FAA Reauthorization Issues & Impacts on Airports

Size: px
Start display at page:

Download "FAA Reauthorization Issues & Impacts on Airports"

Transcription

1 Issues & Impacts on Airports Presentation to Mid America Association of State Transportation Officials July 21, 2011 Presented by Greta J. Hawvermale Sr. Director of Engineering & Environmental Matters

2 FAA Reauthorization What s the fuss? Role of the Airport - Transportation - Economic Engine - Employer

3 The Airport as an Asset Safety Expansion Maintenance

4 History of FAA Reauthorization Federal Aviation Administration s (FAA) authorization expired on Sept. 30, extensions since that date (more than 3 years on continuing resolutions). Current extension provides FAA funding through July 22, 2011(22 day extension). U.S. Senate approved 21 st extension on July 20, 2011.

5 Reauthorization Issues Essential Air Service Program National Mediation Board Rules Passenger Facility Charges (PFC) Reagan National Airport Slots Airport Improvement Funding

6 Congressional Bills In February 2011, the U.S. Senate passed FAA Air Transportation and Modernization and Safety Improvement Act (S. 223), a $34.5 billion, two year FAA reauthorization bill. April 2011, the U.S. House passed FAA Reauthorization and Reform Act of 2011 (H.R. 658), a $59.7 billion, four year FAA reauthorization bill.

7 Congressional Positions House Bill (H.R. 658) Senate Bill (S.223) No PFC Increase. No PFC Increase. PFC pilot program to allow up to 5 airports to use PFCs to fund ground access projects that provide airport access. PFC pilot program to allow up to 6 airports allows airports to have unlimited PFC cap but requires selfcollection. Streamlines PFC consultation process with the airlines and the public notice and comment period for the local community.

8 House Bill (H.R. 658) AIP Authorization: Congressional Positions (con t) Senate Bill (S.223) AIP Authorization: $3.1 billion in FY 2011 $3.0 billion in FY FY 2014 Formula Changes: No Change. Requires 90% match for state block grants and small hubs. $4.0 billion in FY 2010 $4.1 billion in FY 2011 Formula Changes: Sec. 207 requires 95% match for state block grants and small airports. Sec. 208(i) allows airports whose enplanement numbers dropped below 10,000 to continue to be eligible to receive the minimum entitlement.

9 House Bill (H.R. 658) Congressional Positions (con t) Senate Bill (S.223) Provides liability limitations for airports and responsible parties that collect safety management system (SMS) data. No SMS language. Protects data collected for SMS through FY 2014.

10 House Bill (H.R. 658) Congressional Positions (con t) Sunsets the Essential Air Service Program by 2014, except for Alaska and Hawaii. Senate Bill (S.223) Authorizes $150 million for the Essential Air Service Program. Limits eligibility to airports more than 90 miles from a large or medium hub and that average more than 10 enplanements per day.

11 House Bill (H.R. 658) Congressional Positions (con t) Eliminates separate funding authorization for the Small Community Air Service Development Program, funds program through overflight fees. Senate Bill (S.223) Extends Authorization of the Small Community Air Service Development Program of $35 million per year for FY 2010 and 2011.

12 House Bill (H.R. 658) Congressional Positions (con t) 10 new beyond perimeter slots at Reagan National Airport (DCA) to be offset by a reduction of 10 within perimeter slots. Priority for new slots given to new entrant and limited incumbent air carriers. Senate Bill (S.223) 24 new beyond perimeter slots 10 would be designated for airlines with limited or no service at DCA, remaining slots would go to incumbent airlines. Requires DOT study on whether there are adverse effects of additional slots if study finds no negative effects DOT could authorize up to 8 additional slots.

13 House Bill (H.R. 658) Keeps jet fuel taxes the same. Congressional Positions (con t) Senate Bill (S.223) Includes a 14 cent increase on jet fuel. Assesses jet fuel tax on fractional operations.

14 Airport Funding Impacts Currently only 85% of entitlement funds have been appropriated (entitlement funds are based on size and/or activity levels at an airport). Although FAA anticipates it will reach 100% entitlement funds in future short-term resolutions through end of FAA fiscal year (September 30 th ). Emphasis on funding entitlements at expense of discretionary program.

15 IAA Airport System The Indianapolis Airport Authority (IAA) operates: Indianapolis International Airport, IND, (medium hub, and 6 th largest US cargo airport) and five non-primary airports (general aviation).

16 Impact to IAA at Indianapolis International FAA Reauthorization Total entitlement dollars reduced approximately $640,000 from $6.1M (FY 2010) to $5.46M (FY 2011, if entitlements reach 100%). IAA is on a cash only (pay as you go) program so reduction in funding results in reduction in projects. Three projects to be funded with entitlement dollars to be deferred due to lack of grant funds. This deferral will likely have domino effect of pushing back other projects in future years. Deferred projects include pavement management plan and design of parallel taxiway rehabilitation. This has the potential to impact management of airfield infrastructure.

17 Impact to IAA at Indianapolis International (con t) Requested increase in discretionary dollars for a project on the candidate list, declined as no increases are being funded (requested increase $440,000). FAA to plan for reduced levels in future years, anticipated to result in additional delayed implementation of infrastructure projects in future years.

18 Impact to IAA at Non-Primary Airports Programmed discretionary grants for fencing projects at two airports, not expected due being too low on candidate list with reduced funding. - At Hendricks County Airport/Gordon Graham Field lost $350,000 or 45% of project grant funding. - At Metropolitan Airport lost $360,000 or 55% of project grant funding. Results in projects being divided into reduced size phases and extending construction over additional years, which may delay other future projects. Fencing project to increase security and wildlife control will take longer to implement and experience benefit of fence.

19 Impact to IAA at Non-Primary Airports (con t) A pavement rehabilitation project at Eagle Creek Airpark programmed with discretionary grants will have discretionary grant funds replaced with a state apportionment grant ($140,000). Good news for IAA, but it means another Indiana airport will have reduced funding. Other IAA non-primary airports had projects planned with all entitlement dollars, but have been waiting for sufficient funds to be appropriated to request a grant.

20 Continuing Challenges U.S. Senate approved 21 st extension, U.S. House action still needed. FAA to reprogram future years also at reduced levels, increasing funding challenges to maintain infrastructure. Inefficiencies and increased costs introduced with additional phasing of projects. Grant funds becoming available late in the year, reduces length of available construction season. Scheduling for AIP grant money is already difficult and with the FAA operating in its current state, only adds to uncertainty in the funding process.

National Association of State Aviation Officials. John Shea Government Relations Manager (703)

National Association of State Aviation Officials. John Shea Government Relations Manager (703) National Association of State Aviation Officials John Shea Government Relations Manager (703) 610-0272 jshea@nasao.org Fiscal 2018 Omnibus: DOT Highlights Department of Transportation (DOT) The bill provides

More information

Airport Funding FAA Airport Improvement Program (AIP)

Airport Funding FAA Airport Improvement Program (AIP) Airport Funding FAA Airport Improvement Program (AIP) Presented to: Texas Aviation Conference By: Mike Nicely, Manager Texas ADO Date: May 15, 2013 Discussion Topics Enabling Legislation Authorization

More information

Session 6 Airport Finance 101 Funding Sources for Airports

Session 6 Airport Finance 101 Funding Sources for Airports Session 6 Airport Finance 101 Funding Sources for Airports 31 st Annual AAAE Basics of Airport Law Workshop and 2015 Legal Update November 1-3, 2015 Desk Reference Chapters 2, 19, 22 Frank J. San Martin

More information

Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding

Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion in Omnibus Funding Session Ten: Washington Update: FAA Reauthorization, ATC Reform, 1500 Hour Rule, and $1 Billion 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau in Omnibus

More information

Next Generation Air Transportation System Financing Reform Act of 2007

Next Generation Air Transportation System Financing Reform Act of 2007 Next Generation Air Transportation System Financing Reform Act of 2007 Funding Proposal An ACC Summary of Key Provisions in the USDOT s FAA Reauthorization Proposal Overall, the change in the aviation

More information

AirportInfo. Airport Improvement Program

AirportInfo. Airport Improvement Program AirportInfo Airport Improvement Program April 2014 Airport Improvement Program (AIP) AIP provides grants to airport sponsors for the planning and development of public-use airports. To be eligible for

More information

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN

Office of Airports. Overview of the FAA s. Federal Aviation Administration ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Overview of the FAA s Office of Airports Prepared for: Presented by: 2016 ACI-NA/AAAE Airport Board & Commissioners Conference Indianapolis, IN Eduardo Angeles Associate Administrator for Airports Date:

More information

Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority

Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority September 12, 2017 Contents 1. Funding Sources for Airport Projects 2. Financial Metrics 3. CIP Summary and Funding

More information

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP)

6.0 Capital Improvement Program. 6.1 Capital Improvement Plan (CIP) 6.0 The addresses the phased scheduling of projects identified in this Master Plan and their financial implications on the resources of the Airport and the City of Prescott. The phased Capital Improvement

More information

Manager of Strategy and Policy. SUBJECT: LEGISLATIVE UPDATE DATE: April 28, Federal. Raising the Passenger Facility Charge Cap

Manager of Strategy and Policy. SUBJECT: LEGISLATIVE UPDATE DATE: April 28, Federal. Raising the Passenger Facility Charge Cap TO: AIRPORT COMMISSION FROM: Matthew Kazmierczak Manager of Strategy and Policy SUBJECT: LEGISLATIVE UPDATE DATE: Federal Raising the Passenger Facility Charge Cap With recent proposals for a $1 billion

More information

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017

Airport. Improvement Program (AIP) Overview. Federal Aviation Administration. Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Airport Improvement Program (AIP) Overview Texas Aviation Conference Ben Guttery, Texas ADO April 2017 Objectives Status of AIP Legislative Authority History and Summary of AIP AIP funding formulas 2 AIP

More information

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL This chapter delineates the recommended 2005 2024 Sussex County Airport Capital Improvement Program (CIP). It further identifies probable construction

More information

AIRPORT WITH NO RUNWAYS IS A MALL

AIRPORT WITH NO RUNWAYS IS A MALL RUNWAY EXTENSION INITIATIVE AT FT. LAUDERDALE HOLLYWOOD INTERNATIONAL AIRPORT ISMAEL IZZY BONILLA DEPUTY DIRECTOR BROWARD COUNTY AVIATION AUTHORITY AIRPORT WITH NO RUNWAYS IS A MALL Runway Business Case

More information

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions

ECONOMIC DEVELOPMENT INCENTIVES AND PROGRAMS. Provide Airport Encroachment Protection. Standardize Ad Valorem Tax Exemptions ECONOMIC MASTER PLAN Florida s airport industry indicates the following programs are needed to maximize its impact on the State s economy: AIRPORT SECURITY Develop Model Security Plan for General Aviation

More information

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 INDIANAPOLIS AIRPORT AUTHORITY 2017 APPROPRIATION BUDGET ORDINANCE NO. 2-2016 BOARD APPROVED AUGUST 19, 2016 2017 Appropriation Budget Table of Contents Board Approved August 19, 2016 1 Appropriation Summary

More information

Issue Brief for Congress Received through the CRS Web

Issue Brief for Congress Received through the CRS Web Order Code IB10026 Issue Brief for Congress Received through the CRS Web Airport Improvement Program Updated July 1, 2002 Robert S. Kirk Resources, Science, and Industry Division Congressional Research

More information

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Yakima Air Terminal/McAllister Field Airport Master Plan Update Yakima Air Terminal/McAllister Field Airport Master Plan Update City of Yakima Work Session July 9, 2013 Meeting Goals Summarize the master plan recommendations. Discuss the decision-making process used

More information

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS

P U B L I C N O T I C E. MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application C-00-MBS P U B L I C N O T I C E MBS International Airport Freeland, Michigan Passenger Facility Charge (PFC) Application 10-07-C-00-MBS INTRODUCTION: This Public Notice is issued as part of a Federal Aviation

More information

Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress

Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress Federal Aviation Administration (FAA) Reauthorization: An Overview of Legislative Action in the 112 th Congress Bart Elias, Coordinator Specialist in Aviation Policy April 29, 2011 Congressional Research

More information

THE FAA MODERNIZATION AND REFORM ACT OF 2012

THE FAA MODERNIZATION AND REFORM ACT OF 2012 THE FAA MODERNIZATION AND REFORM ACT OF 2012 A. Introduction... 1 A.1 Structure of the 2012 Reform Act... 1 B. AIP Funding... 2 B.1 Level and Duration of Funding Authority... 2 B.2 Apportionment Formulas

More information

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011

Aviation Planning in Maine and Our Region. Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Aviation Planning in Maine and Our Region Stacie Haskell Aviation Coordinator & Study Manager Maine Department of Transportation April 27, 2011 Overview The National Aviation System Maine s Economic Dependence

More information

PFC Application #2 Niagara Falls International Airport

PFC Application #2 Niagara Falls International Airport Public Notice Application #2 Falls International April 12, 2018 Agenda Program at the Falls International Notice to air carriers and consultation meeting Class of air carriers not required to collect Air

More information

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HOUSE AND SENATE FAA REAUTHORIZATION BILLS

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HOUSE AND SENATE FAA REAUTHORIZATION BILLS 409 West Huron Street Suite 400 Chicago, IL 60654 Tel. (312) 988-3360 Fax. (312) 988-3370 Email: barrymolar@unison-ucg.com Website: www.unison-ucg.com ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR

More information

COMMERCIAL AVIATION. Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects Less Certain

COMMERCIAL AVIATION. Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects Less Certain United States Government Accountability Office Report to Congressional Requesters December 2014 COMMERCIAL AVIATION Raising Passenger Facility Charges Would Increase Airport Funding, but Other Effects

More information

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018 LAWTON-FORT SILL REGIONAL AIRPORT LAWTON, OKLAHOMA PASSENGER FACILITY CHARGE PROPOSED

More information

SENATE PASSES FAA REAUTHORIZATION BILL

SENATE PASSES FAA REAUTHORIZATION BILL SENATE PASSES FAA REAUTHORIZATION BILL February 17, 2011 What s at Issue The U.S. Senate has passed S.223, the FAA Air Transportation Modernization and Safety Improvement Act. Why It s Important The legislation

More information

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment PUBLIC NOTICE The Dallas Department of Aviation (the Department) intends to file an amendment application to increase the PFC amount of one previously approved project at Dallas Love Field Airport (the

More information

Finance and Implementation

Finance and Implementation 5 Finance and Implementation IMPLEMENTATION The previous chapters have presented discussions and plans for development of the airfield, terminal, and building areas at Sonoma County Airport. This chapter

More information

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice 14 C.F.R. Part 158 Passenger Facility Charge Program Logan International Airport Public Notice Summary of Proposed 2018 PFC Application PFC Project Descriptions and Justifications PFC Financial Plan Class

More information

Chapter 9: Financial Plan Draft

Chapter 9: Financial Plan Draft Chapter 9: Draft TABLE OF CONTENTS 9... 5 9.2.1 ABIA Accounting... 6 9.2.2 Legal Environment... 6 9.2.3 Governing Documents... 8 9.3.1 FAA AIP Grants... 13 9.3.2 Local ABIA Funds... 14 9.4.1 Defer or Delay

More information

Financing Airport Improvements

Financing Airport Improvements (name redacted) Analyst in Transportation and Industry (name redacted) Specialist in Transportation Policy March 24, 2016 Congressional Research Service 7-... www.crs.gov R43327 Summary There are five

More information

DALLAS LOVE FIELD MAY 2015 DRAFT

DALLAS LOVE FIELD MAY 2015 DRAFT 8. Funding Plan This section presents a potential funding plan for implementing the CIP projects recommended in the Master Plan Update, along with an assessment of the ability of the Airport sponsor (i.e.,

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2015-15 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MARINA AUTHORIZING SUBMISSION OF A GRANT APPLICATION TO THE FEDERAL AVIATION ADMINISTRATION (FAA) FOR PARTICIPATION IN THE 2015 MILITARY

More information

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018

PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 PFC NOTICE AND OPPORTUNITY FOR PUBLIC COMMENT ST. THOMAS CYRIL E. KING AIRPORT SEPTEMBER 26, 2018 Table of Contents Section Page I. Overview 2 II. Notice and Opportunity for Public Comment 3 III. Application

More information

FAA Update. Airports Program. Western-Pacific Region. Federal Aviation Administration

FAA Update. Airports Program. Western-Pacific Region. Federal Aviation Administration Airports Program Western-Pacific Region Presented to: ACA By: Robin Hunt & David Cushing Date: September 14, 2012 FY11 Program Highlights AIP Performance Metric FAA Modernization and Reform Act of 2012

More information

Airport Improvement Program: Issues for Congress

Airport Improvement Program: Issues for Congress Order Code RL33891 Airport Improvement Program: Issues for Congress February 26, 2007 Robert S. Kirk Specialist in Transportation Resources, Science, and Industry Division Airport Improvement Program:

More information

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017

2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 INDIANAPOLIS AIRPORT AUTHORITY 2018 APPROPRIATION BUDGET ORDINANCE NO. 1-2017 BOARD APPROVED AUGUST 18, 2017 2018 Appropriation Budget Table of Contents Board Approved August 18, 2017 1 Appropriation Summary

More information

Chapter 8.0 Implementation Plan

Chapter 8.0 Implementation Plan Chapter 8.0 Implementation Plan 8.1 Introduction This chapter is the culmination of the analytical work accomplished in the previous chapters. The result is a prioritized list of the essential projects.

More information

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN

PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN PENSACOLA INTERNATIONAL AIRPORT MASTER PLAN UPDATE WORKING PAPER 8 FINANCIAL PLAN OCTOBER 2018 T A B L E O F C O N T E N T S Table of Contents Chapter 8 Financial Plan 8.1 Introduction... 8-1 8.2 Enplanement

More information

SECTION 7. THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation)

SECTION 7. THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation) SECTION 7 THE AIRPORT IMPROVEMENT PROGRAM (Source: City of Dayton Department of Aviation) The Dayton International Airport spans over 4,500 acres in both Montgomery and Miami Counties. The airport encompasses

More information

Funding Airport Infrastructure: Federal Options for Solvency

Funding Airport Infrastructure: Federal Options for Solvency Funding Airport Infrastructure: Federal Options for Solvency Grant D. Bennett For the Washington Internship for Students of Engineering Sponsored by the American Society of Civil Engineers August 5 th,

More information

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS Pocatello Regional Airport Airport Master Plan APPENDIX B NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS The Airport and Airway Improvement Act of 1982

More information

Airport Improvement Program (AIP): Reauthorization Issues for Congress

Airport Improvement Program (AIP): Reauthorization Issues for Congress Airport Improvement Program (AIP): Reauthorization Issues for Congress Robert S. Kirk Specialist in Transportation Policy May 29, 2009 Congressional Research Service CRS Report for Congress Prepared for

More information

AirportInfo. Passenger Facility Charge

AirportInfo. Passenger Facility Charge AirportInfo Passenger Facility Charge May 2014 PFC A Cornerstone of Airport Capital Programs PFC user fees were first authorized by Congress in 1990 and are tied directly to local airport projects that:

More information

,~-- JOHN WAYNE AIRPORT, ORANGE COUNTY. Airline Competition Plan UPDATE. Barry A. Rondinella, A.A.E/C.A.E. Airport Director

,~-- JOHN WAYNE AIRPORT, ORANGE COUNTY. Airline Competition Plan UPDATE. Barry A. Rondinella, A.A.E/C.A.E. Airport Director JOHN WAYNE AIRPORT, ORANGE COUNTY Airline Competition Plan UPDATE JOrNVAYN. AIRPOITT O R A N GE COU N TY,~-- Barry A. Rondinella, A.A.E/C.A.E. Airport Director 3160 Airway Avenue Costa Mesa, CA 92626 January

More information

AIRPORT CAPITAL DEVELOPMENT NEEDS

AIRPORT CAPITAL DEVELOPMENT NEEDS AIRPORT CAPITAL DEVELOPMENT NEEDS 2013-2017 January 2013 TABLE OF CONTENTS BACKGROUND... 1 RESULTS IN BRIEF... 2 ACI-NA ESTIMATE OF CAPITAL DEVELOPMENT NEEDS... 4 PROJECT DEVELOPMENT COSTS BY LOCATION

More information

Alaska Aviation System Plan (AASP) Overview. June 2010

Alaska Aviation System Plan (AASP) Overview. June 2010 Alaska Aviation System Plan (AASP) Overview June 2010 What is an Aviation System Plan? Sets 20 year vision for aviation Identifies airport improvements and standards Guides funding priorities Documents

More information

WikiLeaks Document Release

WikiLeaks Document Release WikiLeaks Document Release February 2, 2009 Congressional Research Service Report RL33920 Federal Aviation Administration Reauthorization: An Overview of Selected Provisions in Proposed Legislation Bart

More information

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee

Presented to the: NCTCOG Air Transportation Advisory Committee. Presented to the: NCTCOG Air Transportation Advisory Committee ...while at FAA By: Kelvin L. Solco, P.E., MBA, President, The Solco Group Presented to the: NCTCOG Air Transportation Advisory Committee Presented to the: NCTCOG Air Transportation Advisory Committee

More information

Section (a)(1). Description of Projects Impose and Use

Section (a)(1). Description of Projects Impose and Use November 21, 2017 Mrs. Kelly Lane SkyWest Airlines 444 South River Road St. George, UT 84790 RE: Notice of Intent to Impose and Use a New Passenger Facility Charge Bert Mooney Airport Butte, Montana Dear

More information

American Society of Civil Engineers

American Society of Civil Engineers American Society of Civil Engineers Despite surging oil prices, volatile credit markets, and a lagging economy, the Federal Aviation Administration predicts 3% annual growth in air travel. Travelers are

More information

Chapter VI Implementation Planning

Chapter VI Implementation Planning Chapter VI Implementation Planning This chapter presents a general financial plan for the capital improvements recommended in the Master Plan. The purpose of the financial plan is to demonstrate that the

More information

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application

Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application July 3, 2018 Notice and Opportunity to Comment on New Proposed Passenger Facility Charge (PFC) New Application The City of Kansas City (City), Missouri through its Aviation Department ( the Department

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction Introduction and Purpose The Airport Master Planning process evaluates an airport s physical facilities, establishes a forecast for future demand, and identifies a development plan

More information

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009

ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009 ANALYSIS OF PROVISIONS AFFECTING AIRPORTS AND THEIR COMMUNITIES IN HR 915, FAA REAUTHORIZATION ACT OF 2009 By Barry Molar, Director, Unison Consulting June 30, 2009 409 W. Huron Street Suite 400 Chicago,

More information

Stimulating Airports is Stimulating the Economy

Stimulating Airports is Stimulating the Economy Stimulating Airports is Stimulating the Economy House of Commons Standing Committee on Finance Pre-budget 2010 Submission August 14 th, 2009 Executive Summary Atlantic Canada Airports Association s (ACAA)is

More information

Greater Orlando Aviation Authority

Greater Orlando Aviation Authority Greater Orlando Aviation Authority Orlando International Airport & Orlando Executive Airport Budgets Fiscal Year 2017-2018 Greater Orlando Aviation Authority Orlando, Florida Greater Orlando Aviation Authority

More information

MOST aircraft need a runway for landing and takeout.

MOST aircraft need a runway for landing and takeout. 38th Annual Concrete Paving Workshop Upcoming Airport Projects January 17, 2017 MOST aircraft need a runway for landing and takeout. 1 Airport Improvement Program AIP Eligibility The federal AIP grants

More information

THE CASE OF A SUCCESSFUL PFC APPLICATION

THE CASE OF A SUCCESSFUL PFC APPLICATION THE CASE OF A SUCCESSFUL PFC APPLICATION 1 Chapter One: Scene of the case study 2 Chapter One: The Scene Spokane, WA Home of the RED TURF at Eastern WA University (and Gonzaga) 3 Chapter One: The Scene

More information

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension

Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analysis Item 71: Department of Aviation Aurora State Airport Runway Extension Analyst: Gregory Jolivette Request: Approve, retroactively, the submission of a federal grant application to the Federal Aviation

More information

Collier County Airport Authority. Joint Automated Capital Improvement Program

Collier County Airport Authority. Joint Automated Capital Improvement Program Collier County Airport Authority Joint Automated Capital Improvement Program Joint Automated Capital Improvement Program (JACIP) What is the JACIP? Financial planning process supported by Web-based computer

More information

PILOTS FOR MONTANA AIRPORTS

PILOTS FOR MONTANA AIRPORTS PILOTS FOR MONTANA AIRPORTS Montana s Community Airports and MDT Aeronautics are in critical need of help and the solution is quite SIMPLE! 1. The Aviation Fuel tax has remained static at $0.04/gal since

More information

Airport Incentive Programs: Legal and Regulatory Considerations in Structuring Programs and Recent Survey Observations

Airport Incentive Programs: Legal and Regulatory Considerations in Structuring Programs and Recent Survey Observations Airport Incentive Programs: Legal and Regulatory Considerations in Structuring Programs and Recent Survey Observations 2010 ACI-NA AIRPORT ECONOMICS & FINANCE CONFERENCE Monica R. Hargrove ACI-NA General

More information

CHAPTER 7 IMPLEMENTATION PLAN

CHAPTER 7 IMPLEMENTATION PLAN CHAPTER 7 IMPLEMENTATION PLAN INTRODUCTION An implementation plan for Blue Grass Airport (LEX) has been prepared based upon the facility needs identified in the Facility Requirements and the Alternatives

More information

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport

Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Notice of Intent to File an Application to Impose and Use a Passenger Facility Charge at Fort Lauderdale-Hollywood International Airport Pursuant to 14 CFR Part 158.24(a) (1) (III), the Broward County

More information

Jacksonville Aviation Authority Annual Report The Power Within.

Jacksonville Aviation Authority Annual Report The Power Within. Jacksonville Aviation Authority Annual Report 2007 The Power Within. Board of Directors & Executive Team Cyrus Jollivette Chairman 1 John D. Clark Executive Director / CEO Jim McCollum Vice-Chairman 2

More information

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17

BURLINGTON INTERNATIONAL AIRPORT BOARD OF AIRPORT COMMISSIONERS MINUTES OF MEETING May 22, 2017 APPROVED 6/28/17 MINUTES SUBJECT TO CORRECTION BY THE BOARD OF AIRPORT COMMISSIONERS. CHANGES, IF ANY, WILL BE RECORDED IN THE MINUTES OF THE NEXT MEETING OF THE COMMISSION. MEMBERS PRESENT: BTV STAFF PRESENT: OTHERS PRESENT:

More information

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Lake Tahoe Airport Master Plan City Council Briefing October 20, 2015 What is an Airport Master Plan? a comprehensive study of an airport [that] usually describes the short, medium, and long term development

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Financial Feasibility Analysis

Financial Feasibility Analysis CHAPTER F Financial Feasibility Analysis 1. Introduction This chapter presents a funding plan for completion of recommended capital projects at Friedman Memorial Airport (the Airport) through FY 2034,

More information

MassDOT Aeronautics Division Capital Improvements Presentation

MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Aeronautics Division Capital Improvements Presentation MassDOT Board Retreat October 27, 2011 Presentation Agenda Capital Improvement Plan (CIP) Overview Airports Capital Improvement Plan (ACIP)

More information

AVIATION. MichiganReportCard.com 5

AVIATION. MichiganReportCard.com 5 MichiganReportCard.com 5 GRADE C AVIATION OVERVIEW Michigan s 200+ airports bring $4.3 billion into the economy each year. The state s Tier 1 and Tier 2 airports were evaluated based on six key infrastructure

More information

ASIP2 AIR SERVICE INCENTIVE PROGRAM

ASIP2 AIR SERVICE INCENTIVE PROGRAM Albany International Airport ASIP2 AIR SERVICE INCENTIVE PROGRAM December 2011 Albany International Airport Air Service Incentive Program Introduction: The Albany County Airport Authority (ACAA), operator

More information

NEW PFC APPLICATION #5

NEW PFC APPLICATION #5 NEW PFC APPLICATION #5 New PFC Application #5 Public Notice Norfolk International Airport Norfolk, VA Table of Contents PFC Program at Norfolk International Airport Class of Air Carrier Not Required to

More information

Airport Finance 101 Session 3 - Capital Funding

Airport Finance 101 Session 3 - Capital Funding Airport Finance 101 Session 3 - Capital Funding Capital Development Funding Improvement Projects usually require substantial funding to be implemented In business world capital is associated with funds

More information

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016 Project Team Kittitas County, WA Airport Owner (Sponsor) and Operator, Land Use Century West

More information

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau

Session Six: State Aviation System Plan Overview GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau Session Six: State Aviation System Plan Overview 2018 GAA Annual Conference & Expo Jekyll Island, Ga Back to the Beach: For a Low Country Luau STUDY GOALS AND OBJECTIVES The purpose of the Georgia Statewide

More information

PRESIDENT S COMMUNITY ADVISORY COUNCIL. February 7, 2017

PRESIDENT S COMMUNITY ADVISORY COUNCIL. February 7, 2017 PRESIDENT S COMMUNITY ADVISORY COUNCIL February 7, 2017 PMGAA Board of Directors John Giles Mayor Mesa Chair Jenn Daniels Mayor Gilbert Vice Chair Jeff Serdy Mayor Apache Junction Secretary Monica Antone

More information

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan Project Schedule Today Slide 40 Project Vision To provide an achievable, flexible, fiscally, and environmentally

More information

COMMONWEALTH PORTS AUTHORITY

COMMONWEALTH PORTS AUTHORITY REPORT ON COMPLIANCE AND INTERNAL CONTROL OVER COMPLIANCE WITH REQUIREMENTS APPLICABLE TO THE PASSENGER FACILITY CHARGE PROGRAM YEAR ENDED SEPTEMBER 30, 2015 Deloitte & Touche LLC P.O. Box 500308 Saipan,

More information

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports

FAA Update. Dakota-Minnesota (DMA) Airports District Office. Federal Aviation Administration. Presented to: By: Date: Minnesota Council of Airports FAA Update Dakota-Minnesota (DMA) Airports District Office Presented to: By: Date: Minnesota Council of Airports Chris Hugunin April 15, 2015 FY 2014 DMA ADO Total AIP Funding $107.2 Million / 136 Grants

More information

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER PETE FLAHERTY COMMISSIONER TOM FOERSTER CHAIRMAN DEPARTMENT OF AVIATION BARBARA HAFER COMMISSIONER STEPHEN A. GEORGE DIRECTOR ROOM M 134, TERMINAL BUILDING GREATER PITTSBURGH INTERNATIONAL AIRPORT PITTSBURGH,

More information

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal Airport Master Plan Rapid City Regional Airport October 2015 FAA Submittal Rapid City Regional Airport Master Plan Update Table of Contents Executive Summary... i Scope & Timeline... i Forecasts... i Preferred

More information

Development Program and Implementation Plan

Development Program and Implementation Plan CHAPTER 8 Development Program and Implementation Plan 8.1 INTRODUCTION The FAA identifies airports that are significant to national air transportation through the development of the National Plan of Integrated

More information

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012 Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach

More information

Punta Gorda Airport Master Plan Update

Punta Gorda Airport Master Plan Update Punta Gorda Airport Master Plan Update Draft Executive Summary Prepared for: The Charlotte County Airport Authority January 2018 Charlotte County Airport Authority James Herston, Chair Robert D. Hancik,

More information

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM PORT OF PORTLAND Chapter Seven CAPITAL IMPROVEMENT PROGRAM CHAPTER SEVEN PORT OF PORTLAND CAPITAL IMPROVEMENT PROGRAM The analyses conducted in the previous chapters evaluated airport development needs

More information

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C.

UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Order 2014-12-10 Served: December 15, 2014 UNITED STATES OF AMERICA DEPARTMENT OF TRANSPORTATION OFFICE OF THE SECRETARY WASHINGTON, D.C. Issued by the Department of Transportation on the 15 th day of

More information

BOARD OF AIRPORT COMMISSIONERS

BOARD OF AIRPORT COMMISSIONERS 1 8/17/2018 8/21/2018 8/16/2018 i ElY MY Y I : JH MT BY...01,, III1*.ji,"1.111Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS Meeting Date: la Approved by: e1. "ampbell, Chief Airports

More information

Chapter 9 Airport Financial Plan

Chapter 9 Airport Financial Plan Chapter 9 Airport Financial Plan Introduction The purpose of this chapter is to present the projects identified in the twenty-year Airport Capital Improvement Program (ACIP) that have been developed and

More information

Federal Perspectives on Public-Private Partnerships (P3) in the United States

Federal Perspectives on Public-Private Partnerships (P3) in the United States Federal Perspectives on Public-Private Partnerships (P3) in the United States Prepared for: ACI-World Bank Symposium London, United Kingdom Presented by: Elliott Black Director Office of Airport Planning

More information

RECOMMENDED 2013 BUDGET

RECOMMENDED 2013 BUDGET RECOMMENDED 2013 BUDGET December 12, 2012 Budget Highlights Draft October 17, 2012 Aviation Operation & Maintenance (O&M) Expenses 1.5 percent overall O&M increase (including debt service) 2013 Salary

More information

Chapter 2 FINDINGS & CONCLUSIONS

Chapter 2 FINDINGS & CONCLUSIONS Chapter 2 FINDINGS & CONCLUSIONS 2.01 GENERAL Dutchess County acquired the airport facility in 1947 by deed from the War Assets Administration. Following the acquisition, several individuals who pursued

More information

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM

10.1 INTRODUCTION NORTH PERRY AIRPORT MASTER PLAN UPDATE SECTION 10: CAPITAL IMPROVEMENT PROGRAM 10.1 INTRODUCTION Based on the findings from the Facility Requirements and the combined plan recommended in the Alternative Analysis, a capital improvement program for North Perry Airport has been developed

More information

United States General Accounting Office

United States General Accounting Office GAO United States General Accounting Office Testimony Before the Subcommittee on Aviation, Committee on Transportation and Infrastructure, House of Representatives For Release on Delivery Expected at 10:00

More information

Airports for the Future: ACI-NA Grassroots Campaign. AirportsForTheFuture.org

Airports for the Future: ACI-NA Grassroots Campaign. AirportsForTheFuture.org Airports for the Future: ACI-NA Grassroots Campaign AirportsForTheFuture.org 1 Learning From the Past 111 th Congress (2009-2011) House passed an FAA bill with a $7 PFC. Senate bill had no increase. ACI-NA

More information

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007 JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 27 11242 1 of 14 Sponsor: City of Naples Airport Authority NPIAS No.: 12-53 Sponsor ID: 122 Airport ID: APF Site No.: 3379.*A 11242 Airport Project ID: 1

More information

Beginning balance available for Priority I Projects: $1,737,029

Beginning balance available for Priority I Projects: $1,737,029 2016 COAR Grant Cycle Priority I Projects Airport Name Project Name Requested Grant Amount Match % of Grant Match Total Project Cost or Total FAA Grant Match Amount required RUNNING TOTAL (Available Balance)

More information

Memphis International Airport Enplanements by Fiscal Year (000 s)

Memphis International Airport Enplanements by Fiscal Year (000 s) Enplanements (000's) Memphis International Airport Enplanements by Fiscal Year (000 s) 6000 5000 4000 3000 International Domestic 2000 1000 0 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Enplanements

More information

April 4, McKinney Airport Advisory Committee Airport Master Plan Update.

April 4, McKinney Airport Advisory Committee Airport Master Plan Update. McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)

More information