CONFERENCE 2017 Challenges of the Air

More information

TCAS RA not followed. Tzvetomir BLAJEV Stan DROZDOWSKI

TCAS RA not followed. Tzvetomir BLAJEV Stan DROZDOWSKI TCAS RA not followed Tzvetomir BLAJEV Stan DROZDOWSKI EUROCONTROL European Organisation for the Safety of Air Navigation Civil-military intergovernmental organisation 41 Member States 2 Comprehensive Agreement

More information

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Starting with its baseline features, the Pro Line Fusion avionics in your Gulfstream PlaneView280 flight deck offer capabilities

More information

Discuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES

Discuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES ADS-B SITF/6-IP/3 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) SEMINAR AND THE SIXTH MEETING OF ADS-B STUDY AND IMPLEMENTATION TASK FORCE (ADS-B SITF/6)

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009

The D-AIM Project and Trials. Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009 The D-AIM Project and Trials Roger Li, D-AIM Project Manager LFV AIXM/WXXM Conference Washington DC, May 13, 2009 D-AIM Background Cooperation between LFV (Swedish Airports and Air Navigation Services)

More information

European Aviation Safety Agency

European Aviation Safety Agency European Aviation Safety Agency EXPLANATORY NOTE EXECUTIVE SUMMARY The scope of this Decision is to transpose some FAA TSO standards for parts and appliances into EASA ETSO as outlined in the Terms of

More information

VALUE PROPOSITION FOR TRAINING AND SIMULATION A White Paper on Electronic Terrain & Obstacle collection

VALUE PROPOSITION FOR TRAINING AND SIMULATION A White Paper on Electronic Terrain & Obstacle collection VALUE PROPOSITION FOR TRAINING AND SIMULATION A White Paper on Electronic Terrain & Obstacle collection The FANS Group 8703 Yates Drive, suite 125 Westminster, Colorado 80031 www.fans-group.aero 877.710.7932

More information

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink

Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators. Fred Abbink Glass Cockpits in General Aviation Aircraft. Consequences for training and simulators Fred Abbink Content Development of Air transport cockpits, avionics, automation and safety Pre World War 2 Post World

More information

Part 175.D & E Aeronautical Data Originators Data Product Specification: Vertical Obstructions

Part 175.D & E Aeronautical Data Originators Data Product Specification: Vertical Obstructions Part 175.D & E Aeronautical Data Originators Data Product Specification: Vertical Obstructions ATS-DPS-0010 Version 2 Effective 22 December 2017 Prepared: Authorised: Sateesh Sathineni Aeronautical Data

More information

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures OCP-WG-WP 4.18 OBSTACLE CLEARANCE PANEL WORKING GROUP AS A WHOLE MEETING ST. PETERSBURG, RUSSIA 10-20 SEPTEMBER 1996 Agenda Item 4: PANS-OPS Implementation CFIT-Procedure Design Considerations Use of VNAV

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

IRELAND SAFETY REGULATION DIVISION

IRELAND SAFETY REGULATION DIVISION NOTICE TO AIR NAVIGATION SERVICE PROVIDERS IRELAND SAFETY REGULATION DIVISION NR S.016 ISSUE 1 DATE 03.03.10 IRISH AVIATION AUTHORITY AVIATION HOUSE HAWKINS STREET DUBLIN 2 Tel +353 1 6718655 Fax +353

More information

Aeronautical Data Quality - A New Challenge for Surveyors

Aeronautical Data Quality - A New Challenge for Surveyors Aeronautical Data Quality - A New Challenge for Surveyors Ralf Wolfgang SCHROTH, Germany Key words: surveying, work flow management, aeronautical data quality, International Civil Aviation Organisation

More information

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System GANIS Montreal, December 2017 Paco Salabert, EUROCONTROL The European Organisation for the Safety of Air Navigation

More information

AIXM Annual Conference 2008 Day 2 March 19 th (morning) Migration TO and FROM AIXM from other AMDB Formats. Alan Poole/Dejan Damjanovic

AIXM Annual Conference 2008 Day 2 March 19 th (morning) Migration TO and FROM AIXM from other AMDB Formats. Alan Poole/Dejan Damjanovic AIXM Annual Conference 2008 Day 2 March 19 th (morning) Migration TO and FROM AIXM from other AMDB Formats Alan Poole/Dejan Damjanovic Overview Background and Problem Definitions. IATA AIS Data Pool Vision.

More information

EUROCONTROL approach to the execution of the PBN IR Mandate

EUROCONTROL approach to the execution of the PBN IR Mandate EUROCONTROL approach to the execution of the PBN IR Mandate Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation

More information

GANP ASBU Symposium 2017

GANP ASBU Symposium 2017 GANP ASBU Symposium 2017 ICAO EUR NAT Office/ACAC Tunisia, 27-30 March 2017 Session 3: ASBU Implementation Monitoring Report Ana Paula FRANGOLHO EUROCONTROL EUROCONTROL DPS/PEPR ASBU Implementation Monitoring

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

APPENDIX A MODULE NO. B0-101: ACAS IMPROVEMENTS

APPENDIX A MODULE NO. B0-101: ACAS IMPROVEMENTS Appendix A APPENDIX A MODULE NO. B0-101: ACAS IMPROVEMENTS Summary Main performance impact as per Doc 9854 Operating environment/ Phases of flight Applicability considerations Global concept component(s)

More information

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a

More information

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM

Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM Overview ICAO Standards and Recommended Practices for Aerodrome Mapping Data reported to AIM References ICAO SARPS Annex 14 Vol. I, 7 th Edition, July 2016 ICAO SARPS Annex 15, 15 th Edition, July 2016

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Advisory Circular. Automatic Dependent Surveillance - Broadcast

Advisory Circular. Automatic Dependent Surveillance - Broadcast Advisory Circular Subject: Automatic Dependent Surveillance - Broadcast Issuing Office: Standards PAA Sub Activity Area: Aviation Safety Regulatory Framework Document No.: AC 700-009 File Classification

More information

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation

Overview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation

More information

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management User Forum 2011 AIM/EAD Evolutions Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management The European Organisation for the Safety of Air Navigation EAD General Concept

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 23/6 Official Journal of the European Union 27.1.2010 COMMISSION REGULATION (EU) No 73/2010 of 26 January 2010 laying down requirements on the quality of aeronautical data and aeronautical information

More information

ICAO framework for LPV

ICAO framework for LPV ICAO framework for LPV Patrizio Vanni GNSS expert enav.it Torrejon, 10-10-2013 Main topics PBN framework GANP & ASBU concept PBN Manual GNSS Manual Italian experience Conclusions 2 The challenges Air Traffic

More information

Aeronautical Information Management

Aeronautical Information Management Aeronautical Information Management NOTAM Activities Introduction Presented to: By: Barry C. Davis Date: May 3, 2011 What s AIM? Dynamic, integrated management of aeronautical information services safely,

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2010R0073 EN 20.10.2014 001.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B COMMISSION REGULATION (EU) No 73/2010 of 26 January

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI)

1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI) SSC/14/54/5 Agenda Item 4.1 16 June 2014 54 th SINGLE SKY COMMITTEE 1/2 July 2014 Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability

More information

Ground movement safety systems and procedures - an overview

Ground movement safety systems and procedures - an overview Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)

More information

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL From AIS to AIM Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL AIS-AIM Study Group Active from 2008-2015 Objectives Global strategy/roadmap for the transition from AIS to AIM SARPs/Guidance

More information