Implementation Success Through Coordination
|
|
- Frank Cox
- 5 years ago
- Views:
Transcription
1 ICAO PBN Symposium Workshop - Operations 17 October 2012 Montreal, Canada Implementation Success Through Coordination Jon Tree Director of Industry Affairs Jeppesen
2 Stakeholder Involvement The key element in collaboration Requires close coordination Effective communication is essential Educational process throughout Defined goals and results driven Sharing of different perspectives Transparency at all levels Proactive integration Excellence in Program Management Evolving effort Be prepared and open to changes Focused - share information/ideas 2
3 Jeppesen/Boeing Global Effort for PBN Regionally based initiatives Use of global standards Procedure design team in Atlanta, GA Support Jeppesen/DEN, FRA and Regional Offices Boeing/SEA and Regional Offices Globally Ongoing efforts: China North America Asia/Russia and CIS Europe Australia/New Zealand Latin America STEP 1: Apply para 2-2 Segment Initial Fix 2 RNP 2 RNP a R Segment Terminating Fix STEP 4 STEP 3 c STEP 5 Tangent Points b R Tangent Points a=r b=r+(2xrnp) c=r-(2xrnp) STEP 2: Locate Turn Center 2 RNP 2 RNP 3
4 Flight Procedure Design Service Provider Quality Assurance Processes Independent review of procedures Ground validation Criteria verification Determine level of safety impact Develop safety documentation Flight validation Data verification Conduct continuous maintenance Conduct periodic reviews Training Use of validated systems and tools Official State approvals 4
5 Indonesia 5
6 Indonesia Goals: Enhance safety Decrease flight track miles Improve Maximum Gross Takeoff Weight for departures Challenging environment: Ongoing improvements to infrastructure Restricted airspace nearby Obstacle data limited and out of date Lion Air flight crews professional and knowledgeable Jeppesen familiarization training provided to ATC Successfully delivered 8 approach procedures, including charting and printing Key element was coordination with all stakeholders: Lion Air, DGCA of Indonesia, ATC, Boeing, Jeppesen 6
7 RNP Approach Procedures Manado (MDC) 7
8 RNP Approach Procedures Ambon (AMQ) 8
9 Panama Goals: Enhance safety Decrease flight track miles and improve operational efficiencies Technological improvements at the airports 8 procedures at Tocumen and 2 at Balboa, including charting and coding ATC and flight crew training provided Close coordination among all stakeholders on planning and procedure design Copa Airlines Panamanian DGAC Air Traffic Control Boeing and Jeppesen 9
10 Panama RNAV (RNP) procedures Tocumen (PTY) Balboa (BLB) 10
11 United States Airport Partnered with the FAA in conceptual design of RNAV/RNP procedures at a major airport Constituent airlines desire to benefit from PBN Safety and efficiency improvements Desire to realize benefits of equipage investments Jeppesen provided PD drafting assistance to the FAA Coded for flight simulator use Close coordination with ATM units Actively engaged 10 airlines Accumulated valuable input from operators and ATC Collaboration critical in gaining approval for continued development of actual procedures Operations begin 3 Dec
12 In Summary Effective collaboration is crucial to PBN success All stakeholders engaged in early stages Effective communication Transparency Flexibility Proactive integration Excellence in program management 12
RNP AR APCH Approvals: An Operator s Perspective
RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided
More informationAirplane Navigation Capabilities
Airplane Navigation Capabilities Increasing Operational Safety & Efficiency June 19, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes
More informationImplementation challenges for Flight Procedures
Implementation challenges for Flight Procedures A Data-house perspective for comprehensive Procedure Design solution: A need today Sorin Onitiu Manager Business Affairs, Government & Military Aviation,
More informationAir Navigation Bureau ICAO Headquarters, Montreal
Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation
More informationInformation Paper 2 SUMMARY
COSCAP North Asia Cooperative Development of Operational Safety & Continuing Airworthiness Programme 14th STEERING COMMITTEE MEETING Performance Based Navigation (PBN) Update on ICAO Asia and Pacific Regional
More informationUSE AND APPLICATION OF GNSS IN THE IMPLEMENTATION OF NAVIGATION BASED ON PERFORMANCE IN ECUADOR
BACKGROUND OF GNSS USE The guidelines for the transition to the use of the Global Navigation Satellite System GNSS in the CAR / SAM Regions were issued by ICAO at the Eleventh World Air Navigation Conference
More informationDP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011
DP-7 The need for QMS controlled processes in AIS/AIM Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, 17 19 May 2011 Werner Kurz Director International Relations Jeppesen
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More information2012 Performance Framework AFI
2012 Performance Framework AFI Nairobi, 14-16 February 2011 Seboseso Machobane Regional Officer ATM, ESAF 1 Discussion Intro Objectives, Metrics & Outcomes ICAO Process Framework Summary 2 Global ATM Physical
More informationPerformance Based Navigation Implementation of Procedures
Performance Based Navigation Implementation of Procedures Dr. Daniel Schaad Head of Instrument Flight Procedures (ATM/IFP) Minsk, April 10th, 2015 DIESER TEXT DIENT DER NAVIGATION First of all thank you
More informationSaint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis
Saint Petersburg-Clearwater International Airport Airspace & Instrument Approach Analysis February 23, 2005 Jeppesen Boeing Jeppesen Government / Military Services Group Airspace Services Division AIRSPACE
More informationAviation Noise and Emissions Reduction Symposium (ANERS): Panel on Performance-Based Navigation (PBN) Implementation
Aviation Noise and Emissions Reduction Symposium (ANERS): Panel on Performance-Based Navigation (PBN) Implementation John-Paul Clarke Georgia Institute of Technology Presenters 2 Robert Root ² RNP Project
More informationThank you, Director Heijl and Bon Jour. It s good to be back in Montreal for this important symposium.
Keynote Speech by Ms. Victoria Cox, Vice President, Operations Planning United States Federal Aviation Administration Air Traffic Organization Worldwide Symposium on Performance of the Air Navigation System
More informationFLIGHT OPERATIONS PANEL (FLTOPSP)
International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationPROGRAMME. Workshop B (Cont d) PBN and the Cockpit Regulatory and Certification Forum Technical Requirements Forum Training Forum
PROGRAMME Day 1: Tuesday, 16th October 2012 o Plenary PBN, Expediting Implementation Together o Session 1 PBN from 35,000 feet: A top down look o Session 2 Validating PBN: What s in it for me o Session
More informationThe Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap
The Information Paper of the China s PBN implementation roadmap Table of Contents News Briefs Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation
More informationAviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute
Aviation Safety Information Analysis and Sharing ASIAS Overview PA-RAST Meeting March 2016 ASIAS Proprietary Do Not Distribute Updated: March 2016 2 12 How can safety be improved in an environment of near-zero
More informationPBN and RNAV concepts
PBN and RNAV concepts Rabat, 16/27-03-2015 Target: Learn basic concept on PBN and RNAV. NOT FOR COMMERCIAL PURPOSES 2 Concepts Part 1: PBN concept Part 2: RNAV, RNP Part 3: FTE (Flight Technical Error)
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationQuality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E
Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation
More informationFlight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures
Flight Evaluation and Validation of RNP AR/SAAAR Instrument Flight Procedures Donald P. Pate Consultant Aviation Airspace Consulting, Inc. Edmond, OK, USA E-mail: donppate1@yahoo.com ABSTRACT With the
More informationPBN and Procedure Design training
PBN and Procedure Design training 2 PBN and Procedure Design training PBN and Procedure Design training Contents Get your Procedure Designers ready for PBN Implementation 5 Online and Classroom Training
More information4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.
Safety and Airspace Regulation Group 13 May 2014 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) is intended to provide guidance to ANSPs
More informationICAO Activities. IFPP work on the Manual for Continuous Descent Operations. Federal Aviation Administration
ICAO Activities IFPP work on the Manual for Continuous Descent Operations Presented to: JPDO, EWG, Ops SC Workshop NASA Ames Facility, Moffet Field, CA By: Lynn Boniface, ISI, Supporting AFS-420 Date:
More informationAVIATION TRAINING DEVELOPMENT IN INDONESIA TO MEET THE RAPID INCREASE IN DEMAND FOR AVIATION PROFESSIONALS
AVIATION TRAINING DEVELOPMENT IN INDONESIA TO MEET THE RAPID INCREASE IN DEMAND FOR AVIATION PROFESSIONALS Capt. Bobby MAMAHIT Head of Human Resources Development on Transport Agency Trainair Plus Global
More informationICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES
AFCAC/ICAO Joint Workshop Walter White ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES 24 JUNE 2014 Airbus ProSky Corporate Presentation 29/06/2014 PERFORMANCE-BASED NAVIGATION The implementation of Performance-Based
More informationRequired Navigation Performance (RNP) in the United States
Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes
More informationWORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:
WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a
More informationOverview of Evolution to Performance Based Navigation. ICAO PBN Seminar Overview of Evolution to Performance Based Navigation
Overview of Evolution to Performance Based Navigation 1 Overview Learning Objectives: at the end of this presentation you should: Understand what are the two main elements of Performance Based Navigation
More informationNav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation
Nav Specs and Procedure Design Module 12 Activities 8 and 10 European Airspace Concept Workshops for PBN Implementation Learning Objectives By the end of this presentation you should understand: The different
More informationFAA GBAS Program Update January 29, 2010
US-India Aviation Cooperation Program FAA GBAS Program Update January 29, 2010 Carlos A. Rodriguez FAA GBAS Program Manager Major milestone completed in the history of the FAA GBAS program FAA completed
More informationSession III Issues for the Future of ATM
NEXTOR Annual Research Symposium November 14, 1997 Session III Issues for the Future of ATM Synthesis of a Future ATM Operational Concept Aslaug Haraldsdottir, Boeing ATM Concept Baseline Definition Aslaug
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationU.S. India Aviation Cooperation Program. Air Traffic Management Training Program Update March 2009
U.S. India Aviation Cooperation Program Air Traffic Management Training Program Update March 2009 ATMTP Overall Objective This ATMTP is the first project under the U.S.-India Aviation Cooperation Program
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationPBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Aeroplane Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationINTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)
IP-5 INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE (Dakar, Senegal, 20 22nd July 2011) Agenda item: Presented by: Implementation of a African Regional Centralised Aeronautical
More informationDon-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs
Don-Jacques OULD FERHAT VP Airspace and Airlines Services Airbus PBN Safety programs Long term cooperation with China Complex projects in China RNP AR at Kathmandu airport Cochin : First RNP APCH in India
More informationAviation System Block Upgrades (ASBU), Blocks 0 and 1
ATC Global Federal Aviation Aviation System Block Upgrades (ASBU), Blocks 0 and 1 Presented by: B. Bagstad, FAA ATO International Date: September, 2014 Aviation System Block Upgrades (ASBU) ASBU is a systems
More informationPBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)
PBN Syllabus Helicopter Training Topic phase Theoretical PBN concept training (as described in ICAO Doc 9613) PBN principles PBN components PBN scope Navigation specifications RNAV and RNP Navigation functional
More informationAN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report
29/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 REPORT OF THE COMMITTEE TO THE CONFERENCE ON AGENDA ITEM 2 The attached report has been approved by thee Committee for submission
More informationPBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain
PBN Hybrid Procedures as an Enabler for Airport Accessibility in Challenging Terrain the example of Innsbruck/Austria Dr.-Ing. Philipp Daniel Schaad Head of Instrument Flight Procedures Austro Control
More informationBoeing Air Traffic Management Overview and Status
Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes
More informationAir Traffic Management
Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of
More informationKJFK Runway 13R-31L Rehabilitation ATFM Strategies
Advanced ATM Techniques Symposium and Workshops Today s Opportunities for Saving Fuel and Reducing Emissions 4 6 November 2013, ICAO Headquarters, Montréal KJFK Runway 13R-31L Rehabilitation ATFM Strategies
More informationAsia/Pacific Air Traffic Management Perspectives
Asia/Pacific Air Traffic Management Perspectives Len Wicks Regional Officer, Air Traffic Management, International Civil Aviation Organization (ICAO) MID ATMSG/4, Amman, April 2018 Contents Asia/Pacific
More informationWEST ATLANTIC ROUTE SYSTEM (WATRS) PLUS AIRSPACE REDESIGN AND SEPARATION REDUCTION INITIATIVE. (Presented by United States of America) SUMMARY
International Civil Aviation Organization 16/10/06 CAR/SAM Regional Planning and Implementation Group (GREPECAS) Fifth Meeting of the Air Traffic Management / Communications, Navigation and Surveillance
More informationPerformance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports
Performance Based Navigation (PBN) Update on ICAO APAC Regional Sub-Office, APAC Flight Procedure Programme, and COSCAP Supports COSCAP-NA 14 th Steering Committee Meeting June 2014 ICAO APAC Regional
More informationNextGen Priorities: Multiple Runway Operations & RECAT
NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the
More informationFlight Procedure Design and Cartography
Flight Procedure Design and Cartography ATNS Air Traffic Management Division INDEX About ATNS What is Flight Procedure Design and Cartography? Features of Flight Procedure Design and Cartography Benefits
More informationValidation & Implementation Considerations Module 14 Activities 11 to 17
Validation & Implementation Considerations Module 14 Activities 11 to 17 European Airspace Concept Workshops for PBN Implementation Objective This module provides an overview airspace and Flight Procedure
More informationPacific Project. CPWG/8 - WP/6 Appendix A
Pacific Project CPWG/8 - WP/6 Pacific Project Objective This project aims to substantially improve operational efficiency and environmental outcomes on the major air traffic flow between North America
More informationCRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)
E/CAR/DCA/25 WP/10 International Civil Aviation Organization 13/11/13 North American, Central American and Caribbean Office (NACC) Twenty-fifth Meeting of Directors of Civil Aviation of the Eastern Caribbean
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationEnvironmental Assessment Las Vegas Area Airspace Optimization Project
Environmental Assessment Las Vegas Area Airspace Optimization Project John Williams, Senior Vice President, Ricondo & Associates, Inc. ACI-NA Environmental Affairs Committee Conference May 16, 2013 Halifax,
More informationICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS. Presented by ICAO APAC RSO
ICAO International Aviation and Environment Seminar OPERATIONAL IMPROVEMENTS Presented by ICAO APAC RSO Operations in the Context of Aviation Planning & Pre-Flight Post Landing Applicable Operational Improvements
More informationEuropean Joint Industry CDA Action Plan
Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in
More information(RN R A N V A V & & RN R P N
PBN (RNAV & RNP) 1 What is the Perfect Flight? 2 Conventional Navigation [1920s] Ground-based navigation aids (NAVAIDs) Aircraft Overfly NAVAID or Intersection Display Accuracy is a Function of Distance
More informationThe EU as a partner for low carbon development Prospects for the aviation sector
Destination Green ICAO Symposium on Aviation and Climate Change, Destination Green, 14 16 May 2013 The EU as a partner for low carbon development Prospects for the aviation sector Session VIII Financing
More informationMinneapolis-St. Paul International Airport (MSP)
2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationPeter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry
Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace
More informationAIRSPACE. Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers
AIRSPACE Enabling Excellence in Aviation Aviation Consultancy at its best. Specialist aviation support to help solve problems for airports and airport developers www.cyrrus.co.uk AIRSPACE Airspace is a
More informationName of Customer Representative: Bruce DeCleene, AFS-400 Division Manager Phone Number:
Phase I Submission Name of Program: Equivalent Lateral Spacing Operation (ELSO) Name of Program Leader: Dr. Ralf Mayer Phone Number: 703-983-2755 Email: rmayer@mitre.org Postage Address: The MITRE Corporation,
More informationICAO Young Aviation Professionals Programme
ICAO Young Aviation Professionals Programme In partnership with and The International Civil Aviation Organization (ICAO), in partnership with the International Air Transport Association (IATA) and Airports
More informationLife Cycle Solutions
Life Cycle Solutions Increasing Operational Safety & Efficiency June 17, 2008 The statements contained herein are based on good faith assumptions and provided for general information purposes only. These
More informationReal-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.
Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Operational Efficiency of Dynamic Navigation Charting Benefits such as improved
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationSecond MID Regional Runway Safety Seminar (MID-RRSS/2) 2-4 June 2014 Dubai, UAE
Second MID Regional Runway Safety Seminar (MID-RRSS/2) 2-4 June 2014 Dubai, UAE TABLE OF CONTENTS PART I GENERAL Page 1.1 Place and Duration 1 1.2 Attendance 1 1.3 Agenda/Programme.. 1 1.4 Objective...
More informationRNP AR and Air Traffic Management
RNP AR and Air Traffic Management BOEING is a trademark of Boeing Management Company. Copyright 2009 Boeing. All rights reserved. Expanding the Utility of RNP AR Sheila Conway RNP AR User s Forum Wellington,
More informationTrajectory Based Operations
Trajectory Based Operations Far-Term Concept Proposed Trade-Space Activities Environmental Working Group Operations Standing Committee July 29, 2009 Rose.Ashford@nasa.gov Purpose for this Presentation
More informationFLIGHT PATH FOR THE FUTURE OF MOBILITY
FLIGHT PATH FOR THE FUTURE OF MOBILITY Building the flight path for the future of mobility takes more than imagination. Success relies on the proven ability to transform vision into reality for the betterment
More informationPBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931
International Civil Aviation Organization PBN AIRSPACE CONCEPT WORKSHOP SIDs/STARs/HOLDS Continuous Descent Operations (CDO) ICAO Doc 9931 Design in context Methodology STEPS TFC Where does the traffic
More informationOperators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11
Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance
More informationPBN, ADQ, ADQ2 IR EUROCONTROL Activities Status
PBN, ADQ, ADQ2 IR EUROCONTROL Activities Status Sylvie GRAND-PERRET DSS/SES Unit, EUROCONTROL ICAO EUR APV Workshop 25-27th of May 2011 The European Organisation for the Safety of Air Navigation PBN IR
More informationPBN Implementation in the UK
PBN Implementation in the UK Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy UK Civil Aviation Authority 06 October 06 October PBN TF/3 1 Presentation Overview UK
More informationToronto Pearson: Toronto Pearson:
Case Studies Toronto Pearson: Optimization study Check-in and baggage outbound (December 2014 March 2015) Toronto Pearson: Baggage operation improvement (March 2015 - ) OPTIMIZATION STUDY CHECK-IN AND
More informationAERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen
Page 1 of 8 1. INTRODUCTION 1.1. This material has been prepared to provide step-by-step guidance on the application of performance-based navigation (PBN) in developing an Airspace Change Proposal (ACP).
More informationImplementation of PBN in Armenian airspace
Implementation of PBN in Armenian airspace PBN implementation plan, based on the specifications of the airspace of the Republic of Armenia, has been developed in accordance with Resolution A36-23, approved
More informationInternational Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview
International Civil Aviation Organization Aviation System Block Upgrade (ASBU) Methodology An Overview Outline Today s Challenges Tomorrow s Needs Why ASBU methodology ASBU explanation Global Plan Next
More informationColombian PBN implementation: El Dorado case study
Colombian PBN implementation: El Dorado case study SDM WORKSHOP ON PBN 19.10.2017 XAVIER OUTTERS SME & PROJECT MANAGER NAVBLUE SAS Electronic Flight Bag Dispatch Pre-flight Airport Databases - FlySmart+
More informationLR IFP REGULATION DRAFT INESE LIEGE
LR IFP REGULATION DRAFT INESE LIEGE HEAD OF REGULATION SECTION OF CAA OF LATVIA 23.01.-24.01.2013. WHY WE NEED TO HAVE NATIONAL IFP REGULATION ICAO has issued many documents applicable for the IFP which
More informationCOMPANY INTRODUCTION
COMPANY INTRODUCTION INTRODUCTION Global Aviation Partners, a unique international sales, marketing and service organization with a dedicated team of aviation professionals providing a range of services
More informationFederal Aviation Administration DCA. By: Terry Biggio, Vice President Air Traffic Services Date: June 18, Federal Aviation Administration
DCA Presented to: Arlington County By: Terry Biggio, Vice President Air Traffic Services Date: June 18, 2015 Air Traffic Roles and Responsibilities As aviation technology advances, the FAA is putting in
More informationPBN/TF/7 DRAFT Appendix D to the Report D-1
DRAFT STATUS OF IMPLEMENTATION TASKS LIST PBN Task Force C4/1 The APAC PBN TF encourages States to consider the GO Team visit. On-going. States are encouraged to consider the GO Team visit as required.
More informationFederal Aviation Administration. Air Traffic Control System Command Center (ATCSCC)
Air Traffic Control System Command Center (ATCSCC) ATCSCC Mission Focal point for National Airspace System (NAS) issues and balance Air Traffic Demand System Capacity System Efficiency 2 FAA Air Traffic
More informationExecutive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport
Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche
More informationConsiderations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation
Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?
More informationPBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)
International Civil Aviation Organization The First Meeting of South China Sea Major Traffic Flow Review Group (SCS-MTFRG/1) Kuala Lumpur, Malaysia, 19-20 January 2015 Agenda Item 5: Discuss strategy for
More information34 th Airline/ATS Safety Forum
34 th Airline/ATS Safety Forum Colleen Kitson, Senior ATS Specialist Outline RNP1 - including Albury Future applications Workshop Background ICAO Global Air Navigation Plan specifies PBN as the highest
More informationKey Issues for the Critical Path Approach, Landing and Go-Arounds
Key Issues for the Critical Path Approach, Landing and Go-Arounds Moderator John Allen Vice-President, Chief Safety Officer, JetBlue Airways Panelists Atholl Buchan Head, Flight Operations Regulatory Affairs,
More informationSDM Workshop on PBN Airborne Perspective. Michael Hopp, Lufthansa Group Brussels,
Michael Hopp, Lufthansa Group Brussels, 19.10.2017 lufthansagroup.com Lufthansa Group SESAR Projects in the PBN Context 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 Prepare and Implement High
More informationFlight Operations Inspector Manual
1. Purpose of the job aid APPLICATION TO CONDUCT RNP APCH OPERATIONS a) To provide information on the relevant documents. b) To provide a record of the operator application, the inspector comments and
More informationRNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.
RNP OPERATIONS 1. Introduction Planes were made as a means of transport. To successfully fly from a location A to a location B, pilots were first and foremost navigators. Originally relying on visual landmarks
More informationEASA RNP (AR) Workshop The Landscape Working Together
EASA RNP (AR) Workshop The Landscape Working Together 20 October 2010 Cologne Capt Herbert Meyer EASA Certification Flight Standards Content Aspects for Consideration Conventional versus RNP AR approaches
More informationBangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)
INTERNATIONAL CIVIL AVIATION ORGANIZATION FIFTH MEETING OF THE ASIA/PACIFIC PERFROMANCE BASED NAVIGATION TASK FORCE (PBN TF/5) Bangkok, Thailand, 15 17 July 2009 Agenda Item 3: 3.1 State PBN Plan and Status
More information