Enav perspective of RWY Incursion Hazards and Proposed Mitigation Strategies associated with aerodrome design. ISTANBUL, 5/8 November 2013

Size: px
Start display at page:

Download "Enav perspective of RWY Incursion Hazards and Proposed Mitigation Strategies associated with aerodrome design. ISTANBUL, 5/8 November 2013"

Transcription

1 Enav perspective of RWY Incursion Hazards and Proposed Mitigation Strategies associated with aerodrome design ISTANBUL, 5/8 November 2013

2 Getting to the roots of the problem

3 Most of the main European airports date back their foundations from the pre-war to the early 1960 period. The inherited aerodrome design is not meeting the high traffic volume operational & environmental needs. Cities have often surrounded the airport fences. Sudden and not always well controlled grow of the airport infrastructures,... hence... TWR line of sight frequently limited

4 Human factor Complex or inadequate Aerodrome Design ICAO Doc 9870

5 COMPLEX OR INADEQUATE aerodrome design significantly increases the probability of a runway incursion. The FREQUENCY OF RUNWAY INCURSIONS has been shown in many studies to be related to the number of runway crossings and the characteristics of the aerodrome layout. POOR INFRASTRUCTURE DESIGN has highly contributed to the quantity and severity of runway incursions. All studies confirm the relevant role of an appropriate aerodrome layout in managing runway safety. Airfield design is a process that must balance safety, efficiency, capacity and enviroment TAXIWAY AND AIRFIELD DESIGN PLANNING GOES HAND-IN-HAND WITH OPERATIONAL CONSIDERATION

6 AN IMPORTANT FACTOR IN PREVENTING RUNWAY INCURSIONS IS TO LIMIT THE PHYSICAL POSSIBILITIES FOR PILOTS AND VEHICLE DRIVERS TO MISTAKENLY ENTER RUNWAYS. This basic principle includes, but is not limited to: The simplicity and logic of taxi/runway lay-out. The avoidance of runway crossings The optimal use of perimeter taxiways for a/c The compulsory use of segregated service road for vehicles The avoidance of using a runway as a taxiway...

7 OPTIMIZE PILOTS RECOGNITION OF RUNWAYs TO INCREASE SITUATIONAL AWARENESS AND ENSURE THAT TAXIWAYS LAYOUTS TAKE OPERATIONAL REQUIREMENTS AND REALITIES INTO ACCOUNT: FULL PARALLEL TAXIWAYS limit direct and unaware entries onto runways and provide easy access to each runway end Use a RIGHT ANGLE FOR TAXIWAY conducting to the runway (except high speed exit) AVOID WIDE EXPANSES OF PAVEMENT AT RUNWAY ENTRY (VERY WIDE TAXIWAY) HF problem: the ability, to see and understand the holding points, is compromised Avoid maintaining THE SAME NAME TO A TWY making several turns along its route Limit the NUMBER OF TAXIWAYS INTERSECTING AT ONE SPOT Implement STANDARD TAXI ROUTE Implement, whenever possible, ONE WAY TAXIWAYS Highly consider the opportunity to modify the taxiway nomenclature to maintain it INSTINCTIVE

8 What can be done and how ATC can help. Runway crossing Pilot expectations

9 Use strategies to reduce the number/severity of active runway crossing: PROMOTE THE BUILDING AND USE OF LOOP PERIMETER TAXIWAYS TO AVOID RUNWAY CROSSINGS OR AT LEAST: Ensure proper TRAFFIC FLOW STRATEGIES KEEPING THE CROSSING POINT AT THE LAST TWO THIRDS OF THE RUNWAY, the risk of category A or B incursions is higher for crossing occurring in the first third of the runway, USE ONLY RIGHT-ANGLE TAXIWAYS, never use an high speed exit for entering the runway ( aircraft and vehicles); Must issue a specific clearance to cross any runway, Avoid to insert the crossing clearance inside a complex/long message or taxi instruction Avoid the contemporary use of conditional clearances

10 New configuration at the end of 1998 Increased volume of traffic since then Rwy incursion connected with the crossing 35L : 18 ( ) NEW TWY H BUILT (2007/09) TWY H length 2,5 KM Useful when 35R is used for departure Useless when RWY 35R is used for arrivals (due to noise abatement runway configuration changes every 24 hours) Compulsory use of 35R for departure in LVP and consequently of TWY H. Runway incursion, connected with the crossing, after the TWY H opening to today :

11 The role of expectations

12 These unusual location for the RHP are frequently missed by pilots and leads to R.I severity type D Due to OFZ requirements or displaced threshold PILOT EXPECTATION

13 As the airport reopened to traffic after a renovation, the number of runway incursions showed a problem which couldn t be ignored. It was clear since the beginning, the main trouble was related to RHP on TWY A followed by RHP K1, that it was involved in less than 1/4 of the total incursions ACTION TAKEN: LRST in action! An HOT SPOTS map was published in AIP (first time in Italy) and reproduced on the first page of each PIB/meteo folder given to pilots (periodically repeated) ATCOs and airside operators have been trained & stressed on the subject. The situation is constantly monitored, analyzed and data up-dated.

14 Incursions on RHP A

15 ACTION TAKEN: Hotspot map, but wasn t enough hence Increase pilot awareness introducing the use of ad hoc fraseology TWR: I-ALDE TAXI TO CATEGORY III HOLDING POINT G RUNWAY 29 Huge reduction of misunderstandings, hence of R.I.

16

17 Data on Enav airports

18 A B C D E n.c. NO ATM ATM A B C D E n.c. NO ATM ATM A B C D E n.c. NO ATM ATM A B C D E n.c. NO ATM ATM

19 % 16% 10% 5% Aircraft Helicopter Person 1% Aircraft Helicopter Person Vehicle Vehicle 73% 83% % % 2% Aircraft Helicopter Person Vehicle 9% 22% Aircraft Helicopter Person 80% 69% Vehicle

20 If you only fix the symptoms what you see on the surface the problem will almost certainly happen again... which will lead you to fix it, again, and again, and again. If, instead, you look deeper to figure out why the problem is occurring, you can fix the underlying systems and processes that cause the problem.

IFALPA. International Federation of Air Line Pilots Associations

IFALPA. International Federation of Air Line Pilots Associations Runway Incursion IFALPA International Federation of Air Line Pilots Associations Runway incursion Any occurrence at an aerodrome involving the incorrect presence of an aircraft, vehicle or person on the

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps

More information

NETWORK MANAGER - SISG SAFETY STUDY

NETWORK MANAGER - SISG SAFETY STUDY NETWORK MANAGER - SISG SAFETY STUDY "Runway Incursion Serious Incidents & Accidents - SAFMAP analysis of - data sample" Edition Number Edition Validity Date :. : APRIL 7 Runway Incursion Serious Incidents

More information

Second ICAO Global Runway Safety Symposium, Lima, Peru, November 2017 Panel 3 - Root causes of runway accidents and incidents David Gamper,

Second ICAO Global Runway Safety Symposium, Lima, Peru, November 2017 Panel 3 - Root causes of runway accidents and incidents David Gamper, Second ICAO Global Runway Safety Symposium, Lima, Peru, 20-22 November 2017 Panel 3 - Root causes of runway accidents and incidents David Gamper, Director, Safety and Technical, Airports Council International

More information

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions

Session Best Practices Amendments From Annex14, Volume I Annex 15. Runway Incursions Runway Excursions Session Best Practices Amendments From Annex14, Volume I Annex 15 Runway Incursions Runway Excursions Annex 15 AIP - Member States Report: Installation of ARRESTOR SYSTEMS Location - Runway End Industry

More information

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017

JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017 JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM April 10 th 2017 1 Agenda Recap Potential Mitigation Response to Stakeholder Questions Next Steps 2 Recap 3 Background Master Plan considered the runway

More information

Telephone No. 2:4622495 Telegraphic Address: Commercial : AIRCIVIL NEW DELHI Aeronautical : VIDDYAYX E Mail: dri@dgca.nic.in Fax : 01124629221 GOVERNMENT OF INDIA AERONAUTICAL INFORMATION SERVICES DIRECTOR

More information

Appendix A COMMUNICATION BEST PRACTICES

Appendix A COMMUNICATION BEST PRACTICES Appendix A COMMUNICATION BEST PRACTICES 1. GENERAL 1.1 It is apparent from investigation reports and surveys regarding runway safety occurrences that communication issues are frequently a causal or contributory

More information

DHMI GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY. Suat YILDIRIM ATC Expert

DHMI GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY. Suat YILDIRIM ATC Expert DHMI GENERAL DIRECTORATE OF STATE AIRPORTS AUTHORITY Suat YILDIRIM ATC Expert INSTITUTIONAL ORGANISATION Ministry of Transport, Maritime Affairs and Communuication (M of TMAC) Ministry of Defence (M of

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational

More information

The airport operator s perspective on runway incursion hazards

The airport operator s perspective on runway incursion hazards Session 2 Presentation 2 The airport operator s perspective on runway incursion hazards Mr. Henning Pfisterer MSc Senior Manager Safety and Airside Operations Introduction to Incursion Hazards 1. Airport

More information

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS) Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1

More information

Runway Safety Programme Global Runway Safety Action Plan

Runway Safety Programme Global Runway Safety Action Plan Runway Safety Programme Global Runway Safety Action Plan Brian DeCouto ICAO Air Navigation Bureau Implementation Support Officer - Safety 2 nd Global Runway Safety Symposium Lima, Peru, 20-22 November

More information

Runway Incursion Analysis Safety Performance Analysis, Safety and Assurance December 2017

Runway Incursion Analysis Safety Performance Analysis, Safety and Assurance December 2017 Runway Incursion Analysis Safety Performance Analysis, Safety and Assurance December 2017 Simon McDonald, Safety Performance Analyst Matthew Streat, Senior ATM Safety Performance Lead Purpose and methodology

More information

THE TOWER CONTROL POSITION (TWR)

THE TOWER CONTROL POSITION (TWR) 1. Introduction THE TOWER CONTROL POSITION (TWR) The Aerodrome Local Control, or Tower (called TWR) controller has the responsibility of ensuring Air Traffic Control (ATC) Services within a restricted

More information

LELYSTAD AIRPORT PILOT S INFORMATION

LELYSTAD AIRPORT PILOT S INFORMATION LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

LELYSTAD AIRPORT PILOT S INFORMATION

LELYSTAD AIRPORT PILOT S INFORMATION LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest

More information

MAST 16 th December 2009

MAST 16 th December 2009 MAST 16 th December 2009 Items for Discussion A380 meeting feedback Safety Performance Driver Van Run feedback AIP Review of AIP text re push-backs Review of AIP text re conditional line ups - unclear

More information

STANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP)

STANDARD AIRPORT TAXI ROUTES (SATR) INDIRA GANDHI INTERNATIONAL AIRPORT NEW DELHI (VIDP) AIRAC AIP SUPPLEMENT TEL: 91-11-24632950 Extn: 2219/2233 AFS: VIDDYXAX FAX: 91-11-24615508 Email: gmais@aai.aero INDIA AERONAUTICAL INFORMATION SERVICE AIRPORTS AUTHORITY OF INDIA RAJIV GANDHI BHAVAN SAFDARJUNG

More information

Defining and Managing capacities Brian Flynn, EUROCONTROL

Defining and Managing capacities Brian Flynn, EUROCONTROL Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All

More information

Effective: CANBERRA AIRPORT (YSCB) LIGHTING UPGRADE AND STOP BAR INSTALLATION RUNWAY 17/35 AND RUNWAY 12/30

Effective: CANBERRA AIRPORT (YSCB) LIGHTING UPGRADE AND STOP BAR INSTALLATION RUNWAY 17/35 AND RUNWAY 12/30 AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367, CANBERRA ACT 2601 Phone: 02 6268 4874 Email: aim.editorial@airservicesaustralia.com Effective: AIP SUPPLEMENT (SUP) H 92/18

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13)

INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE. Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Thirteenth Meeting of the FANS I/A Interoperability Team (SAT/FIT/13) Durban, South Africa, 4-5 June 2018 Agenda Item 4: System

More information

North End: Runway Configurations at LAX in Arnold Barnett

North End: Runway Configurations at LAX in Arnold Barnett North End: Runway Configurations at LAX in 2020 Arnold Barnett Some Background: As built in the late 1950 s, the LAX airfield consisted of two pairs of parallel runways separated by 700 feet, one on the

More information

Runway Safety through Standardized Stop Bars Practices

Runway Safety through Standardized Stop Bars Practices Runway Safety through Standardized Stop Bars Practices The UAE National Runway Safety Team (NRST) has identified Management of Stop Bars as one of the highest runway safety priorities in the prevention

More information

LFPG / Paris-Charles de Gaulle / CDG

LFPG / Paris-Charles de Gaulle / CDG This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

RUNWAY INCURSION PREVENTION MEASURES AT PARIS-CHARLES DE GAULLE AIRPORT

RUNWAY INCURSION PREVENTION MEASURES AT PARIS-CHARLES DE GAULLE AIRPORT RUNWAY INCURSION PREVENTION MEASURES ------------------------- COSCAP SEA/SA/NA: SEARAST/SARAST/NARAST meetings ( Bangkok, Thailand, 8-9/11-12/15-16 January 2007) ------------------------------------------

More information

A-B-C... it should be easy as 1-2-3!

A-B-C... it should be easy as 1-2-3! A-B-C... it should be easy as 1-2-3! How to design a simple, safe and efficient taxiway designation system by Gaël le Bris and Magali Kintzler Introduction An airside where all users can find their way

More information

LELYSTAD AIRPORT PILOT S INFORMATION

LELYSTAD AIRPORT PILOT S INFORMATION LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest

More information

Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION

Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION Application of the reduced runway separation minima at the Sheremetyevo airport RUSSIAN FEDERATION Use of the runway system at aerodrome Sheremetyevo Aerodrome has two close parallel RWYs Separation between

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of

More information

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE

helicopter? Fixed wing 4p58 HINDSIGHT SITUATIONAL EXAMPLE HINDSIGHT SITUATIONAL EXAMPLE Fixed wing or helicopter? Editorial note: Situational examples are based on the experience of the authors and do not represent either a particular historical event or a full

More information

AERODROME MARKINGS AND SIGNALIZATION

AERODROME MARKINGS AND SIGNALIZATION 1. Introduction AERODROME MARKINGS AND SIGNALIZATION This article will present the main aerodrome markings and signalization on runways and taxiways. 2. Runway Markings This chapter will show the runway

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

Supplementary airfield projects assessment

Supplementary airfield projects assessment Supplementary airfield projects assessment Fast time simulations of selected PACE projects 12 January 2018 www.askhelios.com Overview The Commission for Aviation Regulation requested Helios simulate the

More information

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014

Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme. Cockpit Initiatives. ATC Global 2014 Beijing, 18 h of September 2014 Pierre BACHELIER Head of ATM Programme Cockpit Initiatives for ATM ATC Global 2014 Page 2 Cockpit Initiatives for ATM Airbus vision on ATM transformation Airbus position

More information

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport

A PILOT S GUIDE To understanding ATC operations at Lancaster Airport A PILOT S GUIDE To understanding ATC operations at Lancaster Airport - 1 - Welcome to the Lancaster Airport (This material shall be used for informational purposes only) The Air Traffic Controllers at

More information

RUNWAY SAFETY MINISTRY OF TRANSPORT REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIRWORTHINESS AND AIRCRAFT OPERATIONS

RUNWAY SAFETY MINISTRY OF TRANSPORT REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIRWORTHINESS AND AIRCRAFT OPERATIONS RUNWAY SAFETY MINISTRY OF TRANSPORT REPUBLIC OF INDONESIA DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIRWORTHINESS AND AIRCRAFT OPERATIONS RUNWAY SAFETY A runway safety issue is any safety issue

More information

Appendix 6.1: Hazard Worksheet

Appendix 6.1: Hazard Worksheet Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp

More information

International Civil Aviation Organization. First Meeting of the RASG-MID Steering Committee (RSC/1) Global Developments related to Aviation Safety

International Civil Aviation Organization. First Meeting of the RASG-MID Steering Committee (RSC/1) Global Developments related to Aviation Safety 28/05/2012 International Civil Aviation Organization First Meeting of the RASG-MID Steering Committee (RSC/1) (Cairo, Egypt, 18 20 June 2012) Agenda Item 2: Global Developments related to Aviation Safety

More information

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions. ALBUQUERQUE INTERNATIONAL SUNPORT AIRCRAFT HOLD LINE LOCATION ANALYSIS WHITE PAPER JUNE 24, 2016 HOLD LINE LOCATION ISSUE The location of many of the taxiway hold lines at the Sunport do not meet current

More information

LFBO / Toulouse-Blagnac / TLS

LFBO / Toulouse-Blagnac / TLS This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main

More information

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure) Produced by Airfield Services Document Author Operations Support Manager Contents 1 SECTION 1 - LOW VISIBILITY PROCEDURES (LVP S)...

More information

Recent amendment to Annex 14, Volume I and an update on PANS-Aerodromes

Recent amendment to Annex 14, Volume I and an update on PANS-Aerodromes Recent amendment to Annex 14, Volume I and an update on PANS-Aerodromes Yong Wang Chief, Airport Operations and Infrastructure, ICAO Overview Adoption of Amendment 14 to Annex 14, Volume I Update on PANS-Aerodromes

More information

Chapter 16. Airports Authority of India Manual of Air Traffic Services Part RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC

Chapter 16. Airports Authority of India Manual of Air Traffic Services Part RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC Chapter 16 16.1 RESPONSIBILITY IN REGARD TO MILITARY TRAFFIC 16.1.1 It is recognized that some military aeronautical operations necessitate non-compliance with certain air traffic procedures. In order

More information

New ICAO Runway Safety Provisions

New ICAO Runway Safety Provisions New ICAO Runway Safety Provisions Yong Wang Chief, Airport Operations and Infrastructure, ANB/ICAO Flight Plan Assembly Resolution on Runway Safety Overview of ICAO Documentation New ICAO Provisions Ongoing

More information

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization NPF/SIP/2010-WP/19 Aerodrome Safety H.V. SUDARSHAN International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nairobi, 6-10 December

More information

ENHANCE RUNWAY SAFETY. (Presented by the Secretariat)

ENHANCE RUNWAY SAFETY. (Presented by the Secretariat) International Civil Aviation Organization 27/07/12 rth American, Central American and Caribbean Office (NACC) Twenty-fourth Meeting of Directors of Civil Aviation of the Eastern Caribbean (E/CAR/DCA/24)

More information

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010 Massport Study Team Evaluation of CAC Noise Study Alternatives October 2010 Massport s Evaluation Team Aviation Planning Capital Programs Aviation Operations Environmental Permitting Consultation with

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: Publication of the Level of Service with Respect to Departure Below RVR 2600 (½ Statute Mile) Issuing Office: Civil Aviation, Standards Document No.: AC 302-001 File Classification

More information

DUTCH SAFETY BOARD. Runway incursion Amsterdam Airport Schiphol

DUTCH SAFETY BOARD. Runway incursion Amsterdam Airport Schiphol DUTCH SAFETY BOARD Runway incursion Amsterdam Airport Schiphol Runway incursion Amsterdam Airport Schiphol 18 April 2012 The Hague, December 2013 The reports issued by the Dutch Safety Board are open to

More information

Low Visibility Operations

Low Visibility Operations Airside Operational Instruction 21 Uncontrolled when printed Page 0 of 7 1 LOW VISIBILITY OPERATIONS Policy East Midlands Airport (EMA) is committed to providing facilities and procedures to enable aircraft

More information

print materials visit information on free live seminars, online courses, and

print materials visit   information on free live seminars, online courses, and The AOPA Air Safety Foundation is dedicated to making flying easier and safer for general aviation pilots. For information on free live seminars, online courses, and print materials visit. ILS Critical

More information

Airport Design-3 Geometric Design

Airport Design-3 Geometric Design Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop Presented To: Caribbean States By: FAA Office of Airports OBJECTIVE Development of an Aerodrome Manual (AM). 2 ICAO ANNEX 14 - SECTION

More information

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2

SPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity

More information

RUNWAY SAFETY GO-TEAM METHODOLOGY

RUNWAY SAFETY GO-TEAM METHODOLOGY RUNWAY SAFETY GO-TEAM METHODOLOGY INTRODUCTION The ICAO Runway Safety Programme (RSP) promotes the establishment of Runway Safety Teams (RSTs) at airports as an effective means to reduce runway related

More information

Chapter 4.0 Alternatives Analysis

Chapter 4.0 Alternatives Analysis Chapter 4.0 Alternatives Analysis Chapter 1 accumulated the baseline of existing airport data, Chapter 2 presented the outlook for the future in terms of operational activity, Chapter 3 defined the facilities

More information

SAFETY. Global Safety Network (GSN) Diploma Programme

SAFETY. Global Safety Network (GSN) Diploma Programme SAFETY Global Safety Network (GSN) Diploma Programme Global Safety Network (GSN) Diploma Enhancing levels of safety to meet regulatory standards and best operational practice Silver diploma: GSN 1 to GSN

More information

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR)

Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Guidance for Complexity and Density Considerations - in the New Zealand Flight Information Region (NZZC FIR) Version 1.0 Director NSS 14 February 2018 Guidance for Complexity and Density Considerations

More information

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20 NPF/SIP/2011-WP/20 Aerodrome Safety Saulo Da Silva International Civil Aviation Organization Workshop on the development of National Performance Framework for Air Navigation Systems (Nadi, Fiji, 28 March-1

More information

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS INTRODUCTION The Zelienople Airport Authority (ZAA) has commenced engineering activities for the rehabilitation of Runway 17-35 to a

More information

Aerodrome Certification - Setting the scene

Aerodrome Certification - Setting the scene International Civil Aviation Organization Aerodrome Certification - Setting the scene ICAO CAR/SAM Seminar on Aerodrome Certification October 2017 Avner Shilo, Technical Officer Airport Operations and

More information

Zagreb International Airport Implementation of the EC Regulation 139/ Certification Specification (CS) - Cluj, Romania, Sept /60

Zagreb International Airport Implementation of the EC Regulation 139/ Certification Specification (CS) - Cluj, Romania, Sept /60 Zagreb International Airport Implementation of the EC Regulation 139/2014 - Certification Specification (CS) - Cluj, Romania, 21-22 Sept 2015 1/60 Contact Data Slavko Roguljic D Sc Airport Operations Division

More information

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 Lake Tahoe Airport Master Plan Public Meeting March 16, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development plans

More information

Use of triple one principle and vehicle driver training at Brussels Airport

Use of triple one principle and vehicle driver training at Brussels Airport Use of triple one principle and vehicle driver training at Brussels Airport EAPPRI Ed. 3.0 Runway Safety Seminar Lisbon, 18 October 2018 Dirk Geukens, Senior Safety Expert Brussels Airport Company www.

More information

Final report on aircraft serious incident

Final report on aircraft serious incident Final report on aircraft serious incident Case no.: 18-007F002 Date: 11. January 2018 Location: Reykjavik Airport (BIRK) Description: Airplane took off without a takeoff clearance Investigation per Icelandic

More information

RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE. Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014

RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE. Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014 RUNWAY SAFETY AN ANNEX 14 PERSPECTIVE Joseph K W CHEONG, P.E. Dubai, UAE - 2 to 4 June 2014 ..THIS MORNING THE BIG and now the small picture. TOPICS CURRENT : ANNEX 14 VOL 1 PROVISIONS RELATED TO RUNWAY

More information

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan GRANDE PRAIRIE AIRPORT Reduced Visibility Operations Plan Amended November 8, 2017 Distribution List: (Updates to the Reduced Visibility Operations Plan will be circulated to this list.) Name and Title

More information

Inauguration 2017 Dulles Tower

Inauguration 2017 Dulles Tower Inauguration 2017 Dulles Tower Presented to: IAD Users By: IAD Staff, Management and NATCA Date:1/3/2017 General Information Inauguration takes place Friday, January 20, 2017 at 1200 (noon) local. The

More information

European Action Plan for the Prevention of Runway Incursions v3.0

European Action Plan for the Prevention of Runway Incursions v3.0 European Action Plan for the Prevention of Runway Incursions v3.0 2017 ICAO GRSS, Lima, Peru Tzvetomir BLAJEV Operational Safety Coordinator November 2017 In this briefing: History Change Drivers Collaborative

More information

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Ref. AIM Para AOPA Air Safety Foundation   Supported by the FAA   Ref. AIM Para Supported by the FAA ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with

More information

Appendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM

Appendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM Appendix F ICAO MODEL RUNWAY INCURSION INITIAL REPORT FORM Report no.: A. Date/time of runway incursion (in UTC) (YYYYMMDDhhmm) Day Night B. Person submitting the report Name: Job title: Telephone no.:

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited Gatwick Airport Limited Response to Airports Commission Consultation Appendix 37 Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Further information

More information

Airport Leonardo Da Vinci Fiumicino AERODROME MANUAL PART E

Airport Leonardo Da Vinci Fiumicino AERODROME MANUAL PART E Airport Leonardo Da Vinci Fiumicino AERODROME MANUAL PART E SECTION 7 to 32 - Procedures Aerodrome Leonardo Da Vinci Fiumicino Page 1 of 31 Part E 7 AERODROME REPORTING... 3 8 PROCEDURES FOR ACCESSING

More information

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015 Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2015 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,

More information

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016

Minneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016 Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,

More information

IVAO Switzerland Division

IVAO Switzerland Division IVAO ATC Operations Zurich Tower Date Updated by Update description 08.01.2016 CH-TC Document Creation 30.10.2017 CH-AOC Document Revision 1 Contents 1-Objective... 3 2-Zurich Tower LSZH_TWR... 4 3-Operating

More information

Andres Lainoja Eesti Lennuakadeemia

Andres Lainoja Eesti Lennuakadeemia Andres Lainoja Eesti Lennuakadeemia In the beginning was the Word... Convention on International Civil Aviation (Doc 7300) was signed on 7 December 1944 International Civil Aviation Organization began

More information

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY Ermenando Silva APEX, in Safety Manager ACI, World Aerodrome Manual The aim and objectives of the aerodrome manual and how it is to be used by operating

More information

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION

October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION October 2014 BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN PRESENTATION The Master Plan Process Inventory Of Existing Conditions Complete. Forecasts Of Aviation Demand Complete. Facility Requirements Complete.

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Standard Operational Procedures

Standard Operational Procedures Standard Operational Procedures Aerodrome Ostrava Mošnov VERSION 1.2 CHANGES AND UPDATES Effective Version Change 24 JUN 09 1.1 LVP added. 12 FEB 11 1.2 General text revision. NOTES Official scenery and

More information

Runway Incursions 3 Markings

Runway Incursions 3 Markings Session Visual Aids Runway Incursions 3 Markings 3.12.2 A runway-holding position shall be established: a) on the taxiway, at the intersection of a taxiway and a runway; and b) at an intersection of a

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

SESAR Solutions at ATC Global Surface Management

SESAR Solutions at ATC Global Surface Management SESAR Solutions at ATC Global Surface Management Beijing 18 th September 2014 Roland Kaps-Becker, Zurich Airport SEAC Contribution Manager SESAR European Airport Consortium Overview SEAC members Airports

More information

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons.

VFR PHRASEOLOGY. The word IMMEDIATELY should only be used when immediate action is required for safety reasons. VFR PHRASEOLOGY 1. Introduction 1.1. What is phraseology? The phraseology is the way to communicate between the pilot and air traffic controller. This way is stereotyped and you shall not invent new words.

More information

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat) International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for

More information

V.D. Taxiing. References: FAA-H ; POH/AFM

V.D. Taxiing. References: FAA-H ; POH/AFM References: FAA-H-8083-3; POH/AFM Objectives Key Elements Elements Schedule Equipment IP s Actions SP s Actions Completion Standards The student should develop knowledge of the elements related to taxiing

More information

Unmanned Aircraft System (UAS): regulatory framework and challenges. NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, April 2015

Unmanned Aircraft System (UAS): regulatory framework and challenges. NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, April 2015 Unmanned Aircraft System (UAS): regulatory framework and challenges NAM/CAR/SAM Civil - Military Cooperation Havana, Cuba, 13 17 April 2015 Overview Background Objective UAV? Assumptions Challenges Regulatory

More information

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE.

EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE. EVERY AIRPORT CAN BENEFIT AND EVERY AIRPORT CAN CONTRIBUTE. Challenge The safety and security of the aviation system and the traveling public are top priorities for all airports. The continued growth in

More information

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport

SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN. Los Angeles International Airport SURFACE MOVEMENT GUIDANCE AND CONTROL SYSTEM PLAN Los Angeles International Airport Surface Movement Guidance and Control System (SMGCS) Plan The SMGCS Plan for Los Angeles International Airport (LAX)

More information

Two s Too Many BY MARK LACAGNINA

Two s Too Many BY MARK LACAGNINA BY MARK LACAGNINA Two s Too Many Angled taxiways limiting the pilots view of the runway, clearances issued and read back hastily and incorrectly, and crossed radio transmissions 1 were among the common

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

Airport Engineering Lectures

Airport Engineering Lectures Airport II- Airport. II-1 Definitions System capacity: Ability efficiently process the transported units. Aircrafts Passengers Baggage cargo Public access facilitation Runway Taxiway Gate Terminal Building

More information

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations

ICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This

More information

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments

EASA NPA on SERA Part ENAV Response sheet. GENERAL COMMENTS ON NPA PACKAGE Note: Specific comments are provided after the General Comments EASA NPA on SERA Part ENAV Response sheet GENERAL COMMENTS ON NPA PACKAGE te: Specific comments are provided after the General Comments 1 SERA Parts C and D ENAV still misses clarity on the whole scope

More information