AIRLINE CONSULTATION MEETING
|
|
- Kelly Bond
- 6 years ago
- Views:
Transcription
1 AIRLINE CONSULTATION MEETING Passenger Facility Charges Proposed Projects Bangor International Airport Bangor, Maine June 2011
2 Bangor International Airport intends to file an application with the Federal Aviation Administration (FAA) to impose and use Passenger Facility Charges (PFCs) on various projects in the terminal/landside area. PROJECTS TO BE INCLUDED IN THE NEW APPLICATION Projects to be included in the new application are as follows: 1. Electrical Upgrades 2. Renovations in Domestic Terminal 3. PFC Application Costs NOTICE TO AIR CARRIERS A meeting will be held with the air carriers serving the airport, foreign and domestic, on June 14, 2011 at 11:00 AM in the Airport Conference Room. This brochure provides all of the information that is required to be presented at that meeting as part of the consultation with air carriers. It includes the following: 1. A description of the projects. 2. An explanation of the need for the projects (justification). 3. A detailed financial plan for the projects, including (1) the estimated allowable project costs allocated to major project elements, (2) the anticipated total amount of PFC revenue that would be used to finance the projects, (3) the sources and amounts of other funds, if any, needed to finance the projects, and (4) a copy of the Airport's five-year Capital Improvement Program. REQUEST THAT A CLASS OF CARRIER NOT BE REQUIRED TO COLLECT PFCs Subsection 11 of FAR Part 158 permits the Airport to request that a class of air carriers or foreign air carriers not be required to collect PFCs. Such a class is one that constitutes no more than 1% of the total number of passengers enplaned annually at the airport at which the PFC is imposed. In the Notice of Intent, the Airport indicated that it intends to request that On Demand Air Taxi Commercial Operations (ATCO) that do not
3 enplane or deplane passengers at the Airport's main passenger terminal building be exempt from collecting PFCs. This class of carrier at Bangor International Airport represents 0.23% of total passengers enplaned annually as recorded on FAA Form AIR CARRIERS REQUIREMENTS In conformance with Section , following the meeting of June 14, 2011, each carrier has until July 14, 2011 to provide the Airport with a written certification of its agreement or disagreement with the proposed project. A certification of disagreement must contain the reasons for such disagreement. The absence of such reasons shall void certification of disagreement. If a carrier fails to provide the Airport with certification of agreement or disagreement with the proposed project by July 14, 2011, the carrier is considered to have certified its agreement. 2
4 PROJECT DESCRIPTIONS
5 1. ELECTRICAL UPGRADES DESCRIPTION A. Electrical Primary Underground Service This project will consist of removing existing riser poles, installing new riser poles with switches and air breaks in front of Dock 13, installing (3) runs of 4" PVC conduits encased in concrete for the airport loop feed system and (2) runs for the Hotel radial feed system, a new underground service to feed Docks II & 13, (2) 750 KVA transformers to supply the domestic terminal and international terminal, (4) new concrete pull boxes, removal of existing wiring and devices within the existing manholes, new aluminum cabling, earthwork, and pavement replacement. B. International Terminal Generator Upgrade This project includes modifying the existing building to accommodate NEC and the manufacturer's space requirements, demolition of the existing generator, demolition of the existing switchboard in the generator building, replacement of fuel system components within the building, installation of a new 625 KVA generator, new double doors, and new conduit and wiring from the generator building to the existing automatic transfer switch. C. Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades Upgrade the existing 240/416V service to 120/208V 3-phase power. Replace the original 240/416V and miscellaneous panels in the Electric Room with new panels. Install a new step up transformer so as to supply 480V / 3- Phase power to the existing equipment. The new work does not include replacing or rewiring any existing branch circuit wires to their respective fixtures/outlets. It includes replacing feeders between new subpanels in the Electrical Room. JUSTIFICATION AND OBJECTIVE The electrical service equipment has exceeded its useful life. A majority of the components are showing signs of wear and corrosion. This was evident in a recent power outage that lasted several days last summer. An investigation was conducted by Carpenter Associates to identify the elements that need to be updated. In general, the underground electric was installed as a radial type feed. A radial type feed system provides only one circuit from the source (Utility Poles) to the load(s) (pad mount transformers). The major issue with radial type feed is when a problem occurs and power is required to be shut down, all the loads connected to that circuit will be without power. 2
6 . All originally installed primary cables have an open neutral type cable. Past records indicate that these cables were installed circa These cables are expected to last 25 years without incident. The more immediate concern with the originally installed cables with the open neutral is the copper conductors are unprotected and therefore subject to corroding sooner, so the potential danger of a neutral decaying or breaking open increases. If one of the neutrals on the 3 cables should become defective, the load on the remaining two neutrals would have to compensate for the last cable that has a defective concentric neutral. If the load on these two neutrals exceeds their rating, there is a potential for severe damage or possibly a fire. The replacement of the generator for the international building is necessary because the generator is old and has become a maintenance problem, with frequent repairs required and parts hard to come by because of its age. In addition, the existing generator is unable to operate the critical systems at the airport and needs to be larger. ELIGIBILITY Costs related to administrative (nonpublic use) space and any equipment, furnishings or facilities used in revenue production (e.g., snack bar equipment or furniture, vending machines, telephones, reservation lines) are not allowable costs. Therefore, these costs must be broken out of the overall cost of the project. A. Electrical Primary Underground Service A portion of the new primary underground service is intended to serve the hotel. This cost is ineligible for funding under the PFC program. Portions of the terminal building are non-public and portions are also leased. These are also ineligible for funding with PFC collections. The eligibility of the domestic terminal and the international terminal was determined to be 69.2%. Appendix A shows the calculations for the portions of the terminals that are eligible as well as ineligible. Docks 11 and 13 are used by the airport for storage of equipment and are therefore 100% eligible. B. International Terminal Generator Upgrade The eligibility of the generator is based on the square footage of public space within the international terminal. This was calculated to 79.5%. See Appendix A for calculations. C. Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades As stated above, Docks 11 and 13 are used for airport equipment storage and are therefore, 100% eligible. 3
7 ESTIMATED TOTAL PROJECT COST Electrical Primary Underground Service... $655,000 International Terminal Generator Upgrade... $192,000 Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades... $106,000 Total Project 1... $953,000 ESTIMATED ELIGIBLE PROJECT COST Electrical Primary Underground Service... $434,324 International Terminal Generator Upgrade... $152,665 Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades... $106,000 Eligible Total Project 1... $692,989 Ineligible Total Project 1... $206,011 SCHEDULE Estimated Project Implementation Dates: Electrical Primary Underground Service... August 1, 2011 International Terminal Generator Upgrade... August 1, 2011 Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades... August 1, 2011 Estimated Project Completion Dates: Electrical Primary Underground Service... Nov 1, 2011 International Terminal Generator Upgrade... Nov 1, 2011 Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades... Nov 1,
8 APPENDIX A 5
9 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY SUMMARY Domestic Terminal (SF) International Terminal (SF) Total Terminal Buildings public space: 55,446 72, ,534 Terminal Buildings non-public/lease space: 38,078 18,574 56,652 93,524 90, ,186 Eligibility 59.3% 79.5% 69.2% A. Electrical Primary Underground Service total cost eligiblity eligible cost Docks 11 and 13 $51, % $51,700 Hotel $50, % $0 Terminal Buildings $552, % $382,624 $655,000 $434,324 B. International Terminal Generator Upgrade $192, % $152,665 C. Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades $106, % $106,000 $692,989
10 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - DOMESTIC TERMINAL - 1st FLOOR Room Eligible Ineligible Room Name Number Area (S.F.) Area (SF) 102 Closet 23 0 A Freight Elev. A Vestibule Receiving Corridor B Elevator B Coffee Shop Storage Storage Toilet Room Delta Baggage Delta Office Delta Lockers Vestibule Delta Baggage Delta Breakroom Delta Storage Delta Office Delta Women's Restroom Delta Men's Restroom Delta Office Delta Office Baggage Handling (Outside) Allegiant Office Allegiant Office Allegiant Office Allegiant Office Allegiant Office Allegiant Office Maintenance Storage Maintenance Storage Maintenance Vestibule Maintenance Storage Parking Enforcement Ticketing Ticket Queue Corridor Vestibule State Police TSA Office Men's Restroom Janitor's Room Women's Restroom Vestibule 178 0
11 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - DOMESTIC TERMINAL - 1st FLOOR Room Eligible Ineligible Room Name Number Area (S.F.) Area (SF) 147 Lobby Baggage Claim S1 Stair S Avis Budget Hertz National Alamo Vestibule Women's Restroom Janitor's Room Men's Restroom Gate 1 Holding Ticket Queue Ticketing American Eagle American Eagle American Eagle American Eagle Baggage Vacant Vacant Baggage Vacant US Air Office US Air Office US Air Baggage US Air Office Elevator Elevator Lobby Stair Elevator Machinery Room Stair Stairs/Escalator First Floor Total
12 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - DOMESTIC TERMINAL - 2nd FLOOR Room Eligible Ineligible Room Name Number Area (S.F.) Area (SF) 201 Boarding Lounge Boarding Lounge Boarding Lounge Boarding Lounge Boarding Lounge Lounge Concourse USO Coffee Shop Seating Coffee Shop Kitchen Storage Office Red Baron Lounge Vestibule Women's Restroom Men's Restroom Closet Concessions Concessions Storage Concessions Storage Concessions Office Concessions Unfinished Space Gate 2A Corridor Corridor Closet Closet Stairs Stairs Second Floor total First Floor Total Total Domestic Building
13 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - INTERNATIONAL TERMINAL - 1st FLOOR Room Number Room Name Eligible Area (S.F.) Ineligible Area (SF) 178 Storage International Check-in 2, Women's Restroom Men's Restroom Baggage Claim 4, Command Center Search Search Conference/Training Room Baggage Baggage USCS Office Office Office USCS Office USCS Office USCS Office USCS Office Baggage USDA Dog USCS Storage USDA Inspection USDA Cargo USDA Oil USDA Computer USDA Storage USDA Supervisor USDA Lab Staff Lounge Men's Restroom Women's Restroom Security Storage Storage Command Center General Office 0 1, Immigration Port Director IMM Supervisor INS Reception Storage IMM Primary Inspection/Queuing 0 9, Janitorial Closet Men's Restroom 320 0
14 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - INTERNATIONAL TERMINAL - 1st FLOOR Room Number Room Name Eligible Area (S.F.) Ineligible Area (SF) 1123 Women's Restroom Child Care Holding Room Holding Room Holding Room Holding Room Interrogation Room Search Secure INS Reception Lab Computer Room USPHS Storage USPHS Isolation USPHS An??? Office Storage Storage Customs Inspection 12, Corridor Corridor Corridor Corridor Corridor Stair Elevator Elevator Stair Stair First Floor Total 23,242 17,902
15 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - INTERNATIONAL TERMINAL 2nd FLOOR Room Number Room Name Eligible Area (S.F.) Ineligible Area (SF) 231 Security Checkpoint 1, TSA Break Storage TSA Administration TSA Office Smoking Lounge In-Transit Sterile Lounge 6, In-Transit Sterile Lounge 11, Secure Corridor 3, Stair # Secure Corridor 1, Concessions Vestibule Corridor 1, Men's Restroom Women's Restroom Child Care Men's Restroom Women's Restroom Men's Restroom Women's Restroom Corridor Storage Corridor Concourse 9, ??? STAIR STAIR ELEVATOR STAIR ELEVATOR STAIR Second Floor Total 39,767 3,655
16 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY - INTERNATIONAL TERMINAL 3rd FLOOR Room Number Room Name Eligible Area (S.F.) Ineligible Area (SF) 301 Airport Director Conference Room Superintendant of Operations Assistant Airport Director Operations/Dispatch Briefing Room Storage Security Conference Room Storage Office Storage Women's Restroom Men's Restroom Reception Office Conference Room Office Office Computer Room Office General Office Storage Kitchen Corridor Third Floor Total 0 6,096 Second Floor Total 39,767 3,655 First Floor Total 23,242 17,902 Total International Building 63,009 27,653
17 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION ELECTRICAL UPGRADES ELIGIBILITY UTILITY ROOMS (PRO-RATED) Pro-rated rooms (Domestic Terminal): Room Area Room Name Number (S.F.) 100 Boiler Electrical Electrical A Tele/Comm Elevator Elec Standby Generator Electr/Alarm Mechanical Boiler Electrical Room Electrical Room 60 Total 3556 Pro-rated rooms (International Terminal): Room Area Room Name Number (S.F.) Generator Boiler Mechanical Elevator Mechanical Room Janitor Electrical Room Electrical Room 114 Total 2218
18
19
20
21
22
23 2. RENOVATIONS IN DOMESTIC TERMINAL DESCRIPTION This project includes design and construction of high priority upgrades to the existing domestic terminal building which will improve passenger flow, better utilize existing lower level terminal space, and improve the energy efficiency of the building. The project will include upgrades to: a. lower level public restrooms b. public vertical circulation elements (elevator and escalators) c. main entrances and support spaces along curbside edge of ticket lobby. d. consolidation of airline ticket counters, including relocation of spaces to accommodate new outbound baggage screening system (funded by TSA) JUSTIFICATION The 2007 terminal area study identified significant deficiencies in safety, security, efficiency, terminal functionality, and passenger service. Various conceptual approaches to address these deficiencies were identified and assessed. This project will address the highest priority elements indicated in the 2007 study. PROJECT OBJECTIVE The primary goal of the Project is to make improvements to existing building deficiencies in security, safety, functional efficiency, and customer amenity. Expansion to accommodate increased capacity IS NOT being proposed as part of this effort. ELIGIBILTY Costs related to administrative (nonpublic use) space and any equipment, furnishings or facilities used in revenue production (e.g., snack bar equipment or furniture, vending machines, telephones, reservation lines) are not allowable costs. Therefore, these costs must be broken out of the overall cost of the project. The work is contained to the first floor of the terminal building. A sketch of the proposed renovation is included. The calculations for the percentage of public space are also included in Appendix B. The percentage of public space (eligible space) has been calculated to be 74.0%. ESTIMATED PROJECT COST Total Project 2... $4,000,000 6
24 Eligible Cost $2,376,000 Ineligible Cost... $1,624,000 PROPOSED SCHEDULE Estimated Project Implementation Date... January 1, 2012 Estimated Project Completion Date... March 1,
25 APPENDIX B 8
26 BANGOR INTERNATIONAL AIRPORT 2011 PFC APPLICATION TERMINAL BUILDING RENOVATIONS ELIGIBILITY Public Space: Room Area (SF) Lobby renovations 16,500 new restrooms 900 Subtotal 17,400 Non- Public Space: Room Area (SF) rental car space/ state police 1,600 airline ticket counters (south end) 11,300 Subtotal 12,900 Total area of renovations 30,300 Eligible 57.4% Ineligible 42.6%
27
28
29 3. PFC APPLICATION COSTS DESCRIPTION Professional services are required to assist the airport staff with the preparation of the application and the previous amendment to collect Passenger Facility Charges (PFC's). This will include the preparation of supporting documentation such as project sketches, funding scenarios, narratives of need and justification for the projects, and assistance with the preparation of the Airport Capital Improvement Program, including cost estimates. JUSTIFICATION The Airport has contracted for assistance with the preparation of documentation, cost estimates of projects, graphics, assistance with airline consultation, and general matters relating to the application to collect PFC's. ESTIMATED GROSS PROJECT COST a. PFC Application Costs... $43,700 PROPOSED SCHEDULE Estimated Project Implementation Date... February 1, 2011 Estimated Project Completion Date... September 1,
30 FINANCIAL PLAN
31 Financial Plan Exhibit A-1 shows a Summary of Project Costs for the new PFC program at Bangor International Airport. The amount of this new impose and use application is $3,726,708 In accordance with Section (b)(3)(ii), Exhibit A-2 presents the calculation of the net PFC revenue that is anticipated to be collected by the City and used to pay for the PFC projects. PFC collections are currently being collected at a rate of $4.50 per passenger. Exhibit A-2 shows the amount of PFC fees collected through March 31, An estimated 92% of the projected enplaned passengers will be required to pay a PFC. The air carrier fee is calculated at $0.11 per qualifying passenger. The anticipated expiration date is July 1, Exhibit A-3 presents the cash flow for the projects using the project costs per year and the net collected PFC revenues.
32 EXHIBIT A-1a 2011 APPLICATION BANGOR INTERNATIONAL AIRPORT PFC PROGRAM SUMMARY Equipment/ PFC PFC PROJECT DESCRIPTION Construction A/E Costs Total Eligible Ineligible 1 Purchase Snow Removal Equipment $1,756,330 $0 $1,756,330 $1,756,330 $0 2 Electrical Improvements A. Electrical Primary Underground Service $600,000 $55,000 $655,000 $434,324 $220,676 B. International Terminal Generator Upgrade $176,000 $16,000 $192,000 $152,665 $39,335 C. Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades $90,000 $16,000 $106,000 $106,000 $0 3 Terminal Building Renovations, Phase 1 $3,620,000 $380,000 $4,000,000 $2,297,030 $1,040,000 4 PFC Application Costs $66,800 $66,800 $66,800 0 TOTAL: $6,242,330 $533,800 $6,776,130 $4,813,149 $1,300,011 Page 1 of 1
33 EXHIBIT A-1b 2011 APPLICATION BANGOR INTERNATIONAL AIRPORT PROJECT SUMMARY PFC PFC PROJECT DESCRIPTION Construction A/E Costs Total Eligible Ineligible 2 Electrical Improvements A. Electrical Primary Underground Service $600,000 $55,000 $655,000 $434,324 $220,676 B. International Terminal Generator Upgrade $176,000 $16,000 $192,000 $152,665 $39,335 C. Docks 11 and 13 Interior Electrical Distribution Equipment Upgrades $90,000 $16,000 $106,000 $106,000 $0 $692,989 3 Terminal Building Renovations, Phase 1 $3,620,000 $380,000 $4,000,000 $2,297,030 $1,702,970 4 PFC Application Costs $43,700 $43,700 $43,700 $0 TOTAL: $4,486,000 $510,700 $4,996,700 $3,726,708 $1,962,981
34 EXHIBIT A APPLICATION BANGOR INTERNATIONAL AIRPORT CALCULATION OF TOTAL PASSENGER FACILITY CHARGE REVENUE PFC PROGRAM CALENDAR TOTAL ENPLANED ASSUMED PFC - ELIGIBLE TOTAL ESTIMATED AIRLINE COLLECTION NET PFC REVENUE YEAR PASSENGERS (1) ENPLANED PASSENGERS (2) PFC REVENUE (3) FEES (4) (5) Collected through March 31, 2011 $1,254, , ,900 $616,050 $15,059 $600, , ,534 $821,399 $20,078 $801, , ,184 $837,828 $20,480 $817, , ,908 $854,586 $20,889 $833, , ,078 $517,847 $12,658 $505, , ,605 $3,647,709 $89,164 $4,813,149 (1) Based on actual enplaned passengers for 2010 (194,516) with 2% growth thereafter. (2) Based on 92% of Total Enplaned Passengers (3) Assumed PFC eligible passengers X $4.50 (4) Assumed PFC eligible passengers X $0.11/passenger Collection started December 1, 2010 (5) Total Estimated PFC Revenue - Airline Collection Fees Anticipated Expiration Date - July 1, 2015 Page 1 of 1
35 EXHIBIT A APPLICATION BANGOR INTERNATIONAL AIRPORT PFC PROGRAM CASH FLOW Prior to CY CY CY CY CY PROJ DESCRIPTION 3/31/ CASH BALANCE: (BEGIN CY) $1,254,586 ($524,844) ($2,957,572) ($2,156,251) ($1,338,903) ($505,206) 1 Purchase Snow Removal Equipment (1,756,330) 2 Electrical Improvements (692,989) 3 Terminal Building Renovations, Phase 1 (2,297,030) 4 PFC Application Cost ($23,100) ($43,700) TOTAL ANNUAL COST: ($1,779,430) ($3,033,719) NET COLLECTED PFC (CY): $600,991 $801,321 $817,348 $833,697 $505,207 TOTAL AVAILABLE NEXT CY: ($524,844) ($2,957,572) ($2,156,251) ($1,338,903) ($505,206) $0 ($xxxxx) = Cash Out $xxxxx = Cash In Page 1 of 1
36 EXCLUDED CARRIERS
37 Bangor International Airport Passenger Facility Charge Program Carriers Excluded From Collecting PFCs JUSTIFICATION: BGR is excluding On-demand Air Taxi Commercial Operators (ATCOs). The annual revenue to BGR from each proposed excluded carrier would be less than $ These revenues would not cover the cost of the airport s recordkeeping requirements and the cost of the annual audit. For the largest collecting carrier in the excluded class this translates to a compensation of $1.11 per month to pay for the expense of collecting and remitting the PFCs. This equals $3.33 per quarter to cover the cost of the quarterly report requirements of FAR Part If the quarterly reports are not required then there is only $13.31 available for the required annual report. These compensation levels do not cover the costs of the monthly remittance and annual report for the carrier. EXCLUDED CARRIERS: Subsection 11 of FAR Part 158 permits the Bangor International Airport to request that a class of air carriers not be required to collect PFCs. Such a class is one that constitutes less than 1% of the total number of passengers enplaned annually at the airport. The airport intends to request that On Demand Air Taxi Commercial Operators (ATCO) that (1) do not enplane or deplane passengers at the airport's main passenger terminal building and (2) enplane less than 200 passengers per year at the airport be exempt from collecting PFCs. This class of carriers represents less than 1% of total passengers enplaned annually as recorded on FAA Form Carriers excluded from collecting PFCs at the Bangor International Airport based on FAA Form reporting for calendar year 2010 are: Capital Excel Inc enplanement ElanAir, Inc enplanements Executive Air Charter of Boca Raton enplanements Executive Jet Management, Inc enplanements Flight Services Group, Inc enplanements Jet Solution, LLC enplanements Jetchoice 1 LLC enplanements Maine Instrument Flight enplanements Modesto Executive Air Charter, Inc enplanements Nxaero LLC... 4 enplanements Ontario Air Service, Inc enplanements Pro Airways LLC... 5 enplanements
38 Silver Ranch Airpark, Inc enplanements Sun Aviation, Inc enplanements Twin Cities Air Service LLC enplanements Total enplanements of excluded carriers: enplanements Total enplanements of all carriers: ,516 enplanements Percentage of total enplanements for excluded carriers: % 14
Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport
Re: Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport Los Angeles World Airports (LAWA) intends to submit
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019 The City of Atlanta is providing an opportunity for public comment until April 25, 2019 related to the
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationAIRLINE CONSULTATION MEETING
AIRLINE CONSULTATION MEETING Passenger Facility Charges Proposed Projects South Burlington, Vermont August 2012 Prepared by: 150 Dow St., Manchester, NH 03101 603-669-5555 INTRODUCTION The Burlington International
More informationPFC Application #2 Niagara Falls International Airport
Public Notice Application #2 Falls International April 12, 2018 Agenda Program at the Falls International Notice to air carriers and consultation meeting Class of air carriers not required to collect Air
More informationBrief Recap of Project to Date
CITY AND BOROUGH OF SITKA Rocky Gutierrez Airport (SIT) Terminal Improvements Project Brief Recap of Project to Date Schematic Design: Design Development Meetings June 26 & 27, 2018 Project Description
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationPUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017
PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017 Agenda Overview of PFC Program at Spokane Airport (GEG) Proposed New PFC 11 Application Project
More informationNew PFC Application #13
PUBLIC CONSULTATION New PFC Application #13 Buffalo, NY December 16, 2015 Agenda PFC Program at Notice to Carriers and Consultation Meeting Class of Carrier Not Required to Collect PFC Air Carrier Requirements
More informationSection (a)(1). Description of Projects Impose and Use
November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear
More informationGreenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17
Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17 1 Airline/Airport Use & Lease Agreement Greenville-Spartanburg International Airport Cost Center Boundaries
More informationPassenger Facility Charge Public Notice. February 14, 2018
Passenger Facility Charge Public Notice February 14, 2018 Overview The Memphis-Shelby County Airport Authority intends to submit a new Passenger Facility Charge (PFC) application for a project at Memphis
More information14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice
14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class
More informationGreater Orlando Aviation Authority Orlando International Airport One Jeff Fuqua Boulevard Orlando, Florida Memorandum TO: FROM:
Greater Orlando Aviation Authority One Jeff Fuqua Boulevard Orlando, Florida 32827-4399 Memorandum TO: FROM: Participating Airlines Phil Brown, Executive Director DATE: SUBJECT: Rate Methodology for FY
More informationNEW PFC APPLICATION #5
NEW PFC APPLICATION #5 New PFC Application #5 Public Notice Norfolk International Airport Norfolk, VA Table of Contents PFC Program at Norfolk International Airport Class of Air Carrier Not Required to
More informationSCHEDULE OF RATES AND CHARGES
SCHEDULE OF RATES AND CHARGES Effective: October 1, 2014 Revised: April 1, 2015 TABLE OF CONTENTS Page Airlines 4 Passenger Facility Charge 5 Badges and Security 6 Cargo 6 Concessions 7 FBO/SASO 7 Fuel
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationEXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE
EXHIBIT E to Signatory Airline Agreement for Palm Beach International Airport RATE AND FEE SCHEDULE SECTION I - DEFINITIONS The following words, terms and phrases used in this Exhibit E shall have the
More informationAmended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement)
Amended & Restated Lease of Terminal Building Premises (Airport Use & Lease Agreement) Briefing to the Transportation and Environment Committee Department of Aviation October 27, 2008 Purpose Review 5-Party
More informationPreliminary Draft Budget FY Airline Rates and Charges. Sea-Tac International Airport
Draft Budget FY 2015 Airline Rates and Charges Sea-Tac International Airport Aviation Finance & Budget 2015 Budget Airline Rates and Charges TABLE OF CONTENTS Exhibit Contents 1 Aeronautical Revenue Summary
More informationLove Field Modernization Program Update: Master Planning Recommendations
Love Field Modernization Program Update: Master Planning Recommendations Briefing to the Council Transportation and Environment Committee April 28, 2008 1 1 Briefing Objective Discuss the background and
More informationTerminal Space and Ratemaking
Terminal Space and Ratemaking (Written by Dafang Wu on March 19, 2016; PDF version) This article discusses classification of terminal space and options for setting terminal rates and charges methodology.
More informationBOARD ITO Aide REPORT TO THE AIRPORT COMMISSIONERS
1 [1 11 BOARD ITO Aide 001:4 Los Angeles World Airports REPORT TO THE Approved by: Justin rbacci - hief Innovation and Commercial St tegy Officer (--(AtSotA_ /1//r/'(10 PV Reviewed by: Samson Mengistu
More informationNotice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application
July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationGREATER ORLANDO AVIATION AUTHORITY
GREATER ORLANDO AVIATION AUTHORITY Amendment to PFC Applications #7, 8, and 16 and New PFC Application #18 PUBLIC NOTICE June 7, 2016 1 P age Table of Contents PUBLIC NOTICE... 3 PROPOSED ACTIONS... 3
More informationTampa International Airport Master Plan Update. December 12, 2012
Tampa International Airport Master Plan Update December 12, 2012 1 Prior Presentation Consolidated rental car and people mover Decongest curbsides and roadways Enable rental car growth Gain long term parking
More informationSCHEDULE OF RATES AND CHARGES
SCHEDULE OF RATES AND CHARGES Effective: October 1, 2017 TABLE OF CONTENTS Page Airlines 4 Passenger Facility Charge 5 Badges and Security 6 Cargo 6 Concessions 7 FBO/SASO 7 Fuel Flowage 7 General Aviation
More informationOFFICE OF THE AUDITOR
OFFICE OF THE AUDITOR DEPARTMENT OF AVIATION REVENUE AND COMPLIANCE AUDIT JANUARY 2005 Dennis J. Gallagher Auditor Dennis J. Gallagher Auditor City and County of Denver 201 West Colfax Ave., Dept. 705
More informationSCHEDULE OF RATES AND CHARGES
SCHEDULE OF RATES AND CHARGES Effective: October 1, 2018 TABLE OF CONTENTS Page Airlines 4 Passenger Facility Charge 5 Badges and Security 6 Cargo 6 Concessions.. 7 FBO/SASO 7 Fuel Flowage. 7 General
More informationCOUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019
COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fees for Fiscal Year 2019 October 1, 2018 through September 30, 2019 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development
More informationFinancial Feasibility Analysis
CHAPTER F Financial Feasibility Analysis 1. Introduction This chapter presents a funding plan for completion of recommended capital projects at Friedman Memorial Airport (the Airport) through FY 2034,
More informationSAN JOSÉ INTERNATIONAL AIRPORT
SAN JOSÉ INTERNATIONAL AIRPORT NEAR-TERM TERMINAL CAPACITY ANALYSIS AIRPORT COMMISSION AUGUST 14, 2017 August 14, 2017 AGENDA 1. Forecast Review (with 14 MAP High Case) 2. Gate Requirements and Aircraft
More informationNotice of Air Carrier Consultation Meeting for PFC Application Niagara Falls International Airport (NFIA/IAG)
181 Ellicott Street Buffalo, New York 14203 716-855-7300 Fax: 716-855-7657 TDD: 855-7650 www.nfta.com Re: Notice of Air Carrier Consultation Meeting for PFC Application Niagara Falls International Airport
More informationVIRGIN ISLANDS PORT AUTHORITY (VIPA) 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE. ! July
VIRGIN ISLANDS PORT! July AUTHORITY (VIPA) 2016 2016 PUBLIC HEARING ON PROPOSED TARIFF INCREASE FINANCIAL OPERATIONS VIPA AVIATION DIVISION VIRGIN ISLANDS PORT AUTHORITY 2 5-YEAR INCOME STATEMENT SNAPSHOT-
More informationCONSOLIDATED MAY 8, 2017 CITY OF CAMPBELL RIVER PROVINCE OF BRITISH COLUMBIA BYLAW NO. 3211
CONSOLIDATED MAY 8, 2017 CONSOLIDATION FOR CONVENIENCE PURPOSES ONLY, OF BYLAWS 3211, 3335, 3485, 3495, 3547, 3666 CITY OF CAMPBELL RIVER PROVINCE OF BRITISH COLUMBIA BYLAW NO. 3211 A BYLAW OF THE CITY
More informationPUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT
PUBLIC NOTICE OF PASSENGER FACILITY CHARGE FOR DENVER INTERNATIONAL AIRPORT Pursuant to CFR 158.24, the City and County of Denver Department of Aviation ( City ), owner and operator of the Denver International
More informationIRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN
IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN.doc TABLE OF CONTENTS SAN Appendix 1 - DOT Required Contingency Plan Appendix 2 CBP Sterile Area Procedures.doc 1.0 Purpose 1.1. The purpose of the is to provide
More informationSECTION NO. PAGE NO. Amendment NO.
INDEX TO AIRLINE RATES, FEES AND CHARGES AMENDED ORDINANCE 201601 GREATER ASHEVILLE REGIONAL AIRPORT AUTHORITY DESCRIPTION ORDINANCE NO. SECTION NO. PAGE NO. Amendment 201601 12 10 Effective Date 201601
More informationCOUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018
COUNTY OF MUSKEGON MUSKEGON COUNTY AIRPORT Rates, Charges and Fee for FY18 October 1, 2017 through September 30, 2018 GROUND & FACILITY LEASE RATES Ground Lease Rate Bare ground for development Per Individual
More informationCurrent and Forecast Demand
Existing Facilities Jacksonville International Airport (JIA) is served by a number of airside and landside facilities. There are two runways that serve the airport in an open V configuration. The Annual
More informationSTUDY WORK GROUP MEETING No. 4. July 12, 2017
STUDY WORK GROUP MEETING No. 4 July 12, 2017 Agenda Welcome and introductions Update of project schedule Brief overview of previous SWG meeting Introduction to airport development alternatives Comments,
More informationPUBLIC CONSULTATION. Projects Proposed to be Financed with Passenger Facility Charges. Proposed 2018 PFC Application C-00-BOS
PUBLIC CONSULTATION Projects Proposed to be Financed with Passenger Facility Charges Proposed 2018 PFC Application 18-11-C-00-BOS Boston-Logan International Airport Massachusetts Port Authority Boston,
More informationCharles H. Ada II Executive Manager A.B. Won Pat International Airport Guam
Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam ABOUT THE GUAM AIRPORT Autonomous instrumentality of the Government of Guam; created in 1975 by P.L. 13-57; only commercial
More informationPublic Notice July 14, 2017
Public Notice July 14, 2017 PROPOSED IMPLEMENTATION OF PFC 13 NOTICE TO AIR CARRIERS AND CONSULTATION MEETING Implementation of PFC On June 14, 2017 the Omaha Airport Authority provided written notice
More information2018 Appropriation Budget Table of Contents Board Approved August 18, 2017
INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary
More information? 0-? WA", ilp. Y ON 1Z Cond 1 0 AIRPORT COMMISSIONERS BOARD REPORT TO THE Los Angeles World Airports 0*1-
I 1 RW MT BOARD 0*1-.04 11 Los Angeles World Airports REPORT TO THE 0 AIRPORT COMMISSIONERS Meeting Date: Approved /by: Dave Jone - Airline Prop nd Concession Services ) 7/13/2017 Reviewed by:.',...ek
More informationRates & Charges Analysis
Aeronautics Division Rates & Charges Analysis Executive Summary Executive Summary In This Report: Airlines Rates and Charges Other Building Rental Rates Landing Fees Parking Rates Tie-Downs Special Use
More informationASIP2 AIR SERVICE INCENTIVE PROGRAM
Albany International Airport ASIP2 AIR SERVICE INCENTIVE PROGRAM December 2011 Albany International Airport Air Service Incentive Program Introduction: The Albany County Airport Authority (ACAA), operator
More informationCITY OF PALM SPRINGS FINANCING AUTHORITY CITY OF PALM SPRINGS
CITY OF PALM SPRINGS FINANCING AUTHORITY $12,720,000 Airport Passenger Facility Charge Revenue Bonds, Series 1998 (Palm Springs Regional Airport) Issue Date: June 3, 1998 CITY OF PALM SPRINGS $12,115,000
More informationFeasibility Study Federal Inspection Service Facility at Long Beach Airport
Feasibility Study Federal Inspection Service Facility at Long Beach Airport 13 December 2016 Long Beach City Council PLEASE NOTE: The information, analysis, assessments and opinions contained in this presentation
More informationKansas City Aviation Department. Update to Airport Committee Customer Service
Kansas City Aviation Department Update to Airport Committee Customer Service 1 Perspective An estimated 800,000 people participated in the Royals Word Series Parade On average 883,000 airline passengers
More informationCOUNTY OF ORANGE, CALIFORNIA AIRPORT REVENUE BONDS, SERIES 2009 A & B ANNUAL REPORT FOR FISCAL YEAR ENDED JUNE 30, 2013
COUNTY OF ORANGE, CALIFORNIA AIRPORT REVENUE BONDS, SERIES 2009 A & B ANNUAL REPORT FOR FISCAL YEAR ENDED JUNE 30, 2013 Dated: January 28, 2014 COUNTY OF ORANGE, CALIFORNIA AIRPORT REVENUE BONDS, SERIES
More informationOFFICE OF THE AUDITOR
OFFICE OF THE AUDITOR DEPARTMENT OF AVIATION REVENUE AND CONTRACT COMPLIANCE AUDIT JUNE 2006 Dennis J. Gallagher Auditor Dennis J. Gallagher Auditor City and County of Denver 201 West Colfax Ave., Dept.
More informationSTANDARD RATES AND FEES AT BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL (BWI MARSHALL) AIRPORT
TENANT DIRECTIVE BWI: 401.1 DATE: May 31, 2018 DISTRIBUTION: A TITLE: STANDARD RATES AND FEES AT BALTIMORE/WASHINGTON INTERNATIONAL THURGOOD MARSHALL (BWI MARSHALL) AIRPORT I. REFERENCES A. This Directive
More informationDallas Love Field Update. Dallas City Council Briefing February 18, 2015
Dallas Love Field Update Dallas City Council Briefing February 18, 2015 Purpose Construction Update Impacts of Wright Amendment Repeal Increase in operations/passengers/ projections Concessions performance
More informationJANUARY 2018 BOARD INFORMATION PACKAGE
JANUARY 2018 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: January 19, 2018 Financial Report (document) Informational Reports: A.
More informationPassenger Facility Charge Application #1
Passenger Facility Charge Application #1 February 2017 APPLICATION PUNTA GORDA AIRPORT PFC ASSURANCES CERTIFICATION STATEMENT The undersigned Chair of the Charlotte County Airport Authority assures
More informationCHAPTER 7 IMPLEMENTATION PLAN
CHAPTER 7 IMPLEMENTATION PLAN INTRODUCTION An implementation plan for Blue Grass Airport (LEX) has been prepared based upon the facility needs identified in the Facility Requirements and the Alternatives
More informationVIRGI ISLA DS PORT AUTHORITY
VIRGI ISLA DS PORT AUTHORITY AVIATIO DIVISIO RATES Effective 10/01/05-1 - AVIATIO RATE SCHEDULE By virtue of authority granted under Title 29, Section 543 (12) of the Virgin Islands Code, the Virgin Islands
More informationOPERATING DIRECTIVE Number: D Aviation Authority Revised: 03/25/15
Page: 1 of 10 PURPOSE: To maintain the aesthetics of the airport by establishing standards and procedures to be followed by tenants concerning approval of and placement of tenant related displays, signs,
More informationNotice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport
Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County
More informationCity of Tallahassee, FL Department of Aviation
City of Tallahassee, FL Department of Aviation Proposed Application to Federal Aviation Administration For Authority to Impose a Passenger Facility Charge (PFC) at Tallahassee International Airport and
More informationGSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT
About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South
More informationAIRPORT MASTER PLAN UPDATE
AIRPORT MASTER PLAN UPDATE PENSACOLA INTERNATIONAL AIRPORT Technical Advisory Committee Meeting #2 June 20, 2017 Agenda» Introduction» Facility Requirements Airside Terminal Landside General Aviation Cargo
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More information2018 Accomplishments
CY2018 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the current and future needs of the community
More informationPROMOTION CONFERENCES ADDITIONAL BENEFITS COMPLIMENTARY PUBLICATIONS
Airports Council International-North America (ACI-NA) represents Airport Members who enplane 95 percent of all domestic and virtually all international airline passenger and air cargo traffic in North
More informationBirmingham Airport 2033
Over the next 15 years, we will expand and improve the Airport to maximise our potential as a single runway airport by investing 500 million in new development. Our plans take account of our forecasted
More informationJANUARY 2017 BOARD INFORMATION PACKAGE
JANUARY 2017 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: January 13, 2017 Financial Report (document) Informational Reports: A.
More informationTRACK: B TERMINAL/LANDSIDE
Salt Palace Convention Center TRACK: B TERMINAL/LANDSIDE WORKSHOP: 3 Title: Airlines and Airports Consolidation and Changing Faces Who is building the Terminals, Technology, and Flexibility? Moderator:
More informationSouthwestFloridaInternational Airport
SouthwestFloridaInternational Airport SouthwestFloridaInternationalAirportislocatedinLee CountyalongtheGulfCoastofSouthFlorida,tenmiles southeastofthefortmyerscentralbusinessdistrict. Theprimaryhighwayaccesstotheairportfrom
More information2017 Accomplishments
CY2017 ANNUAL REPORT Vision The Chippewa Valley Regional Airport will provide our users with a safe, efficient and welcoming operation while striving to meet the needs of the communities we serve. 2017
More informationSalt Lake City International Airport April 23, 2013 Budget Briefing. Page 1
Budget Briefing Fiscal Year 2014 Budget Honorable Members of the City Council April 23, 2013 Page 1 FY 2014 Budget Goals and Objectives Develop and implement a plan of execution for the terminal redevelopment
More informationA REGULATION OF THE CITY AND BOROUGH OF JUNEAU, ALASKA. Adoption of Title 07, Juneau International Airport Chapter 10, Rates and Fees
A REGULATION OF THE CITY AND BOROUGH OF JUNEAU, ALASKA Adoption of Title 07, Chapter 10, Rates and Fees PURSUANT TO AUTHORITY GRANTED BY THE ASSEMBLY OF THE CITY AND BOROUGH OF JUNEAU, THE MANAGER AND
More informationFY 2018 Rates, Fees, and Charges Year End Reconciliation. Finance Department P.O. Box DFW Airport, Texas
FY Rates, Fees, and Charges Year End Reconciliation Finance Department P.O. Box 619428 DFW Airport, Texas 75261-9428 Business Units Executive Summary Summary of FY Year-End Reconciliation Landing Fee Terminal
More information2017 Appropriation Budget Table of Contents Board Approved August 19, 2016
INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary
More informationAIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES
AIRPORT RATES AND CHARGES October 1, 2016 to September 30, 2017 SIGNATORY AIRLINE CHARGES Landing Fees - per 1,000 lbs. of Maximum Gross Landed Weight Terminal Rental Rate - includes ATO, BSO, ticket counters,
More informationRAPID CITY REGIONAL AIRPORT
RAPID CITY REGIONAL AIRPORT Budget: $16,232,274 Full time Employees: 24 Mission Statement It is the mission of the Rapid City Regional Airport Board to provide safe, efficient, environmentally sensitive,
More informationSEPTEMBER 2015 BOARD INFORMATION PACKAGE
SEPTEMBER 2015 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: September 11, 2015 Financial Report (document) Informational Reports:
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationLos Angeles International Airport (LAX) Airside $907M
Los Angeles International Airport (LAX) $3,948M Airside $907M Airfield Electrical Systems Rehabilitation Bradley West Core Renovation, East Ramp and Concourse Demolition Imperial Terminal Aircraft Parking
More informationOFFICE OF THE AUDITOR
OFFICE OF THE AUDITOR DEPARTMENT OF AVIATION (FORMERLY AMERICAN TRANS AIR, INC.) REVENUE AND CONTRACT COMPLIANCE AUDIT JUNE 2006 Dennis J. Gallagher Auditor Dennis J. Gallagher Auditor City and County
More informationMaster Plan Phase 2 Workshop
Master Plan Phase 2 Workshop Tampa Airport: A Legacy of Innovation and Convenience Tampa Airport: A legacy of Innovation and Convenience The world s first airport people mover Tampa Airport: A legacy of
More informationCOMMONWEALTH PORTS AUTHORITY
REPORT ON COMPLIANCE AND INTERNAL CONTROL OVER COMPLIANCE WITH REQUIREMENTS APPLICABLE TO THE PASSENGER FACILITY CHARGE PROGRAM YEAR ENDED SEPTEMBER 30, 2015 Deloitte & Touche LLC P.O. Box 500308 Saipan,
More informationThe 14-Gate Replacement Terminal Project and Protections for Burbank
The 14-Gate Replacement Terminal Project and Protections for Burbank UNITED AIRPORT 1934 The Airport Needs A Safer, Modern, and More Convenient Replacement Terminal Why the Airport Needs a Replacement
More informationCity and County of San Francisco
City and County of San Francisco Office of the Controller City Services Auditor RECREATION AND PARK DEPARTMENT: Concession Audit of Stow Lake Corporation March 3, 2009 CONTROLLER S OFFICE CITY SERVICES
More informationUS Aviation Regulatory Update: A Review of 2010, and Issues to Watch
US Aviation Regulatory Update: A Review of 2010, and Issues to Watch Anita Mosner Partner, Holland & Knight LLP IATA Legal Symposium 14 February 2010 New Developments - 2010 Many new developments. Among
More information,~-- JOHN WAYNE AIRPORT, ORANGE COUNTY. Airline Competition Plan UPDATE. Barry A. Rondinella, A.A.E/C.A.E. Airport Director
JOHN WAYNE AIRPORT, ORANGE COUNTY Airline Competition Plan UPDATE JOrNVAYN. AIRPOITT O R A N GE COU N TY,~-- Barry A. Rondinella, A.A.E/C.A.E. Airport Director 3160 Airway Avenue Costa Mesa, CA 92626 January
More informationNorfolk International Airport History
Norfolk International Airport History As early as 1903, Hampton Roads was making a connection with aviation. The Virginian-Pilot based in Norfolk, Va. was one of the first newspapers in the country to
More informationPFC Quarterly Status Report September 30, 2016
PFC Quarterly Status Report September 0, 06 Public Agency: Greater Orlando Aviation Authority Use Airport: Orlando International Airport (MCO) Charge Expiration Date: $4.50 8//08 Total Collection Authority
More informationBNA Master Plan Update Community Advisory Committee Meeting No. 5
A Six Sigma Organization BNA Master Plan Update Community Advisory Committee Meeting No. 5 September 19, 2012 Introductions MNAA Staff RW Armstrong Team Albersman & Armstrong, Ltd. Atkins North America,
More informationAPRIL 2016 BOARD INFORMATION PACKAGE
APRIL 2016 BOARD INFORMATION PACKAGE MEMORANDUM TO: Members of the Airport Authority FROM: Lew Bleiweis, Executive Director DATE: April 8, 2016 Financial Report (document) Informational Reports: A. February,
More informationFinancial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority
Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority September 12, 2017 Contents 1. Funding Sources for Airport Projects 2. Financial Metrics 3. CIP Summary and Funding
More informationIAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines
IAH Terminal Redevelopment Project Memorandum of Agreement with United Airlines May 29, 2014 On April 24, HAS presented plans for a new Mickey Leland International Terminal (MLIT) Sufficient capacity for
More informationTABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.
TABLE OF CONTENTS Section Page Section Page 1.0 INTRODUCTION... 1 1.1 Purpose of an... 1 1.2 Goals and Objectives... 1 1.3 Mission Statement... 2 1.4 Stakeholder/Public Involvement... 2 1.5 Major Deliverables...
More informationQuarterly Performance Measurement Report
Quarterly Performance Measurement Report Department: Aviation Section: Administration/Executive To provide the executive and administrative support necessary to the Divisions within the Aviation Department
More informationDALLAS LOVE FIELD MAY 2015 DRAFT
8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,
More informationGerald R. Ford International Airport Authority Master Plan Update A World Class Gateway
Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway Master Plan Advisory Committee (MPAC) Alternatives September 28, 2017 AGENDA Review of Previous Work Ultimate Land
More informationSCHEDULES OF FEES AND CHARGES FOR THE WICHITA AIRPORT AUTHORITY. Schedule 1 - Signatory Scheduled Passenger Air Carriers
SCHEDULES OF FEES AND CHARGES FOR THE WICHITA AIRPORT AUTHORITY Schedule 1 - Signatory Scheduled Passenger Air Carriers Schedule 2 Non-Signatory Passenger Air Carriers Schedule 3 Non-Participating Passenger
More information