Landsnet. Five years of synchrophasor use in the control center. NASPI Work Group Meeting February 2013, Huntington Beach, CA

Size: px
Start display at page:

Download "Landsnet. Five years of synchrophasor use in the control center. NASPI Work Group Meeting February 2013, Huntington Beach, CA"

Transcription

1 Landsnet Five years of synchrophasor use in the control center NASPI Work Group Meeting February 2013, Huntington Beach, CA Ragnar Guðmannsson System Operation

2 Overview 1. The Icelandic Transmission System and challenges in System Operation 2. WAMS in Landsnet s control room 3. WACS project s 4. Results and future development

3 Location of Iceland with distances over the Atlantic Ocean

4 Generation and Consumption

5 Generation Capacity ,5% 1,5% 4% 10% 0,5% MW % 0,5% 13% 6% 55% Transmission lines 220 kv 132 kv 66 kv 33 kv Substation Geothermal Hydro

6 Generation Capacity % 3% 30% MW % 14% 36% 4% Transmisson lines 220 kv 132 kv 66 kv 33 kv Substation Geothermal Hydro

7 WAMS and tuning of PSS to improve stability in relation to commissioning of 690 MW generation and load in 2007 KR2 FLJ/KAR G G G G G G KRA 60 MW KR2 FL2 B A BLA 150 MW KAR 690 MW SI4 B ARE A PMU PSS Data center Auxiliary load 25 MW Potline 535 MW

8 Now 12 PMUs installed, with detail of Eastern 220kV AC system (DC to follow) for co-ordinating control KR2 FLJ/KAR G G G G G G KRA 60 MW KR2 FL2 B A BLA 150 MW KAR 690 MW SI4 B ARE A PMU PSS Data center Auxiliary load 25 MW Potline 535 MW

9 WAMS in Landsnet s control room Psymetrix - PhasorPoint RT monitoring of system stability PMU installation 2013 ARE, HRY, BUR, BUD, KLA PMU installation 2014 REY, ISA Data center is located at Landsnet control center Gylfaflöt Krafla Blanda Brennimelur Hrauneyjafoss Fljótsdalur Sigalda PMU location Data Centre 220kV 132kV 66kV

10 WAMS in Landsnet s control room WAMS - PhasorPoint EMS Tetra

11 WAMS in Landsnet s control room

12 WAMS Operator view Normal operating condition High resolution measurment [Hz, MW, kv, MVAR] - observation window 15 min (was 1-2 hr) - oscillation not seen by conventional EMS - damping, frequency bands (new) Maintenance Security assessment - predefined graph for better monitoring of system conditions Open 132 kv ring - interarea mode (0,3 to 0,5 Hz) - variation af production and influence on damping - better view of angle condition when closeing

13 WAMS Operator reponse Critical events or operating condition Opening of 132 kv ring (inter area mode) Trip of smelter load ( large proportion of total load) Trip of generation (at high transport between areas) Operator training EMS training simulator (3 days in 6 months interval) WAMS Known Issus Predefined actions Operator response Active power control of Hydro units GOV - AGC PSO Voltage control units, capacitor banks System spilt to prevent power ocillations Reduction of smelter load

14 WAMS trip of line on 132 kv ring PSO opens bustie CB at BLA Trip of FL2 open 132 kv ring FL2 CB closed at FLJ trip again

15 WAMS trip and reconnection of 132 kv ring Trip of SI4 open 132 kv ring System protection split at BLA 132 kv ring connected at HOL 132 kv ring closed at BLA

16 WAMS PSS tuning and system tests PSS off in KRA PSS on in KRA

17 WAMS PSS tuning and long-term tests 1.2Hz Mode 0.8Hz Mode Mode Amplitude (MW) Before PSS tuning After PSS tuning Mode Amplitude (MW) Mode Decay Time Constant (sec) Mode Decay Time Constant (sec)

18 WAMS PSS testing at HRA Unit without PSS and above normal operating limits [70 MW] 17,5 MW Test during PSS commisioning to check PSS damping performance

19 WAMS - KR2 out production changes Brennimelur FLJ Sigalda

20 WACS Project overview Psymetrix Wide Area Defence Scheme started 2011 Power balance of areas Prevent system split Increased system security Secondary Load Shedding started 2013 Increased power flow on 132 kv ring Faster shedding after system split More focus on lower voltage levels (smart grid) Increased system security PMU PDC Tetra modem trip of load

21

22 WACS - dynamics related to 132 kv ring BL2 A frequency SV frequency SI4 Load 132kV ring power flow Production area

23 WACS - Trip of 500 MW smelter load in SouthWest Active Power 132 kv ring Active Power 132 kv ring to KAR/ARE Frequency Voltage angle between FLJ and SIG

24 WACS - Wide Area Defence Scheme

25 WADS - Wide Area Defence Scheme Emergency control to maintain system stability seen as grid service, similar to underfrequency load shed targeted, controlled action to reduce overall impact Uses measurements from PhasorPoint - frequency, voltage angle Trips generation in an area where a large proportion of load has tripped Proportionate response to angle stability condition Increased system security with connected system

26 Results Knowledge of system dynamics has increased PSO s response time shorter and more affective Improved capability to analyse disturbances Important for testing and monitoring of regulation equipment GOV, AVR, PSS Knowledge of system dynamics has increased Stability has significantly increased with successful PSS tuning

27 Future : Improved damping PSS tuning of all hydro and geothermal units SVC POD commissioning and tunning Tunning of smelter load regulation equipment

28 Future : Governor design and tuning New governor design for Geothermal Island operation Geothermal units in AGC for emergency control Optimal settings for Hydro units in island operation to deal with smelter load variation after long outage

29 Future : WACS and smart grid solutions Emergency control of smelter load to reduce impact of disturbances Control of all secondary load from EMS and WACS (0-120 s) Intelligent system design to ensure secure system split depending on operating conditions

Attachment F1 Technical Justification - Applicability WECC-0107 Power System Stabilizer VAR-501-WECC-3

Attachment F1 Technical Justification - Applicability WECC-0107 Power System Stabilizer VAR-501-WECC-3 Power System Stabilizer Applicability in the WECC System Study Progress Report to WECC-0107 Drafting Team Shawn Patterson Bureau of Reclamation April 2014 Introduction Power System Stabilizers (PSS) are

More information

VAR-501-WECC-3 Power System Stabilizer. A. Introduction

VAR-501-WECC-3 Power System Stabilizer. A. Introduction A. Introduction 1. Title: Power System Stabilizer (PSS) 2. Number: VAR-501-WECC-3 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal conditions

More information

A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC

A. Introduction Title: Power System Stabilizer (PSS) 2. Number: VAR 501 WECC A. Introduction 1. 1. Title: Power System Stabilizer (PSS) 2. 3. 2. Number: VAR 501 WECC 2 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal

More information

A Practical Power System Stabilizer Tuning Method and its Verification in Field Test

A Practical Power System Stabilizer Tuning Method and its Verification in Field Test 4 Journal of Electrical Engineering & Technology Vol. 5, No. 3, pp. 4~46, 21 A Practical Power System Stabilizer Tuning Method and its Verification in Field Test Jeonghoon Shin, Suchul Nam*, Jaegul Lee*,

More information

A. Introduction Title: Power System Stabilizer (PSS)

A. Introduction Title: Power System Stabilizer (PSS) A. Introduction 1. 1. Title: Power System Stabilizer (PSS) 2. 3. 2. Number: VAR-501-WECC-2 3. Purpose: To ensure the Western Interconnection is operated in a coordinated manner under normal and abnormal

More information

SOME NSW SYSTEM PLANNING ISSUES. Dr Col Parker Manager/System Planning & Analysis

SOME NSW SYSTEM PLANNING ISSUES. Dr Col Parker Manager/System Planning & Analysis SOME NSW SYSTEM PLANNING ISSUES Dr Col Parker Manager/System Planning & Analysis David Hill s Contributions from a NSW planning perspective Dynamics of voltage collapse Modelling of loads and load dynamics

More information

Gain-Scheduled Control of Blade Loads in a Wind Turbine-Generator System by Individual Blade Pitch Manipulation

Gain-Scheduled Control of Blade Loads in a Wind Turbine-Generator System by Individual Blade Pitch Manipulation Proceedings of WindEurope Summit 2016 27 29 SEPTEMBER, 2016, HAMBURG, GERMANY Gain-Scheduled Control of Blade Loads in a Wind Turbine-Generator System by Individual Blade Pitch Manipulation Tetsuya WAKUI,

More information

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR

Validation Results of Airport Total Operations Planner Prototype CLOU. FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR Validation Results of Airport Total Operations Planner Prototype CLOU FAA/EUROCONTROL ATM Seminar 2007 Andreas Pick, DLR FAA/EUROCONTROL ATM Seminar 2007 > Andreas Pick > July 07 1 Contents TOP and TOP

More information

Criteria for a Successful Shore Power Project

Criteria for a Successful Shore Power Project Criteria for a Successful Shore Power Project Availability of an adequate supply of electricity at a reasonable cost. Frequency of calls by cruise vessels equipped to connect to Shore Power. Availability

More information

The Southern African Power Pool. Meeting growing power demands through Southern African regional integration

The Southern African Power Pool. Meeting growing power demands through Southern African regional integration he Southern African Power Pool www.sapp.co.zw Meeting growing power demands through Southern African regional integration Johnson Maviya Southern African Power Pool SAREE/IRENA Workshop, Windhoek Namibia

More information

PCB Relay G8P. Ordering Information. Small, Low-Cost 30-A Power Relay for PCB Applications. Accessories (Order Separately)

PCB Relay G8P. Ordering Information. Small, Low-Cost 30-A Power Relay for PCB Applications. Accessories (Order Separately) PCB Relay Small, Low-Cost 0-A Power Relay for PCB Applications Small, yet capable of switching up to a 0-A loads. Inexpensive. Ideal for home and industrial appliances, HVAC (heating, ventilating, and

More information

Engineering Design Assurance Test Report ( S )

Engineering Design Assurance Test Report ( S ) TEST EQUIPMENT LIST: AC Source : Chroma programmable AC source Model 61504 Power Analyzer : Chroma Power Analyzer Model 6630 Load : Chroma Electronic DC Load 63103 Oscilloscope : Lecroy wave surfer 424

More information

Power Network Control by HVDC in Japan

Power Network Control by HVDC in Japan Power Network Control by HDC in Japan The 8 th EPCC Workshop June 2005 Toshiba Corporation Tokyo Japan Courtesy of N. Fukushima 1 Power Network Control by HDC in Japan Islands are connected by HDC. The

More information

Load-following capabilities of Nuclear Power Plants. Erik Nonbøl

Load-following capabilities of Nuclear Power Plants. Erik Nonbøl Load-following capabilities of Nuclear Power Plants Erik Nonbøl Outline Why load-following Modes of power operation BWR technique for load-following PWR technique for load-following Effects on components

More information

East African Power Industry Convention 2007, Addis Ababa, ETHIOPIA

East African Power Industry Convention 2007, Addis Ababa, ETHIOPIA Pan African Electrical Interconnection and Power rade By Dr. Fatma Moustafa, Dr. Babiker Ibrahim, Dr. azem anafi, Mr. Jelal Shafi Eastern Nile echnical Regional Office Nile Basin Initiative East African

More information

Engineering Design Assurance Test Report ( S )

Engineering Design Assurance Test Report ( S ) TEST EQUIPMENT LIST: AC Source : Chroma programmable AC source Model 61504 Power Analyzer : Chroma Power Analyzer Model 6630 Load : Chroma Electronic DC Load 63103 Oscilloscope : Lecroy wave surfer 424

More information

Engineering Design Assurance Test Report ( S ) MODEL: SPS-070P V 12 Amax 60 Wmax

Engineering Design Assurance Test Report ( S ) MODEL: SPS-070P V 12 Amax 60 Wmax TEST EQUIPMENT LIST: AC Source : Chroma programmable AC source Model 61504 Power Analyzer : Chroma Power Analyzer Model 6630 Load : Chroma Electronic DC Load 63103 Oscilloscope : Lecroy wave surfer 424

More information

Aircraft Design: A Systems Engineering Approach, M. Sadraey, Wiley, 2012 Chapter 12 Design of Control Surfaces. Tables

Aircraft Design: A Systems Engineering Approach, M. Sadraey, Wiley, 2012 Chapter 12 Design of Control Surfaces. Tables Aircraft Design: A Systems Engineering Approach, M. Sadraey, Wiley, 2012 Chapter 12 Design of Control Surfaces Tables No Term 1 Trim, balance, equilibrium Definition When the summations of all forces exerting

More information

Engineering Design Assurance Test Report ( S ) MODEL: SPS-350P V 14.7 Amax 353 Wmax TEST EQUIPMENT LIST:

Engineering Design Assurance Test Report ( S ) MODEL: SPS-350P V 14.7 Amax 353 Wmax TEST EQUIPMENT LIST: TEST EQUIPMENT LIST: INPUT FUNCTION TEST AC Source : Chroma programmable AC source Model 61504 Power Analyzer : Chroma Power Analyzer Model 6630 Load : Chroma Electronic DC Load 63103 Oscilloscope : Lecroy

More information

Engineering Design Assurance Test Report ( S ) MODEL: SPS--230P V 9.6 Amax 230 Wmax TEST EQUIPMENT LIST:

Engineering Design Assurance Test Report ( S ) MODEL: SPS--230P V 9.6 Amax 230 Wmax TEST EQUIPMENT LIST: TEST EQUIPMENT LIST: INPUT FUNCTION TEST AC Source : Chroma programmable AC source Model 61504 Power Analyzer : Chroma Power Analyzer Model 6630 Load : Chroma Electronic DC Load 63103 Oscilloscope : Lecroy

More information

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis

Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Airspace Complexity Measurement: An Air Traffic Control Simulation Analysis Parimal Kopardekar NASA Ames Research Center Albert Schwartz, Sherri Magyarits, and Jessica Rhodes FAA William J. Hughes Technical

More information

WÄRTSILÄ HYBRID SOLUTIONS

WÄRTSILÄ HYBRID SOLUTIONS WÄRTSILÄ HYBRID SOLUTIONS 1 WHAT IS WÄRTSILÄ HY? The first integrated hybrid power module in the marine industry Enabling sustainable societies with smart technology AIP 2 1 Wärtsilä HY differentiates

More information

Supplementary protector S 200 MR for ring-tongue applications acc. to UL 1077

Supplementary protector S 200 MR for ring-tongue applications acc. to UL 1077 Electrical installations in buildings for ring-tongue applications acc. to UL 1077 S 200 MR is a high-performance supplementary protector with ring cable lug connections conforming to UL, CSA, and IEC

More information

15W Single Output Switching Power Supply MODEL:RS OUTPUT FUNCTION TEST NO TEST ITEM SPECIFICATION TEST CONDITION RESULT VERDICT

15W Single Output Switching Power Supply MODEL:RS OUTPUT FUNCTION TEST NO TEST ITEM SPECIFICATION TEST CONDITION RESULT VERDICT 15W Single Output Switching ower Supply MODEL:RS-15-15 OUTUT FUNCTION TEST NO TEST ITEM SECIFICATION TEST CONDITION RESULT VERDICT 1 RILE & NOISE V1:120 mvp-p (Max ) I/: 230VAC O/:FULL LOAD V1: 52 mvp-p

More information

MODEL:RT-65B OUTPUT FUNCTION TEST NO TEST ITEM SPECICATION TEST CONDITION RESULT VERDICT I/P: 230 VAC O/P:FULL LOAD

MODEL:RT-65B OUTPUT FUNCTION TEST NO TEST ITEM SPECICATION TEST CONDITION RESULT VERDICT I/P: 230 VAC O/P:FULL LOAD 65W Triple Output Switching ower Supply MODEL:RT-65B OUTUT FUNCTION TEST NO TEST ITEM SECICATION TEST CONDITION RESULT VERDICT 1 RILE & NOISE V1: 80 mvp-p (Max ) V2: 120 mvp-p (Max ) V3: 80 mvp-p (Max

More information

Power System Stabilizer(PSS) Design Using ANFIS Algorithm and Comparing the Results with conventional and fuzzy PSS

Power System Stabilizer(PSS) Design Using ANFIS Algorithm and Comparing the Results with conventional and fuzzy PSS J. Basic. Appl. Sci. Res., ()458-469,, TextRoad Publication IS 9-44X Journal of Basic and Applied Scientific Research www.textroad.com Power System Stabilizer(PSS) Design Using ANFIS Algorithm and Comparing

More information

Supplementary airfield projects assessment

Supplementary airfield projects assessment Supplementary airfield projects assessment Fast time simulations of selected PACE projects 12 January 2018 www.askhelios.com Overview The Commission for Aviation Regulation requested Helios simulate the

More information

The Electric Power System

The Electric Power System The Electric Power System - Bosnia and Herzegovina - Bosnia and Herzegovina Power System 1 2 Basic facts Area: 51.197 km 2 Population: 3.791.622 Number of electricity consumers: 1.505.015 Number of TSOs:

More information

Shanghai Green Port Construction. Shanghai Municipal Transportation Commission

Shanghai Green Port Construction. Shanghai Municipal Transportation Commission Shanghai Green Port Construction Shanghai Municipal Transportation Commission 1.Profile of Shanghai 2.Air pollution by vessels of Shanghai Port 3.Shanghai Green Port Construction 4.Implementation of ECA

More information

C/L TIMER v4.x _

C/L TIMER v4.x   _ The active timer controls the ESC actuating in the motor RPM during flight based on the data received from the accelerometer, keeping the flight speed more constant and making it possible to have flights

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Test Report: HEP

Test Report: HEP Test Report: HEP-600-24 600W Single Output Switching Power Supply DESIGN VERIFY TEST Output Function Test Input Function Test Protection Function Test Control Function Test Component Stress Test SAFETY

More information

DYNAMIC AIRBORNE REROUTE PROGRAM (DARP) APPLICATION IN BUSINESS AVIATION

DYNAMIC AIRBORNE REROUTE PROGRAM (DARP) APPLICATION IN BUSINESS AVIATION DYNAMIC AIRBORNE REROUTE PROGRAM (DARP) APPLICATION IN BUSINESS AVIATION Michal Pazourek 1 Summary: With relatively significant growth of business aviation oceanic operations the need to optimize them

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

Reforms in Kosovo s power System

Reforms in Kosovo s power System Reforms in Kosovo s power System SABRI LIMARI FIEK University of Kosovo Prishtina, KOSOVO ARMEND YMERI KEKJSC, Gjilan, KOSOVO FEHMI AZEMI TOOB, Univesity Abstract: -Within the South East European Integrations,

More information

Transmission Investment Programme

Transmission Investment Programme 3 rd December 2015 Transmission Investment Programme www.spenergynetworks.co.uk 1 Strategic Transmission Upgrades www.spenergynetworks.co.uk 2 1. Beauly / Denny SPT scope is: 20km of new 400/275kV overhead

More information

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study

Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Pumped storage hydroelectric power plants: Issues and applications BIH Case Study Sasa Scekic, Head of Licensing and Technical Affairs Dpt., SERC BIH www. erranet.org Power System of Bosnia and Herzegovina

More information

Planning Resilient Transmission Networks in Chile

Planning Resilient Transmission Networks in Chile Planning Resilient Transmission Networks in Chile Juan C. Araneda Transmission Planning Manager 1 CHILEAN NATIONAL POWER SYSTEM 2018 SEN 3,100 km Installed Capacity: Peak Demand: 24,000 MW 11,000 MW Source:

More information

2017 Digital Grid Customer Summit Session Abstracts

2017 Digital Grid Customer Summit Session Abstracts 2017 Digital Grid Customer Summit Session Abstracts April 3-7, 2017 PTI PSC/EBA Breakout Session April 4, 2017 Summit Day 2 State of the Utility: How to Embrace Distributed Energy Resources (DER) Market

More information

City of Reykjavík Data center locations. March 2018 Department of Economic Development City of Reykjavik

City of Reykjavík Data center locations. March 2018 Department of Economic Development City of Reykjavik City of Reykjavík Data center locations March 2018 Department of Economic Development City of Reykjavik 80 summer destinations 40 winter destinations Daily flights to New York, London & Copenhagen 200.000

More information

Load-following capabilities of nuclear power plants

Load-following capabilities of nuclear power plants Downloaded from orbit.dtu.dk on: Sep 18, 2018 Load-following capabilities of nuclear power plants Nonbøl, Erik Publication date: 2013 Link back to DTU Orbit Citation (APA): Nonbøl, E. (2013). Load-following

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power Access and

More information

Advances for Pipelines

Advances for Pipelines Advances for Pipelines Eugene Buddy Broerman EBroerman@swri.org Jeffrey Bennett JBennett@swri.org Gas/Electric Partnership Conference 2016 Houston, T Southwest Research Institute Non-profit organization

More information

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018

PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference. 4 th December 2018 PORT MORESBY POWER PROJECT - UPDATE PNG Mining & Petroleum Investment Conference 4 th December 2018 CONTENTS NiuPower Recap Port Moresby Power Station Project Current Status Where to Now Port Moresby Power

More information

Test Report: APC

Test Report: APC Test Report: AC-25-500 25W Single Output Switching ower Supply DESIGN VERIFY TEST Output Function Test Input Function Test rotection Function Test Component Stress Test SAFETY & E.M.C. TEST Safety Test

More information

62.5W Rated output power for convection; 80W with 18CFM min. forced air

62.5W Rated output power for convection; 80W with 18CFM min. forced air Jameco SKU Number: 668828 RT-65 s e ries SECIFICATION MODEL OUTUT INUT ROTECTION ENVIRONMENT OTHERS NOTE OUTUT NUMBER DC VOLTAGE RATED CURRENT CURRENT RANGE EAK LOAD RATED OWER OUTUT OWER (max.) VOLTAGE

More information

Performance Review Body 18

Performance Review Body 18 Performance Review Body 18 Performance Review Body 19 Performance Review Body 20 Conclusions Performance is the bottom line Major change under SES II Enforceable performance targets, incentives Significant

More information

Solutions for infrastructure and power transfer in hybrid operated vessels

Solutions for infrastructure and power transfer in hybrid operated vessels Solutions for infrastructure and power transfer in hybrid operated vessels Wärtsilä Marine Solutions Mari Tech 2018 Mark Keneford, General Manager Marine Solutions 1 Wärtsilä 20.02.18 Conference in Athens

More information

Western Area Power Administration Sierra Nevada Region. Annual Ten-Year Transmission Plan Assessment Report

Western Area Power Administration Sierra Nevada Region. Annual Ten-Year Transmission Plan Assessment Report Western Area Power Administration Sierra Nevada Region 2008 Annual Ten-Year Transmission Plan Assessment Report Attachment 5A: Category C (NERC Planning Standard TPL-003): Double Element Outages, (N-2)

More information

Smart Networks Smart Islands. Nikos Chatziargyriou Chairman and CEO

Smart Networks Smart Islands. Nikos Chatziargyriou Chairman and CEO Smart Networks Smart Islands Nikos Chatziargyriou Chairman and CEO 1 HEDNO THE GREEK DSO 04 Hellenic Electricity Distribution Network Operator S.A. Within the 10 largest Electricity Distribution Corporations

More information

J.M.Alveirinho Dias * R. Gonzalez * Ó. Ferreira * * Universidade do Algarve Faculdade de Ciências do Mar e do Ambiente

J.M.Alveirinho Dias * R. Gonzalez * Ó. Ferreira * * Universidade do Algarve Faculdade de Ciências do Mar e do Ambiente J.M.Alveirinho Dias * R. Gonzalez * Ó. Ferreira * * Universidade do Algarve Faculdade de Ciências do Mar e do Ambiente 4ª bacia hidrográfica (em área) da Península Ibérica Area: 66 960 km 2 Comprimento:

More information

20W Single Output Industrial DIN Rail Power Supply MODEL:MDR OUTPUT FUNCTION TEST NO TEST ITEM SPECICATION TEST CONDITION RESULT VERDICT

20W Single Output Industrial DIN Rail Power Supply MODEL:MDR OUTPUT FUNCTION TEST NO TEST ITEM SPECICATION TEST CONDITION RESULT VERDICT 20W Single Outut Industrial DIN Rail Power Suly MODEL:MDR-20-12 OUTPUT FUNCTION TEST 1 RIPPLE & NOISE V1: 120 mv- (Max ) I/P: 230VAC V1: 19 mv- (Max ) 2 OUTPUT VOLTAGE CH1: 10.8 V~ 13.2 V 10.21 V~ 13.85

More information

MONTHLY REPORT Issue No. R02-18 February 2018

MONTHLY REPORT Issue No. R02-18 February 2018 Southern African Power Pool Energising the region for economic development 1 MONTHLY REPORT Issue No. R02-18 February CONTENTS Meetings, Workshops and Conferences.. 1 50 th SAPP Management Committee Meetings...

More information

P ROTECT JUST ABOUT E VERYTHING

P ROTECT JUST ABOUT E VERYTHING P ROTECT JUST ABOUT E VERYTHING www.intermatic.com/surge T RANSIENT V OLTAGE S URGES: A GROWING P ROBLEM POWER DISTURBANCES Lightning and fluctuations in utility power (caused by grid switching, for example)

More information

Benefits of Integrating into a Regional Power Pool

Benefits of Integrating into a Regional Power Pool EASTERN AFRICA POWER POOL Benefits of Integrating into a Regional Power Pool Ephrem Tesfaye Power Economist Eastern Africa Power Pool (EAPP) ETHIOPIA The Eastern African Power Pool (EAPP) The Energy Ministers

More information

Feature. Model comment JG 3NA B L - B - D3

Feature. Model comment JG 3NA B L - B - D3 Feature Device type universal nut terminals with safety protective cover -A Power Output Rated load voltage 20VAC/VAC Triac power switch Have DC-AC (DC signal to control the AC load) AC-AC (AC signal to

More information

Packed to perfection. FAST, FUNCTIONAL AND FLEXIBLE For industrial self-generation, small utilities, industrial and IPP customers who do not

Packed to perfection. FAST, FUNCTIONAL AND FLEXIBLE For industrial self-generation, small utilities, industrial and IPP customers who do not POWER CUBES 2 Packed to perfection Are you looking for a great package deal for power generation in the 5-30 MW range? With our GasCube and OilCube power generation solutions for smaller power plants,

More information

Ship Owner Expectations

Ship Owner Expectations Sibrand Hassing, Director Fleet Operations Europe, Holland America Group Workshop Sustainable Energy Supply & Innovative Solutions for Emission Reduction Improved Ports Cruise Line Collaboration, Bergen/Norway

More information

Performance Analysis of Space-Based ADS-B

Performance Analysis of Space-Based ADS-B Performance Analysis of Space-Based ADS-B MIT Lincoln Labs ATC Workshop December 5 th, 2017 Dr. Michael Garcia and John Dolan 1 Agenda Aireon Overview On-Orbit Acceptance Test (OOAT) Performance Results

More information

DRIVING PROFITABLE GROWTH. BJÖRN ROSENGREN President & CEO

DRIVING PROFITABLE GROWTH. BJÖRN ROSENGREN President & CEO DRIVING PROFITABLE GROWTH BJÖRN ROSENGREN President & CEO 1 Wärtsilä 14 November 2013 BJÖRN ROSENGREN Fundamental changes taking place in our end markets 2 Wärtsilä 14 November 2013 BJÖRN ROSENGREN vw

More information

Distributed by: www.jameco.com 1-800-831-4242 The content and copyrights of the attached material are the property of its owner. 480W Single Output Industrial DIN RAIL with FC Function SECIFICATION MODEL

More information

Test Report: EPP

Test Report: EPP Test Report: E 150 24 150W Single Output with FC Function DESIGN VERIFY TEST Output Function Test Input Function Test rotection Function Test Control Function Test Component Stress Test SAFETY & E.M.C.

More information

Test Report: EDR-75-12

Test Report: EDR-75-12 Test Report: EDR-75-12 75W Single Output Industrial DIN RAIL DESIGN VERIFY TEST Output Function Test Input Function Test rotection Function Test Component Stress Test SAFETY & E.M.C. TEST Safety Test E.M.C.

More information

Atlantic Interoperability Initiative to Reduce Emissions AIRE

Atlantic Interoperability Initiative to Reduce Emissions AIRE ICAO Colloquium on Aviation and Climate Change ICAO ICAO Colloquium Colloquium on Aviation Aviation and and Climate Climate Change Change Atlantic Interoperability Initiative to Reduce Emissions AIRE Célia

More information

Black Start Ancillary Service Schedule

Black Start Ancillary Service Schedule 1. Glossary and Interpretation 1.1 Glossary: In this Ancillary Service Schedule, unless the context otherwise requires, the following definitions apply: Availability Fee means the monthly availability

More information

Integrating Life-Cycle Solutions for Maximum Return on Investment

Integrating Life-Cycle Solutions for Maximum Return on Investment Integrating Life-Cycle Solutions for Maximum Return on Investment NDIA E2S2 New Orleans, LA May 9-12, 2011 Kevin Pleiss Wärtsilä 1 Wärtsilä Kevin Pleiss NDIA E2S2 May 2011 Ship efficiency Utilized energy

More information

Performance of Wind Farms in Thailand

Performance of Wind Farms in Thailand Performance of Wind Farms in Thailand Based on Mott MacDonald s in country experience Sasaraj Laoharatchapruek Bangkok, 06 June 2018 Sasaraj Laoharatchapruek Renewable Energy Consultant Bangkok Based Experience

More information

Measurement of environmental benefits from the implementation of operational improvements

Measurement of environmental benefits from the implementation of operational improvements Measurement of environmental benefits from the implementation of operational improvements ICAO International Aviation and Environment Seminar 18 19 March 2015, Warsaw, Poland Sven Halle Overview KPA ASSEMBLY

More information

CH2 12V CH3-5V. 72W with 18CFM min. Forced air convection

CH2 12V CH3-5V. 72W with 18CFM min. Forced air convection Jameco SKU Number: 2457 65W Triple Output Medical Type M T-65 s e ries SECIFICATION MODEL OUTUT INUT ROTECTION ENVIRONMENT SAFETY EMC (Note 4) OTHERS NOTE OUTUT NUMBER DC VOLTAGE RATED CURRENT CURRENT

More information

EA-12 Coupled Harmonic Oscillators

EA-12 Coupled Harmonic Oscillators Introduction EA-12 Coupled Harmonic Oscillators Owing to its very low friction, an Air Track provides an ideal vehicle for the study of Simple Harmonic Motion (SHM). A simple oscillator assembles with

More information

Distributed by: www.jameco.com 1-800-831-4242 The content and copyrights of the attached material are the property of its owner. geprufre Sicherheit 60W AC-DC Single Output Desktop G S60 s e ries SECIFICATION

More information

Distributed by: www.jameco.com 1-800-831-4242 The content and copyrights of the attached material are the property of its owner. 60W Single Output Industrial DIN Rail ower Supply DR-60 s e ries SECIFICATION

More information

DEVELOPMENT. Challenges and Opportunities. 9/5/2008 eapic 2008 Nairobi 1

DEVELOPMENT. Challenges and Opportunities. 9/5/2008 eapic 2008 Nairobi 1 REGIONAL DEVELOPMENT INFRASTRUCTURE Challenges and Opportunities 9/5/2008 eapic 2008 Nairobi 1 CONTENTS Introduction Regional Cooperation Generation Resources Existing and Future Power Systems Implementation

More information

20W Single Output Switching Power Supply MODEL:LPV OUTPUT FUNCTION TEST NO TEST ITEM SPECIFICATION TEST CONDITION RESULT VERDICT O/P:FULL LOAD

20W Single Output Switching Power Supply MODEL:LPV OUTPUT FUNCTION TEST NO TEST ITEM SPECIFICATION TEST CONDITION RESULT VERDICT O/P:FULL LOAD 20W Single Output Switching ower Supply LV-20 series MODEL:LV-20-24 OUTUT FUNCTION TEST NO TEST ITEM SECIFICATION TEST CONDITION RESULT VERDICT 1 RILE & NOISE V1: 150 mvp-p (Max ) I/: 230VAC O/:FULL LOAD

More information

Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT. Mostar,

Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT. Mostar, Wind Energy in South-east Europe: Seminar III: WIND ENERGY PROJECT DEVELOPMENT UNIVERSITY OF SPLIT FACULTY OF ELECTRICAL ENGINEERING, MECHANICAL ENGINEERING AND NAVAL ARCHITECTURE Wind Project Development

More information

TfL Planning. 1. Question 1

TfL Planning. 1. Question 1 TfL Planning TfL response to questions from Zac Goldsmith MP, Chair of the All Party Parliamentary Group on Heathrow and the Wider Economy Heathrow airport expansion proposal - surface access February

More information

Garrecht TRX 1500 Traffic-Sensor

Garrecht TRX 1500 Traffic-Sensor SECTION 9 Pilot s Operating Handbook Supplement Garrecht TRX 1500 Traffic-Sensor This supplement is applicable and must be integrated into the Airplane Flight Manual if a Garrecht Traffic-Sensor is installed

More information

Test Report: GSM40A18

Test Report: GSM40A18 Test Report: GSM40A18 40W AC DC Single Output Medical Type DESIGN VERIFY TEST Output Function Test Input Function Test rotection Function Test Control Function Test Component Stress Test SAFETY & E.M.C.

More information

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions

Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions Towards a 100% renewable energy future: WÄRTSILÄ Energy Solutions Marco Golinelli, Director Energy Solutions X Conferenza Nazionale per l Efficienza Energetica THIS IS WÄRTSILÄ A global leader in smart

More information

Standardization of Shore connection Systems

Standardization of Shore connection Systems Standardization of Shore connection Systems Thomas Hartmann Dept. MPE, Germanischer Lloyd Head Office Hamburg, Germany December 2006 Current Regulations LV-shore power: Current classification societies

More information

Safety insulation transformers for SmartPower controller family

Safety insulation transformers for SmartPower controller family Design and Manufacture of inductive components and ferrites for industrial electronics automotive electronics lighting techonology consumer goods industry telecommunications / entertainmentelectronics

More information

Pumped Storage Schemes & imported hydroelectricity

Pumped Storage Schemes & imported hydroelectricity Pumped Storage Schemes & imported hydroelectricity Date 11 May 2011 Role of pumped storage Ingula Pumped Storage Scheme Some important design criteria ydropower potential in Southern Africa Frans Louwinger

More information

Trapped Key Transfer System SHGV SVM SVE

Trapped Key Transfer System SHGV SVM SVE Trapped Key Transfer System SHGV SVM SVE Description Area of application Cost Savings The SHGV key transfer system occurs mainly in more complex manufacturing systems and equipment. It is especially suitable

More information

Test Report: HB

Test Report: HB Test Report: HB-100-48 100W Single Switching ower Supply DESIGN VERIFY TEST Function Test Input Function Test rotection Function Test Other Test Component Stress Test SAFETY & E.M.C. TEST Safety Test E.M.C.

More information

WÄRTSILÄ HY. Wärtsilä 29 May 2018 WÄRTSILÄ HY

WÄRTSILÄ HY. Wärtsilä 29 May 2018 WÄRTSILÄ HY WÄRTSILÄ HY 1 Wärtsilä 29 May 2018 WÄRTSILÄ HY WHAT IS WÄRTSILÄ HY? The first integrated hybrid power module in the marine industry Enabling sustainable societies with smart technology AIP 2 Wärtsilä 29

More information

Test Report. 240W Single Output Switching Power Supply DESIGN VERIFY TEST

Test Report. 240W Single Output Switching Power Supply DESIGN VERIFY TEST Test Report 240W Single Switching ower Supply DESIGN VERIFY TEST Function Test Input Function Test rotection Function Test Other Test Component Stress Test SAFETY & E.M.C. TEST Safety Test E.M.C. Test

More information

120W Single Output Industrial DIN RAIL Power Supply MODEL:DRH OUTPUT FUNCTION TEST NO TEST ITEM SPECICATION TEST CONDITION RESULT VERDICT

120W Single Output Industrial DIN RAIL Power Supply MODEL:DRH OUTPUT FUNCTION TEST NO TEST ITEM SPECICATION TEST CONDITION RESULT VERDICT 120W Single Output Industrial DIN RAIL ower Supply MODEL:DRH-120-24 OUTUT FUNCTION TEST NO TEST ITEM SECICATION TEST CONDITION RESULT VERDICT 1 RILE & NOISE V1: 80 mvp-p (Max ) I/: 400 VAC O/:FULL LOAD

More information

Tradition and innovation

Tradition and innovation Wärtsilä Auxpac Tradition and innovation The Wärtsilä Auxpac generating sets are the most compact and lightweight generating sets available on the market. The compact design of the generating set simplifies

More information

Congestion. Vikrant Vaze Prof. Cynthia Barnhart. Department of Civil and Environmental Engineering Massachusetts Institute of Technology

Congestion. Vikrant Vaze Prof. Cynthia Barnhart. Department of Civil and Environmental Engineering Massachusetts Institute of Technology Frequency Competition and Congestion Vikrant Vaze Prof. Cynthia Barnhart Department of Civil and Environmental Engineering Massachusetts Institute of Technology Delays and Demand Capacity Imbalance Estimated

More information

Helicopter Vector IFR

Helicopter Vector IFR Helicopter Vector IFR Gerry Wiseman IFR Survey Manager Contents What is IFR? Land IFR Method Dynamic IFR Survey Helicopter IFR Survey Northern Alberta Project MWD Relies on the Earth s Magnetic Field MWD

More information

Definite Purpose Contactors 1, 2 and 3 pole Type GDP

Definite Purpose Contactors 1, 2 and 3 pole Type GDP Definite Purpose Contactors 1, 2 and 3 pole Type l Definite Purpose Contactors l Switching up to 100A resistive, 90A inductive l Line Voltage up to 600VAC on most sizes l Control voltage up to 480VAC l

More information

Test Report: EPP

Test Report: EPP Test Report: E 100 24 100W Single Output with FC Function DESIGN VERIFY TEST Output Function Test Input Function Test rotection Function Test Control Function Test Component Stress Test SAFETY & E.M.C.

More information

DETERMINATION OF SOUND POWER LEVELS OF A TRANSFORMER AND A REACTOR

DETERMINATION OF SOUND POWER LEVELS OF A TRANSFORMER AND A REACTOR DETERMINATION OF SOUND POWER LEVELS OF A TRANSFORMER AND A REACTOR Prepared for: Grand Bend Wind Limited Partnership Northland Power Inc. 30 St. Clair Avenue West, Unit 1700 Toronto, Ontario M4V 3Al October

More information

Large Disturbances During 2014 in Power System of Serbia

Large Disturbances During 2014 in Power System of Serbia Large Disturbances During 2014 in Power System of Serbia (32 nd Conference of CIGRE Serbia, Zlatibor, 17.-21. May 2015) by Gojko Dotlić SO3 SU3 SR NS3 SANDORFALVA ZR2 Power Transmission System of Serbia

More information

Test Report: IRM-20-24

Test Report: IRM-20-24 Test Report: IRM-20-24 20W Single Output Encapsulated Type DESIGN VERIFY TEST Output Function Test Input Function Test rotection Function Test Control Function Test Component Stress Test SAFETY & E.M.C.

More information

United States Aircraft Certification Standards and Guidance on ADS-B

United States Aircraft Certification Standards and Guidance on ADS-B United States Aircraft Certification Standards and Guidance on ADS-B Date: Presented To: ADS-B SITF/12 Date: April 15, 2013 Overview ADS-B Out Final Rule Overview Dual Frequencies Timeline ADS-B Out Standards

More information

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS

EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS EXPERIMENTAL ANALYSIS OF THE INTEGRATION OF MIXED SURVEILLANCE FREQUENCY INTO OCEANIC ATC OPERATIONS Laura Major Forest & R. John Hansman C.S. Draper Laboratory, Cambridge, MA 9 USA; lforest@draper.com

More information

1000W Intelligent Single Output Battery Charger MODEL:PB OUTPUT FUNCTION TEST NO TEST ITEM SPECIFICATION TEST CONDITION RESULT VERDICT.

1000W Intelligent Single Output Battery Charger MODEL:PB OUTPUT FUNCTION TEST NO TEST ITEM SPECIFICATION TEST CONDITION RESULT VERDICT. B-1000 series MODEL:B-1000-24 OUTUT FUNCTION TEST NO TEST ITEM SECIFICATION TEST CONDITION RESULT VERDICT 1 BOOST CHARGE VOLTAGE 28.8V + 0.6V I/: 230 VAC I/: 115 VAC O/: BAT 28.83 V/ 230 VAC 28.83 V/ 115

More information

Distinctive Characteristics

Distinctive Characteristics Distinctive Characteristics Base of heat resistant resin meets ULV-0 flammability rating. Maximized voltage capability of V allows use in medium source applications and increases operating life. Award-winning

More information

Required Navigation Performance (RNP) in the United States

Required Navigation Performance (RNP) in the United States Required Navigation Performance (RNP) in the United States Overview FAA Roadmap for Performance-Based Navigation Moving to Performance-Based Navigation (RNAV and RNP) Definitions Operational attributes

More information