1 Recommended Allocation: $250,000 ACRP Staff Comments This problem statement was also submitted last year. TRB AV030 supported the research; however, it was not recommended by the review panel, which noted the FAA is addressing this issue through other research means. TRB Aviation Committee Comments ENVIRONMENTAL IMPACTS OF AVIATION: Limited support. Reviewers were mixed on this problem statement. Several felt this would support developing an aircraft weight takeoff database and improving defaults in AEDT. Others felt this was a topic that AEE is working on for the next version of AEDT. Review Panel Recommendation and Comments Recommended. The consensus of the review panel was that anything to make the AEDT model more accurate would be beneficial. Yet there was also cautious recognition that ACRP research resulting in suggestions for model improvements cannot be directly implemented with respect to changes to the model. Isn't this something FAA/Volpe should do? Where would users get the data? And if there is a database, who would maintain it? AOC Disposition This problem statement received an average rating of 2.2 points out of a possible 5 points among voting AOC members. There was no discussion. No funds were allocated.

2 ACRP Problem Statement Problem Statement Title: Background: Average domestic aircraft load factors have steadily increased from a low of 60.7% in 1990 to a record 84.5% in Legacy and Low Cost Carriers (LCC) have reduced equipment capacity leading to higher load factors using narrow-body aircraft on domestic and some international routes formally served by wide-body aircraft. These narrow-body aircraft were not 1) anticipated to carry load factors over 80% on a consistent basis or 2) fly transcontinental routes. These two factors lead to heavier aircraft on departure than are assumed in the FAA s Aviation Environmental Design Tool (AEDT). AEDT Version 2b is based on Legacy carrier s break-even load factor percentages below 70%; this was revolutionized by LCC flying narrow body aircraft with higher load factors on longer routes. Aircraft inputs into AEDT are based in part on aircraft size, destination, fuel burn, and assuming smaller/narrow body aircraft fly shorter routes. Assumptions about shorter routes include an aircraft that has enough fuel for a route no longer than 500 nautical miles with little cargo and 65% load factor. The last year that United States domestic load factors were 65% was in 1995; since then, aircraft load factors have been well above that, even after the events of 2001 and the recession of This leads to aircraft that execute departure climbs at angles that more closely match longer stage lengths than aircraft assumed to have a lower load factor, less fuel, and less cargo. AEDT aircraft noise modeling tools are used in part to output DNL/CNEL contours used by airports for long-term land use planning, noise abatement efforts, and residential sound insulation program eligibility. Given the steady increase in load factors over the past 21 years and change from the Legacy model to LCC, there is a gap between how airlines operate and how these operations are modeled by practitioners. This gap can lead to inaccurate analysis and a prediction of aircraft noise contours that are smaller than what is actually generated by aircraft operations. Technical Notes: In AEDT, stage length is defined as a range of trip distances. The idea behind using stage length is that the longer the trip, the heavier the assumed average takeoff weight due to increased fuel requirements. Historically, it has been easier to obtain trip length data than average aircraft weight data, so stage length has been used as a surrogate for aircraft takeoff weight. However, given that aircraft weight directly affects the departure profile, it is important to obtain average takeoff weight if it is feasible. The reason is that a shorthaul flight could carry full load of passengers and ferry extra fuel, and the practitioner would unknowingly under predict noise by using stage length. 1 United States Department of Transportation, Bureau of Transportation Statistics, T-100 Segment Data, March 2015 BridgeNet International P a g e 1

3 Profile weight is the weight of the aircraft during the operation. Aircraft fuel burn is not accounted for, so the weight remains constant over the entire operation. o If procedural profiles are used, departure profile weight influences the altitude that can be attained in a given amount of ground distance, thus affecting the noise produced by the airplane. o For approach procedural profiles, weight influences the thrust required to maintain a descent profile, thus affecting the noise produced by the airplane. o For fixed-point profiles, altitude and thrust are pre-computed and the weight parameter is used only for reference. Objective: Develop an aircraft weight database that can be incorporated into AEDT instead of relying on stage length. Determine how often this database should be updated and the mechanism to get it updated in future updates to AEDT. Proposed Tasks: The research plan should include appropriate interim deliverables that include at a minimum: and A working paper describing the results from a review of existing aircraft weight databases, including the T-100 Segment Data from the Bureau of Transportation Statistics. An interim report that includes: Survey airports with radar to determine delta between actual aircraft climb profile and AEDT climb profile for specific aircraft, extrapolating this to DNL/CNEL noise contour output analysis. Survey the aircraft weight data for airports representative of small, medium, and large hubs. The research plan should describe sources for aircraft weight data, the proposed airports to be included in the analysis (and the rationale for their consideration), and criteria to evaluate results; A plan for coordinating with the AEDT Support/Development Team to ensure research results are compatible with the AEDT aircraft noise model; A plan for peer review (including SAE A-21 Committee on Aircraft Noise) of model improvements; and A prioritized list of potential AEDT improvements and the rationale for their prioritization (e.g., precision, cost, data requirements, ease of implementation). The research plan should build in appropriate checkpoints with the ACRP panel, including at a minimum: (1) a kick-off teleconference to be held within 1 month of Notice to Proceed; (1) one web-enabled meeting to discuss the results of the working paper; (1) one face-to-face meeting to discuss the results of the interim report; and (4) other web-enabled meetings or teleconferences tied to the panel review and ACRP approval. BridgeNet International P a g e 2

4 The final deliverables will include: (1) A technical report documenting the entire research effort, including the research methodology, results, and a prioritized list of additional related research needs; (2) Detailed documentation of model improvements (e.g., process map, equations, data, validation and verification) to improve the noise prediction accuracy of AEDT; and (3) A supplement to the AEDT User Guide to help practitioners incorporate updates. The supplement should describe input data, the modeling method, and generation and interpretation of results. Estimated Funding: The estimated funding for this project is $250,000. This accounts for the above tasked items. Estimated Research Duration: The duration of this project is estimated to be 16 months. It is assumed the majority of the schedule will be in the initial tasks of creating draft research plan and data analysis. Related Research: The team preparing the Problem Statement examined existing data sources, including for related research. This search found information regarding load factors, but not a relationship between load factors and assumed aircraft weight related to stage lengths. ACRP has funded programs related to AEDT, including improving arrival and departure profiles, helicopter noise modeling guidance, modeling of ground surfaces, taxi noise, and emissions reporting. 2 Process Used to Develop Problem Statement: The process used to formulate this Problem Statement included discussion between the airport and consultant staff. This discussion was prompted by a previous need by the airport to adjust the stage lengths for its Noise Exposure Map update, including a request to the FAA for amended stage-lengths. The process also included review of historic radar data showing aircraft climb profiles for certain heavily-traveled routes were, on average, lower than the INM noise departure profiles. 2 ACRP Projects 2-55, 2-54, 2-44, 2-52, 2-27 and 2-45 BridgeNet International P a g e 3

5 Person(s) Submitting the Problem Statement: Bert Ganoung Noise Abatement Office Manager San Francisco International Airport Aircraft Noise Abatement Office E: P: In Conjunction With: Justin W. Cook Vice President BridgeNet International E: P: BridgeNet International P a g e 4

Estimating Operations and Airport-Specific Landing & Take-off Cycles at GA Airports

Estimating Operations and Airport-Specific Landing & Take-off Cycles at GA Airports Estimating Operations and Airport-Specific Landing & Take-off Cycles at GA Airports 2016 Purdue Road School Mary E. Johnson, Ph.D. Associate Professor Chenyu Huang Ph.D. student Facts The 117 public-use

More information

3. ICAO Supporting Tools - Publicly available

3. ICAO Supporting Tools - Publicly available States Action Plans Seminar 3. ICAO Supporting Tools - Publicly available ICAO Secretariat Introduction Baseline Mitigation Measures Mitigation Measures Expected Results?????? ICAO Environmental Tools

More information

Part 150 and Part 161: Purpose, Elements, and Process

Part 150 and Part 161: Purpose, Elements, and Process Part 150 and Part 161: Purpose, Elements, and Process Presentation to: Noise Compatibility Committee January 29, 2015 Ted Baldwin Part 150, Airport Noise Compatibility Planning FAA created in response

More information

Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development

Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development ACRP Problem Statement 16-07-04 Recommended Allocation: -- Planning and Designing Airport Infrastructure to Support GPS and PBN Approach Development ACRP Staff Comments -- TRB Aviation Committee Comments

More information

Forecast of Aviation Activity

Forecast of Aviation Activity DETROIT METROPOLITAN WAYNE COUNTY AIRPORT FAR PART 150 NOISE COMPATIBILITY STUDY UPDATE CHAPTER B FORECAST OF AVIATION ACTIVITY Forecast of Aviation Activity Introduction This chapter summarizes past aviation

More information

Takeoff/Climb Analysis to Support AEDT APM Development Project 45

Takeoff/Climb Analysis to Support AEDT APM Development Project 45 FAA CENTER OF EXCELLENCE FOR ALTERNATIVE JET FUELS & ENVIRONMENT Takeoff/Climb Analysis to Support AEDT APM Development Project 45 Project manager: Bill He, FAA Lead investigator: Michelle Kirby, Georgia

More information

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning

Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Problem Statement 17-03-09 Recommended Allocation: $500,000 Airports and UAS: Integrating UAS into Airport Infrastructure and Planning ACRP Staff Comments This is one of four UAS-themed problem statements

More information

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR

APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR APPENDIX H 2022 BASELINE NOISE EXPOSURE CONTOUR This appendix sets forth the detailed input data that was used to prepare noise exposure contours for 2022 Baseline conditions. H.1 DATA SOURCES AND ASSUMPTIONS

More information

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY

WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY WELCOME! FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Public Information Workshop November 2017 1 14 CFR Part 150 Overview Establishes the methodology

More information

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP)

MINNEAPOLIS-ST. PAUL PUBLIC INPUT MEETING 3 RD QUARTER 2016 INTERNATIONAL AIRPORT (MSP) 3 RD QUARTER 2016 MINNEAPOLIS-ST. PAUL INTERNATIONAL AIRPORT (MSP) PUBLIC INPUT MEETING Metropolitan Airports Commission Noise Program Office July 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

Preferred Alternative Summary

Preferred Alternative Summary Tacoma Narrows Airport Master Plan Update Preferred Alternative Summary The Preferred Alternative represents Pierce County s vision for the long-term development of the Tacoma Narrows Airport. This Alternative

More information

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report

Welcome to Public Information Workshop 1. San Francisco International Airport FAR Part 150 Study Update Noise Exposure Map Report Welcome to Public Information Workshop 1 Chetcuti Room, City of Milbrae 450 Poplar Avenue Milbrae, California 94030 Wednesday, June 4, 2014 5:45 p.m. to 6:45 p.m. PDT The FAA typically uses the airport

More information

Project 045 Takeoff/Climb Analysis to Support AEDT APM Development

Project 045 Takeoff/Climb Analysis to Support AEDT APM Development Project 045 Takeoff/Climb Analysis to Support AEDT APM Development Georgia Institute of Technology Project Lead Investigator Prof. Dimitri Mavris Professor Dimitri N. Mavris Director Aerospace Systems

More information

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport Executive Summary MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport As a general aviation and commercial service airport, Fort Collins- Loveland Municipal Airport serves as an important niche

More information

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D

STAFF REPORT. Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan. MEETING DATE: November 19, 2015 AGENDA ITEM: 7D STAFF REPORT SUBJECT: Airport Land Use Plan Consistency Review: Santa Barbara Airport Master Plan MEETING DATE: AGENDA ITEM: 7D STAFF CONTACT: Peter Imhof, Andrew Orfila RECOMMENDATION: Adopt findings

More information

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Buchanan Field. Airport Planning Program. FAR Part 150 Meeting. September 28, Master Plan FAR Part 150 Noise Study Strategic Business Plan Airport Planning Program Master Plan FAR Part 150 ise Study Strategic Business Plan FAR Part 150 Meeting September 28, 2006 Agenda Introduction Part 150 Study Working Paper Two Operational Alternatives

More information

RNP AR APCH Approvals: An Operator s Perspective

RNP AR APCH Approvals: An Operator s Perspective RNP AR APCH Approvals: An Operator s Perspective Presented to: ICAO Introduction to Performance Based Navigation Seminar The statements contained herein are based on good faith assumptions and provided

More information

Airports and UAS: Managing UAS Operations in the Airport Vicinity

Airports and UAS: Managing UAS Operations in the Airport Vicinity ACRP Problem Statement 17-10-09 Recommended Allocation: $350,000 Airports and UAS: Managing UAS Operations in the Airport Vicinity ACRP Staff Comments This is one of four UAS-themed problem statements

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006

PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 PUBLIC INFORMATION WORKSHOP #4 / PUBLIC HEARING November 8 / 9, 2006 A Noise Compatibility Study, prepared under Part 150 of the Federal Aviation Regulations (FAR), is a voluntary program aimed at balancing

More information

1.0 OUTLINE OF NOISE ANALYSIS...3

1.0 OUTLINE OF NOISE ANALYSIS...3 Table of Contents 1.0 OUTLINE OF NOISE ANALYSIS...3 2.0 METHODOLOGY...3 2.1 BACKGROUND...3 2.2 COMPUTER MODELING...3 3.0 EXISTING NOISE ENVIRONMENT...4 3.1 EXISTING SANTA MONICA MUNICIPAL AIRPORT NOISE...4

More information

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis

Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis Recommendations for Northbound Aircraft Departure Concerns over South Minneapolis March 21, 2012 Noise Oversight Committee Agenda Item #4 Minneapolis Council Member John Quincy Background Summer of 2011

More information

Quiet Climb. 26 AERO First-Quarter 2003 January

Quiet Climb. 26 AERO First-Quarter 2003 January Quiet Climb Boeing has developed the Quiet Climb System, an automated avionics feature for quiet procedures that involve thrust cutback after takeoff. By reducing and restoring thrust automatically, the

More information

Air Navigation Bureau ICAO Headquarters, Montreal

Air Navigation Bureau ICAO Headquarters, Montreal Performance Based Navigation Introduction to PBN Air Navigation Bureau ICAO Headquarters, Montreal 1 Performance Based Navigation Aviation Challenges Navigation in Context Transition to PBN Implementation

More information

6.0 JET ENGINE WAKE AND NOISE DATA. 6.2 Airport and Community Noise

6.0 JET ENGINE WAKE AND NOISE DATA. 6.2 Airport and Community Noise 6.0 JET ENGINE WAKE AND NOISE DATA 6.1 Jet Engine Exhaust Velocities and Temperatures 6.2 Airport and Community Noise D6-58329 JULY 1998 93 6.0 JET ENGINE WAKE AND NOISE DATA 6.1 Jet Engine Exhaust Velocities

More information

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014

LAX Community Noise Roundtable. Aircraft Noise 101. November 12, 2014 LAX Community Noise Roundtable Aircraft Noise 101 November 12, 2014 Overview Roles and Responsibilities for Aircraft Noise Relevant Federal Regulations Relevant California Regulations Aircraft Noise Metrics

More information

Minneapolis-St. Paul International Airport (MSP)

Minneapolis-St. Paul International Airport (MSP) 2 nd Quarter 2016 Minneapolis-St. Paul International Airport (MSP) Public Input Meeting Metropolitan Airports Commission Noise Program Office April 27, 2016 PUBLIC INPUT MEETING Meeting Goals To hear the

More information

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis

Appendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway

More information

Time-series methodologies Market share methodologies Socioeconomic methodologies

Time-series methodologies Market share methodologies Socioeconomic methodologies This Chapter features aviation activity forecasts for the Asheville Regional Airport (Airport) over a next 20- year planning horizon. Aviation demand forecasts are an important step in the master planning

More information

RTIA Runway Utilization Discussion Paper

RTIA Runway Utilization Discussion Paper RTIA Runway Utilization Discussion Paper December 2003 1.0 Introduction The Airport Noise Advisory Panel (ANAP) is a voluntary committee formed by the Airport Authority of Washoe County (AAWC) Board of

More information

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module

Aircraft Noise. Why Aircraft Noise Calculations? Aircraft Noise. SoundPLAN s Aircraft Noise Module Aircraft Noise Why Aircraft Noise Calculations? Aircraft Noise Aircraft noise can be measured and simulated with specialized software like SoundPLAN. Noise monitoring and measurement can only measure the

More information

APPENDIX C NOISE ANALYSIS

APPENDIX C NOISE ANALYSIS APPENDIX C NOISE ANALYSIS KBE Final - 10/11/16 Existing Noise The extent of existing noise resulting from aircraft operations at Central Colorado Regional Airport (AEJ) was determined using the FAA-approved

More information

Peer Review of Noise Modelling using ECAC Doc. 29 for Amsterdam Schiphol Airport. D Rhodes

Peer Review of Noise Modelling using ECAC Doc. 29 for Amsterdam Schiphol Airport. D Rhodes Peer Review of Noise Modelling using ECAC Doc. 29 for Amsterdam Schiphol Airport D Rhodes UK Civil Aviation Authority October 2018 Summary A peer review has been undertaken on the Dutch aircraft noise

More information

DCA Airport Noise. MWAA WG Dec 15, 2016

DCA Airport Noise. MWAA WG Dec 15, 2016 DCA Airport Noise MWAA WG Dec 15, 2016 BACKGROUND FAA Next Gen noise Analyzed on macro level Data below 3K Ft under estimated community level impacts Primary focus has been on departure procedures 1 part

More information

6.0 JET ENGINE WAKE AND NOISE DATA. 6.2 Airport and Community Noise

6.0 JET ENGINE WAKE AND NOISE DATA. 6.2 Airport and Community Noise 6.0 JET ENGINE WAKE AND NOISE DATA 6.1 Jet Engine Exhaust Velocities and Temperatures 6.2 Airport and Community Noise SEPTEMBER 2005 153 6.0 JET ENGINE WAKE AND NOISE DATA 6.1 Jet Engine Exhaust Velocities

More information

Continuous Descent? And RNAV Arrivals

Continuous Descent? And RNAV Arrivals Continuous Descent? And RNAV Arrivals From an ATC Perspective Presentation to: CDA Workshop GA Tech Name: Don Porter RNP Project Lead FAA, RNAV RNP Group Date: 18 April 2006 My Background 22 years Terminal

More information

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010

msp macnoise.com MSP Noise Oversight Committee (NOC) November 17, 2010 MSP Noise Oversight Committee (NOC) November 17, 2010 Operations Update Technical Advisor s Report Summary MSP Complaints September October 2010 3,025 3,567 2009 6,350 6,001 Total Operations September

More information

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY. Safety and Airspace Regulation Group 31 May 2018 Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY 1 Introduction 1.1 This Policy Statement (PS) presents CAA policy and guidance to Air Navigation

More information

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation

Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Mr. Chairman, Members of the Committee, I am Chet Fuller, President GE Aviation Systems, Civil. Thank you for the opportunity to testify before the Subcommittee today on the issue of Area Navigation (RNAV)

More information

Part 150 Update Status and Recommendation

Part 150 Update Status and Recommendation Part 150 Update Status and Recommendation Presentation to: Noise Compatibility Committee October 26, 2010 Ted Baldwin 2 Topics Part 150 background Project status Noise Exposure Map Noise Compatibility

More information

SFO Tailored Arrivals Environmental Analysis

SFO Tailored Arrivals Environmental Analysis Advanced Air Traffic Management SFO Tailored Arrivals Environmental Analysis by Kevin Elmer, Rob Mead, Louis Bailey, Brad Cornell, Jesse Follet (Boeing) Richard Lanier (NASA Ames Research Center / FAA)

More information

Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee

Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Noise Compatibility Committee Revised National Business Aviation Association (NBAA) Noise Abatement Departure Procedures (NADPs) Presentation to: Noise Compatibility Committee October 29, 2015 Ted Baldwin What are NADPs? Departure

More information

Restricted Hours Operating Policy

Restricted Hours Operating Policy Restricted Hours Operating Policy Airside Systems & Programs Creation Date: [February 19, 2018] Version: [4.0] Table of Contents 1 Introduction... 1 1.1 General Information... 1 1.2 Noise Operating Restrictions

More information

Appendix 5 Supplemental Noise and Aircraft Substitution

Appendix 5 Supplemental Noise and Aircraft Substitution Appendix 5 Supplemental Noise and Aircraft Substitution Appendix Integrated Noise Model Substitutions Summary The FAA s Integrated Noise Model (INM), Version 7.d, was used to generate aircraft noise exposure

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input

More information

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT/20 WP/10 Attachement A PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT SAT Region PROJECT DESCRIPTION (PD) Title of the Project Starting date Ending date Meetings on The Improvement of Air Traffic Services

More information

Runway Length Analysis Prescott Municipal Airport

Runway Length Analysis Prescott Municipal Airport APPENDIX 2 Runway Length Analysis Prescott Municipal Airport May 11, 2009 Version 2 (draft) Table of Contents Introduction... 1-1 Section 1 Purpose & Need... 1-2 Section 2 Design Standards...1-3 Section

More information

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity.

The forecasts evaluated in this appendix are prepared for based aircraft, general aviation, military and overall activity. Chapter 3: Forecast Introduction Forecasting provides an airport with a general idea of the magnitude of growth, as well as fluctuations in activity anticipated, over a 20-year forecast period. Forecasting

More information

TRB and ACRP Research Updates: Practical Application

TRB and ACRP Research Updates: Practical Application TRB and ACRP Research Updates: Practical Application 2014 ACI Environmental Affairs Conference Danielle J. Rinsler, AICP FAA Office Airports, Airport Planning and Environmental Division Baltimore, MD Advisory

More information

Safety Enhancement SE ASA Design Virtual Day-VMC Displays

Safety Enhancement SE ASA Design Virtual Day-VMC Displays Safety Enhancement SE 200.2 ASA Design Virtual Day-VMC Displays Safety Enhancement Action: Implementers: (Select all that apply) Statement of Work: Manufacturers develop and implement virtual day-visual

More information

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11

Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. aero quarterly qtr_04 11 Operators may need to retrofit their airplanes to ensure existing fleets are properly equipped for RNP operations. 24 equipping a Fleet for required Navigation Performance required navigation performance

More information

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia

Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University. January 27, 2009 Blacksburg, Virginia Dr. Antonio A. Trani Professor of Civil Engineering Virginia Polytechnic Institute and State University January 27, 2009 Blacksburg, Virginia 1 Runway Design Assumptions (FAA 150/5325-4b) Applicable to

More information

Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010

Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Martin County Airport / Witham Field Noise Abatement Departure Profile (NADP) Demonstration Technical Report March 2010 Prepared for: Federal Aviation Administration (FAA) Orlando Airport District Office

More information

ACRP Problem Statement: Wingtip Collisions on the Ground. Recommended Funding Amount: $400,000. ACRP Staff Comments. No staff comments.

ACRP Problem Statement: Wingtip Collisions on the Ground. Recommended Funding Amount: $400,000. ACRP Staff Comments. No staff comments. ACRP Problem Statement: 15-04-03 Recommended Funding Amount: $400,000 ACRP Staff Comments No staff comments. TRB Aviation Group Committee Comments AIRCRAFT/AIRPORT COMPATIBILITY: The research seems useful,

More information

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017

14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY. Technical Committee Meeting #2 August 23, 2017 14 CFR PART 150 NOISE AND LAND USE COMPATIBILITY STUDY Technical Committee Meeting #2 August 23, 2017 1 Agenda Introductions Review of the Role of the TC Meeting Facilitator Review of TC Meeting No.1 Data

More information

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Evaluation of Alternative Aircraft Types Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 5: 10 March 2014

More information

FAA Research on Aviation Noise

FAA Research on Aviation Noise FAA Research on Aviation Noise To: By: 32 nd Annual Aviation Noise and Emissions Symposium Dr. James I. Hileman Chief Scientific and Technical Advisor for Environment and Energy Office of Environment and

More information

AUCKLAND INTERNATIONAL AIRPORT MASTERPLAN

AUCKLAND INTERNATIONAL AIRPORT MASTERPLAN MASTERPLAN REPORT NO. 13365 VERSION A MARCH 2014 PREPARED FOR RCP 6 FOX STREET, PARNELL AUCKLAND, NEW ZEALAND MASTERPLAN DOCUMENT CONTROL Version Status Date Prepared By Reviewed By A Final 4 April 2013

More information

3. Aviation Activity Forecasts

3. Aviation Activity Forecasts 3. Aviation Activity Forecasts This section presents forecasts of aviation activity for the Airport through 2029. Forecasts were developed for enplaned passengers, air carrier and regional/commuter airline

More information

TRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET

TRANSPORTATION RESEARCH BOARD. Passenger Value of Time, BCA, and Airport Capital Investment Decisions. Thursday, September 13, :00-3:30 PM ET TRANSPORTATION RESEARCH BOARD Passenger Value of Time, BCA, and Airport Capital Investment Decisions Thursday, September 13, 2018 2:00-3:30 PM ET Purpose Discuss research from the Airport Cooperative Research

More information

RE: Draft AC , titled Determining the Classification of a Change to Type Design

RE: Draft AC , titled Determining the Classification of a Change to Type Design Aeronautical Repair Station Association 121 North Henry Street Alexandria, VA 22314-2903 T: 703 739 9543 F: 703 739 9488 arsa@arsa.org www.arsa.org Sent Via: E-mail: 9AWAAVSDraftAC2193@faa.gov Sarbhpreet

More information

15:00 minutes of the scheduled arrival time. As a leader in aviation and air travel data insights, we are uniquely positioned to provide an

15:00 minutes of the scheduled arrival time. As a leader in aviation and air travel data insights, we are uniquely positioned to provide an FlightGlobal, incorporating FlightStats, On-time Performance Service Awards: A Long-time Partner Recognizing Industry Success ON-TIME PERFORMANCE 2018 WINNER SERVICE AWARDS As a leader in aviation and

More information

PBN and airspace concept

PBN and airspace concept PBN and airspace concept 07 10 April 2015 Global Concepts Global ATM Operational Concept Provides the ICAO vision of seamless, global ATM system Endorsed by AN Conf 11 Aircraft operate as close as possible

More information

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To:

Memorandum. Federal Aviation Administration. Date: June 19, Richard Doucette, Environmental Protection Specialist. From: To: Federal Aviation Administration Memorandum Date: June 19, 2008 From: To: Subject: Richard Doucette, Environmental Protection Specialist LaVerne Reid, Airports Division Manager John Donnelly, Regional Counsel

More information

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19

Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update. 6th Working Group Briefing 1/7/19 Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update 6th Working Group Briefing 1/7/19 Study Purpose Agenda Background Summary of last stakeholder meetings Refresher on DNL,

More information

FLIGHT OPERATIONS PANEL (FLTOPSP)

FLIGHT OPERATIONS PANEL (FLTOPSP) International Civil Aviation Organization FLTOPSP/1-WP/3 7/10/14 WORKING PAPER FLIGHT OPERATIONS PANEL (FLTOPSP) FIRST MEETING Montréal, 27 to 31 October 2014 Agenda Item 4: Active work programme items

More information

Airline Operating Costs Dr. Peter Belobaba

Airline Operating Costs Dr. Peter Belobaba Airline Operating Costs Dr. Peter Belobaba Istanbul Technical University Air Transportation Management M.Sc. Program Network, Fleet and Schedule Strategic Planning Module 12: 30 March 2016 Lecture Outline

More information

Make Smart, Informed Flight Planning Decisions with Intelligent Weather Insights

Make Smart, Informed Flight Planning Decisions with Intelligent Weather Insights Make Smart, Informed Flight Planning Decisions with Intelligent Weather Insights White Paper www.dtn.com / 1.800.610.0777 Copyright 2017 DTN Effective monitoring of the weather is one of the most important

More information

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW

POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW POST-IMPLEMENTATION COMMUNITY IMPACT REVIEW RNAV STAR updates and RNP AR approaches at Winnipeg James Armstrong Richardson International Airport NAV CANADA 77 Metcalfe Street Ottawa, Ontario K1P 5L6 November

More information

Opportunities to improve noise management and communications at Heathrow

Opportunities to improve noise management and communications at Heathrow Opportunities to improve noise management and communications at Heathrow Summary of a dialogue between Aviation Environment Federation, British Airways, HACAN, Heathrow Airport and NATS 1. Introduction

More information

CRUISE TABLE OF CONTENTS

CRUISE TABLE OF CONTENTS CRUISE FLIGHT 2-1 CRUISE TABLE OF CONTENTS SUBJECT PAGE CRUISE FLIGHT... 3 FUEL PLANNING SCHEMATIC 737-600... 5 FUEL PLANNING SCHEMATIC 737-700... 6 FUEL PLANNING SCHEMATIC 737-800... 7 FUEL PLANNING SCHEMATIC

More information

Advisory Circular. Regulations for Terrain Awareness Warning System

Advisory Circular. Regulations for Terrain Awareness Warning System Advisory Circular Subject: Regulations for Terrain Awareness Warning System Issuing Office: Standards Document No.: AC 600-003 File Classification No.: Z 5000-34 Issue No.: 03 RDIMS No.: 10464059-V5 Effective

More information

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016

Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC. December 8, 2016 Massport and FAA RNAV Pilot Study Overview Briefing to Massport CAC December 8, 2016 Contents FAA/Massport RNAV MOU Context Boston Logan Context FAA RNAV MOU, Overview Q&A 12/8/2016 2 FAA/Massport RNAV

More information

APPENDIX X: RUNWAY LENGTH ANALYSIS

APPENDIX X: RUNWAY LENGTH ANALYSIS APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for

More information

Fuel Burn Impacts of Taxi-out Delay and their Implications for Gate-hold Benefits

Fuel Burn Impacts of Taxi-out Delay and their Implications for Gate-hold Benefits Fuel Burn Impacts of Taxi-out Delay and their Implications for Gate-hold Benefits Megan S. Ryerson, Ph.D. Assistant Professor Department of City and Regional Planning Department of Electrical and Systems

More information

Measurement of environmental benefits by ICAO Secretariat

Measurement of environmental benefits by ICAO Secretariat International Civil Aviation Organization Measurement of environmental benefits by ICAO Secretariat ICAO PBN TF Sven Halle ICAO EUR/NAT Office ICAO EUR/NAT Office PBN Workshop 1 Overview KPA ASSEMBLY RESOLUTION

More information

GROUP ON INTERNATIONAL AVIATION AND CLIMATE CHANGE (GIACC)

GROUP ON INTERNATIONAL AVIATION AND CLIMATE CHANGE (GIACC) International Civil Aviation Organization INFORMATION PAPER GIACC/2-IP/2 26/6/08 14/7/08 English only GROUP ON INTERNATIONAL AVIATION AND CLIMATE CHANGE (GIACC) SECOND MEETING Montréal, 14 to 16 July 2008

More information

Feds plan to handle airport noise goes back to square one. It s not a win-win. You re shifting the noise around, said Curtis Holsclaw of the FAA.

Feds plan to handle airport noise goes back to square one. It s not a win-win. You re shifting the noise around, said Curtis Holsclaw of the FAA. LONG ISLAND Feds plan to handle airport noise goes back to square one It s not a win-win. You re shifting the noise around, said Curtis Holsclaw of the FAA. A jet lifts off from a runway at LaGuardia Airport

More information

Welcome to the Boise Airport Master Plan Update Open House

Welcome to the Boise Airport Master Plan Update Open House Welcome to the Boise Airport Master Plan Update Open House Get the facts and sign up for the Master Plan Update newsletter at http://www.iflyboise.com/about-boi/master-plan/ What does the Master Plan Update

More information

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group

Optimized Profile Descents A.K.A. CDA A New Concept RTCA Airspace Working Group Optimized Profile Descents A.K.A. CDA A New Concept RTCA Presented to Environmental Working Group December 05, 2007 Outline RTCA Charter and Terms of Reference Objectives Membership and Organization Activities

More information

FIRST PUBLIC WORKSHOP

FIRST PUBLIC WORKSHOP Lambert-St. Louis International Airport Master Plan & 14 CFR Part 150 Noise Compatibility Plan Update FIRST PUBLIC WORKSHOP February 12 th 2009 Why prepare a Master Plan Update Now? Last full Master Plan

More information

SECTION 5.0 FORECASTS OF AVIATION DEMAND

SECTION 5.0 FORECASTS OF AVIATION DEMAND SECTION 5.0 FORECASTS OF AVIATION DEMAND SECTION 5.0 FORECASTS OF AVIATION DEMAND 5.1 GENERAL This section provides an update of aviation activity forecasts for through the year 2021. The aviation activity

More information

Evaluation of Predictability as a Performance Measure

Evaluation of Predictability as a Performance Measure Evaluation of Predictability as a Performance Measure Presented by: Mark Hansen, UC Berkeley Global Challenges Workshop February 12, 2015 With Assistance From: John Gulding, FAA Lu Hao, Lei Kang, Yi Liu,

More information

Brighton City Airport Brighton City Airport, Shoreham by Sea, BN43 5FF

Brighton City Airport Brighton City Airport, Shoreham by Sea, BN43 5FF Site: «JobCustom Site Address» Test date: «JobCustom PCT Test Date» Field measurements of sound insulation ANC Registration No: 117 REPORT No: «JobCustom ANC No.» Acoustic Associates Sussex Ltd Client:

More information

EAT Master Plan Planning Advisory Committee (PAC) Meeting #2 Summary (FINAL)

EAT Master Plan Planning Advisory Committee (PAC) Meeting #2 Summary (FINAL) PAC Meeting #2: November 10, 2016 Meeting Participants: Pangborn Airport: Port of Chelan County: Consultant Team: PAC Members: Trent Moyers, Tina Stadther, Ron Russ Mark Urdahl Damon Smith, Jeff Smith,

More information

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures

Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures VIA E-MAIL Date: To: From: Subject: Boston Technical Advisory Committee (BOS/TAC) Project Consultant (PC) Alternative 5 Runway 22R/L RNAV Departures At the February 17, 2006 BOS/TAC meeting several issues

More information

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology

Noise Abatement Arrival Procedures at Louisville International Airport. Prof. John-Paul Clarke Georgia Institute of Technology Noise Abatement Arrival Procedures at Louisville International Airport Prof. John-Paul Clarke Georgia Institute of Technology The Team Noise Abatement Procedures Working Group (NAPWG) has the following

More information

FORECASTING FUTURE ACTIVITY

FORECASTING FUTURE ACTIVITY EXECUTIVE SUMMARY The Eagle County Regional Airport (EGE) is known as a gateway into the heart of the Colorado Rocky Mountains, providing access to some of the nation s top ski resort towns (Vail, Beaver

More information

Updates to Procedures at St. John s International Airport

Updates to Procedures at St. John s International Airport October 10, 2017 Updates to Procedures at St. John s International Airport This document provides notice of upcoming changes to instrument procedures being implemented by NAV CANADA at the St. John s International

More information

Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES AMENDMENT #1 FOR BOS/TAC REVIEW

Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES AMENDMENT #1 FOR BOS/TAC REVIEW Phase 1 PROJECT CONSULTANT SCOPE OF SERVICES AMENDMENT #1 FOR BOS/TAC REVIEW September 30, 2005 Project Consultant Amendment #1 DRAFT FOR BOS/TAC REVIEW 9/30/2005 TABLE OF CONTENTS 1 STUDY DESIGN... 3

More information

Regional Jets ,360 A319/ , , , ,780

Regional Jets ,360 A319/ , , , ,780 Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.

More information

ARRIVALS REVIEW GATWICK

ARRIVALS REVIEW GATWICK ARRIVALS REVIEW GATWICK BO REDEBORN GRAHAM LAKE bo@redeborn.com gc_lake@yahoo.co.uk 16-12-2015 2 THE TASK Has everything been done that is reasonably possible to alleviate the noise problems from arriving

More information

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT

6.C.1 AIRPORT NOISE. Noise Analysis and Land Use Impact Assessment FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT 6.C.1 AIRPORT NOISE The existing land uses are described in Chapter Five, Affected Environment. The methodologies used to develop the Geographic Information System (GIS) land use database, the estimated

More information

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports

SOURDINE II EU- 5FW project on Noise Abatement Procedures. Overall view. Ruud den Boer / Collin Beers Department: ATM & Airports SOURDINE II EU- 5FW project on Noise Abatement Procedures Overall view Ruud den Boer / Collin Beers Department: ATM & Airports Study of key elements weighed key elements 4th Framework Programme Definition

More information

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority

IRISH AVIATION AUTHORITY DUBLIN POINT MERGE. Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority IRISH AVIATION AUTHORITY DUBLIN POINT MERGE Presented by James O Sullivan PANS-OPS & AIRSPACE INSPECTOR Irish Aviation Authority 2012 Holding Holding Before Point Merge No Pilot anticipation of distance

More information

Noise Certification Workshop

Noise Certification Workshop Session 2: Aircraft Noise Certification Harmonisation James Skalecky U.S. FAA 1 Harmonisation / The Beginning In June 1990 at a meeting of the JAA Council and the FAA, the FAA Administrator committed the

More information

SUPPLEMENT AUGUST CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL THRU FM-S51-00 S51-1 U.S.

SUPPLEMENT AUGUST CITATION PERFORMANCE CALCULATOR (CPCalc) MODEL THRU FM-S51-00 S51-1 U.S. MODEL 525 525-0001 THRU -0359 CITATION PERFORMANCE CALCULATOR (CPCalc) COPYRIGHT 2007 CESSNA AIRCRAFT COMPANY WICHITA, KANSAS, USA 14 AUGUST 2007 U.S. S51-1 SECTION V - SUPPLEMENTS CITATION PERFORMANCE

More information

Chapter 1 EXECUTIVE SUMMARY

Chapter 1 EXECUTIVE SUMMARY Chapter 1 EXECUTIVE SUMMARY Contents Page Aviation Growth Scenarios................................................ 3 Airport Capacity Alternatives.............................................. 4 Air Traffic

More information

Approach and Landing Accident Reduction Joint Safety Implementation Team

Approach and Landing Accident Reduction Joint Safety Implementation Team SE 22 (21) Approach and Landing Accident Reduction Joint Safety Implementation Team Implementation Plan For Flight Deck Equipment Upgrade/Installation to Improve Altitude Awareness and Checklist Completion

More information