The Australian ADS-B Program Greg Dunstone
|
|
- Nelson Henry
- 5 years ago
- Views:
Transcription
1 The Australian ADS-B Program Greg Dunstone Surveillance Program Lead, Airservices Australia
2 : Australian operational trial Operationally commissioned 9 aircraft Dh8, Shorts, B200, Jabiru Objective : Learn operational lessons Separation standards approved
3 NOW INCORPORATED INTO AIP
4 Radar Coverage today at FL100
5 Australian Surveillance 250 NM Mode S radars (20) With Mode S DAPS (currently not used) With Flight ID Legacy A/C radars till NM Primary radars for TMA only Limited Multilateration Application Support to ASMGCS SYWAM and TASWAM Extensive ADS-B coverage Fully operational continent wide Shared with Indonesia Future: Additional ADS-B coverage ADS-B based surveillance including Air-Air applications
6 ADS-B : Current Status
7 ADS-B is operational today Service is provided today Continent wide Using internationally agreed standards Coverage is altitude dependent RADAR ADS-B FL100 COVERAGE Planned ADS-B
8 Australian ATC Display Radar ADS-C ADS-B WAM Flight Plan tracks
9 ADS-B Installation at Longreach with NDB & VHF outlet
10 Thursday Island
11 Operational for some years Billabong Roadhouse Satellite Ground Station
12 ADS-B Antenna Folding Pole at Billabong Roadhouse Satellite Ground Station
13 Operational for some years Karratha ADS-B station
14 Mt Newman ADS-B station Operational for some years
15 Broome An aircraft trajectory at Broome (ADS-B data)
16 OCEANIC ADS-B is operational 836m 945m New NDB, ADS-B & VHF site aerial top Transit Hill 120m 210m
17 ADS-B at FL100 Service is provided today Continent wide Using internationally agreed standards Coverage is altitude dependent RADAR ADS-B FL100 COVERAGE Planned ADS-B
18 WAM systems with ADS-B are operational TAS WAM Commissioned SY WAM Commissioned SY PRM Commissioned SY WAM ADS-B to enroute ATC Commissioned ADS-B from SYDNEY WAM
19 We share ADS-B data with Indonesia (Hopefully with PNG in future) Operational today Indonesian data is on screen in Brisbane ATC centre Impact on safety of FIR boundary
20 Planning ADS-B on Gas/Oil Rigs
21 PLANNING ADS-B for Remote Control Towers Why? Low cost surveillance No COMS But no monitoring TSAD PC BOX PC with integrated ADS-B receiver Status Display operational with radar
22 Alliance
23 Filtering was removed in September For safety operators must ensure that all ADS-B transmissions are compliant. Removal of approval process We no longer know who has which avionics Operator gets ADS-B service if they transmit ADS-B
24 We retain a Black list Your customers don t want to be in Blacklist The Blacklist is for Non compliant aircraft Airservices will ask CASA to chase down compliance Allows Airservices management of flights until aircraft is compliant CASA may issue an exemption to CAO 20:18 on request (no guarantees) ADS-B services restored once aircraft is fixed and Airservices notified. An interim correction may be to disable ADS-B output or set NUCp or NIC to zero
25 Australian ADS-B rules in place Effective date 6 June 2007 Mandate Non compliant ADS-B must be disabled before flight [no bad data] 12 Dec 2013 Operation at/above FL290 requires ADS-B [12 months to go] Status Regulation in place (see CAO 20:18) (All airspace categories) 6 Feb 2014 All IFR aircraft first registered after [14 months to go] 6 Feb 2014 must have ADS-B out 6 Jan 2016 All IFR must have ADS-B out within 500 Nm Perth to north & east Regulation in place (see CAO 20:18) 8 Dec Jan 2017 ADS-B position source must be SA aware for aircraft manufactured after date All IFR must have ADS-B out in Australia (Applies to aircraft operating in Class A,B,C, E) Regulation in place (see CAO 20:18) (All airspace categories)
26 Transponder Rules in place Effective date 9 Feb Feb Feb 2016 Mandate All new registrations with Mode S transponder must have Mode S Flight ID All Mode S DAPS must be in accord with ICAO SARPS [no bad data] New registrations must have Top/bottom antenna if >5700Kg or TAS>250 Kts All new registrations or transponder installation replaced must have mode S with Flight ID & ADS-B capability All operations at Sydney, Brisbane, Melbourne & Perth airports must have mode S with Flight ID Status Regulation in place (see CAO 20:18) Applies to all aircraft operating in Class A,B,C, E or Above 10K in G Exceptions in Class E & G if the aircraft does not have an engine; or sufficient enginedriven electrical power generation capacity to power a Mode S transponder. Regulation in place (see CAO 20:18) Applies to all aircraft no exceptions New transponders for aircraft in Class A,B,C,E or above 10K must be Mode S with ADS-B capability - The phase out of Mode A/C has begun
27 Matching GPS rules in place too - Provides GPS based PBN (Note deeming rules CAO 20.91) Effective date 6 Feb 2014 Forward fit & New installations Mandate All IFR aircraft first registered after 6 Feb 2014 & New GPS installations in IFR after 6 Feb 2014 Must have TSO145/146/196 GPS (or CASA approved RNP capability) Status Regulation in place (see CAO 20:18) Almost no new TSO129 installations post Feb 2014 (they can be installed in VFR) 6 Jan 2016 Retrofit All IFR aircraft must have TSO145/146/196 GPS (or CASA approved RNP capability) or TSO129 Regulation in place (see CAO 20:18) Old TSO129 can stay until replaced BUT : a) probably can t feed ADS-B b) operator must carry fuel for alternate aerodrome with conventional navaids (many being decommissioned)
28 We are making sure everyone is aware.
29
30 AIP H96/12 Published Dec 2012
31 STATISTICS
32 % of Flights with ADS-B (Australian Rego) % Flights with ADSB ABOVE FL 285 Percent ALL LEVELS BELOW FL Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Date
33 Australian Military aircraft are equipping with ADS-B Currently equipped, approved & receiving service A332- MRRT Transport/Tanker B737-BBJ VIP Fleet Bombardier CL604 VIP Fleet B350 Army & Air Force Images Courtesy of Department of Defence
34 Chief of Air Force affirmed - The Australian Defence force is committed to a joint national Air Traffic Management system Defence commitment to ensuring its aviation activities take account of the ADS-B implementation program. Defence will enhance IFF, Mode S and ADS-B capabilities All future Defence Surveillance platforms will meet the ADS-B requirements Defence aircraft being retained post 2020 are expected to be equipped by 2018, with the ability to disable transmission as required. Images Courtesy of Department of Defence
35 Work to be done on the Australian IFR Fleet for 2017 Equipped To be ADS-B equipped Above FL285 Below FL285 ~283 (61%) ~136 (5%) ~178 ~ 2,636 By Dec 2013 (12 months) 15/month By Feb 2017 (~50 months) 53/month Plus workload of new Mode S transponders for SSR rules Plus workload associated with GPS mandate 2016 Based on detections by Airservices Ground stations
36 BUSINESS ARGUMENT
37 Why owners should fit early Investment has to be made (Mandate) Benefits of early ADS-B fitment exceed time value of money Operational benefits now - Safety benefit (& for companies liability) - Efficiency benefit (more likely clearance) High dollar (may be different in ) Low interest rates cost to equip earlier is low Track by Web tools Installation costs are likely to be higher in 2016 panic period Mode S transponder required in 2016 for major cities ADS-B require earlier if you operate in WA Potential NAV benefit - NPA approaches - Reduced need for fuel to alternate with Navaid (TSO146 GPS) as Navaid numbers reduce Reason to Delay Possible new products Will dispose of aircraft before mandate
38 Thank you & Questions?
39 SPARES
40 Test the output! Use an ADS-B capable test set. Know whether the transponder is DO260 (TSO166), DO260A (TSO166A) or DO260B (TSO166B) standard. The version number is available in BDS 6.5 A/C OP status. Check Flight ID : Callsign/ Registration (WITHOUT VH) Check 24 bit aircraft address : Check 24 bit aircraft address as allocated by CASA Check Emitter category : Check emitter category set and type are appropriate for the aircraft. Check Integrity (NIC ) = Examine the Type code for DO260A & DO260B It is important that NIC be non zero If the aircraft is transmitting AIRBORNE squits then the type code needs to be 9-15 Type HPL NIC code 9 <7.5m <25m <185.2m 9 or 8 12 <0.2 nm 7 13 <0.5 nm 6 14 <1.0 nm 5 15 <2.0 nm 4 16 <10 nm 3 or 2 Not used by ATC 17 <20 nm 1 Not used by ATC 18 > 20 nm 0 Not useable indicates no integrity
International Civil Aviation Organization
International Civil Aviation Organization ADS-B SITF/14 IP/07 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST SEMINAR AND FOURTEENTH MEETING OF AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) STUDY AND IMPLEMENTATION
More informationSafety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6
Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance
More informationInternational Civil Aviation Organization
International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and
More informationMode S & ACAS Programme Operational Introduction of SSR Mode S
Mode S & ACAS Programme Operational Introduction of SSR Mode S John Law Programme Manager john.law@eurocontrol.int Tel: +32 2 729 3766 European 1 Organisation for the Safety of Air Navigation Mode S Airborne
More informationSeychelles Civil Aviation Authority. Telecomm & Information Services Unit
Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA
More informationOverview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge
ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN
More informationDiscuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES
ADS-B SITF/6-IP/3 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) SEMINAR AND THE SIXTH MEETING OF ADS-B STUDY AND IMPLEMENTATION TASK FORCE (ADS-B SITF/6)
More informationAUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA
Phone/ Fax : 62 21 3507603 Telegraphic Address AFS : WRRRYNYX REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIR NAVIGATION SUB DIRECTORATE AERONAUTICAL
More informationInternational Civil Aviation Organization
CNS/MET SG/14 IP/32 International Civil Aviation Organization FOURTEENTH MEETING OF THE COMMUNICATIONS/NAVIGATION/SURVEILLANCE AND METEOROLOGY SUB-GROUP OF APANPIRG (CNS/MET SG/14) Jakarta, Indonesia,
More informationADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico
ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM
More informationTHIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.
IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS
More informationApproach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM
Approach 15 Australasian PBN Forum Flight Deck Equipage to Enable CNS/ATM Contents Australian CNS / ATM mandates Regulatory Structure Installation Considerations Continuing airworthiness consideration
More informationAIC 02/ JUN 2014
TEL: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: ais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIC 02/2014 06 JUN 2014
More informationADS-B Rule and Installation Guidance
ADS-B Rule and Installation Guidance Presented by: Don Walker Date: June 2011 Outline U.S. ADS-B Rulemaking Airspace Rule Rule performance requirements AC 20-165 Installation and airworthiness approval
More informationAUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.
TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used
More informationFrequently Asked Questions ADS-B. (Automatic Dependent Surveillance Broadcast)
Frequently Asked Questions ADS-B (Automatic Dependent Surveillance Broadcast) WARNING: Information, statements and opinions contained in this document are given in good faith and have been derived from
More informationSurveillance Opportunities and Challenges
Services Info Days Brussels, 6-7 December 2017 Opportunities and Challenges Christos Rekkas Head of SUR Modernisation TLP: GREEN 1 SUR Applications list extending PSR/SSR Mode S Elementary Enhanced ADS-C
More informationPBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN
PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components
More informationUnderstanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out
Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, July 2015 Safely guiding pilots and their passengers worldwide for over
More informationAPAC PBN UPDATE Slide 1 of xx
APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide
More informationIssues related to the provision of surveillance service
Surveillance Seminar for the NAM/CAR/SAM Region Port of Spain, 18-20 June 2007 Issues related to the provision of surveillance service Presented by: Jan Berends EUROCONTROL Surveillance Domain Manager
More informationREPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE
AFS: WSSSYNYX caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE
More informationSubject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization
OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent
More informationFLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission
FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission Access is a huge problem 2 out of 3 people in the world are not connected to the internet current solutions fail to effectively serve the needs
More informationNotice of Requirement
Notice of Requirement NTC 91.258 Automatic Dependent Surveillance- Broadcast (ADS-B) systems Revision 1 20 July 2018 Preliminary The Director of Civil Aviation issues the following requirements ( the requirements
More informationADS-B Implementation Update 2011 CNS/ATM Conference
ADS-B Implementation Update 2011 CNS/ATM Conference Prepared by Jeff Cochrane Manager, CNS Service Design June 2011 Briefing Overview Canadian ADS-B Implementation Review of Requirements for ADS-B surveillance
More informationFrench DSNA approach to CNS rationalization & evolution
French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single
More informationInternational Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez
International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate
More informationServices Charter. 2014/15 to 2015/16
Services Charter 2014/15 to 2015/16 Services Charter Overview Objective Airservices Australia is a governmentowned organisation providing safe and environmentally sound air traffic management, aviation
More information28 January, 2010 New Delhi, India. Larry Coughlin. Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B)
Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B) 28 January, 2010 New Delhi, India Larry Coughlin Managing Director India Operations Boeing Commercial Airplanes BOEING is
More informationUnderstanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out
Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, February 2014 Safely guiding pilots and their passengers worldwide for
More informationModule N B0-102: Baseline Ground-based Safety Nets
Module B0-102 V1 1 2 3 Module N B0-102: Baseline Ground-based Safety Nets 4 5 Summary Main Performance Impact Operating Environment/Phases Flight Applicability Considerations Global Concept Component(s)
More informationRNP AR Experience. Phil Rakena PBN Project Manager February 2015
RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from
More informationThis quarter we made progress against our major capital works program and against our Services Charter. An update is attached to this letter.
Office of the Chief Executive GPO Box 367 CANBERRA ACT 2601 Phone: (02) 6268 4182 Fax: (02) 6268 5685 ABN 59 698 720 886 CEO UPDATE REPORT TO INDUSTRY MARCH QUARTER 2011 OVERVIEW This quarter we made progress
More informationDSNA NAVIGATION STRATEGY
DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,
More informationDEVELOPMENT OF COCKPIT DISPLAY OF TRAFFIC INFORMATION (CDTI)
ADS-B TF/3 -IP/10 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March
More informationTDR Mode S and ADS-B Transponders
Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance
More informationDIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY
DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management
More informationThis material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication.
1 This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication. 1. What is ADS-B?... 6 1.1 How does ADS-B work?... 6 1.2 Why is New Zealand
More informationDraft PBN Implementation Plan Papua New Guinea
Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN
More informationLearning Objectives. By the end of this presentation you should understand:
Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The
More informationInternational Civil Aviation Organization
ADS-B TF/3-IP/16 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March
More informationEntry of Flight Identity
ADS-B TF/3-IP/13 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March
More informationAvionics requirements for State aircraft
Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although
More informationOverview of Worldwide Data Link Equipage Mandates
Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording
More informationMandates. Airbus Fleet Implementations. AEEC 19 th June 2018
Mandates Airbus Fleet Implementations AEEC 19 th June 2018 Roadmap of operational mandates DATA-LINK NAT-SPG EC EC 20% ELT ADS-B EC HUD 50% 10% 100% A/C Tracking GADSS* Recording Mandates Operationnal
More informationGTX 345 Transponder & ICAO IFR Filing. Charlotte County Composite Squadron FL Feb 2017 Maj Dick Morrell, Lt Tom Britton
GTX 345 Transponder & ICAO IFR Filing Charlotte County Composite Squadron FL-051 21 Feb 2017 Maj Dick Morrell, Lt Tom Britton N922CP C-172S GTN GPS Cockpit KLN 94 NON WAAS GPS Replaced with Garmin GTN
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq
More informationCombined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013
IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY
More informationADS-B Updates. Aviation Electronics Europe Munich, April Johan Martensson. EUROCONTROL Surveillance Modernisation 17 April 2016
ADS-B Updates Aviation Electronics Europe Munich, April 2016 Johan Martensson EUROCONTROL Surveillance Modernisation 17 April 2016 Content Overview Ground ADS-B OUT Implementation Airborne ADS-B OUT Implementation
More informationPBN Implementation Plan - Fiji Version 1 19 January 2010
PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......
More informationPBN Airspace Concept. ATS requirements
INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases
More informationNext Generation Airspace Developments: Key Operational Trends and Enablers
Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory
More informationSpace Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION
Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space
More informationOverview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002
Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety
More informationSpace Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015
Space Based ADS-B Transforming the Way you See the Sky September 23, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED. 2014 AIREON LLC. ALL RIGHTS RESERVED. 1 For optimal operational ATM Performance
More informationUSE OF RADAR IN THE APPROACH CONTROL SERVICE
USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:
More informationAIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES
AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service
More informationSurveillance and Broadcast Services
Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:
More informationPerformance Based Navigation Operational End-State 2023
Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,
More informationVolume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101. A Plain Speak White Paper. on the. Current and Near-Term Future. As Air Navigation Transitions
Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101 A Plain Speak White Paper on the Current and Near-Term Future As Air Navigation Transitions from Ground Based Radar to Satellite Based ATC Assistance
More informationPBN and airspace concept
PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible
More informationADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service
ADS-B Installation Challenges July 13, 2017 James Marks ADS-B Focus Team Lead FAA Flight Standards Service Agenda ADS-B Out Mandate Equipage Enablers Installation Challenges Rule Performance Monitoring
More informationPBN Implementation Plan Tonga
PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using
More informationAIP PORTUGAL ENR NOV-2007
AIP PORTUGAL ENR 1.6-1 ENR 1.6 RADAR SERVICES AND PROCEDURES PROVISION OF RADAR SERVICES WITHIN LISBOA AND SANTA MARIA FIR / UIR Introduction Air Traffic Control Services within Lisboa and Santa Maria
More informationThis Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.
Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide
More informationAutomatic Dependent Surveillance-Broadcast (ADS-B)
Automatic Dependent Surveillance-Broadcast (ADS-B) Tenth Meeting of the ICAO ADS-B Study and Implementation Task Fce (ADS-B SITF/10) Jessie Turner Principal Engineer/DER Singape Avionics Air Traffic Management
More informationPBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies
PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance
More informationModernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018
Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s
More informationRAAC/15-WP/14 International SUMMARY REFERENCES. A Safety
RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,
More informationPBN IMPLEMENTATION IN INDONESIA
PBN IMPLEMENTATION IN INDONESIA Program For The PBN Workshop For ATC I Wayan Sudiartha Head of the Standardization and Certification Division Profile of AirNav Indonesia Establishment : o Declared by Government
More informationTable of Contents. Mode-S Surveillance Decision 3 What is Mode-S? 3 How does Mode-S work? 4
The purpose of this Information Notice is to brief Military Organisations about regulation changes related to the mandatory carriage and operation of Secondary Surveillance Radar (SSR) Mode-S airborne
More informationGround movement safety systems and procedures - an overview
Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)
More informationChange to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information
This document is scheduled to be published in the Federal Register on 12/20/2017 and available online at https://federalregister.gov/d/2017-27202, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal
More informationPBN Implementation. Phil Rakena. PBN Implementation Programme Manager
Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource
More informationDifferent in character or other means of compliance. Less protective or partially implemented not implemented
4//018 Aeroplane CAR Interpretation Australian legislation excludes power-assisted sailplanes Alternate aerodrome AIP GEN. CAR Definitions Take-off and En-route alternates not specifically defined in legislation
More informationPerformance Based Navigation (PBN) Implementation Plan. The Gambia
Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation
More informationTHE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division
THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION
More informationNAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms
06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional
More informationNATA 2018 AGM & CONFERENCE
NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization
More informationOperational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)
International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901
More informationAvionics requirements for State aircraft
Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although
More informationCAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.
CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended
More informationApproach Specifications
Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the
More informationUK Implementation of PBN
UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation
More informationINSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT
INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT 1. For those installations not installed in accordance with GDL 82 Mooney M20 Series STC SA02573SE, a flight manual supplement may be created
More informationADS-B Exclusion List
ADS-B Exclusion List NAT Procedures v-2015-1 Prepared by: Guðmundur Karl Einarsson Last saved: 30. Nov 2015 Document: http://verkefni.isavia.is/verkefnahopar/adsb/shared Documents/Operation/ADS-B-Incidents-And-Blacklist/Blacklist-Avionics/NAT
More informationADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY
20 th E/CAR DCA-IP/12 International Civil Aviation Organization 21/11/06 NORTH AMERICAN, CENTRAL AMERICAN AND CARIBBEAN OFFICE Twentieth Meeting of Directors of Civil Aviation of the Eastern Caribbean
More informationNextGen Priorities: Multiple Runway Operations & RECAT
NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the
More informationCMATS The Civil Military ATM System
CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia
More informationConsiderations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation
Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?
More informationAirworthiness considerations for UAVs
A general overview about the approach to a UAV System under current regulations for operation, airspace and certification Presentation by : STN ATLAS ELEKTRONIK Klaus Wohlers, LMP Airborne Systems Type
More informationNAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten
NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators
More informationFederal Aviation Administration Early Implementation Experiences
Early Implementation Experiences Presented by: Don Walker Presented to: Aircraft Electronics Association Date: February 2011 Outline 1 Errors Seen In Early Implementations 1.1 Software related 1.2 GPS
More information8 Things Every Aircraft Owner Needs To Know About The 2020 ADS-B Mandate. Contents INTRO: WHAT IS ADS-B EQUIPMENT, AND WHAT DOES IT DO?...
Contents INTRO:...3 1. WHAT IS ADS-B EQUIPMENT, AND WHAT DOES IT DO?... 4 2. WHY IS THE FAA MANDATING THIS?... 5 3. HOW DOES IT WORK (TECHNICALLY SPEAKING)?... 6 4. HOW MUCH WILL IT COST ME?...7 5. WHEN
More informationBoeing Air Traffic Management Overview and Status
Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes
More informationInternational Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force
ADS-B-SITF/IP/6 International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force Brisbane, Australia, 24-26 March 2003 Agenda Item 3: Evaluate
More informationFlight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach
Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129
More informationThe INs and OUTs of ADS-B
The INs and OUTs of ADS-B Presented by: Date: John Fisher Nov 12, 2016 Outline Glider ANPRM Process Surveillance Overview ATCRBS, Mode S, and ADS-B ADS-B OUT and IN 1090ES and 978 UAT Other Systems ADS-B
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27
Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,
More information