1 Airport II- Airport. II-1 Definitions System capacity: Ability efficiently process the transported units. Aircrafts Passengers Baggage cargo Public access facilitation Runway Taxiway Gate Terminal Building Balanced Design Car parking b- Factors affecting R/W 1. Environmental Factors: Visibility: In poor visibility, longer separation & R/W occupancy time also under marginal crosswinds R/W will not be used. VFR vs. IFR Ceiling <= 1000 ft &OR Visibility <= 3 miles Runway Surface Condition: In wet/slippery R/W: longer deceleration & R/W occupancy time. In case of snow, the R/W should be closed. Winds: Strong Cross/tail Winds. Noise Abatement Requirements: Use could be restricted for some R/Ws during certain periods of the day. Dr. Eng. Omar Osman 1
2 2. ATC Factors: Regulations for min VL, HL & lateral separation (Operation Safety) Arrival Arrival 2~5 nautical mile depending on ACFT size (2 Arrivals) Arrival Departure Departure Arrival 2 nautical mile between Departure and following Arrival T3.1 Departure Departure 60~120 sec. depending on ACFT Size. Example: Landing speed= 165 mph Min Separation= 3 nmi = 3*6076=18228 ft = 18228/(165*5280/3600) = 75 sec. R/W Occupancy time = 25 sec. Sequencing ( FIFO, Speed-Class, Size,.) 3. Demand Characteristics: AC Size, Speed, Maneuverability, Braking Distance, and Pilot Technique Vortex Approach Speed Fast Approach Slow Approach Landing time R/W Occupancy Time -150 knot for Heavy ACFT -100 knot for Small ACFT Landing time (Touchdown Speed) Touch-and-go operations (landing then T/O without complete stop) = 2 operations one AC doing touch & go, can produce 16 mov./hr -i.e. 1 T/O, 14 T&G, 1L -Seldom under IFR Conditions % Arrivals (% Arrival + % Departure = 100%) AC mix A,B,C,D Mix Index= %C+3%D T3-2 Dr. Eng. Omar Osman 2
3 4. Design Factors R/Ws number, Spacing, Length, Orientation & Configuration T/Ws number, Locations and Exit Design Ramp Entrances Runway Use Strategy (Mixed mode vs. Segregated) 1. Single 2. Parallel 3. Open V 4. Intersecting F3-1 TO & landing TO or Landing Runway Configuration Dr. Eng. Omar Osman 3
4 C- and Delay Avg. Delay/AC Avg. Delay/AC Acceptable Delay Level (1~4 min) Ultimate Practical (op/hr) Demand (op/hr) IFR VFR Peak Demand (op/hr) * Operation at Ultimate capacity Increase Delay Reduce Airport Competitively (Low LOS) * Demand should not be more than practical capacity for so long (e.g. 30hrs/yr) Avg. AC Delay (min) Peaked Schdl Moderatly Schdl Uniform Schdl Demand / Ratio d- Determination 1. Preliminary R/W - for Planning Purposes -for Comparing Airports - Airport Appraisal - Comparing Passenger Demand with capacity (evaluation) See Table 3.3 (Config., MI, VFR/IFR) Hourly & Annual capacity (considering delay) ASV Check demand < ASV (otherwise too much delay & low LOS) Dr. Eng. Omar Osman 4
5 Preliminary Runway - % Arrivals = % Departure - Enough T/W - Touch & Go 0~5% Preliminary Runway - % Arrivals = % Departure - Enough T/W - Touch & Go 0~5% Dr. Eng. Omar Osman 5
6 d- Determination 2. Ultimate (Airport Handbook, FAA 62 Charts Doesn't consider delay) capacity C=Cb * E * T Basic Exit adj. factor Touch &go adj. factor -for Operation Control (ATC) -for Evaluation of Operation Techniques 3. Queuing Theory and Space-Time Concept Ultimate Dr. Eng. Omar Osman 6
7 Ultimate Ultimate Dr. Eng. Omar Osman 7
8 Apron Gate Services (Typical Ground Equipment Service Layout) Apron Gate Services Dr. Eng. Omar Osman 8
9 Apron Gate Services (Gate Occupancy Time) II-3 Apron Gate GateTime Supply GateTime Demand µ. N K and K.60 T. gi mi C i C = min ( C ) = C g gk gk g 2 For all aircraft class i than t can use only gate type k or bigger Where : µ N T C C K gi m i K gk g = Number of gates of type k or bigger. = Gate utilization factor for gate type k. = Avg.gate occupancy time for aircraft class i. = % of aircraft class i in aircraft mix. = Gate capacity limited by gate type k. = Gate capacity for airport. Dr. Eng. Omar Osman 9
10 II-4 Taxiway Usually runway capacity is more critical. II-5 Terminal Building Considerations Runway configuration & TB location See fig 3.6 Shortest taxiing distance (both L & T/O) Gate taxiing & TB concepts See fig 4.12 a-linear b-pier (Finger) c-satellite d-transporter e-combination of concepts. Dr. Eng. Omar Osman 10
11 Runway configuration & TB location Gate Types Dr. Eng. Omar Osman 11
12 Gate Types Dr. Eng. Omar Osman 12
According to FAA Advisory Circular 150/5060-5, Airport Capacity and Delay, the elements that affect airfield capacity include:
4.1 INTRODUCTION The previous chapters have described the existing facilities and provided planning guidelines as well as a forecast of demand for aviation activity at North Perry Airport. The demand/capacity
More informationAirfield Capacity Prof. Amedeo Odoni
Airfield Capacity Prof. Amedeo Odoni Istanbul Technical University Air Transportation Management M.Sc. Program Air Transportation Systems and Infrastructure Module 10 May 27, 2015 Airfield Capacity Objective:
More informationCENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Education, Analysis and Research for the Next Frontier. Airport Capacity. Outline/Notes for Class
CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Education, Analysis and Research for the Next Frontier Airport Capacity Outline/Notes for Class SYST 460/450 1 Factors that Affect Airport Capacity 1. Space
More informationLONG BEACH, CALIFORNIA
LONG BEACH, CALIFORNIA 1 LONG BEACH, CALIFORNIA Airside Capacity Evaluation Techniques Matt Davis Assistant Director of Planning Hartsfield-Jackson Atlanta International Airport Matt.Davis@Atlanta-Airport.com
More informationHartford-Brainard Airport Potential Runway Closure White Paper
Hartford-Brainard Airport Potential Runway 11-29 Closure White Paper June 2012 In recent years there has been discussion regarding the necessity of Runway 11-29 to the Hartford- Brainard Airport (HFD)
More informationThe purpose of this Demand/Capacity. The airfield configuration for SPG. Methods for determining airport AIRPORT DEMAND CAPACITY. Runway Configuration
Chapter 4 Page 65 AIRPORT DEMAND CAPACITY The purpose of this Demand/Capacity Analysis is to examine the capability of the Albert Whitted Airport (SPG) to meet the needs of its users. In doing so, this
More informationIDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT
IDENTIFICATION AND EVALUATION OF ALTERNATIVES ST. PETERSBURG-CLEARWATER INTERNATIONAL AIRPORT 7 7.1 GENERAL The primary objective of this chapter is to evaluate potential development alternatives and identify
More informationTime-Space Analysis Airport Runway Capacity. Dr. Antonio A. Trani. Fall 2017
Time-Space Analysis Airport Runway Capacity Dr. Antonio A. Trani CEE 3604 Introduction to Transportation Engineering Fall 2017 Virginia Tech (A.A. Trani) Why Time Space Diagrams? To estimate the following:
More informationRef. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA
ILS Critical Area Holding Position Sign: ATC may hold you at this sign, on a taxiway, when the instrument landing system is being used at the airport. Aircraft taxiing beyond this point may interfere with
More informationLas Vegas McCarran International Airport. Capacity Enhancement Plan
Las Vegas McCarran International Airport Capacity Enhancement Plan Las Vegas McCarran International Airport Capacity Enhancement Plan September 1994 Prepared jointly by the U.S. Department of Transportation,
More informationSPADE-2 - Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2
- Supporting Platform for Airport Decision-making and Efficiency Analysis Phase 2 2 nd User Group Meeting Overview of the Platform List of Use Cases UC1: Airport Capacity Management UC2: Match Capacity
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 3 - Refinement of the Ultimate Airfield Concept Using the Base Concept identified in Section 2, IDOT re-examined
More informationTallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016
Tallahassee International Airport Master Plan Technical Advisory Committee Meeting #2 October 19, 2016 Agenda Welcome / Introductions Master Plan Process and Project Status Forecast of Aviation Demand
More informationApplication of Wake Turbulence Separation at London Heathrow. Paul Johnson Development Manager NATS Heathrow
Application of Wake Turbulence Separation at London Heathrow Paul Johnson Development Manager NATS Heathrow Heathrow Vital Statistics Passengers per year 67 Million Aircraft movements per year 470,000
More informationTABLE OF CONTENTS. General Study Objectives Public Involvement Issues to Be Resolved
TABLE OF CONTENTS Description Page Number LIST OF ACRONYMS... a CHAPTER ONE INTRODUCTION General... 1-1 Study Objectives... 1-1 Public Involvement... 1-2 Issues to Be Resolved... 1-2 CHAPTER TWO EXISTING
More informationATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System
ATC-Wake: Integrated Air Traffic Control Wake Vortex Safety and Capacity System L.J.P. (Lennaert) Speijker, speijker@nlr.nl WakeNet Europe, 8/9 January 2009 http://www.nlr.nl/public/hosted-sites/atc-wake
More information12 th Facilitation Division
12 th Facilitation Division The Impact of the A380 Georgina Graham Manager Passenger Facilitation Introduction Significant change will be required to many aspects of existing airport infrastructure and
More informationAssignment 7: Airport Geometric Design Standards
CEE 4674: Airport Planning and Design Spring 2018 Date Due: March 23, 2018 Instructor: Trani Problem 1 Assignment 7: Airport Geometric Design Standards An airport is designing a new pier terminal to accommodate
More informationSystem Oriented Runway Management: A Research Update
National Aeronautics and Space Administration System Oriented Runway Management: A Research Update Gary W. Lohr gary.lohr@nasa.gov Senior Research Engineer NASA-Langley Research Center ATM 2011 Ninth USA/EUROPE
More informationThe demand/capacity analysis was performed utilizing Federal Aviation Administration (FAA) publications, including the following:
Chapter Three To properly plan for the future of Monterey Regional Airport, it is necessary to examine the capacities of the key airport systems. This chapter uses the results of the forecasts prepared
More informationCATCODE ] CATCODE
Runways. FAC: 1111 CATCODE: 111111 OPR: AFCEC/COS OCR: AF/A3O-A 1.1. Description. The runway is the paved surface provided for normal aircraft landings and take offs. Runways are classified as either Class
More informationAirport Planning and Terminal Design
Airport Planning and Terminal Design Major Terminal Design Considerations Passenger Terminal Configuration Passenger Terminal Concepts Major Design Considerations 1 Terminal Configuration Centralised processing
More informationRUNWAY OPERATIONS: Computing Runway Arrival Capacity
RUNWAY OPERATIONS: Computing Runway Arrival Capacity SYST 560/460 USE Runway Capacity Spreadsheet Fall 2008 Lance Sherry 1 CENTER FOR AIR TRANSPORTATION SYSTEMS RESEARCH Background Air Transportation System
More informationSIMMOD Simulation Airfield and Airspace Simulation Report. Oakland International Airport Master Plan Preparation Report. Revised: January 6, 2006
Table of Contents SIMMOD Simulation Airfield and Airspace Simulation Report Oakland International Airport Master Plan Preparation Report Revised: January 6, 2006 Produced For: 1. Simmod PRO! Description...
More informationARCHERFIELD AIRPORT MASTER PLAN TECHNICAL PAPER TP 03/10 RUNWAY CAPACITY
ARCHERFIELD AIRPORT MASTER PLAN TECHNICAL PAPER TP 03/10 (Revision 2) RUNWAY CAPACITY An Investigation of Practical Capacity with Class D Airspace Procedures and the Proposed Runway Configuration JULY
More information1.1.3 Taxiways. Figure 1-15: Taxiway Data. DRAFT Inventory TYPICAL PAVEMENT CROSS-SECTION LIGHTING TYPE LENGTH (FEET) WIDTH (FEET) LIGHTING CONDITION
1.1.3 Taxiways EWN has an extensive network of taxiways and taxilanes connecting the terminal, air cargo, and general aviation areas with the runways as listed in Figure 1-15. A 50-foot wide parallel taxiway
More informationRaleigh-Durham International Airport Airport Capacity Enhancement Plan. August 1991
ii Raleigh-Durham International Airport Airport Capacity Enhancement Plan August 1991 Prepared jointly by the U.S. Department of Transportation, Federal Aviation Administration, Raleigh-Durham Airport
More informationAPPENDIX D MSP Airfield Simulation Analysis
APPENDIX D MSP Airfield Simulation Analysis This page is left intentionally blank. MSP Airfield Simulation Analysis Technical Report Prepared by: HNTB November 2011 2020 Improvements Environmental Assessment/
More informationSupplementary airfield projects assessment
Supplementary airfield projects assessment Fast time simulations of selected PACE projects 12 January 2018 www.askhelios.com Overview The Commission for Aviation Regulation requested Helios simulate the
More informationDraft Concept Alternatives Analysis for the Inaugural Airport Program September 2005
Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005 Section 1 - Introduction This report describes the development and analysis of concept alternatives that would accommodate
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2015
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2015 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationMinneapolis-St. Paul International Airport Monthly Runway Use System Report. June 2016
Minneapolis-St. Paul International Airport Monthly Runway Use System Report June 2016 Environment Department, Noise Program Office Metropolitan Airports Commission 6040 28th Avenue South, Minneapolis,
More informationChapter III - Demand/Capacity and Facility Requirements
Chapter III - Demand/Capacity and Facility Requirements The facility requirements identified in this chapter are summarized on Exhibit III.1. The future requirements serve to determine which airport facilities
More informationAirport Master Plan for. Brown Field Municipal Airport PAC Meeting #3
Airport Master Plan for Brown Field Municipal Airport PAC Meeting #3 Public Meeting #1 > 8/24/17 from 5:30 to 8:00 pm > 41 attendees signed-in > Comments: > EAA area > Environmental constraints > Focus
More informationDetermining Airport Acceptance Rate (AAR) Mexico City Airport Case Study
Determining Airport Acceptance Rate (AAR) Mexico City Airport Case Study Airport layout 1 772 THRESHOLD TO SCALE 1 017 3 330 4 954 6 939 7 677 9 744 11 516 Heavy 4% Aircraft mix data taken from March 9
More informationAirport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3
Airport Master Plan for Montgomery-Gibbs Executive Airport PAC Meeting #3 Agenda > Introductions > Public Meetings Overview > Working Paper 3 - Facility Requirements > Working Paper 4 - Environmental Baseline
More informationTransportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee
Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 36 Aprons & Aircraft Parking Dear students, today s lecture we are going
More informationAirport Design-3 Geometric Design
Airport Design-3 Geometric Design When designing airport runways, engineers and other planners have many factors to consider. These include the type and volume of air traffic, the impact of noise, and
More informationWashington Dulles International Airport (IAD) Aircraft Noise Contour Map Update
Washington Dulles International Airport (IAD) Aircraft Noise Contour Map Update Ultimate ASV, Runway Use and Flight Tracks 4th Working Group Briefing 8/13/18 Meeting Purpose Discuss Public Workshop input
More informationFacility Requirements
4. This chapter presents the airside and landside facility requirements necessary to accommodate existing and forecasted demand at Erie International Airport (ERI or the Airport) in accordance with Federal
More informationPartnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory
MIT Lincoln Laboratory Partnership for AiR Transportation Noise and Emissions Reduction Hamsa Balakrishnan, R. John Hansman, Ian A. Waitz and Tom G. Reynolds! hamsa@mit.edu, rjhans@mit.edu, iaw@mit.edu,
More information1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION 10 Project Background 1-1 11 Mission Statement and Goals 1-1 12 Objectives of this Sustainable Master Plan 1-2 CHAPTER 2 INVENTORY 20 Airport Background 2-1 201
More informationNATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION
NATIONAL BUSINESS AVIATION ASSOCIATION (NBAA) CONVENTION LAS VEGAS, October 10 12, 2017 In anticipation of a large number of aircraft operating to and from the Las Vegas area in conjunction with the 2017
More informationDEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport
DEMAND/CAPACITY ANALYSIS St. Petersburg-Clearwater International Airport 5.1 GENERAL OVERVIEW The next step in the Master Plan process is analyzing the capacity of existing airport facilities against forecasted
More informationAnchorage ARTCC Phraseology Guide. Clearance Delivery Operations
Anchorage ARTCC Phraseology Guide Clearance Delivery Operations Initial Contact: The first time an aircraft calls you, you MUST identify your position, i.e. AWE123 Anchorage Delivery. Clearance Delivery:
More informationAppendix B Ultimate Airport Capacity and Delay Simulation Modeling Analysis
Appendix B ULTIMATE AIRPORT CAPACITY & DELAY SIMULATION MODELING ANALYSIS B TABLE OF CONTENTS EXHIBITS TABLES B.1 Introduction... 1 B.2 Simulation Modeling Assumption and Methodology... 4 B.2.1 Runway
More informationDefining and Managing capacities Brian Flynn, EUROCONTROL
Defining and Managing capacities Brian Flynn, EUROCONTROL Some Capacity Guidelines Capacity is what you know you can handle today Capacity = safe throughput capability of an individual or small team All
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 50 INTRODUCTION This chapter describes the airside and landside facility requirements necessary to accommodate existing and forecasted demand in accordance with Federal
More informationAirport Systems: Planning, Design, and Management
Airport Systems: Planning, Design, and Management Richard de Neufville AmedeoR. Odoni McGraw-Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul Singapore
More informationChapter 3. Demand/Capacity & Facility Requirements
Chapter 3. Demand/Capacity & Facility Requirements Chapter 3. DEMAND/CAPACITY & FACILITY REQUIREMENTS This chapter provides an assessment of future airport development requirements based upon the forecasts
More informationApril 4, McKinney Airport Advisory Committee Airport Master Plan Update.
McKinney Airport Advisory Committee Airport Master Plan Update http://mckinney.airportstudy.com/project-documents April 4, 2017 Paul Hendricks phendricks@fairviewtexas.org McKinney National Airport (TKI)
More informationHKIA : OPERATIONS AND CAPACITY
CHAPTER 3 HKIA : OPERATIONS AND CAPACITY Internal and External Transportation Links 3.1 Hong Kong International Airport (HKIA) is located right at the heart of passenger and cargo conveyance between Hong
More informationCAUTION: WAKE TURBULENCE
CAUTION: WAKE TURBULENCE This was the phrase issued while inbound to land at Boeing Field (BFI) while on a transition training flight. It was early August, late afternoon and the weather was clear, low
More informationAirport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka
Airport s Perspective of Traffic Growth and Demand Management CANSO APAC Conference 5-7 May 2014, Colombo, Sri Lanka SL Wong Senior Manager - Technical & Industry Affairs The Question I Try to Answer How
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM. April 10 th 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM April 10 th 2017 1 Agenda Recap Potential Mitigation Response to Stakeholder Questions Next Steps 2 Recap 3 Background Master Plan considered the runway
More information1. Background and Proposed Action
1. Background and Proposed Action This chapter describes Hillsboro Airport and the planning background for the proposed project. The Port of Portland (the Port) is the sponsor for the Hillsboro Airport
More informationNantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012
Nantucket Memorial Airport Commission Master Plan Workshop October 26, 2012 Agenda Introductions Master Plan 101 Airport Planning Issues Noise Abatement Activities Environmental Monitoring Public Outreach
More informationACRP Project 03-17: Evaluating Airfield Capacity
ATLANTA, GEORGIA 1 2 ATLANTA, GEORGIA Planning Session 4: Airside Capacity Analysis Tools and Techniques ACRP Project 03-17: Evaluating Airfield Capacity December 6, 2011 Bill Dunlay Director LeighFisher
More informationCapacity Analysis and Facility Requirements
Capacity Analysis and Facility Requirements Introduction The capacity analysis for Paine Field is composed of two distinct elements: the ability of airport facilities to accommodate existing and projected
More informationCHAPTER 5 - FACILITY REQUIREMENTS
CHAPTER 5 - FACILITY REQUIREMENTS This chapter identifies the requirements for airfield and landside facilities to accommodate the forecast demand level. Facility requirements have been developed for the
More information3.1 Facility Requirements Overview Airfield Facility Requirements... 1
Table of Contents 3.1 Overview... 1 3.2 Airfield... 1 Airspace Capacity...1 Airside Capacity... 2 Aircraft Mix Index... 3 Arrivals Percentage... 4 Touch-and-Go Percentage... 4 Taxiway Access Factors...
More informationRegional Jets ,360 A319/ , , , ,780
Excel Tab Name: Seats (18 MAP) PASSENGER AIRLINE FLIGHT SCHEDULE CALCULATION RECORD Summary 17.2 MAP flight schedule* (with Southwest Airlines B737-800s changed to B737-700s) Number of Total Seats Avg.
More informationKey Purpose & Need Issues
Key Purpose & Need Issues Efficiently meet demand through the 2025 planning horizon 864,000+ annual operations 180-200 operations during peak daytime hours Balance peak hour arrival/departure capability
More informationCHAPTER 4 DEMAND/CAPACITY ANALYSIS
CHAPTER DEMAND/CAPACITY ANALYSIS INTRODUCTION The demand/capacity analysis examines the capability of the airfield system at Blue Grass Airport (LEX) to address existing levels of activity as well as determine
More informationTable of Contents. Master Plan March 2014 TOC i Spokane International Airport
Table of Contents Page Chapter 1 Inventory 1. Introduction... 1 1 1.1 Community Profile... 1 2 1.1.1 Location and Setting... 1 1 1.1.2 Climate... 1 2 1.1.3 Socioeconomic Conditions... 1 5 1.1.4 Area Land
More informationPART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES
PART 210 NOISE ABATEMENT AND RUNWAY PROCEDURES 210.01 NOISE ABATEMENT AND PREFERENTIAL RUNWAY USE PROCEDURES 210.01-1 Establishment Of Procedures; FAA Guidelines This Rule establishes preferential runway
More informationAnalysis of Air Transportation Systems. Airport Capacity
Analysis of Air Transportation Systems Airport Capacity Dr. Antonio A. Trani Associate Professor of Civil and Environmental Engineering Virginia Polytechnic Institute and State University Fall 2002 Virginia
More information[1] Gleim #: Source: AIM Para Learning Statement Code: PLT141
Gleim FAA Test Prep: Private Pilot (15 questions) Unit 3a: Airports, Air Traffic Control, and Airspace Name: Date: Circle the correct answer on the question sheets and fill in the corresponding circle
More informationThe pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 3 Presentation 1
The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 3 Presentation 1 Operational Hazards Workload issues during taxiing that can result in a loss of
More informationPrepared By: Mead & Hunt, Inc Port Lansing Road Lansing, MI 48906
Master Plan The preparation of this document was financed in part through a planning grant from the Federal Aviation Administration (FAA) as provided under Section 505 of the Airport and Airway Improvement
More informationFACILITY REQUIREMENTS
FACILITY REQUIREMENTS In order to ensure that Bradley International Airport (BDL) is capable of supporting the expected increase in passenger traffic, care must be taken to ensure that the recommendations
More informationICAO Standards. Airfield Information Signs. ICAO Annex 14, 4th Edition Aerodrome Design and Operations
ICAO Standards Airfield Information Signs ICAO Annex 14, 4th Edition Aerodrome Design and Operations Federal Aviation Administration U.S. Department of Transportation February 2004 ICAO Standards This
More informationSTUDY WORK GROUP MEETING No. 3. November 29, 2016
STUDY WORK GROUP MEETING No. 3 November 29, 2016 Agenda Welcome and introductions Update project schedule Brief overview of previous SWG meeting Update on aviation forecasts Introduction to airfield demand/capacity
More informationMerritt Island Airport
TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1-1 INTRODUCTION AND PROJECT OVERVIEW... 1-1 General Guidelines... 1-1 Prior Planning Documentation... 1-2 Key Issues... 1-2 Goals and Objectives... 1-2 Regulatory
More informationDEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS
DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 2 MARK QUESTIONS AND ANSWERS 1.Define wind Coverage (AUC NOV/DEC 2010),(AUC NOV/DEC 2011)
More informationIndianapolis International Airport Capacity Enhancement Plan
Indianapolis International Airport Capacity Enhancement Plan 2 Indianapolis International Airport Capacity Enhancement Plan Indianapolis International Airport Capacity Enhancement Plan May 1993 Prepared
More informationFacility Requirements
C H A P T E R T H R E E Facility Requirements 3.0 OVERVIEW Airport planning for facility requirements is based upon addressing any existing issues and accommodating the probable demand that may occur over
More informationJUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017
JUNEAU RUNWAY INCURSION MITIGATION (RIM) PROGRAM JANUARY 25, 2017 1 Agenda Program Description Runway Incursions Design and Geometry Deficiencies Runway 8/26 Operations Potential Mitigation Next Steps
More informationAirport Master Plan. Brookings Regional Airport. Runway Runway 17-35
Runway 17-35 Airport Master Plan Runway 12-30 Brookings Regional Airport Table of Contents Table of Contents Chapter 1: Master Plan Goals... 1-1 1.1. Introduction... 1 1.2. Objective 1 Identify improvements
More informationCONTENTS 1. INTRODUCTION AND SUMMARY
In association with HNTB Corporation Alcantar & Associates, LLC Cephas, Inc. David Evans and Associates, Inc. DKS Associates NEXTOR Parametrix Synergy Consultants, Inc. Zimmer Gunsul Frasca Architects,
More informationStudy Committee Meeting. September 2015
W ki P T / Working Paper Two/ Study Committee Meeting September 2015 Agenda Introductions and Opening Comments Project Overview, Process, and Schedule Review Materials from Working Paper Two Comments,
More informationAPPENDIX X: RUNWAY LENGTH ANALYSIS
APPENDIX X: RUNWAY LENGTH ANALYSIS Purpose For this Airport Master Plan study, the FAA has requested a runway length analysis to be completed to current FAA AC 150/5325-4B, Runway Length Requirements for
More informationVIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION. SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating Procedures
VIRTUAL AIR TRAFFIC SIMULATION NETWORK UNITED STATES DIVISION ALBUQUERQUE ARTCC ORDER PHX ATCT v7110.1a Effective Date: Sept. 18, 2014 SUBJ: Phoenix (PHX) Air Traffic Control Tower (ATCT) Standard Operating
More informationDEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering
DEPARTMENT: CIVIL ENGINEERING SEMESTER: III SUBJECT CODE / Name: CE2303/ Railway, Airport and Harbors Engineering 1.Landing direction indicator UNIT 4 TWO MARK QUESTIONS AND ANSWERS Two mark question with
More informationChapter 5 Facility Requirements
Chapter 5 Facility Requirements 5.0 INTRODUCTION The Facility Requirements chapter of this Sustainable Master Plan Update describes airside and landside facilities, which are needed to accommodate existing
More informationACRP Project Evaluating Airfield Capacity
DEN572 PRESENTATION ACRP Project 03-17 Evaluating Airfield Capacity Presented by Pam Keidel-Adams, Landrum & Brown Brian Poe, Landrum & Brown February 13, 2012 Objectives of Research Develop Guidebook
More informationAgenda: SASP SAC Meeting 3
Agenda: SASP SAC Meeting 3 Date: 04/12/18 Public Involvement Plan Update Defining the System Recommended Classifications Discussion Break Review current system Outreach what we heard Proposed changes Classification
More informationLEYELOV I I ... ** L 8. I *~~~~~...i DATA PACKAGE IVM, 8~ AIRPORT IMPROVEMVENT TASK FORCE DELAY STUDIES
R DAO99 871 PEAT MARWICK MITCHELL AND CO SAN FRANCISCO CALIF F/S 1/2 NEW YORK AIRPORTS DATA PACKAGE NUMBER A, JOHN F KENNEDY INTERN--ETC(U) DEC 79 DOT-FA77WA- 3961 INCLASSIFI ED NL ED LEYELOV I I DATA
More informationReduced Surface Emissions through Airport Surface Movement Optimization. Prof. Hamsa Balakrishnan. Prof. R. John Hansman
Reduced Surface Emissions through Airport Surface Movement Optimization Prof. Hamsa Balakrishnan Prof. R. John Hansman Aeronautics & Astronautics and Engineering Systems Motivation Opportunities to improve
More informationBNA Master Plan Update Public Meeting No. 2
A Six Sigma Organization BNA Master Plan Update Public Meeting No. 2 September 18, 2012 Agenda BNA Master Plan Update Consultants Status of the BNA Master Plan Update Workstation Boards Forecasts of Aviation
More informationMountain / Canyon Flying LLC TAILWHEEL ENDORSEMENT SYLLABUS
Mountain / Canyon Flying LLC TAILWHEEL ENDORSEMENT SYLLABUS Lesson Schedule: Stage1: Introduction to Tailwheel Airplanes [Ground: 1.0 hours. Flight: 1.5 hours]* Stage2: Advanced Tailwheel Operations [Ground:
More informationPlanning Horizon Activity Levels Airfield Capacity and Delay Airport Physical Planning Criteria Airfield and Landside Facility Requirements
Proper airport planning requires the translation of forecast aviation demand into the specific types and quantities of facilities that can adequately serve the identified demand. This chapter will analyze
More informationAnalysis of ATM Performance during Equipment Outages
Analysis of ATM Performance during Equipment Outages Jasenka Rakas and Paul Schonfeld November 14, 2000 National Center of Excellence for Aviation Operations Research Table of Contents Introduction Objectives
More informationLanding on Slippery Runways. BOEING is a trademark of Boeing Management Company. Copyright 2007 Boeing. All rights reserved.
Landing on Slippery Runways WARNING: Export Controlled This document contains technical data whose export is restricted by the Export Administration Act of 1979, as amended, Title 50, U.S.C.; App. 2401,
More informationNavigation - Runways. Chap 2, Nolan
Navigation - Runways Chap 2, Nolan 1 Runways Runways numbered to correspond to magnetic bearing Runway 27 has magnetic bearing 270 degrees Active Runway selected for headwind greater than 5 knots When
More informationAppendix 6.1: Hazard Worksheet
Appendix 6.1: Appendix 6.1: Ref. Condition, real or potential; that can cause injury, illness, etc. This is a prerequisite for an Airfield Hazards 1. Taxiway Geometry Direct access to runway from ramp
More informationEN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport
EN-024 A Simulation Study on a Method of Departure Taxi Scheduling at Haneda Airport Izumi YAMADA, Hisae AOYAMA, Mark BROWN, Midori SUMIYA and Ryota MORI ATM Department,ENRI i-yamada enri.go.jp Outlines
More information4. Demand/Capacity Assessment and Facility Requirements
4. This chapter presents an evaluation of the existing airfield facilities, buildings, and other facilities at the Airport and an assessment of their potential use under the demand scenarios defined for
More informationINTRODUCTION. General
CHAPTER FOUR Airfield Demand/Capacity Analysis & Facility Requirements INTRODUCTION A key step in the master plan process is the determination of airport facility requirements to allow airside and landside
More informationThe pilot and airline operator s perspective on runway incursion hazards and mitigation options. Session 2 Presentation 2
The pilot and airline operator s perspective on runway incursion hazards and mitigation options Session 2 Presentation 2 Operational Hazards Workload issues during taxi that can result in a loss of situational
More information