1 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: MDAP/MAIS Code(s): Resource Summary Prior Years FY 2012 FY 2013 # Base OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway (Units in Dollars) Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date Description: This line item funds modifications to a group of trainer aircraft which includes T-44A/C, and TH-57. The trainer aircraft are described as follows: The T-44 is a twin-engine, multi-seat turboprop aircraft produced by Hawker Beech Aircraft used to simulate operation of multi engine aircraft, specifically the P-3; the TH-57 is a single-engine, multi-seat rotary wing aircraft used for helicopter training. The overall goal of the modification is to maintain safe and reliable operation of the trainer aircraft through the timely installation of necessary changes. tal numbers for T-44 and TH-57 aircraft are 54 and 126, respectively. A total of 3 T-44A aircraft will be modified in FY14 to become T-44C aircraft (via the Avionics Systems Upgrade), bringing the total of T-44C aircraft to 54. tal Item Nomenclature* 1 - OSIP T44 AVIONICS OBSOLESCENCE 2 - OSIP TH-57 SAFETY UPGRADE Item Schedule Prior Years FY 2012 FY 2013 Base OCO tal Exhibits ID CD tal Cost tal Cost P3A P3A OSIP Wing Wiring P3A Inactive OSIPs P3A tal Gross/Weapon System Cost tal Cost tal Cost tal Cost tal Cost LI Navy Page 1 of 18 P-1 Line #42 Volume 2-649

2 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy Date: April 2013 Aircraft / BSA 1: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items: Other Related Program Elements: MDAP/MAIS Code(s): Item Nomenclature* 1 - OSIP T44 AVIONICS OBSOLESCENCE 2 - OSIP TH-57 SAFETY UPGRADE Item Schedule FY 2015 FY 2016 FY 2017 FY 2018 tal Exhibits ID CD tal Cost tal Cost P3A P3A OSIP Wing Wiring P3A Inactive OSIPs P3A tal Gross/Weapon System Cost tal Cost tal Cost tal Cost tal Cost *Item Nomenclature represents Item Number, DODIC, and Item Name for the P40A and P5; Name for the P18 and P23; Modification Number and Modification Title for the P3A; Item Number and Item Name for the P10. Note: tals in this Exhibit P-40 set may not be exact or add due to rounding. Justification: The change from FY13 to FY14 was in the OSIP T-44 Avionics Obsolescence Training Equipment cost element line. It was broken out to better reflect execution. Engineering Change Orders cost element line is necessary because avionics obsolescence will be required to be replaced due to technology improvements. This will be the last device and the Government is preparing for engineering changes that will be required to support these products to Data Publications will be required in FY14 to support the logistics footprint for the life cycle of this product. This funding will support technical publication development, updates and deliverables to support these devices to ILS in FY14 is required to support the current and future logistics integrated into these devices. Without this element, supportability and sustainability of these devices will not be capable. LI Navy Page 2 of 18 P-1 Line #42 Volume 2-650

3 Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 1 - OSIP T44 AVIONICS OBSOLESCENCE OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date tal Description: The T-44A Avionics are becoming non-supportable due to non-availability of parts. The following analog avionics systems require replacement: NCS-31A Area Navigation/Control System, AP-106 Autopilot, Flight Director, digital engine gauges and the RDR-130 Weather Radar. Avionics are being returned from the repair vendor Beyond Economical Repair (BER) due to non-availability of parts. Spare units are not available in the commercial market. Following these Avionics Upgrades the aircraft are designated T-44C; includes funding for changes to Ground Based Training Systems (simulators) to align trainers to T-44C aircraft configuration. IMPACT: As avionics become BER due to lack of parts, spares are being depleted. Lack of avionics will ground aircraft and severely degrade Chief of Naval Air Training's ability to meet Pilot Training Requirements. Current plans call for T-44 to fly its training mission until There are 54 T-44A in the inventory and all 54 will receive this modification. DEVELOPMENT STATUS / MAJOR DEVELOPMENT MILESTONES: The T-44 Avionics Obsolescence (Operational, Safety, and Improvement Program 05-04) non-recurring engineering occurred in FY04. Commercially available Non-Development Item kit procurement began in FY05 and installations in FY05. Beginning in FY13, kits were commercially procured via Fleet Support Team (FST) contract but installed by Naval Air Station (NAS) Jacksonville Fleet Readiness Center (FRC). In FY14, kits will be commercially procured via FST contract but installed by NAS Jacksonville FRC. LI Navy Page 3 of 18 P-1 Line #42 Volume 2-651

4 Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Procurement Financial Plan OSIP T44 AVIONICS OBSOLESCENCE A Kits Recurring Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 1 - OSIP T44 AVIONICS OBSOLESCENCE tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (1) 1.1.1) Install Kits - A kits - NonOrganic 48 / / / / - - / - - / - - / - - / - - / - - / - - / - 54 / Subtotal Recurring 48 / / / / - - / - - / - - / - - / - - / - - / - - / - 54 / Non-Recurring 1.2.1) Installation Kits Non-recurring - Organic 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / Subtotal Non-Recurring 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / B Kits Recurring 2.1.1) Install Kits - B kits - Organic 48 / / / / - - / - - / - - / - - / - - / - - / - - / - 54 / ) Digital Engine Gauges (B kits) - Organic - / - 10 / / / - - / - - / - - / - - / - - / - - / - - / - 13 / ) Digital Engine Gauges - "O" level installation - Organic - / - 16 / / / / - 18 / / - - / - - / - - / - - / - 41 / Subtotal Recurring 48 / / / / / - 18 / / - - / - - / - - / - - / / tal, OSIP T44 AVIONICS OBSOLESCENCE 99 / / / / / - 18 / / - - / - - / - - / - - / / tal Procurement, All Modifications 99 / / / / / - 18 / / - - / - - / - - / - - / / Support 3.1) Engineering Change Orders - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / ) DATA - Publications - / / - - / - - / / - - / / - - / - - / - - / - - / - - / (2) 3.3) Training Equipment 14 / / / / / - - / / / - - / - - / - - / - 14 / ) ILS - / - - / - - / - - / / - - / / - - / - - / - - / - - / - - / (3) 3.5) Other Support - / / / / / - - / / / - - / - - / - - / - - / ) Support Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.7) Interim Contractor Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Support, All Modifications tal Procurement and Support OSIP T44 AVIONICS OBSOLESCENCE Installation Cost - / / / / / - - / / - - / - - / - - / - - / - - / LI Navy Page 4 of 18 P-1 Line #42 Volume 2-652

5 Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Financial Plan Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 1 - OSIP T44 AVIONICS OBSOLESCENCE tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost tal Installation Cost - / / / / / - - / / - - / - - / - - / - - / - - / tal Cost (Procurement + Support + Installation) LI Navy Page 5 of 18 P-1 Line #42 Volume 2-653

6 Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: Manufacturer Information: OSIP T44 AVIONICS OBSOLESCENCE Manufacturer Name: Government Field Mod Team Manufacturer Location: FRC SE Administrative Leadtime (in Months): 1 Production Leadtime (in Months): OSIP T44 AVIONICS OBSOLESCENCE Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Contract Dates Jul 2012 Nov 2012 Delivery Dates Oct 2012 Oct 2013 Installation: OSIP T44 AVIONICS OBSOLESCENCE Method of Implementation: FRC SE Government Field Mod Team Installation Name: Install Kits Installation Cost Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost All Prior Years 31 / / / / - - / - - / - - / - - / - - / - - / - - / - 48 / FY / - - / - 3 / / - - / - - / - - / - - / - - / - - / - - / - 3 / FY / - - / - - / - 3 / / - 3 / / - - / - - / - - / - - / - 3 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal 31 / / / / / - 3 / / - - / - - / - - / - - / - 54 / Installation Schedule FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 APY TC t In Out Installation: OSIP T44 AVIONICS OBSOLESCENCE Method of Implementation: Not Installed - Installation Kits Nonrecurring Installation Quantity: 3 Installation: OSIP T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Install Kits - B kits Installation Quantity: 54 LI Navy Page 6 of 18 P-1 Line #42 Volume 2-654

7 Models of Systems Affected: T-44A/C Type Modification: Safety Related RDT&E PEs: 1 - OSIP T44 AVIONICS OBSOLESCENCE Installation: OSIP T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Digital Engine Gauges (B kits) Installation Quantity: 13 Installation: OSIP T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Digital Engine Gauges - "O" level installation Installation Quantity: 41 Installation: OSIP T44 AVIONICS OBSOLESCENCE Method of Implementation: Organic - Training Equipment Installation Quantity: 14 Footnotes: (1) 1. NAS Jacksonville Fleet Support Team (FST) procures kits via contract with DLA. Installs are completed by the FRC. (2) In FY13 to FY14 Training Equipment (CE 3.3) exceeds OSD/OMB inflation rate because we had to pay licensing fees to Rockwell Collins because of the proprietary data in SN2. (3) In FY13 to FY 14 Other Support (CE 3.5) exceeds OSD/OMB inflation rate because TSD labor increased. Increased labor is due to completion of SETR events, engineering milestones and acquisition planning in support of SN2. LI Navy Page 7 of 18 P-1 Line #42 Volume 2-655

8 Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 2 - OSIP TH-57 SAFETY UPGRADE OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date tal Description: The TH-57 is the sole platform for primary and advanced helicopter flight training for student aviators (United States Navy, United States Marine Corps, United States Coast Guard) and foreign military pilots. This modernization effort capitalizes on technology improvements to aircraft and Ground Based Training Systems (GBTS) by increasing aircrew survivability and situational awareness while providing a fleet representative digital cockpit capable of flying in national airspace after the FY20 mandate to incorporate NextGen requirements. GBTS equipment includes full Flight Simulator Training Devices, Cockpit Procedural Trainers, Computer-based training and courseware to support cockpit modification upgrade. Obsolescence upgrades are to replace avionics purchased in 1981 through 1985, when the TH-57B and TH-57C aircraft were originally purchased. avoid Training Wing FIVE rotary wing pilot throughput disruption, Chief of Naval Air Training requires a proportional number of TH-57D configured simulators, cockpit procedure trainers, and courseware delivered coincident with the TH-57D aircraft conversion. Recent contractor delivery delays of a Federal Aviation Administration Supplemental Type Certificate approving the cockpit configuration have necessitated a schedule adjustment and realignment of funding to properly align GBTS and aircraft modification delivery timelines. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: The components of this block upgrade will be Commercial Off The Shelf. LI Navy Page 8 of 18 P-1 Line #42 Volume 2-656

9 Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Procurement Financial Plan OSIP TH-57 SAFETY UPGRADE A Kits Recurring Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 2 - OSIP TH-57 SAFETY UPGRADE tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (4) 1.1.1) Installation Kits - A kits - NonOrganic 1 / / - - / - - / - - / - - / - - / - - / - 9 / / / / Subtotal Recurring 1 / / - - / - - / - - / - - / - - / - - / - 9 / / / / Non-Recurring 1.2.1) Installation Kits Non-recurring. - NonOrganic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal Non-Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / B Kits Recurring 2.1.1) Installation Equipment - B kits - Organic - / / - - / - - / - - / - - / - - / - - / - 9 / / / / ) Airspace Compliance - B kits - Organic - / - - / - - / - - / - - / - - / - - / - - / - 9 / / / / Subtotal Recurring - / / - - / - - / - - / - - / - - / - - / - 18 / / / / tal, OSIP TH-57 SAFETY UPGRADE 1 / / - - / - - / - - / - - / - - / - - / - 27 / / / / tal Procurement, All Modifications 1 / / - - / - - / - - / - - / - - / - - / - 27 / / / / Support (5) 3.1) DATA - Publications - / / - - / / / - - / / / / / - - / - - / (6) 3.2) Training Equipment - Trainer OFT - / / - - / / / - - / / / / / / / ) ILS - / - - / - - / - - / - - / - - / - - / - - / - - / / / / (7) 3.4) Other Support - / / / / / - - / / / / / / / ) Engineering Change Orders - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.6) Support Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3.7) Interim Contractor Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Support, All Modifications tal Procurement and Support OSIP TH-57 SAFETY UPGRADE Installation Cost - / / - - / - - / - - / - - / - - / - - / - - / / / / tal Installation Cost - / / - - / - - / - - / - - / - - / - - / - - / / / / tal Cost (Procurement + Support + Installation) LI Navy Page 9 of 18 P-1 Line #42 Volume 2-657

10 Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: 2 - OSIP TH-57 SAFETY UPGRADE LI Navy Page 10 of 18 P-1 Line #42 Volume 2-658

11 Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Manufacturer Information: OSIP TH-57 SAFETY UPGRADE Manufacturer Name: Contractor Field Mod Team Manufacturer Location: TBD Administrative Leadtime (in Months): 1 Production Leadtime (in Months): OSIP TH-57 SAFETY UPGRADE Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Contract Dates Oct 2016 Oct 2017 Delivery Dates Jan 2017 Jan 2018 Installation: OSIP TH-57 SAFETY UPGRADE Method of Implementation: Contractor Field Mod Team Installation Name: Install Kits Installation Cost Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost All Prior Years 0 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - 9 / / - - / - 9 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - 19 / / / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 95 / / tal 0 / / - - / - - / - - / - - / - - / - - / - 9 / / / / Installation Schedule FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 APY TC t In Out Installation: OSIP TH-57 SAFETY UPGRADE Method of Implementation: Organic - Installation Equipment - B kits Installation Quantity: 126 Installation: OSIP TH-57 SAFETY UPGRADE Method of Implementation: Organic - Airspace Compliance - B kits Installation Quantity: 126 LI Navy Page 11 of 18 P-1 Line #42 Volume 2-659

12 Models of Systems Affected: TH-57B/C Type Modification: Conversion/Safety Related RDT&E PEs: Footnotes: (4) FY09 PY quantity of 2 removed. 2 - OSIP TH-57 SAFETY UPGRADE (5) In FY13 to FY14 Data Pubs (CE 3.1) exceeds OSD/OMB inflation rate because it includes data collection and pub development plus paying for a review/approval from 4.0P (Air Worthiness). (6) Three simulator kits installed in FY10. In FY13 to FY14 Training Equipment (CE 3.2) exceeds the OSD/OMB inflation rate due to procurement of the first simulator. (7) In FY12 to FY13 Other Support (CE 3.4) exceeds the OSD/OMB inflation rate due to labor needed to start building the simulators but there was a schedule slip in this effort. The effort/labor was moved to FY13. In FY13 to FY14 Other Support (CE 3.4) exceeds the OSD/OMB inflation rate due to T&E labor needed to test the aircraft. LI Navy Page 12 of 18 P-1 Line #42 Volume 2-660

13 Models of Systems Affected: T-44-A/C Type Modification: Safety Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 3 - OSIP Wing Wiring OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date tal Description: The Naval Air Systems Command Wiring System Team, AIR , completed a Wiring Integrity Study on the T-44A in FY02 and identified that the aircraft wiring, outside the pressure vessel, has deteriorated to an unacceptable condition. It was recommended that the wiring in the wings, from pressure vessel outward (including the engines) be replaced. Current Navy long-term plans are to operate the T-44A aircraft until the year In order to safely and economically maintain aircraft availability and Pilot Training Requirements, it is necessary to replace the wiring. Note that aircraft designated T-44A are redesignated T-44C upon completion of Avionics Obsolescence (Operational, Safety, and Improvement Program ) Modifications. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: Wing rewire will be accomplished in conjunction with Avionics Upgrade Mod (OSIP 05-04). Naval Air Station Jacksonville Fleet Readiness Center (FRC) are now able to fabricate the wiring kits. Beginning in FY13, kits were not procured via Fleet Support Team (FST) contract, but fabricated by FRC Jacksonville. In FY14, kits will not be procured via FST contract, but fabricated by FRC Jacksonville. LI Navy Page 13 of 18 P-1 Line #42 Volume 2-661

14 Models of Systems Affected: T-44-A/C Type Modification: Safety Related RDT&E PEs: Procurement OSIP Wing Wiring A Kits Recurring Financial Plan Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 3 - OSIP Wing Wiring tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost (8) 1.1.1) Installation Kits - Wing Wiring - NonOrganic 48 / / - 3 / / / - 3 / / - - / - - / - - / - - / - 54 / Subtotal Recurring 48 / / - 3 / / / - 3 / / - - / - - / - - / - - / - 54 / tal, OSIP Wing Wiring 48 / / - 3 / / / - 3 / / - - / - - / - - / - - / - 54 / tal Procurement, All Modifications 48 / / - 3 / / / - 3 / / - - / - - / - - / - - / - 54 / Support 2.1) Support Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Interim Contractor Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / ) Engineering Change Orders - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.4) Data - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.5) Training Equipment - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.6) ILS - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2.7) Other Support - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Support, All Modifications tal Procurement and Support OSIP Wing Wiring Installation Cost - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Installation Cost - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Cost (Procurement + Support + Installation) LI Navy Page 14 of 18 P-1 Line #42 Volume 2-662

15 Models of Systems Affected: T-44-A/C Type Modification: Safety Related RDT&E PEs: Manufacturer Information: OSIP Wing Wiring Manufacturer Name: Government Field Mod Team (9) Manufacturer Location: FRC SE Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 0 Contract Dates Delivery Dates 3 - OSIP Wing Wiring Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Installation: OSIP Wing Wiring Installation Cost Prior Years FY 2012 FY 2013 / tal Cost / tal Cost Method of Implementation: Concurrent with Avionics Upgrade Modification at Fleet Readiness Center NAS Jacksonville / tal Cost Base / tal Cost OCO / tal Cost Installation Name: Installation Kits - Wing Wiring tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost All Prior Years 48 / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - 3 / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / - - / - - / - - / - 3 / - - / - 3 / - - / - - / - - / - - / - - / - 3 / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal 48 / / - 3 / - 3 / - - / - 3 / - - / - - / - - / - - / - - / - 54 / - Installation Schedule FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 APY TC t In Out Footnotes: (8) Installations are funded out of OSIP 05-04, Avionics Obsolescence; FY13 and FY14 kits are installed same year manufactured (9) Concurrent with Avionics Upgrade Modification at Fleet Readiness Center NAS Jacksonville. 1. Installs funded out of OSIP LI Navy Page 15 of 18 P-1 Line #42 Volume 2-663

16 Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs: Resource Summary Prior Years FY 2012 FY 2013 # Base 4 - Inactive OSIPs OCO ## tal FY 2015 FY 2016 FY 2017 FY 2018 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) tal Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System (Units in Dollars) # FY 2013 Program is from the FY 2013 President's Budget, submitted February 2012 ## The OCO Request will be submitted at a later date tal Description: LI Navy Page 16 of 18 P-1 Line #42 Volume 2-664

17 Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs: Procurement Inactive OSIPs A Kits Recurring Financial Plan Prior Years FY 2012 FY 2013 / tal Cost / tal Cost / tal Cost Base / tal Cost OCO / tal Cost 4 - Inactive OSIPs tal FY 2015 FY 2016 FY 2017 FY 2018 / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost / tal Cost tal / tal Cost 1.1.1) Inactive OSIPs - Organic - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / Subtotal Recurring - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / tal, Inactive OSIPs - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / tal Procurement, All Modifications - / / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / tal Procurement and Support tal Installation Cost - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - tal Cost (Procurement + Support + Installation) LI Navy Page 17 of 18 P-1 Line #42 Volume 2-665

18 Models of Systems Affected: [No Model Specified] Type Modification: [No Modification Type Specified] Related RDT&E PEs: Manufacturer Information: Inactive OSIPs Manufacturer Name: Manufacturer Name Not Provided. Administrative Leadtime (in Months): Contract Dates Delivery Dates Manufacturer Location: Manufacturer Location Not Provided. Production Leadtime (in Months): 4 - Inactive OSIPs Dates FY 2012 FY 2013 FY 2015 FY 2016 FY 2017 FY 2018 Installation: Inactive OSIPs Method of Implementation: No Quantities Associated with Install Installation Quantity: 0 LI Navy Page 18 of 18 P-1 Line #42 Volume 2-666

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Air Force Date: March 2014 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #35 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 4: Trainer Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 24 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 18 P-1 Line #12 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 P-1 Line #53 Exhibit P-40, Budget Line Item Justification: PB 2017 United States Special Operations Command : February 2016 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 1: Aviation Programs

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 16 P-1 Line #57 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 P-1 Line #47 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #21 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1507N: Weapons Procurement, Navy / BA 03: Torpedoes and Related Equipment / BSA 1: Torpedoes and Related Equip ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #121 Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Air Force Date: April 2013 Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B Items:

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base. FY 2016 Base FY 2016 OCO Exhibit P-40, Budget Line Item Justification: PB 2016 Army Date: February 2015 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 2: Tactical Aircraft ID Code

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3021F: Space Procurement, Air Force / BA 01: Space Procurement, Air Force / BSA 1: Space Programs ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 18 P-1 Line #56 Exhibit P-40, Budget Line Item Justification: PB 2016 Air Force Date: February 2015 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 31 P-1 Line #41 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 21 P-1 Line #19 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other Shipboard Equipment ID Code (A=Service Ready,

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 3: Airlift Aircraft ID Code

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 P-1 Line #55 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 33 P-1 Line #94 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 02: Communications & Electronics Equip / BSA 12: Submarine Communications ID Code (A=Service

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2017 Base FY 2017 OCO FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: Modification of Tracked Combat Vehicles ID Code

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 P-1 Line #15 Exhibit P-40, Budget Line Item Justification: PB 2017 Army Date: February 2016 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service

More information

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base

UNCLASSIFIED FY 2015 FY 2015 OCO. FY 2015 Base FY 2015 FY Base Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 151 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 7: Other Expendable Ordnance ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 30 P-1 Line #36 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO FY 2016 OCO. FY 2016 Base Resource Summary Prior Years FY 2014 FY 2015 Base OCO Total FY 2017 FY 2018 FY 2019 FY 2020 To Complete Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions)

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Total Cost ($ M) Unit Cost ($) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 Navy Date: March 2014 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Navy : April 2013 Ammo, MC / BSA 1: Marine Corps Ammunition ID Code (A=Service Ready, B=Not Service Ready) : A Program Elements for Code B : Other

More information

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2014 Base. OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit P-40, Budget Item Justification Sheet: PB 2014 Army Date: April 2013 Aircraft / BSA 10: Modification Of Aircraft ID Code (A=Service Ready, B=Not Service Ready) : Program Elements for Code B Items:

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 34 P-1 Line #51 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 126 P-1 Line #32 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy Date: February 2015 1506N: Aircraft Procurement, Navy / BA 05: Modification of Aircraft / BSA 1: Modification of Aircraft ID Code (A=Service Ready,

More information

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each)

UNCLASSIFIED FY Exhibits Schedule Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total. Unit Cost ($ M) Qty (Each) Exhibit P-40, Budget Line Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0300D: Procurement, Defense-Wide / BA 02: Special Operations Command / BSA 4: Other Procurement

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2017 ir Force Date: February 2016 ppropriation / Budget ctivity / Budget Sub ctivity: 3080F: Other Procurement, ir Force / B 02: Vehicular Equipment

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 5. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0605430N, C/KC-130 AVIONICS MODERNIZATION PROGRAM (AMP)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 17 P-1 Line #13 Exhibit P-40, Budget Line Item Justification: PB 2016 Navy : February 2015 1508N: Procurement of Ammo, Navy & MC / BA 01: Proc Ammo, Navy / BSA 1: Navy Ammunition A Program Elements for Code B Items: Other

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: AIRCRAFT CERTIFICATION FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 6566A: AIRCRAFT CERTIFICATION

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604239F PE TITLE: F-22 EMD BUDGET ACTIVITY COST ($ In Thousands) Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Advanced Tactical Fighter FSD 2,010,717

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Communication, Navigation, Surveillance/Air Traffic Management (CNS/ATM) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 6.754 5.708 4.604-4.604 4.549

More information

Global Civil and Military Simulation & Training Market ( Edition) July 2017

Global Civil and Military Simulation & Training Market ( Edition) July 2017 Global Civil and Military Simulation & Training Market (2017-2021 Edition) July 2017 Global Civil and Military Simulation & Training Market Report Scope of the Report The report titled Global Civil Aviation

More information

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s

Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system. UPGRADES FOR LEGACY C-130s Cost-effective, flexible avionics for today s missions and future challenges. Flight2 integrated avionics system UPGRADES FOR LEGACY C-130s Bring cabin capability into highest definition. Flight2 integrated

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB mended 2015 ir Force Date: June 2014 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

Global Civil Aviation & Military Simulation & Training Market( ) Trends & Opportunities

Global Civil Aviation & Military Simulation & Training Market( ) Trends & Opportunities Global Civil Aviation & Military Simulation & Training Market(2016-20) Trends & Opportunities View Report Details Scope of the Report The report titled Global Civil Aviation and Military Training and Simulation

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 077 SUBJECT NAVIGATION (ATA 34) TCAS 7.1 INSTALLATION JUNE 12, 2012 PILOTS INFORMATION SHEET TCAS 7.1 INSTALLATION This service change upgrades TCAS 2000 or 3000SP systems

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 909 SUBJECT INDICATING / RECORDING (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE DECEMBER 22, 2011 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM

More information

NUMBER 904 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE

NUMBER 904 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE NUMBER 904 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE October 27, 2005 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE This service

More information

M7 AEROSPACE LP

M7 AEROSPACE LP Page 1 2011-02-04 M7 AEROSPACE LP (TYPE CERTIFICATE PREVIOUSLY HELD BY FAIRCHILD AIRCRAFT INCORPORATED) Amendment 39-16577 Docket No. FAA-2011-0014 Directorate Identifier 2010-CE-066-AD PREAMBLE Effective

More information

TRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016)

TRANSMITTAL SHEET. Concurrent Requirement Added G450 Customer Bulletin Number 141 (aircraft that have previously incorporated ASC 016) TRANSMITTAL SHEET This sheet transmits Revision A, dated, to Gulfstream G450 Aircraft Service Change 016, dated August 18, 2005, titled Aircraft General (ATA 00) Maximum Takeoff Gross Weight (MTOGW) Increase.

More information

HERItAGE & PREsENCE. AIRCRAft MANAGEMENt. twenty two locations. three i. i HAwkER PACIfIC

HERItAGE & PREsENCE. AIRCRAft MANAGEMENt. twenty two locations. three i. i HAwkER PACIfIC HAWKER PACIFIC four About us six HERItAGE & PREsENCE eight why HAwkER PACIfIC ten AIRCRAft sales HAWKER PACIFIC twelve fourteen AIRCRAft support AIRCRAft supplies sixteen AIRCRAft MANAGEMENt eighteen flight

More information

Gegaso Ltd. Company Presentation

Gegaso Ltd. Company Presentation Gegaso Ltd. Company Presentation This document and the information contained in it are proprietary of Gegaso Ltd. No person is allowed to use, copy, reprint, reproduce, publish or disclose to others this

More information

Your Trusted Special Missions Partner

Your Trusted Special Missions Partner SPECIAL MISSIONS Your Trusted Special Missions Partner CAPABILITY/OVERVIEW 1 Hawker Pacific Aviation s Trusted Choice Hawker Pacific is the market leader in integrated civil and military aerospace sales

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 31 P-1 Line #2 UNCLSSIFIED Exhibit P-40, Budget Line Item Justification: PB 2016 ir Force : February 2015 ppropriation / Budget ctivity / Budget Sub ctivity: 3011F: Procurement of mmunition, ir Force / B 01: mmunition

More information

NUMBER 903 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE

NUMBER 903 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE NUMBER 903 RECORDING / INDICATING SYSTEMS (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE June 9, 2005 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE This service

More information

NUMBER 008 PLACARDS AND MARKINGS (ATA 11) MAXIMUM ZERO FUEL GROSS WEIGHT - 48,000 POUNDS PLACARD INSTALLATION

NUMBER 008 PLACARDS AND MARKINGS (ATA 11) MAXIMUM ZERO FUEL GROSS WEIGHT - 48,000 POUNDS PLACARD INSTALLATION NUMBER 008 PLACARDS AND MARKINGS (ATA 11) MAXIMUM ZERO FUEL GROSS WEIGHT - 48,000 POUNDS PLACARD INSTALLATION December 15, 2004 PILOTS INFORMATION SHEET MAXIMUM ZERO FUEL GROSS WEIGHT - 48,000 POUNDS PLACARD

More information

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft

Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft Safety Enhancement SE 226 Cargo Hazardous Material Fires Enhanced Protection of Occupants and Aircraft Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Total Financial

More information

Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules

Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 104 prescribes the operating rules for gliders that are additional

More information

Presidential Aircraft Recapitalization

Presidential Aircraft Recapitalization Presidential Aircraft Recapitalization Solicitation Number: FA8625-15-C-6599 Agency: Department of the Air Force Office: Air Force Materiel Command Location: AFLCMC/PK - WPAFB (includes PZ, WL, WW, WI,

More information

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 AE 452 Aeronautical Engineering Design II Cost of an Airplane Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017 Difficulties when estimating cost Number of parameters involved (technical, financial,

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 62-6 11 JUNE 2010 Developmental Engineering USAF AIRWORTHINESS COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering AE 452 Aeronautical Engineering Design II Cost Analysis Prof. Dr. Serkan Özgen Dept. Aerospace Engineering 1 Problems when estimating cost Number of parameters involved (technical, financial, political)

More information

Thales on the Civil Aerospace market

Thales on the Civil Aerospace market thalesgroup.com Innovation - Civil Aerospace - Defence Aerospace - Transportation - Defence - Security Thales on the Civil Aerospace market AT A GLANCE World n 1 in ATM, covering 40% of world s surface

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

AIRCRAFT SERVICE CHANGE

AIRCRAFT SERVICE CHANGE AIRCRAFT SERVICE CHANGE NUMBER 907 SUBJECT INDICATING / RECORDING (ATA 31) PLANEVIEW MASTER OPERATING SYSTEM SOFTWARE UPDATE (SV-PFD) September 8, 2008 PILOTS INFORMATION SHEET PLANEVIEW MASTER OPERATING

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 Program Element

More information

Roadmapping Breakout Session Overview

Roadmapping Breakout Session Overview Roadmapping Breakout Session Overview Ken Goodrich October 22, 2015 Definition Roadmap: a specialized type of strategic plan that outlines activities an organization can undertake over specified time frames

More information

Department of Defense DIRECTIVE

Department of Defense DIRECTIVE Department of Defense DIRECTIVE NUMBER 5030.61 May 24, 2013 Incorporating Change 2, August 24, 2017 USD(AT&L) SUBJECT: DoD Airworthiness Policy References: See Enclosure 1 1. PURPOSE. This directive establishes

More information

U.S. NAVY CNS/ATM Program Status

U.S. NAVY CNS/ATM Program Status U.S. NAVY CNS/ATM Program Status 9 June 2009 Dave Staso CNS/ATM IPTL NAVAIR PMA209 (240) 925-9220 david.staso@navy.mil UNCLASSIFIED Minimum Functionality is a Requirement Amish buggies are not allowed

More information

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY

LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY Beechcraft TITLE: SERVICE BULLETIN LANDING GEAR - REPLACEMENT OF NOSE LANDING GEAR RETRACT PLUNGER ASSEMBLY 1. Planning Information A. Effectivity (1) Airplanes (a) Civil (i) (ii) (b) Military (i) The

More information

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO) EXTENDED DIVERSION TIME OPERATIONS (EDTO) 1. APPLICABILITY 1.1 This notice is applicable to operator engaged in Commercial Air Transport Operations beyond the threshold time established by DCA for EDTO

More information

TDR Mode S and ADS-B Transponders

TDR Mode S and ADS-B Transponders Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance

More information

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS

OPNAVINST B N98 15 Apr Subj: NAVAL AVIATION POLICY FOR AIRCRAFT AVIONICS SAFETY SYSTEMS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 13210.1B N98 OPNAV INSTRUCTION 13210.1B From: Chief of Naval Operations Subj: NAVAL

More information

THE BOEING COMPANY

THE BOEING COMPANY Page 1 2010-23-03 THE BOEING COMPANY Amendment 39-16492 Docket No. FAA-2010-1040; Directorate Identifier 2010-NM-207-AD. PREAMBLE Effective Date (a) This AD is effective November 22, 2010. Affected ADs

More information

Visit Beechcraft.com or contact a defense company sales rep: Beechcraft.com

Visit Beechcraft.com or contact a defense company sales rep: Beechcraft.com T-6C Visit or contact a defense company sales rep: +1.316.676.0800 Images may show optional equipment. 2013 Beechcraft Defense Company LLC. All rights reserved. Beechcraft is a registered trademark of

More information

Section 7 Supplements. Miodel 400A SUPPLEMENTS

Section 7 Supplements. Miodel 400A SUPPLEMENTS Miodel 400A SUPPLEMENTS Section 7 Supplements NOTE When a new airplane is delivered from the factory, the handbook delivered with it contains either an STC (Supplement Type Certificate) Supplement or a

More information

Department of Legislative Services Maryland General Assembly 2009 Session

Department of Legislative Services Maryland General Assembly 2009 Session Department of Legislative Services Maryland General Assembly 2009 Session SB 650 FISCAL AND POLICY NOTE Senate Bill 650 (Senators Pipkin and Astle) Finance and Budget and Taxation Medevac Helicopter Improvement

More information

Mode S & ACAS Programme Operational Introduction of SSR Mode S

Mode S & ACAS Programme Operational Introduction of SSR Mode S Mode S & ACAS Programme Operational Introduction of SSR Mode S John Law Programme Manager john.law@eurocontrol.int Tel: +32 2 729 3766 European 1 Organisation for the Safety of Air Navigation Mode S Airborne

More information

KEY FEATURES IN SHORT

KEY FEATURES IN SHORT KA C90/B200/350 KA C90/B200/350 It is the fixed base simulator of commercial turboprop multi-crew aircraft. The simulator meets all the requirements determined for EASA CS-FSTD(A) FNPTII +MCC level. The

More information

Reporting Instructions FILING REQUIREMENTS

Reporting Instructions FILING REQUIREMENTS FORM N AVIATION PERSONNEL LICENSING AND TRAINING Reporting Instructions General FILING REQUIREMENTS This form is to be used by ICAO Member States to report aviation personnel qualifications and aviation

More information

Investor Presentation

Investor Presentation Investor Presentation Credit Suisse Global Industrials Conference December 3, 2013 2013 Rockwell Collins. All rights reserved. Safe Harbor Statement This presentation contains statements, including certain

More information

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION. National Policy NOTICE U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy N 8900.189 Effective Date: 5/31/12 Cancellation Date: 5/31/13 SUBJ: New OpSpec D301, Aircraft Network Security Program

More information

CUSTOMER SERVICE OWNER PUBLICATIONS CATALOG

CUSTOMER SERVICE OWNER PUBLICATIONS CATALOG CUSTOMER SERVICE OWNER PUBLICATIONS CATALOG This catalog describes the various aircraft and systems publications available from Piper. Prices and availability vary depending upon supply and demand. Most

More information

A New Era. in Offshore Aviation. a SEACOR company

A New Era. in Offshore Aviation. a SEACOR company A New Era in Offshore Aviation a SEACOR company A N E W E R A I N O F F S H O R E AV I AT I O N The world s first functional helicopter took to the air in 1939. Sikorsky s open cockpit helicopter, powered

More information

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to

1-7(28)-2W Wiring Diagrams Manual 10 Sept.27/ to OUT-OF-PRODUCTION MANUAL LIST. DASH 7 New PSM Number Description -7- Operating Data Manual 0 Nov. 0/05-7A-A-DOT Airplane Flight Manual 5 June 02/05 TA 0-7A-A-UK Airplane Flight Manual 20 Aug. 5/05-7-2

More information

TABLE OF CONTENTS 1.0 INTRODUCTION...

TABLE OF CONTENTS 1.0 INTRODUCTION... Advisory Circular Subject: In-Flight Entertainment Systems Issuing Office: Aircraft Certification Activity Area: Qualification No.: 500-022 File No.: 5009-32-4 Issue No.: 01 RDIMS No.: 1193699-V9 Effective

More information

[Docket No. FAA ; Directorate Identifier 2007-NM-047-AD; Amendment ; AD ]

[Docket No. FAA ; Directorate Identifier 2007-NM-047-AD; Amendment ; AD ] [Federal Register: July 21, 2009 (Volume 74, Number 138)] [Rules and Regulations] [Page 35789-35792] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21jy09-10] DEPARTMENT

More information