1 Final Project Report Document information Project Title Project Number Project Manager Deliverable Name Deliverable ID Transversal Consistency of Business/Mission Trajectory Requirements (across WPs) P Airbus S.A.S Final Project Report D10 Edition Template Version Task contributors Airbus, Airbus Defence & Space, Lufthansa Systems, Sabre Airline Solutions, Honeywelll Abstract The purpose of the project P was to to be able to deliver the defined P ( FOC/WOC Operational Requirements Definition) The project P was in charge of the consistency of Business/Mission trajectory concept throughout the SESAR programme. In the frame of this activity, P defined the concept regarding FOC/WOC through : - the capture of the FOC part of operational requirements for other WPs (7, B, 6, 4, 5, 9, 8) - the description of operational processes from AU standpoint - the analysis of the gap against already developed requirements within the SESAR programme when required
2 P also contributed to support the standardisation work in external bodies, such as ICAO ATM-RPP. The main method used was "Expert group analysis" through the involvement of Airspace Users experts on both sides civil and military in workshops. 2 of 17
3 Authoring & Approval Prepared By - Authors of the document. Name & Company Position & Title Date Régis BATTEUX/AIRBUS P & 02 Project Manager 15/09/2016 Reviewed By - Reviewers internal to the project. Name & Company Position & Title Date Daniel CHIESA / Airbus WP Leader 23/09/2016 Olaf BELZER / SABRE Airline Solutions P Project Manager 20/09/2016 Marcus HANTSCHKE / Lufthansa Systems WP Member 22/09/2016 Joseph ABO-ROMMAN / Airbus P Project Manager 26/09/2016 Klaus Dieter HERMANN / Airbus DS Contribution Manager WP11.01 for ADS WOC domain 23/09/2016 Matej PAPP / Honeywell Contribution Manager WP11.01 for Honeywell 23/09/2016 Reviewed By - Other SESAR projects, Airspace Users, staff association, military, Industrial Support, other organisations. Name & Company Position & Title Date <Name / Company> <Position / Title> <DD/MM/YYYY> Approved for submission to the SJU By - Representatives of the company involved in the project. Name & Company Position & Title Date Régis BATTEUX/AIRBUS P & 02 Project Manager 27/09/2016 Daniel CHIESA / AIRBUS WP11.01 Leader 27/09/2016 Rejected By - Representatives of the company involved in the project. Name & Company Position & Title Date <Name / Company> <Position / Title> <DD/MM/YYYY> Rational for rejection None. Document History Edition Date Status Author Justification /09/2016 Draft Régis BATTEUX Initial version /09/2016 Draft Régis BATTEUX Internal Fly4D review /09/2016 Draft Régis BATTEUX Internal Fly4D review with comments integrated /09/2016 Final Régis BATTEUX SJU Release Intellectual Property Rights (foreground) This deliverable consists of SJU foreground. 3 of 17
4 Acronyms Acronym AFUA AIM ARES ASM ATC ATM ATMS AU BMT BT CARATS CDM CMAC CONOPS DOD DS EFPL E-OCVM FOC FPL ICAO INTEROP irmt ismt MEPS Definition Advanced Flexible Use of Airspace Aeronautical Information Management Airspace Reservation/Restriction Airspace Management Air Traffic Control Air Traffic Management Air Traffic Management System Airspace User Business/Mission Trajectory Business Trajectory Collaborative Actions for Renovation of Air Traffic Systems Collaborative Decision Making Civil-Military ATM Coordination Concept of Operations Detailed Operational Description Data Set Extended Flight Plan European Operational Concept Validation Methodology Flight Operations Centre Flight Plan International Civil Aviation Organization Interoperability Requirements Initial Reference Mission Trajectory Initial Shared Mission Trajectory Military Engagement Plan for SESAR 4 of 17
5 MET NM NextGen OAT OFA OI OSED PCG RBT RMT RPP SESAR SESAR Programme SJU SPR SWIM TMA TS TTO UDPP VPA WOC WP Meteorology Network Manager Next Generation Air Transportation System Operational Air Traffic Operational Focus Area Operational Improvement or Operating Index Operational Service and Environment Definition Programme Control Group Reference Business Trajectory Reference Mission Trajectory Requirements and Performance Panel Single European Sky ATM Research Programme The programme which defines the Research and Development activities and Projects for the SJU. SESAR Joint Undertaking (Agency of the European Commission) Safety and Performance Requirements System Wide Information Management Terminal Manoeuvring Area Technical Specification Target Time Over User Driven Prioritisation Process Variable Profile Area Wing Operations Centre Work Package 5 of 17
6 1 Project Overview The purpose of the project P was to to be able to deliver the defined P (FOC/WOC Operational Requirements Definition) The project P was in charge of the consistency of Business/Mission trajectory concept throughout the SESAR programme. In the frame of this activity, P defined the concept regarding FOC/WOC through: - The capture of the FOC part of operational requirements for other WPs (7, B, 6, 4, 5, 9, 8) - The description of operational processes form AU standpoint - The analysis of the gap against already developed requirements within the SESAR programme when required P also contributed to support the standardisation work in external bodies. Through proactive attendance of ICAO ATM-RPP panel, coordination with other external ATM research projects (i.e NextGen, CARATS) was granted. 1.1 Project progress and contribution to the Master Plan The main method used was "Expert group analysis" through the involvement of Airspace Users experts on both sides civil and military (State Airspace Users) in workshops. One civil Airspace User workshop per Quarter was organized by P & 02 to gather operational requirements and to consolidate operational use cases. In order to optimize the research activity related to the FOC, a unique Airspace User community was created for P and AU community includes both Civil and State Airspace Users: Civil Airspace Users are: Scheduled Mainline airlines Regional airlines Low Fare airlines Charter/Leisure airlines Cargo airlines Business Aviation General Aviation. State Airspace Users are: Operators of Large aircraft (military transport type aircraft) Operators of Fighter aircraft Operators of Light aircraft (light civil and military aircraft, helicopters, paramilitary aircraft) Different types of RPAS (Remotely Piloted Air Systems) During all activities performed by P , the work has been performed with the involvement of several AUs, including AUs of other SESAR WPs communities. 6 of 17
7 Specifically for P , as the FOC point of view was partially represented at the beginning of SESAR, it was really key to introduce the FOC role in the definition of basic concepts. In addition, the P contributed to transverse meetings to consolidate overall SESAR concepts (CONOPS and Transition CONOPS meetings organized by B04.02). P also contributed to support the standardisation work in external bodies. Through proactive attendance of ICAO ATM-RPP panel, coordination with other external ATM research projects (i.e NextGen, CARATS) was granted. In the frame of the projects P , the methods and tools for the management of requirements are based on well-known international best practices in system engineering applied within SESAR programme (i.e E-OCVM) : Requirement matrix formalized through textual fields for links to other system engineering objects (requirement, process, service, Operational Focus Area ) A Revised process has been proposed and agreed between WP11.01, SJU and ECTRL in February 2014 for civil activities (FOC side). This 'validation oriented' process had a major impact on the project P The main impact for P was to postpone the DOD / OSED update to the end of SESAR Programme. Consequently, the full traceability to system level could not be provided anymore. Finally, decision to not update the FOC / WOC DODs was taken at Gate #5 (October 2015). The WOC part of P was performed as planned. The DOD was developed together with EUROCONTROL/CMAC and the MEPS. Even though the update of the DOD was cancelled, the DOD is valuable source of information for the description of the operational workflow. Major parts of the DOD are referenced in the OSED and are the baseline for the further work. Here below the table listing the OI Steps that the project P has contributed to. As far as possible, the reference Data Set is the DS16 (Integrated Roadmap Dataset 16) in order to be aligned with the most recent SESAR Dataset of OIs. There are only three OIs among 19 that were described using Dataset14. Each time there is an Operational Improvement linked to a SESAR solution, it has been mentioned in the table. The maturity level at project end for OI steps is retrieved from P , leading V&V activities. Code Name Project contribution Maturity at project start Maturity at project end AOM-0202-A Automated Support for strategic, pre-tactical and tactical Civil- Military Coordination in Airspace Management (ASM). Linked to Solution #31 V3 reach the maturity for all AOM-0206-A Flexible and modular ARES in accordance Linked to Solution #31 V3 7 of 17
8 with the VPA design principle reach the maturity for all AOM-0303 Pan-European Transit Service OAT V3 reach the maturity for all AOM-0304-A Mission Trajectories in Step 1 ) reach the maturity for all AOM-0501 Free Routing for Flights both in cruise and vertically evolving within low to medium complexity environments Linked to Solution #33 - reach the maturity for all 8 of 17
9 AUO-0104 Selective Protection Flight reach the maturity for all AUO-0105 Fleet Assignment Delay reach the maturity for all AUO-0203 EFPL in NM processes Linked to Solution #37 V3 reach the maturity for all AUO-0205-B ATC-ATC, ATC/Aircraft and ATC/NM Update (partial) 9 of 17
10 and Revision of the Reference Business/Mission Trajectory (RBT/RMT) reach the maturity for all AUO-0210 Participation in CDM through ismt and Target Time (TTO) negotiation reach the maturity for all AUO-0211 WOC Management of irmt via improved OAT FPL The main contribution of the project P is the definition of the FOC/WOC operational requirements. As though, P contributed to reach the maturity for all AUO-0215 Sharing ismt through improved OAT flight plan reach the maturity for all 10 of 17
11 AUO-0223 Harmonised and improved integration of airspace and ATC constraints/procedures in trajectories calculated by FOCs and NM. reach the maturity for all AUO-0303-A (DS14) Ground-ground aspects related to irbt/irmt revision (executed at ground or flight crew initiative) reach the maturity for all AUO-0303-B (DS14) Ground-ground aspects related to RBT/RMT revision (executed at ground or flight crew initiative, when aircraft is airborne) reach the maturity for all (partial) MET-0101 Enhanced MET observations, nowcasts and forecasts provided by ATM-MET systems for Step 1 reach the maturity for all (partial) 11 of 17
12 IS-0205 Digital Integrated Briefing for pre-flight phase Linked to solution #34 V3 reach the maturity for all IS-0206 Digital Integrated Briefing during flight execution phase reach the maturity for all IS-0301 (DS14) Provision and use of FOC/WOC data to enhance ATM ground system performance. V3 reach the maturity for all IS-0901-A SWIM for Step1 V3 12 of 17
13 reach the maturity for all IS-0901-B SWIM for Step2 The main contribution of the project P is the definition of the FOC/WOC operational requirements. As though, P contributed to reach the maturity for all V0 1.2 Project achievements The main achievement of the project P is the federation of the FOC/WOC perspective, and contributing consequently to ensure the consensus of all stakeholders of the European air traffic management domain, (airspace users, air navigation service providers, professional staff associations, airports, and manufacturing industry). In addition, the P contributed to transverse meeting to consolidate overall SESAR concepts (CONOPS and Transition CONOPS meetings organized by B04.02). It has been recognized by SJU the significant interaction with the rest of the Programme, in particular with B4.2 on concept development; the PCG also recognised the federating role of the project P proactively reacted to align the planning and the deliverables with the rest of the SESAR program. It resulted a significant bias between initial planning per contract and the current one at the end of the project. Before the beginning of WP11.01, the FOC role was mainly focused on flight planning phase. As a consequence to the development made, it has been recognized that it would not be possible to obtain full benefit of the ATM modernization programme if the FOC involvement during the execution phase is not reinforced, according to what is defined within ICAO document 9976 [9]. Due to organization of WP11.01, each project is a piece of a puzzle, and the overall picture is revealed at WP level only. The work package WP11.01 succeeded in establishing efficient coordination with other work packages, especially: P Optimized Airspace Users Operations (EFPL and UDPP) P Flexible Airspace Management P Aeronautical Information Management P04.03 Integrated and pre-operational validation & cross validation P MET Information Systems. Development, Validation and Verification 13 of 17
14 It permits in the end to execute several validations that were needed to achieve the overall concept of Business/Mission trajectory. Finally, through the work performed by WP11.01, the maturity of the following operational areas significantly increased: BMT (including Extended Flight plan and Improved OAT Flight plan) Free Route AFUA UDPP Digital Briefing 1.3 Project Deliverables The following table presents the relevant deliverables that have been produced by the project. Reference Title Description D01 Definition of the trajectory requirements for Step 1, including gap analysis, support to standardization report from AU perspective Civil DOD Step 1 - This document represents deliverable D and the input to project P focusing on the development of operational requirements for Step 1 from an FOC perspective. The two focus areas for FOC systems are therefore: - Initial time-based operations - Trajectory data exchange Refer to [5] D02 Definition of the trajectory requirements for Step 1 and Step 2 and Step 3 as available, including gap analysis, support to standardization report from Airspace User perspective D08 FOC Definition of the trajectory requirements for Step 2 and Step 3 as available, including gap analysis, support to standardization report from AU perspective D05 Contribution Note to Transition ConOps Military DOD Step 1, Step 2 & Step 3 as available - This document forms the input to project P focusing on the development of operational requirements for Step 1 and Step 2&3 capabilities from a WOC perspective. Refer to [6] Civil DOD Step 2 & Step 3 as available This document provides the description of a Flight Operations concept aiming to model and support the SESAR Step 2 and Step 3 objectives. As not enough material has been produced for Step 3, this DOD will be limited to concept related to Step 2. Refer to [7] This document describes the contribution of WP11.01 to the SESAR 2020 Transition Concept of Operations document with regard to the civil Airspace User s aspects. Refer to [8] 14 of 17
15 1.4 Contribution to Standardisation P contributed to support the standardisation work in external bodies, such as ICAO ATM- RPP (Refer to ICAO document 9976 [9]), NextGen, CARATS, by identifying and consolidating future standardisation requirements. As part of the different contributions made to the discussions and papers developed linked to WP11.01 role, a specific paper has been presented during the ATMRPP Twenty-sixth Working Group Meeting in Japan last 2014 titled: In-Flight monitoring activity performed by FOC (Flight Operations Centre) Although thru this paper it has been recognized that in the current ATM environment In-Flight monitoring of a flight is a task performed by several stakeholders for different purposes, the goal was to present In-Flight monitoring capabilities currently available in a typical Flight Operations Centre and describe the rationality behind each one of them. This paper has been previously agreed with the Airspace Users community of WP The participation in such meetings helped to raise the awareness of WP11.01 among the aeronautical community resulting most useful when both profiles (operational & technical) were present. 1.5 Project Conclusion and Recommendations The projects P & 02 supported the P to translate the operational and business requirements for the FOC/WOC into systems requirements and specifications for the The "Contribution Note to Transition ConOps" delivered by P will be a basis input for SESAR2020 projects like PJ06, PJ07, PJ08, PJ09 and PJ18. It describes the Civil AU Operations Centre and its role within other ATM stakeholders e.g specifically provision of airspace user operational scenarios, airspace user roles and responsibilities and top level & high level requirements related to SESAR 2020 PJ07 Optimised Airspace Users Operations (civil & military airspace user aspects). Thanks to WP11.01, it has been recognized that it would not be possible to obtain full benefit of the ATM modernization programme if the FOC involvement during the execution phase is not reinforced. The consolidation of the FOC role during execution phase has to be followed-up beyond SESAR and SESAR of 17
16 2 References [1] SESAR Programme Management Plan, Edition [2] European ATM Master Plan [3] Multilateral Framework Agreement ( MFA ) signed between the SJU, EUROCONTROL and its 15 selected members on August 11, 2009, amended on 14 June 2010, 19 October 2010 and 2 July 2012 [4] Transversal Consistency of Business / Mission Trajectory Requirements (across WPs) - Project Initiation Report - Edition /11/11 [5] Definition of the trajectory requirements for Step 1, including gap analysis, support to standardization report from AU perspective - Edition /07/12 [6] Definition of the trajectory requirements for Step 1 and Step 2 and Step 3 as available, including gap analysis, support to standardization report from Airspace User perspective - Edition /02/2013 [7] FOC Definition of the trajectory requirements for Step 2 and Step 3 as available, including gap analysis, support to standardization report from AU perspective - Edition /10/2013 [8] Contribution Note to Transition ConOps - Edition /08/2016 [9] ICAO document Flight Planning and Fuel Management Manual Edition 16 of 17
17 -END OF DOCUMENT- 17 of 17
Work Package Final Report
Work Package Final Report Document information Work Package Title Flight and Wing Operations Centres Work Package Number 11.1 WP Leader(s) Airbus Deliverable Name Work Package Final Report Deliverable
More informationOperations Control Centre perspective. Future of airline operations
Operations Control Centre perspective Future of airline operations This brochure was developed based on the results provided by the OCC project as part of the SESAR programme. This project was managed
More informationGlobal Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number Project Manager
Final Project Report Document information Project Title Global Interoperability - Airborne Architecture and Avionics Interoperability Roadmap Project Number 09.49 Project Manager Deliverable Name Deliverable
More informationWP11.1 FOC - Interoperability Requirements (INTEROP) Step 1 & 2 as available
WP11.1 FOC - Interoperability s (INTEROP) Step 1 & 2 as available Document information Project FOC/WOC Operational s Definition Project Number 11.01.02 Project Manager Deliverable Name Deliverable ID Airbus
More informationAir Space Management - ASM Workshop March 2013 Rabat, Morocco. Advanced Flexible Use of Airspace. Presented by Petri Hartikainen, Integra A/S
Air Space Management - ASM Workshop 18 19 March 2013 Advanced Flexible Use of Airspace Presented by Petri Hartikainen, Integra A/S Presentation Contents On-going R&D related to advanced ASM Airspace design
More informationART Workshop Airport Capacity
ART Workshop Airport Capacity Airport Research Bob Graham Head of Airport Research 21 st September 2016 Madrid Expectations The issues and opportunities for future research New solutions / directions for
More informationWORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:
WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT: SUPPORTING A GLOBALLY HARMONIZED AND SEAMLESS ATM SYSTEM Vince Galotti Chief/ATM ICAO 2 June 2008 Presentation Outline What is a
More informationWorkshop. SESAR 2020 Concept. A Brief View of the Business Trajectory
SESAR 2020 Concept A Brief View of the Business Trajectory 1 The Presentation SESAR Concept: Capability Levels Key Themes: Paradigm change Business Trajectory Issues Conclusion 2 ATM Capability Levels
More informationTrajectory Based Operations (TBO)
Trajectory Based Operations (TBO) David Batchelor Head of International Affairs, SESAR Joint Undertaking Emerging Technologies Workshop ATC Global, Beijing, 12 September 2016 SESAR SINGLE EUROPEAN SKY
More informationCivil-Military Cooperation. Advanced Flexible Use of Airspace
Civil-Military Cooperation Advanced Flexible Use of Airspace Need for Airspace data sharing and collaboration Network Manager Military Civil Airlines Military Operational Requirements for the Use of Airspace
More informationOptimizing trajectories over the 4DWeatherCube
Optimizing trajectories over the 4DWeatherCube Detailed Proposal - SES Awards 2016 Airbus Defence and Space : dirk.schindler@airbus.com Luciad : robin.houtmeyers@luciad.com Eumetnet : kamel.rebai@meteo.fr
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DIRECTORATE E - Air Transport E.2 - Single sky & modernisation of air traffic control Brussels, 6 April 2011 MOVE E2/EMM D(2011) 1. TITLE
More informationSESAR Solutions. Display Options
SESAR Solutions Outputs from the SESAR Programme R&I activities which relate to an Operational Improvement (OI) step or a small group of OI steps and its/their associated enablers, which have been designed,
More informationHome LIST OF ACRONYMS
LIST OF ACRONYMS 6. List of s A/G A-CDM ADS-C AF AFP/ACH AFUA AMAN ANSP AOP APCH APV ARES ASBU ASM A-SMGCS ATC ATCO ATFCM ATM ATM MP ATN ATSP AU CBA CCO CDM CDO CEF CPDLC CPs CTM CTOT DCB DCT DL DLS DMAN
More informationFuture Automation Scenarios
Future Automation Scenarios Francesca Lucchi University of Bologna Madrid, 05 th March 2018 AUTOPACE Project Close-Out Meeting. 27th of March, 2018, Brussels 1 Future Automation Scenarios: Introduction
More informationPackaging Tomorrow s Aviation System
International Civil Aviation Organization Second Briefing on ICAO s Aviation System Block Upgrades Issued: July 2012 The 30 000 Feet View Air traffic growth expands two-fold once every 15 years Growth
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT
Ref. Ares(2013)362601-18/03/2013 EUROPEAN COMMISSION DIRECTORATE-GENERAL MOBILITY AND TRANSPORT Directorate E Aviation and International Transport Affairs E2 Single European Sky Brussels, 8 March 2013
More informationMET matters in SESAR. Dennis HART
MET matters in SESAR Dennis HART Implementing the Single European Sky Performance Safety Technology Airports Human factor -Performance scheme -Performance Review Body -EASA -Crisis coord. cell European
More informationA NextGen Mental Shift: The role of the Flight Operations Center in a Transformative National Airspace System. By: Michael Wambsganss Oct 11, 2012
A NextGen Mental Shift: The role of the Flight Operations Center in a Transformative National Airspace System By: Michael Wambsganss Oct 11, 2012 Review of Terms FOC of Future study group and workshops
More informationAir traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #109 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution with a summary of the results stemming
More informationThe Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010
The Single European Sky and SESAR, the European ATM modernisation programme Patrick Ky, Executive Director 26 May 2010 TODAY S SITUATION IN EUROPE 4 Fragmentation of the European AIrspace THE CONTEXT Traffic
More informationCivil-Military ATM Coordination. Edgar REUBER EUROCONTROL/DECMA/CMC/ARD September, 12th 2018
Civil-Military ATM Coordination Edgar REUBER EUROCONTROL/DECMA/CMC/ARD September, 12th 2018 Civil-Military ATM Coordination Who is the Military Who is the Military Roles and Responsibilities in European
More informationTWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4
26/11/12 TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4 The attached draft report on Agenda Item 4 is presented for approval by the Committee
More informationICAO GANP Requirements and Evolution
ICAO GANP Requirements and Evolution Olga de Frutos Brussels/October 2017 Flight Plan Context Current GANP Role in ICAO Next edition: AMET, DATM, FICE and SWIM The future ATM system To achieve an interoperable
More informationEuropean Joint Industry CDA Action Plan
Foreword In September 2008, CANSO, IATA and EUROCONTROL signed up to a Flight Efficiency Plan that includes a specific target to increase European CDA performance and achievement. This was followed in
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/8 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 3: Interoperability and data through globally
More informationTWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)
INTERNATIONAL CIVIL AVIATION ORGANIZATION TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22) Bangkok, Thailand, 5-9 September 2011 Agenda
More informationFF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva
International Civil Aviation Organization SIP/2012/ASBU/Dakar-WP/19 FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Dakar,
More informationICAO EUR Region Civil/Military Cooperation Seminar/Workshop
ICAO EUR Region Civil/Military Cooperation Seminar/Workshop ICAO Training Institute Kyiv and UkSATSE Boryspil, Ukraine, 28-31 October 2013 ICAO European and North Atlantic Office 6 November 2013 Page 1
More informationEuropean ATM Development The Big Idea
European ATM Development The Big Idea Bo Redeborn Principal Director ATM EUROCONTROL CANSO Data Communications Conference Amsterdam, 6-8 th Sept 2011 The European Organisation for the Safety of Air Navigation
More informationLufthansa Systems, Sabre Airline Solutions, Honeywell, Airbus Defence and Space, Airbus.
Final Project Report Document information Project Title Prototype(s) Specification, Development & Verification Project Number 11.01.04 Project Manager Sabre Airline Solutions Deliverable Name Final Project
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationTerms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)
Rulemaking Directorate Terms of Reference for a rulemaking task Requirements for Air Traffic Services (ATS) ISSUE 1 9.7.2014 Applicability Process map Affected regulations and decisions: Affected stakeholders:
More informationFuture Network Manager Methods
Future Network Manager Methods Workshop on Emerging Technologies Sonke Mahlich Project Manager, EUROCONTROL ATC Global Beijing, 12. Sep. 2016 Network Management A global scope with regional challenges
More informationSESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking
SESAR RPAS Definition Phase Results & Way Forward Denis Koehl Senior Advisor SESAR Joint Undertaking Brussels - December 2 nd 2014 Content The Rationale The EC Mandate Requirements & Challenges SESAR RPAS
More informationSEAMLESS SKY IN EUROPE. Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009
SEAMLESS SKY IN EUROPE Carlo Maria Borghini Director Administration and Finance Muscat, OMAN October 2009 EUROPE AND ASIA-PACIFIC FACING SIMILAR SITUATION EUROPE ASIA-PACIFIC Traffic growth (travel 4.1%,
More informationCooperative traffic management
3/17/2017 Cooperative traffic management Moderated by Peter Alty, SESAR JU #SESAR 2 Cooperative Traffic Management The Airport view 8 th March 2017 Alison Bates Head of Service Transformation and Ops Efficiency
More informationFirst Announcement and Call for Abstracts for the WMO Aeronautical Meteorology Scientific Conference (AMSC-2017)
Our ref.: 24486/2017/WDS/AMSC-2017 13 July 2017 Annex: 1 (available in English only) Subject: First Announcement and Call for Abstracts for the WMO Aeronautical Meteorology Scientific Conference (AMSC-2017)
More informationTerms of Reference for a rulemaking task. Implementation of Evidence-Based Training within the European regulatory framework RMT.0696 ISSUE
Terms of Reference for a rulemaking task Implementation of Evidence-Based Training within the European regulatory framework ISSUE 1 3.9.2015 Applicability Process map Affected regulations and decisions:
More informationRussian Federation ATM modernization program
Russian Federation ATM modernization program Alexander Vedernikov Deputy Director of Federal Air Transport Agency 20-21 March, 2012, Moscow Main strategic directions of Russian Air Navigation System development
More informationAdvanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS
Advanced Flexible Use of Airspace (AFUA) Kris DELCOURTE, EUROCONTROL Davide BARDELLI, LUFTHANSA SYSTEMS AFUA - the partners Initial situation Airspace reservations: TSAs/TRAs Non-optimal use of large volumes
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationEUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013
EUROCONTROL Centralised Services concept Joe Sultana Director Network Manager 1 July 2013 EUROCONTROL Centralised Services 2 Why do we need Centralised Services? Europe needs to be competitive again! a
More informationREG ASP MIL APO USE INT IND NM
ECAC REG ASP MIL APO USE INT IND NM Subject matter and scope This objective is linked to ATM Functionality 3 of Commission Regulation (EU) No 716/2014 on the establishment of the Pilot Common Project,
More informationEUROCONTROL General Presentation
EUROCONTROL General Presentation Luc Tytgat, Director DSS EUROCONTROL The European Organisation for the Safety of Air Navigation One day s traffic General Presentation 2 ATM Today Air Transport Air Navigation
More informationWorkshop on the Performance Enhancement of the ANS through the ICAO ASBU framework. Dakar, Senegal, September 2017 presented by Emeric Osmont
Workshop on the Performance Enhancement of the ANS through the ICAO ASBU framework Dakar, Senegal, 18-22 September 2017 presented by Emeric Osmont The Aviation Community Indra 2 The Aviation Community
More informationPeter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry
Future of ATM Peter Sorensen Director, Europe Safety, Operations & Infrastructure To represent, lead and serve the airline industry 1 1 Air Traffic Management (ATM) Management of aircraft and airspace
More informationThe evolving air navigation system and the impact on avionics
International Civil Aviation Organization The evolving air navigation system and the impact on avionics Vincent Galotti Deputy Director, Safety Standardization & Infrastructure, ICAO 18 August 2011 Introduction
More informationWORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the
INTERNATIONAL CIVIL AVIATION ORGANIZATION WORLD METEOROLOGICAL ORGANIZATION MET/14-WP/64 18/7/14 Meteorology (MET) Divisional Meeting (2014) Commission for Aeronautical Meteorology Fifteenth Session Montréal,
More informationTerms of Reference for a rulemaking task
Rulemaking Directorate Terms of Reference for a rulemaking task Technical requirements and operational procedures for the provision of data for airspace users for the purpose of air navigation ISSUE 1
More informationMulti Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014
Multi Nodal Regional ATFM/CDM Concept and Operational Trials Colombo 7 May 2014 CANSO Asia Pacific Collaborative ATM Operations Workshop, Colombo 7 May 201 Evolution of the Regional ATFM Concept Research
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 17/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationGANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation
GANP 2019/ASBUs Olga de Frutos Technical Officer Air Navigation Marrakesh/10 th December 2018 Agenda Background information GANP 2019 Global Strategic level Global Technical level BBB and ASBU framework
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 19/3/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 (Presented by the Secretariat) EXPLANATORY NOTES ON THE AGENDA ITEMS The
More informationWork Package Final Report
Work Package Final Report Document information Work Package Title Network Operations and Network Information Management System Work Package Number 07.00 & 13.00 WP Leader(s) EUROCONTROL Deliverable Name
More informationSESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM
SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM Subject matter and scope * The extension of the applicability area to non-eu ECAC States that have not signed an aviation agreement with EU, as well
More informationAnalysis of en-route vertical flight efficiency
Analysis of en-route vertical flight efficiency Technical report on the analysis of en-route vertical flight efficiency Edition Number: 00-04 Edition Date: 19/01/2017 Status: Submitted for consultation
More information1/2 July Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability SPI)
SSC/14/54/5 Agenda Item 4.1 16 June 2014 54 th SINGLE SKY COMMITTEE 1/2 July 2014 Draft Commission Implementing Regulation amending Regulation (EU) No 1207/2011 (Surveillance Performance and Interoperability
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution #13 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationNORTH ATLANTIC VISION
NORTH ATLANTIC VISION Implementing Benefits Together Alastair Muir NATS Operations Director (Prestwick) IMG Chairman NAT FUTURE CONCEPT OF OPERATION Free Flight Progressive Reductions in separation standards
More information30 SEP - 02 OCT, 2014
EASTERN CARIBBEAN AERONAUTICAL INFORMATION MANAGEMENT (AIM) FAMILIARIZATION WORKSHOP TRINIDAD AND TOBAGO AVIATION AUTHORITY COMPLEX PORT OF SPAIN, TRINIDAD AND TOBAGO, 30 SEPTEMBER TO 2 OCTOBER 2014 30
More informationFrom AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez
From AIS to AIM COMSOFT AIS to AIM Lima, Peru 24-28.11.2014 Context and Overview Isabel Zambrano Rodriguez Context: Challenges to AIS Worldwide AIS throughout the world face a number of challenges : Air
More informationSOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT
PRE-PLANNING PHASE Nomination of the State Focal Point of Contact Appointment of the South Africa PBN Project Manager and Team Define the goals and objectives of Project Define the Terms of Reference for
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 14/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 4: Optimum Capacity and Efficiency through global collaborative
More informationEfficiency and Automation
Efficiency and Automation Towards higher levels of automation in Air Traffic Management HALA! Summer School Cursos de Verano Politécnica de Madrid La Granja, July 2011 Guest Lecturer: Rosa Arnaldo Universidad
More informationi4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales
i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales 1 Single European Sky ATM Research (SESAR) - Objectives Enabling EU skies to handle 3 times
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 5 SESAR Solution ID #12 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as
More informationNEFAB Project Feasibility Study Report Operational Concept
NEFAB Project Feasibility Study Report Operational Concept Page 1 of 16 TABLE OF CONTENTS 1. INTRODUCTION... 4 2. AIRSPACE DESIGN... 6 2.1 ATS Routes and Free Routes 6 2.2 Sectorisation 6 2.3 Airspace
More informationScreening Chapter 14 Transport. Single European Sky (SES) 18 December Transport
Screening Chapter 14 Single European Sky (SES) 18 December 2014 SINGLE EUROPEAN SKY OBJECTIVES: INCREASE SAFETY, EFFICIENCY, CAPACITY & PERFORMANCE Reduce fragmentation and complexity of ATM in Europe
More informationEUROCONTROL and the Airport Package
European Economic and Social Committee Public Hearing Brussels, 20 February 2012 EUROCONTROL and the Airport Package François HUET EUROCONTROL Directorate Single Sky, Performance Review Unit The European
More informationSWIM: An ANSP Perspective. Jan-Philipp LAUER, MSc CANSO AIMWG SC Member
SWIM: An ANSP Perspective Jan-Philipp LAUER, MSc CANSO AIMWG SC Member ICAO Interregional APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Agenda
More informationConcept of Operations Workshop
Concept of Operations Workshop CS#2 4DPP 4D Trajectory Calculation for Purposes Bernard Rausch CS2 Project Manager 03 September 2013 On the menu today. 1. Drivers for change 2. Objectives 3. Concept 4.
More informationICAO EUR Region Performance Framework
ICAO EUR Region Performance Framework Regional Performance Framework Workshop Baku, Azerbaijan, 10-11 April 2014 ICAO European and North Atlantic Office 9 April 2014 Page 1 OUTLINES Why a Regional Performance
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization 16/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Montréal, 19 to 30 November 2012 Agenda Item 5: Efficient flight paths through trajectory-based operations
More informationRPAS - Standardisation activities
RPAS - Standardisation activities ICAO Remotely Piloted Aircraft Systems Symposium 23-25 March 2015, Montreal Alexander Engel, EUROCAE About EUROCAE Relevant EUROCAE Activities 2 What is EUROCAE? EUROCAE
More informationFollow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES
RAAC/15-WP/28 International Civil Aviation Organization 04/12/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationDMT Report. Overview for Step 1. Maturity Assessment Issue date: (OFA view) 28/01/2015
MAT Report References: Maturity Assessment Issue date: (OFA view) Integrated roadmap 26/11/2014 Dataset 13 - Baseline 5.0 DMT Report 26/01/2015 PIRM Result 19/09/2014 Updated Assessment in 2014 (Step1)
More informationTWELFTH AIR NAVIGATION CONFERENCE
International Civil Aviation Organization AN-Conf/12-WP/6 7/5/12 WORKING PAPER TWELFTH AIR NAVIGATION CONFERENCE Agenda Item 2: Aerodrome operations improving airport performance 2.2: Performance-based
More informationECOsystem: MET-ATM integration to improve Aviation efficiency
ECOsystem: MET-ATM integration to improve Aviation efficiency Daniel MULLER ICAO APAC/EUR/MID Workshop on Service improvement through integration of AIM, MET and ATM Information Services Brussels, October
More informationRMT.0464 ATS Requirements The NPA
RMT.0464 ATS Requirements The NPA Fabio GRASSO EASA ATM/ANS Regulations Officer IFISA - FISO Seminar #7 08.09.2016 TE.GEN.00409-001 ATM/ANS CRs Regulation 2016/1377 Main objectives are to: implement Essential
More informationMY AGENDA FOR TODAY. Today s Partners for Tomorrows aviation. Page 3
FIRST OUR VIDEO MY AGENDA FOR TODAY PERFORMANCE: Our Challenges & Ambition PARTNERSHIP: Public private partnership RESPONSIBILITY: Safety, Security and Environment RESULTS: Work Programme Operational Concept
More informationNEFAB Annual Report 2016
NEFAB Council #11/WP2 NEFAB Annual Report 2016 Version 1.0 Revision history Version Date Description/Change Author Approved 1.0 08.05.2017 LV 2 Main developments in 2016 NEFAB Strategy Implementation Plan
More informationImplementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)
INTERNATIONAL CIVIL AVIATION ORGANIZATION SAM/IG/10-WP/08 South American Regional Office - Regional Project RLA/06/901 05/09/12 Assistance for the Implementation of a Regional ATM System, taking into account
More informationFACILITATION PANEL (FALP)
International Civil Aviation Organization WORKING PAPER FALP/10-WP/19 Revised 29/8/18 FACILITATION PANEL (FALP) TENTH MEETING Montréal, 10-13 September 2018 Agenda Item 6: Other matters FACILITATION FOR
More informationATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT
AIRPORTS AUTHORITY OF INDIA ATM STRATEGIC PLAN VOLUME I Optimising Safety, Capacity, Efficiency and Environment DIRECTORATE OF AIR TRAFFIC MANAGEMENT Version 1 Dated April 08 Volume I Optimising Safety,
More informationfounding members Today s partners for Tomorrow s aviation
founding members Today s partners for Tomorrow s aviation SESAR joint undertaking / 02 / Key figures 2.1 billion euros invested in R&D during the development phase 20.4 million yearly flight movement by
More informationThe Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap
The Information Paper of the China s PBN implementation roadmap Table of Contents News Briefs Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation
More informationThe VINGA project. Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress
The VINGA project Henrik Ekstrand Novair Flight Operations Aerospace Technology Congress 2016-10-11 Introduction to the VINGA project Validation and Implementation of Next Generation Airspace A Single
More informationContextual note SESAR Solution description form for deployment planning
Purpose: Release 4 SESAR Solution #51 Contextual note SESAR Solution description form for deployment planning This contextual note introduces a SESAR Solution (for which maturity has been assessed as sufficient
More informationEnter here your Presentation Title 1
EXERCISE 4/ Simulation Potential Improvement Measures The European Organisation for the Safety of Air Navigation Objective Present a selection of additional improvement measures for enhanced civil-military
More informationATFM/CDM ICAO s Perspective
ATFM/CDM ICAO s Perspective Elie El Khoury ICAO Regional Officer, ATM/SAR Middle East Office, Cairo Cairo/3-4 April 2016 Outline Traffic Growth in the MID Region What is ATFM/CDM Main Objectives ICAO Guidance
More informationENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES. Guido Kerkhofs Director ATM Programmes EUROCONTROL
ENVIRONMENTAL BENEFITS FROM IMPROVED OPERATIONAL MEASURES Guido Kerkhofs Director ATM Programmes EUROCONTROL EUROCONTROL Air Traffic Emissions Estimates EU 27 States 2004-2006 Tonnes of CO 2 Drop Page
More informationMaster Plan edition 2
Updated with SESAR s first developments The Roadmap for Sustainable Air Traffic Management European ATM Master Plan edition 2 October 2012 European Union Updated with SESAR s first developments The Roadmap
More informationGlobal ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization
SIP/2009-WP/8 Business case Global ATM System ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization Workshop on the Development of Business Case for the
More informationEASA ATM/ANS regulatory update
EASA ATM/ANS regulatory update Fabio GRASSO EASA ATM/ANS Expert 05.09.2018 TE.GEN.00409-001 New EASA Basic Regulation New Regulation 2018/1139 published on 22 August 2018 More detailed regulatory framework
More informationAirspace Organization and Management
Airspace Organization and Management Asia and Pacific Regional Sub Office 2014 17 November 2014 Page 1 CONTENTS Concept of Flexible Use of Airspace (FUA) Flexible and adaptable airspace structure Conditional
More informationIris Information Event October Overview of SESAR P. Tavernise
Iris Information Event 10-11 October 2011 Overview of SESAR P. Tavernise WHY SESAR? EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked to growth Environment: Growth
More informationAir Traffic Flow & Capacity Management Frederic Cuq
Air Traffic Flow & Capacity Management Frederic Cuq www.thalesgroup.com Why Do We Need ATFM/CDM? www.thalesgroup.com OPEN Why do we need flow management? ATM Large investments in IT infrastructure by all
More informationAIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place
AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place Workshop for the development of AIS management and oversight for Civil Aviation Authorities CAA)
More information