1 The Australian ADS-B Program Greg Dunstone Surveillance Program Lead, Airservices Australia

2 : Australian operational trial Operationally commissioned 9 aircraft Dh8, Shorts, B200, Jabiru Objective : Learn operational lessons Separation standards approved

3 NOW INCORPORATED INTO AIP

4 Radar Coverage today at FL100

5 Australian Surveillance 250 NM Mode S radars (20) With Mode S DAPS (currently not used) With Flight ID Legacy A/C radars till NM Primary radars for TMA only Limited Multilateration Application Support to ASMGCS SYWAM and TASWAM Extensive ADS-B coverage Fully operational continent wide Shared with Indonesia Future: Additional ADS-B coverage ADS-B based surveillance including Air-Air applications

6 ADS-B : Current Status

7 ADS-B is operational today Service is provided today Continent wide Using internationally agreed standards Coverage is altitude dependent RADAR ADS-B FL100 COVERAGE Planned ADS-B

8 Australian ATC Display Radar ADS-C ADS-B WAM Flight Plan tracks

9 ADS-B Installation at Longreach with NDB & VHF outlet

10 Thursday Island

11 Operational for some years Billabong Roadhouse Satellite Ground Station

12 ADS-B Antenna Folding Pole at Billabong Roadhouse Satellite Ground Station

13 Operational for some years Karratha ADS-B station

14 Mt Newman ADS-B station Operational for some years

15 Broome An aircraft trajectory at Broome (ADS-B data)

16 OCEANIC ADS-B is operational 836m 945m New NDB, ADS-B & VHF site aerial top Transit Hill 120m 210m

17 ADS-B at FL100 Service is provided today Continent wide Using internationally agreed standards Coverage is altitude dependent RADAR ADS-B FL100 COVERAGE Planned ADS-B

18 WAM systems with ADS-B are operational TAS WAM Commissioned SY WAM Commissioned SY PRM Commissioned SY WAM ADS-B to enroute ATC Commissioned ADS-B from SYDNEY WAM

19 We share ADS-B data with Indonesia (Hopefully with PNG in future) Operational today Indonesian data is on screen in Brisbane ATC centre Impact on safety of FIR boundary

20 Planning ADS-B on Gas/Oil Rigs

21 PLANNING ADS-B for Remote Control Towers Why? Low cost surveillance No COMS But no monitoring TSAD PC BOX PC with integrated ADS-B receiver Status Display operational with radar

22 Alliance

23 Filtering was removed in September For safety operators must ensure that all ADS-B transmissions are compliant. Removal of approval process We no longer know who has which avionics Operator gets ADS-B service if they transmit ADS-B

24 We retain a Black list Your customers don t want to be in Blacklist The Blacklist is for Non compliant aircraft Airservices will ask CASA to chase down compliance Allows Airservices management of flights until aircraft is compliant CASA may issue an exemption to CAO 20:18 on request (no guarantees) ADS-B services restored once aircraft is fixed and Airservices notified. An interim correction may be to disable ADS-B output or set NUCp or NIC to zero

25 Australian ADS-B rules in place Effective date 6 June 2007 Mandate Non compliant ADS-B must be disabled before flight [no bad data] 12 Dec 2013 Operation at/above FL290 requires ADS-B [12 months to go] Status Regulation in place (see CAO 20:18) (All airspace categories) 6 Feb 2014 All IFR aircraft first registered after [14 months to go] 6 Feb 2014 must have ADS-B out 6 Jan 2016 All IFR must have ADS-B out within 500 Nm Perth to north & east Regulation in place (see CAO 20:18) 8 Dec Jan 2017 ADS-B position source must be SA aware for aircraft manufactured after date All IFR must have ADS-B out in Australia (Applies to aircraft operating in Class A,B,C, E) Regulation in place (see CAO 20:18) (All airspace categories)

26 Transponder Rules in place Effective date 9 Feb Feb Feb 2016 Mandate All new registrations with Mode S transponder must have Mode S Flight ID All Mode S DAPS must be in accord with ICAO SARPS [no bad data] New registrations must have Top/bottom antenna if >5700Kg or TAS>250 Kts All new registrations or transponder installation replaced must have mode S with Flight ID & ADS-B capability All operations at Sydney, Brisbane, Melbourne & Perth airports must have mode S with Flight ID Status Regulation in place (see CAO 20:18) Applies to all aircraft operating in Class A,B,C, E or Above 10K in G Exceptions in Class E & G if the aircraft does not have an engine; or sufficient enginedriven electrical power generation capacity to power a Mode S transponder. Regulation in place (see CAO 20:18) Applies to all aircraft no exceptions New transponders for aircraft in Class A,B,C,E or above 10K must be Mode S with ADS-B capability - The phase out of Mode A/C has begun

27 Matching GPS rules in place too - Provides GPS based PBN (Note deeming rules CAO 20.91) Effective date 6 Feb 2014 Forward fit & New installations Mandate All IFR aircraft first registered after 6 Feb 2014 & New GPS installations in IFR after 6 Feb 2014 Must have TSO145/146/196 GPS (or CASA approved RNP capability) Status Regulation in place (see CAO 20:18) Almost no new TSO129 installations post Feb 2014 (they can be installed in VFR) 6 Jan 2016 Retrofit All IFR aircraft must have TSO145/146/196 GPS (or CASA approved RNP capability) or TSO129 Regulation in place (see CAO 20:18) Old TSO129 can stay until replaced BUT : a) probably can t feed ADS-B b) operator must carry fuel for alternate aerodrome with conventional navaids (many being decommissioned)

28 We are making sure everyone is aware.

29

30 AIP H96/12 Published Dec 2012

31 STATISTICS

32 % of Flights with ADS-B (Australian Rego) % Flights with ADSB ABOVE FL 285 Percent ALL LEVELS BELOW FL Aug Sep Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Date

33 Australian Military aircraft are equipping with ADS-B Currently equipped, approved & receiving service A332- MRRT Transport/Tanker B737-BBJ VIP Fleet Bombardier CL604 VIP Fleet B350 Army & Air Force Images Courtesy of Department of Defence

34 Chief of Air Force affirmed - The Australian Defence force is committed to a joint national Air Traffic Management system Defence commitment to ensuring its aviation activities take account of the ADS-B implementation program. Defence will enhance IFF, Mode S and ADS-B capabilities All future Defence Surveillance platforms will meet the ADS-B requirements Defence aircraft being retained post 2020 are expected to be equipped by 2018, with the ability to disable transmission as required. Images Courtesy of Department of Defence

35 Work to be done on the Australian IFR Fleet for 2017 Equipped To be ADS-B equipped Above FL285 Below FL285 ~283 (61%) ~136 (5%) ~178 ~ 2,636 By Dec 2013 (12 months) 15/month By Feb 2017 (~50 months) 53/month Plus workload of new Mode S transponders for SSR rules Plus workload associated with GPS mandate 2016 Based on detections by Airservices Ground stations

36 BUSINESS ARGUMENT

37 Why owners should fit early Investment has to be made (Mandate) Benefits of early ADS-B fitment exceed time value of money Operational benefits now - Safety benefit (& for companies liability) - Efficiency benefit (more likely clearance) High dollar (may be different in ) Low interest rates cost to equip earlier is low Track by Web tools Installation costs are likely to be higher in 2016 panic period Mode S transponder required in 2016 for major cities ADS-B require earlier if you operate in WA Potential NAV benefit - NPA approaches - Reduced need for fuel to alternate with Navaid (TSO146 GPS) as Navaid numbers reduce Reason to Delay Possible new products Will dispose of aircraft before mandate

38 Thank you & Questions?

39 SPARES

40 Test the output! Use an ADS-B capable test set. Know whether the transponder is DO260 (TSO166), DO260A (TSO166A) or DO260B (TSO166B) standard. The version number is available in BDS 6.5 A/C OP status. Check Flight ID : Callsign/ Registration (WITHOUT VH) Check 24 bit aircraft address : Check 24 bit aircraft address as allocated by CASA Check Emitter category : Check emitter category set and type are appropriate for the aircraft. Check Integrity (NIC ) = Examine the Type code for DO260A & DO260B It is important that NIC be non zero If the aircraft is transmitting AIRBORNE squits then the type code needs to be 9-15 Type HPL NIC code 9 <7.5m <25m <185.2m 9 or 8 12 <0.2 nm 7 13 <0.5 nm 6 14 <1.0 nm 5 15 <2.0 nm 4 16 <10 nm 3 or 2 Not used by ATC 17 <20 nm 1 Not used by ATC 18 > 20 nm 0 Not useable indicates no integrity

International Civil Aviation Organization

International Civil Aviation Organization International Civil Aviation Organization ADS-B SITF/14 IP/07 AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST SEMINAR AND FOURTEENTH MEETING OF AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) STUDY AND IMPLEMENTATION

More information

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6 European Airspace Concept Workshops for PBN Implementation Why have safety and performance criteria? Measure performance

More information

International Civil Aviation Organization

International Civil Aviation Organization International Civil Aviation Organization THE FOURTH MEETING OF STUDY AND IMPLEMENTATION TASK FORCE ( SITF/4) Nadi, Fiji, 26-28 October 2005 Agenda Item 13: Discuss issues observed during the trial and

More information

Mode S & ACAS Programme Operational Introduction of SSR Mode S

Mode S & ACAS Programme Operational Introduction of SSR Mode S Mode S & ACAS Programme Operational Introduction of SSR Mode S John Law Programme Manager john.law@eurocontrol.int Tel: +32 2 729 3766 European 1 Organisation for the Safety of Air Navigation Mode S Airborne

More information

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit Seychelles Civil Aviation Authority Telecomm & Information Services Unit 12/15/2010 SCAA 1 WORKSHOP EXERCISE Workshop on the development of National Performance Framework 6 10 Dec 2010 10/12/2010 SCAA

More information

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge ETSO Workshop 2008 New Developments in Avionic Friedhelm Runge Parts & Appliances Avionics PCM Dec. 2008 P&A section 1 Overview Single European Sky Communication Datalink 8.33 khz VHF Navigation ICAO PBN

More information

Discuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES

Discuss issues observed during the trial and implementation of ADS-B including review items from ADS-B Problem report database ADS-B ISSUES ADS-B SITF/6-IP/3 International Civil Aviation Organization AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) SEMINAR AND THE SIXTH MEETING OF ADS-B STUDY AND IMPLEMENTATION TASK FORCE (ADS-B SITF/6)

More information

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA

AUTOMATIC DEPENDENT SURVEILLANCE BROADCAST (ADS-B) IMPLEMENTATION IN INDONESIA Phone/ Fax : 62 21 3507603 Telegraphic Address AFS : WRRRYNYX REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION DIRECTORATE GENERAL OF CIVIL AVIATION DIRECTORATE OF AIR NAVIGATION SUB DIRECTORATE AERONAUTICAL

More information

International Civil Aviation Organization

International Civil Aviation Organization CNS/MET SG/14 IP/32 International Civil Aviation Organization FOURTEENTH MEETING OF THE COMMUNICATIONS/NAVIGATION/SURVEILLANCE AND METEOROLOGY SUB-GROUP OF APANPIRG (CNS/MET SG/14) Jakarta, Indonesia,

More information

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico INTEGRATION OF SPACE-BASED (SB ADSB) TECHNOLOGY INTO THE CANADIAN AIR NAVIGATION SYSTEM

More information

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN.

THIS BULLETIN REPLACES BULLETIN WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. IBAC Bulletin 16-03 THIS BULLETIN REPLACES BULLETIN 16-01 WHICH IS NO LONGER CURRENT AND HAS BEEN WITHDRAWN. Subject: Performance-based Navigation in Australian airspace - General guidance on the GNSS

More information

Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM

Approach 15 Australasian PBN Forum. Flight Deck Equipage to Enable CNS/ATM Approach 15 Australasian PBN Forum Flight Deck Equipage to Enable CNS/ATM Contents Australian CNS / ATM mandates Regulatory Structure Installation Considerations Continuing airworthiness consideration

More information

AIC 02/ JUN 2014

AIC 02/ JUN 2014 TEL: 248-4384186 AFS: FSIAYNYX FAX: 248-4384179 Email: ais@scaa.sc REPUBLIC OF SEYCHELLES CIVIL AVIATION AUTHORITY AERONAUTICAL INFORMATION SERVICE P.O.BOX 181, VICTORIA SEYCHELLES AIC 02/2014 06 JUN 2014

More information

ADS-B Rule and Installation Guidance

ADS-B Rule and Installation Guidance ADS-B Rule and Installation Guidance Presented by: Don Walker Date: June 2011 Outline U.S. ADS-B Rulemaking Airspace Rule Rule performance requirements AC 20-165 Installation and airworthiness approval

More information

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20. TELEPHONE: 1300-306-630 (local call - Aust wide, except from mobile phone) FAX: 02 6268 5111 1. INTRODUCTION 1.1 This AIP SUP amends AIP to remove navigation approvals that are no longer able to be used

More information

Frequently Asked Questions ADS-B. (Automatic Dependent Surveillance Broadcast)

Frequently Asked Questions ADS-B. (Automatic Dependent Surveillance Broadcast) Frequently Asked Questions ADS-B (Automatic Dependent Surveillance Broadcast) WARNING: Information, statements and opinions contained in this document are given in good faith and have been derived from

More information

Surveillance Opportunities and Challenges

Surveillance Opportunities and Challenges Services Info Days Brussels, 6-7 December 2017 Opportunities and Challenges Christos Rekkas Head of SUR Modernisation TLP: GREEN 1 SUR Applications list extending PSR/SSR Mode S Elementary Enhanced ADS-C

More information

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN PBN Performance Based Navigation - PBN & Airspace Concepts - Introduction to PBN 1 Learning Objectives PBN Concept within the context of an Airspace (Operational) Concept. Introduction to PBN 2/37 Components

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, July 2015 Safely guiding pilots and their passengers worldwide for over

More information

APAC PBN UPDATE Slide 1 of xx

APAC PBN UPDATE Slide 1 of xx APAC PBN UPDATE Slide 1 of xx Ian Mallett FREE OFFERS! CASA Training DVDs GNSS ADS-B More available from CASA Safety Management System (SMS) Booklet CASA Shop Items www.casa.gov.au Slide 2 of xx Slide

More information

Issues related to the provision of surveillance service

Issues related to the provision of surveillance service Surveillance Seminar for the NAM/CAR/SAM Region Port of Spain, 18-20 June 2007 Issues related to the provision of surveillance service Presented by: Jan Berends EUROCONTROL Surveillance Domain Manager

More information

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE AFS: WSSSYNYX caas_singaporeais@caas.gov.sg www.caas.gov.sg REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE

More information

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization

Subject: Automatic Dependent Surveillance-Broadcast (ADS-B) Operations and Operational Authorization OC NO 17 OF 2014 Date: 14 th October 2014 File No AV 22024/30/2014-FSD GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OPERATIONS CIRCULAR Subject: Automatic Dependent

More information

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission Access is a huge problem 2 out of 3 people in the world are not connected to the internet current solutions fail to effectively serve the needs

More information

Notice of Requirement

Notice of Requirement Notice of Requirement NTC 91.258 Automatic Dependent Surveillance- Broadcast (ADS-B) systems Revision 1 20 July 2018 Preliminary The Director of Civil Aviation issues the following requirements ( the requirements

More information

ADS-B Implementation Update 2011 CNS/ATM Conference

ADS-B Implementation Update 2011 CNS/ATM Conference ADS-B Implementation Update 2011 CNS/ATM Conference Prepared by Jeff Cochrane Manager, CNS Service Design June 2011 Briefing Overview Canadian ADS-B Implementation Review of Requirements for ADS-B surveillance

More information

French DSNA approach to CNS rationalization & evolution

French DSNA approach to CNS rationalization & evolution French DSNA approach to CNS rationalization & evolution Jean-Marc LOSCOS Senior expert on European Programs DSNA Toulouse CONTEXT: EUROPEAN ATM MASTER PLAN 2015 AND SINGLE EUROPEAN SKY (SES) The Single

More information

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez International Civil Aviation Organization PBN Airspace Concept Victor Hernandez Overview Learning Objective: at the end of this presentation you should Understand principles of PBN Airspace Concept 2 Gate

More information

Services Charter. 2014/15 to 2015/16

Services Charter. 2014/15 to 2015/16 Services Charter 2014/15 to 2015/16 Services Charter Overview Objective Airservices Australia is a governmentowned organisation providing safe and environmentally sound air traffic management, aviation

More information

28 January, 2010 New Delhi, India. Larry Coughlin. Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B)

28 January, 2010 New Delhi, India. Larry Coughlin. Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B) Airports Authority of India Automatic Dependent Surveillance-Broadcast (ADS-B) 28 January, 2010 New Delhi, India Larry Coughlin Managing Director India Operations Boeing Commercial Airplanes BOEING is

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, February 2014 Safely guiding pilots and their passengers worldwide for

More information

Module N B0-102: Baseline Ground-based Safety Nets

Module N B0-102: Baseline Ground-based Safety Nets Module B0-102 V1 1 2 3 Module N B0-102: Baseline Ground-based Safety Nets 4 5 Summary Main Performance Impact Operating Environment/Phases Flight Applicability Considerations Global Concept Component(s)

More information

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

RNP AR Experience. Phil Rakena PBN Project Manager February 2015 RNP AR Experience Phil Rakena PBN Project Manager February 2015 1 What is PBN? Area navigation, using on-board systems to provide position and confirm navigation performance. PBN represents a shift from

More information

This quarter we made progress against our major capital works program and against our Services Charter. An update is attached to this letter.

This quarter we made progress against our major capital works program and against our Services Charter. An update is attached to this letter. Office of the Chief Executive GPO Box 367 CANBERRA ACT 2601 Phone: (02) 6268 4182 Fax: (02) 6268 5685 ABN 59 698 720 886 CEO UPDATE REPORT TO INDUSTRY MARCH QUARTER 2011 OVERVIEW This quarter we made progress

More information

DSNA NAVIGATION STRATEGY

DSNA NAVIGATION STRATEGY DSNA NAVIGATION STRATEGY PBN & GNSS Ministère de l'écologie, du Développement durable, et de l Énergie PBN IMPLEMENTATION DRIVERS IN FRANCE ICAO directions towards PBN Improve Safety and Airspace Capacity,

More information

DEVELOPMENT OF COCKPIT DISPLAY OF TRAFFIC INFORMATION (CDTI)

DEVELOPMENT OF COCKPIT DISPLAY OF TRAFFIC INFORMATION (CDTI) ADS-B TF/3 -IP/10 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March

More information

TDR Mode S and ADS-B Transponders

TDR Mode S and ADS-B Transponders Business and Regional Systems Marketing Bulletin TDR Mode S and ADS-B Transponders Ref. No. BRS-110102.2M Pub Date 06/2012 Offering a variety of system solutions to meet Elementary/Enhanced Surveillance

More information

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY DGCA/06-IP/41 17/3/06 English only DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY Montréal, 20 to 22 March 2006 Theme 2: Improving aviation safety Topic 2.2: Management

More information

This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication.

This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication. 1 This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication. 1. What is ADS-B?... 6 1.1 How does ADS-B work?... 6 1.2 Why is New Zealand

More information

Draft PBN Implementation Plan Papua New Guinea

Draft PBN Implementation Plan Papua New Guinea Draft PBN Implementation Plan Papua New Guinea Version 1 12 April 2011 Civil Aviation Safety Authority of Papua New Guinea Table of Contents Acronyms... 1 Executive Summary... 3 Introduction... 4 The PBN

More information

Learning Objectives. By the end of this presentation you should understand:

Learning Objectives. By the end of this presentation you should understand: Designing Routes 1 Learning Objectives By the end of this presentation you should understand: Benefits of RNAV Considerations when designing airspace routes The basic principles behind route spacing The

More information

International Civil Aviation Organization

International Civil Aviation Organization ADS-B TF/3-IP/16 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March

More information

Entry of Flight Identity

Entry of Flight Identity ADS-B TF/3-IP/13 International Civil Aviation Organization The Third Meeting of Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force (ADS-B TF/3) Bangkok, 23-25 March

More information

Avionics requirements for State aircraft

Avionics requirements for State aircraft Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although

More information

Overview of Worldwide Data Link Equipage Mandates

Overview of Worldwide Data Link Equipage Mandates Overview of Worldwide Data Link Equipage Mandates Wednesday, November 18, 2015 3:00 to 4:30 pm PRESENTED BY: Tom Kraft, FAA CPDLC and ADS-C Data Link Mandates (and Incentives) FAA Airborne Data Link Recording

More information

Mandates. Airbus Fleet Implementations. AEEC 19 th June 2018

Mandates. Airbus Fleet Implementations. AEEC 19 th June 2018 Mandates Airbus Fleet Implementations AEEC 19 th June 2018 Roadmap of operational mandates DATA-LINK NAT-SPG EC EC 20% ELT ADS-B EC HUD 50% 10% 100% A/C Tracking GADSS* Recording Mandates Operationnal

More information

GTX 345 Transponder & ICAO IFR Filing. Charlotte County Composite Squadron FL Feb 2017 Maj Dick Morrell, Lt Tom Britton

GTX 345 Transponder & ICAO IFR Filing. Charlotte County Composite Squadron FL Feb 2017 Maj Dick Morrell, Lt Tom Britton GTX 345 Transponder & ICAO IFR Filing Charlotte County Composite Squadron FL-051 21 Feb 2017 Maj Dick Morrell, Lt Tom Britton N922CP C-172S GTN GPS Cockpit KLN 94 NON WAAS GPS Replaced with Garmin GTN

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS 2011-2015 Presented by Ahmed Mosaheb Chief Officer ATM MAURITIUS Characteristics of the Industry FIR- 9,000,000 sq

More information

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 IP/2 Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013 Agenda Item 2: Action Item from ASIOACG/7 Indian Ocean RNP4 (Presented by Airservices Australia) SUMMARY

More information

ADS-B Updates. Aviation Electronics Europe Munich, April Johan Martensson. EUROCONTROL Surveillance Modernisation 17 April 2016

ADS-B Updates. Aviation Electronics Europe Munich, April Johan Martensson. EUROCONTROL Surveillance Modernisation 17 April 2016 ADS-B Updates Aviation Electronics Europe Munich, April 2016 Johan Martensson EUROCONTROL Surveillance Modernisation 17 April 2016 Content Overview Ground ADS-B OUT Implementation Airborne ADS-B OUT Implementation

More information

PBN Implementation Plan - Fiji Version 1 19 January 2010

PBN Implementation Plan - Fiji Version 1 19 January 2010 PBN Implementation Plan - Fiji Version 1 19 January 2010 Airports Fiji Limited and Civil Aviation Authority of the Fiji Islands Table of Contents Acronyms........ 1 Executive Summary......... 3 Introduction.......

More information

PBN Airspace Concept. ATS requirements

PBN Airspace Concept. ATS requirements INTERNATIONAL CIVIL AVIATION ORGANIZATION PBN Airspace Concept ATS requirements Victor Hernandez RO ATM/SAR ICAO North America, Central America and Caribbean Regional Office 1 Gate to Gate concept Phases

More information

Next Generation Airspace Developments: Key Operational Trends and Enablers

Next Generation Airspace Developments: Key Operational Trends and Enablers Next Generation Airspace Developments: Key Operational Trends and Enablers ICNS 2013, Day 1 Plenary Nikos Fistas EUROCONTROL Herdon, VA, 23/04/13 Agenda Key goals of future European ATM system 4D Trajectory

More information

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION Space Based ADS-B ICAO SAT meeting - June 2016 1 Options to Detect an Aircraft Position Position Accuracy / Update Interval Voice Position Reporting ADS-C Position Reporting Radar Surveillance / MLAT Space

More information

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002

Overview of Satellite Navigation Transition. CAASD Industry Day with Users May 7, 2002 Overview of Satellite Navigation Transition CAASD Industry Day with Users May 7, 2002 Safety First and Foremost Navigation The Separation Safety Triad Communications Surveillance Three Legs of the Safety

More information

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015 Space Based ADS-B Transforming the Way you See the Sky September 23, 2015 COPYRIGHT 2014 AIREON LLC. ALL RIGHTS COPYRIGHT RESERVED. 2014 AIREON LLC. ALL RIGHTS RESERVED. 1 For optimal operational ATM Performance

More information

USE OF RADAR IN THE APPROACH CONTROL SERVICE

USE OF RADAR IN THE APPROACH CONTROL SERVICE USE OF RADAR IN THE APPROACH CONTROL SERVICE 1. Introduction The indications presented on the ATS surveillance system named radar may be used to perform the aerodrome, approach and en-route control service:

More information

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES AIP ENR 1.6-1 JORDAN 12 DEC 2013 ENR 1.6 RADAR SERVICES AND PROCEDURES 1. GENERAL 1.1 SERVICES a) Radar units in the Amman FIR operate as integral parts of the ATS system and provide Radar Control Service

More information

Surveillance and Broadcast Services

Surveillance and Broadcast Services Surveillance and Broadcast Services Benefits Analysis Overview August 2007 Final Investment Decision Baseline January 3, 2012 Program Status: Investment Decisions September 9, 2005 initial investment decision:

More information

Performance Based Navigation Operational End-State 2023

Performance Based Navigation Operational End-State 2023 Performance Based Navigation Operational End-State 2023 A Regulatory View Organisation Civil Aviation Authority of New Zealand Date of this Document November 2018 Authored by: Primary Author: Ray Harvey,

More information

Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101. A Plain Speak White Paper. on the. Current and Near-Term Future. As Air Navigation Transitions

Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101. A Plain Speak White Paper. on the. Current and Near-Term Future. As Air Navigation Transitions Volume 5 Issue 1 Issue Date May 15, 2013 ADS-B 101 A Plain Speak White Paper on the Current and Near-Term Future As Air Navigation Transitions from Ground Based Radar to Satellite Based ATC Assistance

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

ADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service

ADS-B. Installation Challenges. July 13, Federal Aviation Administration. James Marks ADS-B Focus Team Lead FAA Flight Standards Service ADS-B Installation Challenges July 13, 2017 James Marks ADS-B Focus Team Lead FAA Flight Standards Service Agenda ADS-B Out Mandate Equipage Enablers Installation Challenges Rule Performance Monitoring

More information

PBN Implementation Plan Tonga

PBN Implementation Plan Tonga PBN Implementation Plan Tonga Version: 2 Date: January 2013 Executive Summary Performance Based Navigation (PBN) is a change from aircraft navigating/flying using ground based navigation aids to using

More information

AIP PORTUGAL ENR NOV-2007

AIP PORTUGAL ENR NOV-2007 AIP PORTUGAL ENR 1.6-1 ENR 1.6 RADAR SERVICES AND PROCEDURES PROVISION OF RADAR SERVICES WITHIN LISBOA AND SANTA MARIA FIR / UIR Introduction Air Traffic Control Services within Lisboa and Santa Maria

More information

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM. Serial Number: 2017_001_Rev 02 1 Subject: NAT common DLM AIC Originator: NAT SPG Issued: 19 July 2017 Effective: 21 July 2017 The purpose of North Atlantic Operations Bulletin 2017_001_Rev 02 is to provide

More information

Automatic Dependent Surveillance-Broadcast (ADS-B)

Automatic Dependent Surveillance-Broadcast (ADS-B) Automatic Dependent Surveillance-Broadcast (ADS-B) Tenth Meeting of the ICAO ADS-B Study and Implementation Task Fce (ADS-B SITF/10) Jessie Turner Principal Engineer/DER Singape Avionics Air Traffic Management

More information

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies

PBN Performance. Based Navigation. Days 1, 2 & 3. ICAO PBN Seminar Seminar Case Studies Days 1,2,3. Seminar Case Studies PBN Performance Based Navigation Seminar Case Studies Days 1, 2 & 3 1 Overview 2 Case Study - Day 1 Case Study - Day 2 Case Study - Day 3 3 Case Study - Day 1 Learning Objectives Identify navigation performance

More information

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018 Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures Controller Pilot Symposium 24 October 2018 Our airspace Flight Information Regions London & Scottish FIRs: 1m km 2 11% of Europe s

More information

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety RAAC/15-WP/14 International Civil Aviation Organization 14/ /11/17 ICAO South American Regional Office Fifteenth Meeting of the Civil Aviation Authorities of the SAM Region (RAAC/15) (Asuncion, Paraguay,

More information

PBN IMPLEMENTATION IN INDONESIA

PBN IMPLEMENTATION IN INDONESIA PBN IMPLEMENTATION IN INDONESIA Program For The PBN Workshop For ATC I Wayan Sudiartha Head of the Standardization and Certification Division Profile of AirNav Indonesia Establishment : o Declared by Government

More information

Table of Contents. Mode-S Surveillance Decision 3 What is Mode-S? 3 How does Mode-S work? 4

Table of Contents. Mode-S Surveillance Decision 3 What is Mode-S? 3 How does Mode-S work? 4 The purpose of this Information Notice is to brief Military Organisations about regulation changes related to the mandatory carriage and operation of Secondary Surveillance Radar (SSR) Mode-S airborne

More information

Ground movement safety systems and procedures - an overview

Ground movement safety systems and procedures - an overview Ground movement safety systems and procedures - an overview Thorsten Astheimer, Fraport AG Airside System Development Purpose of Surface Movement Guidance Systems Definition of A-SMGCS Levels (ICAO): 1)

More information

Change to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information

Change to Automatic Dependent Surveillance Broadcast Services. SUMMARY: This action announces changes in ADS-B services, including Traffic Information This document is scheduled to be published in the Federal Register on 12/20/2017 and available online at https://federalregister.gov/d/2017-27202, and on FDsys.gov DEPARTMENT OF TRANSPORTATION Federal

More information

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager

PBN Implementation. Phil Rakena. PBN Implementation Programme Manager Implementation Phil Rakena Implementation Programme Manager CANSO APAC Conference - 06 th May 2017 Implementation Scope: What, Why, When? How to? o Needs / Plan o Collaborate o Educate o Regulate o Resource

More information

Different in character or other means of compliance. Less protective or partially implemented not implemented

Different in character or other means of compliance. Less protective or partially implemented not implemented 4//018 Aeroplane CAR Interpretation Australian legislation excludes power-assisted sailplanes Alternate aerodrome AIP GEN. CAR Definitions Take-off and En-route alternates not specifically defined in legislation

More information

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Performance Based Navigation (PBN) Implementation Plan. The Gambia Performance Based Navigation (PBN) Implementation Plan The Gambia Version 1.0 Table of contents 1. Executive summary.. 2 2. Introduction. 2 3. The need for PBN implementation 2 4. Benifit of PBN implementation

More information

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA 2011-2015 Presented by Ghebreab Ghebremedhin Director ANS/AGA Division DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION

More information

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms 06/09/17 Seventh Meeting of the North American, Central American and Caribbean Directors of Civil Aviation (NACC/DCA/07) Washington, D. C., United States, 19 21 September 2017 Agenda Item 5: NAM/CAR Regional

More information

NATA 2018 AGM & CONFERENCE

NATA 2018 AGM & CONFERENCE NATA 2018 AGM & CONFERENCE Tracy Beeman A / VP, Stakeholder and Commercial Relations Jeff Cochrane Director, Navigation and Airspace TOPICS NAV CANADA Corporate Update Navigation and Airspace NAVAID Modernization

More information

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana) International Civil Aviation Organization SAM/IG/22-IP/19 South American Regional Office 12/11/2018 Twenty Second Workshop/Meeting of the SAM Implementation Group (SAM/IG/22) - Regional Project RLA/06/901

More information

Avionics requirements for State aircraft

Avionics requirements for State aircraft Avionics requirements for State aircraft EUROCONTROL has prepared a short summary offering an overview of a significant series of avionics requirements and their applicability to State aircraft. Although

More information

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs.

CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. CAR Section II Series I Part VIII is proposed to be amended. The proposed amendments are shown in subsequent affect paragraphs. The text of the amendment is arranged to show deleted text, new or amended

More information

Approach Specifications

Approach Specifications Approach Specifications RNP Approach (RNP APCH) and Baro-VNAV Approach Specifications RNP APCH and Baro-VNAV 1 Overview Learning Objectives: At the end of this presentation, you should: Understand the

More information

UK Implementation of PBN

UK Implementation of PBN UK Implementation of PBN Geoff Burtenshaw Directorate of Airspace Policy UK Civil Aviation Authority 1 UK airspace context Presentation Overview Future Airspace Strategy (FAS) (FAS) Industry Implementation

More information

INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT

INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT INSTRUCTIONS FOR USING THIS SAMPLE FLIGHT MANUAL SUPPLEMENT 1. For those installations not installed in accordance with GDL 82 Mooney M20 Series STC SA02573SE, a flight manual supplement may be created

More information

ADS-B Exclusion List

ADS-B Exclusion List ADS-B Exclusion List NAT Procedures v-2015-1 Prepared by: Guðmundur Karl Einarsson Last saved: 30. Nov 2015 Document: http://verkefni.isavia.is/verkefnahopar/adsb/shared Documents/Operation/ADS-B-Incidents-And-Blacklist/Blacklist-Avionics/NAT

More information

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY

ADVANCED TECHNOLOGIES AND OCEANIC PROCEDURES (ATOP) SYSTEM. Presented by the United States of America SUMMARY 20 th E/CAR DCA-IP/12 International Civil Aviation Organization 21/11/06 NORTH AMERICAN, CENTRAL AMERICAN AND CARIBBEAN OFFICE Twentieth Meeting of Directors of Civil Aviation of the Eastern Caribbean

More information

NextGen Priorities: Multiple Runway Operations & RECAT

NextGen Priorities: Multiple Runway Operations & RECAT NextGen Priorities: Multiple Runway Operations & RECAT May 2018 Presented by Paul Strande & Jeffrey Tittsworth Federal Aviation Administration National Airspace System Today Air traffic services for the

More information

CMATS The Civil Military ATM System

CMATS The Civil Military ATM System CMATS The Civil Military ATM System OneSKY Australia Program Update Michael Berechree National Manager Aviation Meteorological Services Bureau of Meteorology OneSKY Australia program By 2021, Australia

More information

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation Considerations for RNP to xls Operations Juergen Ruppert Regional Director Air Traffic Optimisation Services GE Aviation RNP to ILS 2 Content Why RNP to XLS What is the technology How does it work now?

More information

Airworthiness considerations for UAVs

Airworthiness considerations for UAVs A general overview about the approach to a UAV System under current regulations for operation, airspace and certification Presentation by : STN ATLAS ELEKTRONIK Klaus Wohlers, LMP Airborne Systems Type

More information

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten NAV CANADA and DATA LINK IMPLEMENTATION Shelley Bailey NAV CANADA May 2016 Sint Maarten OPDWLG Operational Data Link Working Group 5 members here today representing ANSPs, manufacturers and regulators

More information

Federal Aviation Administration Early Implementation Experiences

Federal Aviation Administration Early Implementation Experiences Early Implementation Experiences Presented by: Don Walker Presented to: Aircraft Electronics Association Date: February 2011 Outline 1 Errors Seen In Early Implementations 1.1 Software related 1.2 GPS

More information

8 Things Every Aircraft Owner Needs To Know About The 2020 ADS-B Mandate. Contents INTRO: WHAT IS ADS-B EQUIPMENT, AND WHAT DOES IT DO?...

8 Things Every Aircraft Owner Needs To Know About The 2020 ADS-B Mandate. Contents INTRO: WHAT IS ADS-B EQUIPMENT, AND WHAT DOES IT DO?... Contents INTRO:...3 1. WHAT IS ADS-B EQUIPMENT, AND WHAT DOES IT DO?... 4 2. WHY IS THE FAA MANDATING THIS?... 5 3. HOW DOES IT WORK (TECHNICALLY SPEAKING)?... 6 4. HOW MUCH WILL IT COST ME?...7 5. WHEN

More information

Boeing Air Traffic Management Overview and Status

Boeing Air Traffic Management Overview and Status Boeing Air Traffic Management Overview and Status ENRI International Workshop on ATM/CNS EIWAC 2010 November 10-15, 2010 Tokyo, Japan Matt Harris Avionics Air Traffic Management Boeing Commercial Airplanes

More information

International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force

International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force ADS-B-SITF/IP/6 International Civil Aviation Organization Automatic Dependent Surveillance Broadcast (ADS-B) Study and Implementation Task Force Brisbane, Australia, 24-26 March 2003 Agenda Item 3: Evaluate

More information

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach

Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Flight Evaluation Schedule For GPS IFR Approval Primary Means Enroute, Terminal and Non-Precision Approach Aircraft Description: Model ZK- Operator GPS Description: Manufacturer Model Serial Number TSO-C129

More information

The INs and OUTs of ADS-B

The INs and OUTs of ADS-B The INs and OUTs of ADS-B Presented by: Date: John Fisher Nov 12, 2016 Outline Glider ANPRM Process Surveillance Overview ATCRBS, Mode S, and ADS-B ADS-B OUT and IN 1090ES and 978 UAT Other Systems ADS-B

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 23 P-1 Line #27 Exhibit P-40, Budget Line Item Justification: PB 2015 Army Date: March 2014 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready,

More information