Development of EFB. Electronic Flight Bag. a message for Flight Examiners

Size: px
Start display at page:

Download "Development of EFB. Electronic Flight Bag. a message for Flight Examiners"

Transcription

1 Development of EFB Electronic Flight Bag a message for Flight Examiners

2

3 Paper vs Electronic It was simple back in my day

4 In my day

5 Just another change

6

7 Why use an Electronic flight bag Updating is instant (warning) All documents and charts in one place Training appropriate automation skills Saving weight, fuel, paper Controlled Document process Its just easy and simple.

8 Part 91 Operations Do they need an approval or not? 91.7 (c)(6) & (d)(2) PED IFR Yes. / No Documents to be Carried Yes (1)(i) Safety of Aircraft (docs inspected) Yes (2) Aeronautical Charts Yes (3) Installed equipment. Yes

9 Current Rule AC91-20 Part 91 VFR Operations if the EFB is replacing any documents / systems they require CAA authorisation PIC will need to satisfied the equipment does not interfere with any existing systems Part 91 IFR Operations Need to comply with AC91-20 and gain CAA approval.

10 Approval Process AC Operational Approval Form 2. Operator submits an operational approval plan (details) 3. CAA in-depth review. 4. Validation testing. Provide sufficient proof. 5. CAA grants authorisation (or not).

11 Flight Examining Current Rule AC91-20 EF B

12 Case Study - Massey University Electronic Flight Bag Approval ipad2 DA-40 & DA-42 April 2016

13 Current Rule AC91-20 System Classifications EFB Hardware Considerations EFB Design Considerations Risk Mitigation Operational Approval.

14 Case Study Risk Mitigation Safety Action Group (SMS) 1. Interference with onboard systems (EMI) 2. AvPlan product reliability and support 3. Loss of data EFB failure.

15 Case Study Risk Mitigation 1. Interference with onboard systems (EMI) Air NZ conducted EMI testing on the ipad Australian Defence Force testing ipad (Black Hawk & Tiger) for night vision, IFR ops Diamond Aircraft with Garmin 1000 at Massey operate on a considerably different set of frequencies. SAG - EMI occurrence is improbable.

16 Case Study Hardware ipad Mini & ipad with Garmin GLO ipad Air + Cellular 64GB Minimum Covers / Mounting Note: Significant WiFi upgrade required.

17 Case Study Software Phase 1 Phase 2 EFBNZ & Air Nav Pro - VNC s ibooks / Dropbox AvPlan & OzRunways (back-up) Note: G1000 has all current NavData.

18 Case Study - Trials Phased Trial - TOC to TOD - Take-off to TOD - Take-off to TOD 4000 ipad flights. Reliability 98.75% Individual ipads Simple use EFB Application.

19 Case Study - Trials Lessons Securing for critical phase of flight Single user ipad / issue and control ipad Mini good for AIP, not for VNC Screen Glare. FI - student, sunny day, IMC, Night Direct sunlight AIP easier to view and zoom Unlock passcode Turbulence. zooming hardest (mini requires more) Battery use 20-40% on a 2hr flight Multiple Apps simultaneous use Paper Navigation Log.

20 Case Study - Trials Human Factor - Lessons Pilot workload, single pilot and multi crew Size, resolution, and legibility of chart symbols and text Access to desired charts Grouping of information General layout Orientation (track-up, north-up) Depiction of Scale information Guided Access (single use App).

21 Approval - SOP MEL to dispatch aircraft 1 x EFB for each crew member 1 x Aircraft EFB 1 x EFB Charger G1000 NavData Current Battery minimum 90% charged AvPlan current and saved Bluetooth, WiFi and Cellular Off Aircraft power Prohibited.

22 Approval - SOP Hardware Control Register ipad2 AvPlan App only Process for IOS updates Defect Reporting / Failure Procedures 3 Year replacement EFB Syllabus Phases.

23 Flight Examiners Setting the Standards Not plugged into the aircraft power Not installed in the aircraft (is portable) Must have paper copies of Doc s How have they satisfied the requirement of AC91-21 Interference / Software human interface / Redundancy How does the amendment process work.

24 Not replacing any required documents IFR needs approval (91 replacing docs) Ask to see the letter and conditions.

25 Hardware Class 1 Class 2 Class 3 Standard commercial-offthe-shelf (COTS) COTS and purpose-built devices Installed equipment Not attached to the aircraft Mounted to the aircraft Stowed or secured for T/O and LND Uses aircraft power, or data Requires Compliance with CAA AC91-20 Requires Approval and Type Cert All airworthiness requirements

26 Thanks

Introducing Glass Cockpit to Ab- Initio Flight Training

Introducing Glass Cockpit to Ab- Initio Flight Training Introducing Glass Cockpit to Ab- Initio Flight Training Paul Kearney Chief of Standards Massey University Sean Kim Team Leader Multi Engine IFR Instructor The Training Platform 12 Diamond DA-40 and 2 DA-42

More information

Form 91 Application for Approval of an EFB System

Form 91 Application for Approval of an EFB System Form 91 Application for Approval of an EFB System This form must be completed by the Flight Representative (FOR) or Operator as recorded on the current Form 20. Please refer to RP4 Guidance to Operators

More information

Mobile FliteDeck VFR Release Notes

Mobile FliteDeck VFR Release Notes Mobile FliteDeck VFR Release Notes This document supports version 2.3.0 (build 2.3.0.10334) of Mobile FliteDeck VFR for ios. The minimum operating system requirement for this release is ios10. On the date

More information

Mobile FliteDeck VFR Version Release Notes

Mobile FliteDeck VFR Version Release Notes Mobile FliteDeck VFR Version 2.2.1 - Release Notes This document supports version 2.2.1 (build 10281) of Mobile FliteDeck VFR for ios. The minimum operating system requirement for this release is ios10.

More information

Mijloace acceptabile de conformitate. Electronic Flight Bag (EFB)

Mijloace acceptabile de conformitate. Electronic Flight Bag (EFB) AUTORITATEA AERONAUTICĂ CIVILĂ REPUBLICA MOLDOVA Mijloace acceptabile de conformitate Electronic Flight Bag (EFB) Ediţia 01/februarie 2014 Log of Signatures Log of Signatures Taken action Function Name

More information

AIRWORTHINESS ADVISORY. Airworthiness Impacts of Electronic Flight Bags

AIRWORTHINESS ADVISORY. Airworthiness Impacts of Electronic Flight Bags DEPARTMENT OF THE AIR FORCE AA-15-01 Headquarters Air Force Life Cycle Management Center (AFMC) 15 JAN 2015 Engineering Directorate Wright-Patterson AFB OH 45433-7101 AIRWORTHINESS ADVISORY Airworthiness

More information

Garmin Pilot. Plan. File. Fly.

Garmin Pilot. Plan. File. Fly. Garmin Pilot Plan. File. Fly. Garmin Pilot Comprehensive Suite of Aviation Tools VFR Sectionals IFR High and Low En-route charts Dynamic Layer Maps Aviation Weather AOPA Airport Directory Flight Plan Filing

More information

APPLICATION FOR SPECIAL OPERATIONAL APPROVALS

APPLICATION FOR SPECIAL OPERATIONAL APPROVALS A. DETAILS OF AIRCRAFT: 1. Registration Mark: P4-2. A/C Mfr.: 3. Model: 4. Serial No.: B. DETAILS OF APPLICANT: 1. Operator: 2. Name Coordinator/Administrator (1): 3. Tel.: 4. E-mail: 5. Name Coordinator/Administrator

More information

CONNECT UP! Your Flight Path to the Connected Aircraft. In-Flight Internet Onboard Entertainment Flight Operations

CONNECT UP! Your Flight Path to the Connected Aircraft. In-Flight Internet Onboard Entertainment Flight Operations CONNECT UP! Your Flight Path to the Connected Aircraft In-Flight Internet Onboard Entertainment Flight Operations YOUR FLIGHT PATH TO THE CONNECTED AIRCRAFT Leading airlines depend on Viasat to deliver

More information

Part 135 GA Air Operator Certificate Helicopters and Small Aeroplanes General Aviation Maintenance

Part 135 GA Air Operator Certificate Helicopters and Small Aeroplanes General Aviation Maintenance Part 119 / 135 Compliance Matrix Maintenance Requirements General Aviation Air Operator Certificate The Rule references in this compliance matrix have been extracted from the Civil Aviation Rules system

More information

Progressive Technology Facilitates Ground-To-Flight-Deck Connectivity

Progressive Technology Facilitates Ground-To-Flight-Deck Connectivity Progressive Technology Facilitates Ground-To-Flight-Deck Connectivity By Robert Turner Connected Airline and Connected Flight Deck are two of the latest phrases regularly being voiced by the airline industry,

More information

5. DEFINITIONS. The following definitions are specific to this AC and may differ with those definitions contained in other published references.

5. DEFINITIONS. The following definitions are specific to this AC and may differ with those definitions contained in other published references. Subject: GUIDELINES FOR THE CERTIFICATION, AIRWORTHINESS, AND OPERATIONAL APPROVAL OF ELECTRONIC FLIGHT BAG COMPUTING DEVICES Date: 3/17/03 Initiated By: AFS-400 AC No: 120-76A Change: 1. PURPOSE. This

More information

Jeppesen Total Navigation Solution

Jeppesen Total Navigation Solution Jeppesen Total Navigation Solution Executive summary Do more with less. It s a challenge we all face, and it s the reality of military operations. Jeppesen s Total Navigation Solution (TNS) gives you enterprise,

More information

Registry Publication 17

Registry Publication 17 Preparation Requirements for Certificate of Airworthiness (C of A) Renewal Survey The following are the preparation requirements to enable the Operator (normally the person identified on Form 31 as the

More information

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS CIVIL AVIATION AUTHORITY, PAKISTAN Air Navigation Order No. : 91-0004 Date : 7 th April, 2010 Issue : Two OPERATIONAL CONTROL SYSTEMS CONTENTS SECTIONS 1. Authority 2. Purpose 3. Scope 4. Operational Control

More information

BEFORE THE FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Docket FAA PETITION OF DELTA AIR LINES, INC. FOR AN EXEMPTION December 21, 2012

BEFORE THE FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Docket FAA PETITION OF DELTA AIR LINES, INC. FOR AN EXEMPTION December 21, 2012 BEFORE THE FEDERAL AVIATION ADMINISTRATION WASHINGTON D.C. Petition of: DELTA AIR LINES, INC. OPERATING CERTIFICATE DALA026A Docket FAA-2012- For exemption of certain requirements of 14 C.F.R. 91.9(a)

More information

Evidence Based Training from a Regulator s Perspective

Evidence Based Training from a Regulator s Perspective Evidence Based Training from a Regulator s Perspective Marcelo Ureña Regional Officer, Flight Safety ICAO South American Office Evidence Based Training and Advanced Qualification Programme Workshop Lima,

More information

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E Quality Assurance 1 A B C D E Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion 2 1 Introduction 3 Introduction The implementation

More information

Pro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind.

Pro Line Fusion integrated avionics system. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind. Pro Line Fusion on Embraer Legacy 450 and 500: Business-jet technology designed with tomorrow in mind. Your Pro Line Fusion flight deck provides a broad range of baseline capabilities that maximize the

More information

Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings

Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings Part 63 CAA Consolidation 22 June 2006 Flight Engineer Licences and Ratings Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 63 prescribes the rules relating to the issue of cadet

More information

Checklist & Guide for the development of a

Checklist & Guide for the development of a Checklist & Guide for the development of a FIED WING COMPANY OPERATIONS MANUAL for Canadian Aviation Regulations (CARs) 703-Air Taxi and CARs 704-Commuter Company: Date: The contents of Company Operations

More information

Simplifying the business of flight. ARINCDirectSM FLIGHT SOLUTIONS

Simplifying the business of flight. ARINCDirectSM FLIGHT SOLUTIONS Simplifying the business of flight. ARINCDirectSM FLIGHT SOLUTIONS Manage your fleet with comprehensive flight solutions. Rockwell Collins is simplifying the business of flight with our ARINCDirect SM

More information

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR

Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR KING AIR Pro Line 21 King Air upgrades Baseline package includes the latest AFD version 10.4 and FMS software

More information

Signature: Signature:

Signature: Signature: Application for ETOPS approval Applicants Statement The undersigned certifies the following information to be correct and true and that aeroplane system installation, continuing airworthiness of systems,

More information

EFB Users Forum EASA EFB latest development

EFB Users Forum EASA EFB latest development EFB Users Forum EASA EFB latest development 11 November 2015 Yves Koning EASA Outline AMC20-25 status Current EASA IRs ICAO SARPs Future rulemaking 11/11/2015 AIR Workshop - Abidjan 2 AMC20-25 / ETSO C165a:

More information

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane)

NZQA registered unit standard version 2 Page 1 of 9. Demonstrate flying skills for an airline transport pilot licence (aeroplane) Page 1 of 9 Title Demonstrate flying skills for an airline transport pilot licence (aeroplane) Level 6 Credits 35 Purpose People credited with this unit standard are able, for an airline transport pilot

More information

FPAW Summer CFR Part 135 Automated Surface Weather Observation Factors. Federal Aviation Administration

FPAW Summer CFR Part 135 Automated Surface Weather Observation Factors. Federal Aviation Administration FPAW Summer 2012 14 CFR Part 135 Automated Surface Weather Observation Factors Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Regulatory Information 135.213 Weather reports and forecasts

More information

Review of Airworthiness

Review of Airworthiness Review of Airworthiness Helicopter Check List Report Operator Principal Maintainer Job No. Date review carried out Reg. Mark: ZK Facility and location where review was carried out Notes for use: Also refer

More information

Aer Lingus Case Study - AeroDocs deployment to Aer Lingus. Aer Lingus cuts CASK with AeroDocs

Aer Lingus Case Study - AeroDocs deployment to Aer Lingus. Aer Lingus cuts CASK with AeroDocs Aer Lingus Case Study - AeroDocs deployment to Aer Lingus Aer Lingus cuts CASK with AeroDocs Paul Stanley, EFB Project Manager, Aer Lingus and Capt. Eamon Kierans, Manager Flight Ops Compliance, Aer Lingus

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

OPERATIONS CIRCULAR 10 OF 2011

OPERATIONS CIRCULAR 10 OF 2011 GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION NEW DELHI OPERATIONS CIRCULAR 10 OF 2011 AV.22028/01/2010-FID June 13, 2011 Subject: APPROVAL OF ELECTRONIC FLIGHT

More information

Portable electronic devices

Portable electronic devices Portable electronic devices Summary International regulatory developments and technological changes have prompted a review of New Zealand civil aviation regulations relating to portable electronic devices

More information

Part 139 Aerodromes. Part 139 Compliance Matrix

Part 139 Aerodromes. Part 139 Compliance Matrix Part 139 Compliance Matrix The rule references in this compliance matrix have been extracted from the Civil Aviation Rules system as the minimum compliance requirements for an applicant for the issue or

More information

3. RELATED 14 CFR PARTS. Title 14 CFR parts 21, 23, 25, 27, 29, 43, 91F, 91K, 121, 125, and 135.

3. RELATED 14 CFR PARTS. Title 14 CFR parts 21, 23, 25, 27, 29, 43, 91F, 91K, 121, 125, and 135. U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Guidelines for the Certification, Airworthiness, and Operational Use of Portable Electronic Flight Bags Date:

More information

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES Page 1 of 8 1. PURPOSE 1.1. This Advisory Circular provides guidance to personnel involved in construction of instrument and visual flight procedures for publication in the Aeronautical Information Publication.

More information

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER

Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Taking your Pro Line 21 Hawker into NextGen airspace. Pro Line 21 INTEGRATED AVIONICS SYSTEM FOR HAWKER Pro Line 21 Hawker upgrades Baseline package includes the latest AFD software version 10.4 and FMS

More information

OPS General Rules for Operations Manuals

OPS General Rules for Operations Manuals CAR OPS 1 Subpart P (Manuals Logs and Records) Date of audit: 20 th December 2016 Audit conducted by: Stephanie Vella Gera. Audit Ref: QM_13 Compliant Reference/Question es No Comment/Remark OPS 1.1040

More information

PACIFIC AEROSTAR L.L.C.

PACIFIC AEROSTAR L.L.C. PACIFIC AEROSTAR L.L.C. INITIAL AND RECURRENT GROUND & FLIGHT TRAINING PROGRAMS AND SYLLABUS 2005 Pacific Aerostar L.L.C. All Rights Reserved.. AEROSTAR INITIAL AND RECURRENT COURSES INTRODUCTION: THE

More information

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERONAUTICAL INFORMATION CIRCULAR 18/18 NAV CANADA 19 JUL 18 AERONAUTICAL INFORMATION CIRCULAR 18/18 GUIDANCE FOR STANDARD TERMINAL ARRIVAL (STAR) PROCEDURES The guidance currently published in the Transport Canada Aeronautical Information Manual

More information

RED SKY VENTURES. Study guide. COPYRIGHT RED SKY VENTURES AVIATION CC First edition published JULY 2003 This edition: January 2005.

RED SKY VENTURES. Study guide. COPYRIGHT RED SKY VENTURES AVIATION CC First edition published JULY 2003 This edition: January 2005. RED SKY VENTURES PPL Air Law Study guide COPYRIGHT RED SKY VENTURES AVIATION CC First edition published JULY 2003 This edition: January 2005 1 PPL Air Law CONTENTS NOTE TO TEXT... 6 Current Namibian Law...

More information

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA

CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA CIVIL AVIATION REGULATIONS PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN FEDERATED STATES OF MICRONESIA FEDERATED STATES OF MICRONESIA 2001 [THIS PAGE INTENTIONALLY LEFT BLANK] 10-ii

More information

Realizing the Value of the EFB in Digital Aviation

Realizing the Value of the EFB in Digital Aviation Realizing the Value of the EFB in Digital Aviation Pete Giusti Strategic Manager Government and Military Aviation October 2016 The Journey to a Digital Cockpit Leveraging Industry to Deliver Proven Solutions

More information

EFB Wireless Connectivity & Security Considerations

EFB Wireless Connectivity & Security Considerations Aircraft Electronics Association (AEA) Wi-Fi Summit Federal Aviation EFB Wireless Connectivity & Security Considerations Presented by: Peter Skaves, AIR-130 130, Avionic Systems Branch Briefing Objectives

More information

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0

Index to Paragraph Numbers - OTAR Parts 91, 125, 135, 121 Issue 10-0 Index to Paragraph umbers - TAR Parts 91, 125, 135, 121 Issue 10-0 Part 91 Part 125 Part 135 Part 121 Subpart A General 1 91.1 Applicability 125.1 Applicability 135.1 Applicability 121.1 Applicability

More information

Virgin Atlantic Airways

Virgin Atlantic Airways Virgin Atlantic Airways Virgin Atlantic Airways Electronic Log It s (NOT) simple Nigel Scott Senior System Analyst / ELB Administrator Contents History ELB Project Issues and Lessons Learned History History

More information

NZQA registered unit standard version 2 Page 1 of 5. Demonstrate flying skills for a commercial pilot licence (balloon)

NZQA registered unit standard version 2 Page 1 of 5. Demonstrate flying skills for a commercial pilot licence (balloon) Page 1 of 5 Title Demonstrate flying skills for a commercial pilot licence (balloon) Level 5 Credits 8 Purpose People credited with this unit standard are able, for a commercial pilot licence (balloon),

More information

CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office

CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office Form 4 In the name of God CHECKLIST FOR ATO ANNUAL INSPECTION Personnel Licensing Office DATE OF INSPECTION : INSPECTION AT : INSPECTOR : GENERAL INFORMATION: NAME OF ORGANISATION: Certificate of Approval

More information

Hosted Flight Data Monitoring. Information Sheet

Hosted Flight Data Monitoring. Information Sheet 17 Wellington Business Park Crowthorne Berkshire RG45 6LS England Tel: +44 (0) 1344 234047 www.flightdatapeople.com Hosted Flight Data Monitoring Information Sheet www.flightdatapeople.com Commercial in

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more.

PRO LINE FUSION INTEGRATED AVIONICS SYSTEM. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Pro Line Fusion on Gulfstream G280: Your direct path to see and access more. Starting with its baseline features, the Pro Line Fusion avionics in your Gulfstream PlaneView280 flight deck offer capabilities

More information

DANGEROUS GOODS STANDARD DEPARTMENT Operations Manual s Dangerous Goods Segment Checklist

DANGEROUS GOODS STANDARD DEPARTMENT Operations Manual s Dangerous Goods Segment Checklist Instruction: 1. The form once completed should be returned to the CAAT. 2. Failure to complete this form in full may result in a delay in processing the application. 3. The issuing of this form does not

More information

3. RELATED 14 CFRs. Title 14 CFR parts 21, 23, 25, 27, 29, 43, 91, 121, 125, and 135.

3. RELATED 14 CFRs. Title 14 CFR parts 21, 23, 25, 27, 29, 43, 91, 121, 125, and 135. U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Guidelines for the Certification, Airworthiness, and Operational Use of Electronic Flight Bags (EFB) Date: DRAFT

More information

GARMIN Ltd. or its subsidiaries c/o GARMIN International, Inc E. 151st Street Olathe, Kansas U.S.A.

GARMIN Ltd. or its subsidiaries c/o GARMIN International, Inc E. 151st Street Olathe, Kansas U.S.A. GARMIN Ltd. or its subsidiaries c/o GARMIN International, Inc. 1200 E. 151st Street Olathe, Kansas 66062 U.S.A. EASA Approved AIRPLANE FLIGHT MANUAL SUPPLEMENT GTX 33X and GTX 3X5 Transponders for ADS-B

More information

Sao Tome and Principe Civil Aviation Regulations

Sao Tome and Principe Civil Aviation Regulations INAC Instituto Nacional de Aviação Civil Sao Tome and Principe Civil Aviation Regulations STPCAR - PART 10 COMMERCIAL AIR TRANSPORT BY FOREIGN AIR OPERATORS WITHIN SAO TOME AND PRINCIPE LIST OF EFFECTIVE

More information

Subject: Guidelines for the Certification, Date: AC No: C Airworthiness, and Operational Use of Electronic Flight Bags

Subject: Guidelines for the Certification, Date: AC No: C Airworthiness, and Operational Use of Electronic Flight Bags U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Guidelines for the Certification, Date: 5-9-14 AC No: 120-76C Airworthiness, and Operational Use of Electronic

More information

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance.

Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Real-time route planning streamlines onboard operations, reduces fuel burn and delays, and improves on-time performance. Operational Efficiency of Dynamic Navigation Charting Benefits such as improved

More information

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1

The pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1 The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of

More information

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs)

OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) OVERSEAS TERRITORIES AVIATION REQUIREMENTS (OTARs) Part 173 FLIGHT CHECKING ORGANISATION APPROVAL Published by Air Safety Support International Ltd Air Safety Support International Limited 2005 ISBN 0-11790-410-4

More information

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES

RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES RECOMMENDED GUIDANCE FOR FPL AND RELATED ATS MESSAGES Abbreviations ACI ADS ADS-B ADS-C AFTN AIDC AIP ANSP AMHS APAC APANPIRG ASBU ASIOACG ATFM ATM ATS AUSEP CHG CNL CPDLC CPL DARP DLA EOBT FAA FIR FIRBX

More information

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy

U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy U.S. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION National Policy NOTICE N 8000.353 SUBJ: Revised Guidance for Authorizing the Use of Electronic Flight Bags, Issuance of A061, Electronic

More information

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant

Certification Memorandum. Guidance to Certify an Aircraft as PED tolerant Certification Memorandum Guidance to Certify an Aircraft as PED tolerant EASA CM No.: CM-ES-003 Issue 01 issued 23 August 2017 Regulatory requirement(s): CS 23.1309(b)(1), CS 25.1309(a)(1), CS 27.1309(a),

More information

NZQA registered unit standard version 3 Page 1 of 5. Demonstrate type rating competency for an aeroplane not exceeding 5700 kg MCTOW

NZQA registered unit standard version 3 Page 1 of 5. Demonstrate type rating competency for an aeroplane not exceeding 5700 kg MCTOW Page 1 of 5 Title Demonstrate type rating competency for an aeroplane not exceeding 5700 kg MCTOW Level 5 Credits 5 Purpose People credited with this unit standard are able to demonstrate: technical knowledge

More information

EUROPEAN AVIATION SAFETY AGENCY Joint Aviation Authorities

EUROPEAN AVIATION SAFETY AGENCY Joint Aviation Authorities EUROPEAN AVIATION SAFETY AGENCY Joint Aviation Authorities Joint al Evaluation Board BELL 412EP Final Report, dated 05 May 2011 European Aviation Safety Agency Postfach 10 12 53 D-50452 Koeln, Germany

More information

VFR GENERAL AVIATION FLIGHT OPERATION

VFR GENERAL AVIATION FLIGHT OPERATION 1. Introduction VFR GENERAL AVIATION FLIGHT OPERATION The general aviation flight operation is the operation of an aircraft other than a commercial air transport operation. The commercial air transport

More information

Electronic Flight Bag Policies at Collegiate Aviation Programs

Electronic Flight Bag Policies at Collegiate Aviation Programs International Journal of Aviation, Aeronautics, and Aerospace Volume 4 Issue 4 Article 8 11-12-2017 Electronic Flight Bag Policies at Collegiate Aviation Programs Tyler A. Babb Middle Tennessee State University,

More information

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. Civil Aviation 1 GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS. REGULATIONS ARRANGEMENT OF REGULATIONS 1. Citation. 2. Interpretation. 3. Applicability of Regulations. PART A GENERAL REQUIREMENTS

More information

Part 135 GA Air Operator Certificate Helicopters and Small Aeroplanes General Aviation Helicopters VFR

Part 135 GA Air Operator Certificate Helicopters and Small Aeroplanes General Aviation Helicopters VFR Part 119 / 135 Compliance Matrix Helicopters VFR General Aviation Air Operator Certificate The rule references in this compliance matrix have been extracted from the Civil Aviation Rules system as the

More information

7 Instructor Certificates

7 Instructor Certificates Flight Experience Instructor Certificate (HG/PG) 7 Instructor Certificates 7.1 Types and Requirements Hang Gliding and Paragliding Hang Glider and Paraglider Instructor certificates are issued on five

More information

FliteStar USER S GUIDE

FliteStar USER S GUIDE FliteStar USER S GUIDE 2003 Jeppesen Sanderson, Inc. All rights reserved. Printed in the United States of America. No part of this publication may be reproduced, stored in a retrieval system, or transmitted,

More information

Checklist & Guide for the development of a

Checklist & Guide for the development of a Checklist & Guide for the development of a Fixed Wing Company Operations Manual for Canadian Aviation Regulations (CARs) 703-Air Taxi VFR Only Operator Company: Date: The contents of Company Operations

More information

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application

REGULATION No. 10/2011 ON APPROVAL OF FLIGHT PROCEDURES INCLUDING SID-s AND STAR-s. Article 1 Scope of Application Republika e Kosovës Republika Kosovo Republic of Kosovo Autoriteti i Aviacionit Civil i Kosovës Autoritet Civilnog Vazduhoplovstva Kosova Civil Aviation Authority of Kosovo Director General of Civil Aviation

More information

Cessna Corvalis TT x. INTRINZIC TM Flight Deck powered by Garmin

Cessna Corvalis TT x. INTRINZIC TM Flight Deck powered by Garmin Cessna Corvalis TT x INTRINZIC TM Flight Deck powered by Garmin The purpose of this booklet is to introduce pilots to the INTRINZIC TM Flight Deck powered by Garmin. Hardware and software orientation new

More information

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION

FIT FOR PURPOSE: A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR PURPOSE INFORMATION FIT FOR : A Guide to Using NAV CANADA Aeronautical Publications SECTION B PUBLICATION SPECIFIC FIT FOR INFORMATION I TABLE OF CONTENTS SECTION A: GENERAL MATERIAL 2 SECTION B: PUBLICATION SPECIFIC FIT

More information

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace

Civil Instrument Flight Rules at Military Aerodromes or in Military Controlled Airspace Federal Departement of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Flight Operations FOCA GM/INFO Guidance Material / Information

More information

Evidence Based Training For Airline Pilots

Evidence Based Training For Airline Pilots ANZSASI 2012 Sydney 1 3 June Evidence Based Training For Airline Pilots Patrick Murray EBT Project Team APATS BANGKOK 20 / 21 Sep 2011 APATS BANGKOK 20 / 21 Sep 2011 Hull Loss per million departures 1st

More information

An advisory circular may also include technical information that is relevant to the standards or requirements.

An advisory circular may also include technical information that is relevant to the standards or requirements. Advisory Circular AC66.1 Aircraft Maintenance Engineer Licence Examination Subject 1 Air Law Oral Revision 1 18 September 017 General Civil Aviation Authority advisory circulars contain guidance and information

More information

Annex to Decision 2015/006/R. AMC and GM to Part-SPO Amendment 2

Annex to Decision 2015/006/R. AMC and GM to Part-SPO Amendment 2 Annex to Decision 2015/006/R AMC and GM to Part-SPO Amendment 2 The Annex to Decision 2014/018/R 1 is hereby amended as follows: The text of the amendment is arranged to show deleted, new or amended text

More information

APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL

APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL APPLICATION FOR EXTENDED OPERATIONS (ETOPS) OPERATIONAL APPROVAL This form is to be used for applicants seeking Extended Diversion Time Operational (EDTO) approval in accordance with OTAR Part 121.275.

More information

Joint Delta/FAA Demonstration of Supplemental Turbulence Products for Pilots

Joint Delta/FAA Demonstration of Supplemental Turbulence Products for Pilots Joint Delta/FAA Demonstration of Supplemental Turbulence Products for Pilots Delta Air Lines, Inc. requests authorization to demonstrate the feasibility of using a low-cost tablet personal computer (PC)

More information

Recurrent Training & Checking Form

Recurrent Training & Checking Form Recurrent Training & Checking Form Flight Training / Operator Proficiency Check () / Line Check (LC) Flight Training and/or Type of Check LC Training /LC/Training valid for the following: SEP insert type(s):,,

More information

EDTO SARPS FROM ANNEX 6 PART 1

EDTO SARPS FROM ANNEX 6 PART 1 EDTO SARPS FROM ANNE 6 PART 1 4.7.1 Requirements for operations beyond 60 minutes to an en route alternate aerodrome STATE (SRVSOP) IMPLEMENTATION YES Regulation ref. no. NO LAR 121.2581 4.7.1.1 Operators

More information

EASA Safety Information Bulletin. SIB No.: Issued: 09 December 2013

EASA Safety Information Bulletin. SIB No.: Issued: 09 December 2013 EASA Safety Information Bulletin Subject: Ref. Publications: Applicability: Description: SIB No.: 2013-21 Issued: 09 December 2013 Use of Portable Electronic Devices during Commercial Air Transport Aircraft

More information

Instrument Ground School IFR Decision Making

Instrument Ground School IFR Decision Making IFR Decision Making IFR Judgment Skills Resource Management Review Aeronautical Decision Making Risk Management Task Management Automation Management Controlled Flight into Terrain Situational Awareness

More information

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case.

The type rating of test pilots having flown the aircraft for its development and certification needs to be addressed as a special case. FLIGHT TESTING: COMMENTS ON NPA 2008-17,PILOT LICENSING FCL.700 Circumstances in which class or type ratings are required Subparagraph (b) (b) Notwithstanding paragraph (a), in the case of flights related

More information

Contracting of continuing airworthiness management tasks

Contracting of continuing airworthiness management tasks Contracting of continuing airworthiness management tasks Xinming Lv, CAAC June 2014, Mongolia 1 Outline Background Reference Main Principle Implementation 2 Background Background Fast development of Chinese

More information

Gogo Connected Aircraft Services

Gogo Connected Aircraft Services Gogo Connected Aircraft Services Connected Aircraft Services The power of a connected fleet These benefits are made possible through Gogo Inflight Services, the Gogo FLEX Inflight System, the Gogo Inflight

More information

PBN Operational Approval Overview

PBN Operational Approval Overview PBN Operational Approval Overview Eduardo Chacin Regional Officer Flight Safety ICAO NACC Regional Office XI ICAO-ASPA Seminar Mexico City, Mexico, 7 8 May 2013 21 May 2013 Page 1 Agenda 1. Performance-based

More information

IEPCHECKLIST. Internal Evaluation Program Checklist. Attention: PRISM PRO Subscribers SCALE OF 1-5

IEPCHECKLIST. Internal Evaluation Program Checklist. Attention: PRISM PRO Subscribers SCALE OF 1-5 IEPCHECKLIST A SAFETY ASSURANCE COMPONENT OF YOUR SMS SEPTEMBER 2017 MAINTENANCE 6 (PART 91) SCALE OF 1-5 1-2- 3-4- 5- If your answer is NOT a 3 or better, you must record a finding that requires corrective

More information

The Effect of Electronic Flight Bag Use on Pilot Performance During an Instrument Approach

The Effect of Electronic Flight Bag Use on Pilot Performance During an Instrument Approach The Effect of Electronic Flight Bag Use on Pilot Performance During an Instrument Approach Kevin Haddock and Wendy Beckman Middle Tennessee State University A perpetual problem: With ever increasing information

More information

European Aviation Safety Agency. Opinion No 10/2017

European Aviation Safety Agency. Opinion No 10/2017 European Aviation Safety Agency Opinion No 10/2017 Transposition of provisions on electronic flight bags from ICAO Annex 6 RELATED NPA/CRD: 2016-12 RMT.0601 EXECUTIVE SUMMARY The objective of this Opinion

More information

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent

More information

GOVERNMENT OF INDIA INVESTIGATION REPORT

GOVERNMENT OF INDIA INVESTIGATION REPORT GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT INVESTIGATION REPORT EMERGENCY LANDING INCIDENT AT MANGALORE TO AIR INDIA AIRBUS A-320 A/C VT-ESE WHILE OPERATING FLIGHT AI-681 (MUMBAI-COCHIN) ON 27-02-2017.

More information

Smiths Falls Flying Club. Operational Procedures Guidance (OPG)

Smiths Falls Flying Club. Operational Procedures Guidance (OPG) V4 Sept 2017 Smiths Falls Flying Club Operational Procedures Guidance (OPG) References: CARs 405, 406,605,425,246 SFFC MCM, SFFC PPL Flight Training Outline, SFFC Flight Instructors Guide General The objective

More information

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017

Part 171. Aeronautical Telecommunication Services - Operation and Certification. CAA Consolidation. 10 March 2017 Part 171 CAA Consolidation 10 March 2017 Aeronautical Telecommunication Services - Operation and Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 171 provides the

More information

Intro What is flight planning Historical & Classic perception Challenges in the market of today Flight Planning today & in the future What is

Intro What is flight planning Historical & Classic perception Challenges in the market of today Flight Planning today & in the future What is Intro What is flight planning Historical & Classic perception Challenges in the market of today Flight Planning today & in the future What is optimized flight plans ...It also makes it possible for the

More information

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management L 80/10 Official Journal of the European Union 26.3.2010 COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management (Text with EEA relevance) THE EUROPEAN

More information

PRO LINE 21 FOR KING AIR. Taking your Pro Line 21 King Air into NextGen airspace.

PRO LINE 21 FOR KING AIR. Taking your Pro Line 21 King Air into NextGen airspace. PRO LINE 21 FOR KING AIR Taking your Pro Line 21 King Air into NextGen airspace. Pro Line 21 King Air upgrade options SVS package 1 SVS package 2 SVS package 3 Comment Display Update The AFD 3010 update

More information

AIRBUS Generic Flight Test Installation

AIRBUS Generic Flight Test Installation AIRBUS Generic Flight Test Installation Jean-Pascal CATURLA AIRBUS Operations SAS, Toulouse, France ABSTRACT This paper describes new concepts of test mean and processes to perform flight test for all

More information

For TURKISH Candidates

For TURKISH Candidates SUPREME VIATION INC Professional Pilot Program For TURKISH Candidates # Index Page# 1. Enrollment Process & Instructions 2-5 2. Enrollment Form/ Student Application 6 3. CPL + ATPL (A) frozen Fees & information

More information

COCKPIT USB POWER INTEGRATION

COCKPIT USB POWER INTEGRATION COCKPIT USB POWER INTEGRATION POWER SHORTAGE IN COCKPIT With today s technology, the struggle for airlines to keep up with EFB and other battery powered electronics to stay charged during flight creates

More information