1 93 DALLAS COUNTY PUBLIC WORKS January 12, 2011 MEMORANDUM TO: Commissioners Court THROUGH: Maurine Dickey, Commissioner District No. I FROM: Alberta L. Blair, P.E. Director of Public Works SUBJECT: MCIP PROJECT NORTHAVENINORTH-CENTRAL LINK BACKGROUND In partnership with the City of Dallas on the Northaven Trail portion (Preston Road to White Rock Creek Trail) of MCIP 10221, NorthavenINorth-Central Link, a route alignment study will be completed by Dallas County for the eastern extension segment from Valleydale Drive to White Rock Creek Trail tying into what will be the "Low 5" trail junction. Eventual construction of the eastern extension segment will serve as the match to the City of Dallas led segment from Preston Road to Valleydale Drive. The implementation of this Major Capital Improvement Project (MCIP) was authorized by Court Order dated January 19,2010 which approved specified projects including MCIP project that will be known as NorthavenINorth-Central Link and will be allocated an overall amount of$2,500,000. For the Northaven Trail portion of this project the City of Dallas is designing and constructing from Preston Road to Valleydale Drive, while Dallas County will be designing and constructing the connecting eastern extension segment from Valleydale Drive to White Rock Creek Trail. This City led segment has completed design and will begin eonstruction later this spring. The County led segment also involves a study to identify the most viable and preferred route that best connects to White Rock Creek Trail by traversing potential barriers which include White Rock Creek and possibly both US 75 and a DARTlight rail line. The prime consultant for this study will be Urban Engineers Group, which is an approved IDIQ consultant firm. Urban Engineers Group has assembled a team of sub-consultants that strongly complements the expertise their firm possesses from developing the engineering plans for other high-profile trail projects such as segments III, IV and VI ofkaty Trail. This expertise is critical to delivering a high-quality report considering the connection to White Rock Creek Trail will facilitate vital links with two other nearby trails (Cottonwood Trail and the future Veloway). 411 Elm Street, 4th Floor Dallas, Texas

2 94 Commissioners Conrt January 12,2011 Page Two The eventual junction of these trails, all within less than one mile of each other, has been referred to as the "Low 5" because it will provide users with five directions of non-motorized travel as an alternative to mot0l1zed traffic on the nearby "High 5" US 75/1-635 highway interchange. The overall NorthavenlNorth-Central Link project, MCIP 10221, involves two intersecting segments that will fulfill a need for improved bicycle/pedestrian connectivity in north central Dallas and begin fonning an important east-west route identified on the NCTCOG Regional Veloweb crossing a majority of northern Dallas. SCHEDULE Route alignment study Design Construction FY 2011 FY 2012 FY 2013 STRATEGIC PLAN COMPLIANCE In seeking to provide regional mobility and improved air quality by partnel1ng with Dallas County cities to develop these important infrastructure improvements, Dallas County is remaining consistent with the County's overall Strategic Plan; and in particular is directly fulfilling the following vision statements: Vision 1 Vision 4 Vision 5 Dallas County is a model interagency Partner Dallas County proactively addresses critical regional issues Dallas County is the destination of choice for residents and businesses. FINANCIAL IMPACT County will provide project funding in an amount not to exceed $109,500 towards completion of the NOlihaven Trail Eastern Extension Route Study. The total amount of funding for this project is available with $2,500,000 from MCIP Fund 196, Project RECOMMENDATION If Commissioners Court is in agreement, a court order will be placed on the agenda next week authorizing the execution of a IDIQ contract with Urban Engineers Group, Inc. in an amount not to exceed $109,500 to be paid from Fnnd 196, Project APPROVED BY: rta/ Blair, P.E. Director of Public Works cc: 411 Elm Street, 4th Floor Dallas, Texas

3 95 urban I eng inee rsl 9 roup inc. To RE: Tushar Solanki, PE Dallas County Public Works 411 Elm Street, 4th Floor Dallas, TX Proposal for Professional Services NORTHA VEN TRAIL EASTERN EXTENSION ROUTE STUDY MCIP 10221, NORTHA VEN I NORTH-CENTRAL LINK Dear Tushar, Urban Engineers Group is pleased to submit this proposal to provide professional services relating to the Northaven Trail Eastern Extension Route Study. 1. PROJECT The project shall be described as follows: NORTHAVEN TRAIL EASTERN EXTENSION: ROUTE STUDY Evaluate four (4) different routes for the connection of the Northaven Trail to the White Rock Creek Trail, Phase 4 of the Veloweb Trail and Section G of the Cottonwood Trail. The four (4) routes shall be described as follows; A. "U.S. 75 Signature Bridge" (ONCOR ROW to White Rock Creek Trail at Royal Lane) Connection western end: East end of ONCOR ROW, just west of the southbound US- 75 Service Road and north of Royal Lane; Connection eastern end: White Rock Creek Trail at Royal Lane; Alternate connection eastern end: Veloway Trail south of the proposed Veloway Trail bridge connecting to White Rock Creek Trail and north of Royal lane, and Alternate connection eastern end: Manderville Trail, south of Royal Lane Study possibility of utilizing a buffered bike lane connection along Royal Lane that is being considered in the Dallas Bike Plan update. B. "The Under-Over Connection" (ONCOR ROW to Park Central Plaza, under U.S. 75, and over White Rock Creek to White Rock Creek Trail) Connection western end: East end of ONCOR ROW, just west of the southbound US-75 service road and north of Royal Lane; Alternate connection western end: Intersection of Vallydale Drive and the ONCOR ROW,then Connection eastern end: White Rock Creek Trail between the DART Red Line bridge and US-7 5; Alternative connection eastern end: Continue trail from US 75 along south side of White Rock Creek crossing under the DART Red Line bridge to the proposed Veloway Trail; 167 Turtle Creek Blvd., Suite A, Dallas, Texas (on) [iaxl

4 96-2- January 6, 2011 C. "The Park Central Crossing" (ONCOR ROW to Park Central Place and over White Rock Creek to White Rock Creek Trail) Connection western end: Intersection of Valley dale Drive and ONCOR ROW Connection eastern end: White Rock Creek Trail west of U.S. 75 and south of Forest Lane D. "The Nasher-Forest Connection near Medical City" (Northaven TraillNasher Route to Forest Lane over White Rock Creek to White Rock Creek Trail near Medical City) Connection western end: Northaven TraiVONCOR ROW at the Nasher Route (St. Michaels Dr.) Connection eastern end: White Rock Creek Trail at Forest Lane via St. Michaels Drive and Hill Haven Lane We anticipate the duration of this routing study to be six (6) months. 2. BASIC SERVICES As follows are the basic services required to prepare this routing study: 2.1 Attend monthly progress review meetings with the CLIENT. 2.2 Prepare a base map that includes the area roughly bounded by Royal Lane to the south, Forest Lane to the north, the DART Red Line to the east and st. Michael Drive to the west. See the attached study area exhibit identified as Attachment A. Base map will ideutify property parcels, streets and street ROW's, utility easements andlor ROW's, utility locations (information gathered from map room research and visual iuventory),aerial photograph, oue hundred (100) year floodplain, and two (2') foot contours. 2.3 Accompanying the base map will be a photographic iuventory of the existing conditions of each route optiou and alternative. 2.4 Coordinate routing study with the following trail consultants; County Project Manager will coordinate the exchange of infonnation: HOK - Veloweb Trail Master Plan; Huitt Zolars - Veloweb Trail Phase IV; HNTB - Cottonwood Trail Segment G; Toole Design Group - City of Dallas Bikeway System Update. 2.5 Coordinate routing study with the following public agencies and outside groups. County Project Manager will coordinate the exchange of information with all public agencies; Consultant will coordinate directly with other private entities listed below: City of Dallas - Public Works; City of Dallas - Transportation; City of Dallas - Parks and Recreation; Developer of the Midtown Park development (east of US 75 and south of Royal Ln) City of Dallas - Floodplain Management; City of Dallas - Sustainable Development and Construction; City of Dallas - Dallas Water Utilities Dallas County - Public Works Project Management and Planning Staff; DART; 167 Turtle Creei< Blvd" Suite A, Dallas, Texas , (ph) "214,252,1612(fax)

5 97-3- January 6, 2011 TxDOT; ONCOR; Atmos Energy; Cable television providers; Friends of the Northaven Trail; Developer of the Manderville Development; Jewish Community Center. White Rock Trail Friends Group (Urban Reserve Community) 2.6 Prepare a preliminary routing study for four (4) options for the connection of the Northaven Trail to the Cottonwood, Veloweb and White Rock Creek Trail. Preliminary routing study shall include the evaluation of the following components; Trail alignment; Bridge crossings of White Rock Creek (up to 4 locations); Hydraulic impact of trail and bridge locations within the 100 year floodplain and floodway; Overhead bridge crossings of US 75; Bridge crossing over and under the DART Red Line; Below grade crossing of US 75; At-grade crossings of the US 75 frontage roads and other at-grade crossings of city streets as determined by the routing study (crossing options could include signalization, paint striping and signage, etc.). These crossings could occur mid-block or at existing roadway intersections; Impact to adjacent private property owners; Shared use of roadways with Shared Lane Markings (SLM); The possible need to acquire property or to acquire access easements (CLIENT will provide iufonnation that identifies private property owners, ownership of public ROW or easements); Trail access points and overall ease of connectivity to existiug and future trails; Impact on existing improvements and vegetation; Utility conflicts; 2.7 DELIVERABLE: Colored illustrations that clearly identify each routing option and the components of each option. Format of these illustrations will be 11 "x17" for each individual route option with a 30"x 42" overall plan that shows all four (4) options to be used at the preliminary routing public meeting. 2.8 Preparation of a preliminary opinion of probable construction cost for all four (4) routing options. 2.9 A meeting will be held with the CLIENT to present the result of the preliminary routing study and opinion of probable construction cost. At this presentation the pros and cons will be discuss cd regarding each of the proposed route options. Modifications will be made to options as the result ofthis meeting and before the first public meeting Attend and facilitate a public meeting to present the preliminary routing study. CLIENT will be responsible for arranging the location for this meeting and for issuing invitations for this meeting. CONSULTANT will lead the meeting and provide the meeting materials. CONSULTANT will also prepare meeting minutes to record items discussed at these public meetings. 167 Turtle Creek BlVd. Suite A, Dallas, Texas (ph} (lax}

6 98-4- January 6, After the public meeting the routing studies for each of the four (4) potential trail corridors will be modified to reflect the comments received. The opinion of probable costs will be modified to reflect modifications to the routing studies A follow-up public meeting will be held to present the final routing study.. CLIENT will be responsible for arranging the location for this meeting and for issuing invitations for this meeting. CONSULTANT will lead the meeting and provide the meeting materials. CONSULTANT will also prepare meeting minutes to record items discussed at these public meetings FINAL DELIVERABLE: will be a bound 11 'x17" booklet that includes an overall plan identifying all four (4) routing options. 0 detailed individual plan for each option and an opinion of probable costfor each option including afull size (2 'x3) exhibitfor each routing option The final routing study will presented a project stakeholder update meeting or at a North West Interagency Transportation Alliance (NWITA) meeting. Presentation will be in the form of a power point presentation. A meeting summary will be prepared that documents the items discussed at this presentation. 3. CONSULTANT TEAM The consultant team shall include the following consultants; Urban Engineers Group Iuc. ( will provide project management, research, rccommendations and cost estimating related to street crossings and utility impacts, traffic control concepts review and overall cost estimating for all study components); la terra studio ( will provide basemap, photographic inventory of site conditions and alternate illustrations, exhibits, public meetings and final route study report deliverable); Yaggi Eugineering Inc, (will provide research, recommendations and cost estimating for impact on existing electrical distribution and transmission lines); Boyd Hydrology, LLC (provide research and recommendations for hydraulic impacts at bride crossings of White Rock Creek) Jaster Quintania (provide research, recommendations and cost estimating for structural engineering associated with the proposed bridge structures) David McCaskill Design Group (will provide sitc photographic inventory, design altemate feedback, assist in consultant coordination, attend design progress meetings and public meetings and deliver final route study report) 4. COMPENSATION 4.1 The CLIENT agrees to pay the CONSULTANT for the BASIC SERVICES listed above for a lump sum fee of: $]09,500 - One Hundred Nine Thousand Five Hundred Dollars and Zero Cents. The lump sum fee shall be broken down as follows; Urban Engineers Group... $23,820 o Project Management & Consultant Coordination... $ o Utility Research & Exhibit for base map... $ o Study, site visits, design review... $ o Prepare cost estimates... $ o Attendance at monthly progress meetings & public mtg(s)... $ Turtle Creek Blvd. Suite p." Dalias, Texas (ph) 2' (fax)

7 99-5- January 6, 2011 la terra studio... $50,140 o Prepare base map... $ o Prepare photographic inventory of site conditions... $ o Prepare route study illustrations & Coordinate it with others... $22, o Consultant coordination... $ o Attendance and facilitation of public meetings... $ o Attendance at monthly progress review meetings... $ o Provide supporting documentation, text, graphics for the preparation of the final route study report deliverable... $9, David McCaskill Design Group... $16,700 o Site Assessment and inventory of site conditions... $ o Assistance in basemap, consultant coordination & route study... $ o Attendance at monthly progress review meetings... $ o Attendance at public meeting(s)... $ o Preparation of the final route study report deliverable... $9, Jaster Quiutania.., $12,460 o Structural analysis related to 5 individual bridges... $ o Cost estimating related to bridges... $ o Bridge layout assistance... $ o Analysis & estimating for retaining walls... $ Boyd Hydrology, LLC... $5,000 o Hydraulic analysis for 3 bridges over White Rock Creek... $ Yaggi Eugineering, Inc... $1,380 o Evaluation of impacts to electrical transmission and distribution lines.. $ ADDITIONAL SERVICES shall be provided on an hourly basis with a mutually agreed "not to exceed amount". Hourly rates for Additional Services are as follows: Principal/ Project Manager Registered Landscape Architect/Project Mgr Senior Engineer Landscape Architect Civil Designer/CAD Intern Landscape Architect/Graphic Designer/CAD Administrative $175.00/hour $ /hour $ I hour $ / hour $ / hour $ / hour $ 50.00/ hour 4.3 Reimbursable expenses include, but are not limited to: reproduction of graphics and plans, postage, handling of documents, in-house plotting, courier services and authorized travel expenses. All reimbursable expenses shall be billed at a rate of 1.1 % and shall not exceed $3, in total expenses without prior authorization from the CLIENT: Sincerely, urban I engineers I group inc. Faisal Syed, P.E., PTOE Principal cc: Files 167 Turtie Creek Blvd, Suite A, Dallas, Texas ,252,1600(ph) (fax)

Northaven Trail Phase 2 Initial Project Overview

Northaven Trail Phase 2 Initial Project Overview Northaven Trail Phase 2 Initial Project Overview Partnership Project to extend existing Northaven Trail Improve Bike/Ped Connectivity On Dallas Trail Network Plan City and County Funding Oncor Texas Trails

More information

US 380 FEASIBILITY STUDY

US 380 FEASIBILITY STUDY US 380 FEASIBILITY STUDY Denton County CSJ(s): 0135-10-061, 0135-10-062 Public Meeting(s): January 15 & 22, 2019 WELCOME US 380 Denton County Feasibility Study DALLAS DISTRICT PUBLIC MEETING January 15

More information

DONOR RECOGNITION OPPORTUNITIES Northaven Trail

DONOR RECOGNITION OPPORTUNITIES Northaven Trail DONOR RECOGNITION OPPORTUNITIES Northaven Trail GET INVOLVED FRIENDS OF NORTHAVEN TRAIL is a volunteer organization for the support, maintenance and beautification of the Northaven Trail. All neighbors,

More information

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT

Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT Longmont to Boulder Regional Trail Jay Road Connection DRAFT FINAL REPORT December 2018 Project Summary Boulder County, Colorado, in partnership with the City of Boulder, is evaluating options for multi-use

More information

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY

City of Solvang SUNNY FIELDS SPUR TRAIL STUDY City of Solvang SUNNY FIELDS SPUR TRAIL STUDY project description The City of Solvang, in partnership with the County of Santa Barbara Public Works Department, is developing an alignment study for a proposed

More information

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative.

Section II. Planning & Public Process Planning for the Baker/Carver Regional Trail began in 2010 as a City of Minnetrista initiative. Section II Planning & Public Process Planning for the began in 2010 as a City of initiative. city staff began discussions with the Park District on the possibility of a north/south regional trail connection

More information

Downtown Dallas Priority Parks DEVELOPMENT AND FUNDING AGREEMENT

Downtown Dallas Priority Parks DEVELOPMENT AND FUNDING AGREEMENT Downtown Dallas Priority Parks DEVELOPMENT AND FUNDING AGREEMENT Park and Recreation Board April 19, 2018 Purpose Provide background information on the four (4) priority Downtown Parks Carpenter Park Harwood

More information

WELCOME US 83 Public Meeting

WELCOME US 83 Public Meeting WELCOME US 83 Public Meeting From north of the Starr/Zapata County Line to Loma Blanca Road Thursday, June 8, 2017 Roma Middle School Lecture Hall Open House: 5 6 p.m. Presentation and Public Comment:

More information

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013

Citrus Heights Creek Corridor Trail Project. Trail Advisory Group Meeting #3 July 8, 2013 Citrus Heights Creek Corridor Trail Project Trail Advisory Group Meeting #3 July 8, 2013 Agenda Introductions Recap: Community Workshop, Survey Findings, and TAG Field Trip Community Concern Discussion:

More information

One East First Street Reno, NV

One East First Street Reno, NV AECOM City Hall Tower, 16th Floor One East First Street Reno, NV 89501 www.aecom.com 775.337.9565 tel 916.414.5850 fax Mr. David Whalen, P.E. City of Fernley Public Works 595 Silverlace Blvd. Fernley,

More information

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY

AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY March 19, 2018 AGENDA ITEM 5 D WAKULLA ENVIRONMENTAL INSTITUTE (WEI) TRAIL FEASIBILITY STUDY TYPE OF ITEM: Action STATEMENT OF ISSUE The Wakulla Environmental Institute (WEI) Trail is one of several trails

More information

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017

Update on Trinity Trails. Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017 Update on Trinity Trails Presented by: Richard Zavala, Director Park and Recreation Department February 7, 2017 Overview Provide review of trail planning and development along the main stem Trinity River

More information

1803 West Hwy 160 Monte Vista, CO (719) TTY (719)

1803 West Hwy 160 Monte Vista, CO (719) TTY (719) USDA Forest Service Rio Grande National Forest http://www.fs.fed.us/r2/riogrande 1803 West Hwy 160 Monte Vista, CO 81144 (719)852-5941 TTY (719)852-6271 USDI Bureau of Land Management San Luis Valley Center

More information

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David David Johnson From: Sent: To: Cc: Subject: Attachments: David Johnson Tuesday, April 12, 2011 4:33 PM Thomas Malecek Dave Dyer; Jason Marks (jmarks@segroup.com) VWC Scoping Letter

More information

CITY OF DALLAS TRAIL NETWORK UPDATE

CITY OF DALLAS TRAIL NETWORK UPDATE CITY OF DALLAS TRAIL NETWORK UPDATE Transportation and Trinity River Corridor Project Committee October 12, 2015 Briefing Outline The Purpose of this briefing is to provide an overview of: The current

More information

Architectural Review Commission

Architectural Review Commission Architectural Review Commission staff report Item 3: Project Planner: Applicant/Owner: VITALITY BOWLS SIGNAGE APPEAL 100 CRESCENT DRIVE PLN 14-0473 Jeff Olsen, (925) 671-5206, jolsen@ci.pleasant-hill.ca.us

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2011 Metropolitan Washington Airports Authority 1593 Spring Hill Road, Suite 300 Vienna, Virginia 22182 JANUARY 2012 Introduction The

More information

CITY OF DALLAS TRAIL NETWORK UPDATE

CITY OF DALLAS TRAIL NETWORK UPDATE CITY OF DALLAS TRAIL NETWORK UPDATE Trinity River Corridor Project Committee: June 10, 2013 Briefing Outline The Purpose of this briefing is to provide an overview of: The current status of the Dallas

More information

Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research

Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research Ellis County/ Midlothian to Waxahachie Regional Trail Corridor Research Prepared by: The University of Texas at Arlington Program in Landscape Architecture, School of Architecture and The Institute of

More information

Header i

Header i Header i 048285014.10 Header Sub Title Body Text here. Body text here. Body text here. Section 1... 1 Executive Summary... 1 Opportunities and Constraints... 3 Overall Opportunities and Constraints Map

More information

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired

The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired 1 The Chu property is a 6.57 acre parcel located in the Town of Superior on the west side of McCaslin Boulevard. In 2014, the Town of Superior acquired the Chu property for open space with a contribution

More information

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by:

FEASIBILITY STUDY. holdings SEPTEMBER 13, prepared for: prepared by: FEASIBILITY STUDY SEPTEMBER 13, 2013 prepared for: holdings prepared by: Table of Contents Project Feasibility... 3 Project Background... 4 Project and Community Context... 5 Site constraints... 6 Statement

More information

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report STAFF REPORT ACTION REQUIRED 3741 3751 Bloor Street West Rezoning Application for a Temporary Use By-law Final Report Date: June 12, 2007 To: From: Wards: Reference Number: Etobicoke York Community Council

More information

FEASIBILITY CRITERIA

FEASIBILITY CRITERIA This chapter describes the methodology and criteria used to evaluate the feasibility of developing trails throughout the study areas. Land availability, habitat sensitivity, roadway crossings and on-street

More information

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET Report No. 3 of the Regional Council Meeting of March 28, 2013 1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET The recommends: 1. Receipt

More information

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP)

Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Environment and Natural Resources Trust Fund 2019 Request for Proposals (RFP) Project Title: Glacial Edge Trail and Downtown Pedestrian Bridge Category: G. Land Acquisition for Habitat and Recreation ENRTF

More information

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project GENERAL AIRPORT INFORMATION AIRPORT USERS Airport ownership: Public, owned by the Pullman-Moscow Regional Airport Board Year opened: February

More information

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization

12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization REPORT FOR ACTION 12, 14 and 16 York Street - Amendments to Section 16 Agreement and Road Closure Authorization Date: April 27, 2018 To: Toronto and East York Community Council From: Senior Strategic Director,

More information

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017)

Summary of Transportation Development Credits (TDCs) Dallas-Fort Worth Metropolitan Planning Organization (MPO) (As of September 30, 2017) ATTACHMENT 1 Summary of Transportation Development Credits (s) (MPO) Original Allocation of s to Dallas/Fort Worth MPO: 465,486,222 Award Type 1 - Strategic Awards to Small Transit Providers 2 - RTC Has

More information

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD

US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD US 83 FROM NORTH OF THE STARR/ZAPATA COUNTY LINE TO LOMA BLANCA ROAD PUBLIC MEETING JUNE 8, 2017 Talk Text Crash 2 AGENDA TECHNICAL PRESENTATION (Roma Area Engineer Eduardo Gracia, P.E.) PROJECT SCHEDULE

More information

Establishing a National Urban Park in the Rouge Valley

Establishing a National Urban Park in the Rouge Valley STAFF REPORT ACTION REQUIRED Establishing a National Urban Park in the Rouge Valley Date: March 29, 2012 To: From: Wards: Reference Number: Executive Committee Deputy City Manager, Cluster B All p:\2012\cluster

More information

Report to the Strategic Development Committee

Report to the Strategic Development Committee Report to the Strategic Development Committee Request of Virginia Department of Transportation for Easements across Washington Dulles International Airport Property at Route 28 May 2016 PURPOSE Staff requests

More information

Basic Project Information

Basic Project Information FY 2015-16 PROJECT DESCRIPTION FORM (2C) Submitting Agency: Loudoun County Basic Project Information Project Title: Loudoun County Parkway (VA Route 607) U.S. 50 to Creighton Rd. (2C) Project Type (check

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of April 13, Business Item No. Committee Report Business Item No. 2016-48 Community Development Committee For the Metropolitan Council meeting of April 13, 2016 Subject: Harriet Island-South St. Paul Regional Trail Master Plan, Saint

More information

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12

COASTAL CONSERVANCY. Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 COASTAL CONSERVANCY Staff Recommendation September 22, 2011 BAY AREA RIDGE TRAIL: HOOD MOUNTAIN TO HIGHWAY 12 File No. 11-039-001 Project Manager: Betsy Wilson RECOMMENDED ACTION: Authorization to disburse

More information

CITY COUNCIL AGENDA MEMORANDUM

CITY COUNCIL AGENDA MEMORANDUM To: Mayor and City Council From: Charles Ozaki, City and County Manager Prepared By: Kevin Standbridge, Deputy City and County Manager Katie Allen, City and County Engineer David Shinneman, Community Development

More information

7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS

7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS 7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS The Planning and Economic Development Committee recommends the adoption of the recommendation contained in the following

More information

Spadina Avenue Built Form Study Preliminary Report

Spadina Avenue Built Form Study Preliminary Report STAFF REPORT ACTION REQUIRED Spadina Avenue Built Form Study Preliminary Report Date: July 9, 2014 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

South Bay Metro Green Line Extension

South Bay Metro Green Line Extension South Bay Metro Green Line Extension Spring 2011 Community Meetings 1 2 Agenda Introduction Where We ve Been Project Status What s Next Discussion 3 Where We ve Been Scoping Meetings April/May 2010 4 Meetings

More information

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012 1. Introduction The Federal Aviation Administration (FAA) recommends that airport master plans be updated every 5 years or as necessary to keep them current. The Master Plan for Joslin Field, Magic Valley

More information

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge Public Consultation Centre (PCC) No. 3 Please Sign-in Cambridge City Hall November 21, 2017 2:00 to 8:00pm Preston Memorial Auditorium

More information

I-3 DFW Extension Public Hearing. June 2, 2011

I-3 DFW Extension Public Hearing. June 2, 2011 1 I-3 DFW Extension Public Hearing June 2, 2011 2 DFW LRT Extension Agenda: Introductions Service Plan Amendment Alignment, Grade Separations, Station, Yard Environmental Assessment Environmental Impacts/Mitigation

More information

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO

FINAL. Bicycle/Pedestrian Feasibility Study City of DeBary Dirksen Drive Trail. Prepared For: Volusia County MPO City of DeBary Dirksen Drive Trail FINAL Prepared By: Reynolds, Smith and Hills, Inc. Prepared For: Volusia County MPO September 2007 Table of Contents INTRODUCTION...1 PROJECT PURPOSE AND SCOPE...2 PHYSICAL

More information

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL

COASTAL CONSERVANCY. Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL COASTAL CONSERVANCY Staff Recommendation December 2, 2004 COYOTE HELLYER COUNTY PARK BAY AREA RIDGE TRAIL File No. 04-057 Project Manager: Amy Hutzel RECOMMENDED ACTION: Authorization to disburse up to

More information

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee Memorandum DATE August 10, 2018 CITY OF DALLAS TO Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee SUBJECT Dallas Love Field Master Plan Update On Monday, August

More information

Community Development Committee

Community Development Committee C Community Development Committee For the Metropolitan Council meeting of October 31, 2012 Committee Report Item:2012-316 ADVISORY INFORMATION October 16, 2012 Date Prepared: Subject: Intercity Regional

More information

REPORT TO THE PARKS AND RECREATION COMMISSION rd Avenue NE, Woodinville, WA

REPORT TO THE PARKS AND RECREATION COMMISSION rd Avenue NE, Woodinville, WA CITY OF WOODINVILLE, WA REPORT TO THE PARKS AND RECREATION COMMISSION 17301 133rd Avenue NE, Woodinville, WA 98072 WWW.CI.WOODINVILLE.WA.US To: From: Subject: Honorable Parks and Recreation Commission

More information

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES Recurring topics emerged in some of the comments and questions raised by members of the

More information

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner

PLANNING COMMISSION AGENDA REPORT May 10, Members of the Planning Commission. Joyce Parker-Bozylinski, Contract Planner PLANNING COMMISSION AGENDA REPORT May 10, 2007 TO: FROM: PROPOSAL: APPLICANT: RECOMMENDATION: Members of the Planning Commission Joyce Parker-Bozylinski, Contract Planner Approval of the Calabasas Trails

More information

Cascade River State Park Management Plan Amendment

Cascade River State Park Management Plan Amendment This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Cascade River State

More information

2016 Regional Transportation Alternatives Program (TAP) Grant Application

2016 Regional Transportation Alternatives Program (TAP) Grant Application 2016 Regional Transportation Alternatives Program (TAP) Grant Application PROJECT TITLE: Yelm-Tenino Trail Extension Feasibility Study TRPC use only GENERAL PROJECT INFORMATION Agency or Organization City

More information

ISTRIO MUNICIPALITY OF MUSKOK

ISTRIO MUNICIPALITY OF MUSKOK ISTRIO MUNICIPALITY OF MUSKOK.- -..-.. -.-... -- PLANNING AND ECONOMIC DEVELOPMENT DEPARTMENT 70 PINE STREET, BRACEBRIDGE, ONTARIO PI L 1 N3 Telephone (705) 645-2231 OR 1-800-461-4210 (705 area code) Fax

More information

Project Deliverable 4.1.3d Individual City Report - City of La Verne

Project Deliverable 4.1.3d Individual City Report - City of La Verne Pomona Valley ITS Project Project Deliverable 4.1.3d Individual City Report - City of La Verne Prepared by: April 19, 2002 099017000.1 Copyright 2002, Kimley-Horn and Associates, Inc TABLE OF CONTENTS

More information

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012

US 83 Relief Route. City of La Joya City of Peñitas Hidalgo County. November 15, 2012 US 83 Relief Route City of La Joya City of Peñitas Hidalgo County November 15, 2012 TxDOT Mission: Work with others to provide safe and reliable transportation solutions for Texas. Public Meeting Agenda

More information

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS

3.0 LEARNING FROM CHATHAM-KENT S CITIZENS 3.0 LEARNING FROM CHATHAM-KENT S CITIZENS An important aspect in developing the Chatham-Kent Trails Master Plan was to obtain input from stakeholders and the general public. Throughout the course of the

More information

Arvidson, Adam R. Adam,

Arvidson, Adam R. Adam, Arvidson, Adam R. From: Andrew Hestness Sent: Wednesday, May 18, 2016 5:39 PM To: Arvidson, Adam R. Cc: Renee Spillum; Schroeder, Michael Subject: RE: Park Dedication Attachments: FranklinPlan - Bystrom

More information

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer)

COMMUNICATIONS DEPARTMENT (Lisa Belsanti, Director) (Joshua Schare, Public Information Officer) CITY COUNCIL UNFINISHED BUSINESS AUGUST 21, 2017 SUBJECT: INITIATED BY: SUNSET STRIP ENTERTAINMENT SHUTTLE - PILOT PROGRAM HUMAN SERVICES & RENT STABILIZATION DEPARTMENT (Elizabeth Savage, Director) 'fj1f'..

More information

ROAD AND TRAIL PROJECT APPROVAL

ROAD AND TRAIL PROJECT APPROVAL ROAD AND TRAIL PROJECT APPROVAL www.marincountyparks.org Marin County Parks, 3501 Civic Center Dr, Suite 260, San Rafael, CA 94903 DATE: July 12, 2017 PRESERVE: Gary Giacomini Open Space Preserve PROJECT:

More information

Figure 1: Little Dry Creek Trail Crossing

Figure 1: Little Dry Creek Trail Crossing Figure 1: Little Dry Creek Trail Crossing Figure 2: Little Dry Creek Trail Crossing Northwest Rail Environmental Evaluation Temporary Trail Detour Concurrence Form Adams County, Little Dry Creek Trail

More information

The Baker/Carver Regional Trail is intended to

The Baker/Carver Regional Trail is intended to Section V Design Guidance The Baker/Carver Regional Trail is intended to safely accommodate 183,000 annual visits, an array of non-motorized uses, a variety of skill levels, and persons with special needs.

More information

Construction Staging Adelaide Street West

Construction Staging Adelaide Street West REPORT FOR ACTION Construction Staging Adelaide Street West Date: October 6, 2016 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District

More information

Memorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS

Memorandum. Pauline Medrano Mitchell Rasansky Steve Salazar. Power Transmission Lines in the Trinity River Corridor Follow-up CITY OF DALLAS Memorandum CITY OF DALLAS DATE April 18, 2008 TO Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Mayor Pro Tern Dr. Elba Garcia (Vice-Chair) Deputy Mayor Pro Tern Dwaine Caraway

More information

Memorandum / Letter of Intent

Memorandum / Letter of Intent VERONA WAUKESHA KENOSHA APPLETON WESTON Memorandum / Letter of Intent To: Adam Sayre, Director of Planning & Development, City of Verona From: Kevin Yeska, JSD Professional Services, Inc. www.jsdinc.com

More information

Welcome to the future of Terwillegar Park a Unique Natural Park

Welcome to the future of Terwillegar Park a Unique Natural Park Welcome to the future of Terwillegar Park a Unique Natural Park 1 Introduction The Terwillegar Park Concept Plan study will develop an overall concept plan, management objectives and development guidelines

More information

Fuller/Fuller Heights Road Improvements

Fuller/Fuller Heights Road Improvements Fuller/Fuller Heights Road Improvements Total Project Cost - $4.4M Project Description This project will construct a mini-roundabout at the intersection of Fuller Heights Road and Old Triangle Road to

More information

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan.

Business Item No XXX. Proposed Action That the Metropolitan Council approve the Coon Creek Regional Trail Master Plan. Business Item No. 2015-XXX Metropolitan Parks and Open Space Commission Meeting date: July 7, 2015 For the Community Development Committee meeting of July 20, 2015 For the Metropolitan Council meeting

More information

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018

Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Preferred Recreation Recommendations Stemilt-Squilchuck Recreation Plan March 2018 Below are the recommended recreation ideas and strategies that package together the various recreation concepts compiled

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950 Date: February 26,

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

Northwest Corridor LRT Line to Irving/DFW

Northwest Corridor LRT Line to Irving/DFW Northwest Corridor LRT Line to Irving/DFW AGENCY SCOPING May 25, 2005 NW to Irving/DFW Agenda: Introductions Project Development Process Project Update Federal Involvement Scoping Project Schedule Decisions

More information

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION Three Sisters Road: Abandonment No. AB740 MCPB Item No. 11 Date: 5-1-14 Katherine Holt, Senior Planner,

More information

White Mountain National Forest Saco Ranger District

White Mountain National Forest Saco Ranger District United States Department of Agriculture Forest Service White Mountain National Forest Saco Ranger District 33 Kancamagus Highway Conway, NH 03818 Comm: (603) 447-5448 TTY: (603) 447-3121 File Code: 1950

More information

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel: Sub:Selection of Consultants for preparation of eco-tourism management plan forvedaranyam area in Tamil Nadu. ICZMP (Integrated Coastal Zone Management Project) Credit No. 4765 0 IN Amendment #1 The TOR

More information

Concord Road Interchange. Standard hours of work

Concord Road Interchange. Standard hours of work Artist impression of the Concord Road interchange, Concord - concept only WestConnex s M4 East will extend the M4 Motorway with two new 5.5 kilometre tunnels from Homebush to Haberfield, providing a bypass

More information

Becker County Trail Routing Feasibility Study

Becker County Trail Routing Feasibility Study 2016 Becker County Trail Routing Feasibility Study CONNECTING DETROIT MOUNTAIN AND MOUNTAIN VIEW RECREATIONAL AREA TO THE HEARTLAND TRAIL BECKER COUNTY ULTEIG ENGINEERS Contents Acknowledgements...2 INTRODUCTION...3

More information

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT HRTPO Board Meeting March 21, 2013 Agenda ITEM #9: HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT Congestion at the Hampton Roads Bridge-Tunnel (HRBT) on I-64 has long been identified as a problem

More information

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk

STAGE 2 & 3 Pavement reconstruction within viaduct footprint, pavement widening and resurfacing N/S of viaduct footprint, sidewalk STAGE 1 Viaduct removal, deck replacement on the River Bridge, and approach of the Chicago River Bridge north to Roscoe) Maintain local access roadways - 1 lane in each direction A signed alternate route

More information

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee

Expropriation of a portion of 5795 Yonge Street for public street purposes. Government Management Committee GM13.18 STAFF REPORT ACTION REQUIRED Expropriation of a portion of 5795 Yonge Street for public street purposes Date: May 25, 2016 To: From: Wards: Reference Number: Government Management Committee Chief

More information

AGENDA ITEM I-6 Public Works

AGENDA ITEM I-6 Public Works AGENDA ITEM I-6 Public Works STAFF REPORT City Council Meeting Date: 8/6/2018 Staff Report Number: 18-150-CC Informational Item: Update on the Willow Road and highway 101 interchange construction, upcoming

More information

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report

Susitna-Watana Hydroelectric Project (FERC No ) Recreation Resources Study Study Plan Section Study Implementation Report (FERC No. 14241) Recreation Resources Study Study Plan Section 12.5 2014 Study Implementation Report Prepared for Prepared by AECOM November 2015 TABLE OF CONTENTS 1. Introduction... 4 2. Study Objectives...

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: March 23, 2018 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 4/10/18 Board Meeting: San Francisco Freeway Corridor Management Study Update

More information

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No.

Committee Report. Community Development Committee For the Metropolitan Council meeting of August 12, Business Item No. Committee Report Business Item No. 2015-168 Community Development Committee For the Metropolitan Council meeting of August 12, 2015 Subject: Coon Creek Regional Trail Master Plan, Anoka County Proposed

More information

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts Macleod Trail Corridor Study Welcome Macleod Trail Corridor Study Open House Presentation of Proposed Design Concepts Study Purpose Develop a corridor plan for Macleod Trail that aligns with The City s:

More information

Committee. Presentation Outline

Committee. Presentation Outline CW-33-15 11/9/2015 Community and Corporate Services Committee November 10, 2015 1 Presentation Outline Background Vision and Objectives Study Process and Timeline Public and Stakeholder Engagement Organization

More information

Mt. Hood National Forest

Mt. Hood National Forest United States Department of Agriculture Forest Service Mt. Hood National Forest Zigzag Ranger District 70220 E. Highway 26 Zigzag, OR 97049 503-622-3191 Fax: 503-622-5622 File Code: 1950-1 Date: June 29,

More information

crrv OF DALLAS Memorandum Trinity River Corridor Project Update On Recreation

crrv OF DALLAS Memorandum Trinity River Corridor Project Update On Recreation Memorandum OATE December 8, 2011 crrv OF DALLAS TO Trinity River Corridor Project Committee Members: Vonciel Jones Hill (Chair) Linda Koop (Vice Chair), Monica Alonzo, Scott Griggs, Angela Hunt, Delia

More information

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting

MEMORANDUM. FROM: John A. Bishop, AICP, Assistant Director - Transportation. May 22, 2017 Transportation Committee Meeting COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Transportation Committee FROM: John A. Bishop, AICP, Assistant Director - Transportation

More information

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East

URBAN DESIGN REPORT. Proposed Residential Development, Old Church Road, Caledon East Proposed Residential Development, Old Church Road, Caledon East TABLE CONTENTS: 1.0 DEVELOPMENT 1.1 Introduction-Analysis of Guiding Principles and Documents 1.2 Community Design and Architectural Design

More information

SECTION 106 ACTIVITIES ANNUAL REPORT

SECTION 106 ACTIVITIES ANNUAL REPORT SECTION 106 ACTIVITIES ANNUAL REPORT FOR THE YEAR ENDING DECEMBER 31, 2014 Metropolitan Washington Airports Authority 198 Van Buren Street, Suite 300 Herndon, Virginia 20170 JANUARY 2015 Introduction The

More information

Legal Notice. Columbus and Franklin County Metro Parks Request for Statement of Qualifications (RFQ): Professional Design and Engineering Services

Legal Notice. Columbus and Franklin County Metro Parks Request for Statement of Qualifications (RFQ): Professional Design and Engineering Services Legal Notice Columbus and Franklin County Metro Parks Request for Statement of Qualifications (RFQ): Professional Design and Engineering Services Olentangy River Trail Connector Public Notice: The Columbus

More information

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017

Thornton Water Project. Larimer County Route Study and Project Update September 12, 2017 Thornton Water Project Larimer County Route Study and Project Update September 12, 2017 Purpose of Meeting Provide information on the Thornton Water Project Present the results of the pipeline routing

More information

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY

(DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY (DRAFT) AFI REDUCED VERTICAL SEPARATION MINIMUM (RVSM) RVSM SAFETY POLICY 26 May 04 TABLE OF CONTENTS CONTENTS... PAGE SECTION 1: INTRODUCTION...3 SECTION 2: RVSM OPERATIONAL CONCEPT...3 SECTION 3: AFI

More information

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE

4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE 4 VIVA PHASE 2 YONGE STREET - Y2, AND HIGHWAY 7 - H3 CORRIDORS PRELIMINARY ENGINEERING UPDATE The Rapid Transit Public/Private Partnership Steering Committee recommends the following: 1. The presentation

More information

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is considering options for improving surface access and connectivity

More information

AGENCY NAME TRANSPORTATION

AGENCY NAME TRANSPORTATION TRANSPORTATION TRANSPORTATION AGENCY NAME Prince William County FY 2015 BUDGET CIP-TRANSPORTATION 561 Fuller Road/Fuller Heights Road Improvements Total Project Cost - $4.4 M This project will widen Fuller

More information

Union Station Queens Quay Transit Link Study

Union Station Queens Quay Transit Link Study Welcome Union Station in 1899. Image: City of Toronto Archives Union Station today. Image: Camil Rosiak Activity along Queens Quay. Image: Waterfront Toronto For more information or to comment, visit toronto.ca/waterfronttransit

More information

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture United States Department of Agriculture Forest Service Uinta-Wasatch-Cache National Forest Salt Lake Ranger District 6944 South 3000 East Salt Lake City, UT 84121 801-733-2660 File Code: 1950/2300 Date:

More information

Terms of Reference: Introduction

Terms of Reference: Introduction Terms of Reference: Assessment of airport-airline engagement on the appropriate scope, design and cost of new runway capacity; and Support in analysing technical responses to the Government s draft NPS

More information

Sawtooth National Forest Fairfield Ranger District

Sawtooth National Forest Fairfield Ranger District United States Department of Agriculture Forest Service Sawtooth National Forest Fairfield Ranger District P.O. Box 189 Fairfield, ID. 83327 208-764-3202 Fax: 208-764-3211 File Code: 1950/7700 Date: December

More information