1 Brussels Airport, 4 March 2015 Renovation of runway 25L at Brussels Airport On the 27th of May, Brussels Airport will start important renovation works on runway 25L/07R. So as to minimise the impact on the neighbouring residents and the airport activities, Brussels Airport plans these renovation works in several stages and also at night. Belgocontrol has defined the use of the runways during these stages in close collaboration with Brussels Airport. Runways have to be thoroughly renovated every 30 years to guarantee the safety of aircraft landing or taking off. The previous renovation dates back to This year we will be renovating runway 25L/07R; the two other runways will be renovated in the coming years. The asphalt surface layers will be replaced, the runway shoulders and drainage system will be renewed, the sewerage will be renovated and runway lighting will be replaced by energy-efficient LED lighting. Finally, the roof slab of the tunnel under RWY 25L on the Tervuursesteenweg will be given a new waterproof lining. Runway 25L/07R will be unavailable during most of the works. Belgocontrol will do what it can to minimise the impact of the works on the preferential runway system in force*. Every deviation from the PRS 1 will be assessed based on different parameters including runway and taxiway availability, the weather conditions and the density of air traffic. As always, absolute priority will be given to air navigation safety. Moreover, every effort will be made to reduce as much as possible any delays for the passengers. The actual flight paths will not be modified as a result of the renovation works. Work will only impact the frequency at which they are used. 1 Preferential Runway System Take-off from runway 25R Landing on runways 25R and 25L on weekdays Take-off from runways 25R and 19 and landing on runways 25R and 25L during the night and on the off-peak hours of the weekend, conditions permitting More information on
2 Chosen period to carry out the works Work will be carried out in three stages from 27 May to 7 September. Summer is the best period to carry out these works as this season provides the most favourable conditions: lowest chance of rain or frost, most hours of daylight Work will continue 24/7 in the first two stages. However, work may be delayed due to unexpected technical setbacks or unfavourable weather conditions. Stage 1: eastern and western sections from 27 May to 3 August The first stage of the renovation works on runway 25L/07R will start on 27 May with the renovation of a long stretch on the east side of the runway (2,110m) and a short stretch on the west side (630 m). During this period, runways 25R/07L and 01/19, remain available. As runway 25L is not available, the landings that normally take place on this runway will be carried out on runway 25R. Because of the larger number of landings on runway 25R, runway 19 will also have to be used for some of the take-offs during the day, especially during peak landing hours. During the night, Belgocontrol will do their utmost to comply as much as possible with the preferential runway system. Take-offs and landing which ought to be carried out on runway 25L according to the PRS will be moved to runway 25R.
3 In the event that runways 25R and 19 cannot be used due to wind conditions, runways 01 and/or 07L will be used for take-off and landing.
4 Stage 2: work on the intersection continues 24/7 from 3 to 15 August The second stage includes the renovation of the asphalt layers, the drainage and sewerage of the intersection of runways 25L/07R and 01/19. The shoulders will be repaved and the runway lighting will be replaced with LED lighting. This stage will take about 2 weeks. During this stage, RWY 25R/07L will be the only runway available. Runway 25R will be used for all take-offs and landings both during the day and at night.
5 If due to wind conditions runway 25R cannot be used, runway 07L will be used for take-off and landing. Stage 3: works on the intersection carried out only at night from 15 August to 7 September In the third stage, work on the intersection of runways 25L/07R and 01/19 continues. The asphalting work will be finished and the lighting will be replaced. At this stage of the renovation, the nature of the works allows for them to be carried out exclusively between 10 pm and 6 am. As a result, the runway is made available again at 6 am. During this stage, all runways thus remain available between 6 am and 10 pm. The preferential runway system in force will apply.
6 Between 10 pm and 6 am, work on the intersection of runways 25L/07R and 01/19 will continue. Consequently, these two runways will not be available and runway 25R will be used for all take-offs and landings. In the event that runway 25R cannot be used due to wind conditions, runway 07L will be used for both take-off and landing. Information 24/7 available for neighbouring residents, the general public and the passengers During the different stages of the works, real-time runway use information is available on It is also possible to go back up to seven days. The website also provides a forecast of the runway use for the next few hours. will provide all information on the progress of the works. Permanent updates will be available on Brussels Airport s social media accounts. Moreover, the airport magazine connect will devote an in-depth article to the runways works. This magazine is published at 600,000 copies and is distributed in Brussels and Flanders. Brussels Airport Company wishes to inform as many people as possible through its various communication channels.
7 Key figures Runway 25L/07R is 3,211 m long and 45 m wide Removal and replacement of 200,000 m² of asphalt, 12-cm thick layers 60,000 m² of runway shoulders demolished and replaced 218 kilometres of cable renewed 7 kilometres of groundwater and rainwater drains demolished and rebuilt 9 kilometres of sewerage renovated Waterproof tunnel lining replaced 1,300 lamps replaced by LED lamps Press Contact: Brussels Airport Company Corporate Communication Tel Belgocontrol: Dominique Dehaene Spokesperson Tel About Brussels Airport Brussels Airport is one of the largest airports in Europe, handling 21.9 million passengers and 454,000 tonnes of freight annually. Brussels Airport links the European capital with 228 destinations worldwide that are served by 80 different airlines. (figures 2014). Brussels Airport caters for the specific needs of the business travellers, and also has the largest low-fare offer in Belgium. Brussels Airport is the second most important centre of economic growth in Belgium providing direct and indirect employment for 60,000 people. Brussels Airport is operated by Brussels Airport Company. The shareholders are the Belgian State (25 percent) and a consortium of private investors (75 percent). Follow on Twitter or on About Belgocontrol Belgocontrol is an autonomous public company, created in October 1998, with the mission to guarantee the safety of air navigation in the airspace for which Belgium is responsible. Its zone of activities extends from ground level (at Brussels Airport and the airports of Antwerp, Charleroi, Liege and Ostend) to flight level 245 (8,000 meters) above Belgium and from flight levels 145/165 to 245 for the Grand Duchy of Luxembourg. The EUROCONTROL centre in Maastricht is responsible for the area above 8,000 metres, and jointly manages the air traffic of the upper airspace of Belgium, Luxembourg, the Netherlands and the western part of Germany.
and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009
and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009 Contents Belgocontrol Environmental approach Emission management Serving today s aviation in
More informationSuvarnabhumi Airport Runway Maintenance. Air Traffic Management Situation Review Week 4: 2 8 July 2012
Suvarnabhumi Airport Runway Maintenance Air Traffic Management Situation Review Week 4: 2 8 July 2012 9 Jul 2012 1 Flight Movements Daily Traffic & Runway Utilization 900 800 700 Daily Traffic & Runway
More informationBrussels Airport Route Development Fly to the heart of Europe
Brussels Airport Route Development Fly to the heart of Europe AIRPORT FACTS & FIGURES PASSENGER ALL-TIME RECORD IN 2017 25 million CONNECTIONS up to 20% transfer passengers NETWORK 217 passenger destinations
More informationForty years of vision. The EUROCONTROL Maastricht UAC story. years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL
1972-2012 Forty years of vision The EUROCONTROL Maastricht UAC story years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL years of vision EUROCONTROL MAASTRICHT UAC Since the dawn of time, man has dreamed
More informationBRUTuS Program A Case study on Apron Safety Collaboration
BRUTuS Program A Case study on Apron Safety Collaboration Dirk Geukens, Senior Safety Expert ACI-NA World Conference September 27, 2016 Montreal Brussels Airport Aircraft Movements Passengers Cargo 220,000
More informationForeword by Steering Committee Chairman 3. Activity Report by Board Chairman 4. Organisational Support and Communication 5
Index Foreword by Steering Committee Chairman 3 Activity Report by Board Chairman 4 Organisational Support and Communication 5 Ongoing Activities in 2009 6 Acting together 8 Single European Sky 10 The
More informationAIRPORT WITH NO RUNWAYS IS A MALL
RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case
More informationASSEMBLY 39TH SESSION
International Civil Aviation Organization WORKING PAPER 19/8/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 37: Other issues to be considered by the Technical Commission TO DEFINE THE VALIDATION
More informationGEN 4 CHARGES FOR AERODROMES/HELIPORTS AND AIR NAVIGATION SERVICES
AIP Belgium and Luxembourg GEN 4.1-1 GEN 4 CHARGES FOR AERODROMES/HELIPORTS AND AIR NAVIGATION SERVICES GEN 4.1 Aerodrome/Heliport Charges 1 EBAW 1.1 Landing and Take-off The charges for landing, take-off
More informationWelcome to AVI AFRIQUE 2017
Welcome to AVI AFRIQUE 2017 Single African sky and Functional Airspace Blocks: Improving Air Traffic Management The global ATM operational concept is fundamental framework drive ATM operational requirements,
More informationFurther strong revenue increase for the first quarter of Eurotunnel Shuttle revenue showed strong growth to 138.
PRESS RELEASE 18 April 2018 6:30 a.m. Further strong revenue increase for the first quarter of 2018 Revenues for the first quarter of 2018 increased by 5% 1 to 241.4 million Channel Tunnel Fixed Link Eurotunnel
More informationInternational Civil Aviation Organization. Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, March 2017
International Civil Aviation Organization SEACG/24 IP/10 06 08/03/2017 Twenty-Fourth South East Asia ATM Coordination Group (SAIOACG/7) Bangkok, Thailand, 06 08 March 2017 Agenda Item 3: Review of Current
More informationInterFAB Ops meeting Traffic volatility in Brussels hotspot sectors
InterFAB Ops meeting Traffic volatility in Brussels hotspot sectors Maastricht Upper Area Control Centre Dirk De Herdt Team Leader Airspace & Network Planning 02-03 May 2016 Traffic volatility in Brussels
More informationAgenda. Institutional Arrangements Structures Procedures Example of TSA200 FUA at Regional Level
Agenda Institutional Arrangements Structures Procedures Example of TSA200 FUA at Regional Level Civ-Mil Relationship In France, GAT and OAT are handled by distinct ANSPs : DSNA is a directorate of the
More informationKJFK Runway 13R-31L Rehabilitation ATFM Strategies
Advanced ATM Techniques Symposium and Workshops Today s Opportunities for Saving Fuel and Reducing Emissions 4 6 November 2013, ICAO Headquarters, Montréal KJFK Runway 13R-31L Rehabilitation ATFM Strategies
More informationIAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport
IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport In its draft 2014 determination of the maximum level of charges at Dublin
More informationDe toegevoegde waarde van regionale luchthavens. Marcel Buelens CEO Antwerp International Airport & Ostend-BrugesInternational Airport
De toegevoegde waarde van regionale luchthavens Marcel Buelens CEO Antwerp International Airport & Ostend-BrugesInternational Airport 24 november 2015 Creative for the long term March 2014 1.The Egis group
More informationA Love Note from Me to You
Community Weekly Update for September 8- September 14, 2012 A Love Note from Me to You Dear Neighbors, Please be advised that we have a scheduled closure of our Preferential Runway 13R/31L (Denton) Friday
More informationNew Runway Project. Connecting people and places. Supporting business. Engaging with community
New Runway Project Perth is investing in an important piece of infrastructure for Western Australia. The new runway will see Perth continue to connect lives, businesses and communities to a world full
More informationGIVING WINGS TO GROWTH ANNUAL REPORT 2017
GIVING WINGS TO GROWTH ANNUAL REPORT 2017 CONTENTS INTRODUCTION & KEY FIGURES... 1 FOREWORD Johan Decuyper, Chief Executive Officer... 2 Renaud Lorand, Chairman of the Board of Directors... 4 ACTIVITY
More informationLFPG / Paris-Charles de Gaulle / CDG
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationAviation Safety Information Leaflet (ASIL) AIRSPACE INFRINGEMENTS Analysis of the pilot questionnaires V.1.3
nr.02/2018 Aviation Safety Information Leaflet (ASIL) AIRSPACE INFRINGEMENTS Analysis of the pilot questionnaires V.1.3 Federal Public Service Mobility and Transport Update of the Belgian Airspace Infringement
More informationPlanning Advisory Committee November 20, 2014
Planning Advisory Committee November 20, 2014 Master Plan website up & running: www.flydurango.com Planning Advisory Committee (PAC) established & meeting Briefings provided to City Council, County Commissioners
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor June 11, :30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting May 14, 2014 Approval of Minutes: Special
More informationPERFORMANCE REPORT CAPACITY
PERFORMANCE REPORT 2015-2019 CAPACITY June 2018 Contents Description & Analysis 3 FABEC TRAFFIC DEVELOPMENT (en-route) 4 FABEC TRAFFIC DEVELOPMENT (arrival) 5 KPI #1: En-route ATFM delay per controlled
More informationElia Facts & Figures 2010
Elia Facts & Figures 2010 EN 01 ELIA GROUP Elia Group - Key figures Consolidated IFRS results (in million, results per share in ) Revenue 1,037.5 Net profit 123.2 Total assets 5,904 Net profit 2.26 Dividend
More informationFORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT
D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix
More informationSingle European Sky Benefits for the airline industry. Warsaw, 28 November 2011
Single European Sky Benefits for the airline industry Warsaw, 28 November 2011 SES finally starts to gain momentum But continues to be slowed down by EU Member States After nearly 50 years of talk! 2009
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) March 8, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Water: In the back of the room. Emergency Exit:
More informationUPDATE ON THE 6 IDEAS (1-4) NAV CANADA
UPDATE ON THE 6 IDEAS (1-4) THE 6 INITIATIVES 1. New approaches for night-time operations - Implemented 2. New departure procedures for night-time operations - Implemented 3. Increased downwind arrival
More informationGEN 3.3 Air Traffic Services
AIP Belgium and Luxembourg GEN 3.3-1 GEN 3.3 Air Traffic Services 1 RESPONSIBLE SERVICES 1.1 Civil, ANA and Eurocontrol are the responsible authorities for the provision of air traffic services within
More informationCharges & fees at Brussels Airport Effective as from 1 November, 2018
Charges & fees at Brussels Airport Effective as from 1 November, 2018 V1: Dec 2017 V2: Feb 2018 (CUP fee correction) V3: Apr 2018 (CUP fee update 2018) V4: Jul 2018 (Intermediate tariff consultation update)
More informationBadgery s Creek Airport Presention. Revised from NAN 2015 AGM
Badgery s Creek Airport Presention Revised from NAN 2015 AGM Contents History Badgery s Creek Objectives Why is another airport required? Badgery s Creek Airport key facts, approval process and timeline
More informationAviation and the Belgian Climate Policy : Integration Options and Impacts. ABC Impacts
Aviation and the Belgian Climate Policy : Integration Options and Impacts ABC Impacts Synthesis ABC Impacts project results and forthcoming work Workshop on aviation scenarios and climate impacts 26 March
More informationTechnical Report. Aircraft Overflight and Noise Analysis. Brisbane, California. December Prepared by:
Aircraft Noise Abatement Office Technical Report Aircraft Overflight and Noise Analysis Brisbane, California Prepared by: P.O. Box 8097 San Francisco, California 94128 (650) 821-5100 Introduction In response
More informationUSE OF REMOTELY PILOTED AIRCRAFT AND MODEL AIRCRAFT IN AVIATION
luo Regulation 1 (10) OPS M1-32 Issued: 4 December 2018 Enters into force: 7 December 2018 Validity: indefinitely Legal basis: Aviation Act (864/2014), Sections 5, 9 and 57 Act on Transport Services (320/2017),
More informationEnter here your Presentation Title 1
Exercise 2 Static Airspace Plan Exercise parameters Civil Objective: Improve existing situation by establishing Static Airspace planning Four (4) Countries, Blue, Yellow, Orange and Green (See MAP); Teams
More informationACI EUROPE POSITION PAPER. Airport Slot Allocation
ACI EUROPE POSITION PAPER Airport Slot Allocation June 2017 Cover / Photo: Madrid-Barajas Adolfo Suárez Airport (MAD) Introduction The European Union s regulatory framework for the allocation of slots
More informationFACT Sheet. General information. January Maastricht Upper Area Control Centre
January 2013 EUROCONTROL FACT Sheet Maastricht Upper Area Control Centre General information The Maastricht Upper Area Control Centre (MUAC), operated by EUROCONTROL on behalf of four European States,
More informationThe implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.
The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands. Connecting People Building Opportunities 198 Brisbane Airport Corporation CHAPTER 10
More informationEUROCONTROL General Presentation
EUROCONTROL General Presentation Luc Tytgat, Director DSS EUROCONTROL The European Organisation for the Safety of Air Navigation One day s traffic General Presentation 2 ATM Today Air Transport Air Navigation
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationAviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers
Aviation Data and Analysis Seminar 20-23 February 2017 Economics of Airports and Air Navigation Services Providers 250 7000 6000 200 5000 150 4000 Growth of air transport World recession SARS Freight Tonne
More informationNoise Action Plan Summary
2013-2018 Noise Action Plan Summary Introduction The EU Noise Directive 2002/49/EU and Environmental Noise (Scotland) Regulations 2006 requires airports with over 50,000 movements a year to produce a noise
More informationTAP AIR PORTUGAL SELECTS AVIAREPS TO HANDLE ALL ITS SALES AND SERVICE CENTRE ACTIVITIES IN BELGIUM, LUXEMBOURG AND THE NETHERLANDS
FOR IMMEDIATE RELEASE TAP AIR PORTUGAL SELECTS AVIAREPS TO HANDLE ALL ITS SALES AND SERVICE CENTRE ACTIVITIES IN BELGIUM, LUXEMBOURG AND THE NETHERLANDS Amsterdam, Netherlands (October 6 th, 2017) AVIAREPS,
More informationAirspace Infringements: Impact on ATC
Airspace Infringements: Impact on ATC Airspace Infringement Workshop 24 January 2008 Eurocontrol HQ, Brussels Presented by: xavier.henriod@skyguide.ch Xavier Henriod, DSO, 24/01/2008 Objective To highlight
More informationManchester Airports Group
Manchester Airports Group WHO ARE WE? MAG is a leading UK based airport company, which owns and operates Manchester, London Stansted and East Midlands airports. MAG is privately managed on behalf of its
More informationACI EUROPE POSITION PAPER
ACI EUROPE POSITION PAPER November 2018 Cover / Photo: Stockholm Arlanda Airport (ARN) Introduction Air traffic growth in Europe has shown strong performance in recent years, but airspace capacity has
More informationLegal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL
Legal and Institutional Aspects of ATM in Europe Roderick D. van Dam Head of Legal Service EUROCONTROL EUROCONTROL: European Organisation for the Safety of Air Navigation Coordination and integration -
More informationClimate Change and. Airport Regions
Climate Change and Airport Regions Climate Change and Airport Regions Airport regions welcome aviation if it can be developed with a sustainable profile. With the integration of regional economies in
More informationCommunity Noise Consortium Newsletter January 22, 2015
Community Noise Consortium Newsletter January 22, 2015 Issue No.33 Message from the Chief Executive Officer Joseph Lopano Construction on Tampa International Airport s historic expansion is well underway.
More informationChanging runways at Sydney Airport to share the noise
Changing runways at Sydney Airport to share the noise The purpose of this document is to show the variables and challenges that Sydney air traffic controllers face when deciding to use different runway
More informationMake Smart, Informed Flight Planning Decisions with Intelligent Weather Insights
Make Smart, Informed Flight Planning Decisions with Intelligent Weather Insights White Paper www.dtn.com / 1.800.610.0777 Copyright 2017 DTN Effective monitoring of the weather is one of the most important
More informationServices Charter. 2014/15 to 2015/16
Services Charter 2014/15 to 2015/16 Services Charter Overview Objective Airservices Australia is a governmentowned organisation providing safe and environmentally sound air traffic management, aviation
More informationHeathrow Consultation January March 2018
A briefing from HACAN Heathrow Consultation January March 2018 Heathrow launched its biggest ever consultation on 17 th January. It closes on 28 th March. In reality, it is two consultations running in
More informationLGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7th 2009 Event time: 1200z 2200z. Ankara and Istanbul FIR Guides & LTAI Guide
LGAV LTAI Real Flights Event Partnership EUROPE PILOT's BRIEFING March 7th 2009 Event time: 1200z 2200z Ankara and Istanbul FIR Guides & LTAI Guide Written by: TR-STAFF Dear fellow IVAO members and virtual
More informationDEADLINE APPROACHES FOR AVIATION CARBON FOOTPRINT CAP
12 DEADLINE APPROACHES FOR AVIATION CARBON FOOTPRINT CAP EUROCONTROL is due to release by the end of this year its first detailed assessment of the aviation industry s forecast environmental footprint in
More informationACL Company Profile. Aviation, Optimised.
ACL Company Profile ACL Company Profile ACL is the coordinator of choice for 39 airports worldwide. We coordinate 3.6 million flights carrying over 495 million passengers each year. Aviation, Optimised.
More informationNetwork Management, building on our experience of flow management and network planning.
Network Management, building on our experience of flow management and network planning. Giovanni Lenti Head of Network Operation Services The European Organisation for the Safety of Air Navigation Air
More informationACL Company Profile. Aviation, Optimised.
ACL Company Profile ACL is the coordinator of choice for 38 airports worldwide. We coordinate over 3.8 million flights per year. We optimise capacity, for the benefit of airports, airlines, regulators
More informationCrosswind dependent separations and update on TBS concept (transitional step)
Crosswind dependent separations and update on TBS concept (transitional step) 28-29 June 2010 WAKENET 3 EUROPE 2 nd workshop Airbus, Toulouse Peter CHOROBA, EUROCONTROL peter.choroba@eurocontrol.int The
More informationWhat options were considered
What options were considered As part of the initial planning for the new runway, several options were identified and assessed before determining that the new runway is the most appropriate development
More informationPolitical Newsletter. Editorial. Focus on sustainability at THE CIRCLE. Going forward with a modernised terminal
Political Newsletter 2018 Editorial 03 Aviation policy report implementation of measures 04 Forward-looking infrastructure planning 06 Going forward with a modernised terminal 08 The baggage system at
More informationThe Art to Feel at Home!
The Art to Feel at Home! Franchise Opportunity with Leonardo An intelligent decision! 1 Table of content About Leonardo Hotels 3 Current Destinations 3 Leonardo Hotels Vision & Mission 4 Leonardo Hotels
More informationAirport Design-3 Geometric Design
Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and
More informationStrategic Airport Management Programme April Airport Economics. presented by. Eileen Poh Assistant Director (ICAO Affairs)
Airport Economics presented by Eileen Poh Assistant Director (ICAO Affairs) 1 Outline Regulated and non-regulated Revenues Price Cap-Regulation: Single or Dual Till Financial State of Airports Airports
More informationApplewood Heights Community Open House
Applewood Heights Community Open House Agenda TORONTO PEARSON BACKGROUND Toronto Pearson: For you. The World. Our goal: To become North America s premier gateway airport. Our job is to get you better connected
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2015 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationMaastricht Upper Area. Introducing the next generation of air traffic control. New flight data processing system
Maastricht Upper Area Control Centre Introducing the next generation of air traffic control New flight data processing system A dynamic change to managing Europe s air traffic The new flight data processing
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More information8 OAMARU AIRPORT ZONE
8 OAMARU AIRPORT ZONE 8.1 ZONE STATEMENT The Oamaru Airport Zone covers approximately 254 hectares of land north of Oamaru. The zone provides future opportunity for the development of the Oamaru Airport.
More informationSAFEGUARDING OF AERODROMES. Advice Note 1
AIRPORT OPERATORS ASSOCIATION & GENERAL AVIATION AWARENESS COUNCIL supported by CIVIL AVIATION AUTHORITY Working in Co-operation SAFEGUARDING OF AERODROMES Advice Note 1 Safeguarding - An Overview 1. The
More informationCommunity Noise Consortium Meeting (CNC)
Community Noise Consortium Meeting (CNC) September 13, 2018 Meeting Title or Type / Month Day, Year Safety Restrooms: Outside the door you entered on the left. Emergency Exit: Door through which you entered
More informationEFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY
EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL
More informationWorkshop Exercise, EGYPT Air Navigation Plan 10 /12/2010
Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR
More informationTHE GRAND SOLUTION FOR ISTANBUL'S CAPACITY PROBLEM
38 THE GRAND SOLUTION FOR ISTANBUL'S CAPACITY PROBLEM Mehmet Büyükkaytan Chief Operating Officer at Istanbul Grand Airport As the recent Challenges of Growth report has shown there is a major capacity
More informationIndustry Monitor The EUROCONTROL bulletin on air transport trends
EUROCONTROL 2010 Issue N 118. 30/04/10 Industry Monitor The EUROCONTROL bulletin on air transport trends European air traffic increased by 1.6% in March International air traffic grew 9% during the first
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationEUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL
EUROCONTROL Visit of the Transport Attachés 10 April 2015 Frank Brenner Director General EUROCONTROL One day s traffic EUROCONTROL - Visit of the Transport Attachés - 10 April 2015 2 ATM Today Air Transport
More informationWHAT IS THE BALANCED APPROACH?
WHAT IS THE BALANCED APPROACH? Averting and reducing aircraft noise 1 WHAT IS THE BALANCED APPROACH? Table of contents About the author... 3 1. Noise management at airports: a necessity... 4 Averting and
More informationLFBO / Toulouse-Blagnac / TLS
This page is intended to draw commercial and private pilots attention to the aeronautical context and main threats related to an aerodrome. They have been identified in a collaborative way by the main
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More informationSupplementary airfield projects assessment
Supplementary airfield projects assessment Fast time simulations of selected PACE projects 12 January 2018 www.askhelios.com Overview The Commission for Aviation Regulation requested Helios simulate the
More informationUse of triple one principle and vehicle driver training at Brussels Airport
Use of triple one principle and vehicle driver training at Brussels Airport EAPPRI Ed. 3.0 Runway Safety Seminar Lisbon, 18 October 2018 Dirk Geukens, Senior Safety Expert Brussels Airport Company www.
More informationPilot briefing 2018 revision 1.1
We welcome you at the EFLEVA Days 2018! Page 1 of 17 Pilot briefing 2018 revision 1.1 On top of this Pilot Briefing we also provide a Welcome Flyer with more general information. It will be provided to
More informationFacts and figures about Munich Airport
Location information February 2017 Munich Airport - Facts and figures about Munich Airport 1 - Direct flights from Munich 2 - Cargo traffic 3 - The airport as an engine of employment 3 - Europe's best
More informationKey Purpose & Need Issues
Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability
More informationResponse to the London Heathrow Airport Expansion Public Consultation
Response to the London Heathrow Airport Expansion Public Consultation Summary This report sets out the response to the Heathrow Airport s consultation on airport expansion and airspace change. The consultation
More informationClassification: Public
Appendices 1 Runway Scheduling Limits 2 Additional Runway Scheduling Constraints 3 Terminal Scheduling Limits 4 Load Factors - to be used for terminal scheduling calculations 5 Stand Limits 6 Additional
More informationTANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)
Page 1 of 11 AERODROME NAME: ICAO REFERENCE CODE: TRAFFIC DENSITY CLASS: (see Note 3) VISIBILITY CONDITION: (see Note 3) AERODROME INSPECTOR: DATE: S/N ICAO A SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM 1
More informationFF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva
International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,
More informationLELYSTAD AIRPORT PILOT S INFORMATION
LELYSTAD AIRPORT PILOT S INFORMATION This information bulletin contains a summary of the most relevant operational information for pilot s. Always check the AIP, the AIP SUP and NOTAM s for the latest
More informationDRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03
DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD Revised 12/12/03 As recommended for approval by the Plan Commission General Project Description
More information$960 $1,175 $91 OVERVIEW National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY
2015 18 National Land Transport Programme Auckland AUCKLAND REGIONAL SUMMARY OVERVIEW Achieving an effective and efficient transport system is central to supporting Auckland s future. Auckland is home
More informationFAA Update Society of American Military Engineers
FAA Update Society of American Military Engineers May 8, 2013 Presented by Joseph Miniace Regional Administrator FAA Central Region Current FAA FAA Mission is to provide the safest, most efficient aerospace
More informationStephanie Sinnott, Executive Director, Finance, Office of the City Manager
Public Report To: From: Finance Committee Stephanie Sinnott, Executive Director, Finance, Office of the City Manager Paul D. Ralph, BES, RPP, MCIP, Commissioner, Development Services Department Report
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Aviation (100%) Project ID
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4960 Project Name EG-Second
More informationSEMI-CIRCULAR RULE. The default worldwide semi-circular rule is the East/West orientation of the flight level parity:
SEMI-CIRCULAR RULE 1. Introduction The semi-circular rule is the basic rule for flight level or altitude selection in function of the aircraft heading in order to ensure basic vertical separation. 1.1.
More information