1 Management Cairns CAFNEC Submission to the proposed amendments to the Cairns Area Plan of Management Please accept this submission on Behalf of the Cairns and Far North Environment Centre. Regards 19 March 2007 Steve Ryan Campaigner PART A 1. Increased flexibility for 365-day tour operators primarily conducting charter fishing All 365-day operators receive daily access to the Planning Area itself, with a maximum of 50 days anchoring access per year to each Location. Some 365-day operators who primarily conduct single-day fishing charters have advised the GBRMPA that a combination of recent management changes (for example, the Queensland Coral Reef Fin Fish Management Plan and the Great Barrier Reef Marine Park Zoning Plan) together with the existing 50-day to a Location access limitation under this Plan, has led to decreased opportunities. The GBRMPA proposes that these operators have the opportunity to apply for daily access to the General Use (light blue) Zones, Habitat Protection (dark blue) Zones and Conservation Park (yellow) Zones (other than that part of the Conservation Park Zone that is included in a Public Appreciation Special Management Area). It is likely that only a small number of operators would be likely to fall into this category. Amending Instrument Reference p.26, subclause 1.20 (10) Do you support the proposed increased access to the Cairns Planning Area for this style of operation? The decision should be based upon whether access is permitted under the stipulation of the original GBRMP Zoning Plan. Furthermore, if there is spatial management data that suggests that those zones specified as being accessible for charter fishing also require limits placed on the amount of time that access is permitted for fishing activities, then there needs to be restrictions such as are in place (existing 50-day to a Location). The decision must be made with regard to the research informing the plan, not on operators wishes. If the Marine Park can not be seen to be fairly managed like this, then it may be necessary to employ other measures, such as the designation of more Green Zones. Cairns and Far North Environment Centre Inc. PO Box 323N, North Cairns, Qld Ph: (07) Fax: (07) Mob: campaign@cafnec.org.au Web:

2 2. Providing for extra moorings (as required) The Plan currently caps the number of moorings at each Location (refer to Schedule 6). The GBRMPA has been asked to consider allowing the installation of a heli-pontoon in the Cairns Area which would require the use of a mooring. Situations may also arise where additional moorings at a site may be of environmental benefit. It is proposed to allow up to 20 additional moorings in the Planning Area to be allocated as required. These moorings would be subject to the development of site plans (including public comment with all interest groups) and, if found to be appropriate, would be allocated via an Expression of Interest process. Amending Instrument Reference- p.21, subclause 1.16 (5) Do you support the proposed amendment to provide for up to 20 additional moorings in the Cairns Planning Area? There is a need for GBRMPA to come to a final decision on limits to growth regarding the usage of the reef. CAFNEC recognises that there is a current need for a number of new moorings, but does endorse the 20 proposed new moorings which seemingly matches the number of possible new operations under the existing PoM. Hence we recommend: A. Allocate only 10 moorings using a tiered approach to allocation: the heli-pontoon in the Ribbon Reef Sector (for safety and operational reasons); a maximum of 4 in the Ribbon Reef and Offshore Port Douglas Sectors; a maximum of 4 moorings in the Offshore Cairns and South Offshore Cairns Sector in locations where operators have options restricted for different aspect winds; and the remainder spread evenly across the other sectors. All allocations are to be subject to a transparent process of expressions of interest, public consultation and impact assessment considering how these integrate into the GBRMPA management aspirations for the World Heritage Area. ie as the agency managing the WHA, GBRMPA needs to be mindful of the need to preserve and improve the Area s natural heritage values. B. Instead of allocating additional moorings, GBRMPA should establish a system where-by existing moorings could be shared. C. For the recommended ten moorings, restrict the usage and install a management regime where the tackle is removed when usage is not permitted (other than for the medi-vac heli-pontoon). The time frame for which tackle is removed should be based on research suggesting what length of time it takes for the sites coral cover and co-inhabiting species to regenerate. D. Conduct an overall assessment of usage within the Cairns PoM and commit to an absolute upper-capped limit to the number of moorings on the Reef (which is not negotiable). 2

3 3. Increasing the maximum group size at Flynn Reef and Pellowe Reef Every location in the Cairns Area has been defined for low, moderate or intensive-use, and maximum group sizes apply to all users when visiting a Location (see Schedule 4). Flynn Reef and Pellowe Reef are both Moderate-Use Locations and currently have a maximum group size of 60 people. In 2004, a list of sites were selected (see Schedule 4) to allow up to 100 people if operating to a mooring. It is proposed to amend the Plan to allow operators to carry up to 100 people to Flynn Reef and Pellowe Reef if operating to a mooring. Amending Instrument Reference- p.49, Schedule 6A Do you support the proposed increase in group size to a mooring for Flynn Reef and Pellowe Reef? In relation to protected areas management there is research that supports the concentration of nature based recreation in certain areas as a method of containing and managing impacts. If there is an increase in the visitation numbers at Flynn and Pellowe Reefs this may simply increase the impacts across all the sites. Increasing the usage from Medium to Heavy usage allows for almost a doubling of the usage at those sites. A. Before the GBRMPA goes ahead with decisions such as these, they need to be able to provide the research as to what impacts occur when sites are upgraded from Medium to Heavy usage areas. Science (that is the present condition of the site and what it takes for coral colonies and associated species to regenerate) needs to determine the frequency and duration of use. B. Pellowe - heavier usage of this site would require an impact assessment to determine the present condition and to gain a better understanding of the impacts of upgrading to a Heavy Usage categorisation. C. The poor condition of Flynn Reef could suggest the need for a limited usage management regime to allow the site to rest and for coral to recover and recolonise. For example Medium to Heavy usage could be rotated over a rostered time frame as informed by research. D. If moorings for northerly winds are required, only open up those specific existing moorings for the time when northerlies dominate - not the whole reef. E. GBRMPA to consider the style of usage at these sites when determining the impacts of changing the usage (eg intro divers, poor swimmers/snorkellers) 3

4 4. Children under four to not be included in group size limits Currently children under four years of age are not being counted for the purposes of the Environmental Management Charge; that is they are free of charge. The Tourism Industry has requested that for administrative purposes, children under four also don t get counted when calculating group sizes. Amending Instrument Reference- p.31, subclause 2.1 Do you support that children under four years of age not be included when calculating group sizes? Children under the age of four generate minimal revenue for GBRMPA or operators. They also have a very low usage capacity of the reef. It is fair not to include them in calculating group sizes. 5. Rewrite of part 1 Part 1 of the Plan outlines the values, issues and management strategies for the Planning Area. It is proposed to amend the Plan by replacing Part 1 with an updated version that explains the intent and provision of the Plan and has been edited to update or remove out-of-date information. See the website ( for a copy of the proposed Part 1. Do you have any comments on the updated Part 1? No 6. Minor technical and grammatical amendments A number of minor technical and grammatical changes are proposed. These will not alter the existing intent of the Plan. The following minor amendments are proposed: Move cruise ship anchorages from the Plan to the Great Barrier Reef Marine Park Regulations Move the enforcement provisions relating to whales from the Plan to the Great Barrier Reef Marine Park Regulations The Policy on Whale and Dolphin Conservation in the Great Barrier Reef Marine Park is also being reviewed. 6.3 Clause 2.19 of the Plan prevents the Authority from granting a permit that is inconsistent with the Plan. Additional enforcement provisions relating to the Authority s ability to grant and convert permits are better placed in Part 1 of the Plan. 6.4 References to traditional inhabitants to be changed to Traditional Owners to be consistent with the Zoning Plan. 6.5 Remove clause 2.16 that refers to collecting and fishing in Lizard Island Locality 1 and replace it with a Special Management Area under the Great Barrier Reef Marine Park Regulations Move East Hope Island to a Group A Sensitive Location. East Hope Island was included as a Group B Sensitive Location to address transitional permitting arrangements. These have now been completed and East Hope Island can be returned to a Group A 4

5 Sensitive Location. 6.7 Update the datum of all geographic co-ordinates from AGD66 to GDA94 to comply with Commonwealth Government requirements. Where this causes a significant change to a boundary, for example a setting, the description of that setting will be adjusted to maintain the original intent. 6.8 Remove ambiguity regarding the need for cruise ships that are regional tour operations to book to access the Planning Area. Cruise ship operations with endorsements for 365-day access to the Planning Area will not need to book to access the Planning Area but will be required to book to access a cruise ship anchorage. 6.9 Move the map of the Planning Area to the Schedule. Update references from private moorings to permitted moorings. Insert Chinaman Reef into Schedule 4 as a Moderate Use Location in the Offshore Port Douglas Sector. This change was inadvertently omitted in a previous amendment. The definition of vessel length is to refer directly to the definition contained in the Great Barrier Reef Marine Park Act This will ensure that the definition remains consistent across the Marine Park. Activities in the Low Isles Locality a) Insert exclusions to Plan provisions for management and permitted research activities at Low Isles. As Low Isles is a Commonwealth Island, the provisions of the Plan apply to the island as well. It was not intended that the provisions of the Plan would capture activities associated with the residence and research station. b) Include hull cleaning as an activity that cannot be conducted (GBRMPA currently specify hull scraping and hull painting). Definitions in Schedule 9 have been updated to complement the redrafting of Part 1 and the datum conversion Do you have any comments on any of the above technical and grammatical amendments? No 5

6 PART B 7. Proposed changes at Upolu Cay The GBRMPA is considering allowing the permanent mooring of glass bottom boats at Upolu Cay for operational and safety reasons. Since 1992 Upolu Cay has been managed to be free of structures1. The objective of the No Structures Policy is to ensure that some areas of the Great Barrier Reef remain: 1 In a natural state, largely unaltered by human works 2 Free from structures and permanently-moored facilities, except for approved vessel moorings, approved management, research and monitoring facilities and approved navigational markers which are essential for the protection, wise use, understanding and enjoyment of the Marine Park. Allowing permanent mooring of glass bottom boats would not require an amendment to the Cairns Area Plan of Management, however, it would be a departure from the way in which Upolu Cay has been managed. The GBRMPA is therefore seeking feedback on the issue of whether glass bottom boats should be allowed to be permanently moored at Upolu Cay. View a map of the No Structure area at Upolu Cay. Do you support the permanent mooring of glass bottom boats at Upolu Cay? The area is already a heavy usage area by recreational users. Allowing permanent mooring of glass-bottom boats at Upolu Cay would degrade the visual amenity of the site and add to over crowding on busy days. Operators already have good access to the site and need to be mindful of others in relation to their operations. It could also increase the possibility of unmonitored pollution and for an accidental free-drifting boat to damage the reef. 6

LATENCY OF TOURISM PERMITS IN THE GREAT BARRIER REEF MARINE PARK AUDIT FOR THE YEAR 2000

LATENCY OF TOURISM PERMITS IN THE GREAT BARRIER REEF MARINE PARK AUDIT FOR THE YEAR 2000 LATENCY OF TOURISM PERMITS IN THE GREAT BARRIER REEF MARINE PARK AUDIT FOR THE YEAR 2 Tourism and Recreation Group December 2 DISCLAIMER The information provided in this Audit is for information and discussion

More information

Great Barrier Reef Ports Strategy Have your say

Great Barrier Reef Ports Strategy Have your say Great Barrier Reef Ports Strategy Have your say Written submission form The Great Barrier Reef Ports Strategy presents the vision and principles guiding the Queensland Government s approach to future port

More information

Questions and Answers Cape Town Agreement of 2012

Questions and Answers Cape Town Agreement of 2012 Questions and Answers Cape Town Agreement of 2012 1. What is the Cape Town Agreement of 2012? The Cape Town Agreement of 2012 (the Agreement) sets internationally agreed minimum standards for the design,

More information

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan.

That Council endorses the attached submission on the Reef 2050 Long-term Sustainability Plan. 4 ORDINARY MEETING 22 OCTOBER 2014 1 REEF 2050 LONG-TERM SUSTAINABILITY PLAN D Walton 8/24/18-01 #4506842v2 RECOMMENDATION: That Council endorses the attached submission on the Reef 2050 Long-term Sustainability

More information

CAIRNS A STRATEGIC PORT

CAIRNS A STRATEGIC PORT CAIRNS A STRATEGIC PORT CURRENT ISSUES AS AT 6 JUNE 2018 Cairns Port Development Inc. is not-for-profit and community based. We live and work beside the Great Barrier Reef, applying world's best standards

More information

Waterways Management Program

Waterways Management Program Waterways Management Program 2017-2021 Table of Contents GCWA WATERWAYS MANAGEMENT PROGRAM 2017-2021 3 Gold Coast Waterways Management Strategy 2014-2023 3 Waterways Authority Funding & Investment 4 Table

More information

Application for a Research Cruise within Waters under Ireland s Jurisdiction

Application for a Research Cruise within Waters under Ireland s Jurisdiction Ref.id.: KS&SMS-5-4-10 Skjema Side 1 av 12 Department of Foreign Affairs Application for a Research Cruise within Waters under Ireland s Jurisdiction Note: This form must be delivered, through official

More information

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION

SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION SLOTS AND BUSINESS AVIATION - THE LEGAL POSITION John Balfour Clyde & Co EUACA SEMINAR ON BUSINESS AVIATION 30 September 2009, Amsterdam THE SLOT REGULATION - SCOPE The Regulation is basically concerned

More information

Summary of Public Submissions Received on

Summary of Public Submissions Received on Summary of Public Submissions Received on NPRM 15-01 Omnibus 2014 Prepared by DENISE RATIETA and PAUL ELTON 17 August 2015 Table of Contents General... 1 Summary of Submissions... 1 Definition of controlled

More information

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1. 54 PLANNING AND ECONOMIC COMMITTEE 8 JULY 2015 3 SUSTAINABLE PORTS DEVELOPMENT BILL Neil Quinn 1/58/14 #4771706 RECOMMENDATION: That Council endorses the Submission made to the Infrastructure, Planning

More information

Millport Charrette. Moving forward What do you think? Where are the opportunities? What are the priorities?

Millport Charrette. Moving forward What do you think? Where are the opportunities? What are the priorities? Millport Charrette North Ayrshire Council invite you to share your views on marine tourism opportunities at Millport. North Ayrshire Council s Economy and Communities Team is keen to further develop Millport

More information

Tourism Partnerships Supporting Conservation. Presented by Karen Vohland, Director, Tourism and Stewardship Great Barrier Reef Marine Park Authority

Tourism Partnerships Supporting Conservation. Presented by Karen Vohland, Director, Tourism and Stewardship Great Barrier Reef Marine Park Authority Tourism Partnerships Supporting Conservation Presented by Karen Vohland, Director, Tourism and Stewardship Great Barrier Reef Marine Park Authority The Great Barrier Reef is an amazing place and its worth

More information

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector

easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector easyjet response to the European Commission consultation on the aviation package for improving the competitiveness of the EU aviation sector Introduction easyjet started flying in 1995. Since then we have

More information

Buck Island Reef National Monument News Release Date: Immediate Contact: Joel Tutein, Superintendent, x 222

Buck Island Reef National Monument News Release Date: Immediate Contact: Joel Tutein, Superintendent, x 222 National Park Service U.S. Department of the Interior www.nps.gov 2100 Church Street, # 100 Christiansted, VI 00820 News Release Date: Immediate Contact: Joel Tutein, Superintendent, Joel.Tutein@nps.gov

More information

Appendix A BC Provincial Parks System Goals

Appendix A BC Provincial Parks System Goals Appendix A BC Provincial Parks System Goals The British Columbia Provincial Parks System has two mandates: To conserve significant and representative natural and cultural resources To provide a wide variety

More information

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96

> Aircraft Noise. Bankstown Airport Master Plan 2004/05 > 96 Bankstown Airport Master Plan 2004/05 > 96 24.1 Why Is Aircraft Noise Modelled? Modelling of the noise impact of aircraft operations has been undertaken as part of this MP. Such modelling is undertaken

More information

Curriculum Vitae - Tony Charters AM

Curriculum Vitae - Tony Charters AM Curriculum Vitae - Tony Charters AM Education Bachelor of Science (Environmental Studies) School of Australian Environmental Studies Griffith University Major subject areas: land use planning, economics,

More information

City of Sydney Convenience Store Development Control Plan 2004

City of Sydney Convenience Store Development Control Plan 2004 City of Sydney Convenience Store Development Control Plan 2004 Table of Contents 1 Introduction 1 1.1 Citation 1 1.2 Area to which the plan applies 2 1.3 Commencement 1 1.4 Relationship to other environmental

More information

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT

8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT 8 CROSS-BOUNDARY AGREEMENT WITH BRAMPTON TRANSIT The Transportation Services Committee recommends the adoption of the recommendations contained in the following report dated May 27, 2010, from the Commissioner

More information

The Economics of Ecosystems and Biodiversity on Bonaire. Tourism value of ecosystems in Bonaire

The Economics of Ecosystems and Biodiversity on Bonaire. Tourism value of ecosystems in Bonaire The Economics of Ecosystems and Biodiversity on Bonaire Tourism value of ecosystems in Bonaire 2 The Economics of Ecosystems and Biodiversity on Bonaire Tourism value of ecosystems in Bonaire This study

More information

MEDIUM SIZE STADIUM STRATEGY

MEDIUM SIZE STADIUM STRATEGY MEDIUM SIZE STADIUM STRATEGY Approved by City Council on March 12, 2014 This plan is available online at www.edmonton.ca I. Executive Summary... 4 II. Medium Size Stadium Strategy... 5 1. Background...

More information

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02. Hutt Valley Tramping Club PO Box 30 883 LOWER HUTT 5045 Tukituki Catchment Proposal Environmental Protection Agency Private Bag 63 002 WELLINGTON 6140 29 July 2013 Submission on the Tukituki Catchment

More information

Frequently Asked Questions

Frequently Asked Questions What is VBS? The Vehicle Booking System is a slot allocation system designed to manage the flow of traffic in and out of the terminal. Why have a VBS? The idea of the VBS is to smooth the peaks and troughs

More information

Short-Haul Operations Route Support Scheme (RSS)

Short-Haul Operations Route Support Scheme (RSS) Short-Haul Operations Route Support Scheme (RSS) Valid from January 1 st, 2018 1: Introduction: The Shannon Airport Authority is committed to encouraging airlines to operate new routes to/from Shannon

More information

Cooloolabin Dam Recreation Management Discussion Paper. November 2013

Cooloolabin Dam Recreation Management Discussion Paper. November 2013 Cooloolabin Dam Recreation Management Discussion Paper November 2013 Contents November 2013... 1 Background... 3 Overview of Cooloolabin Dam... 6 Weed Management... 7 Cultural Heritage... 7 Commercial

More information

CHARTERS. Great Barrier Reef Islands Harbour Cruises CAIRNS AUSTRALIA

CHARTERS. Great Barrier Reef Islands Harbour Cruises CAIRNS AUSTRALIA CHARTERS Great Barrier Reef Islands Harbour Cruises CAIRNS AUSTRALIA Reef Magic Cruises home port of Cairns is the gateway to Australia s Great Barrier Reef. Chartering one of our fast motor catamarans

More information

F6. Coastal Ferry Terminal Zone

F6. Coastal Ferry Terminal Zone F6. Coastal Ferry Terminal Zone F6.1. Zone description The purpose of the Coastal Ferry Terminal Zone is to provide for the integrated and efficient operation and development of ferry terminal facilities.

More information

Tourism 201 CHAPTER 10

Tourism 201 CHAPTER 10 Tourism 201 CHAPTER 10 202 Doncaster Unitary Development Plan Tourism 203 Tourism INTRODUCTION 10.1 The increasing importance of tourism is recognised in the UDP by having its own chapter. The benefits

More information

Australian Network of Environmental Defender s Offices

Australian Network of Environmental Defender s Offices Australian Network of Environmental Defender s Offices Submission on draft Regulation Impact Statement to ban disposal of capital dredge spoil material in the Great Barrier Reef Marine Park 27 March 2015

More information

AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012

AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012 AIRPORT EMERGENCY CONTINGENCY PLAN TEMPLATE V 3.3 April 27, 2012 Section 42301 of the FAA Modernization and Reform Act of 2012 1 (the Act) requires airport operators to submit emergency contingency plans

More information

AIPPI Study Question - Partial designs

AIPPI Study Question - Partial designs Study Question Submission date: May 8, 2018 Sarah MATHESON, Reporter General Jonathan P. OSHA and Anne Marie VERSCHUUR, Deputy Reporters General Yusuke INUI, Ari LAAKKONEN and Ralph NACK, Assistants to

More information

Member s report on activities related to ICRI

Member s report on activities related to ICRI Member s Report INTERNATIONAL CORAL REEF INITIATIVE (ICRI) 32 nd General Meeting 7-9 December 2017 Nairobi, Kenya Member s report on activities related to ICRI MALAYSIA Reporting period November November

More information

Planning for island visitor use and expectations in the Great Barrier Reef World Heritage Area

Planning for island visitor use and expectations in the Great Barrier Reef World Heritage Area Planning for island visitor use and expectations in the Great Barrier Reef World Heritage Area Island Arks Symposium - Daydream Island 7 December 2009 Damien Head Queensland Parks and Wildlife Service

More information

Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC

Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC Freshwater Neighbourhood Plan Examination Reply to request for further information and questions from the Examiner to the Parish Council and IWC 1. Please would IWC confirm the date the Plan area was designated.

More information

To ensure the sustainable provision of safe, reliable, friendly and efficient passenger and cargo shipping services for the residents of Sark and

To ensure the sustainable provision of safe, reliable, friendly and efficient passenger and cargo shipping services for the residents of Sark and To ensure the sustainable provision of safe, reliable, friendly and efficient passenger and cargo shipping 1 1) Introduction 2) IOSS financial performance 2015-16 and 2016-17 Year to Date 3) IOSS operational

More information

DAA Response to Commission Notice CN2/2008

DAA Response to Commission Notice CN2/2008 22 nd September 2008 DAA Response to Commission Notice CN2/2008 1 DAA welcomes the opportunity to respond to the Commission notice CN2/2008 which discusses the interaction between the regulations governing

More information

EASA FTL 2016: Examples of ORO.FTL.110 Operator Responsibilities. 04-Dec-2015

EASA FTL 2016: Examples of ORO.FTL.110 Operator Responsibilities. 04-Dec-2015 EASA FTL 2016: Examples of ORO.FTL.110 Operator 04-Dec-2015 The following aid has been developed to provide some suggestions for meeting Operator responsibilities. Not all examples have been presented,

More information

Draft airspace design guidance consultation

Draft airspace design guidance consultation Draft airspace design guidance consultation Annex 2: CAP 1522 Published by the Civil Aviation Authority, 2017 Civil Aviation Authority Aviation House Gatwick Airport South West Sussex RH6 0YR You can copy

More information

Land Transport Rule Work Time and Logbooks Amendment 2017 Rule 62001/7

Land Transport Rule Work Time and Logbooks Amendment 2017 Rule 62001/7 DISALLOWABLE INSTRUMENT WELLINGTON, NEW ZEALAND PURSUANT to sections 152, 158, and 160(4) of the Land Transport Act 1998, and after having had regard to the criteria specified in section 164(2) of that

More information

Robinson Helicopter Fleet Consultation Document

Robinson Helicopter Fleet Consultation Document Consultation Document Civil Aviation Authority Table of Contents Introduction... 1 Background... 1 The CAA's review... 2 What the CAA proposes to do... 3 How the CAA proposes to bring these changes into

More information

At a meeting of the Development Management Committee held on 22 February 2018

At a meeting of the Development Management Committee held on 22 February 2018 1 HAVANT BOROUGH COUNCIL At a meeting of the held on Present Councillor Keast (Chairman) Councillors Buckley, Hughes, Keast, Perry, Satchwell, Lloyd and Guest (Standing Deputy) 105 Apologies for Absence

More information

PURPOSE AND NEED. Introduction

PURPOSE AND NEED. Introduction Public Scoping: Allocation of Recreation Capacity for Commercial Outfitter Guide Services on North Kruzof Island Trails (Kruzof Island Outfitter Guide) PURPOSE AND NEED Introduction The U.S. Department

More information

Dear Reviewing Officer:

Dear Reviewing Officer: From: To: Subject: Date: Attachments: Peter Hart FS-r02admin-review Objection Re: Maroon Bells Snowmass Wilderness Overnight Visitor Use Management Plan Monday, August 14, 2017 8:38:01 PM Final Objection

More information

Policy. Huts, Cabins and Lodges in BC Provincial Parks

Policy. Huts, Cabins and Lodges in BC Provincial Parks Policy Huts, Cabins and Lodges in BC Provincial Parks Federation of Mountain Clubs of BC Version 1.3 Published August 2, 2015 INTRODUCTION The Federation of Mountain Clubs of BC (FMCBC) promotes self-propelled

More information

How should the proposed protected area be administered and managed?

How should the proposed protected area be administered and managed? SPERRGEBIET CONSERVATION PLANNING Questionnaire In big words the main objectives of this questionnaire are to contribute to: 1. finding approaches and mechanism for implementing a multi-use protected area

More information

The Multilateral Agreement on the Liberalization of International Air Transportation

The Multilateral Agreement on the Liberalization of International Air Transportation Seminar prior to the ICAO Worldwide Air Transport Conference Aviation in Transition: Challenges & Opportunities of Liberalization Session 1: The Liberalization Experience The Multilateral Agreement on

More information

Minutes: 25 th September Meeting title/subject: Premium Check-in Areas Consultation. Meeting location: Kuala Lumpur Meeting Room, Compass Centre

Minutes: 25 th September Meeting title/subject: Premium Check-in Areas Consultation. Meeting location: Kuala Lumpur Meeting Room, Compass Centre 25 th September 2013 Meeting title/subject: Premium Check-in Areas Consultation Meeting location: Kuala Lumpur Meeting Room, Compass Centre Present: John Arbuckle (JA) Heathrow Airport Kingsley Mack (KM)

More information

Code of conduct on international travel and invasive alien species

Code of conduct on international travel and invasive alien species Code of conduct on international travel and invasive alien species Riccardo Scalera Programme officer, IUCN/SSC Invasive Species Specialist Group 37th meeting of the Standing Committee of the Bern Convention

More information

Consideration will be given to other methods of compliance which may be presented to the Authority.

Consideration will be given to other methods of compliance which may be presented to the Authority. Advisory Circular AC 139-10 Revision 1 Control of Obstacles 27 April 2007 General Civil Aviation Authority advisory circulars (AC) contain information about standards, practices and procedures that the

More information

Approval of Limited Facilities Camping Interim Policy 1

Approval of Limited Facilities Camping Interim Policy 1 Strategic policy Approval of Limited Facilities Camping Interim Policy Corporate Plan reference: A smart economy A prosperous, high-value economy of choice for business, investment and employment - Strong

More information

The official closing date for the Sault Ste. Marie Locks (U.S.A.) is 2400 hours January 15, 2015.

The official closing date for the Sault Ste. Marie Locks (U.S.A.) is 2400 hours January 15, 2015. SEAWAY NOTICE NO. 11-2014 Closing of the 2014 Navigation Season Mariners are reminded that there is always a possibility that severe climatic conditions may occur during the closing period. Should this

More information

PROTECTED AREAS ZONE - POLICY

PROTECTED AREAS ZONE - POLICY PROTECTED AREAS ZONE - POLICY.1 Introduction The Protected Areas Zone applies to the land depicted on the Ruapehu District Plan Maps as: Amenity Policy Area. Protected Areas - Conservation. (c) Protected

More information

2 THE MASTER PLAN 23

2 THE MASTER PLAN 23 2 THE MASTER PLAN 23 THE MASTER PLAN 2.1 Purpose of the Master Plan A Master Plan provides the airport operator, the Commonwealth, State and Local Governments, the local community, aviation industries

More information

STAFF REPORT ACTION REQUIRED

STAFF REPORT ACTION REQUIRED STAFF REPORT ACTION REQUIRED Proposed Area-Specific Amendment to Chapter 694, Signs, General, with Respect to Ricoh Coliseum and BMO Field and a Portion of Exhibition Place Date: July 23, 2014 To: From:

More information

The Ecology and Economy of Coral Reefs: Considerations in Marketing Sustainability

The Ecology and Economy of Coral Reefs: Considerations in Marketing Sustainability The Ecology and Economy of Coral Reefs: Considerations in Marketing Sustainability Rick MacPherson Director, Conservation Programs Coral Reef Alliance Coral Reefs in Peril: Worldwide Status 2004: 70% of

More information

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC)

Airservices Australia Long Term Pricing Agreement. Discussion Paper April Submission by Australia Pacific Airport Corporation (APAC) Airservices Australia Long Term Pricing Agreement Discussion Paper April 2015 Submission by Australia Pacific Airport Corporation (APAC) Airservices Australia Long Term Pricing Agreement Discussion Paper

More information

Cairns Airport Aircraft Noise Information Report. Quarter (July to September)

Cairns Airport Aircraft Noise Information Report. Quarter (July to September) Cairns Airport Aircraft Noise Information Report Quarter 3 2012 (July to September) 1 Version Control Version Number Detail Prepared by Date 1 - Environment 19 December 2012 Airservices Australia. All

More information

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document

Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document Consumer Council for Northern Ireland response to Department for Transport Developing a sustainable framework for UK aviation: Scoping document Introduction The Consumer Council for Northern Ireland (CCNI)

More information

GUIDANCE FOR THE SAFE OPERATION OF MODEL AIRCRAFT, SMALL-UNMANNED AIRCRAFT AND SMALL UNMANNED SURVEILLANCE AIRCRAFT IN GUERNSEY AND ALDERNEY

GUIDANCE FOR THE SAFE OPERATION OF MODEL AIRCRAFT, SMALL-UNMANNED AIRCRAFT AND SMALL UNMANNED SURVEILLANCE AIRCRAFT IN GUERNSEY AND ALDERNEY GUIDANCE FOR THE SAFE OPERATION OF MODEL AIRCRAFT, SMALL-UNMANNED AIRCRAFT AND SMALL UNMANNED SURVEILLANCE AIRCRAFT IN GUERNSEY AND ALDERNEY 1 Introduction 1.1 This document has been produced by Guernsey

More information

2018 Nelson and Marlborough Airspace Review Initial consultation

2018 Nelson and Marlborough Airspace Review Initial consultation 2018 Nelson and Marlborough Airspace Review Civil Aviation Authority Table of Contents 1. 2018 Nelson and Marlborough airspace review... 1 2. Review process... 1 Scope of review... 1 a) Airways Corporation

More information

CITY CLERK. Toronto-Rochester Fast Ferry - Project Update (Ward 30 Toronto-Danforth)

CITY CLERK. Toronto-Rochester Fast Ferry - Project Update (Ward 30 Toronto-Danforth) CITY CLERK Clause embodied in Report No. 5 of the, as adopted by the Council of the City of Toronto at its meeting held on May 30, 31 and June 1, 2001. 3 Toronto-Rochester Fast Ferry - Project Update (Ward

More information

Recreational Carrying Capacity

Recreational Carrying Capacity 9 th Annual Caribbean Sustainable Tourism Conference Recreational Carrying Capacity Graham C Barrow What is Recreational Carrying Capacity? It s not about fixing absolute numbers of visitors/tourists that

More information

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003

WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION. Montreal, 24 to 29 March 2003 26/2/03 English only WORLDWIDE AIR TRANSPORT CONFERENCE: CHALLENGES AND OPPORTUNITIES OF LIBERALIZATION Montreal, 24 to 29 March 2003 Agenda Item 1: Preview 1.1: Background to and experience of liberalization

More information

Appendix 3-B. Phase 2 - Recent Consultation

Appendix 3-B. Phase 2 - Recent Consultation Appendix 3-B Phase 2 - Recent Consultation PRE COMMONWEALTH EIS PUBLIC COMMENT PERIOD 19 23 March Gladstone s and tour Positive comments on the good level of engagement for the Project Percentage of bauxite

More information

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES

REVALIDATION AND VALIDATION: PROCESSES AND PROCEDURES PROCESS OVERVIEW PROCESS AIMS PROCESS STAGES PROCESS PROCEDURES STAGE 1: BUSINESS PLANNING SCHEDULE STAGE 2: OUTLINE PLANNING PERMISSION STAGE 3: FULL PROPOSAL CONSIDERATION GENERAL PROCEDURES VALIDATION

More information

Airservices Australia

Airservices Australia Submission to Airservices Australia Pricing Structure Options October 2008 The RAAA and its Members The Regional Aviation Association of Australia (RAAA) Pricing Submission to Airservices Australia The

More information

CAIRNS A STRATEGIC PORT

CAIRNS A STRATEGIC PORT CAIRNS A STRATEGIC PORT CURRENT ISSUES AS AT 25 SEPTEMBER 2017 Cairns Port Development Inc. is not-for-profit and community based. We live and work beside the Great Barrier Reef, applying world's best

More information

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand

Part 141. Aviation Training Organisations Certification. CAA Consolidation. 10 March Published by the Civil Aviation Authority of New Zealand Part 141 CAA Consolidation 10 March 2017 Aviation Training Organisations Certification Published by the Civil Aviation Authority of New Zealand DESCRIPTION Part 141 prescribes rules governing the certification

More information

Special nature reserve and ornithological reserve Scope of implementation (local, Local national)

Special nature reserve and ornithological reserve Scope of implementation (local, Local national) Example of good practice From a waste disposal area to a protected area: the example of the Tivat salt flats Category Management; education; tourism Organization Centre for bird protection and monitoring

More information

Changing Patterns of Reef Tourism

Changing Patterns of Reef Tourism Changing Patterns of Reef Tourism Gianna Moscardo, Rebecca Saltzer, Anne Galletly, Adrian Burke & Amy Hildebrandt CRC Reef Research Centre & James Cook University www.reef.crc.org.au Established and supported

More information

Montreal-Lake Ontario section at 12:00 hours on December 31, 2018.

Montreal-Lake Ontario section at 12:00 hours on December 31, 2018. SEAWAY NOTICE NO. 13-2018 Closing of the 2018 Navigation Season - Revised (Cancelled 2018/12/27) Note: In consideration of anticipated conditions at closing, we have revised the closing notice with respect

More information

In this document the following words shall have the following meanings: Airport Coordination Limited, the Coordinator of London City Airport

In this document the following words shall have the following meanings: Airport Coordination Limited, the Coordinator of London City Airport LOCAL RULE 1 ADMINISTRATION OF THE LONDON CITY MOVEMENT CAP 1. POLICY A planning condition applicable at London City Airport limits the number of aircraft movements permitted at London City Airport to

More information

REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I. General provisions Article 1 Objective

REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I. General provisions Article 1 Objective REGULATION No. 990/2017 on the operation of remotely piloted aircraft CHAPTER I General provisions Article 1 Objective This Regulation sets out rules on the operation of remotely piloted aircraft with

More information

15/06/2018. Lord Howe Island Marine Park. Moreton Bay Marine Park. Rottnest Island Conservation Reserve WA

15/06/2018. Lord Howe Island Marine Park. Moreton Bay Marine Park. Rottnest Island Conservation Reserve WA 15/06/2018 Lord Howe Island Marine Park Intro Values Management Legislation Core programs Intro A few islands and a few Marine Parks along the way Moreton Bay Marine Park 3400,000ha 2 million people Ramsar

More information

Submission to. Queenstown Lakes District Council. on the

Submission to. Queenstown Lakes District Council. on the Submission to Queenstown Lakes District Council on the Queenstown Lakes District Proposed District Plan, Section 32 Evaluation, Stage 2 Components October 2017, for Visitor Accommodation Date: 23 Feb 2018

More information

APPLICATION OF THE NO-SPECIAL-FEE SYSTEM IN THE BALTIC SEA AREA

APPLICATION OF THE NO-SPECIAL-FEE SYSTEM IN THE BALTIC SEA AREA CONVENTION ON THE PROTECTION OF THE MARINE ENVIRONMENT OF THE BALTIC SEA AREA HELSINKI COMMISSION - Baltic Marine HELCOM 19/98 Environment Protection Commission 15/1 Annex 19 19th Meeting Helsinki, 23-27

More information

To the Members May Alaska Alternative Planning Criteria (APC)

To the Members May Alaska Alternative Planning Criteria (APC) To the Members May 2012 Alaska Alternative Planning Criteria (APC) As from 14 May 2012, the US Coast Guard (USCG) will require compliance with new Alternative Planning Criteria (APC) for certain vessels

More information

Office of Utility Regulation

Office of Utility Regulation Office of Utility Regulation Competition for 3G Mobile Telecommunications Licence Report on the Consultation Document No: OUR 06/03 February 2006 Office of Utility Regulation Suites B1 & B2, Hirzel Court,

More information

ECOTOURISM. Hill & Mountain Ecosystems

ECOTOURISM. Hill & Mountain Ecosystems ECOTOURISM Hill & Mountain Ecosystems Importance of Hill & Mountain Areas Home to most indigenous populations Provider of essential resources Major source of water supply Centres of culture and indigenous

More information

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION

TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR RESOLUTION DATE: 11 November 2011 SUBJECT: REPORT OF: Proposed making of a Quality Partnership Scheme for the A6 corridor between Manchester and Hazel

More information

Nyheter i EASA NPA om Flygarbetstid (FTL)

Nyheter i EASA NPA om Flygarbetstid (FTL) EASA NPA FTL Nyheter i EASA NPA om Flygarbetstid (FTL) www.easa.europa.eu 1 Definitions Acclimatised A crew member is considered to be acclimatised to the WOCL of the time zone they are in when they have

More information

Penzance Heliport Ltd.

Penzance Heliport Ltd. Penzance Heliport Ltd. Penzance Heliport Ltd is planning to reinstate the popular scheduled helicopter service between Penzance and the Isles of Scilly. To operate the service, it proposes to build a new

More information

QLDC Council 14 December Report for Agenda Item: 13

QLDC Council 14 December Report for Agenda Item: 13 QLDC Council 14 December 2017 Department: Property & Infrastructure Report for Agenda Item: 13 New licence to E-Skate Limited to undertake guided electric skateboard tours along the Frankton Track Purpose

More information

SAFEGUARDING OF AERODROMES. Advice Note 1

SAFEGUARDING OF AERODROMES. Advice Note 1 AIRPORT OPERATORS ASSOCIATION & GENERAL AVIATION AWARENESS COUNCIL supported by CIVIL AVIATION AUTHORITY Working in Co-operation SAFEGUARDING OF AERODROMES Advice Note 1 Safeguarding - An Overview 1. The

More information

A Master Plan is one of the most important documents that can be prepared by an Airport.

A Master Plan is one of the most important documents that can be prepared by an Airport. The Master Plan A Master Plan is one of the most important documents that can be prepared by an Airport. A Master Plan is a visionary and a strategic document detailing planning initiatives for the Airport

More information

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION

A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION A GUIDE TO MANITOBA PROTECTED AREAS & LANDS PROTECTION Manitoba Wildands December 2008 Discussions about the establishment of protected lands need to be clear about the definition of protection. We will

More information

AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011

AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011 AIRSERVICES AUSTALIA DRAFT PRICING NOTIFICATION REGIONAL EXPRESS SUBMISSION TO THE ACCC MAY 2011 1. Introduction This submission is provided to the ACCC by Regional Express Holdings Ltd in response to

More information

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director

RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director RESPONSE TO AIRPORT EXPANSION CONSULTATION 27 MARCH 2018 Submitted online by Helen Monger, Director 1. Expanding Heathrow The expansion of Heathrow will be one of the largest infrastructure projects in

More information

Air Operator Certification

Air Operator Certification Civil Aviation Rules Part 119, Amendment 15 Docket 8/CAR/1 Contents Rule objective... 4 Extent of consultation Safety Management project... 4 Summary of submissions... 5 Extent of consultation Maintenance

More information

CLASS D CONTROLLED AIRSPACE GUIDE

CLASS D CONTROLLED AIRSPACE GUIDE CLASS D CONTROLLED AIRSPACE GUIDE Introduction Norwich International Airport is surrounded by Class D Controlled Airspace (CAS). This airspace is made up of a Control Zone (CTR) and a Control Area (CTA).

More information

Development Watch Inc PO Box 1076, Coolum Beach, QLD, 4573

Development Watch Inc PO Box 1076, Coolum Beach, QLD, 4573 Development Watch Inc PO Box 1076, Coolum Beach, QLD, 4573 ABN 53 627 632 278 www.developmentwatch.org.au 26 June 2013 The Chief Executive Officer Sunshine Coast Council PO Box 76 NAMBOUR QLD 4560 (By

More information

Sustainable Rural Tourism

Sustainable Rural Tourism Sustainable Rural Tourism Tourism: its nature and potential Tourism = multifaceted economic activity + strong social element Definition of tourism by the World Tourism Organisation (WTO): tourism comprises

More information

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Safety Regulatory Oversight of Commercial Operations Conducted Offshore Page 1 of 15 Safety Regulatory Oversight of Commercial Operations Conducted Offshore 1. Purpose and Scope 2. Authority... 2 3. References... 2 4. Records... 2 5. Policy... 2 5.3 What are the regulatory

More information

How to setup your Campground booking system

How to setup your Campground booking system WebReserv Quickstart Guides How to setup your Campground booking system How to set up your campground booking system 1 Introduction WebReserv is a highly configurable booking system. It can be used for

More information

AMPTO SUBMISSION ON GBR STRATEGIC ASSESSMENT. A. Review of Dredging Impacts on the Great Barrier Reef World Heritage Area

AMPTO SUBMISSION ON GBR STRATEGIC ASSESSMENT. A. Review of Dredging Impacts on the Great Barrier Reef World Heritage Area 31 st January 2014 Targeted Crown of Thorns Starfish Control Programme Great Barrier Reef Strategic Assessment Public Consultation Manager GPO Box 668 Brisbane QLD 4001 SUBMISSION ON GBR STRATEGIC ASSESSMENT

More information

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT

PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT PPR REGULATIONS FOR BUSINESS AND GENERAL AVIATION AT EINDHOVEN AIRPORT Eindhoven, September 2017 Contents Scope of application p. 3 Definitions p. 3 Capacity p. 3 Distribution of PPRs p. 4 PPR applications

More information

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue;

1. Purpose and scope. a) the necessity to limit flight duty periods with the aim of preventing both kinds of fatigue; ATTACHMENT A. GUIDANCE MATERIAL FOR DEVELOPMENT OF PRESCRIPTIVE FATIGUE MANAGEMENT REGULATIONS Supplementary to Chapter 4, 4.2.10.2, Chapter 9, 9.6 and Chapter 12, 12.5 1. Purpose and scope 1.1 Flight

More information

Pillar Park. Management Plan

Pillar Park. Management Plan Pillar Park Management Plan January 2014 Pillar Park Management Plan Approved by: Jeff Leahy Regional Director Thompson Cariboo Region BC Parks January 9, 2014 Date Brian Bawtinheimer Executive Director

More information

2009 Muskoka Airport Economic Impact Study

2009 Muskoka Airport Economic Impact Study 2009 Muskoka Airport Economic Impact Study November 4, 2009 Prepared by The District of Muskoka Planning and Economic Development Department BACKGROUND The Muskoka Airport is situated at the north end

More information

MANAGEMENT DIRECTION STATEMENT June, 1999

MANAGEMENT DIRECTION STATEMENT June, 1999 Thompson River District MANAGEMENT DIRECTION STATEMENT June, 1999 for Roche Lake Provincial Park Ministry of Environment Lands and Parks BC Parks Division Table of Contents I. Introduction A. Setting

More information