1 Issues & Impacts on Airports Presentation to Mid America Association of State Transportation Officials July 21, 2011 Presented by Greta J. Hawvermale Sr. Director of Engineering & Environmental Matters
2 FAA Reauthorization What s the fuss? Role of the Airport - Transportation - Economic Engine - Employer
3 The Airport as an Asset Safety Expansion Maintenance
4 History of FAA Reauthorization Federal Aviation Administration s (FAA) authorization expired on Sept. 30, extensions since that date (more than 3 years on continuing resolutions). Current extension provides FAA funding through July 22, 2011(22 day extension). U.S. Senate approved 21 st extension on July 20, 2011.
5 Reauthorization Issues Essential Air Service Program National Mediation Board Rules Passenger Facility Charges (PFC) Reagan National Airport Slots Airport Improvement Funding
6 Congressional Bills In February 2011, the U.S. Senate passed FAA Air Transportation and Modernization and Safety Improvement Act (S. 223), a $34.5 billion, two year FAA reauthorization bill. April 2011, the U.S. House passed FAA Reauthorization and Reform Act of 2011 (H.R. 658), a $59.7 billion, four year FAA reauthorization bill.
7 Congressional Positions House Bill (H.R. 658) Senate Bill (S.223) No PFC Increase. No PFC Increase. PFC pilot program to allow up to 5 airports to use PFCs to fund ground access projects that provide airport access. PFC pilot program to allow up to 6 airports allows airports to have unlimited PFC cap but requires selfcollection. Streamlines PFC consultation process with the airlines and the public notice and comment period for the local community.
8 House Bill (H.R. 658) AIP Authorization: Congressional Positions (con t) Senate Bill (S.223) AIP Authorization: $3.1 billion in FY 2011 $3.0 billion in FY FY 2014 Formula Changes: No Change. Requires 90% match for state block grants and small hubs. $4.0 billion in FY 2010 $4.1 billion in FY 2011 Formula Changes: Sec. 207 requires 95% match for state block grants and small airports. Sec. 208(i) allows airports whose enplanement numbers dropped below 10,000 to continue to be eligible to receive the minimum entitlement.
9 House Bill (H.R. 658) Congressional Positions (con t) Senate Bill (S.223) Provides liability limitations for airports and responsible parties that collect safety management system (SMS) data. No SMS language. Protects data collected for SMS through FY 2014.
10 House Bill (H.R. 658) Congressional Positions (con t) Sunsets the Essential Air Service Program by 2014, except for Alaska and Hawaii. Senate Bill (S.223) Authorizes $150 million for the Essential Air Service Program. Limits eligibility to airports more than 90 miles from a large or medium hub and that average more than 10 enplanements per day.
11 House Bill (H.R. 658) Congressional Positions (con t) Eliminates separate funding authorization for the Small Community Air Service Development Program, funds program through overflight fees. Senate Bill (S.223) Extends Authorization of the Small Community Air Service Development Program of $35 million per year for FY 2010 and 2011.
12 House Bill (H.R. 658) Congressional Positions (con t) 10 new beyond perimeter slots at Reagan National Airport (DCA) to be offset by a reduction of 10 within perimeter slots. Priority for new slots given to new entrant and limited incumbent air carriers. Senate Bill (S.223) 24 new beyond perimeter slots 10 would be designated for airlines with limited or no service at DCA, remaining slots would go to incumbent airlines. Requires DOT study on whether there are adverse effects of additional slots if study finds no negative effects DOT could authorize up to 8 additional slots.
13 House Bill (H.R. 658) Keeps jet fuel taxes the same. Congressional Positions (con t) Senate Bill (S.223) Includes a 14 cent increase on jet fuel. Assesses jet fuel tax on fractional operations.
14 Airport Funding Impacts Currently only 85% of entitlement funds have been appropriated (entitlement funds are based on size and/or activity levels at an airport). Although FAA anticipates it will reach 100% entitlement funds in future short-term resolutions through end of FAA fiscal year (September 30 th ). Emphasis on funding entitlements at expense of discretionary program.
15 IAA Airport System The Indianapolis Airport Authority (IAA) operates: Indianapolis International Airport, IND, (medium hub, and 6 th largest US cargo airport) and five non-primary airports (general aviation).
16 Impact to IAA at Indianapolis International FAA Reauthorization Total entitlement dollars reduced approximately $640,000 from $6.1M (FY 2010) to $5.46M (FY 2011, if entitlements reach 100%). IAA is on a cash only (pay as you go) program so reduction in funding results in reduction in projects. Three projects to be funded with entitlement dollars to be deferred due to lack of grant funds. This deferral will likely have domino effect of pushing back other projects in future years. Deferred projects include pavement management plan and design of parallel taxiway rehabilitation. This has the potential to impact management of airfield infrastructure.
17 Impact to IAA at Indianapolis International (con t) Requested increase in discretionary dollars for a project on the candidate list, declined as no increases are being funded (requested increase $440,000). FAA to plan for reduced levels in future years, anticipated to result in additional delayed implementation of infrastructure projects in future years.
18 Impact to IAA at Non-Primary Airports Programmed discretionary grants for fencing projects at two airports, not expected due being too low on candidate list with reduced funding. - At Hendricks County Airport/Gordon Graham Field lost $350,000 or 45% of project grant funding. - At Metropolitan Airport lost $360,000 or 55% of project grant funding. Results in projects being divided into reduced size phases and extending construction over additional years, which may delay other future projects. Fencing project to increase security and wildlife control will take longer to implement and experience benefit of fence.
19 Impact to IAA at Non-Primary Airports (con t) A pavement rehabilitation project at Eagle Creek Airpark programmed with discretionary grants will have discretionary grant funds replaced with a state apportionment grant ($140,000). Good news for IAA, but it means another Indiana airport will have reduced funding. Other IAA non-primary airports had projects planned with all entitlement dollars, but have been waiting for sufficient funds to be appropriated to request a grant.
20 Continuing Challenges U.S. Senate approved 21 st extension, U.S. House action still needed. FAA to reprogram future years also at reduced levels, increasing funding challenges to maintain infrastructure. Inefficiencies and increased costs introduced with additional phasing of projects. Grant funds becoming available late in the year, reduces length of available construction season. Scheduling for AIP grant money is already difficult and with the FAA operating in its current state, only adds to uncertainty in the funding process.
National Association of State Aviation Officials. John Shea Government Relations Manager (703)
National Association of State Aviation Officials John Shea Government Relations Manager (703) 610-0272 jshea@nasao.org Fiscal 2018 Omnibus: DOT Highlights Department of Transportation (DOT) The bill provides
More informationAirport Funding FAA Airport Improvement Program (AIP)
Airport Funding FAA Airport Improvement Program (AIP) Presented to: Texas Aviation Conference By: Mike Nicely, Manager Texas ADO Date: May 15, 2013 Discussion Topics Enabling Legislation Authorization
More informationSession 6 Airport Finance 101 Funding Sources for Airports
Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin
More informationWashington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding
Session Ten: Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau in Omnibus
More informationNext Generation Air Transportation System Financing Reform Act of 2007
Next Generation Air Transportation System Financing Reform Act of 2007 Funding Proposal An ACC Summary of Key Provisions in the USDOT s FAA Reauthorization Proposal Overall, the change in the aviation
More informationAirportInfo. Airport Improvement Program
AirportInfo Airport Improvement Program April 2014 Airport Improvement Program (AIP) AIP provides grants to airport sponsors for the planning and development of public-use airports. To be eligible for
More informationOffice of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN
Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:
More informationFinancial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority
Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority September 12, 2017 Contents 1. Funding Sources for Airport Projects 2. Financial Metrics 3. CIP Summary and Funding
More information6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)
6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement
More informationManager of Strategy and Policy. SUBJECT: LEGISLATIVE UPDATE DATE: April 28, Federal. Raising the Passenger Facility Charge Cap
TO: AIRPORT COMMISSION FROM: Matthew Kazmierczak Manager of Strategy and Policy SUBJECT: LEGISLATIVE UPDATE DATE: Federal Raising the Passenger Facility Charge Cap With recent proposals for a $1 billion
More informationAirport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017
Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP
More informationChapter Seven COST ESTIMATES AND FUNDING A. GENERAL
Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction
More informationAIRPORT WITH NO RUNWAYS IS A MALL
RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case
More informationECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions
ECONOMIC MASTER PLAN Florida s airport industry indicates the following programs are needed to maximize its impact on the State s economy: AIRPORT SECURITY Develop Model Security Plan for General Aviation
More information2017 Appropriation Budget Table of Contents Board Approved August 19, 2016
INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary
More informationIssue Brief for Congress Received through the CRS Web
Order Code IB10026 Issue Brief for Congress Received through the CRS Web Airport Improvement Program Updated July 1, 2002 Robert S. Kirk Resources, Science, and Industry Division Congressional Research
More informationYakima Air Terminal/McAllister Field Airport Master Plan Update
Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used
More informationP U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS
P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation
More informationFederal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress
Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress Bart Elias, Coordinator Specialist in Aviation Policy April 29, 2011 Congressional Research
More informationTHE FAA MODERNIZATION AND REFORM ACT OF 2012
THE FAA MODERNIZATION AND REFORM ACT OF 2012 A. Introduction... 1 A.1 Structure of the 2012 Reform Act... 1 B. AIP Funding... 2 B.1 Level and Duration of Funding Authority... 2 B.2 Apportionment Formulas
More informationAviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011
Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence
More informationPFC Application #2 Niagara Falls International Airport
Public Notice Application #2 Falls International April 12, 2018 Agenda Program at the Falls International Notice to air carriers and consultation meeting Class of air carriers not required to collect Air
More informationANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HOUSE AND SENATE FAA REAUTHORIZATION BILLS
409 West Huron Street Suite 400 Chicago, IL 60654 Tel. (312) 988-3360 Fax. (312) 988-3370 Email: barrymolar@unison-ucg.com Website: www.unison-ucg.com ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR
More informationCOMMERCIAL AVIATION. Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects Less Certain
United States Government Accountability Office Report to Congressional Requesters December 2014 COMMERCIAL AVIATION Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects
More informationNOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018
NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED
More informationSENATE PASSES FAA REAUTHORIZATION BILL
SENATE PASSES FAA REAUTHORIZATION BILL February 17, 2011 What s at Issue The U.S. Senate has passed S.223, the FAA Air Transportation Modernization and Safety Improvement Act. Why It s Important The legislation
More informationPUBLIC NOTICE. Table 1 Projects Proposed by Amendment
PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the
More informationFinance and Implementation
5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter
More information14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice
14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class
More informationChapter 9: Financial Plan Draft
Chapter 9: Draft TABLE OF CONTENTS 9... 5 9.2.1 ABIA Accounting... 6 9.2.2 Legal Environment... 6 9.2.3 Governing Documents... 8 9.3.1 FAA AIP Grants... 13 9.3.2 Local ABIA Funds... 14 9.4.1 Defer or Delay
More informationFinancing Airport Improvements
(name redacted) Analyst in Transportation and Industry (name redacted) Specialist in Transportation Policy March 24, 2016 Congressional Research Service 7-... www.crs.gov R43327 Summary There are five
More informationDALLAS LOVE FIELD MAY 2015 DRAFT
8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,
More informationRESOLUTION NO
RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY
More informationPFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018
PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application
More informationFAA Update. Airports Program. Western-Pacific Region. Federal Aviation Administration
Airports Program Western-Pacific Region Presented to: ACA By: Robin Hunt & David Cushing Date: September 14, 2012 FY11 Program Highlights AIP Performance Metric FAA Modernization and Reform Act of 2012
More informationAirport Improvement Program: Issues for Congress
Order Code RL33891 Airport Improvement Program: Issues for Congress February 26, 2007 Robert S. Kirk Specialist in Transportation Resources, Science, and Industry Division Airport Improvement Program:
More information2018 Appropriation Budget Table of Contents Board Approved August 18, 2017
INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary
More informationChapter 8.0 Implementation Plan
Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.
More informationPENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN
PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN OCTOBER 2018 T A B L E O F C O N T E N T S Table of Contents Chapter 8 Financial Plan 8.1 Introduction... 8-1 8.2 Enplanement
More informationSECTION 7. THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation)
SECTION 7 THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation) The Dayton International Airport spans over 4,500 acres in both Montgomery and Miami Counties. The airport encompasses
More informationFunding Airport Infrastructure: Federal Options for Solvency
Funding Airport Infrastructure: Federal Options for Solvency Grant D. Bennett For the Washington Internship for Students of Engineering Sponsored by the American Society of Civil Engineers August 5 th,
More informationAPPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS
APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS Pocatello Regional Airport Airport Master Plan APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS The Airport and Airway Improvement Act of 1982
More informationAirport Improvement Program (AIP): Reauthorization Issues for Congress
Airport Improvement Program (AIP): Reauthorization Issues for Congress Robert S. Kirk Specialist in Transportation Policy May 29, 2009 Congressional Research Service CRS Report for Congress Prepared for
More informationAirportInfo. Passenger Facility Charge
AirportInfo Passenger Facility Charge May 2014 PFC A Cornerstone of Airport Capital Programs PFC user fees were first authorized by Congress in 1990 and are tied directly to local airport projects that:
More information,~-- JOHN WAYNE AIRPORT, ORANGE COUNTY. Airline Competition Plan UPDATE. Barry A. Rondinella, A.A.E/C.A.E. Airport Director
JOHN WAYNE AIRPORT, ORANGE COUNTY Airline Competition Plan UPDATE JOrNVAYN. AIRPOITT O R A N GE COU N TY,~-- Barry A. Rondinella, A.A.E/C.A.E. Airport Director 3160 Airway Avenue Costa Mesa, CA 92626 January
More informationAIRPORT CAPITAL DEVELOPMENT NEEDS
AIRPORT CAPITAL DEVELOPMENT NEEDS 2013-2017 January 2013 TABLE OF CONTENTS BACKGROUND... 1 RESULTS IN BRIEF... 2 ACI-NA ESTIMATE OF CAPITAL DEVELOPMENT NEEDS... 4 PROJECT DEVELOPMENT COSTS BY LOCATION
More informationAlaska Aviation System Plan (AASP) Overview. June 2010
Alaska Aviation System Plan (AASP) Overview June 2010 What is an Aviation System Plan? Sets 20 year vision for aviation Identifies airport improvements and standards Guides funding priorities Documents
More informationWikiLeaks Document Release
WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RL33920 Federal Aviation Administration Reauthorization: An Overview of Selected Provisions in Proposed Legislation Bart
More informationPresented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee
...while at FAA By: Kelvin L. Solco, P.E., MBA, President, The Solco Group Presented to the: NCTCOG Air Transportation Advisory Committee Presented to the: NCTCOG Air Transportation Advisory Committee
More informationSection (a)(1). Description of Projects Impose and Use
November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear
More informationAmerican Society of Civil Engineers
American Society of Civil Engineers Despite surging oil prices, volatile credit markets, and a lagging economy, the Federal Aviation Administration predicts 3% annual growth in air travel. Travelers are
More informationChapter VI Implementation Planning
Chapter VI Implementation Planning This chapter presents a general financial plan for the capital improvements recommended in the Master Plan. The purpose of the financial plan is to demonstrate that the
More informationNotice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application
July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department
More informationChapter 1 Introduction
Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan
More informationANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009
ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009 By Barry Molar, Director, Unison Consulting June 30, 2009 409 W. Huron Street Suite 400 Chicago,
More informationStimulating Airports is Stimulating the Economy
Stimulating Airports is Stimulating the Economy House of Commons Standing Committee on Finance Pre-budget 2010 Submission August 14 th, 2009 Executive Summary Atlantic Canada Airports Association s (ACAA)is
More informationGreater Orlando Aviation Authority
Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority
More informationMOST aircraft need a runway for landing and takeout.
38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1 Airport Improvement Program AIP Eligibility The federal AIP grants
More informationTHE CASE OF A SUCCESSFUL PFC APPLICATION
THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene
More informationAnalysis Item 71: Department of Aviation Aurora State Airport Runway Extension
Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analyst: Gregory Jolivette Request: Approve, retroactively, the submission of a federal grant application to the Federal Aviation
More informationCollier County Airport Authority. Joint Automated Capital Improvement Program
Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer
More informationPILOTS FOR MONTANA AIRPORTS
PILOTS FOR MONTANA AIRPORTS Montana s Community Airports and MDT Aeronautics are in critical need of help and the solution is quite SIMPLE! 1. The Aviation Fuel tax has remained static at $0.04/gal since
More informationAirport Incentive Programs: Legal and Regulatory Considerations in Structuring Programs and Recent Survey Observations
Airport Incentive Programs: Legal and Regulatory Considerations in Structuring Programs and Recent Survey Observations 2010 ACI-NA AIRPORT ECONOMICS & FINANCE CONFERENCE Monica R. Hargrove ACI-NA General
More informationCHAPTER 7 IMPLEMENTATION PLAN
CHAPTER 7 IMPLEMENTATION PLAN INTRODUCTION An implementation plan for Blue Grass Airport (LEX) has been prepared based upon the facility needs identified in the Facility Requirements and the Alternatives
More informationNotice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport
Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County
More informationJacksonville Aviation Authority Annual Report The Power Within.
Jacksonville Aviation Authority Annual Report 2007 The Power Within. Board of Directors & Executive Team Cyrus Jollivette Chairman 1 John D. Clark Executive Director / CEO Jim McCollum Vice-Chairman 2
More informationBURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17
MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE COMMISSION. MEMBERS PRESENT: BTV STAFF PRESENT: OTHERS PRESENT:
More informationLake Tahoe Airport Master Plan
Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development
More informationFORECASTING FUTURE ACTIVITY
EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver
More informationFinancial Feasibility Analysis
CHAPTER F Financial Feasibility Analysis 1. Introduction This chapter presents a funding plan for completion of recommended capital projects at Friedman Memorial Airport (the Airport) through FY 2034,
More informationMassDOT Aeronautics Division Capital Improvements Presentation
MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)
More informationAVIATION. MichiganReportCard.com 5
MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure
More informationASIP2 AIR SERVICE INCENTIVE PROGRAM
Albany International Airport ASIP2 AIR SERVICE INCENTIVE PROGRAM December 2011 Albany International Airport Air Service Incentive Program Introduction: The Albany County Airport Authority (ACAA), operator
More informationNEW PFC APPLICATION #5
NEW PFC APPLICATION #5 New PFC Application #5 Public Notice Norfolk International Airport Norfolk, VA Table of Contents PFC Program at Norfolk International Airport Class of Air Carrier Not Required to
More informationAirport Finance 101 Session 3 - Capital Funding
Airport Finance 101 Session 3 - Capital Funding Capital Development Funding Improvement Projects usually require substantial funding to be implemented In business world capital is associated with funds
More informationKittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016
Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West
More informationSession Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau
Session Six: State Aviation System Plan Overview 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau STUDY GOALS AND OBJECTIVES The purpose of the Georgia Statewide
More informationPRESIDENT S COMMUNITY ADVISORY COUNCIL. February 7, 2017
PRESIDENT S COMMUNITY ADVISORY COUNCIL February 7, 2017 PMGAA Board of Directors John Giles Mayor Mesa Chair Jenn Daniels Mayor Gilbert Vice Chair Jeff Serdy Mayor Apache Junction Secretary Monica Antone
More informationRNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan
RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally
More informationCOMMONWEALTH PORTS AUTHORITY
REPORT ON COMPLIANCE AND INTERNAL CONTROL OVER COMPLIANCE WITH REQUIREMENTS APPLICABLE TO THE PASSENGER FACILITY CHARGE PROGRAM YEAR ENDED SEPTEMBER 30, 2015 Deloitte & Touche LLC P.O. Box 500308 Saipan,
More informationFAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports
FAA Update Dakota-Minnesota (DMA) Airports District Office Presented to: By: Date: Minnesota Council of Airports Chris Hugunin April 15, 2015 FY 2014 DMA ADO Total AIP Funding $107.2 Million / 136 Grants
More informationDEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER
PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,
More informationAirport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal
Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred
More informationDevelopment Program and Implementation Plan
CHAPTER 8 Development Program and Implementation Plan 8.1 INTRODUCTION The FAA identifies airports that are significant to national air transportation through the development of the National Plan of Integrated
More informationNantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012
Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach
More informationPunta Gorda Airport Master Plan Update
Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,
More informationPORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM
PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs
More informationUNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.
Order 2014-12-10 Served: December 15, 2014 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation on the 15 th day of
More informationBOARD OF AIRPORT COMMISSIONERS
1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports
More informationChapter 9 Airport Financial Plan
Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and
More informationFederal Perspectives on Public-Private Partnerships (P3) in the United States
Federal Perspectives on Public-Private Partnerships (P3) in the United States Prepared for: ACI-World Bank Symposium London, United Kingdom Presented by: Elliott Black Director Office of Airport Planning
More informationRECOMMENDED 2013 BUDGET
RECOMMENDED 2013 BUDGET December 12, 2012 Budget Highlights Draft October 17, 2012 Aviation Operation & Maintenance (O&M) Expenses 1.5 percent overall O&M increase (including debt service) 2013 Salary
More informationChapter 2 FINDINGS & CONCLUSIONS
Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued
More information10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM
10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed
More informationUnited States General Accounting Office
GAO United States General Accounting Office Testimony Before the Subcommittee on Aviation, Committee on Transportation and Infrastructure, House of Representatives For Release on Delivery Expected at 10:00
More informationAirports for the Future: ACI-NA Grassroots Campaign. AirportsForTheFuture.org
Airports for the Future: ACI-NA Grassroots Campaign AirportsForTheFuture.org 1 Learning From the Past 111 th Congress (2009-2011) House passed an FAA bill with a $7 PFC. Senate bill had no increase. ACI-NA
More informationJACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007
JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1
More informationBeginning balance available for Priority I Projects: $1,737,029
2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)
More informationMemphis International Airport Enplanements by Fiscal Year (000 s)
Enplanements (000's) Memphis International Airport Enplanements by Fiscal Year (000 s) 6000 5000 4000 3000 International Domestic 2000 1000 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Enplanements
More informationApril 4, McKinney Airport Advisory Committee Airport Master Plan Update.
McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)
More information