REVIEW OF THE IMPLEMENTATION REQUIREMENTS IN AIR NAVIGATION SERVICES. (Presented by the Secretariat)

Size: px
Start display at page:

Download "REVIEW OF THE IMPLEMENTATION REQUIREMENTS IN AIR NAVIGATION SERVICES. (Presented by the Secretariat)"

Transcription

1 International Civil Aviation Organization 18/06/12 North American, Central American and Caribbean Office (NACC) Twelfth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/12) Punta Cana, Dominican Republic, 10 to 13 July 2012 Agenda Item 3: Air Navigation Matters 3.2 Review of the implementation of air navigation requirements REVIEW OF THE IMPLEMENTATION REQUIREMENTS IN AIR NAVIGATION SERVICES (Presented by the Secretariat) SUMMARY This working paper presents a review of the critical compliance requirements which should be considered by the Central Caribbean States and Territories for a harmonized implementation of the Air Navigation Services (ANS), in relation with the Regional Performance Objectives (RPOs) adopted by the NACC/DCA/3 Meeting; which are part of the NAM/CAR Regional Performance Based Air Navigation Implementation Plan (NAM/CAR RPBANIP). The suggested action for the Meeting is presented in paragraph 4.1 References: NAM/CAR RPBANIP: Doc 9750, Global Air Navigation Plan Doc 9854, Global Air Traffic Management Operational Concept Doc 9882, Manual on Air Traffic Management System Requirements Doc 9883, Manual on Global Performance of the Air Navigation System Strategic Objectives This working paper is related to Strategic Objectives A. Safety Enhance global civil aviation safety and C. Environmental Protection and Sustainable Development of Air Transport 1. Introduction 1.1 The Global Air Traffic Management Operational Concept (Doc 9854) presents ICAO s vision for an interoperable and harmonized seamless global ATM system for all users that ensures appropriate safety levels and allows optimal economical operations and environmental protection.

2 2 1.2 The Third NACC/DCA Meeting, through Decision 3/3, approved the NAM/CAR Regional Performance Based Air Navigation Implementation Plan (NAM/CAR RPBANIP) which contains the requirements for inter-regional implementation of Air Navigation Services (ANS), taking in consideration the Manual on Air Traffic Management System Requirements (Doc 9882), the Manual on Global Performance of the Air Navigation System (Doc 9883) and the Global Planning Initiatives (GPI) of the Global Air Navigation Plan (Doc 9750). 2. Analysis 2.1 The strategies for operational improvements are reflected as Regional Performance Objectives (RPO) in the NAM/CAR RPBANIP. The RPOs maintain a systemic approach of dynamic implementation in the short and long term, identifying operational improvements in the ANS such as: safety, security, environmental impact, cost-efficiency, capacity, flight efficiency, predictability, access and equity, participation and collaboration, interoperability. 2.2 The evolution and improvement of the air navigation system is directly related to the performance expectations and the ANS implementation requirements. The compliance of these requirements is made possible by assuring: Services and procedures Human resources Infrastructure Process and technology systems Standards and regulations According to the States needs defined in their action plans The allocation of sufficient qualified personnel According to the requirements of the service capacity for the air operations According to the requirements of interoperability and operational improvement agreed. Publications according to ICAO provisions. Compliance with the ANS implementation requirements 2.3 The following activities should be considered as critical for compliance in the short term to achieve the operational improvements agreed for air navigation services. Implementation of the New ICAO model Flight Plan Form (RPO 5) The lack of, or delay in the, efficient implementation of the new flight plan (FPL) requirements might cause delays or cancellation of air operations, including transmission of errors in the flight plan, etc.

3 The Air Navigation Service Providers (ANSPs) of States and Territories should take action to ensure timely compliance of the regionally agreed tasks of the Consolidated Action Plan for the implementation of the New ICAO model Flight Plan Form on 15 November Among the tasks with high priority are the following: introduce the required improvements in the flight plan processing systems; establish or review the bilateral agreements between the ANSPs of the adjacent airspaces and regions for testing and interfacing of new FPL processing systems; publish the required standards and procedures to avoid duplication or errors in the FPL filing; develop training programmes; and ensure sufficient qualified personnel in the ANSPs Since May 2012, the ICAO NACC Regional Office has conducted monthly teleconferences for this implementation for the continuous and effective follow-up and adequate regional decision making. The next monthly teleconference is to be held on Tuesday 10 July The next Meeting/Workshop for the Implementation of the New ICAO model Flight Plan Form has been scheduled from 4 to 6 September 2012, with the purpose of identifying and developing proposals to resolve the regional implementation problems. The support documentation and regional references can be found at Performance Based Navigation (PBN) Implementation (RPO 1) 2.4 The implementation of a PBN airspace concept requires coordination of a multidisciplinary group to analyze the Airspace Organization and Management (AOM). Currently several proposals for ATS routes amendment in the CAR region exist that require the active participation of all the States, not only for its harmonization but also for its optimization in the upper and lower airspace. 2.5 With regard to the implementation of required navigation performance (RNP) approach procedures, States/Territories who have submitted information in compliance with Assembly Resolution A37-11 are as follows: FIR State (No. Aerodromes) Aerodrome RWY SID STAR RNP Total /Date Remarks ARUBA (1) TNCA 11/ Mar-08 RNAV (GPS) CURACAO BONAIRE (1) TNCB 10/ Apr-12 RNAV (GNSS) CURACAO (1) TNCC 11/ Apr-12 RNAV (GNSS)

4 4 FIR State (No. Aerodromes) Aerodrome RWY SID STAR RNP Total /Date Remarks CUBA (10) MUCM 07/25 MUCC 08/26 HAVANA MUCL 12/30 MUCF 02/20 MUHA 06/24 MUHG 05/23 MUMZ 08/26 10/28 - MUCU 01/19 MUSC 08/26 MUVR 06/24 CAYMAN ISLANDS, UK MWCB 09/ Jan-10 RNAV (GNSS) KINGSTON (2) MWCR 08/ Feb-10 RNAV (GNSS) JAMAICA (2) MKJP 12/ Aug-08 RNAV GNSS MKJS 07/ Jun-06 RNAV GNSS MEXICO MEXICO (66) MMMX 05/23- L/R CDO MMTO 15/ Feb-11 RNAV (GNSS) 14/32 - MYNN 09/ Nov-08 RNAV (GPS) MYGF 06/ Jul-09 RNAV (GPS) MYEH 07/ May-09 RNAV (GPS) NASSAU BAHAMAS (8) MYSM 10/ Jan-10 RNAV (GPS) MYEF 12/ Jan-10 RNAV (GPS) MYEM 15/ May-09 RNAV (GPS) NEW YORK PORT AU PRINCE MYAT 14/ Feb-10 RNAV (GPS) MYSM 10/ Jan-10 RNAV BERMUDA, UK (1) TXKF 12/ Nov-09 RNAV (GNSS) HAITI (2) MTPP 10/ Jul-05 RNAV (GPS) MTCH 05/ Jul-05 RNAV (GPS) MDSD 17/ Feb-10 RNAV (GNSS) MDPC 09/ Jun-09 RNAV (GNSS) SANTO DOMINICAN MDPP 08/ Jun-09 RNAV (GNSS) DOMINGO REPUBLIC (7) MDLR 11/ Jun-09 RNAV (GNSS) MDST 11/ Mar-10 RNAV (GNSS) MDJB 01/ Mar-10 RNAV (GNSS) MDCY 07/ Mar-10 RNAV (GNSS)

5 5 FIR State (No. Aerodromes) Aerodrome RWY SID STAR RNP Total /Date Remarks BRITISH VIRGIN I., UK (1) TUPJ 07/25 TJBQ 08/ Oct-09 RNAV (GPS) SAN JUAN TJIG 09/ Apr-08 RNAV (GPS) PUERTO RICO, TJMZ 09/ Oct-05 GPS US (6) TJPS 12/ Mar-09 RNAV (GPS) 08/26- TJSJ 10/ May-09 RNAV (GPS) TJVQ 09/ Feb-10 RNAV (GPS) RNAV (GNSS) MBAC 07/ Feb-10 TURKS & MBGT 11/ Feb-10 RNAV (GNSS) CAICOS I., UK MIAMI (5) MBMC 10/ Dec-08 RNAV (GNSS) MBPV 10/ Feb-10 RNAV (GNSS) SAN JUAN VIRGIN ISLANDS, US (2) MBSC 11/ Feb-10 RNAV (GNSS) RNAV (GPS) TIST 10/ Nov-06 TISX 10/ Nov-06 RNAV (GPS) Optimization and modernization of the communication infrastructure (RPO 9) 2.6 An ATS communication deficiency has been detected in the oceanic airspace between Curacao, Kingston and Santo Domingo FIRs. Actions to improve this air to ground communications coverage deficiency are required. This deficiency results in an increase of large height deviations (LHDs), related with safety assessment of the RVSM airspace. 2.7 The implementation of AIDC (use of CPL-LAM messages) as a solution and improvement to ATS communications has also shown operational benefits, for which several States/Territories like Cuba, Curacao, Dominican Republic and Jamaica have manifested their support; so an active participation by the CAR States is expected. 2.8 The MEVA II Regional Telecommunication Network modernization (MEVA III) represents a collective effort that the Central Caribbean States are supporting and that represents the main infrastructure of the ATN network and Air Navigation services.

6 6 Improvement of the availability of meteorological information (RPO 12) 2.9 Since May 2010, a transition started from the World Area Forecast System (WAFS) to the WAFS Internet File Service (WIFS). Since 1 July 2012, WIFS is the only available resource for users to obtain WAFS data products from the World Area Forecasting Centre (WAFC) in Washington. However, if States were unable to access WIFS operationally by the end of June 2012, there is an option for continuing to receive WAFS products that the State s SADIS Provider will be able to provide temporary access to SADIS/Secure SADIS FTP during the migration to WIFS SADIS FTP services are the official back-up services for the International Satellite Communication System (ISCS), and they will continue to serve as the official back-up services for WIFS. As such, any ISCS user who was unable to switch over to WIFS are strongly advised to ensure that they have access to SADIS FTP services. Approved ISCS users can access the SADIS FTP services through the following link: Additionally, it is necessary to remember that the requirement for implementation of a MET Quality Management System (QMS) will be applicable from 15 th November The MET QMS status of implementation in the Central Caribbean reported by the World Meteorological Organization (WMO) on April 2012 is as follows: State Aruba Bahamas Cayman Islands Cuba Curaçao Dominican Republic Jamaica Haiti Mexico Turks and Caicos United States MET QMS Implementation Status Implementation is at an advanced stage Mid stage of implementation Mid stage of implementation Completed MET QMS implementation Implementation is at an advanced stage Relevant progress of more than 50% in the implementation of MET QMS Starter stage of implementation State at starting stage in QMS implementation Less than 50% progress in the implementation of MET QMS Early stage of QMS implementation Implementation is at the advanced stage, more than 50% of it has been completed

7 7 World Geodetic System (WGS-84), Electronic terrain obstacle database (e-tod) and transition to Aeronautical Information Management (AIM) (RPO 10) 2.12 In the Central Caribbean only Cuba and Dominican Republic have implemented ISO 9001:2008 for the QMS in AIM as an important part of AIS of AIM transition. States are required to implement the corresponding obstacle survey and to complete the publication of WGS-84 coordinates. Cuba has completed WGS-84 implementation in accordance with Doc Likewise, States are required to develop their action plans for the e-tod (Doc 9881) implementation. To date, only Cuba and Dominican Republic are developing an action plan for e-tod implementation With respect to the ICAO AIS to AIM transition roadmap implementation, it is important to highlight that the States and Territories of the Central Caribbean should continue with the formulation of their action plans for the development of all the associated elements that are defined in the roadmap; that includes the concept of Aeronautical Information Exchange Model (AIXM), the Geographical Information Systems (GIS) and the databases that allow the electronic management of the Integrated Aeronautical Information Package (IAIP). Search and Rescue (SAR) system improvement (RPO 6) 2.14 To improve this service in the Central Caribbean, assessments of SAR capacity are required for all States, which should then use the assessment to develop a strategy to implement the required improvements. So far only Dominican Republic, Haiti and Mexico have submitted related information to ICAO. 3. Conclusion 3.1 Currently, only some States and Territories are working on their national ANS implementation plans. The Meeting should encourage the development of the action plans and other initiatives that are adapted to individual needs to ensure a harmonized implementation of air navigation services and infrastructure in the States and Territories of the Central Caribbean. 3.2 National implementation plans should be harmonized with the NAM/CAR RPBANIP and an active follow-up to the implementation of these plans should ensure the harmonization of the national work with the regional effort aimed in the afore-mentioned operational improvements. 3.3 In this regard, ICAO Regional Technical Cooperation Project for the Caribbean Region Implementation of the Performance Based Air Navigation Systems (RLA/09/801) will support the participating States and Territories.

8 8 4. Suggested Action 4.1 The Meeting is invited to: a) take note of the information presented in the working paper; b) encourage the compliance with the implementation requirements of the air navigation service mentioned in this working paper; c) identify the requirements and/or operational improvements for a regionally harmonized air navigation system; and d) recommend other actions as deemed necessary. END

REVIEW OF THE IMPLEMENTATION REQUIREMENTS OF PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

REVIEW OF THE IMPLEMENTATION REQUIREMENTS OF PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) C/CAR/DCA/13 WP/09 International Civil Aviation Organization 12/03/13 North American, Central American and Caribbean Office (NACC) Thirteenth Meeting of Directors of Civil Aviation of the Central Caribbean

More information

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat) E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14 Julio Garriga, RO/TA International Civil Aviation Organization North American,

More information

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule

(Presented by the Secretariat) SUMMARY. This Working Paper presents for the Meeting s consideration, the Draft Agenda and suggested schedule NACC/WG/2- WP/01 Rev. International Civil Aviation Organization 23/04/08 North American, Central American and Caribbean Office Second North American, Central American and Caribbean Working Group Meeting

More information

2012 Performance Framework AFI

2012 Performance Framework AFI 2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical

More information

RESULTS ON THE IMPLEMENTATION OF A PBN AIRSPACE CONCEPT. (Presented by the Secretariat)

RESULTS ON THE IMPLEMENTATION OF A PBN AIRSPACE CONCEPT. (Presented by the Secretariat) CA/ANE/WG/7 / C/CAR/WG/9 WP/08 International Civil Aviation Organization 28/02/12 North American, Central American and Caribbean Office (NACC) Seventh Central American Air Navigation Experts Working Group

More information

PBN Implementation CAR/NAM Regions

PBN Implementation CAR/NAM Regions Regional Forum Creating More Lift PBN Implementation CAR/NAM Regions Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office Project: PBN Implementation Regional Performance

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER A39-WP/389 9/9/16 (Information Paper) English only ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 36: Aviation safety and air navigation

More information

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat)

Air navigation deficiencies in the CAR/SAM Regions with high risk ( U priority) (Presented by the Secretariat) PPRC/1 - WP/03 International Civil Aviation Organization 17/04/12 CAR/SAM Regional Planning and Implementation Group (GREPECAS) First Meeting of the Programmes and Projects Review Committee (PPRC/1) Mexico

More information

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016

P/01REV. Accountability and Performance Report of the ICAO NACC Regional Office to Member States. Nassau, Bahamas, May 2016 P/01REV Accountability and Performance Report of the ICAO NACC Regional Office to Member States Nassau, Bahamas, May 2016 NACC Overview and NCLB Status Background and Status of NACC NCLB Strategy Implementation

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

(Presented by the Secretariat) EXECUTIVE SUMMARY

(Presented by the Secretariat) EXECUTIVE SUMMARY C/CAR/DCA/14 WP/02 19/03/15 Fourteenth Directors of Civil Aviation of the Central Caribbean Meeting (C/CAR/DCA/14) Kingston, Jamaica, 11 to 13 May 2015 Agenda Item 2: Review of the Conclusions from the

More information

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat)

AVIATION SECURITY (AVSEC) AND FACILITATION (FAL) TRAINING AND ASSISTANCE ACTIVITIES IN THE NAM/CAR REGIONS. (Presented by the Secretariat) 26/11/14 Second NAM/CAR Civil Aviation Training Centres Working Group Meeting (NAM/CAR/CATC/WG/2) ICAO NACC Regional Office, Mexico City, Mexico, 2 to 5 December 2014 Agenda Item 9: Other Business AVIATION

More information

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office

AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop. ICAO NACC Office AIR NAVIGATION PLAN REGIONAL PERSPECTIVE Performance Framework Workshop Víctor Hernández ndez Regional Officer ATM/SAR ICAO NACC Office 1 CONTENTS ICAO REGIONAL OFFICES - OBJECTIVE REGIONAL AIR NAVIGATION

More information

Russian Federation ATM modernization program

Russian Federation ATM modernization program Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development

More information

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 NACC/WG/4 WP/16 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 Agenda Item 3: Follow-up on the NAM/CAR Regional Performance-Based

More information

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a

More information

ASSEMBLY 39TH SESSION

ASSEMBLY 39TH SESSION International Civil Aviation Organization WORKING PAPER 1/9/16 6/9/16 ASSEMBLY 39TH SESSION TECHNICAL COMMISSION Agenda Item 33: Aviation safety and air navigation monitoring and analysis COMPLIANCE WITH

More information

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office

NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP) Luis Sanchez ICAO NACC Regional Office Outline NAM/CAR Regional Performance-based Air Navigation Implementation Plan (RPBANIP)

More information

SATELLITE DISTRIBUTION SYSTEM OPERATIONS GROUP (SADISOPSG)

SATELLITE DISTRIBUTION SYSTEM OPERATIONS GROUP (SADISOPSG) International Civil Aviation Organization 5/4/13 WORKING PAPER SATELLITE DISTRIBUTION SYSTEM OPERATIONS GROUP (SADISOPSG) EIGHTEENTH MEETING Dakar, Senegal, 29 to 31 May 2013 Agenda Item 10: Any other

More information

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY 21/10/15 Twenty-sixth Directors of Civil Aviation of the Eastern Caribbean Meeting (E/CAR/DCA/26) New Orleans, United States, 1-3 December 2015 Agenda Item 6: Air Navigation Matters 6.1 GREPECAS Update

More information

Aviation Security (AVSEC) and Facilitation (FAL) 7.3 Other Aviation Security and Facilitation Matters

Aviation Security (AVSEC) and Facilitation (FAL) 7.3 Other Aviation Security and Facilitation Matters 09/04/14 Fifth North American, Central American and Caribbean Directors of Civil Aviation Meeting (NACC/DCA/5) Port-of-Spain, Trinidad and Tobago, 28 to 30 April 2014 Agenda Item 7: Aviation Security (AVSEC)

More information

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the

More information

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air

More information

Regional air navigation planning and implementation performance framework: Review of programmes and projects

Regional air navigation planning and implementation performance framework: Review of programmes and projects International Civil Aviation Organization 02/04/18 CAR/SAM Regional Planning and Implementation Group (GREPECAS) Eighteenth Meeting of the CAR/SAM Regional Planning and Implementation Group (GREPECAS/18)

More information

Proposal for the updating of the FASID ATM Evolution Tables

Proposal for the updating of the FASID ATM Evolution Tables WP/24 22/09/03 International Civil Aviation Organization UNDP/ICAO Regional Project RLA/98/003 Transition to the CNS/ATM Systems in the CAR and SAM Regions Sixth Meeting/workshop of Air Traffic Management

More information

(Presented by Secretariat) EXECUTIVE SUMMARY

(Presented by Secretariat) EXECUTIVE SUMMARY 19/02/15 Second NAM/CAR Air Navigation Implementation Working Group (ANI/WG) Air Traffic Services Inter-facility Data Communication (AIDC) Task Force (AIDC/TF/2) Meeting Mexico City, Mexico, 27 February

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat) INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account

More information

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS December 4, 2014

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS December 4, 2014 CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS 2014 December 4, 2014 FINAL Destination Table 1: Tourist (Stop-over) Arrivals in 2014 Period Tourist Arrivals % Change Overall Winter# Summer# Anguilla

More information

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY

EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY EFFICIENCY PFFs FOR ENROUTE, TERMINAL & COMMUNICATION UGANDA-CIVIL AVIATION AUTHORITY INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based

More information

Work Programme of ICAO Panels and Study Groups

Work Programme of ICAO Panels and Study Groups SIP/2009-WP/16 Performance framework Work Programme of ICAO Panels and Study Groups H.V. SUDARSHAN, Regional Programme Officer International Civil Aviation Organization Workshop on the Development of National

More information

THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas) SUMMARY

THE BAHAMAS FLIGHT INFORMATION REGION (FIR) (Presented by Bahamas) SUMMARY C/CAR DCA/7-WP/16 International Civil Aviation Organization 14/06/04 North American, Central American and Caribbean Office Seventh Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/7)

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

CNS/ATM Systems Interoperability and Harmonization

CNS/ATM Systems Interoperability and Harmonization SIP/2004-WP18 Business case Special Implementation Project CNS/ATM Systems Interoperability and Harmonization (Presented by H.V.SUDARSHAN) Workshop on the development of business case for the implementation

More information

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018) Hello Bonjour WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018) 28 to 30 November 2018 Dakar, Senegal ACMA 2018 28 to 30 November 2018 Dakar, Senegal MET response

More information

Global ATM System ~Interoperability and Harmonization ~

Global ATM System ~Interoperability and Harmonization ~ SIP/2009-WP/7 Business case Global ATM System ~Interoperability and Harmonization ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq

More information

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION AIM SG/5 (Egypt, Cairo, 22 24 January 2019) AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION Presentation contents : 1. NG Aviation company overview 2. New documentation

More information

Advisory Circular. File No.: Z U Issue No.: 01

Advisory Circular. File No.: Z U Issue No.: 01 Advisory Circular Subject: Requirements for the Timely Notification of Amendments to Aeronautical Information Issuing Office: Standards AC No.: 300-015 File No.: Z 5000-34 U Issue No.: 01 RDIMS No.: 12611990v5

More information

POST-IMPLEMENTATION MONITORING OF THE NEW ICAO MODEL FLIGHT PLAN FORMAT. (Presented by Cuba)

POST-IMPLEMENTATION MONITORING OF THE NEW ICAO MODEL FLIGHT PLAN FORMAT. (Presented by Cuba) International Civil Aviation Organization 25/07/13 North American, Central American and Caribbean Office (NACC) First NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/1) Mexico City,

More information

Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions

Agenda Review to the action plans for the implementation of AIDC interconnection in the NAM/CAR/SAM Regions International Civil Aviation Organization AIDCNAMCARSAM -WP/04 South American Regional Office 04/04/18 Meeting of Implementation of AIDC (ATS data communication between facilities) in the NAM/CAR/SAM Regions

More information

QMS for AIS/MAP Service Implementation Workshop

QMS for AIS/MAP Service Implementation Workshop TITLE DP-9 QMS for AIS/MAP Service Implementation Workshop AIS to AIM transitions: The AFI challenges The global evolution from AIS to AIM capability is considered an essential and over-arching objective

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The

More information

Presented by: Trinidad and Tobago

Presented by: Trinidad and Tobago Presented by: Trinidad and Tobago November 2013 References ICAO PBN toolkit ICAO Global Air Navigation Plan (Doc 9750) ICAO PBN Manual (Doc 9613) Piarco FIR PBN Action Plan TTCAA PBN Core Implementation

More information

Review of Air Navigation Matters 2.1 Global Air Navigation and CAR/SAM developments NAM/CAR Regional Air Navigation Implementation Plan

Review of Air Navigation Matters 2.1 Global Air Navigation and CAR/SAM developments NAM/CAR Regional Air Navigation Implementation Plan E/CAR/WG/31 WP/07 International Civil Aviation Organization 11/09/09 North American, Central American and Caribbean Office (NACC) Thirty-First Eastern Caribbean Working Group Meeting (E/CAR/WG/31) St.

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE NPF/SIP/2010-WP/22 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS (NAIROBI, 6-10

More information

ANI/WG/2 WP/11 22/05/15 Second NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/2) Puntarenas, Costa Rica, 1 to 4 June 2015

ANI/WG/2 WP/11 22/05/15 Second NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/2) Puntarenas, Costa Rica, 1 to 4 June 2015 ANI/WG/2 WP/11 22/05/15 Second NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/2) Puntarenas, Costa Rica, 1 to 4 June 2015 Agenda Item 4 Follow-up on the NAM/CAR Regional Performance

More information

Automation Interface Update North American, Caribbean and Central America

Automation Interface Update North American, Caribbean and Central America Automation Interface Update North American, Caribbean and Central America Presented To: CAR/SAM AIDC Workshop By: Dan Eaves, FAA HQ, AJV-724, Requirements and Validation Date: 22 September 2015 Introduction

More information

2.2 Air Navigation Deficiencies ICAO CAR/SAM AIR NAVIGATION DEFICIENCIES DATABASE SIP. (Presented by the Secretariat) SUMMARY

2.2 Air Navigation Deficiencies ICAO CAR/SAM AIR NAVIGATION DEFICIENCIES DATABASE SIP. (Presented by the Secretariat) SUMMARY C/CAR DCA/7-WP/17 International Civil Aviation Organization 16/06/04 North American, Central American and Caribbean Office Seventh Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/7)

More information

Development of the Global AIM Strategy (AIM Projects)

Development of the Global AIM Strategy (AIM Projects) Development of the Global AIM Strategy (AIM Projects) Roberta Luccioli ICAO AIM Technical Officer Interregional EUR/MID PANS AIM Workshop (Paris, 10-12 July 2018) Outline Status-quo: ICAO AIM provisions

More information

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010 INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN OFFICE WORKSHOP ON THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR

More information

World Tourism Organization Leading organization in the field of tourism today. Global forum for tourism policy issues and a practical source of

World Tourism Organization Leading organization in the field of tourism today. Global forum for tourism policy issues and a practical source of World Tourism Organization Leading organization in the field of tourism today. Global forum for tourism policy issues and a practical source of tourism know how Members are 139 countries and 350 affiliate

More information

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS 2008

CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS 2008 CARIBBEAN TOURISM ORGANIZATION LATEST STATISTICS 2008 December 9, 2008 Table 1: Tourist (Stop-over) Arrivals in 2008 Period Tourist Arrivals % Change Overall Winter# Summer# Anguilla Jan-Aug 53,077-10.8-13.9-7.0

More information

(Presented by United States) EXECUTIVE SUMMARY

(Presented by United States) EXECUTIVE SUMMARY NACC/WG/5 IP/07 27/04/17 Fifth North American, Central American and Caribbean Working Group Meeting (NACC/WG/5) Port of Spain, Trinidad and Tobago, 22-26 May 2017 Agenda Item 3 Implementation on Air Navigation

More information

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING

International Civil Aviation Organization FIT-ASIA CRA ARRANGEMENTS, PROBLEM REPORTS, AND PERFORMANCE DATA ANALYSIS REPORTING International Civil Aviation Organization FIT-Asia/5 WP/02 05-06/05/2016 The Fifth Meeting of the Future Air Navigation Systems Interoperability Team- Asia (FIT-Asia/5) Bangkok, Thailand, 05 06 May 2016

More information

Implementation of PBN in Armenian airspace

Implementation of PBN in Armenian airspace Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved

More information

30 SEP - 02 OCT, 2014

30 SEP - 02 OCT, 2014 EASTERN CARIBBEAN AERONAUTICAL INFORMATION MANAGEMENT (AIM) FAMILIARIZATION WORKSHOP TRINIDAD AND TOBAGO AVIATION AUTHORITY COMPLEX PORT OF SPAIN, TRINIDAD AND TOBAGO, 30 SEPTEMBER TO 2 OCTOBER 2014 30

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN

INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN 05/04/00 INTERNATIONAL CIVIL AVIATION ORGANIZATION FOURTH MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CENTRAL CARIBBEAN (Grand Cayman, Cayman Islands, 17-20 May 2000) Agenda Item 3: Air Traffic Management

More information

When replying please quote: Ref.: NT-NS2-35, N E.OSG - NACC February 2016

When replying please quote: Ref.: NT-NS2-35, N E.OSG - NACC February 2016 When replying please quote: Ref.: NT-NS2-35, N1-8.2.24 E.OSG - NACC59272 5 February 2016 To: States, Territories and International Organizations Subject: Action Required: Project RLA/09/801 Implementation

More information

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU ASBU WORKSHOP WI/20/09//2017 Day n 3: STRATEGY ASBU STATUS OF IMPLEMENTATION OF ICAO ASBU [Presented by the Agency for the Safety of Air Navigation in Africa and Madagascar] Executive Summary The purpose

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

AIXM/WXXM CONFERENCE 2010

AIXM/WXXM CONFERENCE 2010 AIXM/WXXM CONFERENCE 2010 ICAO Aeronautical Information Services Aeronautical Information Management Study Group (AIS-AIMSG) Development of Standards and Recommended Practices (SARPS) Presented to: AIXM/WXXM

More information

AIM in support of ATM

AIM in support of ATM AIM in support of ATM Abbas NIKNEJAD Regional Officer, AIM/ATM ATM SG/3 (Cairo, Egypt, 22-25 May 2017) Role of AIS ATM The dynamic, integrated management of air traffic and airspace. Enabling flight operations.

More information

PROGRAMME CALENDAR 2018

PROGRAMME CALENDAR 2018 EAST AFFRICAN SCHOOL OF AVIATION EAST AFRICAN SCHOOL OF AVIATION Training Directorate of Kenya Civil Aviation Authority (KCAA) PROGRAMME CALENDAR 2018 Authorized Training Centre efficiently managing air

More information

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014

NACC/WG/4 IP/27 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 17/03/14 Fourth North American, Central American and Caribbean Working Group Meeting (NACC/WG/4) Ottawa, Canada, 24 to 28 March 2014 Agenda Item 3 Follow-up on the NAM/CAR Regional Performance-Based Air

More information

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally

More information

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM

International Civil Aviation Organization. Global and Regional Developments related to ATM GLOBAL AND REGIONAL DEVELOPMENTS RELARED TO ATM 30/05/2014 International Civil Aviation Organization MIDANPIRG ATM Sub-Group First Meeting (ATM SG/1) (Cairo, Egypt, 9-12 June 2014) Agenda Item 3: Global and Regional Developments related to ATM GLOBAL

More information

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE International Civil Aviation Organization AN-Conf/12-WP/13 1/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum capacity and efficiency through

More information

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization

NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization NAM/CAR Regional Performance-Based Air Navigation Implementation Plan (RPBANIP) v3.1 April 2014 International Civil Aviation Organization RPBANIP (1) v3.1 2014 This document is available in the ICAO North

More information

ICAO GANP Requirements and Evolution

ICAO GANP Requirements and Evolution ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable

More information

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda

More information

MID Region Air Navigation Strategy

MID Region Air Navigation Strategy MID Region Air Navigation Strategy Mohamed Smaoui ICAO Deputy Regional Director Middle East Office, Cairo Cairo/23 26 November 2015 Outline Background Strategy Main Objectives MID ASBU Block 0 Modules

More information

AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC)

AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC) SAFETY IMPROVEMENTS FROM ANS IMPLEMENTATION AIR TRAFFIC SERVICES (ATS) INTERFACILITY DATA COMMUNICATION (AIDC) Mayda Ávila CNS Regional Officer RASG-PA ESC/29 Meeting ICAO NACC Regional Office, Mexico

More information

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES GEN 3.1-1 1. RESPONSIBLE SERVICE GEN 3. SERVICES GEN 3.1 - AERONAUTICAL INFORMATION SERVICES 1.1 The object of the aeronautical information service (AIS) is to ensure the flow of aeronautical data and

More information

SWIM Transition of TFMS and ATFM in the Caribbean. Eurocontrol Collaborative ATFM Workshop - Madrid March 9, 2016

SWIM Transition of TFMS and ATFM in the Caribbean. Eurocontrol Collaborative ATFM Workshop - Madrid March 9, 2016 SWIM Transition of TFMS and ATFM in the Caribbean Eurocontrol Collaborative ATFM Workshop - Madrid March 9, 2016 TFMS Collection of Systems and Interfaces Traffic Situation Display Flight Schedule Monitor?

More information

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status

PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR

More information

ICAO provisions on data link implementation

ICAO provisions on data link implementation ICAO provisions on data link implementation Crystal Kim Technical Officer, Airspace Management and Optimization Section Secretary of Operational Data Link Working Group (OPDLWG) and Air Traffic Management

More information

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for

More information

NEW FPL Transition Phase & Implementation Stages

NEW FPL Transition Phase & Implementation Stages International Civil Aviation Organization NEW FPL 2012 Transition Phase & Implementation Stages Victor Hernandez RO ATM/SAR New FPL implementation & Switchover Review the New FPL Strategy & Implementation

More information

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY

WEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY International Civil Aviation Organization 16/10/06 CAR/SAM Regional Planning and Implementation Group (GREPECAS) Fifth Meeting of the Air Traffic Management / Communications, Navigation and Surveillance

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

(Presented by the Secretariat) SUMMARY

(Presented by the Secretariat) SUMMARY C/CAR DCA/6 - WP/02 International Civil Aviation Organization 21/05/03 North American, Central American and Caribbean Office Sixth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR

More information

MIDAD Project IDS Vision

MIDAD Project IDS Vision MIDAD Project IDS Vision Cairo July, 2013 Ramy El-Jabi Outline MIDAD Scope Solution High Level Architecture IDS Air Navigation Suite Proposed Implementation Schedule 2 MIDAD Scope Drawbacks related to

More information

Review of the measures adopted during December January 2014 period for mitigation of errors (recommended actions)

Review of the measures adopted during December January 2014 period for mitigation of errors (recommended actions) FPL/AD/MON WP/16 19/02/15 FPL Ad hoc Group Missing/duplicated/erroneous Filed flight plan /Flight plan (FPL) evaluation meeting (FPL/AD/MON) Mexico City, Mexico, 24-26 February 2015 Agenda Item 3 Review

More information

ANI/WG/3 WP/23 5/04/16 Third NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/3) Mexico City, Mexico, 4 to 6 April 2016

ANI/WG/3 WP/23 5/04/16 Third NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/3) Mexico City, Mexico, 4 to 6 April 2016 5/04/16 Third NAM/CAR Air Navigation Implementation Working Group Meeting (ANI/WG/3) Mexico City, Mexico, 4 to 6 April 2016 Agenda Item 4: Follow up, Performance Evaluation and Monitoring of the NAM/CAR

More information

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011) IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical

More information

Continuous Improvement of the Global Air Traffic Management System

Continuous Improvement of the Global Air Traffic Management System Continuous Improvement of the Global Air Traffic Management System Nancy Graham Director/Air Navigation Bureau Vince Galotti Chief/Air Traffic Management 1 Message Air traffic management contributes to

More information

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team

Performance Metrics for Oceanic Air Traffic Management. Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Performance Metrics for Oceanic Air Traffic Management Moving Metrics Conference Pacific Grove, California January 29, 2004 Oceanic Metrics Team Agenda Metrics Team Michele Merkle, FAA AUA-600 Lynne Hamrick,

More information

What is safety oversight?

What is safety oversight? What is safety oversight? ATM SAFETY MANAGEMENT SYSTEM AUDITORS SEMINAR FOR CAR/SAM REGIONS Mexico City, Mexico, 05-09 December 2005 ICAO Universal Safety Oversight Audit Programme /USOAP Safety oversight

More information

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY

Standards and procedures for the approval of performance-based navigation operations. (Presented by Colombia) SUMMARY 216 INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/9-WP/15 South American Regional Office Regional Project RLA/06/901 12/04/12 Assistance for the implementation of a regional ATM system according to

More information

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003 Prepared by the APIRG RVSM Implementation Task Force AFI STRATEGY/ACTION

More information

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat)

4.6 Other Aviation Safety Matters FLAGS OF CONVENIENCE. (Presented by the Secretariat) International Civil Aviation Organization 23/07/09 North American, Central American and Caribbean Office (NACC) Tenth Meeting of Directors of Civil Aviation of the Central Caribbean (C/CAR/DCA/10) Grand

More information

Asia/Pacific Air Traffic Management Perspectives

Asia/Pacific Air Traffic Management Perspectives Asia/Pacific Air Traffic Management Perspectives Len Wicks Regional Officer, Air Traffic Management, International Civil Aviation Organization (ICAO) MID ATMSG/4, Amman, April 2018 Contents Asia/Pacific

More information

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2 Singapore s Journey to Implement ASBU B-0 & B-1 Modules in Scope Introduction Strategy for Implementation of ASBU AIDC Implementation Plan (B0-FICE) AIM-SG (B0-DATM) Aeronautical Meteorology (B0-AMET)

More information

PROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY

PROPOSED CHANGES FOR THE CAR REGION ATS ROUTE STRUCTURE. (Presented by the Secretariat) SUMMARY CNS/ATM/SG/2-WP/28 11/10/10 International Civil Aviation Organization CAR/SAM Regional Planning Implementation Group (GREPECAS) Second Meeting of the Communications, Navigation and Surveillance / Air Traffic

More information