1 Chapter Three To properly plan for the future of Monterey Regional Airport, it is necessary to examine the capacities of the key airport systems. This chapter uses the results of the forecasts prepared in Chapter Two, as well as established planning criteria, to evaluate the air ield system, passenger terminal building, and vehicle parking and access systems at Monterey Regional Airport. This analysis establishes capacities for each of these airport systems and compares those capacities to projected demand. Where de iciencies are identi ied, potential alternatives for reconciliation will be analyzed in the Alternatives Analysis of this Master Plan. The demand/capacity analysis was performed utilizing Federal Aviation Administration (FAA) publications, including the following: Advisory Circular (AC) 150/ A, Airport Design ( ) AC 150/5060-5, Airport Capacity and Delay ( ) AC 150/ Planning and Design Guidelines for Airport Terminal Facilities ( ) PLANNING HORIZONS An updated set of aviation demand forecasts for the Airport has been established. The activity forecasts include enplanements, operations, based aircraft, leet mix, and peaking 3-1 Draft June 2014

2 characteristics. With this information, specific components of the airfield and landside system are evaluated to determine their capacity to accommodate future demand. Cost-effective, efficient, and orderly development of an airport must rely more upon actual demand than a time-based forecast figure. In order to develop a master plan that is demand-based rather than time-based, a series of planning horizon milestones have been established that take into consideration the reasonable range of aviation demand projections. The planning horizons are the Short Term (approximately years 1-5), the Intermediate Term (years 6-10), and the Long Term (years 11-20). Actual activity at the Airport may be higher or lower than what the annualized forecast portrays. Utilizing activity milestones, rather than specific dates in time, allows Airport management the flexibility to make decisions and develop facilities according to need generated by actual demand levels. The demand-based milestones provide flexibility, as development schedules can be slowed or expedited according to demand at any given time over the planning period. The resultant plan provides Airport officials with a financially responsible and needs-based program. Table 3A presents the planning horizon activity milestones. TABLE 3A Aviation Demand Planning Horizons Monterey Regional Airport Base Year (2013) Short Term Intermediate Term Long Term Annual Enplanements 200, , , ,000 Annual Air Cargo (lbs.) 1,021,856 1,124,000 1,196,000 1,339,000 Based GA Aircraft Annual Operations Air Carrier/Commuter 11,786 11,800 12,000 11,800 Air Cargo Other Air Taxi 3,610 4,300 6,300 10,200 GA Itinerant 25,270 28,100 31,300 40,400 GA Local 10,876 11,800 12,800 15,900 Military 1,717 1,500 1,500 1,500 Total Operations 53,827 58,100 64,600 80,600 AIRFIELD CAPACITY Airfield capacity is measured in a variety of ways: The hourly capacity measures the maximum number of aircraft operations that can take place in an hour. The annual service volume (ASV) is an annual level of service that may be used to define airfield capacity needs. Aircraft delay is the total delay incurred by aircraft using the airfield during a given timeframe. FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, provides a methodology for examining the operational capacity of an airfield for planning purposes that was utilized in this analysis. In accordance with AC 150/5060-5, this analysis takes into account specific factors about the airfield depicted in Exhibit 3A. The following discussion further describes the input factors as they relate to Monterey Regional Airport. DEMAND/CAPACITY ANALYSIS 3-2 DRAFT JUNE 2014

3 Runway Configuration Runway Use Number of Exits 10L 28R 10R 28L VMC IMC PVC Visual Meteorological Conditions Instrument Meteorological Conditions Poor Visibility Conditions 71.7% 10.8% 17.5% Category A & B Aircraft Category C Aircraft Category D Aircraft (less than 12,000 lbs.) (12, ,000 lbs.) (over 300,000 lbs.) Single Engine Business Jet Commuter Small Turboprop Twin Piston Regional Jet Commercial Jet Wide Body Jets Arrivals Departures Total Annual Operations (in thousands) Touch-and-Go Operations J F M A M J J A S O N D (example) Exhibit 3A AIRFIELD CAPACITY FACTORS

4 CAPACITY FACTORS Runway Configuration The Monterey Regional Airport has two parallel runways that are separated by 500 feet. The capacity model considers this configuration to be a single runway because the distance between the two runways is less than the minimum (700 feet) required for simultaneous visual operations. Runway Use Runway use is controlled by wind and/or airspace conditions. The direction of takeoffs and landings is generally determined by the speed and direction of the wind. It is generally safest for aircraft to take-off and land into the wind, avoiding a crosswind (wind that is blowing perpendicular to the travel of the aircraft) or tailwind. Under visual conditions, both runways will be utilized, with Runway 28 generally considered the calm wind runway. Table 3B presents the general runway use percentages by aircraft type. TABLE 3B Runway Use Percentage by Aircraft Type Monterey Regional Airport Runway Jets Turboprop/ Multi-Engine Single Engine Touch & Go 10R 25.0% 23.8% 23.8% 5.0% 28L 75.0% 71.3% 71.3% 15.0% 10L 0.0% 1.3% 1.3% 20.0% 28R 0.0% 3.8% 3.8% 60.0% Source: Interview with ATCT Manager; originally presented in the 2007 Noise Exposure Maps (NEM) Update. The availability of instrument approaches is also considered. Runway 10R is equipped with an instrument landing system (ILS), which provides the best visibility and cloud ceiling minimums. On a day with particularly poor conditions, this runway would be utilized exclusively. Exit Taxiways Exit taxiways have a significant impact on airfield capacity since the number and location of exits directly determines the occupancy time of an aircraft on the runway. For Monterey Regional Airport, taxiway exits located between 3,000 and 5,500 feet from the runway threshold count in the capacity determination. Landings to either end of Runway 10L-28R have at least two exits for capacity calculation. Weather Conditions The Airport operates under visual flight rules (VFR) 71.7 percent of the time. When cloud ceilings are between 500 and 1,000 feet and visibility is between one and three miles, instrument flight rule (IFR) conditions apply, which is approximately 10.8 percent of the year. Poor visibility conditions (PVC) apply when cloud ceilings are below 500 feet and visibility is below one mile. PVC conditions occur 17.5 percent of the year. Table 3C summarizes the weather conditions between 2004 and DEMAND/CAPACITY ANALYSIS 3-3 DRAFT JUNE 2014

5 TABLE 3C Annual Weather Conditions Monterey Regional Airport Condition Cloud Ceiling Visibility Observations Percent Visual (VFR) >1,000' > 3 mi. 86, % Instrument (IFR) 1,000' and > 500' 3 mi. and Vis > 1 mi. 13, % Poor Visibility (PVC) 500' 1 mi. 21, % TOTAL 121, % Source: National Oceanic and Atmospheric Administration (NOAA). Data from the on-airport ASOS ( ) Aircraft Mix Aircraft mix for the capacity analysis is defined in terms of four aircraft classes. Classes A and B consist of small and medium-sized propeller and some jet aircraft, all weighing 12,500 pounds or less. These aircraft are associated primarily with general aviation activity, but do include some air taxi aircraft. Class C consists of aircraft weighing between 12,500 pounds and 300,000 pounds, which includes most turboprops, business jets and medium-sized commercial transport aircraft. Class D aircraft consists of large aircraft weighing more than 300,000 pounds, such as Boeing 747, 777, and 787 aircraft. The Airport is not forecast to experience any Class D operations. The percentage of Class C and Class D aircraft is important in the capacity analysis because these aircraft typically require larger separation distances and have longer runway occupancy times. Overall, Class C operations represent 50.5 percent of operations currently and are forecast to remain relatively steady through the long term, as shown in Table 3D. TABLE 3D Total Class C Aircraft Type Percent Monterey Regional Airport Planning Horizon Class C Total Operations Percent ,169 53, % Short Term 29,301 58, % Intermediate Term 32,970 64, % Long Term 40,723 80, % C = Aircraft weighing between 12,500 and 300,000 pounds Source: Coffman Associates analysis utilizing FAA AC 150/5060-5, Airport Capacity and Delay. Percent Arrivals The percent of aircraft arrivals is equal to the ratio of landing operations to the total operations of an airport. This percent is considered due to the fact that aircraft approaching an airport for landing require more runway occupancy time than aircraft departing the airfield. The FAA methodology used herein provides for computing airfield capacity with a 40, 50, or 60 percent of arrivals figure. In the capacity analysis, the percent of arrivals is used to look at times when there is a large arrival or departure push. For example, at commercial service airports, a DEMAND/CAPACITY ANALYSIS 3-4 DRAFT JUNE 2014

6 peak departure time is often seen in the first few hours of the day, while peak arrival times might occur later in the evenings. To determine an overall airfield capacity figure, a 50 percent arrival value is utilized as an average or neutral effect for Monterey Regional Airport. Touch-and-Go Activity Touch-and-go training activity has the effect of increasing capacity since runway dwell times are shorter. Touch-and-go activity is limited to local general aviation and military operations at the Airport. Following the FAA capacity model, 80 percent of local operations are touch-and-go, thus 25 percent of all general aviation and military activity is touch-and-go in nature. Peak Period Operations For the airfield capacity analysis, average daily operations and average peak hour operations during the peak month, as calculated in the previous chapter, are utilized. Typical operations activity is important in the calculation of an airport s annual service volume as peak demand levels occur sporadically. The peak periods used in the capacity analysis are representative of normal operational activity and can be exceeded at various times throughout the year. CALCULATION OF AIRFIELD CAPACITY The preceding information was used in conjunction with the airfield capacity methodology developed by the FAA to determine airfield capacity and delay for Monterey Regional Airport. The following sections outline the analysis. Hourly Runway Capacity The first step in determining annual service volume involves the computation of the hourly capacity of each runway configuration as defined in FAA AC 150/5060-5, Airport Capacity and Delay. The percentage use of each runway, the amount of touch-and-go training activity, and the number and locations of runway exits become important factors in determining the hourly capacity of each runway configuration. Hourly runway capacity volume is calculated by the following equation: Hourly Capacity = C x T x E C = Hourly Capacity Base T = Touch-and Go Factor E = Taxiway Exit Factor The base hourly capacity determined in visual conditions is 64 operations. In IFR conditions, the hourly capacity is calculated at 56 operations. In PVC, the hourly capacity is calculated as 48 operations. Under visual conditions, touch-and-go activity and the taxiway exit factor have the effect of increasing the hourly capacity to 71. In IFR conditions, when touch-and-go activity is less likely, the hourly capacity decreases to 52 operations. In PVC conditions, the hourly capacity remains the same at 48 operations. DEMAND/CAPACITY ANALYSIS 3-5 DRAFT JUNE 2014

7 The hourly capacity figures are then weighted based on the aircraft mix index. Monterey Regional Airport has a high mix percent of Class C aircraft. This has the effect of decreasing capacity due to longer runway occupancy times and greater separation requirements. This is particularly true in IFR and PVC conditions. The current overall weighted hourly capacity is estimated at 54, which is forecast to remain steady through the long term planning horizon. Annual Service Volume (ASV) Once the hourly capacity is known, the annual service volume can be determined. Annual service volume is calculated by the following equation: Annual Service Volume = C x D x H C = weighted hourly capacity D = ratio of annual demand to average daily demand during the peak month H = ratio of average daily demand to average peak hour demand during the peak month Following this formula, the current ASV for Monterey Regional Airport has been calculated at 125,000 operations. Utilizing operational projections for the short term, the calculated ASV would decrease to 124,000. The reduced ASV is primarily due to the increase in operations by Class C aircraft. The projected increase in Class C aircraft operations results in a slightly reduced airfield ASV of 123,000 annual operations by the long term planning period. CALCULATION OF AIRFIELD DELAY As the number of annual aircraft operations approaches the airfield s ASV, increasing amounts of delay to aircraft operations will occur. Delays occur to arriving and departing aircraft in all weather conditions. Arriving aircraft delays result in aircraft holding outside of the airport traffic area while in the air. Departing aircraft delays result in aircraft holding on the ground until released by the airport traffic control tower (ATCT). Currently, total annual delay at the Airport is estimated at 269 hours, which equates to 18 seconds per aircraft operation. During peak periods, average delay could be five to ten times higher. The FAA threshold for significant delay is four minutes per operation. As the demand/capacity ratio increases, average delay grows exponentially. By the long term, average delay is forecast to reach 806 total annual hours which equates to 36 seconds per operation. AIRFIELD CAPACITY SUMMARY Given the factors outlined above, the airfield ASV is estimated at 125,000. The ASV does not indicate a point of absolute gridlock for the airfield; however, it does represent the point at which operational delay for each aircraft operation will increase exponentially. The current operations level estimated for Monterey Regional Airport represents 43 per- DEMAND/CAPACITY ANALYSIS 3-6 DRAFT JUNE 2014

8 cent of the airfield s ASV. By the end of the planning period, total annual operations are anticipated to reach 66 percent of the airfield s ASV. Table 3E summarizes the capacity analysis for Monterey Regional Airport. Exhibit 3B presents a graphic comparison of the project demand versus the calculated ASV. TABLE 3E Airfield Demand/Capacity Summary Monterey Regional Airport PLANNING HORIZON Current Short Term Intermediate Term Long Term Operational Demand Annual 53,827 58,100 64,600 80,600 Design Hour Capacity Annual Service Volume 125, , , ,000 Percent Capacity 43.06% 46.85% 52.10% 65.53% Weighted Hourly Capacity Delay Per Operation (Minutes) Total Annual (Hours) FAA Order B, Field Formulation of the National Plan of Integrated Airport Systems (NPIAS), indicates that improvements for airfield capacity purposes should begin to be considered once operations reach 60 to 75 percent of the annual service volume or when delay is measures at four minutes per operation. This is an approximate level to begin the detailed planning of capacity improvements. At the 80 percent level, the planned improvements should be under design or construction. Since the capacity ratio is not projected to exceed 60 percent of ASV until the long term planning period, major capacity improvements are not considered necessary within the scope of this Master Plan; however, planned improvements may have the additional effect of increasing capacity. In addition the presence of the parallel runway may also help increase overall capacity depending how tower personnel integrate its use. PASSENGER TERMINAL COMPLEX Components of the passenger terminal complex include aircraft gate positions, departures processing, arrivals processing, concourse facilities, as well as public spaces. This section identifies the existing capacity and demand levels for each of the terminal complex components. Many aspects of passenger terminal design are based upon peaking periods of commercial activity as determined by the flight schedules for the Airport. The February 2014 flight schedule was used for this analysis. Flight schedules are subject to change on a daily basis and are published by the Airport on a monthly basis. It is likely that the flight schedule to- DEMAND/CAPACITY ANALYSIS 3-7 DRAFT JUNE 2014

9 Estimated Annual Service Volume (Capacity) 125, , , , CAPACITY/DEMAND (in thousands) ,827 (43%) 58,100 (47%) Forecast Operations (Demand) 64,600 (52%) 80,600 (66%) CURRENT SHORT TERM INTERMEDIATE TERM LONG TERM Exhibit 3B AIRFIELD DEMAND VS. CAPACITY

10 day will be different than the one used for this analysis 1 ; however, the February 2014 schedule provides for a reasonable analysis. PASSENGER AND AIRCRAFT DEMAND The forecast demand of annual, peak month, design day passengers and aircraft operations were developed in Chapter Two Forecasts, and the planning horizon activity milestones are used as the basis for determining the facility capacities and requirements. Combined Peak Hour Operations As previously mentioned, the flight schedule for February 2014 was used as the basis for the analysis in this chapter. (A review of the 2013 flight schedules has indicated that relatively few changes in equipment, airline service, or peaking characteristics have occurred, although the airlines have varied arrival and/or departure times.) According to the February 2014 flight schedule, the peak number of operations (all departures, in this case) occurs between the hours of 5:15 a.m. and 6:15 a.m. There are a total of five departures during this one-hour period, consisting of a total of 227 available seats. The average peak hour operations represent 17 percent of the average daily operations by the airlines. During this hour, 30 percent of the average daily departure seats are available (pro-rated based on schedule). Departing and Arriving Peak Hour Operations Individual arrival and departure peaks were also examined, since they occur at different times of the day. The departure peak occurs between 5:15 a.m. and 6:15 a.m. with five departures and 227 available seats (30 percent of the average daily seats available). The arrival peak occurs between the hours of 9:00 p.m. and 10:00 p.m. with three arrivals (150 total seats). However, Allegiant Air (which varies arrival and departure times during the monthly schedule) had three scheduled arrivals during February 2014 in this same period, increasing total arrival seats to 316 during this peak which occurs three times per month. AIRCRAFT GATE/APRON CAPACITY An airport terminal gate designates an aircraft parking position adjacent to a terminal building for the loading and unloading of passengers and baggage. The size and type of aircraft served, the parking arrangement, and assignment procedures affect the required number of gates, size, and layout of the terminal gates. 1 An example would be the flight to Denver provided by United Express that is planned to be discontinued in June Future flight schedules may include a resumption of this flight or the addition or subtraction of other flights. DEMAND/CAPACITY ANALYSIS 3-8 DRAFT JUNE 2014

11 Presently, the configuration of the terminal gates at Monterey Regional Airport provides for ten ground level boarding and parking positions which are sized to handle regional jet or large turboprop aircraft. Five of these positions are assigned to specific boarding gates, while the remainder provides hard-stand parking positions for overnighting aircraft. Gate 2 is used by US Airways, Gate 3 is used by American Eagle, Gate 4 is used by Alaska Airlines and Allegiant Air, and Gate 5 is used by United Express. Gate 1 is currently unassigned. The terminal is not equipped with passenger loading bridges and only provides ground level boarding. Exhibit 3C details gate utilization at Monterey Regional Airport. This detail was developed based on the flight schedule for February 2014, at which time there were 15 average daily scheduled airline departures (several flights were operated six days each week and Allegiant Air operated two days each week). Table 3F outlines airline gate utilization and average daily flights by each airline. TABLE 3F Airline Gate Utilizations (February 2014) Monterey Regional Airport Gate Airline(s) Daily Departures Departures Per Gate Gate 2 US Airways Gate 3 American Eagle Gate 4 Alaska Airlines/Allegiant Air¹ Gate 5 United Express Totals ¹Allegiant Air was operating two weekly flights from Gate 4. Source: Monterey Regional Airport; Consolidated Flight Schedule, February The number of gates required can be estimated from the following formula: N = V x T/U N = the number of gates V = design hour volume for arrivals or departures (aircraft per hour) T = weighted mean stand occupancy time (hrs.) U = utilization factor The terminal building has a total of five departure gates and ten parking positions which are generally designed to accommodate regional jet size aircraft. When larger aircraft utilize the terminal apron, they must park parallel to Taxiway A, which reduces the total number of aircraft parking positions available. The design hour volume (V) is four, or 27 percent of the 15 daily departures (remaining overnight (RON) aircraft excluded). An analysis of stand or gate occupancy times (T), excluding overnights, was determined to average 29 minutes (0.48 hour) per aircraft. The current utilization factor is 0.40, since four of the ten positions are used during the design hour (RON excluded). The result of the formula calculation, presented in Table 3G, is a current demand for five gates, which means the terminal is operating at 100 percent of its gate capacity. Presently, the Airport has six RON aircraft on the terminal apron. With a total of ten existing terminal DEMAND/CAPACITY ANALYSIS 3-9 DRAFT JUNE 2014

12 GATE AIRLINE Time (Hours) CRJ200 3 CRJ200 4 Q-400 MD-80 (Su/Th Only - Schedule Varies) 5 EMB CRJ200 CRJ200 CRJ200 CRJ200 Q-400 MD-80 Series CRJ200 EMB120 Source: Monterey Regional Airport Flight Schedule, February Schedules are updated monthly and can change daily. Exhibit 3C TERMINAL GATE OCCUPANCY

13 parking positions, the Airport is at 60 percent capacity when demand for RON spaces is included. TABLE 3G Terminal Gate Capacity Monterey Regional Airport Available Demand % Capacity Annual Enplanement Level 200,651 Daily Departures 15 Design Hour Departures 5 Gate Requirements % RON Requirements Included % Daily Departures/Gate 3 Annual Enplanements/Gate 40,130 Occupancy Time (T) hrs Utilization Factor (U) 0.4 RON: Remain overnight. Source: Coffman Associates analysis Terminal Aircraft Gate Requirements Future gate requirements at Monterey Regional Airport have been examined using three widely accepted methodologies applicable to domestic scheduled operations. These include peak hour utilization, daily utilization, and annual utilization. These methodologies were developed by the FAA and are detailed in FAA AC 150/ , Planning and Design Guidelines for Airport Terminal Facilities. The peak hour method determines the existing gate utilization by dividing design hour operations by the number of active gates. The commercial ramp provides for ten parking positions, served through five terminal gates. The additional capacity provides hard-stand parking for overnighting aircraft. The current gate utilization ratio can be expected to remain static through the planning period, resulting in a long term projected need for five gates. Daily utilization analyzes the number of daily departures during the average day of the peak month. The daily utilization factor in February 2014 was 3.0 (and had been at 3.4 in fall 2013). Therefore, it can be expected to increase slightly over the planning period. This projection results in a long term need for five active gates. The annual utilization method produces active gate recommendations by projecting enplanements per gate using Figures 4-1 and 4-3 from the AC 150/ , Planning and Design Guidelines for Airport Terminal Facilities. This method also results in a need for five gates through the long term planning horizon. DEMAND/CAPACITY ANALYSIS 3-10 DRAFT JUNE 2014

14 The results of each active gate projection methodology are shown in Table 3H. Based on a typical flight schedule and average peak periods, the Airport is projected to continue to need five gates through the long term planning period. With five active gates and an additional five parking positions available on the commercial ramp for overflow or overnighting aircraft parking, the Airport meets long range demand for gate positions. However, all gates are presently utilized exclusively for ground level boarding. As has been previously discussed, it is anticipated that the airline fleet mix will shift over time away from smaller 50-passenger regional jet aircraft to larger seat aircraft. Already, Alaska Airlines is serving the Airport with a 76-seat turboprop and Allegiant Air is serving the airport with a 166-seat jet (MD-88) on two weekly flights. Parking configurations must be adjusted on the ramp to accommodate the larger aircraft, limiting the number of available parking positions. Therefore, a change in the commercial mix in future years will create further challenges in parking configurations, which will be examined in the Alternatives chapter. TABLE 3H Terminal Gate/Apron Requirements Summary Monterey Regional Airport Available 2013 Short Term Intermediate Term Long Term Peak Hour Utilization Method Design Hour Operations Gate Utilization Factor Active Gates Daily Utilization Method ADPM Departures Daily Utilization Factor Active Gates Annual Utilization Method Annual Enplanements 200, , , ,000 Enplanements Per Gate 40,130 44,600 a 48,000 a 50,000 a Active Gates PROJECTED ACTIVE GATES Ground Boarding Only TERMINAL APRON REQUIREMENTS Terminal Gate Parking (s.y.) 14,000 14,000 14,000 14,000 Overflow/RON Parking (s.y.) 14,000 14,000 14,000 14,000 Total Apron (s.y.) 28,000 28,000 28,000 28,000 a Calculated utilizing Figures 4-1 and 4-3 from FAA AC 150/ ADPM Average Day Peak Month s.y. square yards Source: FAA AC 150/ , Planning and Design Guidelines for Airport Terminal Facilities. Terminal Aircraft Apron Requirements Terminal apron requirements are determined by the number of gates, the size of the gates, the maneuvering area required for aircraft at gates, and the aircraft parking layout in the gate area. The existing 28,000 square yard commercial apron is designed for ten aircraft positions (regional jets), with alternative parking configurations able to accommodate a DEMAND/CAPACITY ANALYSIS 3-11 DRAFT JUNE 2014

15 mix of larger aircraft. The normal aircraft parking layout in front of the terminal requires aircraft to park on a 45-degree angled nose-in arrangement, with the alternative parking configurations parallel to the front (airside) of the building. Greater area is provided around the aircraft at the two parking positions on the east end of the ramp (furthest distance from the terminal). Based upon anticipated changes in airline fleet mix over the course of the planning period and projected gate requirements, terminal apron requirements have been prepared and are also presented in Table 3H. Annual commercial airline operations at the Airport are projected to remain relatively flat at approximately 11,800 through the long term planning period; however the mix of aircraft is projected to include a larger percentage of seat regional jets. The existing commercial ramp area is approximately the correct size to accommodate the changing fleet mix through the long term planning horizon. Monterey Regional Airport has limited separation distances between Runway 10R-28L, Taxiway A, and the commercial ramp, creating the need to restrict taxiing operations by aircraft with greater than 95-foot wingspans when a MD-80 series or larger aircraft is parked in front of the terminal. The projected terminal ramp requirements reflect the need to accommodate small regional jets in the short term, with the mix transitioning to include stretched narrow-body regional jet aircraft by the intermediate and long term planning horizons. The ability of the existing ramp to meet these changing demands will be examined more thoroughly in the following chapter. TERMINAL BUILDING CAPACITY The requirements for the passenger terminal building begin with a demand capacity analysis of the existing facilities that determines the current capacity of key processing areas for comparison to the passenger demand at the Airport. The purpose of the analysis is to quantify and qualify the ability of the existing terminal facilities to satisfy the current demand of the traveling public at the Airport. A spreadsheet model based on industry standards and calibrated for Monterey Regional Airport based upon observations of passenger activities and terminal operations and design, was used in this analysis. The model utilizes the standard queuing theory which can be defined as: passengers arriving minus passengers processed equals passengers in queue. The evaluation of individual processing elements is based on industry standards and formulas. The model considers the level of service standards established by the International Air Transport Association (IATA). Level of service (LOS) defines the comfort and quality of the passenger experience. Some are related to crowding in queuing areas, while others define the amount of time a passenger must wait for processing. Table 3J outlines the basic level of service standards. DEMAND/CAPACITY ANALYSIS 3-12 DRAFT JUNE 2014

16 TABLE 3J Level of Service Standards (IATA) Monterey Regional Airport AREA PER OCCUPANT A B C+ C C- D E F Level of Service Standards Ft 2 Ft 2 Ft 2 Ft 2 Ft 2 Ft 2 Ft 2 Ft 2 Check-in Queue Area Wait/Circulate Hold Room Bag Claim Area (excl. claim device) Federal Inspection Services A Excellent levels of service; conditions of free flow; excellent level of comfort. B High level of service; condition of stable flow; very few delays; high level of comfort. C Good level of service; condition of stable flow; acceptable delay; good level of comfort. D Adequate level of service; condition of unstable flow; acceptable delays for short periods of time; adequate level of comfort. E Inadequate level of service; condition of unstable flow; unacceptable delays; inadequate levels of comfort. F Unacceptable levels of service; conditions of cross flows, system breakdown and unacceptable delays; unacceptable levels of comfort. Applies to areas below LOS E. In general, LOS C is a typical design goal for most airports. LOS B would be a preferred goal if the budget allows. LOS A is generally too expensive to achieve, and thus prohibitive to implement. For purposes of this analysis, an LOS C+ was used to represent a median between LOS B and C. Departures Processing The first destination for most enplaning passengers in the terminal building is the ticket counters. The ticketing area includes the counters, queuing area and lobby, the ticket offices, and bag screening and processing. Ticket Counters - The percentage of the departing passenger peak hour demand that checks in at the ticket lobby is estimated at 85 percent. The remainder are assumed to check in prior to arriving at the Airport and do not have checked baggage. The capacity at the ticket counters was calculated based on the passenger processing rate derived from observation and IATA averages. The ticket counters were found to be operating at 67 percent capacity. Ticket Lobby - The adequacy of the ticket lobby floor area is also evaluated to determine whether demand levels result in an acceptable level of service. The ticket lobby demand included a percentage of well-wishers in addition to the passengers. Industry standards assume that some passengers enter the queue with their friends or family for assistance. The evaluation was based on a service goal of a 2.5-minute maximum wait in queue and an LOS C+ of 16.1 square feet per person in queue with baggage. When concentrated within the frontage required for ticketing, the queuing area was determined to be operating at 92 percent of capacity. The remainder of the ticket lobby used for circulation and waiting is currently at 65 percent of capacity. DEMAND/CAPACITY ANALYSIS 3-13 DRAFT JUNE 2014

17 Public Area - The public area is typically the space between the ticketing lobby and the security screening area. This space is utilized both by departing and arriving passengers, meeters/greeters, and well-wishers. There is some seating for waiting meeters/greeters, but most of the space is used as circulation space. The demand, therefore, is based on the combined peak hour passenger numbers and the capacity is based on the level of service standard for circulation space and the rate of passengers leaving the space. Since some of the terminal s exterior space features have been designed such that a portion of this space demand can be accommodated outside of the building, the interior public circulation area can be designed to a lower requirement. Therefore, the indoor public area circulation demand is currently estimated at 82 percent of capacity. Bag Screening and Processing The Transportation Security Administration (TSA) must inspect every checked bag that is to be put on an aircraft. The current system at the Airport involves hand inspection stations and screening machines behind the airline ticket counters. Based upon the current operation, the bag screening facilities are operating near capacity during peak hours. After the bags are screened, they proceed as outbound baggage to be placed on carts for delivery to the aircraft. The outbound baggage area available is currently at 50 percent capacity. It should be noted that as airlines have instituted bag fees, passengers are adjusting by checking fewer bags. The outbound baggage area is adequate according to the methodology employed; however, the area specified for TSA baggage check may be limited. Passenger Security Screening - The processing rate at current security levels is estimated at 100 passengers per hour. With two stations, the capacity for the current number of stations is, therefore, 200 passengers per hour, which is adequate for short-term planning. The required queuing area for the checkpoint was determined using an area of 16.1 square feet per person at a level of service LOS C+. The area for queuing is at 81 percent capacity. Across the country, TSA is making efforts to help streamline the screening process. Efforts are being made to provide staff during peak periods, install new equipment, and open precheck lanes. Exhibit 3D summarizes the current capacity for the functional areas within the terminal building. Arrivals Processing The passenger arrivals process consists primarily of those facilities and functions that provide means to reunite the arriving passenger with items that were checked at the origin of the flight. Baggage Claim - It is estimated that 75 percent of arriving peak hour passengers claim checked baggage. The remaining 25 percent of the passengers bypass the baggage claim areas and go directly to the curb or to other ground transportation related facilities. An industry standard of 1.3 checked bags per passenger is utilized. The baggage claim capacity DEMAND/CAPACITY ANALYSIS 3-14 DRAFT JUNE 2014

18 FUNCTIONAL AREA Unit Available Current Need Current % Capacity Short Term 223,000 ENPLANEMENT MILESTONES Intermediate Term 245,000 DEPARTURES PROCESSING Ticket Counters Passengers Using counter (Utilization Factor) 85% Agent Positions # % Kiosk Positions # % Frontage LF % Area SF % Ticket Lobby Queuing Area SF 1,640 1,510 92% 1,790 1,970 2,210 TSA Baggage Check SF 1,500 1, % 1,740 1,740 2,540 Outbound Baggage SF 6,790 3,410 50% 4,044 4,454 4,994 Airline Ticket Office SF 4,320 2,990 69% 3,547 3,907 4,381 Ticket Lobby Circulation SF 2,870 1,860 65% 2,199 2,422 2,716 Public Area Circulation SF 6,670 5,490 82% 6,510 7,170 8,040 Security Stations Number # % Queuing Area SF % Station Area SF 1, % 1,600 1,600 2,400 TSA Administration/Operations SF % 900 1,000 1,100 ARRIVALS PROCESSING Baggage Claim Passengers Claiming Bags (Utilization Factor) 75% Claim Display Frontage LF % Inbound Baggage SF 1,870 1,320 71% 1,562 1,721 1,930 Baggage Service Office SF % Claim Lobby Claim Area SF 1,280 2, % 2,978 3,280 3,678 Circulation Area SF 1,250 1, % 2,327 2,563 2,874 CONCOURSE FACILITIES Passenger Holdrooms Gates # % Holdroom Area SF 5,050 4,500 89% 5,000 6,600 9,100 Concourse Circulation Circulation Area SF 1,330 4, % 4,904 5,401 6,057 PUBLIC SPACES Restrooms Area SF 2,850 2,200 77% 2,604 2,868 3,216 Concessions Food & Beverage SF 5,390 2,890 54% 3,345 3,675 4,125 Retail SF 670 1, % 1,784 1,960 2,200 Rental Car Counter Frontage LF % Counter and Office Area SF 2,210 1,370 62% 1,628 1,793 2,010 Counter Queue Area SF % 1,085 1,195 1,340 ADMINISTRATIVE SPACES Administration/Operations SF 4,680 5,732 82% 5,868 5,956 6,072 Conference Center SF % FUNCTIONAL AREA TOTAL Total Programmed Functional Area SF 56,430 50,682 90% 57,835 63,847 73,751 BUILDING SYSTEMS/SUPPORT Mechanical/HVAC SF 1,640 2, % 2,313 2,554 2,950 General Circulation/Stairwells/Storage SF 10,800 10,680 99% 12,145 13,408 15,488 TOTAL TERMINAL Gross Building Area (Rounded) SF 68,900 63,400 92% 72,300 79,800 92,200 Long Term 275,000 BOLD TYPE represent current or potential future deficiencies. Source: Coffman Associates analysis Exhibit 3D TERMINAL BUILDING CAPACITIES AND REQUIREMENTS

19 is based on the device frontage per person. The currently available claim device is operating at 96 percent capacity. Claim Lobby - The lobby area adjacent to the baggage claim device includes space from the edge of the claim device to the wall next to the rental car counters. Passengers often view this as the outer boundary of the claim area. With the LOS C+ area of 18.3 square feet per person, the demand for baggage claim lobby currently exceeds capacity. If baggage claim circulation requirements at Monterey Regional Airport are designed to lower standards (approximately 11 square feet per occupant), the baggage claim circulation area may be considered to operate at capacity, but only during arrival peaks (late evening). Concourses The concourses consist primarily of the public circulation spaces and secure passenger holdrooms. While holdrooms and circulation are calculated separately, it is common for actual usage to include both of these elements. For example, while passengers are waiting, they will typically disperse throughout the secure concourse. As it gets closer to boarding time, passengers tend to gather in the gate area. As a result it is common to consider holdroom and concourse capacity in aggregate. Holdrooms - The holdroom capacity is based upon available seats for the design aircraft for each gate and average load factor at the Airport. Podium space and queuing/exit space is also considered. The holdroom space is currently 89 percent capacity. Circulation The holdrooms are located at either end of the terminal, and concourse circulation is located between the two holdroom areas. The circulation requirement is based upon providing circulation at 22.6 square feet per occupant. The concourse circulation area demand exceeds available capacity currently. There is approximately 6,380 square feet available for combined holdroom and circulation space. There is a combined current need for 8,640 square feet of space, therefore the holdroom and circulation capacity is currently exceeded. By the long term planning period, a total of 15,154 square feet is needed. Public Spaces Public spaces include restrooms, concessions, and rental car facilities. Restrooms - Restrooms in the terminal are located in the main entrance lobby, the bag claim lobby, adjacent to the two holdrooms, and on the second floor adjacent to the restaurant and administration offices. Restroom capacity is calculated based on square footage per peak hour passenger, as provided in FAA Advisory Circular 150/ , Planning and Design Guidelines for Airport Terminal Facilities. That ratio has been adjusted for wider stalls. The combined restroom areas are estimated at 77 percent capacity. DEMAND/CAPACITY ANALYSIS 3-15 DRAFT JUNE 2014

20 Concessions and Retail - While planning standards and demand are an important consideration in the adequacy of concessions in a terminal, there are marketing considerations that determine the capacity and economic viability of airport food/beverage services and retail concessions. Concessions are available on both the secure and non-secure sides of the terminal, and retail is available only on the secure side. Food and beverage concessions are at 54 percent capacity. Retail demand is currently estimated to exceed available capacity. Rental Car Rental car space planning is estimated based upon design hour passengers. The rental car counter frontage, located on the first level near the baggage claim area, is currently operating at capacity. Office space behind the rental car counter is at 62 percent capacity, and the queuing area in front of the counter (limited by columns and stairwells) exceed capacity. TERMINAL BUILDING REQUIREMENTS This section identifies the facilities required to meet the Airport s terminal building needs through the long term planning horizon. The review of the various terminal complex requirements was performed with the guidance of FAA Advisory Circular 150/ , Planning and Design Guidelines for Airport Terminal Facilities, the TSA Recommended Security Guidelines for Airport Planning, Design and Construction, IATA Level of Service Standards, and the Airport Cooperative Research Program s (ACRP) Airport Passenger Terminal Planning and Design. Terminal building requirements are summarized in Exhibit 3D and are described in further detail below. Airline Ticketing and Operations Area The first destination for enplaning passengers who need to retrieve a boarding pass or check baggage in the terminal building is usually the airline ticket counters. The ticketing area consists of the ticket counters, queuing area for passengers to approach the counters, and the ticket lobby which provides circulation. The ticket lobby should be arranged so that the enplaning passenger has immediate access and clear visibility to the individual airline ticket counters upon entering the building. Circulation patterns should allow the option of bypassing the counters with minimum interference. Provisions for seating should be minimal to avoid congestion and encourage passengers to proceed to the gate area. Airline ticket counter frontage, automated check-in kiosk positions, counter area, ticketing lobby, and airline office and baggage make up area requirements for each projected enplanement level milestone have been calculated. From the analysis presented in Exhibit 3D, the ticket counter queuing area and TSA baggage check areas may require additional area to meet projected demands in the short term (223,000 passenger boardings), while several of the remaining functional areas (kiosks, public circulation, and airline offices) may require additional area to meet projected demands in the intermediate and long term planning horizons. DEMAND/CAPACITY ANALYSIS 3-16 DRAFT JUNE 2014

21 Security Screening The security checkpoint is equipped with two screening stations. The capacity of a single station is estimated at 100 persons per hour, making the existing stations adequate through the intermediate term planning horizon. Prior to reaching the long term enplanement milestone of 275,000 annual boardings, an additional station, queuing area, and TSA operational area will be required. Additional TSA administrative offices are shown to be needed by the intermediate planning horizon. Baggage Claim Facilities The passenger arrivals process consists primarily of those facilities and functions that reunite the arriving passengers with their checked baggage. The existing claim frontage (the baggage carousel belt) is projected to be inadequate (by industry standards) prior to reaching the short term enplanement threshold of 223,000 boardings. In fact, the existing public bag claim area fails to meet existing needs on days when Allegiant Air has an arrival during the same peak evening arrival period as United and American Eagle. Additional public floor area for bag claim device frontage, circulation, and claim floor area will be needed as peak period passenger deplanements increase. Available inbound baggage area (the area behind the wall where bags are loaded onto the carousel) is also projected to be inadequate by the long planning horizon. Holdroom and Concourse Facilities The number of gates required for servicing the combined peak hour operations and the mix of aircraft during the peak hour determines holdroom capacity requirements. The holdrooms are sized to provide adequate area for the largest aircraft using each gate. The requirement for gate podiums and check-in space are included within the overall holdroom area. The current layout provides separate holdrooms at the boarding gates used by US Airways (Gates 1,2, and 3) and the remaining carriers (Gates 4, and 5). The two holdrooms are connected by a concourse circulation corridor on the secure side of airport security. The snack bar and gift shop are available to both holdrooms. Some seating areas are equipped with electrical outlets to charge personal electronic devices. Projections indicate there is a current need for additional holdroom and circulation space. As the Airport realizes increasing enplanements levels, the need for additional combined holdroom and circulation space will become more acute. Terminal Services Available food and beverage space in the terminal meets current demand; however, the majority of the food and beverage area is on the second floor, which is on the public side of airport security.. Only a snack bar provides food and beverage service on the secure side DEMAND/CAPACITY ANALYSIS 3-17 DRAFT JUNE 2014

22 of the terminal. Current airport design standards suggest locating a large portion of concessions on the secure side of the terminal building. This change has occurred because passing through security has added time to passenger movements. Many passengers will desire to pass through security before taking advantage of available concession options so that they are in the vicinity of their gate and will be able to board the aircraft in a timely manner. By application of industry standards, the amount of retail space available falls well short of current needs. Available restroom space, in aggregate area, appears to be adequate through the short term, although the area provided on the secure side of the terminal will need to be enlarged to meet projected needs. Monterey Regional Airport offers an observation deck on the second floor. The observation deck is on the public side of the facility. This is an amenity that is uncommon at most airports and provides something unique to Monterey. Rental Car Counter Rental car counter and office space is calculated as a function of deplaning passengers. Rental car counter frontage is calculated as 50 percent of peak hour deplanements. Rental car counter and office space is calculated as 15 square feet for every linear foot of counter length. The rental car queue area is calculated as 10 square feet for every linear foot of counter length. Rental car counter frontage length is currently adequate; however, by the short term planning period an additional 15 feet are needed. By the long term, a total of 40 additional feet are projected to be needed. Behind the counter space, including separate office space is estimated to be adequate through the long term planning period. The rental car queue space does not meet the current demand. As a result it is not uncommon to see lines that occupy both circulation and baggage claim lobby space. Administrative Spaces Often airport administrative offices are located within an airport terminal building. At Monterey Regional Airport, the administration occupies space on the second floor. By industry standards, the administrative offices are somewhat undersized currently. Conference room space (administrative conference room and MPAD boardroom) is adequate through the long term planning period. An additional consideration is the need for training room space. As a commercial service Airport, there are additional need for ongoing training for airport staff, tenants, and other airport users. DEMAND/CAPACITY ANALYSIS 3-18 DRAFT JUNE 2014

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:

According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include: 4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity

More information

CHAPTER 4 DEMAND/CAPACITY ANALYSIS

CHAPTER 4 DEMAND/CAPACITY ANALYSIS CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine

More information

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration

The purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this

More information

AIRPORT MASTER PLAN UPDATE

AIRPORT MASTER PLAN UPDATE AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo

More information

Planning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements

Planning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements Proper airport planning requires the translation of forecast aviation demand into the specific types and quantities of facilities that can adequately serve the identified demand. This chapter will analyze

More information

SAN JOSÉ INTERNATIONAL AIRPORT

SAN JOSÉ INTERNATIONAL AIRPORT SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft

More information

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012

NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 NORTHERN ROCKIES REGIONAL AIRPORT Terminal Expansion ANALYSIS 31 st August 2012 INTRODUCTION The purpose of this report is to analysis the current schedule of operations and assumptions within the 2010

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Chapter III - Demand/Capacity and Facility Requirements

Chapter III - Demand/Capacity and Facility Requirements Chapter III - Demand/Capacity and Facility Requirements The facility requirements identified in this chapter are summarized on Exhibit III.1. The future requirements serve to determine which airport facilities

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

CHAPTER 5 - FACILITY REQUIREMENTS

CHAPTER 5 - FACILITY REQUIREMENTS CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the

More information

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3

Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline

More information

CHAPTER 4: ALTERNATIVES

CHAPTER 4: ALTERNATIVES MSP Long Term Comprehensive Plan Update Metropolitan Airports Commission 4.1 INTRODUCTION CHAPTER 4: ALTERNATIVES Several alternatives were developed and evaluated based on their capability to meet the

More information

BNA Master Plan Update Community Advisory Committee Meeting No. 5

BNA Master Plan Update Community Advisory Committee Meeting No. 5 A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,

More information

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016 Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

Time-series methodologies Market share methodologies Socioeconomic methodologies

Time-series methodologies Market share methodologies Socioeconomic methodologies This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning

More information

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3

Airport Master Plan for. Brown Field Municipal Airport PAC Meeting #3 Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus

More information

Greater Orlando Aviation Authority Orlando International Airport One Jeff Fuqua Boulevard Orlando, Florida Memorandum TO: FROM:

Greater Orlando Aviation Authority Orlando International Airport One Jeff Fuqua Boulevard Orlando, Florida Memorandum TO: FROM: Greater Orlando Aviation Authority One Jeff Fuqua Boulevard Orlando, Florida 32827-4399 Memorandum TO: FROM: Participating Airlines Phil Brown, Executive Director DATE: SUBJECT: Rate Methodology for FY

More information

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities

1 DRAFT. General Aviation Terminal Services Aircraft Hangars Aircraft Parking Aprons Airport Support Facilities To properly plan for improvements at Dallas Executive Airport, it is necessary to translate forecast aviation demand into the specific types and quantities of facilities that can adequately serve the demand.

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate

More information

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 36 Aprons & Aircraft Parking Dear students, today s lecture we are going

More information

Planning, Development and Environment Committee

Planning, Development and Environment Committee Page 1 of 7 MEMORANDUM TO: Planning, Development and Environment Committee FROM: Neil Ralston, Airport Planner Airport Development (726-8129) SUBJECT: 2035 MSP LONG TERM COMPREHENSIVE PLAN FORECAST, FACILITY

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined

More information

Las Vegas McCarran International Airport. Capacity Enhancement Plan

Las Vegas McCarran International Airport. Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,

More information

3. Aviation Activity Forecasts

3. Aviation Activity Forecasts 3. Aviation Activity Forecasts This section presents forecasts of aviation activity for the Airport through 2029. Forecasts were developed for enplaned passengers, air carrier and regional/commuter airline

More information

Love Field Modernization Program Update: Master Planning Recommendations

Love Field Modernization Program Update: Master Planning Recommendations Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and

More information

DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport

DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport 5.1 GENERAL OVERVIEW The next step in the Master Plan process is analyzing the capacity of existing airport facilities against forecasted

More information

Table of Contents. Overview Objectives Key Issues Process...1-3

Table of Contents. Overview Objectives Key Issues Process...1-3 Table of Contents Chapter One Introduction Overview...1-1 Objectives...1-1 Key Issues...1-2 Process...1-3 Chapter Two Inventory of Existing Conditions Airport Setting...2-1 Locale...2-1 Airport Surroundings...2-5

More information

Chapter 5 Facility Requirements

Chapter 5 Facility Requirements Chapter 5 Facility Requirements 5.0 INTRODUCTION The Facility Requirements chapter of this Sustainable Master Plan Update describes airside and landside facilities, which are needed to accommodate existing

More information

Chapter 5 Facility Requirements

Chapter 5 Facility Requirements Chapter 5 Facility Requirements 50 INTRODUCTION This chapter describes the airside and landside facility requirements necessary to accommodate existing and forecasted demand in accordance with Federal

More information

EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE

EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE SECTION I - DEFINITIONS The following words, terms and phrases used in this Exhibit E shall have the

More information

Hartford-Brainard Airport Potential Runway Closure White Paper

Hartford-Brainard Airport Potential Runway Closure White Paper Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)

More information

CATCODE ] CATCODE

CATCODE ] CATCODE Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class

More information

Tampa International Airport Master Plan Update. December 12, 2012

Tampa International Airport Master Plan Update. December 12, 2012 Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking

More information

Forecast of Aviation Activity

Forecast of Aviation Activity DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation

More information

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906

Prepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906 Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement

More information

3.0 Facility Requirements

3.0 Facility Requirements 3.0 Facility Requirements The facility requirements chapter includes an assessment of the aviation and non-aviation components of Rickenbacker International Airport (LCK) including the runway and taxiway

More information

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES INTRODUCTION An Airport Master Plan provides an evalua on of the airport s avia on demand and an overview of the systema c airport development that will best meet those demands. The Master Plan establishes

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

STUDY WORK GROUP MEETING No. 3. November 29, 2016

STUDY WORK GROUP MEETING No. 3. November 29, 2016 STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity

More information

PORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS

PORT OF PORTLAND. Chapter Four AVIATION FACILITY REQUIREMENTS PORT OF PORTLAND Chapter Four AVIATION FACILITY REQUIREMENTS CHAPTER FOUR PORT OF PORTLAND AVIATION FACILITY REQUIREMENTS In this chapter, existing components of the airport are evaluated to identify the

More information

1. Background and Proposed Action

1. Background and Proposed Action 1. Background and Proposed Action This chapter describes Hillsboro Airport and the planning background for the proposed project. The Port of Portland (the Port) is the sponsor for the Hillsboro Airport

More information

STUDY WORK GROUP MEETING No. 4. July 12, 2017

STUDY WORK GROUP MEETING No. 4. July 12, 2017 STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,

More information

CHAPTER 5: Landside Facility Requirements and Development Concepts

CHAPTER 5: Landside Facility Requirements and Development Concepts CHAPTER 5: Landside Facility Requirements and Development Concepts Overview Implementation of the preferred intermediate-term (10-year) and long-term (20-year) airside alternatives will have a significant

More information

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis ITB MAIN TERMINAL DEPARTURES LEVEL & BOARDING AREAS A & G ALTERNATIVES ANALYSIS

More information

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved

TABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING

More information

Alternatives. Introduction. Range of Alternatives

Alternatives. Introduction. Range of Alternatives Alternatives Introduction Federal environmental regulations concerning the environmental review process require that all reasonable alternatives, which might accomplish the objectives of a proposed project,

More information

Facility Requirements

Facility Requirements 4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal

More information

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT

IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify

More information

Appendix C AIRPORT LAYOUT PLANS

Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Appendix C AIRPORT LAYOUT PLANS Airport Master Plan Santa Barbara Airport As part of this Airport Master Plan, the Federal Aviation Administration (FAA) requires the development

More information

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN LAST UPDATE JULY 2013 Acknowledgements The preparation of this document was financed in part by a grant from the Federal Aviation Administration (Project No: 3-27-0000-07-10), with the financial support

More information

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT D.3 RUNWAY LENGTH ANALYSIS Appendix D Purpose and Need THIS PAGE INTENTIONALLY LEFT BLANK Appendix D Purpose and Need APPENDIX D.3 AIRFIELD GEOMETRIC REQUIREMENTS This information provided in this appendix

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Capacity Analysis and Facility Requirements

Capacity Analysis and Facility Requirements Capacity Analysis and Facility Requirements Introduction The capacity analysis for Paine Field is composed of two distinct elements: the ability of airport facilities to accommodate existing and projected

More information

Study Committee Meeting. September 2015

Study Committee Meeting. September 2015 W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,

More information

Passenger Terminal Facility Requirements & Alternatives

Passenger Terminal Facility Requirements & Alternatives MASTER PLAN UPDATE 5 PASSENGER TERMINAL FACILITY REQUIREMENTS & ALTERNATIVES GUNNISON-CRESTED BUTTE REGIONAL AIRPORT PASSENGER TERMINAL FACILITY REQUIREMENTS & ALTERNATIVES Passenger Terminal Facility

More information

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION

1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION 1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway

More information

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future:

B GEORGIA INFRASTRUCTURE REPORT CARD AVIATION RECOMMENDATIONS DEFINITION OF THE ISSUE. Plan and Fund for the Future: 2014 GEORGIA INFRASTRUCTURE REPORT CARD B + RECOMMENDATIONS Plan and Fund for the Future: While the system continues to enjoy excess capacity and increased accessibility it still needs continued focus

More information

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006

SIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006 Table of Contents SIMMOD Simulation Airfield and Airspace Simulation Report Oakland International Airport Master Plan Preparation Report Revised: January 6, 2006 Produced For: 1. Simmod PRO! Description...

More information

Current and Forecast Demand

Current and Forecast Demand Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual

More information

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS This Section compares the projected demand and the existing capacity for the major elements of the Airport and establishes the facility requirements

More information

3.1 CRITICAL AIRCRAFT

3.1 CRITICAL AIRCRAFT The purpose of the demand capacity analysis is to determine an airport s capacity and its ability to support the forecasted aviation demand. Facility requirements identify development, replacement, and/or

More information

Savannah / Hilton Head International Airport Master Plan Update

Savannah / Hilton Head International Airport Master Plan Update EXECUTIVE SUMMARY Savannah / Hilton Head International Airport Master Plan Update Prepared for: The Savannah Airport Commission Prepared by: URS Corporation In Association With: RS&H and Ruth and Associates,

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

C > Capacity Analysis and Facility Requirements

C > Capacity Analysis and Facility Requirements Buchanan Field Buchanan Field Airport Master Planning Program C. CAPACITY ANALYSIS & FACILITY REQUIREMENTS C > Capacity Analysis and Facility Requirements INTRODUCTION. The capacity of an airfield is primarily

More information

Regional Jets ,360 A319/ , , , ,780

Regional Jets ,360 A319/ , , , ,780 Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.

More information

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity. Chapter 3: Forecast Introduction Forecasting provides an airport with a general idea of the magnitude of growth, as well as fluctuations in activity anticipated, over a 20-year forecast period. Forecasting

More information

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY

RSAT RUNUP ANALYSIS 1. INTRODUCTION 2. METHODOLOGY RSAT RUNUP ANALYSIS 1. INTRODUCTION The FAA Runway Safety Action Team (RSAT) is a team of FAA staff that works with airports to address existing and potential runway safety problems and issues. The RSAT

More information

Evaluation of Quality of Service in airport Terminals

Evaluation of Quality of Service in airport Terminals Evaluation of Quality of Service in airport Terminals Sofia Kalakou AIRDEV Seminar Lisbon, Instituto Superior Tecnico 20th of October 2011 1 Outline Motivation Objectives Components of airport passenger

More information

BNA Master Plan Update Public Meeting No. 2

BNA Master Plan Update Public Meeting No. 2 A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation

More information

Forecast and Overview

Forecast and Overview Forecast and Overview DENVER INTERNATIONAL AIRPORT Overall goals of the (MPR): Work with DEN to refine the preferred airport development plan to guide the development over an approximate 25-year planning

More information

Rates & Charges Analysis

Rates & Charges Analysis Aeronautics Division Rates & Charges Analysis Executive Summary Executive Summary In This Report: Airlines Rates and Charges Other Building Rental Rates Landing Fees Parking Rates Tie-Downs Special Use

More information

INTRODUCTION. General

INTRODUCTION. General CHAPTER FOUR Airfield Demand/Capacity Analysis & Facility Requirements INTRODUCTION A key step in the master plan process is the determination of airport facility requirements to allow airside and landside

More information

Public Information Meeting. September 2015

Public Information Meeting. September 2015 W ki P O & T / Working Papers One & Two/ Public Information Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Papers

More information

Terminal Space and Ratemaking

Terminal Space and Ratemaking Terminal Space and Ratemaking (Written by Dafang Wu on March 19, 2016; PDF version) This article discusses classification of terminal space and options for setting terminal rates and charges methodology.

More information

Preliminary Draft Budget FY Airline Rates and Charges. Sea-Tac International Airport

Preliminary Draft Budget FY Airline Rates and Charges. Sea-Tac International Airport Draft Budget FY 2015 Airline Rates and Charges Sea-Tac International Airport Aviation Finance & Budget 2015 Budget Airline Rates and Charges TABLE OF CONTENTS Exhibit Contents 1 Aeronautical Revenue Summary

More information

Airport Planning and Terminal Design

Airport Planning and Terminal Design Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing

More information

DRAFT. Airport Master Plan Update Sensitivity Analysis

DRAFT. Airport Master Plan Update Sensitivity Analysis Dallas Love Field Sensitivity Analysis PREPARED FOR: The City of Dallas Department of Aviation PREPARED BY: RICONDO & ASSOCIATES, INC. August 201 Ricondo & Associates, Inc. (R&A) prepared this document

More information

Facility Requirements

Facility Requirements C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over

More information

Master Plan Update Community Advisory Committee Kick-off Meeting

Master Plan Update Community Advisory Committee Kick-off Meeting Nashville International Airport Master Plan Update Community Advisory Committee Kick-off Meeting September 13, 2018 Agenda Welcome and Introductions Master Plan Objectives Master Plan Process BNA Vision

More information

Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement)

Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement) Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement) Briefing to the Transportation and Environment Committee Department of Aviation October 27, 2008 Purpose Review 5-Party

More information

AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES

AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES Landing Fees - per 1,000 lbs. of Maximum Gross Landed Weight Terminal Rental Rate - includes ATO, BSO, ticket counters,

More information

Chapter 3. Demand/Capacity & Facility Requirements

Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. DEMAND/CAPACITY & FACILITY REQUIREMENTS This chapter provides an assessment of future airport development requirements based upon the forecasts

More information

Key Purpose & Need Issues

Key Purpose & Need Issues Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability

More information

FACILITY REQUIREMENTS

FACILITY REQUIREMENTS FACILITY REQUIREMENTS In order to ensure that Bradley International Airport (BDL) is capable of supporting the expected increase in passenger traffic, care must be taken to ensure that the recommendations

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

CEE 5614 and CEE Aircraft Classifications. Spring 2013

CEE 5614 and CEE Aircraft Classifications. Spring 2013 CEE 5614 and CEE 4674 Aircraft Classifications Dr. Antonio A. Trani Professor Civil and Environmental Engineering Spring 2013 1 Material Presented The aircraft and the airport Aircraft classifications

More information

Merritt Island Airport

Merritt Island Airport TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory

More information

CHAPTER 1: INTRODUCTION

CHAPTER 1: INTRODUCTION CHAPTER 1: INTRODUCTION Purpose and Scope The information presented in this report represents the study findings for the 2016 Ronan Airport Master Plan prepared for the City of Ronan and Lake County, the

More information

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3 This is the presentation for the third Master Plan Update Working Group Meeting being conducted for the Ted Stevens Anchorage International Airport Master Plan Update. It was given on Thursday March 7

More information

APPENDIX D MSP Airfield Simulation Analysis

APPENDIX D MSP Airfield Simulation Analysis APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/

More information

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 10 Preferred Inaugural Airport Concept 10.0 Introduction The Preferred Inaugural Airport Concept for SSA was developed by adding the preferred support/ancillary facilities selected in Section 9

More information

Existing Conditions AIRPORT PROFILE Passenger Terminal Complex 57 air carrier gates 11,500 structured parking stalls Airfield Operations Area 9,000 North Runway 9L-27R 6,905 Crosswind Runway 13-31 5,276

More information

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS

SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS SECTION 4 DEMAND/CAPACITY ANALYSIS AND FACILITY REQUIREMENTS 4.1 INTRODUCTION This section provides a technical presentation of demand/capacity and facility requirements analysis for Nampa Municipal Airport.

More information

TERMINAL DEVELOPMENT PLAN

TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN 5.0 TERMINAL DEVELOPMENT PLAN Key points The development plan in the Master Plan includes the expansion of terminal infrastructure, creating integrated terminals for international,